Bid Notice-Portland Campus - Gymnasium Second Floor Renovation (CP25-118) _ Building Improvements (CP26-136).pdf
PDF 12 MB Posted
- Attached to
- Portland Campus - Gymnasium Second Floor Renovation (CP25-118) & Building Improvements (CP26-136)
- Solicitation number
- CP25-118 & CP26-136
- Issued by
- Lane County, Oregon
About this file
Summary
This Bid Notice and associated Project Manual document the University of Oregon's solicitation for construction services to renovate the 2,700 square foot second floor of the Gymnasium at its Portland Campus (CP25-118) and to complete building-wide improvements including installation of a new 800-ampere electrical main distribution panel and fire alarm system (CP26-136). The project encompasses the gymnasium renovation with potential alternates for new window openings, new skylights, and new luxury vinyl tile flooring at the kitchenette and restroom, as well as building improvements with alternates for new south entry doors and a new sunshade. A mandatory pre-bid conference for prime bidders will be held at 10:00 AM on November 16, 2026, at the Gymnasium building located at 6430 NE 27th Avenue, Portland, Oregon 97211. Electronic bids are due by 10:00 AM Pacific Time on December 17, 2026, via a Smartsheet submission portal. Bids will be publicly opened and read aloud on December 18, 2026, at 10:00 AM at the Campus Center building, Room 212, located at 2823 NE Holman Street, Portland, Oregon 97211. The University desires substantial completion of both the base bid work and any selected alternates prior to the fall 2027 academic term start on September 27, 2027.
Bids are requested on a lump-sum basis for all work, with bid security equal to ten percent of the total base bid amount (Bid Packages 1 and 2 combined, excluding alternates) to be provided in a sealed envelope at the public bid opening. All bidders must comply with prevailing wage requirements under Oregon Revised Statutes 279C.800 through 279C.870, as established by the Bureau of Labor and Industries, and must be registered with the Oregon Construction Contractors Board at the time of bid submission. Contractor is responsible for obtaining necessary permits and licenses, except for general building permit plan check fees, permit fees, systems development charges, and building department inspection fees, which will be paid by the Owner. The University encourages bids from Minority, Women, and Emerging Small Businesses and requires contractor certification regarding non-discrimination in subcontracting. Contractor must provide performance and payment bonds each equal to one hundred percent of the contract sum. Material substitution requests must be submitted by November 18, 2026, at 10:00 AM, and clarifying questions must be submitted by December 1, 2026, at 10:00 AM, with responses issued by addendum.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIVERSITY OF OREGON
Portland Campus - Gymnasium
Second Floor Renovation (CP25-118) and Building Improvements (CP26-136)
TABLE OF CONTENTS
Project Manual
Bidding & Contracting Requirements
Notice of Construction Contracting Opportunity
Instructions to Bidders
Supplemental Instructions to Bidders
Bid Bond
Bid Form
General Conditions January 1, 2016
Supplemental General Conditions
Performance Bond
Payment Bond
Contract for Construction Services
Public Improvement Contract Change Order Form
BOLI Prevailing Wage Rates for Public Works Contracts September 3, 2026 as Amended October 5, Specifications
Reference attached Specifications Table of Contents for Permit/ Bid Set documents dated September 30, 2026 (5 pages)
Reference enclosed Specifications in entirety (861 pages)
Drawings
Reference attached Sheet (Drawings) Index for Permit/ Bid Set documents dated September 30, 2026 (3 pages)
Reference enclosed Drawings in entirety (82 sheet drawings)
Owner's Representative: Melissa Moshofsky, email: melmos@uoregon.edu
Peter Meijer Architect - Specifications
Gym 2nd Floor Renovation & Building Improvements
Project Number: 25-008
SHEET INDEX
Permit/Bid Set | September 30, 2026 Page 1 of 3
00 GENERAL
ALT BID 1 BID 2
G001 ............... PROJECT INFORMATION X X X
G002 ............... CITY INFORMATION & DIRECTIVES X X
G005 ............... SYMBOLS & ABBREVIATIONS X X
G006 ............... CODE ANALYSIS X X
G110 ............... FIRE & LIFE SAFETY SUMMARY X X
G111 ............... FIRE & LIFE SAFETY PLANS X X
G112 ............... FIRE & LIFE SAFETY PLANS X X
G120 ............... OCCUPIED SAFETY PLANS X X
G121 ............... OCCUPIED SAFETY PLANS X X
G122 ............... OCCUPIED SAFETY PLANS X X
01 LANDSCAPE
ALT BID 1 BID 2
L010.2 TREE PROTECTION PLAN X
L100.2 LANDSCAPE PLANTING PLAN X
02 CIVIL
ALT BID 1 BID 2
C100.2 CIVIL NOTES & DETAILS X
C120.2 CIVIL SITE PLAN X
03 ARCH DEMO
ALT BID 1 BID 2
AD110.1 DEMO – FLOOR PLANS X
AD111.1 DEMO – FLOOR PLANS X X
AD112.1 DEMO – ROOF & REFLECTED CEILING PLAN X X
AD200.1 DEMO – ELEVATIONS & DETAILS X X
04 ARCHITECTURAL
ALT BID 1 BID 2
A010.1 ASSEMBLIES X
A100.2 SITE PLAN X
A110.1 FLOOR PLANS X
A111.1 FLOOR PLANS X X
A120.1 EXTERIOR ELEVATIONS & BUILDING SECTION X X
A150.1 REFLECTED CEILING PLAN & FINISH PLAN X X
A400.1 ENLARGED PLANS & INTERIOR ELEVATIONS – 202, 205, EAST STAIR X
A401.1 ENLARGED PLANS & INTERIOR ELEVATIONS – 210A, 207-212 X
A500.1 EXTERIOR DETAILS – WINDOWS & DOOR X
Peter Meijer Architect - Drawings
Permit/Bid Set | September 30, 2026 Page 2 of 3
ALT BID 1 BID 2
A502.2 EXTERIOR DETAILS - SUNSHADE X X
A503.2 EXTERIOR DETAILS – SOUTH ENTRY DOOR X
A550.1 INTERIOR DETAILS - GENERAL X
A551.1 INTERIOR DETAILS – DOORS, THRESHOLDS X
A552.1 INTERIOR DETAILS - CASEWORK X
A553.2 INTERIOR DETAILS – ELECTRICAL ROOM DOOR X
A600.1 SCHEDULES - OPENINGS X
A601.1 SCHEDULES - FINISHINGS X
05 ROOF
ALT BID 1 BID 2
R100.1 ROOF PLAN & DETAILS X X
06 STRUCTURAL
ALT BID 1 BID 2
S001 DRAWING INDEX & LIST OF ABBREVIATIONS X X
S002.1 GENERAL STRUCTURAL NOTES X
S111.1 STRUCTURAL PLANS X
S501.1 STRUCTURAL DETAILS X
S002.2 GENERAL STRUCTURAL NOTES X
S601.2 CANOPY FRAMING PLAN AND DETAILS X
07 MECHANICAL
ALT BID 1 BID 2
M001.1 SYMBOL LIST & GENERAL NOTES - MECHANICAL X
M002.1 SCHEDULES - MECHANICAL X
MD210.1 DEMO FLOOR PLANS - MECHANICAL X
M210.1 FLOOR PLANS - MECHANICAL X
M220.1 ROOF PLAN - MECHANICAL X
M230.1 DETAILS - MECHANICAL X
08 ELECTRICAL
ALT BID 1 BID 2
E001 SYMBOL LIST & GENERAL NOTES - ELECTRICAL X X
E002.1 LUMINAIRE SCHEDULES - ELECTIRCAL X
ED210.1 DEMO PLANS - ELECTRICAL X
ED210.2 DEMO PLANS - ELECTRICAL X
ED501.1 DEMO SINGLE LINE DIAGRAMS - ELECTRICAL X
E501.2 DEMO SINLE LINE DIAGRAMS - ELECTRICAL X
E100.2 SITE PLAN - ELECTRICAL X
E110.1 FLOOR PLANS - LIGHTING X
E210.1 FLOOR PLANS - ELECTRICAL X
E210.2 FLOOR PLANS - ELECTRICAL X
Permit/Bid Set | September 30, 2026 Page 3 of 3
ALT BID 1 BID 2
E211.2 FLOOR PLANS - ELECTRICAL X
E220.1 ROOF PLAN - ELECTRICAL X
E220.2 ROOF PLAN - ELECTRICAL X
E501.1 SINGLE LINE DIAGRAMS - ELECTRICAL X
E501.2 SINGLE LINE DIAGRAMS - ELECTRICAL X
E601 SCHEDULES - ELECTRICAL X X
09 PLUMBING
ALT BID 1 BID 2
P001.1 SYMBOL LIST & GENERAL NOTES - PLUMBING X
PD210.1 DEMO FLOOR PLANS - PLUMBING X
P210.1 FLOOR PLANS - PLUMBING X
10 TECHNOLOGY
ALT BID 1 BID 2
T001 SYMBOL LIST & GENERAL NOTES - TECHNOLOGY X X
TD210.1 DEMO FLOOR PLANS - TECHNOLOGY X
T200.1 FLOOR PLANS - TECHNOLOGY X
T210.1 FLOOR PLANS - TECHNOLOGY X
T210.2 FLOOR PLANS - TECHNOLOGY X
T401.1 ENLARGED PLANS - TECHNOLOGY X
T701.1 DETAILS - TECHNOLOGY X
11 FIRE ALARM
ALT BID 1 BID 2
FA001.2 SYMBOL LIST AND GENERAL NOTES – FIRE ALARM X
FAD210.2 DEMO PLAN – BASEMENT – FIRE ALARM X
FAD211.2 DEMO PLAN – LEVEL 01 – FIRE ALARM X
FAD212.2 DEMO PLAN – LEVEL 02 – FIRE ALARM X
FA210.2 FLOOR PLAN – BASEMENT – FIRE ALARM X
FA211.2 FLOOR PLAN – LEVEL 01 – FIRE ALARM X
FA212.2 FLOOR PLAN – LEVEL 02 – FIRE ALARM X
FA701.2 DETAILS – FIRE ALARM X
UO Bid Opportunity Notification (7/14)
NOTICE OF CONSTRUCTION CONTRACTING OPPORTUNITY
The University of Oregon (“Owner”) is accepting electronic bids on December 17, 2026. Bids are due by 10 AM, Pacific Time (“Closing Date and Time”) for the Portland Campus
Gymnasium Second Floor Renovation (CP25-118) and Building Improvement (CP26-136) projects (as combined) located on the campus in Portland, Oregon (“Project”). The Project includes a renovation of the second floor as well building wide improvements and including alternates for each.
Bids are to be submitted via the following link:
https://app.smartsheet.com/b/form/f0fbbbf6a0ee4751a8a385e8472ecde6
When the site opens it will say “RFQ/RFP Submissions”. Please fill in the information fields and upload your completed Bid Form by the due date and time.
A mandatory (Prime bidders) pre-bid conference will be conducted at 10 AM on Monday, November 16, 2026. Prime bidders shall and any subcontractors may meet with Owner’s
Representative at the University of Oregon’s Portland Campus, Gymnasium building, located at
6430 NE 27th Ave, Portland, OR 97211, for that purpose.
Attendees can park for free at any of the University of Oregon’s Portland Campus parking lots or curbside at City streets where parking is allowed. Please note the small parking lot immediately south of the Gymnasium may be cordoned off for current construction activities. The tennis court area to the north of the Gymnasium can hold overflow parking as needed – this is accessed directly from NE 27th Avenue. Park where available and allow time to navigate to the
Gymnasium’s main lobby entrance facing the west off NE 27th Avenue. See Attachment A -
Portland Campus Map, for building and parking locations.
Attendance will be documented through a sign-in sheet prepared by the Owner’s Representative.
Prime bidders who arrive more than 5 minutes after the start of time of the meeting (as stated in the solicitation and by the Owner’s Representative’s watch) or after the discussion portion of the meeting (whichever comes first) shall not be permitted to sign in and will not be permitted to submit a bid on the Project.
Bids will be opened and publicly read aloud on December 18, 2026 at 10:00 AM, at the
Campus Center building Room 212, located at 2823 NE Holman Street, Portland, OR 97211 by the Owner’s representative or designee. Attendees can park for free at any of the University of
Oregon’s Portland Campus parking lots or curbside at City streets where parking is allowed.
Park where available. See Attachment A - Portland Campus Map, for building and parking locations.
UO Bid Opportunity Notification (7/14)
Bids will be received on a lump-sum basis for all of the work. Bid packets may be obtained for no charge on the UO Business Opportunities website https://pcs.uoregon.edu/content/business-opportunities .
All bidders must comply with requirements of the prevailing wage law in ORS 279C.800 through ORS 279C.870. All bidders must be registered with the Construction Contractor’s
Board at the time of bid submission. No bid will be considered unless fully completed in the manner provided in the “Instructions to Bidders” upon the Bid Form provided and accompanied by Bid Security. OUS encourages bids from Minority, Women, and Emerging Small Businesses.
The University of Oregon
By: Jamie Moffitt, Vice President for Finance and Administration
PUBLICATIONS AND DATES:
Daily Journal of Commerce
The Oregonian
Attachment A - UO Portland Campus Map
Mandatory Prebid
Public Bid Opening
Tennis Court
Construction area - do not enter (dashed boundary)
N E
7t h A ve nu e
NE Holman Street
NE Liberty Street
NE Rosa Parks Way N
E
9t h
A ve nu e
N E
9t h A ve nu e
NE Highland Street
NE Dekum Street
UO Supplemental Instructions to Bidders (07/14)
CONTRACT FOR CONSTRUCTION SERVICES
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
Portland Campus - Gymnasium Second Floor Renovation (CP25-118) and Building
Improvements (CP26-136)
The following modify the University of Oregon “Instructions to Bidders” for this procurement. Where a portion of the Instructions to Bidders has been modified by these Supplemental Instructions to Bidders, the unaltered portions shall remain in effect.
Article 4. Substitute Materials Approval Process, 4.1. Replace with the following –
Substitution requests must be submitted to both Peter Meijer Architects and the Owner
Representative. Submit to both Skyla Leavitt via email at skylal@pmapdx.com and
Melissa Moshofsky via email at melmos@uoregon.edu . The last day for submitting material substitution requests will be November 18, 2026 at 10 AM (Pacific Time).
Responses to all submissions received will be issued through addendum. Responses to requests submitted after this date and time will be at sole discretion of Owners
Representative.
Article 5. Interpretation of Project Manual, 5.1. Replace with the following -
Clarifying questions must be submitted to both Peter Meijer Architects and the Owner
Representative. Submit to both Skyla Leavitt via email at skylal@pmapdx.com and
Melissa Moshofsky via email at melmos@uoregon.edu . The last day for submitting clarifying questions will be December 1, 2026 at 10 AM (Pacific Time). Responses to all questions received will be issued through addendum. Responses to questions submitted after this date and time will be at sole discretion of Owners Representative.
Article 8. Submission of Bids, 8.1. Replace with the following -
Complete Bid, including all information, shall be submitted electronically and received by the Closing Date and Time: December 17, 2026 at 10 AM (Pacific Time). The Bid must be submitted to:
https://app.smartsheet.com/b/form/f0fbbbf6a0ee4751a8a385e8472ecde6
Use the drop-down menu to select “Portland Campus – Gymnasium Second Floor
Renovation and Building Improvements”. Bidders submitting an electronic bid will receive an automatic email reply, if they select the box at the bottom that reads
“send me a copy of my responses”. Bidders that do not receive an automatic reply must telephone Melissa Moshfosky at 503-780-9750, to confirm receipt of the complete
UO Supplemental Instructions to Bidders (07/14) emailed document(s) before the Closing Date and Time. Bids delayed or lost by digital system filtering or failures may be considered at Owner’s sole discretion.
Article 14. Security to Be Furnished By Each Bidder, 14.1. Include additional instructions –
Bidders shall bring their bid security to the public bid opening. The bid security shall be in a sealed envelope labeled with both the Project Name and the Bidder Name clearly indicated on it. No bid will be accepted nor read without providing the required security to the Owner Representative in person. Bidders who do not provide the required security at the public bid opening will be deemed non-responsive. Only bids that have an accompanying bid security will be read. Security amount should 10% of both base bid/ bid packages 1 and 2 combined; security amount should not include any alternates.
UO Bid Bond (07/14)
BID BOND
We, _____________________________________, as “Principal,” (Name of Principal) and ___________________________________, an _________________ Corporation, (Name of Surety) authorized to transact Surety business in Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns to pay unto the University of Oregon (“Obligee”) the sum of
_________________________________________________________________ dollars.
WHEREAS, the condition of the obligation of this bond is that Principal has submitted its proposal or bid to an agency of the Obligee in response to Obligee’s procurement document (No. ___________________) for the project identified as:
_____________________________________________________________________ which proposal or bid is made a part of this bond by reference, and Principal is required to furnish bid security in an amount equal to ten (10%) percent of the total amount of the bid pursuant to the procurement document.
NOW, THEREFORE, if the proposal or bid submitted by Principal is accepted, and if a contract pursuant to the proposal or bid is awarded to Principal, and if Principal enters into and executes such contract within the time specified in the Instructions to Bidders and executes and delivers to Obligee its good and sufficient Performance Bond and Payment Bond required by Obligee within the time fixed by Obligee, then this obligation shall be void; otherwise, it shall remain in full force and effect.
IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by our duly authorized legal representatives this ________________day of _________________________, 20____.
PRINCIPAL: ______________________________ SURETY: _______________________________
By________________________________________ BY ATTORNEY-IN-FACT:
Signature
Official Capacity Name
Attest: ____________________________________ ________________________________________ Corporation Secretary Signature
Address
City State Zip
Phone Fax
BID FORM
PROJECT: Portland Campus – Gymnasium Second Floor Renovation (CP25-118) and Building Improvements (CP26-136)
BID SUBMISSION DATE: December 17, 2026 at 10 AM
BID OPENING: December 18, 2026 at 10 AM
FROM: ___________________________________________________________________
Name of Contractor
TO: The University of Oregon (“Owner”) 1295 Franklin Blvd. / 1276 University of Oregon Eugene OR, 97403
The Undersigned is (check one of the following and insert information as requested):
____a. An individual doing business under an assumed name registered under the laws of the State of _____________________________; or
____b. A partnership registered under the laws of the State of _____________________;
or
____c. A corporation organized under the laws of the State of ____________________; or
____d. A limited liability corporation/company organized under the laws of the State of _____________________________.
1. The Undersigned hereby proposes to furnish all material and labor and perform all Work hereinafter indicated for the above project in strict accordance with the Contract Documents for the Second Floor Renovation (CP25-118) BASE BID/ Bid Package 1 as follows: all scope of work related to bid package 1, but not including alternates or bid package 2. Please note that the university desires this work, and including any selected alternates, to be substantially complete prior to the fall 2027 academic term start of September 27, 2027.
____________________________________________ Dollars ($__________________) .
1a. The Undersigned proposes to add to the Base Bid/ Bid Package 1 indicated above the items of work relating to the following Alternate(s) as designated:
ALTERNATE #1.A: Second Floor New Window Openings
ADD: $_______________ .
1b. The Undersigned proposes to add to the Base Bid/ Bid Package 1 indicated above the items
ALTERNATE #1.B: Second Floor New Skylights
1c. The Undersigned proposes to add to the Base Bid/ Bid Package 1 indicated above the items
ALTERNATE #1.C: Second Floor New LVT Flooring at Kitchenette and Restroom
2. The Undersigned hereby proposes to furnish all material and labor and perform all Work hereinafter indicated for the above project in strict accordance with the Contract Documents for the Building Improvement (CP26-136) BASE BID/ Bid Package 2 as follows: all scope of work related to bid package 2, but not including alternates or bid package 1. Please note that the university desires this work to occur simultaneously to and be substantially complete at same time as Base Bid/ Bid Package 1, and any selected alternates, prior to the fall 2027 academic term start of September 27, 2027.
____________________________________________ Dollars ($__________________) .
2d. The Undersigned proposes to add to the Base Bid/ Bid Package 2 indicated above the items
ALTERNATE #2.D: Building Improvement New South Entry Doors
2e. The Undersigned proposes to add to the Base Bid/ Bid Package 2 indicated above the items
ALTERNATE #2.E: Building Improvement New Sunshade
3. The Substantial Completion date for the Base Bid/ Bid Package 1, Base Bid/ Bid
Package 2 and any/ all selected alternates shall be (fill in acknowledging date) ____________.
4. The Undersigned agrees to be bound by each of the following documents:
• Notice of Construction Contracting Opportunity
• Instructions to Bidders
• Supplemental Instructions to Bidders, if any
• Bid Bond
• UO General Conditions
• Supplemental General Conditions
• Performance Bond
• Payment Bond
• Sample Contract for Construction Services
• Sample PIC Change Order Form (used for contract amendments)
• BOLI Prevailing Wage Rates
• Specifications
• Drawings
• All ADDENDA numbered ____ through____, inclusive (fill in blanks).
5. The Undersigned certifies that: (1) This Bid has been arrived at independently and is being submitted without collusion with and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment or services described in the invitation to bid designed to limit independent bidding or competition; and (2) The contents of the Bid have not been communicated by the Undersigned or its employees or agents to any person not an employee or agent of the Undersigned or its surety on any Bond furnished with the Bid and will not be communicated to such person prior to the official opening of the Bid.
6. The undersigned HAS, HAS NOT (circle applicable status) paid unemployment or income taxes in Oregon within the past 12 months and HAS, HAS NOT (circle applicable status) a business address in Oregon.
7. The Undersigned agrees, if awarded a contract, to comply with the provisions of ORS 279C.800 through 279C.870 pertaining to the payment of the prevailing rates of wage.
8. Contractor's CCB registration number is ____________________________. As a condition to submitting a bid, a Contractor must be registered with the Oregon Construction Contractors Board in accordance with ORS 701.035 to 701.055, and disclose the registration number. Failure to register and disclose the number will render the bid unresponsive and it will be rejected, unless contrary to federal law.
9. The successful Bidder hereby certifies that all subcontractors who will perform construction work as described in ORS 701.005(2) were registered with the Construction Contractors Board in accordance with ORS 701.035 to 701.055 at the time the subcontractor(s) made a bid to work under the Contract.
10. The successful Bidder hereby certifies that, in compliance with the Worker's Compensation Law of the State of Oregon, its Worker's Compensation Insurance provider is ______________________________, Policy No. , and that Contractor shall submit Certificates of Insurance as required.
11. Contractor’s Project Manager for this project is: ______________________________, Office Phone: _________________________ Cell Phone: ______________________________.
12. The Undersigned certifies that it has not discriminated against minority, women, or emerging small businesses in obtaining any subcontracts for this project.
13. Accompanying herewith is Bid Security which is equal to ten (10) percent of the total amount of the Basic Bid.
14. The Undersigned further agrees that the Bid Security accompanying the Bid is left in escrow with the Owner; that the amount thereof is the measure of liquidated damages which the Owner will sustain by the failure of the Undersigned to execute and deliver the above-named Agreement Form, Performance Bond and Payment Bond, and, that if the Undersigned defaults in either executing the Agreement Form or providing the Performance Bond and Payment Bond within twenty (20) calendar days after receiving the Contract Documents, then the Bid Security may become the property of the Owner at the Owner's option; but if the Bid is not accepted within thirty (30) calendar days of the time set for the opening of the Bids, or if the Undersigned executes and timely delivers said Agreement Form, Performance Bond and Payment Bond, the Bid Security shall be returned.
15. The Undersigned agrees, if awarded the Contract, to execute and deliver to Owner, within twenty (20) calendar days after receiving the Contract Documents, an Agreement Form and a satisfactory Performance Bond and Payment Bond, each in an amount equal to one hundred (100) percent of the Contract sum, using forms provided by the Owner. The surety requested to issue the Performance Bond and Payment Bond will be:
(name of surety company - not insurance agency)
The Undersigned hereby authorizes said surety company to disclose any information to the Owner concerning the Undersigned's ability to supply a Performance Bond and Payment Bond each in the amount of the Contract.
By signature below, Contractor agrees to be bound by this Bid.
NAME OF FIRM _______________________________________
ADDRESS _______________________________________
FEDERAL TAX ID _______________________________________
TELEPHONE NO _______________________________________
FAX NO _______________________________________
SIGNATURE 1) _______________________________________
Sole Individual or 2) _______________________________________ Partner or 3) _______________________________________ Authorized Officer of Corporation
(SEAL)
Attested: Secretary of Corporation
Payment information will be reported to the IRS under the name and taxpayer ID # provided above. Information not matching IRS records could subject Contractor to 31 percent backup withholding.
* * * * * E N D O F B I D * * * * *
UO General Conditions for Construction Services Contracts (1/16) 1
GENERAL CONDITIONS
FOR CONSTRUCTION SERVICES CONTRACTS
January 1, 2016
INSTRUCTIONS: The attached University of Oregon General Conditions for Construction Services Contracts
("UO General Conditions”) apply to all designated construction contracts. Changes to the UO General Conditions (including any additions, deletions or substitutions) should only be made by attaching Supplemental General Conditions.
The text of these UO General Conditions should not otherwise be altered.
TABLE OF SECTIONS
SECTION A - GENERAL PROVISIONS
A.1 DEFINITION OF TERMS
A.2 SCOPE OF WORK
A.3 INTERPRETATION OF CONTRACT DOCUMENTS
A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE
A.5 INDEPENDENT CONTRACTOR STATUS
A.6 RETIREMENT SYSTEM STATUS AND TAXES
A.7 GOVERNMENT EMPLOYMENT STATUS
SECTION B - ADMINISTRATION OF THE CONTRACT
B.1 OWNER’S ADMINISTRATION OF THE CONTRACT
B.2 CONTRACTOR'S MEANS AND METHODS
B.3 MATERIALS AND WORKMANSHIP
B.4 PERMITS
B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS
B.6 SUPERINTENDENCE
B.7 INSPECTION
B.8 SEVERABILITY
B.9 ACCESS TO RECORDS
B.10 WAIVER
B.11 SUBCONTRACTS AND ASSIGNMENT
B.12 SUCCESSORS IN INTEREST
B.13 OWNER'S RIGHT TO DO WORK
B.14 OTHER CONTRACTS
B.15 GOVERNING LAW
B.16 LITIGATION
B.17 ALLOWANCES
B.18 SUBMITTALS, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
B.19 SUBSTITUTIONS
B.20 USE OF PLANS AND SPECIFICATIONS
B.21 FUNDS AVAILABLE AND AUTHORIZED
B.22 NO THIRD PARTY BENEFICIARIES
SECTION C - WAGES AND LABOR
C.1 MINIMUM WAGES RATES ON PUBLIC WORKS
C.2 PAYROLL CERTIFICATION AND FEE REQUIREMENTS, ADDITIONAL RETAINAGE
UO General Conditions for Construction Services Contracts (1/16) 2
C.3 PROMPT PAYMENT AND CONTRACT CONDITIONS
C.4 PAYMENT FOR MEDICAL CARE
C.5 HOURS OF LABOR
SECTION D - CHANGES IN THE WORK
D.1 CHANGES IN THE WORK
D.2 DELAYS
D.3 CLAIMS REVIEW PROCESS
SECTION E - PAYMENTS
E.1 SCHEDULE OF VALUES
E.2 APPLICATIONS FOR PAYMENT
E.3 PAYROLL CERTIFICATION REQUIREMENT
E.4 DUAL PAYMENT SOURCES
E.5 RETAINAGE
E.6 FINAL PAYMENT
SECTION F - JOB SITE CONDITIONS
F.1 USE OF PREMISES
F.2 PROTECTION OF WORKERS, PROPERTY, AND THE PUBLIC
F.3 CUTTING AND PATCHING
F.4 CLEANING UP
F.5 ENVIRONMENTAL CONTAMINATION
F.6 ENVIRONMENTAL CLEAN-UP
F.7 FORCE MAJEURE
SECTION G - INDEMNITY, BONDING AND INSURANCE
G.1 RESPONSIBILITY FOR DAMAGES/INDEMNITY
G.2 PERFORMANCE AND PAYMENT SECURITY, PUBLIC WORKS BOND
G.3 INSURANCE
SECTION H - SCHEDULE OF WORK
H.1 CONTRACT PERIOD
H.2 SCHEDULE
H.3 PARTIAL OCCUPANCY OR USE
SECTION I - CORRECTION OF WORK
I.1 CORRECTIONS OF WORK BEFORE FINAL PAYMENT
I.2 WARRANTY WORK
SECTION J - SUSPENSION AND/OR TERMINATION OF THE WORK
J.1 OWNER'S RIGHT TO SUSPEND THE WORK
J.2 CONTRACTOR'S RESPONSIBILITIES
J.3 COMPENSATION FOR SUSPENSION
J.4 OWNER'S RIGHT TO TERMINATE CONTRACT
J.5 TERMINATION FOR CONVENIENCE
J.6 ACTION UPON TERMINATION
SECTION K - CONTRACT CLOSE-OUT
UO General Conditions for Construction Services Contracts (1/16) 3
K.1 RECORD DOCUMENTS
K.2 OPERATION AND MAINTENANCE MANUALS
K.3 COMPLETION NOTICES
K.4 TRAINING
K.5 EXTRA MATERIALS
K.6 ENVIRONMENTAL CLEAN-UP
K.7 CERTIFICATE OF OCCUPANCY
K.8 OTHER CONTRACTOR RESPONSIBILITIES
K.9 SURVIVAL
UO General Conditions for Construction Services Contracts (1/16) 4
GENERAL CONDITIONS FOR CONSTRUCTION SERVICES CONTRACTS
(“UO General Conditions”)
SECTION A
GENERAL PROVISIONS
A.1 DEFINITION OF TERMS
In the Contract Documents the following terms shall be as defined below:
AMENDMENT, means a writing which, when fully executed by the Parties to this Contract, constitutes a change to a Contract Document. Amendments, including change orders, shall be issued in accordance with the provisions of Section D and, if applicable, establish a Contract Price or Contract Time adjustment.
APPLICABLE LAWS, means federal, state and local laws, codes, rules, regulations, ordinances, and Owner policies and procedures applicable to the Work and to the Contract.
ARCHITECT/ENGINEER, means the Person appointed by the Owner to make drawings and specifications and, to provide contract administration of the Work contemplated by the Contract to the extent provided herein or by supplemental instruction of Owner (under which Owner may delegate responsibilities to the Architect/Engineer), in accordance with ORS Chapter 671 (Architects) or ORS Chapter 672 (Engineers) and administrative rules adopted thereunder.
BID, means an offer binding on the Bidder and submitted in response to an Instructions to Bidders or a proposal in connection with a Request for Proposals.
BIDDER, means a Person that submits a Bid in response to Instructions to Bidders or a proposal in connection with a Request for Proposals.
CLAIM, means a demand by Contractor pursuant to Section D.3 for review of the denial of Contractor’s initial request for an adjustment of Contract terms, payment of money, extension of Contract Time or other relief, submitted in accordance with the requirements and within the time limits established for review of Claims in these UO General Conditions.
CONSTRUCTION CHANGE DIRECTIVE, means a written order by the Owner to the Contractor requiring a change in the Work within the general scope of the Contract Documents, issued under the provisions of Section D.
CONTRACT, means the written Contract between the Owner and the Contractor, including the Contract Documents, which describes the Work to be done and the obligations between the parties.
CONTRACT DOCUMENTS, means the Solicitation Document and addenda thereto, Instructions to Bidders, Supplemental Instructions to Bidders, the Contract, all Amendments (including, for example, change orders), UO General Conditions, Supplemental General Conditions, if any, the accepted Bid, Plans, Specifications, and Construction Change Directives.
CONTRACT PERIOD, as set forth in the Contract Documents, means the total period of time for a Project beginning with the full execution of this Contract and concluding upon Final Completion.
CONTRACT PRICE, means the total of the awarded Bid amount for a Project, as set forth in the Contract and increased or decreased by the price of approved alternates or an Amendment, as indicated in the Contract Documents.
CONTRACT TIME, means any incremental period of time allowed under the Contract to complete any portion of the Work as reflected in the Project schedule.
CONTRACTOR, means the Person awarded the Contract for the Work contemplated.
DAYS, are calendar days, including weekdays, weekends and holidays, unless otherwise specified.
UO General Conditions for Construction Services Contracts (1/16)
DIRECT COSTS, means, unless otherwise provided in the Contract Documents, the cost of materials, including sales tax, cost of delivery; cost of labor, including social security, Medicare and unemployment insurance, and fringe benefits required by agreement or custom; worker's compensation insurance; any Project-specific insurance required by the Contract Documents (including, without limitation, Builder’s Risk Insurance and Builder’s Risk Installation Floater); bond premiums, rental cost of equipment, and machinery required for execution of the Work; and the additional costs of field personnel directly attributable to the Work.
FINAL COMPLETION, means the final completion, or the date of final completion, of all requirements under the Contract, including Contract Closeout as described in Section K, but excluding Warranty Work as described in Section I.2, and the final payment and release of all retainage, if any, released.
FORCE MAJEURE, means an act, event or occurrence caused by fire, riot, war, acts of God, nature, sovereign, or public enemy, strikes, freight embargoes or any other act, event or occurrence that is beyond the control of the party to this Contract who is asserting Force Majeure.
MWESB REPORT, means an accurate report by the Contractor to the Owner, pursuant to Owner’s policy titled “Equity Contracting Purchasing and Data,” identifying all Minority, Women and Emerging Small Business (MWESB) enterprises, as those terms are defined in ORS 200.005, receiving direct contracts with the Contractor or a Subcontractor, to perform one or more items of the Work throughout the course of the Work. MWESB Reports are required at the completion of every contract and annually as of July 1 for contracts that extend past June 30 of each year (see Section E.2.9) and as a condition of final payment (see Section K.1). Each report shall be in the form required by the Owner and shall contain the information required by Owner’s policies and procedures as amended from time to time.
OVERHEAD, means those items which may be included in the Contractor's markup (general and administrative expense and profit) and that shall not be charged as Direct Cost of the Work in accordance with these UO General Conditions, including without limitation such Overhead expenses as wages or salary of personnel primarily at the Contractor’s principle place of business, Contractor's office costs and supplies at Contractor’s principal place of business, and Commercial General Liability Insurance and Automobile Liability Insurance.
OWNER, means the University of Oregon. Owner may elect, by written notice to Contractor, to delegate certain duties to more than one party, including without limitation, to an Architect/Engineer. However, nothing in these UO General Conditions is intended to abrogate the separate design professional responsibilities of Architects under ORS Chapter 671 or of Engineers under ORS Chapter 672.
PERSON, means a natural person or entity doing business as a sole proprietorship, a partnership, a joint venture, a corporation, a limited liability company or partnership, or any other entity possessing the legal capacity to contract.
PLANS, means the drawings which show the location, type, dimensions, and details of the Work to be done under the Contract.
PROJECT, means a specific project for which the Contractor will perform Work pursuant to a Supplement and in accordance with the Contract Documents.
PUNCH LIST, means the list of Work yet to be completed or deficiencies which need to be corrected in order to achieve Final Completion of the Contract.
RECORD DOCUMENT, means the as-built Plans (in either electronic or hardcopy format), Specifications, testing and inspection records, Product Data, Samples, manufacturer and distributor/supplier warranties evidencing transfer of ownership to Owner, operational and maintenance manuals, Shop Drawings, Construction Change Directives, MWESB Reports, correspondence, certificate(s) of occupancy, and other documents listed in Subsection B.9.1 of these UO General Conditions, recording all Services performed.
CONTRACT, means the written and fully-executed UO Contract For Construction-Related Services between the Owner and the Contractor.
SOLICITATION DOCUMENT, means Instructions to Bidders or a Request for Proposal or a Request for Qualifications.
SPECIFICATION, means any description of the physical or functional characteristics of the Work, or of the nature of a supply, service or construction item. Specifications may include a description of any requirement for inspecting, testing or preparing a supply, service or construction item for delivery and the quantities or qualities of materials to be furnished under the Contract. Specifications generally will state the results or products to be obtained and may, on occasion, describe the method and manner of doing the Work to be performed. Specifications may be included in the Contract, incorporated in the Contract by reference, or attached to the Contract.
SUBCONTRACTOR, means a Person having a direct contract with the Contractor, or another Subcontractor, to perform one or more items of the Work.
SUBSTANTIAL COMPLETION, means the date when the Owner accepts in writing the Project, alteration or repair of the improvement to real property constituting the Work, or any designated portion thereof as having reached that state of completion when it may be used or occupied for its intended purpose. However, the Substantial Completion of facilities with operating systems occurs only after thirty (30) continuous Days of successful, trouble-free operation of the operating systems as provided in Section K.3.2. Substantial Completion for Occupancy may be initiated contingent upon the documentation of the date the operating systems were fully operational.
SUBSTITUTIONS, means items that in function, performance, reliability, quality, and general configuration are the same or better than the product(s) specified. Approval of any substitute item shall be solely determined by the Owner. The decision of the Owner is final.
SUPPLEMENTAL GENERAL CONDITIONS, means a Supplemental General Conditions to the University of Oregon General Conditions for Construction Services Contracts or a similar Amendment to the UO General Conditions that includes conditions that remove from, add to, or modify these UO General Conditions. Supplemental General Conditions may be included in the Solicitation Document or may be a separate attachment to the Contract.
WARRANTY WORK, means Contractor’s correction of defective Work pursuant to Section I.2.
WORK, means performance of construction-related services, including the furnishing of all materials, equipment, labor, transportation, services and incidentals necessary to successfully complete, as applicable, any individual item, Project, or the entire Contract and the carrying out of duties and obligations imposed by the Contract Documents.
A.2 SCOPE OF WORK
The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction work in connection with any Project described in the Contract Documents. The Contractor shall perform all Work necessary so that the Project can be legally occupied and fully used for the intended use as set forth in the Contract Documents.
A.3 INTERPRETATION OF CONTRACT DOCUMENTS
A.3.1 Unless otherwise specifically defined in the Contract Documents, words which have well-known technical meanings or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings.
Contract Documents are intended to be complementary. Whatever is called for in one, is interpreted to be called for in all. However, in the event of conflicts or discrepancies among the Contract Documents, interpretations will be based on the following descending order of precedence:
(a) Contract, Amendments, and Construction Change Directives, with those of later date having precedence over those of an earlier date;
(b) The Supplemental General Conditions;
(c) The UO General Conditions;
(d) Division One (General Requirements) of the Specifications;
(e) Detailed schedules of finishes, equipment and other items included in the Specifications;
(f) Plans and Specifications (other than Division One and the Detailed Schedules to the Specifications);
(g) Large-scale drawings on Plans;
(h) Small-scale drawings on Plans;
(i) Dimension numbers written on Plans which shall prevail and take precedence over dimensions scaled from Plans;
(j) The Solicitation Document, and any addenda thereto;
(k) The accepted Bid.
A.3.2 In the case of an inconsistency between Plans and Specifications or within either document not clarified by
Amendment, the better quality or greater quantity of Work shall be provided in accordance with the Owner's interpretation in writing.
A.3.3 If the Contractor finds discrepancies in, or omissions from the Contract Documents, or if the Contractor is in doubt as to their meaning, the Contractor shall at once notify the Owner. Matters concerning and interpretation of requirements of the Contract Documents will be decided by the Owner, who may delegate that duty in some instances to the Architect/Engineer. Responses to Contractor's requests for interpretation of Contract Documents will be made in writing by Owner (or the Architect/Engineer, if so delegated) within any time limits agreed upon or otherwise with reasonable promptness. Interpretations and decisions of the Owner (or Architect/Engineer, if so delegated) will be consistent with the intent of and reasonably inferable from the Contract Documents. Contractor shall not proceed without direction in writing from the Owner (or Architect/Engineer, if so delegated).
A.3.4 References to standard specifications, manuals, codes of any technical society, organization or association, to the laws or regulations of any governmental authority, or any other Applicable Law, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, laws or regulations in effect in the jurisdiction where the Project is occurring on the first published date of the Solicitation Document, except as may be otherwise specifically stated.
A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE
A.4.1 It is understood that the Contractor, before submitting a Bid, has made a careful examination of the Contract
Documents; has become fully informed as to the quality and quantity of materials and the character of the Work required; and has made a careful examination of the location and conditions of the Work and the sources of supply for materials. The Owner will in no case be responsible for any loss or for any unanticipated costs that may be suffered by the Contractor as a result of the Contractor's failure to acquire full information in advance in regard to all conditions pertaining to the Work. No oral agreement or conversation with any officer, agent, or personnel of the Owner, or with the Architect/Engineer either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained.
A.4.2 Should the Plans or Specifications fail to particularly describe the materials, kind of goods, or details of construction of any aspect of the Work, Contractor shall have the duty to make inquiry of the Owner and Architect/Engineer as to what is required prior to performance of the Work. Absent Specifications to the contrary, the materials or processes that would normally be used to produce first quality finished Work shall be considered a part of the Contract requirements.
A.4.3 Any design errors or omissions noted by the Contractor shall be reported promptly to the Owner, including without limitation, any nonconformity with Applicable Laws.
A.4.4 If the Contractor believes that adjustments to cost, Contract Price, or Contract Time is involved because of clarifications or instructions issued by the Owner (or Architect/Engineer, if so delegated) in response to the Contractor’s notices or requests for information, the Contractor must submit a written request to the Owner, setting forth the nature and specific extent of the request, including all time and cost impacts against the Contract as soon as possible, but no later than thirty (30) Days after receipt by Contractor of the clarifications or instructions issued. If the Owner denies Contractor’s request for additional compensation, additional Contract Time, or other relief that Contractor believes results from the clarifications or instructions, the Contractor may proceed to file a Claim under
Section D.3, Claims Review Process. If the Contractor fails to perform the obligations of Sections A.4.1 to A.4.3, the Contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations.
A.5 INDEPENDENT CONTRACTOR STATUS
The Work to be performed by the Contractor and all Subcontractors under this Contract are those of an independent contractor as defined in ORS 670.600. Contractor represents and warrants that it is not an officer, employee or agent of the Owner as those terms are used in ORS 30.265.
A.6 RETIREMENT SYSTEM STATUS AND TAXES
Contractor represents and warrants that it is not a contributing member of the Public Employees' Retirement System and will be responsible for any federal or state taxes applicable to payment received under this Contract. Contractor will not be eligible for any employee, retirement, or fringe benefits as a result of Owner’s Contract payments. For example, Contractor will not be eligible for such benefits as federal Social Security, employment insurance, workers' compensation or the Public Employees' Retirement System, except as a self-employed individual. Unless the Contractor is subject to backup withholding, Owner will not withhold from such payments any amount(s) to cover Contractor’s federal or state tax obligations.
A.7 GOVERNMENT EMPLOYMENT STATUS
A.7.1 If this payment is to be charged against federal funds, Contractor represents and warrants that it is not currently employed by the Federal Government. This does not preclude the Contractor from holding another contract with the Federal Government.
A.7.2 Contractor represents and warrants that Contractor is not an employee of the University of Oregon for purposes of performing Work under this Contract.
SECTION B
ADMINISTRATION OF THE CONTRACT
B.1 OWNER’S ADMINISTRATION OF THE CONTRACT
B.1.1 The Owner shall administer the Contract as described in the Contract Documents (1) during construction, (2) until final payment is due, and (3) during the one-year period for correction of Work. The Owner will act as provided in the Contract Documents, unless modified in writing by an Amendment in accordance with other provisions of the Contract. In performing these tasks, the Owner may rely on the Architect/Engineer or other consultants to perform some or all of these tasks.
B.1.2 The Owner will visit the Project site at intervals appropriate to the stage of the Contractor’s operations (1) to become generally familiar with and to keep the Owner informed about the progress and quality of the portion of the Work completed, (2) to endeavor to guard the Owner against defects and deficiencies in the Work, and (3) to determine in general if Work is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. The Owner will not make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Owner will neither have control over or charge of, nor be responsible for the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work.
B.1.3 Except as otherwise provided in the Contract Documents or when direct communications have been specifically authorized, the Owner and Contractor shall communicate with each other about matters arising out of or relating to the Contract. Communications by and with the Architect/Engineer’s consultants shall be through the Architect/Engineer.
Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner.
B.1.4 Based upon the Architect/Engineer’s evaluations of the Contractor’s application for payment, or unless otherwise stipulated by the Owner, the Architect/Engineer will review and certify the amounts due the Contractor.
B.2 CONTRACTOR'S MEANS AND METHODS; MITIGATION OF IMPACTS
B.2.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters. If the Contract Documents give specific instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the Project site safety thereof and, except as stated below, shall be fully and solely responsible for the Project site safety of such means, methods, techniques, sequences or procedures.
B.2.2 The Contractor is responsible to protect and maintain the Work during the course of construction and to mitigate any adverse impacts to the Project, including those caused by Amendments, Construction Change Directives, and other authorized changes, which may affect cost, schedule, or quality.
B.2.3 The Contractor is responsible for the actions of all its employees, personnel, laborers, suppliers, and Subcontractors on the Project. The Contractor shall enforce strict discipline and good order among Contractor’s employees and other persons carrying out the Work. The Contractor shall not permit employment of persons who are unfit or unskilled for the tasks assigned to them.
B.3 MATERIALS AND WORKMANSHIP
B.3.1 The intent of the Contract Documents is to provide for the construction and completion in every detail of the Work described. All Work shall be performed in a professional manner and unless the means or methods of performing a task are specified elsewhere in the Contract Documents, Contractor shall employ methods that are generally accepted and used by the industry, in accordance with industry standards.
B.3.2 The Contractor is responsible to perform the Work as required by the Contract Documents. Defective Work shall be corrected at the Contractor's expense.
B.3.3 Work done and materials furnished shall be subject to inspection and/or observation and testing by the Owner to determine if they conform to the Contract Documents. Inspection of the Work by the Owner does not relieve the Contractor of responsibility for the Work in accordance with the Contract Documents.
B.3.4 Contractor shall furnish adequate facilities, as required, for the Owner to have safe access to the Work including without limitation walkways, railings, ladders, tunnels, and platforms. Producers, suppliers, and fabricators shall also provide proper facilities and access to their facilities.
B.3.5 The Contractor shall furnish Samples of materials for testing by the Owner and include the cost of the Samples in the
Contract Price.
B.4 PERMITS
Contractor shall obtain and pay for all necessary permits, licenses and fees, except for those specifically excluded in the Supplemental General Conditions, for the construction of the Work, for temporary obstructions, enclosures, opening of streets for pipes, walls, utilities, environmental Work, etc., as required for the Project. Contractor shall be responsible for all violations of Applicable Law in connection with the Work or caused by obstructing streets, sidewalks or otherwise.
Contractor shall give all requisite notices to public authorities. Notwithstanding the first sentence of this paragraph, Owner shall pay for the following: Plan check fees and permit fees required for the general building permit, systems development charges, and building department inspection fees. Notwithstanding the foregoing, however, Contractor shall obtain all additional permits, licenses and fees required for the construction of the Work.
B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS
B.5.1 Contractor shall comply with Applicable Laws pertaining to the Work and the Contract Documents both in the conduct of Contractor’s business and in its performance of the Work. Failure to comply with such requirements shall constitute a breach of the Contract and shall be grounds for Contract termination. Specifically, but without limiting the foregoing, Contractor understands that Applicable Laws require all new construction to be accessible to individuals with physical limitations, and any failure of the Project to conform to such Applicable Laws due Contractor’s failure to properly perform the Work constitute a breach of the Contract by Contractor and shall be grounds for Contract termination. Without limiting the generality of the foregoing, Contractor expressly agrees to comply with the following, as applicable:
(i) Title VI and VII of Civil Rights Act of 1964, as amended; (ii) Sections 503 and 504 of…