Bid Notice-Red Soils Campus Sidewalk Replacement Project.pdf

PDF 4 MB Posted

Attached to
Red Soils Campus Sidewalk Replacement Project
Solicitation number
2026-73
Issued by
Clackamas County, Oregon

About this file

This is a Bid Notice and contract documentation package issued by Clackamas County, Oregon for the Red Soils Campus Sidewalk Replacement Project (Invitation to Bid #2026-73). The project encompasses concrete removal, repair, and ADA-compliant sidewalk installation across the 55+ acre Red Soils Campus in Oregon City to maintain safe pedestrian access and address infrastructure preservation. Sealed bids are being accepted until October 22, 2026 at 2:00 PM Pacific Time, with bid opening and public reading scheduled for 2:05 PM the same day via electronic submission through Bid Locker and Zoom conferencing. Prospective bidders must download bidding documents from the Oregon Buys procurement website (Document No. S-C01010-00018043) and register on the Bid Locker platform at https://bidlocker.us/a/clackamascounty/BidLocker. The contractor shall commence work upon issuance of the Notice to Proceed, with a Substantial Completion date of May 15, 2027 and Final Completion date of June 15, 2027. First-tier subcontractor disclosure forms must be submitted within two working hours after the bid closing deadline.

The County's Engineer's Estimate for the project is $125,000.00. Each bid must be accompanied by bid security equal to ten percent (10%) of the total bid amount, provided either as a cashier's check, certified check, or bid bond executed by a surety company licensed in Oregon. The successful bidder must execute the contract and provide 100 percent performance and payment bonds within twenty (20) calendar days of contract award. Prevailing Wage Rate requirements apply to this project under ORS 279C.800 through 279C.870, with rates set by the Bureau of Labor and Industries (BOLI) effective January 5, 2026 and amended September 3, 2026. Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses (M/W/ESB) and requires all bidders to perform Good Faith Effort outreach to at least three certified or self-identified M/W/ESB subcontractors for each division of work to be subcontracted, with required forms (Form 1 and Form 2) due within two hours of bid closing and Form 3 due with final payment application. The successful bidder must be registered with the Oregon Construction Contractors Board and maintain workers' compensation insurance; late proposals will not be accepted.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clackamas Contract Form B-1 (4/2026)

CLACKAMAS COUNTY

NOTICE OF PUBLIC IMPROVEMENT CONTRACT OPPORTUNITY

INVITATION TO BID #2026-73

Red Soils Campus Sidewalk Replacement Project

September 24, 2026

Clackamas County (“County”) through its Board of County Commissioners is accepting sealed bids for the Red Soils Campus Sidewalk Replacement Project until October 22, 2026, 2:00 PM, Pacific Time, (“Bid Closing”) at the following location:

Bidding Documents can be downloaded from the state of Oregon procurement website (“OregonBuys”) at the following address: https://oregonbuys.gov/bso/view/login/login.xhtml, Document No.S-C01010- 00018043.

Prospective Bidders will need to sign in to download the information and that information will be accumulated for a Plan Holder's List. Prospective Bidders are responsible for obtaining any Addenda from Website listed above.

Submitting Proposals: Bid Locker Proposals will only be accepted electronically thru a secure online bid submission service, Bid Locker.

Email submissions to Clackamas County email addresses will no longer be accepted.

A. Completed proposal documents must arrive electronically via Bid Locker located at https://bidlocker.us/a/clackamascounty/BidLocker.

B. Bid Locker will electronically document the date and time of all submissions. Completed documents must arrive by the deadline indicated in Section 1 or as modified by Addendum.

LATE PROPOSALS WILL NOT BE ACCEPTED.

C. Proposers must register and create a profile for their business with Bid Locker in order to submit for this project. It is free to register for Bid Locker.

D. Proposers with further questions concerning Bid Locker may review the Vendor’s Guide located at https://www.clackamas.us/how-to-bid-on-county-projects .

Engineers Estimate: $125,000.00

Contact Information Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us .

Bids will be opened and publicly read aloud at the above Delivery address after the Bid Closing. Bid results will also be posted to the OregonBuys listing shortly after the opening.

Prevailing Wage Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement:

PREVAILING WAGE RATES for Public Works Contracts in Oregon, January 5, 2026 and amended on September 3, 2026, which can be downloaded at the following web address:

http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx The Work will take place in Clackamas County, Oregon.

Clackamas Contract Form B-1 (4/2026)

Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses.

Clackamas Contract Form B-2 (5/2019)

PUBLIC IMPROVEMENT CONTRACT OPPORTUNITY

Table of Contents

Section B-1………………………………............ Notice of Public Improvement Contract Opportunity

Section B-2……………………………………… Instructions to Bidders

Section B-3……………………………………… Supplemental Instructions to Bidders

Section B-4……………………………………… Bid Bond

Section B-5……………………………………… Bid Form

Section B-6……………………………………… Public Improvement Contract

Section B-7……………………………………… Supplemental General Conditions

Section B-8……………………………………… General Conditions

Section B-9……………………………………… Performance Bond

Section B-10…………………………………….. Payment Bond

Section B-11…………………………………….. Project Information, Plans, Specifications and Drawings

PUBLIC IMPROVEMENT CONTRACT

INSTRUCTIONS TO BIDDERS

Clackamas County Local Contract Review Board Rules (“LCRB Rules”) govern this procurement process. LCRB Rules may be found at:

http://www.clackamas.us/code/documents/appendi xc.pdf. The Instructions to Bidders is applicable to the procurement process for Clackamas County, or any component unit thereof identified on the Notice of Public Improvement Contract Opportunity, herein after referred to as the “Owner.”

Article 1. Scope of Work

The work contemplated under this contract with the Owner, includes all labor, materials, transportation, equipment and services necessary for, and reasonably incidental to, the completion of all construction work in connection with the project described in the Project Manual which includes, but is not necessarily limited to, the Notice of Public Improvement Contract Opportunity, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Form, Bid Bond, Public Improvement Contract Form, Performance Bond, Payment Bond, Clackamas County General Conditions for Public Improvement Contracts (10/13/2021), Supplemental General Conditions, and Plans, Specifications and Drawings.

Article 2. Examination of Site and Conditions

Before making a Bid, the Bidder shall examine the site of the work and ascertain all the physical conditions in relation thereto. The Bidder shall also make a careful examination of the Project Manual including the plans, specifications, and drawings and other contract documents, and shall be fully informed as to the quality and quantity of materials and the sources of supply of the materials. Failure to take these steps will not release the successful Bidder from entering into the contract nor excuse the Bidder from performing the work in strict accordance with the terms of the contract at the price established by the Bid.

The Owner will not be responsible for any loss or for any unanticipated costs, which may be suffered by the successful Bidder, as a result of such Bidder's failure to be fully informed in advance with regard to all conditions pertaining to the work and the character of the work required, including site conditions. No statement made by an elected official, officer, agent, or employee of the Owner in relation to the physical or other conditions pertaining to the site of the work will be binding on the Owner, unless covered by the Project Manual or an Addendum.

Article 3. Interpretation of Project Manual and

Approval of Materials Equal to Those Provided in the Specifications

If any Bidder contemplating submitting a Bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications or forms of contract documents, or detects discrepancies or omissions, such Bidder may submit to the Architect (read "Engineer" throughout in lieu of Architect as appropriate) a written request for an interpretation thereof at least ten (10) calendar days prior to the date set for the Bid Closing.

When a prospective Bidder seeks approval of a particular manufacturer's material, process or item of equal value, utility or merit other than that designated by the Architect in the Project Manual, the Bidder may submit to the Architect a written request for approval of such substitute at least ten

(10) calendar days prior to the date set for the Bid Closing. The prospective Bidder submitting the request will be responsible for its prompt delivery.

Requests of approval for a substitution from that specified shall be accompanied by samples, records of performance, certified copies of tests by impartial and recognized laboratories, and such other information as the Architect may request.

To establish a basis of quality, certain processes, types of machinery and equipment or kinds of materials may be specified in the Project Manual either by description of process or by designating a manufacturer by name and referring to a brand or product designation or by specifying a kind of material. Whenever a process is designated or a manufacturer's name, brand or item designation is given, or whenever a process or material covered by patent is designated or described, it shall be understood that the words "or approved equal" follow such name, designation or description, whether in fact they do so or not.

Any interpretation of the Project Manual or approval of manufacturer's material will be made only by an Addendum duly issued. All Addenda will be posted to the OregonBuys listing and will become a part of the Project Manual. The Owner will not be responsible for any other explanation or interpretation of the Project Manual nor for any other approval of a particular manufacturer's process or item for any Bidder.

When the Architect approves a substitution by Addendum, it is with the understanding that the Contractor guarantees the substituted article or material to be equal or better than the one specified.

Article 4. Security to Be Furnished by Each

Bidder

Each Bid must be accompanied by either 1) a cashier's check or a certified check drawn on a bank authorized to do business in the State of Oregon, or

2) a Bid bond described hereinafter, executed in favor of the Owner, for an amount equal to ten percent (10%) of the total amount Bid as a guarantee that, if awarded the contract, the Bidder will execute the contract and provide a performance bond and payment bond as required. The successful Bidder's check or Bid bond will be retained until the Bidder has entered into a contract satisfactory to Owner and furnished a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond. The Owner reserves the right to hold the Bid security as described in Article 10 hereof. Should the successful Bidder fail to execute and deliver the contract as provided for in Article 12 hereof, including a satisfactory performance bond and payment bond within twenty (20) calendar days after the Bid has been accepted by the Owner, then the contract award made to such Bidder may be considered canceled and the Bid security may be forfeited as liquidated damages at the option of the Owner. The date of the acceptance of the Bid and the award of the contract as contemplated by the Project Manual shall mean the date of acceptance specified in the Notice of Intent to Award.

Article 5. Execution of Bid Bond

Should the Bidder elect to utilize a Bid bond as described in Article 4 in order to satisfy the Bid security requirements, such form must be completed in the following manner:

A. Bid bonds must be executed on the County forms, which will be provided to all prospective Bidders by the Owner.

B. The Bid bond shall be executed on behalf of a bonding company licensed to do business in the State of Oregon.

C. In the case of a sole individual, the bond need only be executed as principal by the sole individual. In the case of a partnership, the bond must be executed by at least one of the partners. In the case of a corporation, the bond must be executed by stating the official name of the corporation under which is placed the signature of an officer authorized to sign on behalf of the corporation followed by such person's official capacity, such as president, etc.

The corporation seal should then be affixed to the bond.

D. The name of the surety must be stated in the execution over the signature of its duly authorized attorney-in-fact and accompanied by the seal of the surety corporation.

Article 6. Execution of the Bid Form

Each Bid shall be made in accordance with: (i) the sample Bid Form accompanying these instructions;

(ii) the appropriate signatures for a sole individual, partnership, corporation or limited liability corporation shall be added as noted in Article 5C above; (iii) numbers pertaining to base Bids shall be stated both in writing and in figures; and (iv) the Bidder's address shall be typed or printed.

The Bid Form relates to Bids on a specific Project Manual. Only the amounts and information asked for on the Bid Form furnished will be considered as the Bid. Each Bidder shall Bid upon the work exactly as specified and provided in the Bid Form.

The Bidder shall include in the Bid a sum to cover the cost of all items contemplated by the Contract.

The Bidder shall Bid upon all alternates that may be indicated on the Bid Form. When Bidding on an alternate for which there is no charge, the Bidder shall write the words "No Charge" in the space provided on the Bid Form. If one or more alternates are shown on the Bid Form, the Bidder shall indicate whether each is "add" or "deduct."

Article 7. Prohibition of Alterations to Bid

Bids that are incomplete, or contain ambiguities or have differing conditions required by the Bidder, including requested changes or exceptions to the Public Improvement Contract form or other portions of the Project Manual, may be rejected in Owner’s sole and absolute discretion.

Article 8. Submission of Bid

Each Bid shall be sealed in an envelope, properly addressed to the Owner, showing on the outside of the envelope the name of the Bidder and the name of the project. Bids will be received at the time and place stated in the Notice of Public Improvement Contract Opportunity.

Article 9. Bid Closing and Opening of Bids

All Bids must be received by the Owner at the place and time set for the Bid Closing. Any Bids received after the scheduled Bid Closing time for receipt of Bids will be rejected.

At the time of opening and reading of Bids, each Bid received will be publicly opened and read aloud, irrespective of any irregularities or informalities in such Bids.

Generally, Bid results will be posted to the OregonBuys Website within a couple hours of the opening.

Article 10. Acceptance or Rejection of Bids by Owner

Unless all Bids are rejected, the Owner will award a contract based on the lowest responsive Bid from a responsible Bidder. If that Bidder does not execute the contract, it will be awarded to the next lowest responsible Bidder or Bidders in succession.

The Owner reserves the right to reject all Bids and to waive minor informalities. The procedures for contract awards shall be in compliance with the provisions of the LCRB Rules in effect at that time.

The Owner reserves the right to hold the Bid and Bid security of the three lowest Bidders for a period of thirty (30) calendar days from and after the time of Bid opening pending award of the contract.

Following award of the contract the Bid security of the three lowest Bidders may be held twenty (20) calendar days pending execution of the contract.

All other Bids will be rejected and Bid security will be returned.

In determining the lowest Bidder, the Owner reserves the right to take into consideration any or all authorized base Bids as well as alternates or combinations indicated in the Bid Form.

If no Bid has been accepted within thirty (30) calendar days after the opening of the Bids, each of the three lowest Bidders may withdraw the Bid submitted and request the return of the Bid security.

Article 11. Withdrawal of Bid

At any time prior to the Bid Closing, a Bidder may withdraw its Bid. This will not preclude the submission of another Bid by such Bidder prior to the time set for the Bid Closing.

After the time set for the Bid Closing, no Bidder will be permitted to withdraw its Bid within the time frames specified in Article 10 for award and execution, except as provided for in that Article.

Article 12. Execution of Contract, Performance Bond and Payment Bond

The Owner will provide the successful Bidder with contract forms within seven (7) calendar days after the completion of the award protest period. The Bidder is required to execute the contract forms as provided, including a performance bond and a payment bond from a surety company licensed to do surety business in the State of Oregon, within seven (7) calendar days after receipt of the contract forms. The contract forms shall be delivered to the Owner in the number called for and to the location as instructed by the Owner.

Article 13. Recyclable Products

Contractors will use recyclable products to the maximum extent economically feasible in the performance of the Contract.

Article 14. Clarification or Protest of the Solicitation Document or Specifications

Any request for clarification or protest of the solicitation document or specifications must be submitted in the manner provided for in the applicable section of the LCRB Rules to the Procurement Representative referenced in the Notice of Public Improvement Contract Opportunity.

A protest of the Solicitation Document must be received within seven (7) business days of the issuance of the Bid or within three (3) business days of issuance of an addendum.

Requests for clarification may be submitted no less than five (5) business days prior to the Bid Closing Date.

Article 15. Protest of Intent to Award

Owner will name the apparent successful Bidder in a “Notice of Intent to Award” letter.

Identification of the apparent successful Bidder is procedural only and creates no right in the named Bidder to the award of the contract. Competing Bidders will be notified by publication of the Notice of Intent to Award on the OregonBuys Website of the selection of the apparent successful Bidder(s) and Bidders shall be given seven (7) calendar days from the date on the “Notice of Intent to Award” letter to review the file at the Procurement Division office and file a written protest of award, pursuant to C-049-0450. Any award protest must be in writing and must be delivered by email, hand delivery, or mail to the Procurement Division Director at: Procurement Division, 2051 Kaen Road, Oregon City, OR 97045.

Article 16. Disclosure of First-Tier Subcontractors

Within two (2) working hours after the Bid Closing, all Bidders shall submit to the County a disclosure form identifying any first-tier subcontractors (those entities that would be contracting directly with the prime contractor) that will be furnishing labor and materials on the contract, if awarded, whose subcontract value would be equal to or greater than: (a) Five percent (5%) of the total contract price, but at least $15,000; or (b) $350,000, regardless of the percentage of the total contract price.

Disclosures may be submitted with the Bid or may be hand delivered to the Bid Closing address or emailed to the Contract Information Analyst listed on the Notice of Contract Opportunity.

Clackamas Contract Form B-3 (2/2023)

SUPPLEMENTAL INSTRUCTIONS TO BIDDERS

Project Name 2026-73 Red Soils Campus Sidewalk Replacement Project

The following modify the Clackamas County “Instructions to Bidders” for this Project. Where a portion of the Instructions to Bidders has been modified by these Supplemental Instructions to Bidders, the unaltered portions shall remain in effect.

1. Electronic Submissions: The County is requiring all bids for this project be electronically submitted. Complete Bids (including all attachments) will only be accepted electronically thru a secure online bid submission service, Bid Locker. Email submissions to Clackamas County email addresses will no longer be accepted.

https://bidlocker.us/a/clackamascounty/BidLocker.

Bids will be publicly read aloud via the computer application, Zoom. Bidders will be allowed to video conference or listen by phone to the bid results. The projects Zoom meeting can be accessed via the information below:

ZOOM LINKS

Join Zoom Meeting https://clackamascounty.zoom.us/j/86322595252

Meeting ID: 863 2259 5252

One tap mobile +19712471195,,86322595252# US (Portland)

+16694449171,,86322595252# US

Join instructions https://clackamascounty.zoom.us/meetings/86322595252/invitations?signature=MuTwAXOYC5t iII3xVecKjZxbOgHSLR_xuOLnExHOEGU

**The Apparent Low bid results will be posted to the projects OregonBuys listing as soon as possible following the bid opening.

2. Good Faith Effort: Clackamas County encourages participation in contracts by Historically Underrepresented Businesses. “Historically Underrepresented Businesses” are State of Oregon-certified and self-identified minority, women and emerging small business as well as firms that are certified federally or by another state or entity with substantially similar requirements as the State of Oregon.

Bidders must perform Good Faith Effort (defined below) and submit Form 1 and Form 2 for the Bidders Bid to be considered responsive. Form 1 and Form 2 must be submitted within two (2) hours after the Closing Date and Time. Form 1 and Form 2

Clackamas Contract Form B-3 (2/2023) may be submitted to either the Contact Information Analyst listed on Notice of Contract Opportunity or via the https://bidlocker.us/a/clackamascounty/BidLocker listing.

“Good Faith Effort” is a requirement of a prime contractor to reach out to at least three Historically Underrepresented Business Subcontractors for each division of work that will be subcontracted out and to complete the required forms. If fewer than three Historically Underrepresented Business Subcontractors are reasonably available for a particular division of work, the Bidder must specifically note the reason for there being fewer than three contacts. The outreach should be performed with sufficient time to give the subcontractors at least 5 calendar days to respond to the opportunity. Form 3, which documents the actual amount of subcontractors on the project, must be submitted with the project final pay application. Compliance with the Good Faith Effort and submission of Forms 1, 2 and 3 is a contractual requirement for final payment.

The sufficiency of the documentation or the performance of Good Faith Effort shall be in the sole and absolute determination of Clackamas County. Only those Bidders that Clackamas County has determined have not sufficiently performed Good Faith Effort shall have protest rights of the determination for such Bidder. No Bidder shall have protest rights of the sufficiency of any other Bidder completing Good Faith Effort.

Clackamas County GFE (2/2023) Page 1 of 4

GOOD FAITH EFFORT

SUBCONTRACTOR AND SELF-PERFORMED WORK LIST

(FORM 1)

Prime Contractor Name: Total Contract Amount:

Project Name: BID 2026-73 Red Soils Campus Sidewalk Replacement Project PRIME SELF-PERFORMING: Identify below ALL GFE Divisions of Work (DOW) to be self-performed. Good Faith Efforts are otherwise required.

DOW BIDDER WILL SELF-PERFORM (GFE not required)

PRIME CONTRACTOR SHALL DISCLOSE AND LIST ALL SUBCONTRACTORS, including those Minority-owned, Woman-owned, and Emerging Small Businesses (“M/W/ESB”) that you intend to use on the project. Delivery via bid locker https://bidlocker.us/a/clackamascounty/BidLocker within 2 hours of the BID/Quote Closing Date/Time.

LIST ALL SUBCONTRACTORS BELOW

Use correct legal name of Subcontractor

(No Assumed Business Names)

Division of Work (Painting, electrical, landscaping, etc.)

List ALL DOW performed by Subcontractors

DOLLAR

AMOUNT OF

SUBCONTRACT

If Certified or self-reporting

MBE/WBE/ESB

Subcontractor

Check box

MBE WBE ESB

Name

Address

City/St/Zip

Phone#

OCCB#

Name

Address

City/St/Zip

City/St/Zip

City/St/Zip

GFE SUBCONTRACTOR AND SELF-PERFORMED WORK LIST (FORM 1) cont’d

Clackamas County GFE (2/2023) Page 2 of 4

Prime Contractor Name: Total Contract Amount:

Project Name: BID 2026-73 Red Soils Campus Sidewa Replacement Project

LIST ALL SUBCONTRACTORS BELOW

Use correct legal name of Subcontractor

(No Assumed Business Names)

Division of Work (Painting, electrical, landscaping, etc.)

List ALL DOW performed by Subcontractors

DOLLAR

AMOUNT OF

SUBCONTRACT

If Certified or self-reporting

MBE/WBE/ESB

Subcontractor

Check box

MBE WBE ESB

Name Address City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

Clackamas County GFE (2/2023) Page 4 of 4

GOOD FAITH EFFORT

PROJECT COMPLETION REPORT

(FORM 3)

Prime Contractor Name: Total Contract Amount:

Project Name: BID 2026-73 Red Soils Campus Sidewalk Replacement Project

Complete this form and submit with your request for final payment upon the project completion. Please list all subcontractors used for the project. Use additional sheets as necessary.

LIST ALL SUBCONTRACTORS BELOW

Use correct legal name of Subcontractor

(No Assumed Business Names)

Division of Work (Painting, electrical, landscaping, etc.)

List ALL DOW performed by Subcontractors

FINAL DOLLAR

AMOUNT OF

SUBCONTRACT

If Certified or self-reported

MBE/WBE/ESB

Subcontractor

Check box

MBE

WBE

ESB

Address City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

City/St/Zip

BY SIGNING BELOW, I HEREBY CERTIFY THAT THE ABOVE LISTED FIRMS HAVE BEEN UTILIZED BY OUR COMPANY IN THE AMOUNTS REPRESENTED ABOVE AND THAT

THE INFORMATION CONTAINED HEREIN IS COMPLETE AND ACCURATE. .

Authorized Signature of Contractor Representative Date

Clackamas County Contract Form B-4 (1/2017)

PUBLIC IMPROVEMENT CONTRACT

BID BOND

Project Name: # 2026-73 Red Soils Campus Sidewalk Replacement Project

We, _____________________________________, as “Principal,” (Name of Principal) and __________________________________________, an _________________ Corporation, (Name of Surety) authorized to transact Surety business in Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns to pay unto Clackamas County (“Obligee”) the sum of ($____________________________)

______________________________________________________________________ dollars.

WHEREAS, the condition of the obligation of this bond is that Principal has submitted its proposal or bid to an agency of the Obligee in response to Obligee’s procurement document (No. ) for the project identified above which proposal or bid is made a part of this bond by reference, and Principal is required to furnish bid security in an amount equal to ten (10%) percent of the total amount of the bid pursuant to the procurement document.

NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect.

IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by our duly authorized legal representatives this ___________day of ______________________, 20____.

Principal:_______________________________________

By:____________________________________________ Signature

Official Capacity

Attest:__________________________________________ Corporation Secretary

Surety:________________________________________

By: Attorney-In-Fact

City State Zip

Phone Fax

Clackamas County Contract Form B-5 (1/2026)

BID FORM

PROJECT: BID# 2026-73 Red Soils Campus Sidewalk Replacement Project BID CLOSING: October 22, 2026, 2:00 PM, Pacific Time BID OPENING: October 22, 2026, 2:05 PM, Pacific Time

FROM: __________________________________________________________________

Bidder’s Name (must be full legal name, not ABN/DBA)

TO: https://bidlocker.us/a/clackamascounty/BidLocker

1. Bidder is (check one of the following and insert information requested):

____a. An individual; or

____b. A partnership registered under the laws of the State of ____________________; or

____c. A corporation organized under the laws of the State of ____________________; or

____d. A limited liability corporation organized under the laws of the State of _____________________________;

and authorized to do business in the State of Oregon hereby proposes to furnish all material and labor and perform all work hereinafter indicated for the above project in strict accordance with the Contract Documents for the Basic Bid as follows:

____________________________________________ Dollars ($__________________) and the Undersigned agrees to be bound by the following documents:

• Notice of Public Improvement Contract Opportunity

• Instructions to Bidders • Supplemental Instructions to Bidders

• Bid Bond • Bid Form

• Public Improvement Contract Form • Performance Bond and Payment Bond

• Clackamas County General Conditions • Supplemental General Conditions

• Prevailing Wage Rates • Payroll and Certified Statement Form

• Plans, Specifications and Drawings

• ADDENDA numbered _______ through_______, inclusive (fill in blanks)

Clackamas County Contract Form B-5 (1/2026) Page 2

2. The Undersigned proposes to add to or deduct from the Base Bid indicated above the items of work relating to the following Alternate(s) as designated in the Specifications: N/A

3. The Undersigned proposes to add to or deduct from the Base Bid indicated above the items or work relating to the following Unit Price(s) as designated in the Specifications, for which any adjustments in the Contract amount will be made in accordance with Section D of the Clackamas County General Conditions:

4. The work shall be completed within the time stipulated and specified in the contract documents.

5. Accompanying herewith is Bid Security which is equal to ten percent (10%) of the total amount of the Basic Bid, plus the total sum of all Alternatives (if any).

6. The Undersigned agrees, if awarded the Contract, to execute and deliver to Clackamas County, within twenty (20) calendar days after receiving the Contract forms, a Contract Form, and a satisfactory Performance Bond and Payment Bond each in an amount equal to one hundred percent (100% ) of the Contract sum, using forms provided by the Owner. The surety requested to issue the Performance Bond and Payment Bond will be:

(name of surety company - not insurance agency)

The Undersigned hereby authorizes said surety company to disclose any information to the Owner concerning the Undersigned's ability to supply a Performance Bond and Payment Bond each in the amount of the Contract.

7. The Undersigned further agrees that the Bid Security accompanying the Bid is left in escrow with Clackamas County; that the amount thereof is the measure of liquidated damages which the Owner will sustain by the failure of the Undersigned to execute and deliver the above-named Contract Form, Performance Bond and Payment Bond, each as published, and that if the Undersigned defaults in either executing the Contract Form or providing the Performance Bond and Payment Bond within twenty (20) calendar days after receiving the Contract forms, then the Bid Security shall become the property of the Owner at the Owner's option; but if the Bid is not accepted within thirty (30) calendar days of the time set for the opening of the Bids, or if the Undersigned executes and timely delivers said Contract Form, Performance Bond and Payment Bond, the Bid Security shall be returned.

8. The Undersigned certifies that: (i) This Bid has been arrived at independently and is being submitted without collusion with and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment or services described in the invitation to bid designed to limit independent bidding or competition; and (ii) the contents of the Bid have not been communicated by the Undersigned or its employees or agents to any person not an employee or agent of the Undersigned or its surety on any Bond furnished with the Bid and will not be communicated to such person prior to the official opening of the Bid.

9. The undersigned HAS, HAS NOT (check one) paid unemployment or income taxes in Oregon within the past 12 months and DOES, DOES NOT (check one) a business address in Oregon. The undersigned acknowledges that, if the selected bidder, that the undersigned will have to pay all applicable taxes and register to do business in the State of Oregon before executing the Contract Form.

Clackamas County Contract Form B-5 (1/2026) Page 3

10. The Undersigned agrees, if awarded a contract, to comply with the provisions of ORS 279C.800 through 279C.870 pertaining to the payment of the prevailing rates of wage.

11. Contractor's CCB registration number is ____________________________. As a condition to submitting a bid, a Contractor must be registered with the Oregon Construction Contractors Board in accordance with ORS 701.035 to 701.055, and disclose the registration number. Failure to register and disclose the number will make the bid unresponsive and it will be rejected, unless contrary to federal law.

12. The successful Bidder hereby certifies that all subcontractors who will perform construction work as described in ORS 701.005(2) were registered with the Construction Contractors Board in accordance with ORS 701.035 to 701.055 at the time the subcontractor(s) made a bid to work under the contract.

13. The successful Bidder hereby certifies that, in compliance with the Worker's Compensation Law of the State of Oregon, its Worker's Compensation Insurance provider is ______________________________, Policy No. , and that Contractor shall submit Certificates of Insurance as required.

14. Contractor’s Key Individuals for this project (supply information as applicable):

Project Executive:__________________________, Cell Phone: ____________________, Project Manager: __________________________, Cell Phone: ____________________, Job Superintendent: ________________________, Cell Phone: ____________________, Project Engineer: __________________________, Cell Phone: ____________________.

15. The Undersigned certifies that it has not discriminated against minority, women, or emerging small businesses in obtaining any subcontracts for this project.

16. The Undersigned certifies that it has a drug testing program in accordance with ORS 279C.505.

REMINDER: Bidder must submit the below First-Tier Subcontractor Disclosure Form.

By signature below, Contractor agrees to be bound by this Bid.

NAME OF FIRM _______________________________________

ADDRESS _______________________________________

TELEPHONE NO _______________________________________

EMAIL _______________________________________

SIGNATURE 1) _______________________________________

Sole Individual

Clackamas County Contract Form B-5 (1/2026) Page 4 or 2) _______________________________________ Partner or 3) _______________________________________ Authorized Officer or Employee of Corporation

* * * * * E N D O F B I D * * * * *

Clackamas County Contract Form B-5 (1/2026) Page 5

FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM

PROJECT: 2026-73

BID OPENING: October 22, 2026, 2:00 PM, Pacific Time

Failure to submit this Form by the disclosure deadline will result in a nonresponsive bid.

INSTRUCTIONS:

This First-Tier Subcontractor Disclosure Form (“Form”) must be submitted and received at the location specified in the Notice of Public Improvement Contract Opportunity on the advertised Bid Closing, and within two working hours after the advertised Bid Closing Time.

Proposals will only be accepted electronically thru a secure online bid submission service, Bid Locker.

Email submissions to Clackamas County email addresses will no longer be accepted.

A. Completed proposal documents must arrive electronically via Bid Locker located at https://bidlocker.us/a/clackamascounty/BidLocker.

B. Bid Locker will electronically document the date and time of all submissions. Completed documents must arrive by the deadline indicated in Section 1 or as modified by Addendum.

LATE PROPOSALS WILL NOT BE ACCEPTED.

C. Proposers must register and create a profile for their business with Bid Locker in order to submit for this project. It is free to register for Bid Locker.

D. Proposers with further questions concerning Bid Locker may review the Vendor’s Guide located at https://www.clackamas.us/how-to-bid-on-county-projects .

Subcontractor lists may be submitted with the bid in the same envelope or email at the Bid Closing date and time. Subcontractor lists MUST be submitted within two (2) hours of the Bid Closing date and time.

List below the name of each subcontractor that will be furnishing labor, or labor and materials, for which disclosure is required, the category of work that the subcontractor will be performing, and the dollar value of the subcontract. Enter “NONE” if the value of the project bid is less than $100,000 or there are no subcontractors that need to be disclosed. ATTACH ADDITIONAL SHEETS IF NECESSARY.

SUBCONTRACTOR NAME DOLLAR VALUE CATEGORY OF WORK

1. ____________________________

2. ____________________________

3. ____________________________

4. ____________________________

5. ____________________________

6. ____________________________

The above listed first-tier subcontractor(s) are providing labor, or labor and material, with a Dollar Value equal to or greater than:

a) 5% of the total Contract Price, but at least $15,000. If the Dollar Value is less than $15,000 do not list the subcontractor above; or

b) $350,000 regardless of the percentage of the total Contract Price.

Firm Name:

Bidder Signature: Phone #

Clackamas County Contract Form B-6 (2/2025)

CLACKAMAS COUNTY

Contract #000000XXXX

This Public Improvement Contract (the “Contract”) is made by and between Clackamas County, a political subdivision of the State of Oregon (“Owner”), and Contractor Name (No DBA/ABN) (“Contractor”), both collectively referred to as the “Parties”. This Contract shall become effective on the date this Contract has been signed by all the Parties and shall expire upon completion the completion of all obligations under the terms of this Contract unless terminated earlier by the Parties.

All capitalized terms in this Contract shall have the meanings identified in the Clackamas County General Conditions for Public Improvement Contracts (11/21/2024) (“General Conditions”) referenced within the Instructions to Bidders.

Project Name: #2026-73 Red Soils Campus Sidewalk Replacement Project

1. Contract Price, Contract Documents and Work.

The Contractor hereby agrees to perform all the work described in, and reasonably inferred from, the Contract Documents, as further defined below (“Work”). In consideration of the Contractor performing the Work in accordance with the terms of the Contract, the Owner agrees to pay the Contractor an amount not to exceed Dollars ($ ) (the "Contract Price"). Payment will be made in accordance with the terms and conditions provided in the Contract Documents. The Contract Price is the amount contemplated by the Base Bid adjusted for Alternates [Identify accepted Alternates], as indicated in the accepted Bid.

The following documents are incorporated by reference in this Contract and made a part hereof (“Contract Documents”):

• Notice of Contract Opportunity • Instructions to Bidders

• Supplemental Instructions to Bidders • Bid Bond

• Bid Form • Performance Bond and Payment Bond

• Clackamas County General Conditions • Supplemental General Conditions

• Prevailing Wage Rates • Payroll and Certified Statement Form

• Plans, Specifications and Drawings • [Addenda]

2. Representatives.

Contractor has named as its Authorized Representative to act on its behalf. Owner designates, or shall designate, its Authorized Representative as indicted below (check one):

Unless otherwise specified in the Contract Documents, the Owner designates Steve Bloemer as its Authorized Representative in the administration of this Contract. The above-named individual shall be the initial point of contact for matters related to Contract performance, payment, authorization, and to carry out the responsibilities of the Owner.

Name of Owner’s Authorized Representative shall be submitted by Owner in a separate writing.

3. Key Persons.

The Contractor’s personnel identified below shall be considered Key Persons and shall not be replaced during the project without the written permission of Owner, which shall not be unreasonably withheld. If the Contractor intends to substitute personnel, a request must be given to Owner at least 30 days prior to the intended time of substitution. When replacements have been approved by Owner, the Contractor shall provide a transition period of at least 10 working days during which the original and replacement personnel shall be working on the project concurrently. Once a replacement for any of these staff members is authorized, further replacement shall not occur without the written permission of Owner. The Contractor’s project staff shall consist of the following personnel:

Project Executive: shall be the Contractor’s project executive, and will provide oversight and guidance throughout the project term.

Project Manager: shall be the Contractor’s project manager and will participate in all meetings throughout the project term.

Job Superintendent: shall be the Contractor’s on-site job superintendent throughout the project term.

Project Engineer: shall be the Contractor’s project engineer, providing assistance to the project manager, and subcontractor and supplier coordination throughout the project term.

4. Contract Dates.

The Contractor agrees to complete the Work in accordance with the following key dates:

COMMENCEMENT DATE: Upon Issuance of Notice to Proceed SUBSTANTIAL COMPLETION DATE: May 15, 2027 FINAL COMPLETION DATE: June 15, 2027

6. Liquidated Damages The Owner and the Contractor acknowledge and agree that if the Contractor fails to reach Substantial Completion of the entire Work by the Substantial Completion Date identified in Section 4 above, the Owner will suffer damages, which are both extremely difficult and impracticable to ascertain, and on that basis agree to the assessment by Owner of liquidated damages as provided in this Section. These damages may include, but are not limited to, use of the Project, costs associated with Contract administration, and use of temporary facilities. The liquidated damages amount is not a penalty, but a reasonable estimate of the amount of losses the Owner will suffer. The Owner may deduct such liquidated damages as are payable under this Section from money due or to become due to the Contractor or, at is election, pursue any other legal remedy to collect such liquidated damages from the Contractor and/or its Surety.

If the Contractor fails to achieve Substantial Completion of the entire Work by the Substantial Completion Date identified in Section 4, the Contractor shall pay the Owner as liquidated damages:

6.1. $ per Calendar day past the Substantial Completion date.

Payment of liquidated damages shall not release Contractor from its obligation with respect to the complete performance of the Work, nor shall the payment of liquidated damages constitute a waiver of Owner’s right to collect any additional damages that it may sustain by failure of Contractor to fully perform the Work, as it is the intent of the parties that the liquidated damages are a full and complete payment only for failure of Contractor to complete the Work on time. Owner expressly reserves the right to make claims for any and all other damages that Owner may incur due to contractor’s failure to perform in strict accordance with this Contract.

5. Insurance Certificates.

In accordance with Section G.3.5 of the General Conditions Contractor shall furnish proof of the required insurance naming Clackamas County as an additional insured. Insurance certificates may be returned with the signed Contract or may be emailed to the County Contract Analyst.

7. Tax Compliance.

The Contractor shall comply with all federal, state and local laws, regulation, executive orders and ordinances applicable to this Contract. Contractor represents and warrants that it has complied, and will continue to comply throughout the duration of this Contract and any extensions, with all tax laws of this state or any political subdivision of this state, including but not limited to ORS 305.620 and ORS chapters 316, 317, and 318. Any violation of this section shall constitute a material breach of this Contract and shall entitle County to terminate this Contract, to pursue and recover any and all damages that arise from the breach and the termination of this Contract, and to pursue any or all of the remedies available under this Contract or applicable law.

8. Confidential Information.

Contractor acknowledges that it and its employees or agents may, in the course of performing their responsibilities under this Contract, be exposed to or acquire information that is confidential to Owner. Any and all information of any form obtained by Contractor or its employees or agents in the performance of this Contract shall be deemed confidential information of Owner (“Confidential Information”). Contractor agrees to hold Confidential Information in strict confidence, using at least the same degree of care that Contractor uses in maintaining the confidentiality of its own confidential information, and not to copy, reproduce, sell, assign, license, market, transfer or otherwise dispose of, give, or disclose Confidential Information to third parties or use Confidential Information for any purpose unless specifically authorized in writing under this Contract.

9. Counterparts.

This Contract may be executed in several counterparts, all of which when taken together shall constitute an agreement binding on all Parties, notwithstanding that all Parties are not signatories to the same counterpart.

Each copy of the Contract so executed shall constitute an original.

10. Integration.

All provisions of state law required to be part of this Contract, whether listed in the General or Special Conditions or otherwise, are hereby integrated and adopted herein. Contractor acknowledges the obligations thereunder and that failure to comply with such terms is a material breach of this Contract.

The Contract Documents constitute the entire agreement between the parties. There are no other understandings, agreements or representations, oral or written, not specified herein regarding this Contract.

Contractor, by the signature below of its authorized representative, hereby acknowledges that it has read this Contract, understands it, and agrees to be bound by its terms and conditions.

11. Compliance with Applicable Law. Contractor shall comply with all federal, state, county, and local laws, ordinances, and regulations applicable to the Work to be done under this Contract including, but not limited to, compliance with the prohibitions set forth in ORS 652.220, compliance of which is a material element of this Contract and failure to comply is a material breach that entitles County to exercise any rights and remedies available under this Contract including, but not limited to, termination for default.

12. Responsibility for Taxes. Contractor is solely responsible for payment of any federal, state, or local taxes required as a result of the Contract or the Work including, but not limited, to payment of the corporate activity tax imposed under enrolled HB 3427 (2019 Oregon regular legislative session). Contractor may not include its federal, state, or local tax obligations as part of the cost to perform the Work.

In witness whereof, Owner executes this Contract and the Contractor does execute the same as of the day and year first above written.

Contractor DATA:

(Insert Contractor Name & Address)

Contractor CCB # Expiration Date:

Oregon Business Registry # Entity Type: State of Formation:

Payment information will be reported to the IRS under the name and taxpayer ID# provided by the Contractor.

Information must be provided prior to contract approval. Information not matching IRS records could subject Contractor to 28 percent backup withholding.

Contractor Name (No DBA/ABN)

Authorized Signature Date

Name / Title Printed

Clackamas County

Chair Date

APPROVED AS TO FORM

County Counsel Date

Clackamas County Contract Form B-7 (1/2025)

SUPPLEMENTAL GENERAL CONDITIONS

PROJECT: #2026-73

The following modifies the November 21, 2024 Clackamas County General Conditions for Public Improvement Contracts (“County General Conditions”) for this Contract. Except as modified below, all other terms and conditions of the County General Conditions shall remain in effect.

1. Good Faith Effort As a condition of Contractor being awarded a Contract for this Project, Contractor must complete Good Faith Effort outreach and documentation as described in the Supplemental Instructions to Bidders of the Solicitation Document.

The Contractor may not change who is performing each Division of Work identified in Form 1 of the Good Faith Effort without the express written advance approval of Owner.

This includes substituting identified subcontractors, self-performance of a Division of Work that was identified to be performed by a subcontractor, or the Contractor subcontracting a Division of Work that was identified to be self-performed by the Contractor.

Contractor shall be required to submit the completed Form 3 with its final pay application as a condition of final payment.

Clackamas County General Conditions (November 21, 2024) Page 1

CLACKAMAS COUNTY GENERAL CONDITIONS

FOR PUBLIC IMPROVEMENT CONTRACTS

November 21, 2024 INSTRUCTIONS: The attached Clackamas County General Conditions for Public Improvement Contracts ("County General Conditions”) apply to all designated Public Improvement contracts. Changes to the County General Conditions (including any additions, deletions or substitutions) should only be made by attaching Public Improvement Supplemental General Conditions. The text of these County General Conditions should not otherwise be altered.

TABLE OF SECTIONS

SECTION A - GENERAL PROVISIONS

A.1 DEFINITION OF TERMS

A.2 SCOPE OF WORK

A.3 INTERPRETATION OF CONTRACT DOCUMENTS

A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND PROJECT

A.5 INDEPENDENT CONTRACTOR STATUS

A.6 RETIREMENT SYSTEM STATUS AND TAXES

A.7 GOVERNMENT EMPLOYMENT STATUS

SECTION B - ADMINISTRATION OF THE CONTRACT

B.1 OWNER’S ADMINISTRATION OF THE CONTRACT

B.2 CONTRACTOR'S MEANS AND METHODS

B.3 MATERIALS AND WORKMANSHIP

B.4 PERMITS

B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS

B.6 SUPERINTENDENCE

B.7 INSPECTION

B.8 SEVERABILITY

B.9 ACCESS TO RECORDS

B.10 WAIVER

B.11 SUBCONTRACTS AND ASSIGNMENT

B.12 SUCCESSORS IN INTEREST

B.13 OWNER'S RIGHT TO DO WORK

B.14 OTHER CONTRACTS

SECTION C - WAGES AND LABOR

C.1 MINIMUM WAGES RATES ON PUBLIC WORKS

C.2 PAYROLL CERTIFICATION AND FEE REQUIREMENTS,

ADDITIONAL RETAINAGE

C.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .