Bid Notice-Signing - Porter County.pdf
PDF 4 MB Posted
- Attached to
- Signing - Porter County
- Solicitation number
- T -46034-B
- Issued by
- Porter County, Indiana
About this file
This is a Bid Notice and Contract Information Book issued by the Indiana Department of Transportation (INDOT) for a signing project in Porter County. The project involves the installation, replacement, and maintenance of traffic control signs and devices along various roads throughout Porter County. The contract scope includes construction engineering, mobilization and demobilization, clearing right-of-way, maintaining traffic, sign post installation (36,764 linear feet of square Type 1 reinforced anchor base posts), removal of 3,333 existing signs, and installation of 16,551 square feet of 0.080-inch thickness sign sheets and 6,020.7 square feet of 0.100-inch thickness sign sheets. The contract letting date is May 7, 2026, with the proposal submission deadline at 10:00 AM on that date at the Indiana Government Center North in Indianapolis. The project completion date is set for June 30, 2027, with liquidated damages of $2,500 per day for failure to meet the deadline. The contract is located in the LaPorte District and covers Porter County.
The contract is funded through Federal-aid highway programs and is subject to prevailing wage requirements under the Davis-Bacon Act, with wage determination IN20250001 applying. A Disadvantaged Business Enterprise (DBE) goal has been established, though the specific percentage is not specified in the available documentation. The initial payment for clearing right-of-way is limited to a percentage of the original total bid, also unspecified in the excerpted materials. The consulting firm managing the project is DLZ Indiana, LLC (contact: Trisha Nugent, 219-836-5884), with the INDOT Project Manager being John Krueger and the Area Engineer being Jon Kruger. Contractors must comply with all standard INDOT specifications effective September 1, 2025, federal labor standards, nondiscrimination requirements, and environmental regulations including stormwater and erosion control provisions. Contract-specific questions must be submitted through the INDOT online portal at http://entapps.indot.in.gov/cqa/.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDIANA
DEPARTMENT OF TRANSPORTATION
CONTRACT INFORMATION
BOOK (CIB)
PART I
CONTRACT NO.
LETTING DATE:
Certified By:
Date:
Covering Items in Table of Contents, PART I For Release for Bidding Purposes
T-46034-B
May 7, 2026
4-1-2026
CONTRACT INFORMATION
TABLE OF CONTENTS
CONTRACT NO.
This book shall be examined to determine that each page set out in the Contract Information Table of Contents, and the Special Provisions Table of Contents is attached, legible, and current.
PART I PAGES
1 –
1 -
PROPOSAL PAGE
SCHEDULE OF PAY ITEMS
RECURRING PLAN DETAILS
TRAFFIC CONTROL DEVICE
SPECIAL PROVISIONS 1 –
PART II
Contractors shall submit contract specific questions by completing the Question Form accessed from http://entapps.indot.in.gov/cqa/ The Department will attempt to have an answer on-line within two business days. Contract specific questions asked by any other method will not be answered by the Department.
Retrieve the Question and Answer Form for a specific contract by going on–line in the same manner you retrieve Contract Information Books and Plans. http://erms.indot.in.gov/viewdocs/ will display the interface used for selection of contract letting documents. For the document category, Select "Q and A Form".
CONTACTS FOR DISTRICT PERSONNEL ONLY
CONTRACT SPECIFIC QUESTIONS
T-46034-B
(intentionally left blank) 0 -- 0
CONSULTING FIRM: DLZ Indiana, LLC PHONE: 219-836-5884
CONSULTING FIRM CONTACT: Trisha Nugent
EMAIL: tnugent@dlz.com
PROJECT MANAGER: John Krueckeberg
LPA ERC: Martin Bobcek
PHONE:
PHONE:
260-348-1303
219-465-3608
EMAIL: martin.bobcek@portercountyin.gov
AREA ENGINEER: Jon Kruger PHONE: 219-325-7562
EMAIL: jkruger@indot.in.gov
DBE GOAL: A contract provision goal of percent of the contract bid price has been established as the minimum amount for contracting to disadvantaged business enterprises.
The initial payment for clearing right-of-way will be limited to % of the original total bid.
Indiana Department of Transportation
10:00 AM
Date of Letting:
Location of Letting: INDIANA GOVERNMENT CENTER NORTH
100 N. SENATE AVENUE, N758-CONTRACTS
INDIANAPOLIS, IN 46204
May 07, 2026 Time of Letting:
Proposal
0.00
T -46034-B
Counties:
Districts:
PORTER
Not Applicable
SIGNING
Pre-Bid Meeting Date:
Contract Number: LaPorte
Description:
The following documents are included in the Contract:
2026 INDOT Standard Specifications effective 9-1-2025 INDOT Standard Drawings listed on Standard Drawings Index effective 9-1-2025 INDOT Qualified Materials Lists and Certified Sources Lists Pre-bid Questions and Answers published on the INDOT website
Additional reference material may be available on the INDOT website, which may include, but is not limited to permits, asbestos reports, geotechnical reports and utilities information. The contractor shall consider the available additional reference material when preparing their proposal bid.
Location: ALONG VARIOUS ROADS THROUGHOUT THE COUNTY
2.0
Project Control No. LocationFederal/State No.
2401578 SIGNING2401578
PORTER COUNTY - ALONG VARIOUS ROADS THROUGHOUT THE
COUNTY
Time ID Completion Date or Number of Units Time Type Liquidated Damages RateDescription
00 6/30/2027 DT $2,500.00 per DayCOMPLETION DATE
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
3/5/2026 3:29 PM
Letting Date: May 07, 2026Indiana Department of Transportation
Proposal ID: T -46034-B Project(s): 2401578
1 SIGNINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
LUMP SUMLUMP SUM _________._____
0001 105-06845
CONSTRUCTION ENGINEERING
1.00 1.00 0002 109-08359
LIQUIDATED DAMAGES DOL
1.000
1.00 1.00 0003 109-08360
CONTRACT LIENS DOL
1.000
1.00 1.00 0004 109-08443
QUALITY ADJUSTMENTS,
TEMPORARY TRAFFIC CONTROL
DEVICES
DOL
1.000
1.00 1.00 0005 109-08444
QUALITY ADJUSTMENTS, FAILED
MATERIALS
DOL
1.000
LUMP SUMLUMP SUM _________._____
0006 110-01001
MOBILIZATION AND DEMOBILIZATION
LUMP SUMLUMP SUM _________._____
0007 201-52370
CLEARING RIGHT-OF-WAY
LUMP SUMLUMP SUM _________._____
0008 801-06775
MAINTAINING TRAFFIC
0009 802-05701
SIGN POST, SQUARE, TYPE 1,
REINFORCED ANCHOR BASE
LFT
36,764.000
0010 802-07059
SIGN, SHEET, AND SUPPORTS,
REMOVE
EACH
3,333.000
0011 802-09838
SIGN, SHEET, WITH LEGEND, 0.080
IN. THICKNESS
SFT
16,551.000
0012 802-09840
SIGN, SHEET, WITH LEGEND, 0.100
IN. THICKNESS
SFT
6,020.700
Section: 1 _________._____Total:
Schedule of Pay Items Page 1 of 1
3/5/2026 3:29 PM
02-01-15
103-C-584d
103-C-584d DBE JOINT CHECK REQUEST FORM
(Revised 12-11-14)
INDIANA DEPARTMENT OF TRANSPORTATION
DBE JOINT CHECK REQUEST FORM
Name of DBE Contract Number
Name of Prime Contractor Item Number(s)
Name of Material Supplier
INDOT will closely monitor the use of joint checks. To receive DBE credit for performing a commercially useful function with respect to obtaining materials and supplies, a DBE must “be responsible for negotiating price, determining quality and quantity, ordering the material and installing (where applicable) and paying for the material itself.” Only when a DBE meets all of these requirements should credit be counted for the procurement of the items by the DBE. Please refer to the attached Procedures for Using Joint Checks under the Disadvantaged Business Program for qualifying conditions. If proper procedures are not followed or INDOT determines that the arrangement results in lack of independence for the DBE involved, no credit for the DBE’s participation as it relates to the material cost will be counted toward the contract goal requirement.
I have read and understand the above information and have attached a copy of the Joint Check Agreement relating to this request. I hereby acknowledge that the information provided on this form is true and accurate.
Authorized DBE Representative
Signature Title Date
Authorized Prime Contractor Representative
Signature Title Date
Authorized Material Supplier Representative
Signature Title Date
INDOT USE ONLY
Date Received: INDOT Representative:
Approved Denied Note: Do not process this request without a signed copy (all parties) of the Joint Check Agreement, statement of history, and any related policies.
Comments:
Please send the DBE Joint Check Request Form and supporting documentation to promptpayment@indot.in.gov 1
1 Updated March 22, 2021
LAPORTE DISTRICT CONTRACT NO. T -46034
02-01-15
103-C-584d
INDIANA DEPARTMENT OF TRANSPORTATION
PROCEDURES FOR USING JOINT CHECKS UNDER THE DISADVANTAGED BUSINESS
ENTERPRISE (DBE) PROGRAM
A joint check is a “two party” check payable to two parties. Typically, a joint check is issued by a prime contractor to a subcontractor and to a material supplier or another third party for items or services to be incorporated into a project.
INDOT understands that prime contractors, subcontractors and suppliers may wish to use joint check arrangements for a variety of legitimate reasons, such as assuring that timely payment will be for the supplier’s items or dealing with situations in which it is difficult for a subcontractor to obtain bonding at a competitive rate. However, INDOT also understands that that the use of joint checks can raise questions about whether it is proper to count DBE credit for the items purchased using the joint check.
When joint checks are utilized, DBE credit toward the contract goal will only be allowed when the DBE is performing a “commercially useful function” in accordance with 49 CFR 26.55(c)(1):
“A DBE performs a commercially useful function when it is responsible for execution of the work of the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. To perform a commercially useful function, the DBE must also be responsible, with respect to the materials and supplies used on the contract, for negotiating price, determining quality and quantity, ordering the material, and installing (where applicable), and paying for the material itself.”
The following conditions will apply to payments to DBE subcontractors and material vendors using joint checks. INDOT will closely monitor the use of joint checks to ensure that such a practice does not erode the independence of the DBE nor inhibit the DBE’s ability to perform a commercially useful function. Joint checks will not be allowed simply for the convenience of the prime contractor. Failure to follow these conditions may disqualify DBE participation or adversely impact a contractor’s bidding status.
1. Any implementation of a Joint Check Agreement must first be approved by INDOT and requested by the DBE involved using the DBE Joint Check Request Form provided by INDOT;
2. A formalized Joint Check Agreement between the parties involved (including the conditions of the arrangement and expected use of the joint checks) must accompany the DBE Joint Check Request Form;
3. Each party to the Joint Check Agreement must also submit a statement of its history in using joint checks and any related policies with the DBE Joint Check Request Form;
4. Joint checks should be focused on accomplishing the procurement of materials needed for a particular purpose at a particular time (i.e., contract specific).
5. Even with joint checks, the DBE will remain responsible for the other elements of 49 CFR 26.55(c)(1);
6. No requirement by the prime contractor that the DBE is to use a specific supplier nor the prime contractors “negotiated” price;
7. DBE must release the joint check to the material supplier (upon determining that the material supplier or other third party has fulfilled its responsibilities under the contract);
8. DBEs must be more than an extra participant in releasing the check to the material supplier;
9. Prime contractors must make joint checks available to all contract participants, and may not be restrictive to any one participant; and
10. All parties involved in a formalized joint check agreement must provide INDOT (upon request) with any documentation deemed necessary to substantiate compliance.
Storm Water, Erosion, and Sediment Control Inspection Report INDOT (4-2012)
Project Information
INDOT Lead Des Number: Inspection Type Inspection Date:
Contract Number: 024 hr (After a > 0.5" Event) Date of Last Precipitation:
Road/County: []weekly DQAlQC Amount of Last Precipitation:
Areas Inspected
Area Type Inspected Area Type Inspected Area Inspected ,;INA ';INA Type -/INA
Disturbed Areas Areas where Water Leaves the Erosion Project Site Controls
Material Storage Areas Other: Sediment Controls
How was inspection conducted? (check D Windshield D Walking D Other all that apply)
Stationing Inspected Sta. to Sta. to Sta. to [JEntire Project DSelect Stations: Sta. Sta. Sta.
Part A: Erosion and Sediment Control Best Management Practices (BMPs Ins}!ected Except for the instances listed below, all sediment and erosion controls have been inspected and were found to be in working order and do not require maintenance or conective actions.
BMPType Approximate Station
(see table on From To page 3)
Survey Line: Left, BMP Maintenance or Corrective Action Needed Right or centerline Describe required corrective actions, maintenance, additions, or directions. Along with description provide image filename here for any reference pictnres provided.
Page 1 of5
108-C-192d
Storm Water, Erosion, and Sediment Control Inspection Report
Part B: Additional Quantities or Additional BMPs Needed
INDOT
(4-2012)
Any additional control quantities or new BMPs not shown on the SWPPP must be approved by the PEIPS. If multiple locations are involved, identify the exact location of each addition. Justification for the measure must be provided.
BMPType Approximate Station Survey Line: Left, Description/Justification for the additional BMPs (see table on From To
Right or centerline Along with description provide image filename here for any pa2e 3) reference pictures provided.
Part C: Temporarily or Permanently Suspended Construction Activities Where construction activities (grading, excavating, embankment filling, or other land disturbing activities have been suspended either temporarily or permanently, describe why stabilization measures were not initiated within 7 days.
BMPType Approximate Station Survey Line: Left, Description (see table on From To Right or centerline Along with description provide image ftlename here for any pa2e 3) reference pictures provided.
Part D: Compliance Evaluation (check only one) yWith the maintenance and improvement actions noted, the areas inspected will meet the intent of the Erosion and Sediment ontrol Plan and INDOT contract documents and specifications related to temporary erosion and sediment control.
q The areas inspected are not meeting the intent and are in potential noncompliance with the Erosion and Sediment Control Plan and/or INDOT contract documents and specifications related to temporary erosion and sediment control. There is off site sedimentation and/or a high potential for off-site sedimentation on this project. (If this box is checked, complete the following "Part E: Potential Noncompliance Issues" section of this form)
BMPType (see table on page 3)
Part E: Potential Noncompliance Issues Approximate Station
From To
Survey Line: Left, Describe the potential noncompliance issue(s) e.g. failure to
Right or centerline adequately inspect the project, repeated failure of a BMP, failure to install a required BMP, a visible off-site discharge of material (silt, sand, oily water, etc.), or potential off-site discharges or potential failures.
Page 2 of5
108-C-192d
Storm Water, Erosion, and Sediment Control Inspection Report
Part F: Inspection Certification
INDOT
(4-2012)
I certifY that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assme that qualified personnel properly gather and evaluate the infOlmation submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accmate, and complete.
Inspector Name Printed: I Company: I Title: I Date:
Inspector Signature:
If evaluating an inspection performed by another inspector, please check one of the following boxes:
o I concur with the inspector 0 I do not concur with the inspector (please circle any findings that you do not agree with)
Owner Representative Name: Signature:
Date:
A pennanent copy must be filed with the project records and be provided to lNDOT or IDEM personnel according to requirements or upon request.
Table of Types of Erosion and Sediment Control Best Management Practices (BMPs) 1 Diversion Interceptor 8 Check Dam, 15 Filter Berm 22 Concrete Washout
Traversable
2 Temporary Seeding 9 Slope Drain 16 Filter Sock 23 Secondary Spill Containment
3 Permanent Sod or Seed 10 Splash Pad 17 Turbidity Curtain 24
4 Mulch (hydraulic 01' 11 Sediment Trap 18 Smface Roughening 25 bonded fiber mulch)
5 Straw Mulch 12 Sediment Basin 19 Vegetative Filter Strip 26 (blown/laid)
6 Manufactured Surface l3 Retention Pond 20 Inlet Protection 27 Protection Products
7 Check Dam 14 Silt Fence 21 Construction 28 entrance/exit cc: Prime Contractor Superintendent (add Prime Contractor OwnerlPresident when appropriate) INDOT Project Engineer (add INDOT Area Engineer when appropriate) INDOT District E&SC Specialist (add INDOT Central Office E&SC Specialist when appropriate)
Page 3 of5
108-C-192d
Storm Water, Erosion, and Sediment Control Inspection Report INDOT (4-2012)
Instructions for the Contractor's representative: Fill out this document completely including filling out the Project Information, Areas Inspected and Parts A, B, C, D, E and F the day of your field investigation and put it on file for the project. Submit the signed document to the INDOT project representative the same day. Always provide pictures to document site conditions observed in your report.
Instructions for INDOT's representative:
� When you receive a completed and signed inspection report as completed by the contractor, visit the site within 24 hours of receipt of the contractor's inspection to verify the contractor's fmdings. If you concur with the contractor's inspection, fill out part F and sign as the INDOT representative. If you don't concur with the contractor's inspection, fill out parts E, F and circle any areas where you believe the inspection misrepresented the site's state of compliance with the intent ofINDOT standards. If possible, provide pictures to document site conditions observed. Upon completion, sign under Part F, put it on file with the project and copy the prime contractor's representative.
� If you are completing this as an evaluation of an INDOT project without regard to the contractor's inspection, fill out all parts of the form including part D, E and sign as the inspector in part F. Always provide pictures to document site conditions observed in your report. Provide a copy to the INDOT PE/PS for the project and the Area Engineer. It is recommended that the inspection report be provided to the contractor immediately for their information (not their concurrence). It is also recommended another INDOT rep. visit the site within 24 hours to verify the inspection for their records and sign concurrence or non-concunence in Part F.
Additional Explanation:
• Part A - Only put BMPs in Part A that were deemed to be in need of maintenance or alteration. Do not provide a list of every BMP inspected on the project. The intent is to document only those which were deemed in need of maintenance or alteration in order to continue to meet the intent of the measure at the location.
• Part B - Only put additional BMPs not yet installed on the project site in Part B. These can be BMPs intended for a different construction phase of the project or BMPs planned for other areas of the project that make sense to be deployed at additional locations. This is also where recommendations of measures would occur that identify new BMPs not in the contract documents.
• Part C - This is a list of known bare/exposed areas of the project and the justification why they are remaining bare or exposed during the review period despite a lack of construction activities. This especially includes any areas that are or are planned to be exposed for greater than 7 days without immediate plans to stabilize.
• Part D - Checking that the project is not in compliance with the intent ofINDOT standards indicates that despite the additional maintenance measures and BMPs, the project's oversight is failing to ensure that sediment is prevented from leaving the project site or has the potential to leave the project site.
• Part E - List principles of storm water or erosion and sediment control that appear to be lacking on the proj ect which demonstrate the lack of oversight of the proj ect by qualified personnel.
• Part F - The "I certify" signature of the inspector is important in order to document whose opinion is being provided by the filling out of this form.
Page 4 of5
108-C-192d
BMPType (see table on pa2e 3)
Storm Water, Erosion, and Sediment Control Inspection Report
Approximate Station
From To
Additional Information for Part Left, Right or centerline
Page 5 of5
108-C-192d
Description
INDOT
(4-2012)
IN
D
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-245d RPD of 11
S h e e t o f
C O
N S
T R
U C
T
IO
N
E N
D
A H
E A
D
C O
N S
T R
U C
T
IO
N
R O
A D
R O
A D
W O
R K
E N
D
A H
E A
D
W O
R K
R O
A D
O B
S O
L E
T E
S
IG
N S
R E
P L
A C
E M
E N
T S
IG
N
S
X W
-1 -A x
X W
-1 x
X W
-1 A x
X W
-1 -A x
X W
-1 x
X W
-1 A x
X G
-2 x
X G
-2 x
X G
-2
A
X
R O
A D
W O
R K
A H
E A
D S
IG
N
S
R O
A D
C O
N S
T R
U C
T
IO
N A
N re p la c e d w it h a n
E N
D R
O A
D W
O R
K s ig n
A n
E
N D
C O
N S
T R
U C
T
IO
N s ig n s h o w n o n t h e p la n s s h a ll b e
W
O R
K A
H E
A D o r R
O A
D W
O R
K X
F T s ig n
X
F T s ig n s h o w n o n t h e p la n s s h a ll b e r e p la c e d w it h a
R
O A
D
A
R O
A D
C O
N S
T R
U C
T
IO
N A
H E
A D o r
"R O
A D
C O
N S
T R
U C
T
IO
N
-T
C L
C -1
-T
C L
C -1
-T
C L
C -1
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
C T
C -0
-T
C F
O -0
-T
C T
C -0
-T
C F
O -0
-T
C S
C -0
-T
C F
O -0
-T
C S
C -0
-T
C F
O -0
-T
C S
C -0
-T
C F
O -0
-T
C S
C -0
-T C
C O
-0
-T
C S
C -0
-T C
T R
-0 in t h e F
H W
A S ta n d a rd
H ig h w a y S ig n s e d it io n re p la c e m e n t s ig n s s h o w n o n t h is s h e e t a n d f u rt h e r d e ta il e d fo ll o w in g S ta n d a rd
D ra w in g s s h a ll b e s u p e rs e d e d b y t h e
T h e X
W
-1 a n d X
G
-2 s e ri e s s ig n s d e p ic te d i n t h e
N
O T
E S
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
S li c e D e ta il
S e e S ta n d a rd
D ra w in g E
-T
C D
V -0 f o r
U -C h a n n e l
S te e l
P o s t s ig n s s h a ll b e a s s h o w n o n S ta n d a rd
D ra w in g E
-T
C D
V -0
T h e m in im u m v e rt ic a l a n d h o ri z o n ta l c le a ra n c e s f o r c o n s tr u c ti o n
G E
N E
R A
L N
O T
E S
IN
D
E X
A N
D G
E N
E R
A L
N O
T E
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IN
D
E X
1 3 4 5 6 7 82
S H
E E
T N
O
S U
B
JE
C T
T e m p o ra ry
P a n e l
S ig n P o s t
S e le c ti o n a n d C o n n e c ti o n
D e ta il s
T e m p o ra ry P a n e l
S ig n P o s t
In s ta ll a ti o n
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n s
T ra ff ic
C o n tr o l
S ig n s
In d e x a n d G e n e ra l N o te s
IN
D
E X
1 3 4 5 6 7 82
S H
E E
T N
O
S U
B
JE
C T
T e m p o ra ry
P a n e l
S ig n P o s t
S e le c ti o n a n d C o n n e c ti o n
D e ta il s
T e m p o ra ry P a n e l
S ig n P o s t
In s ta ll a ti o n
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n s
T ra ff ic
C o n tr o l
S ig n s
In d e x a n d G e n e ra l N o te s
P
E E
D
IN
G
M O
W
IN
G
M
IL
E S
S P
E E
D
IN
G
M A
X
Y R
S
R E
C K
L E
S S
D R
IV
IN
G
M A
IN
S
T A
L L
A T
IO
N
O V
E R
H E
A D
S
IG
N
N E
T
R
IV
IN
G
R E
C K
L E
S S
M A
X
Y R
S
M A
X
A H
E A
D
M O
W
IN
G
X W
-6 a -B
X W
-6 a -A
X W
-6 a
X W
-6 b -B
X W
-6 b -A
X W
-6 b
X W
-Y b -A
X W
-Y b
X G
-2
X G
-1
X W
-1
-A
X W
-1
X W
-1
X W
-4
S
X W
-6
-A
X W
-6
N E
M
IL
E
S
R O
A D
W O
R K
A H
E A
D
W O
R K
R O
T C
H F
O R
T R
A F
F
IC
S T
O P
P E
D
R O
A D
W O
R K
E N
D
X W
-8 -A
X W
-8
IN
D
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8 s it e c o n d it io n s
S h a d e d t e x t in d ic a te s m e s s a g e c o n te n t th a t m u s t b e v a ri e d t o r e fl e c t w it h t h e i n d ic a te d s ig n w o rd
A H
E A
D S u c h s ig n s m a y b e u s e d i n p la c e o f o r in c o n ju n c ti o ig n m a y b e o rd e re d t o r e a d
F T o r
F
T i n p la c e o f th e ro a d w a y d u ri n g n o n -w o rk in g h o u rs
S ig n s h a ll b e r e m o v e d c o v e re d o r tu rn e d t o f a c e a w a y f ro m t h
1N
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
E
T O
U R
D E
T O
U R
S ta te S t
S ta te S t
N O
R T
H
E X
IT
E X
IT
E X
IT
O P
E N
C L
O S
E D
F O
R
E X
IT
O
N L
Y
R
IG
H T
L A
N E
W
ID
E F
T
1L O
A D
S N
O O V
E R
E X
IT
O V
E R
L O
A D
W
ID
E 1
M U
S T F
T
L O
A D
R
ES
TR
IC
TI
O
N M
IL
E
S
W
ID
E
X M
-9 e
X M
-9 d
E
-1
E
-2
E -2 a
X W
-7
X W
-Y
W R
(A
X W
-Y W
R (B
X W
-Y
W R
(C
IN
D
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8 s it e c o n d it io n s
S h a d e d t e x t in d ic a te s m e s s a g e c o n te n t th a t m u s t b e v a ri e d t o r e fl e c t
1N O
T E
T R
A F
F
IC
C O
N T
R O
L S
IG
N
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
W o o d p o s t p e rm it te d
T h e m in im u m d e p th f o r w o o d o r s te e l p o s ts s h a ll b e f t.
A ll d im e n s io n s a re i n i n c h e s
S ig n s
S ta n d a rd
H ig h w y rc e n ta g e a s s h o w n i n t h e F
H W
A d o c u m e t, a c in g b e tw e e n l e tt e rs o f th is w o rd o r li n e s h a ll b e r e d u c e d b y t is
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
D E
S
IG
N D
E T
A
IL
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
W o o d p o s t p e rm it te d
T h e m in im u m d e p th f o r w o o d o r s te e l p o s ts s h a ll b e f t.
A ll d im e n s io n s a re i n i n c h e s
S ig n s
S ta n d a rd
H ig h w rc e n ta g e a s s h o w n i n t h e F
H W
A d o c u m e a c in g b e tw e e n l e tt e rs o f th is w o rd o r li n e s h a ll b e r e d u c e d b y t is
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
D E
S
IG
N D
E T
A
IL
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
W o o d p o s t p e rm it te d
T h e m in im u m d e p th f o r w o o d o r s te e l p o s ts s h a ll b e f t.
A ll d im e n s io n s a re i n i n c h e s
S ta n d a rd
H ig h w a y S ig n s p e rc e n ta g e s h o w n i n t h e F
H W
A d o c u m e a c in g b e tw e e n l e tt e rs o f th is w o rd o r li n e s h a ll b e r e d u c e d b y t
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
D E
S
IG
N D
E T
A
IL
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
X
B B m in im u m
A A
18"
4"
C o n c re te E n c a s e m e n t o r
C o m p a c te d S o il
(T y p
A ll
I n s ta ll a ti o n s m in im u m
X
X m in im u m
X m in im u m
Z
Y
Z
Z
Z
-P
O S
T I
N S
T A
L L
A T
IO
N
N O
T E
S
-P
O S
T I
N S
T A
L L
A T
IO
N
-P
O S
T I
N S
T A
L L
A T
IO
N
-P
O S
T I
N S
T A
L L
A T
IO
N
B B
B B
B B
A e q u a l s p a c e s
A e q u a l s p a c e s
A e q u a l s p a c e s
A
A
X
-2 B
A
X
-2 B
A
X
-2 B
A
X
-2 B
A A
A A
A A ty p
P o s t
W o d x
P o s t
(T y p
A ll
B re a k a w a y
P o s ts ty p
P o s t
W o ty p
P o s t
W o o d
P o s t e m b e d m e n t
P o s t e m b e d m e n t
P o s t e m b e d m e n t
P o s t e m b e d m e n t x
P o s t
F ie ld d ri ll e d h o le s t h ro u g h p o s t s h a ll b e p a ra ll e l to s ig n f a c e
S ta n d a rd
D ra w in g E
-T
C D
V -0
T h e m in im u m v e rt ic a l c le a ra n c e s h a ll b e a s s h o w n ta n d a rd
D ra w in g E
-T
C S
N -0
F o r p o s t s e le c ti o n a n d p o s t e m b e d m e n t d e p th s e e t a b le o n d im e n s io n s h a ll b e r o u n d e d u p t o t h e n e a re s t i n c h i n c re m e n t.
X a n d Y d im e n s io n s s h a ll b e i n i n c re m e n ts o f i n c h e s T h e Z b e i n c h e s a n d t h e m a x im u m w id th s h a ll b e A
/2 s p a c in g s h a ll b e
T h e m in im u m o v e rh a n g w id th
B s h a ll
T h e m in im u m p o s t s p a c in g
A s h a ll b e a n d t h e m a x im u m
F ie ld D ri ll e d H o le s
(T y p A ll B re a k a w a y
P o s ts
W o o d
P o s t
(T y p b
C L F ie ld
D ri ll e d H o le s th is f a c e
S ig n a tt a c h
C T
IO
N
A -A d/2 d
P O
S T
I N
S T
A L
L A
T
IO
N
T E
M P
O R
A R
Y P
A N
E L
S
IG
N
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
(X
Y
Z in f t
M a x im u m
N u m b e r o f
P o s ts
E m b e d m e n t
P o s t f t
5 6 5 6 7 8 9 x x x x x x x
W o o d
P o s t
C o n n e c to r
T y p e B
P o s t
S ig n P a n e l
C o n n e c to r
Z S h a p e
A n g le
C o n n e c to r
L x x
/2
N O
T E
S
T Y
P E
B P
O S
T C
O N
N E
C T
IO
N
D e s c ri p ti o n
P o s t
S ig n P a n e l
S ig n P a n e l b x d
P o s t
S iz e
N o m in a l
W o o d
P o s t
W o o d
P o s t
6 6
Z S
H A
P E
C O
N N
E C
T
IO
N A
N G
L E
S H
A P
E C
O N
N E
C T
IO
N
B re a k a w a y
P o s t
P o s t
N o n -B re a k a w
M P
O R
A R
Y P
A N
E L
S
IG
N W
O O
D P
O S
T S
E L
E C
T
IO
N T
A B
L E o u ts id e f a c e o f th e p o s t.
A t e x te ri o r p o s ts th e A n g le
C o n n e c to r s h a ll b e i n s ta ll e d o n t h e g u a rd ra il to t ra ff ic s h a ll b e a t le a s t f e e t fr o m t h e f a c e o f th e b a rr ie r o r b e h in d b a rr ie r o r g u a rd ra il
T h e e d g e o f th e p a n e l s ig n a d ja c e n t
N o n -b re a k a w a y p o s ts s h a ll b e p la c e d o u ts id e t h e c le a rz o n e o r
T h e l e n g th o f th e c o n n e c to r s h a ll b e e q u a l to t h e s ig n h e ig h t
Y
C le a r
H e ig h t
(Z b e tw e e n a n d
S ig n H e ig h t
(Y b e tw e e n a n d
S ig n W id th
X b e tw e e n a n d
T h e t a b le i s v a li d f o r d im e n s io n s w it h in t h e f o ll o w in g r a n g e
S e e S ta n d a rd
D ra w in g E
-T
C S
N -0 f o r
X
Y a n d
Z d im e n s io n s
P o s t m a te ri a l s h a ll b e d e n s e s o u th e rn p in e s e le c t n a tu ra l.
W O
O D
P O
S T
S E
L E
C T
IO
N
T A
B L
E
T E
M P
O R
A R
Y P
A N
E L
S
IG
N S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
T d
1-
T-
0d T
R A
FF
IC
C O
N
TR
O L
D
EV
IC
E
R
EP
O R
T
A d o p t e d
C
N
TR
A C
T:
P R
O
JE
C T:
TE
S:
th ru
LO
C
A
TI
ES
C
R
IP
TI
TE
PL
C
ED
U se if
O .K
D
TE
R
EM
O
V
ED
*R
EM
A
R K
S
M
F
S
If d ev ic e is n ot O
.K de sc rib e de fic ie nc y un de r R em ar ks
D at e C or re ct iv e A ct io n Ta ke n:
R ep or t P re pa re d
B y:
, T itl e:
Contract Number: T-46034-B
LAPORTE DISTRICT Contract No. T -46034
III i
SPECIAL PROVISIONS
TABLE OF CONTENTS
100-C-146 PAYMENT OF PREDETERMINED MINIMUM WAGE DETERMINATION (DAVIS-
BACON ACT) General Decision Number IN20250001
100-C-151A FHWA-1273
100-C-151D EXECUTIVE ORDER 11246
100-C-151E TITLE VI ASSURANCES
100-C-188 STANDARD SPECIFICATIONS
100-C-214 CONSTRUCTION LETTING EMAIL BOX
100-C-246 CARGO PREFERENCE ACT
100-C-281 PG BINDER GRADES
103-C-268 INDIANA-KENTUCKY DBE RECIPROCITY
103-C-269 SUBMITTAL OF DBE QUOTES AND DBE SUPPLIER FORM
106-C-277 BUILD AMERICA, BUY AMERICA ACT REQUIREMENTS
107-C-266 MAINTAINING PEDESTRIAN ACCESSIBILITY DURING CONSTRUCTION
201-C-052 INITIAL PAYMENT FOR CLEARING RIGHT-OF-WAY
203-R-806 EXCAVATION AND EMBANKMENT
505-R-795 EXCEPTIONS TO AASHTO T 152
801-C-157 CERTIFICATION OF TEMPORARY TRAFFIC CONTROL DEVICES
801-T-198 TRAFFIC CONTROL FOR TRAFFIC BREAKS
801-T-246 ROAD WORK AHEAD SIGNS
901-M-069 PORTLAND CEMENTS AND BLENDED CEMENTS
904-M-073 AGGREGATES
913-M-071 WATER
103-C-036 OWNER’S AND CONTRACTOR’S PROTECTIVE LIABILITY INSURANCE
COVERAGE FOR OPERATIONS OF DESIGNATED CONTRACTOR
107-R-169 STATEMENTS ABOUT EXISTING CONDITIONS OF UTILITIES, ADDITIONAL
RIGHT-OF-WAY, AND ENCROACHMENTS
STREET NAME SIGNS
III ii
FLASHING BEACONS
MAINTAINING PEDESTRIAN ACCESSIBILITY DURING CONSTRUCTION
SIGN BANDS
TRAFFIC MAINTENANCE PLAN
VANDAL RESISTANT SIGN HARDWARE
CLEARING RIGHT-OF-WAY
IDENTIFICATION MARKINGS FOR SIGNS
DELINEATORS
III 1
100-C-146 PAYMENT OF PREDETERMINED MINIMUM WAGE DETERMINATION (DAVIS-BACON
ACT) General Decision Number IN20250001
(Revised 06-16-22)
General Decision Number IN20250001 shall apply to this contract.
The above referenced wage determination is available from the USDOL at the SAM internet website https://sam.gov/content/wage-determinations. Any modification published there by the USDOL not later than 10 days prior to letting is applicable to this contract.
The Department will confirm the modification number and publication date for the General Decision effective for the bid opening. Notice of confirmation will be published on the Contract Administration website https://www.in.gov/dot/div/contracts/letting/index.html at least one week prior to the bid opening. The bidder shall acknowledge in applicable wage determination, modification, and publication date in the proposal form.
100-C-151A FHWA-1273
(Revised 10-23-23)
REQUIRED CONTRACT PROVISIONS
FEDERAL - AID CONSTRUCTION CONTRACTS
I. General II. Nondiscrimination III. Non-segregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water Pollution Control Act X. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion XI. Certification Regarding Use of Contract Funds for Lobbying XII. Use of United States-Flag Vessels:
ATTACHMENTS
A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only)
I. GENERAL
1. Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR 633.102(e).
III 2
The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e).
Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.
Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b).
2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d).
3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and
FHWA.
4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b) The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors. 23 U.S.C.
101(a).
II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part 230, Subpart A, Appendix A; EO 11246)
The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.
In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The contractor and all subcontractors must comply with the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.
Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627.
The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
III 3
The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.
1. Equal Employment Opportunity: Equal Employment Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:
a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409(g)(4) & (5).
b. The contractor will accept as its operating policy the following statement:
"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."
2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so.
3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action or are substantially involved in such action, will be made fully cognizant of and will implement the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:
a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official.
b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.
c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.
d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.
e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.
III 4
4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived.
a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.
b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.
c. The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees.
5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age or disability. The following procedures shall be followed:
a. The contractor will conduct periodic inspections of project sites to ensure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.
b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices.
c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.
d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.
6. Training and Promotion:
a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.
III 5
b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs (i.e., apprenticeship and on-the-job training programs for the geographical area of contract performance). In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a).
c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each.
d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.
7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. 23 CFR 230.409. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:
a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.
b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability.
c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.
d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency.
8. Reasonable Accommodation for Applicants / Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established thereunder. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship.
9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.
a. The contractor shall notify all potential subcontractors, suppliers, and lessors of their EEO obligations under this contract.
III 6
b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.
10. Assurances Required:
a. The requirements of 49 CFR Part 26 and the State DOT’s FHWA-approved Disadvantaged Business Enterprise (DBE) program are incorporated by reference.
b. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible.
c. The Title VI and nondiscrimination provisions of U.S. DOT Order 1050.2A at Appendixes A and E are incorporated by reference. 49 CFR Part 21.
11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA.
a. The records kept by the contractor shall document the following:
(1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;
(2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and
(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women.
b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project indicating the number of minority, women, and non-minority group employees currently…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .