Richmond Partial Seismic Rehabilitation – Request for Proposals
This Request for Proposals (RFP 2026-039) is issued by Portland Public Schools, School District 1J, Multnomah County, Oregon, for construction services related to a partial voluntary seismic retrofit and re-roof at Richmond School located at 2276 SE 41st Ave, Portland, OR 97214. The project scope includes structural improvements such as new concrete shear walls, brick veneer anchorage, diaphragm strengthening, column strengthening, and roof-to-wall connections; fire protection modifications including sprinkler system adjustments; and architectural and technology work encompassing partial building re-roofing, interior finish replacement, removal and reinstallation of mechanical equipment, doors, windows, and installation of new teaching walls and wireless access points. The project is a two-phase construction effort scheduled for summers 2027 and 2028, with an anticipated contract start date of March 3, 2027, and project completion date of October 2, 2028. A pre-proposal site walk is scheduled for 6:30 AM on December 1, 2026. The proposal deadline is 2:00:00 PM Pacific Time on December 29, 2026, with electronic submission required via PlanetBids. Interviews are scheduled for January 19–22, 2027, with notification of intent to award on January 26, 2027. The District intends to award a single contract to a qualified vendor.
This is a public works project subject to Oregon prevailing wage requirements (ORS 279C.800-279C.870) and Oregon Construction Contractors Board licensing requirements. Proposers must submit proposal security in the form of a bid bond, irrevocable letter of credit, or certified check equal to ten percent (10%) of the total bid amount for projects exceeding $100,000. The evaluation process consists of two tiers: written proposals (115 points maximum) and interviews (40 points maximum), with proposals ranked by evaluator scores. Written evaluation criteria include compliance statements and licenses (pass/fail), company experience and capacity (25 points), staff experience and capacity (25 points), project understanding and approach (25 points), certified business participation strategy (10 points), sustainable business practices (10 points), and price proposal (20 points). The District has established an Equity in Public Purchasing & Contracting Policy requiring contractors on projects valued at $1,000,000 or greater to offer career learning opportunities to District students, achieve a minimum of 20% labor hours performed by state-registered apprentices in apprenticeable trades, and strive for workforce diversity goals of 25% minority and 14% female hours. First-tier subcontractors meeting disclosure thresholds (5% of total bid or $15,000, whichever is greater, or $350,000 regardless of percentage) must be disclosed. All work must comply with prevailing wage rates, lead-based paint renovation licensing requirements, and asbestos handling protocols. Contractors and key personnel with direct, unsupervised contact with students must pass fingerprint-based criminal history verification at a current cost of $94.50 per person.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 27 Rev. 101326
Portland Public Schools School District 1J
Multnomah County, Oregon
Request for Proposals for Construction Richmond Partial Seismic Rehabilitation
RFP No. 2026-039
Pre-Proposal Site Walk:
One Pre-Proposal site walk will be held at 6:30am on Tuesday, December 1, 2026 at Richmond School, located at 2276 SE 41st Ave Portland, OR 97214. Attendees are asked to remain outside the front entrance until District personnel arrive to begin the pre-proposal site walk. Unescorted site walks during school hours will not be permitted.
Attendance is optional. Portland Public Schools conducts such meetings in order to clarify information provided in the RFP and to provide interested proposers an opportunity to ask questions about the RFP. Statements made by the District’s representatives at the conference are not binding on the District unless confirmed by written addendum.
All questions and contact with Portland Public Schools (hereinafter referred to as “District”) regarding this RFP must be addressed in writing to the Procurement Contact listed above. Any questions or issues that may arise regarding the Specifications, the solicitation process, and/or the award process shall be directed to the Procurement Contact. The District’s official response to any questions or requests will be through the addendum process. Contact with other District staff without prior clearance from the Procurement Contact listed above may result in proposer disqualification.
This Contract is a Public Work subject to ORS 279C.800 to 279C.870.
Proposers should consult PlanetBids regularly until Proposal Closing to avoid missing any Addenda.
RFP Availability:
This RFP is available electronically through the PlanetBids website at:
http://www.planetbids.com/portal/portal.cfm?CompanyID=22555. Interested parties must be registered with PlanetBids to obtain and download documents. Registration is at no cost. Future notices regarding this solicitation, including solicitation addenda, will be posted to PlanetBids.
Proposals Due: Not Later than 2:00:00 PM Pacific Time, December 29, 2026 Late proposals will not be accepted or considered.
Submit Proposals to: ELECTRONIC SUBMITTAL Submit electronically via PlanetBids, The Proposal, including all required documentation, must be submitted through the website not later than 2:00:00 PM on 12/29/2026 in accordance with the PlanetBids internal timestamp. Late Proposals shall be rejected.
HARDCOPY SUBMITTAL
No hardcopy submittals will be accepted.
Direct Questions to: Procurement Contact: Brandon Niles Email: purchasing@pps.net Deadline for Questions: 12/4/2026
Electronic Responses: Electronic responses via PlanetBids are required. E-mailed responses will not be accepted.
Page 2 of 27 Rev. 101326
Proposal Opening:
A public proposal opening will occur via teleconference promptly at 2:05 PM on the day proposals are due.
Only the name of the proposer will be read aloud.
Dial in information:
(US) 3317-319-+1 607
PIN: 772 991 034#
Meeting code meet.google.com/bqv-vgqp-toy
Page 3 of 27 Rev. 101326
RFP Richmond Partial Seismic Rehabilitation 2026-039
TABLE OF CONTENTS
1 Introduction
1.1 About Portland Public Schools
1.2 Timeline
1.3 Definitions
1.4 RFP Questions, Clarifications and Changes
1.5 Construction Proposal Requirements
1.6 Portland Public Schools Equity in Public Purchasing & Contracting Policy\
1.7 Prevailing Wages
1.8 Asbestos Abatement
1.9 Lead Based Paint Renovation License
1.10 Requirements For Hazardous Materials
1.11 Contract, Bonds and Insurance
1.12 Compliance With Law
2 Scope of Work
2.1 Scope of Work
2.2 Statement of Work
2.3 Contractor and Subcontractor Fingerprint-Based Criminal History Verification
2.4 Sustainable Business Practices
3 Proposal Format, Content, and Submission
3.1 Proposal Format
3.2 Proposal Content
3.3 Proposal Responses to Evaluation Criteria
3.4 Proposal Submission
4 Proposal Evaluation and Award
4.1 Clarification of Responses
4.2 Proposal Evaluation
4.3 Notification of Intent to Award
4.4 Negotiation
5 Solicitation Terms and Conditions; Protest of Solicitation or Award
5.1 Solicitation Document
5.2 Proposer Cost of Response Preparation
5.3 Submitted Materials are District Property
5.4 Proposal Validity
5.5 Solicitation Cancellation, Rejection of a Proposal or All Proposals
5.6 Disputes
5.7 Publicity
Page 4 of 27 Rev. 101326
5.8 Preference for Recycled Materials
5.9 Performance within state of public printing, binding and stationary work
5.10 Confidentiality
5.11 Protests
5.12 Intergovernmental Permissive Cooperative Agreement
6 Contract Terms and Conditions
6.1 Contract Award and Term
6.2 Portland Public Schools Contract
6.3 Insurance
SECTION 00 43 13 FORM OF BID BOND
SECTION 00 43 25 SUBSTITUTION REQUESTS (PRE-PROPOSAL)
1.01. SUBSTITUTION REQUESTS
1.02. SUBSTITUTION REQUEST FORM
SUBSTITUTION REQUEST FORM
SECTION 00 43 36 FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM
Attachment A: Sample Contract
Attachment B: Proposer Certification Form
Attachment C: Reference Form
Attachment D: Career Learning
Attachment E: Workforce Training and Hiring Program Directions and Forms
Attachment F: Pricing Proposal Form
Attachment G: Drawings
Attachment H: Project Manual – Specifications
Attachment I: PPS Design Guidelines and Standards (incorporated by reference)
*Link for PPS Design Guidelines and Standards:
https://www.pps.net/departments/rise/project-construction-management/facility-standards-design-and-construction
Attachment J: Special Instructions ROOFING
Attachment K: Respectful Workplace Policy
Attachment L: Schedule (Estimate)
Page 5 of 27 Rev. 101326
1 Introduction
Please Note: The contracting method for this project utilizes an alternative contracting method specified under District Public Contracting Rules PPS-49-0620.
Portland Public Schools (“District”) seeks written proposals from qualified vendors able to provide construction services. The District intends to award a single contract as a result of this RFP. This determination will be based upon the evaluation of scores underlying the rank of each proposal and the capacity of the proposers, and shall be at the sole discretion of the District. The contract term will be approximately March 2026 to October 2028.
1.1 About Portland Public Schools
Portland Public Schools, founded in 1851, is a PK-12 urban school district in Portland, Oregon. With more than 45,000 students in 81schools, it is one of the largest school districts in the Pacific Northwest.
With highly trained teachers and staff; an engaged parent community; strong partnerships, and a focus on closing the racial educational achievement gap, PPS has seen significant gains in its graduation rate and has enjoyed steady enrollment growth. Thanks to the state Legislature, school funding is improving and thanks to Portland voters, a PPS School Building Improvement Bond is now fueling the modernization of our aging school buildings for 21st century learning.
1.2 Timeline
ACTIVITY DATE
Issuance of Request for Proposal 11/13/2026 Pre-Proposal Site Walk 12/1/2026
Deadline for Questions or Clarifications 12/4/2026 Deadline for Substitution Requests 12/4/2026 Final Addenda Deadline 12/15/2026 Proposals Due 12/29/2026
Interviews 1/19-1/22/2027 Notice of Intent to Award 1/26/2027
Anticipated Contract Start 3/3/2027 Project Completion Date 10/2/2028
The District reserves the right to deviate from this schedule.
PLEASE NOTE: After an Intent to Award has been issued, all Offerors are welcome to view the solicitation and evaluation file at District offices. However, a debrief and/or copies of documents in the solicitation file will not be available until after a contract has been fully executed.
1.3 Definitions
a) “CERTIFIED BUSINESS”, as used in this RFP, means a for-profit company certified by the State of Oregon Certification Office of Business Inclusion and Diversity (COBID) as a Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Veteran Business Enterprise (VBE), Oregon Small Business Enterprise (OSBE), and/or an Emerging Small Business (ESB) pursuant to Oregon Revised Statutes Chapter 200; and/or
A company certified in the States of Oregon, Washington and California by the U.S. Department of Transportation (U.S. DOT) as a Disadvantaged Business Enterprise (DBE) pursuant to Code of Federal Regulations (CFR) Title 49, Subtitle A, Parts 23 and 26; and/or
A company certified by the State of Washington Office of Minority and Women’s Business Enterprises as a Minority Business Enterprise (MBE) and/or Woman Business Enterprise (WBE) pursuant to Washington Administrative Code, Title 326, Chapter 326-20.
b) Work, as used in this RFP, means the furnishing of all materials, equipment, labor, and incidentals necessary to successfully complete any individual item or the entire Contract, and successful completion of all duties and obligations imposed by the Contract.
Page 6 of 27 Rev. 101326
Additional definitions are provided in the Portland Public Schools Public Contracting Rules, adopted in 2026:
https://resources.finalsite.net/images/v1761249533/ppsnet/jhfvxeqnejsoyqaka92u/2024PortlandPublicS choolsPublicContractingRules.pdf
1.4 RFP Questions, Clarifications and Changes
Any Proposer requiring clarification of the information provided in this solicitation must submit specific questions or comments in writing to the Procurement Contact shown on page 1 of this document. Email is the preferred form of written communication. The deadline for submitting such questions is shown on page 1 of this document.
Questions should be transmitted by email and should include the solicitation number and title in the subject line of the email. Wherever possible, all questions for a single solicitation should be grouped together in a single email. Such emails must only address one solicitation. If a prospective offeror has questions across multiple solicitations, the offeror should submit separate emails for each solicitation, labeled by solicitation number and title.
The District may at its sole discretion reject questions or requests that do not adhere to these guidelines.
If selected for award, a proposer will be expected to execute a contract with the material terms and conditions of the sample contract included with the solicitation documents. The material terms and conditions of the sample contract may be modified at the sole discretion of the owner upon determination that the modification is in the best interest of the owner.
If the proposer selected for award as a result of this RFP fails to agree to a contract with the material terms and conditions of the sample contract attached, the District may terminate negotiations with the proposer and commence negotiations with the next highest ranked proposer.
1.4.1 Addenda
If the District determines that additional information or interpretation is necessary, such information or interpretation will be supplied in addenda, posted on PlanetBids.
Those who have registered their interest in the solicitation through PlanetBids will be notified of addenda via email. Addenda shall have the same binding effect as though contained in this RFP.
The Director of Purchasing & Contracting or designee shall issue all addenda not less than 72 hours prior to the submission deadline.
Statements made by the District’s representatives are not binding on the District unless confirmed by written addendum.
1.5 Construction Proposal Requirements
1.5.1 First-Tier Subcontractor disclosure
As per the form of first-tier subcontractor disclosure set forth in ORS 279C.370, Proposer shall submit to the District a disclosure of the first-tier subcontractors that:
1. Will be furnishing labor or will be furnishing labor and materials in connection with the public improvement contract; and
2. Will have a contract value that is equal to or greater than five percent of the total project Bid or $15,000, whichever is greater, or $350,000 regardless of the percentage of the total project base proposal price. Bidder must submit this documentation in accordance with Section 00 21 13, 1.02, I.
1.5.2 Proposal Security
Proposal security in the form of either:
a) a Bid bond set forth in Section 00 43 13, Page 7 of 27 Rev. 101326
b) an irrevocable letter of credit issued by an insured institution as defined in ORS 706.008, or
c) a certified check or cashier’s check, in an amount equal to ten percent (10%) of the total amount of the submitted Bid, which has been executed in favor of Portland Public Schools, School District No.
1J, Multnomah County, Oregon, 501 North Dixon Street, Portland, Oregon 97227, shall accompany each Bid exceeding $100,000 as per Section 00 21 13, 1.02, C.
Bid bond and irrevocable letter of credit may be provided electronically with bid submittal if using PlanetBids. If selected as the apparent lowest responsive and responsible proposer, an original must be provided prior to Contract award.
1.5.3 Oregon Construction Contractors Board
Proposers shall be licensed with the Oregon Construction Contractors Board prior to proposing on this project. Failure to comply with this requirement shall result in proposal rejection. Proposers shall provide a copy of their license with their proposal. Landscaping contractors and all subcontractors participating in this project shall be licensed respectively, by the State Landscape Contractors Board, as required by ORS 671.530 and the Oregon Construction Contractors Board, as required by ORS 701.026, at the time they propose to engage in subcontract work. Any proposal received from a Proposer identified by the Oregon Construction Contractors Board as ineligible to hold public contracts in accordance with ORS 701.227 shall be disqualified from consideration.
1.5.4 References
In accordance with District Contracting and Purchasing Rules and ORS 279C.375, District reserves the right to investigate references other than those listed in Proposer’s submission. Investigation may include, without limitation, past performance of any Proposer with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of a project on schedule, and its lawful payment of employees and workers.
1.6 Portland Public Schools Equity in Public Purchasing & Contracting Policy
In July 2012, the PPS Board of Education passed the Portland Public Schools Equity in Public Contracting Policy, 8.50.095-P. The policy has three objectives:
Business Equity: The District will provide professional, supplier, construction and personal service purchasing and contracting opportunities to small businesses that have been historically under-utilized, including businesses owned by people of color, service-disabled veterans and women.
Contractor Workforce Equity: The District will ensure apprenticeship opportunities in the construction trades and will promote construction employment opportunities for people of color and women.
Career Learning Equity: The District will continue to provide career learning opportunities for students, providing them exposure to various potential career paths, including, but not limited to, architecture, engineering and related services, legal and accounting services, as well as building trades and construction work.
DEFINITIONS:
“Certified Business” as used in this solicitation, means a for-profit company certified by the State of Oregon Certification Office of Business Inclusion and Diversity (COBID) as a Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Veteran Business Enterprise (VBE), Oregon Small Business Enterprise (OSBE), and/or an Emerging Small Business (ESB) pursuant to Oregon Revised Statutes Chapter 200; and/or
A company certified in the States of Oregon, Washington and California by the U.S. Department of Transportation (U.S. DOT) as a Disadvantaged Business Enterprise (DBE) pursuant to Code of Federal Regulations (CFR) Title 49, Subtitle A, Parts 23 and 26; and/or
Page 8 of 27 Rev. 101326
A company certified by the State of Washington Office of Minority and Women’s Business Enterprises as a Minority Business Enterprise (MBE) and/or Woman Business Enterprise (WBE) pursuant to Washington Administrative Code, Title 326, Chapter 326-20.
1.6.1 Career Learning Equity
The intent of this objective is to increase the numbers of young people of color and young women in career learning programs.
If the contract resulting from this solicitation has a value equal to or greater than $1,000,000, the awarded Contractor must:
Offer Career Learning opportunities to District students as per Attachment D.
1.6.2 Contractor Workforce Equity
a. Applicability. Upon being awarded a District Public Improvement Contract or a District Intergovernmental Agreement for Construction or Public Improvement with a value greater than $1,000,000, a Contractor shall be obligated to comply with the District Contractor Workforce Equity protocols as described in Attachment E. The District has contracted with the City of Portland for assistance in program administration and compliance. The Contractor Workforce Equity protocols shall apply to:
1) The prime contract; and
2) Any subcontract greater than $250,000
3) Contracts with a project duration exceeding six months
b. Contractor Workforce Equity Protocols.
1) Contractor will ensure that a minimum of 20% of labor hours in apprenticeable trades performed by the contractor and subcontractors on District projects are performed by state-registered apprentices;
2) Contractor will utilize outreach, partnership and recruitment with workforce organizations, trade apprenticeship programs and unions to create an apprenticeship program that reflects the diversity of the Portland metropolitan area; and
3) Contractor will strive to achieve the District’s aspirational workforce diversity goal of a minimum of 25% minority and 14% female hours (including both journey and apprentice level workers) on each eligible project.
1.6.3 Certified Business Utilization Reporting
The District has implemented an online Certified Business utilization tracking system. This web-based software system facilitates Certified Business utilization reporting for all construction, architecture, engineering, and related services contractors doing business with Portland Public Schools. The system is designed to streamline and automate subcontractor utilization reporting requirements and includes the following key features:
Automated tracking of Certified Business utilization, using the COBID database
Online verification of subcontractor payments
Automated communication with contractors via email regarding reporting status
Prime contractors will be required to use the online system to submit first-tier subcontractor data and monthly reports on progress payments to all subcontractors. Subcontractors will be required to use the online system to verify payments received from prime contractors, identify any further tiers of subcontractors, and submit monthly reports on progress payments to their own subcontractors. Prime contractors and subcontractors must access the system at least monthly, when prompted, to manage contract information and provide the required subcontractor and payment information. Prime contractors are responsible for ensuring that all subcontractors comply with the utilization tracking requirements.
Page 9 of 27 Rev. 101326
The Certified Business utilization tracking system is online at https://pps.diversitysoftware.com.
Access information will be provided to the designated point of contact for each contractor after contract award.
1.7 Prevailing Wages
The Contract is for a public work and shall be subject to the prevailing wage requirements of ORS 279C.800 to ORS 279C.870. The selected contractor and its subcontractors shall pay the applicable prevailing wages to their workers as required by ORS 279C.840, (i.e. Prevailing Wage Rates for Public Works Contracts in Oregon) as of the advertisement date of this RFP. This RFP and the resulting Contract are subject to the following BOLI wage rate requirements and the prevailing wage rates set forth in the following booklets:
The effective “Prevailing Wage Rates for Public Works Contracts in Oregon” dated September 3, 2026, including the October 5, 2026 amendment.
The “PWR Apprenticeship Rates” and any other amendments issued by BOLI prior to the issue date of this RFP.
The complete publications may be found online at the BOLI website (https://www.oregon.gov/boli/employers/Pages/prevailing-wage-rates.aspx) and is hereby incorporated by reference.
The fee required by ORS 279C.825(1) will be paid by the District to the Commissioner of the Bureau of Labor and Industries under the administrative rules of the Commissioner.
1.8 Asbestos Abatement
Work to be performed under the contract will will not require the PROPOSER or any subcontractors to be licensed for asbestos abatement work per ors 468a.720.
1.9 Lead Based Paint Renovation License
Perform all work in accordance with OR-OSHA (OAR Chapter 437 Division 3, 1926.62) and Section 02080 (Lead Handling Procedures) specification in the project manual. When working in areas of buildings occupied by children under age six (6), requirements under OAR Chapter 333, Division 69 may also apply, and the Proposer will be required to be licensed under and comply with OAR Chapter 812, Division 7, and ORS Chapter 701.510.
Work to be performed under the contract does does not require the Contractor to hold a Lead- Based Paint Renovation License. Contractors cannot bid/propose on a renovation project until they have completed an approved training class and obtained a Lead-Based Paint Renovation License per the Construction Contractors’ Board (CCB).
1.10 Requirements For Hazardous Materials
Asbestos-containing materials (ACM's) are present in various locations throughout the building. It is the intent of Portland Public Schools to abate only materials that are an obstruction, part of demolition or necessary to complete the renovation. All abatement work is the responsibility of the contractor awarded the project. The Proposer and its subcontractors are required to familiarize themselves with asbestos and asbestos hazards within the building. Provide hazard communication, training and personal protection equipment as necessary to work in or around areas with asbestos materials. The Proposer shall strictly enforce implementation of OR-OSHA (OAR Chapter 437 Division 3, Subdivision Z 1926.1101) requirements during the performance of the work under this contract.
Documents of reference for information on the type, quantity and location of known ACM's are as follows: 1) Portland Public School District's AHERA asbestos inspection report and management plan.
2) Hazardous materials survey/abatement drawings in preparation for the contracted construction. All Sub-contractors are to notify the Proposer if suspect ACM's are uncovered during demolition or renovation activities that are not identified in these documents. Coordinate with the district's hazardous materials consultant as necessary to accommodate testing and abatement work.
Page 10 of 27 Rev. 101326
For this project, the Proposer and its subcontractors shall comply with all applicable OSHA requirements when working in friable asbestos contaminated areas. This includes but not limited to;
floor and attic crawl spaces if those conditions exist in a building. OSHA requirements also apply when working on or around non-friable ACM. This includes but is not limited to; anchorage thru ACM flooring, anchorage of wire molding and fixtures onto ACM plaster or gypsum walls and ceilings, and impacting ACM roofing materials.
1.11 Contract, Bonds and Insurance
A. CONTRACTOR CONTRACT EXECUTION
Within seven (7) calendar days after receipt of Notice of Intent to Award, the successful Proposer shall be prepared to execute the Contract provided by the District, a sample of which is included as Attachment A of this RFP. At the same time, the successful Proposer shall furnish a Performance Bond, a Payment Bond, and required Certificates of Insurance. Prior to starting work under the Contract, the selected Proposer shall provide a performance bond and a payment bond each issued by a surety satisfactory to the District, in an amount equal to the full dollar value of the Contract for the faithful performance of the Contract and all provisions thereof.
B. DISTRICT CONTRACT EXECUTION
After receipt and acceptance of the properly executed Contract, Performance Bond, Payment Bond, and Certificates of Insurance, the District will execute the Contract and issue a Notice to Proceed. No work shall be performed until the Contract is fully executed and a written Notice to Proceed is issued.
C. FAILURE TO EXECUTE
A successful Proposer who fails to execute the Contract or furnish the Performance Bond, Payment Bond and provide Certificates of Insurance in the time and manner indicated herein shall forfeit its Bid security.
D. PUBLIC WORKS BOND
Before starting Work the successful Proposer shall file with the Oregon Construction Contractors Board, and maintain in full force and effect, the separate public works bond required by ORS 279C.836, unless otherwise exempt under those provisions. The successful Proposer shall also include in every subcontract a provision requiring the subcontractor to have a public works bond filed with the Oregon Construction Contractors Board before starting Work, unless otherwise exempt, and shall verify that the subcontractor has filed a public works bond before permitting the subcontractor to start Work.
A disadvantaged, minority, women or emerging small business enterprise certified under ORS 200.055 may, for up to four years after certification, elect not to file a public works bond as required under Section 279C.836 (1). If a business enterprise elects not to file a public works bond, the business enterprise shall give the Oregon Construction Contractors Board written verification of the certification and written notice that the business enterprise elects not to file the bond.
Questions regarding payment of prevailing wages may be directed to BOLI at the BOLI website (www.oregon.gov/BOLI) or at the following address:
Bureau of Labor and Industries Wage and Hour Division
Prevailing Wage Unit 800 N.E. Oregon Street, #32
Portland, Oregon 97232
1.12 Compliance With Law
The selected contractor shall be required to comply with the District’s standard construction contract provisions as provided in Attachment A. In addition, the selected contractor shall comply with and require its subcontractors to comply with all applicable provisions of federal, state and local laws, statutes, ordinances, codes, orders, rules and regulations which pertain to the work specified in this
RFP.
Page 11 of 27 Rev. 101326
2 Scope of Work
2.1 Scope of Work
The Project is a partial voluntary seismic retrofit at Richmond School, including a partial re-roof. This is a two-phase project that will take place during the summers 2027 and 2028, the construction period is outlined in Attachment L.
2.2 Statement of Work
2.2.1 Structural Scope
Work may include but is not limited to the following:
● New concrete shear walls added to the lateral force resisting system
● Anchorage of brick veneer to existing wood-framed walls
● Diaphragm strengthening
● New collectors
● Improved diaphragm to wall connections
● Out-of-plane bracing
● Column strengthening
● Roof to wall connections
● New concrete overlay shear walls
2.2.2 Fire Protection Scope
Work may include but is not limited to:
● Modify existing NFPA wet-pipe sprinkler system to accommodate structural upgrades.
● Demolition portions of existing pipings, hangers, fittings, bracing, restraints and sprinklers to accommodate new shear wall strengthening and ceiling replacement. Replace demolitioned sprinkler components with new UL-listed components in the same location
● Demolish existing hose reel cabinets no longer in service. Cap pipping, remove hose reel and associated equipment.
2.2.3 Architectural and Technology Scope
Work may include but is not limited to the following:
● Seismic improvements to interior and exterior walls, floors, roofs and foundations
● Partial building re-roof
● Full replacement of interior finishes at impacted locations
● Removal and reinstallation of sprinkler lines, architectural casework, sinks, toilets, and other interior items in classrooms, hallways and restrooms
● Removal and reinstallation or replacement of mechanical equipment
● Removal and reinstallation or replacement of interior doors, windows and non-bearing walls in impacted locations.
● Install new teaching walls and wireless access points in classrooms affected by seismic work
Page 12 of 27 Rev. 101326
2.3 Contractor and Subcontractor Fingerprint-Based Criminal History Verification
Performance under this Contract may require or cause Contractor to have direct, unsupervised contact with students. The District requires all Contractor personnel who may have direct, unsupervised contact with students to pass the District fingerprint-based criminal history verification. The Contractor is solely responsible for the cost of these verifications. The current cost is $94.50 and is subject to change.
Proposers are advised to consider this cost when responding to price proposal evaluation criteria as the District will not pay for, or reimburse, such costs. Additional information about this verification process may be found at https://www.pps.net/Page/184
2.4 Sustainable Business Practices
Proposers should prioritize sustainable business practices, including but not limited to:
a. Apply route optimization strategies when providing services, which reduces dependency on oil, saves money, and reduces climate changes when feasible.
b. Maintain a comprehensive and sustainable waste reduction and recycling plan and, where possible, recycle, reuse, and reduce waste going to landfill.
c. Emphasize local product sourcing.
d. Apply water conservation measures to reduce water loss, water usage, and improve water management; including high efficiency fixtures, employee education, and a comprehensive water conservation management plan with actionable goals.
e. Expand use of renewable energy
f. Maintain a toxic waste reduction plan, including but not limited to the following approaches, as applicable: Using certified green cleaning products (e.g. Ecologo, GreenSeal, etc.); reducing technology toxicity (e.g. using EPEAT registered computers); building or remodeling with the intent to be LEED certified with a focus on the environmental health of buildings; using low VOC paints and sealants; and purchasing new goods with Health Product Declarations (HPD).
Page 13 of 27 Rev. 101326
3 Proposal Format, Content, and Submission
3.1 Proposal Format
District proposal standards:
a) Proposal includes a one-page cover letter as the first page of the proposal.
b) Proposal includes Attachment B as the second page of the proposal.
c) Proposal addresses all evaluation criteria.
d) Proposal Response File is 24 pages or less in length. Pages in addition to the page count may be deleted prior to the proposal evaluation. Submit files as follows:
a. File: Response File – Responses to Written Evaluation Criteria
b. File: Qualifications – Attachment C, responses to 3.3.1.A, and relevant staff bios or resumes.
c. File: Attachments – Attachments B and F, Bid Bond, and First-Tier Subcontractor Form
e) Proposals must be submitted electronically via PlanetBids. No hardcopy submittals will be accepted.
Please do not include sales or promotional materials as part of proposal unless requested.
3.2 Proposal Content
Include the content listed in Table 3.2-1.
Proposals shall include all designated mandatory requirements. Proposals lacking one or more of the mandatory requirements may be rejected as non-responsive. Mandatory requirements are designated by a check mark in the “Mandatory” column of Table 3.2-1 below.
Table 3.2-1
Proposal Content Mandatory Scored Optional Proposer Certifications and Representations, signed in ink or indelible pencil
Attachment B
References Attachment C Price Proposal Attachment F First-Tier Subcontractor Form Section 00 43
36 of this RFP
Bid Bond Section 00 43 13 of this RFP
Compliance Statements, Licenses and Certifications
3.3.1.A Responses
Written Evaluation Criteria Responses
3.2.1 Attachment B: Proposer Certifications and Representations
Include a completed Attachment B: Proposer Certifications and Representations form, signed in ink or indelible pencil. If submitted electronically via PlanetBids, a scanned copy will be accepted. Digital and stamped signatures are not accepted.
3.2.2 Attachment C: Reference Sheet
Include a completed Attachment C: Reference Sheet.
3.2.3 Attachment F: Price Proposal
Include a completed Attachment F: Price Proposal.
Page 14 of 27 Rev. 101326
3.3 Proposal Responses to Evaluation Criteria
Address each of the following Evaluation Criteria completely, and in the order provided:
3.3.1 Written Evaluation Criteria
A. Compliance Statements, Licenses and Certifications
Include in your proposal, as stated above, the following:
i. Provide a confirming statement that the proposing firm has reviewed, understands and will comply with all requirements of Oregon public contracting law, including but not limited to, Prevailing Wage Requirements per ORS 279C.800 through ORS 279C.870.
ii. Provide statement regarding current certification of registration with Oregon Construction Contractors Board (CCB) (include copy of certificate)
iii. Provide confirmation of current State of Oregon Business License (include copy)
iv. Provide confirmation of current State of Oregon Lead Based Paint Renovation License (include copy)
v. Provide proof of bonding capacity for a single project as well as aggregate (include copy)
vi. Provide proof of insurance (include copy)
vii. Provide statement that proposing firm is not barred to hold public contracts per Oregon Bureau of Labor and Industries (BOLI)
Valid licensures and certifications for the above are required from the date of award until the expiration date stated in the contract.
Pass/Fail
B. Company Experience and Capacity
i. Provide a company organizational chart of your company; include any wholly owned subsidiary and identify their involvement in the delivery of the project.
ii. State your firm’s annual volume (in dollars) of construction for the past five years. What is your anticipated volume for the current year and what is your plan for the next year, including this project? Describe the capacity of your firm to perform the scope of work provided in Section 2.
iii. Please speak to your capacity to complete multiple projects for PPS concurrently, should your firm be awarded other seismic projects. How will you ensure your best personnel can be adequately allocated to multiple PPS projects?
iv. Provide three (3) to six (6) examples of successful projects, completed during the last eight (8) years, which demonstrate any combination of similar attributes as follows:
a. Similar size, scope and complexity to the Project
b. Construction on a tight delivery timeline
c. Phased construction of an occupied site
v. Include project start and end dates, client contact information, architect contact information, and initial contract amount, final construction costs, and number of change orders. (these may include the three references listed on Attachment C). Previous PPS project experience should be noted in this section.
Maximum Points Available: 25
Page 15 of 27 Rev. 101326
vi. Provide firm’s history of percentage utilization of COBID certified firms on past projects of similar size and scope where COBID certification was tracked.
C. Staff Experience and Capacity
i. List the key staff (including Project Manager, Superintendent and Project Coordinator) proposed to perform the Work. Describe the role of each key staff proposed and the percentage of their time which will be allotted to the project. Provide a brief statement why you think the proposed key staff are the most qualified personnel for this Project.
These staff should be committed for the duration of the project.
ii. Provide resumes for the key staff proposed; resumes should include each individual's education, certifications, work history, length of time with your firm, and prior experience in their role with similar projects.
Include each member’s lessons learned that they will bring from previous project experience to this Project.
iii. Identify the number of accounting staff and their familiarity with Trimble Unity Construct and other similar PMS software.
iv. Describe how your Project team will approach teamwork and collaboration with subcontractors, suppliers, and permitting officials, as well as with the District and the design team.
D. Project Understanding and Approach
Describe your firm’s general understanding of the Project, and the value that your firm’s qualifications bring to the Project.
Address the following as part of the Project Understanding:
i. Discuss the major challenges to successful completion and how your firm proposes to approach them.
ii. Identify key issues or potential constraints and risks that you anticipate for the Project, including areas such as pre-construction, construction, budget, schedule, quality, or safety. Describe your plan for addressing these issues and maintaining the progress of the work.
iii. The school site is located directly adjacent to single family residential development on all sides of the property. It is a constrained site with limited staging and lay-down area. How will the Contractor’s staff maintain site safety and security?
iv. The likelihood for unforeseen conditions while performing the work is high. Describe your firm’s approach to working collaboratively with the design team in addressing unforeseen conditions on a tight delivery timeline.
v. Describe your firm’s approach to assessing and mitigating schedule and budget risks to the project.
vi. Provide a high-level construction schedule to show how you would complete the project.
E. Certified Business Participation Strategy
Certification: Is your firm a certified business as defined in Section 1.3? If yes, indicate the State of certification, all certification types, and your firm’s certification number.
Available: 10
Page 16 of 27 Rev. 101326
Subcontracting: Please provide your firm’s comprehensive plan to recruit Certified Business subcontractors to participate in the performance of this contract. Have you already engaged Certified Businesses as a part of the project team?
An ideal proposal will demonstrate:
Proposer is a Certified Business; and/or Proposer has a comprehensive plan to recruit and partner with
Certified Businesses and has already engaged Certified Businesses as a part of the project team
F. Sustainable Business Practices
Describe your organization’s internal and external approaches to the use of renewable energy, including purchasing energy from low carbon and renewable sources, avoiding products that draw power when not in use, and improving the insulation, lighting, and building envelope features of organization facilities.
Provide detail about potential procurement and/or sourcing of products or services from local, small and/or disadvantaged businesses. As possible, identify suppliers and their ownership.
Describe how your organization will perform all the Sustainable Business Practices listed in Section 2.
Describe and include any sustainability accreditations and/or certifications your organization holds.
Provide the details of your energy conservation efforts in the form of metrics, practices, and/or processes.
An ideal proposal will demonstrate: Offeror prioritizes sustainable business practices within the organization, and has a plan in place to increase sustainability within its operations.
Available: 10
G. Price Proposal
Complete Attachment F. Price proposal will be evaluated with lowest overall proposal cost receiving full points, with all other proposals receiving cost evaluation points proportionately fewer than the maximum based upon the difference from the lowest total proposal cost.
Available: 20
Written Evaluation Criteria Total Total Points Available: 115
Page 17 of 27 Rev. 101326
3.3.2 Interview Evaluation Criteria
Notes: The intent of the interview is to hear primarily from the proposed key staff, i.e. Project Manager, Superintendent, and other team members that the project team will interact with on a daily basis. The following criteria categories will be used to score the interview portion of the selection process.
A. Scheduling and/or Phasing Approach
Available: 15
B. Teamwork & Collaboration
Available: 15
C. Quality Control & Quality Assurance
Available: 5
D. Equity & Diversity
Available: 5
Interview Evaluation Criteria Total
Total Points Available: 40
3.4 Proposal Submission
Electronic Submittal
Submit electronically via PlanetBids, all required sections of the Proposal must be submitted through the website in accordance with the PlanetBids internal timestamp.
Hardcopy Submittal
No hardcopy submittals will be accepted.
A. Proposal
Proposals shall be due up until 2:00:00 PM on the Proposal Closing Date. Failure to submit a complete Proposal by this due date and time may result in Proposal rejection.
B. First-Tier Subcontractor Disclosure Form
The first-tier subcontractor disclosure form is due up until 4:00:00 PM on the Proposal Closing Date. This form will be accepted using any of the following methods:
1. Electronically – with proposal submittal via PlanetBids. PLEASE NOTE: PlanetBids does not allow for submittals after 2:00:00 PM. If submitting this document via PlanetBids it MUST be submitted by 2:00:00 PM. PlanetBids’ internal timestamp will determine timeliness.
2. Hardcopy - No hardcopy submittals will be accepted. Any proposals not submitted via PlanetBids will be rejected.
3. E-mail. If using this method document must be e-mailed to purchasing@pps.net prior to 4:00:00 PM on the Proposal Closing Date. Time and date received on email in Purchasing will determine timeliness of submittal.
Failure to submit first-tier subcontractor disclosure form by this due date and time may result in Proposal rejection.
Page 18 of 27 Rev. 101326
4 Proposal Evaluation and Award
4.1 Clarification of Responses
In the event that one or more proposals are in need of clarification, the District will request such clarification in writing and will afford the Proposer(s) contacted an opportunity to respond in kind, with the necessary clarification.
4.2 Proposal Evaluation
The evaluation process of this RFP will be comprised of a written proposal tier (Tier 1) and an interview/presentation tier (Tier 2).
An Evaluation Committee, consisting of not less than three individuals, shall evaluate the proposals. Each evaluator will independently evaluate and score proposals in accordance with the Evaluation Criteria. The District may assign certain evaluators specific Evaluation Criteria, in alignment with the evaluator’s expertise.
The District may appoint separate evaluation teams for each tier of the evaluation process.
4.2.1 Ranking of Proposals
Evaluations will be scored by rank. The highest-ranked proposal will be determined as follows:
a) Each evaluator will assign a ranking to each proposal, based on the total score he or she awarded each proposal based on the evaluation criteria points.
b) The proposal to which the evaluator awarded the most points will receive an Evaluator Final Rank of 1.
The proposal to which the evaluator awarded the second most points will receive an Evaluator Final Rank of 2, and so forth.
c) The District will then sum the Evaluator Final Ranks for each proposal. The proposal with the lowest total final rank (the sum of all Evaluator Final Ranks) will be ranked first. The proposal with the second lowest final rank will be ranked second, and so on. The proposal with the highest final rank will be ranked last.
4.2.2 Tier 1: Written Proposal Evaluation
a) Each evaluator shall independently score and then rank proposals in accordance with the Evaluation Criteria.
b) District Purchasing & Contracting department, or its designee, shall evaluate fee proposals.
c) The District shall sum the Tier 1 rankings per proposal for a total written evaluation ranking for each proposal.
4.2.3 Establishment of the Competitive Range
a) The District shall establish a Competitive Range after evaluating all responsive proposals in accordance with the Evaluation Criteria.
b) The District anticipates establishing a Competitive Range which will consist of a minimum of one or more Proposers.
c) The District will notify Proposers of the Competitive Range. Notice of Intent to Award issued on PlanetBids shall qualify as this notification in the event there is no Tier 2 evaluation.
Page 19 of 27 Rev. 101326
4.2.4 Tier 2: Invitation for Interview
a) The District may invite all Proposers in the Competitive Range to an interview with the Evaluation Committee.
b) At its sole discretion, the District may eliminate the Tier 2 evaluation if the results are unlikely to change the outcome of the solicitation, or if the District determines the Tier 1 evaluation was sufficient for selection
c) No additions, deletions or substitutions may be made to proposals during the interview/presentation that cannot be viewed as clarification.
4.2.5 Tier 2: Interview Evaluation
a) Each evaluator shall independently score and then rank the interview in accordance with the Interview Evaluation Criteria.
b) The District will sum the Tier 2 rankings per proposer for a total interview evaluation ranking for each proposal.
c) After scoring is completed, the District, if necessary, will apply tier weighting to the evaluator ranks.
d) The District will sum weighted Tier 1 total written evaluation rankings and the weighted Tier 2 total interview evaluation rankings to achieve a total rank per proposal.
4.2.6 Best and Final Offers
a) At its sole discretion, the District may require Best and Final Offers.
b) At its sole discretion, the District may re-establish the competitive range, based on written and interview rankings. If the District exercises this option, it will require Best and Final Offers from Proposers within the re-established Competitive Range.
c) In the event District requires Best and Final Offers, it shall establish a common date and time by which eligible Proposers must submit such Best and Final Offers. The District shall evaluate Proposals as modified by the Best and Final Offer, and on the basis of the Evaluation Criteria.
d) If a Proposer does not submit a Best and Final Offer or a notice of withdrawal, the Proposer’s original proposal shall be construed as its Best and Final Offer.
4.2.7 References
The District reserves the right to investigate references, including customers other than those listed in a Proposer’s submission. This inquiry may include without limitation, investigation of past performance of any Proposer with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, completion or delivery of a project on schedule, and its lawful payment of employees and subcontractors.
4.3 Notification of Intent to Award
The District shall notify Proposers of its Intent to Award by posting such notification on PlanetBids.
Page 20 of 27 Rev. 101326
4.4 Negotiation
a) After the District has issued the Notice of Intent to Award, the District will commence serial negotiations with the highest-ranked eligible Proposer.
b) At any time during negotiations, the District may terminate negotiations with the highest ranked Proposer, or the eligible Proposer with whom it is currently negotiating if the District believes that:
i. The eligible Proposer is not negotiating in good faith; or
ii. Further negotiations or negotiations with the eligible Proposer will not result in the parties agreeing to the terms and conditions of the final Contract in a timely manner.
c) If the District terminates negotiations with an eligible Proposer, the District may then commence negotiations with the next highest-ranked eligible Proposer.
d) The District reserves the right to negotiate final contract terms with the selected Proposer(s) to the fullest extent allowed by law and as in the best interest of the District.
5 Solicitation Terms and Conditions; Protest of Solicitation or Award
5.1 Solicitation Document
This solicitation document may be viewed at the Portland Public Schools Bid Desk, located at the Blanchard Educational Service District Building, 501 N. Dixon St., 2nd Floor, Portland, Oregon 97227.
5.2 Proposer Cost of Response Preparation
Proposers will bear sole responsibility for all costs incurred in preparing and providing their proposals in response to this RFP.
5.3 Submitted Materials are District Property
All materials submitted for any proportion of a Proposal in response to this RFP, or during any tier of this solicitation, will become the property of the District and will not be returned to proposers.
5.4 Proposal Validity
Proposals will remain valid for a period of 90 days following the Proposal submission deadline.
5.5 Solicitation Cancellation, Rejection of a Proposal or All Proposals
The District may cancel the Procurement or reject any or all Proposals in accordance with ORS 279B.100.
The District is not liable to any Proposer for any loss or expense caused by or resulting from the cancellation of a solicitation or rejection of a Proposal.
5.6 Disputes
In case of any doubt or difference of opinion as to:
a) The items or service to be furnished under this RFP, or
b) The interpretation of the provisions of the RFP, the decision of the District will be final and binding upon all parties.
Page 21 of 27 Rev. 101326
5.7 Publicity
News releases relating to this RFP will not be made without prior approval by, and in coordination with, the District Community Involvement and Public Affairs Department.
5.8 Preference for Recycled Materials
The District will give preference for Recycled Materials as set forth in ORS 279A.125 if:
a) The Recycled Product is available;
b) The Recycled Product meets applicable standards
c) The Recycled Product can be substituted for a comparable non-recycled product; and
d) The Recycled Product’s costs do not exceed the costs of non-recycled products by more than 5%, or a higher percentage if the District makes such a written…