This is a bid notice and proposal document issued by the Arkansas Department of Transportation for a state aid county job (Code 9970) titled "Pleasant Plains City Limits - West (Overlay) (S)" in Independence County, Arkansas. The project involves overlaying approximately 2.94 miles of Wish Street and includes aggregate base course, asphalt concrete hot mix (ACHM) surface course, cold milling, ACHM patching, pavement marking, maintenance of traffic, and miscellaneous items. The estimated quantities include 464 tons of aggregate base course, 3,595 gallons of tack coat, 4,137 tons of mineral aggregate in ACHM surface course, 259 tons of asphalt binder, 1,037 square yards of cold milling, 80 tons of ACHM patching, maintenance of traffic on a lump sum basis, 288 square feet of signs, and 31,046 linear feet of reflectorized paint pavement marking. Proposals are due by 1:30 p.m. on May 20, 2026, and the contractor is required to complete the work by November 25, 2026. Bidders must be prequalified with the Arkansas Department of Transportation and must contact the Program Management Division by 4:30 p.m. on the day prior to the bid opening to become eligible bidders.
Bidders must submit proposals through the Bid Express internet bidding service with a unit price for each pay item, with mobilization limited to five percent of the subtotal. A proposal guaranty of five percent of the total bid amount is required in the form of a bank draft, certified check, cashier's check, or surety bond. Upon contract award, the contractor must furnish a performance bond equal to the full contract amount and a payment bond equal to eighty percent of the contract amount. The project is federally funded under Federal Aid Project number 9970SA3280. Liquidated damages are specified in the special provisions based on the original contract amount and whether the project is classified as working day or fixed date. All documents must be submitted electronically through the Doc Express system, and contractors are required to use the Signet application for tracking prompt payments to subcontractors during the soft launch phase at no cost to the contractor. Price adjustments are available for asphalt binder and fuel based on market fluctuations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARKANSAS
STATE HIGHWAY
COMMISSION
PROPOSAL DOCUMENTS
FOR THE CONSTRUCTION OF
STATE JOB NO. SA3280
STATE AID COUNTY JOB (CODE 9970)
PLEASANT PLAINS CITY LIMITS – WEST (OVERLAY) (S)
COUNTY ROAD NO. WISH ST.
IN INDEPENDENCE COUNTY
Bound herein are the Supplemental Specifications, Special Provisions, Proposal
Documents and Schedule of Items applicable to this proposed construction contract.
Applicable to this proposed construction contract, but not bound herein, are the
Arkansas State Highway Commission Standard Specifications for Highway Construction, Edition of
2014, and the Construction Plans.
12/11/14 Rev. 03/18/15 Rev. 11/17/17 Rev. 04/07/22
Please review Section 102 of the Standard Specifictions, 2014 Edition for Bidding Requirements and Conditions. Mistakes or omissions can be costly. Important items for you to check are included in, but not limited to, those listed below. This checklist is furnished only to assist you in submitting a proper bid. Check as you read.
Have you contacted ARDOT (pmd@ardot.gov or 501-569-2261) to become an eligible bidder? This is required to submit a bid in the letting and must occur by 4:30pm the day prior to the letting.
Have you acknowledged all Addenda by email or fax?
Is the unit price entered appropriate for the item?
Have you entered a unit price for each bid item except in the case of authorized alternate pay items? (A zero bid ($0.00) is a valid price and will be considered.)
Have you checked the Schedule of Items for various pay items that may have a minimum or maximum unit bid price? (Refer to the Standard Specifications for further information concerning these items)
Asphalt Binder
Relocating Precast Concrete Barrier
Water
Mobilization
Have you limited your bid for Mobilization to five percent (5%) of the subtotal?
For Federal-aid projects, did you complete the Certification for Federal aid Contracts?
Prior to submitting your bid, did you check for error messages, and are all the folders “green”?
If submitting a paper copy of the Proposal Guaranty (Bid Bond) is it signed by an officer of your company AND the Surety Agent?
Did you ensure your Proposal Guaranty (if you are submitting a paper bond) will arrive prior to the time and date stated on Page 2 of the Proposal Documents?
CAUTION
TO BIDDERS
1-17-08 Revised: 6-1-09 Revised: 2-15-12 Revised: 1-15-15 Revised: 5-26-16 Revised: 11-17-17 Revised: 7-5-23 Revised: 8-4-25 Revised: 12-18-25
ARKANSAS DEPARTMENT OF TRANSPORTATION
NOTICE OF NONDISCRIMINATION
The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, ARDOT does not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the FMCSA Title VI Program), or disability in the admission, access to and treatment in ARDOT’s programs and activities, as well as ARDOT’s hiring or employment practices. Complaints of alleged discrimination and inquiries regarding ARDOT’s nondiscrimination policies may be directed to the Civil Rights Division, P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: Civil.Rights@ardot.gov
Free language assistance may be available upon request.
This notice is available from the ADA/504/Title VI Coordinator in large print, on audiotape, and in Braille.
Arkansas Department of Transportation Supplemental Specifications and Special Provisions Listing
Text1 State Job Number SA3280
Text1The following supplemental specifications and special provisions for this project supplement the standard specifications, edition of 2014. In case of conflict, the supplemental specifications and special provisions shall govern.
ERRATA ERRATA FOR THE BOOK OF STANDARD SPECIFICATIONS
JOB SP DOCUMENTATION OF PAYMENTS MADE TO SUBCONTRACTORS
JOB SP DOCUMENTATION OF PAYMENTS MADE – PROMPT PAYMENT (SIGNET SOFT LAUNCH)
JOB SP BIDDING REQUIREMENTS AND CONDITIONS
JOB SP MANDATORY ELECTRONIC CONTRACT
JOB SP MANDATORY ELECTRONIC DOCUMENT SUBMITTAL
JOB SP LIQUIDATED DAMAGES PROCEDURE FOR BID LETTINGS
JOB SP DESIGN AND QUALITY CONTROL OF ASPHALT MIXTURES
JOB SP SUBMISSION OF ASPHALT CONCRETE HOT MIX ACCEPTANCE TEST RESULTS
JOB SP PRICE ADJUSTMENT FOR ASPHALT BINDER
JOB SP PRICE ADJUSTMENT FOR FUEL
JOB SP WARM MIX ASPHALT
JOB SP RECYCLED ASPHALT SHINGLES
SP 108-1 LIQUIDATED DAMAGES
SS 100-3 CONTRACTOR'S LICENSE
SS 100-4 DEPARTMENT NAME CHANGE
SS 102-2 ISSUANCE OF PROPOSALS
SS 102-3 PREQUALIFICATION OF BIDDERS
SS 103-2 CONTACT INFORMATION FOR MOTORIST DAMAGE CLAIMS
SS 105-4 MAINTENANCE DURING CONSTRUCTION
SS 107-2 RESTRAINING CONDITIONS
SS 108-2 WORK ALLOWED PRIOR TO ISSUANCE OF WORK ORDER
SS 108-3 WORK ORDER FOR FIXED COMPLETION DATE CONTRACTS
SS 303-1 AGGREGATE BASE COURSE
SS 306-1 QUALITY CONTROL AND ACCEPTANCE
SS 400-1 TACK COATS
SS 400-4 DESIGN AND QUALITY CONTROL OF ASPHALT MIXTURES
SS 400-5 PERCENT AIR VOIDS FOR ACHM MIX DESIGNS
SS 400-6 LIQUID ANTI-STRIP ADDITIVE
SS 400-7 TRACKLESS TACK
SS 404-3 DESIGN OF ASPHALT MIXTURES
SS 409-2 ASPHALT LABORATORY FACILITY
SS 410-1 CONSTRUCTION REQUIREMENTS AND ACCEPTANCE OF ASPHALT CONCRETE PLANT MIX
COURSES
SS 410-2 DEVICES FOR MEASURING DENSITY FOR ROLLING PATTERNS
SS 410-4 EVALUATION OF ACHM SUBLOT REPLACEMENT MATERIAL
SS 416-1 RECYCLED ASPHALT PAVEMENT
Page 1 of 2Date Estimated: 3/9/2026
Date Revised:
Supplemental Specifications and Special Provisions Listing
Text1 State Job Number SA3280
Text1The following supplemental specifications and special provisions for this project supplement the standard specifications, edition of 2014. In case of conflict, the supplemental specifications and special provisions shall govern.
SS 604-1 RETROREFLECTIVE SHEETING FOR TRAFFIC CONTROL DEVICES IN CONSTRUCTION ZONES
SS 604-3 TRAFFIC CONTROL DEVICES IN CONSTRUCTION ZONES (MASH)
Page 2 of 2Date Estimated: 3/9/2026
Date Revised:
02-27-14 SS-Errata
Rev. 10-24-14 Page 1 of 1 Rev. 02-12-15
Rev. 06-08-15
Rev. 11-17-17
Rev. 09-13-18
ARKANSAS DEPARTMENT OF TRANSPORTATION
SUPPLEMENTAL SPECIFICATION
ERRATA FOR THE BOOK OF STANDARD SPECIFICATIONS
Errors noted in the printed book of Standard Specifications for Highway Construction, Edition of 2014, are listed below and this publication is hereby revised as follows:
Page 124: The third sentence of the first paragraph of Subsection 110.03(c) should read: The
Engineer will make a decision within 10 business days concerning the necessity or practicability of the request.
Page 195: The sixth paragraph of subsection 303.02 should read: For Classes 1 through 8 materials, the fraction passing the #200 (0.075 mm) sieve shall not be greater than three-fourths of the fraction passing the #40 (0.0425 mm) sieve. For Classes 3 through 8, the fraction passing the #40 (0.425 mm) sieve shall have a liquid limit not greater than 25.
Page 363: In the second paragraph of Subsection 502.02, the reference to ASTM 775 should be replaced by “ASTM A 775”.
Page 636: In the second paragraph of Subsection 730.02, the references to AASHTO M 183 should be replaced with ASTM A36.
Page 637: The last sentence of the second paragraph of Subsection 730.03 should read: All bolts, nuts, and washers shall be galvanized according to AASHTO M 232 or
ASTM B 695, Class 40 or 50.
Page 767: In the fourth paragraph of Subsection 807.06(a), the reference to ASTM B595 should be replaced by “ASTM B695”.
Page 841: Subsection 817.04(a) should read: The treatment of lumber and timber shall meet the applicable requirements of the current edition of the AWPA, Standards U1, Commodity Specification E, Use Category UC4C.
of the completed original payment log forms are acceptable to fulfill this requirement.
All certifications of payments must be received by the Resident Engineer within thirty-five (35) calendar days following the end of each estimate period. Failure to submit the certification will result in the withholding of future progress estimates.
In accordance with Section 108.01 of the Standard Specifications, the Contractor shall pay all subcontractors their respective subcontract amount within 10 calendar days after the Contractor receives payment from the Department. Payments to subcontractors must be certified using the attached form. Facsimile or scanned copies all
SPECIAL PROVISION
JOB NO. SA3280
DOCUMENTATION OF PAYMENTS MADE TO SUBCONTRACTORS
11-06-25 Page 1 of 2
Date Date RE Initials
Rev. 10-8-25
Authorized Signature
Typed or Printed Name
Department
Use Only
Title
Date
Received Verified
By By within 35 calendar days of the ending date of the estimate.
_ % Retainage Previous Total
Total To Date
The Prime Contractor certifies that the payment listed has been made to the Subcontractor and that the documentation of this payment is available for inspection upon request.
* Item Codes for pay items are shown on the estimate voucher
Total This Estimate
Retainage Withheld This Estimate
Subcontractor Payment Log must be received Net Total This Estimate
Estimate No.
Estimate Ending Date
Subcontractor
Date Payment Made to Subcontractor
Item Code* Item Description Subcontract
Unit Price
2nd Tier
Unit Price Quantity
Value Earned
By Subcontractor
Job Number
Arkansas Department of Transportation
Subcontractor Payment Log
Prime Contractor
03/18/2026 Page 1 of 2
SPECIAL PROVISION
JOB NO. SA3280
DOCUMENTATION OF PAYMENTS MADE –
PROMPT PAYMENT (SIGNET SOFT LAUNCH)
In accordance with Section 108.01 of the Standard Specifications, the Contractor shall pay all subcontractors their respective subcontract amount within 10 calendar days after the Contractor receives payment from the Department. Payment is defined as issuing an Electronic Funds Transfer (EFT) or mailing a check to a subcontractor. The 10-day requirement is met on the date that payment is issued to the subcontractor.
First-tier subcontractors have the same obligation to any second-tier subcontractors.
Subcontractors must pay their second-tier subcontractors within 10 days of receipt of payment from the Prime Contractor.
ARDOT monitors payments made by prime contractors to both DBE and non-DBE subcontractors to ensure compliance with prompt payment requirements. Prime contractors are required to report payments made to all subcontractors, and subcontractors must report payments made to any lower-tier subcontractors. Subcontractors are required to confirm receipt of payment.
The tracking of subcontractor prompt payment is conducted using the Signet™ application. Signet™ is a third-party service, supported by the software vendor, which is used by both Prime and Subcontractors. Signet™ is a reporting tool only and does not process financial transactions. ARDOT does not provide direct technical support for Signet™. Information about Signet™ may be found at https://signet-help.zendesk.com and by clicking the Signet™ tab.
ARDOT is soft-launching the Signet™ application for use on this contract and shall be required for use on this construction contract.
Upon completion of the first payment estimate on the contract Signet™ will automatically notify the Contractor via email prompting registration in Signet™ for that contract. Since this contract is part of the Soft Launch phase, the Contractor will not be charged for the use of Signet™. This will activate use of Signet™ for the Prime and all Subcontractors for the duration of that contract, regardless of contract value, number of subcontractors, contract duration, or number of payments reported. Subcontractors will not be charged any fee to register for contracts.
After each estimate, the Prime Contractor will report remitted payment to subcontractors in Signet™. This will trigger notification to each subcontractor via email requesting verification of the reported payment. The subcontractor will be given the opportunity to register with Signet™ at that time (for no cost).
The Prime or Subcontractor reporting payment must report the following information in Signet™:
• The name of the subcontractor or second-tier subcontractor receiving payment.
• The dollar amount of the payment made to the subcontractor or second-tier subcontractor.
• The date the payment was made to the subcontractor or second-tier subcontractor.
• Any retainage, which is only permitted if it was included in the individual subcontract when it was submitted to the Department for acknowledgement.
• The DBE Function performed for this payment (if the subcontractor/second-tier subcontractor is a DBE).
• Other information required by Signet™.
03/18/2026 Page 2 of 2
SPECIAL PROVISION
JOB NO. SA3280
DOCUMENTATION OF PAYMENTS MADE –
PROMPT PAYMENT (SIGNET SOFT LAUNCH)
The contractor must report the return of retainage or other withholdings in separate, standalone payment entries (separate from routine, planned progress payment estimates).
In the event that no subcontract work is included in a payment estimate, such that no payment is due to any subcontractors, the Prime Contractor shall mark the payment complete within Signet™, and no other payments are required to be reported for that estimate.
Subcontractors must verify in the Signet™ application each payment reported by a payer within 10 days of the payment being reported by the payer. This verification includes whether the payment was received and, if so, whether it was as expected.
Basis of Payment. During Soft Launch, there will be no cost for registration for the Signet™ application. All costs for usage, time, labor, or other costs for reporting payments to subcontractors through the Signet™ application will be considered incidental and no direct payment will be made for these.
include any special provisions or requirements that vary from or are not contained in the standard specifications.
All forms included in the proposal documents are considered a part thereof. The plans, specifications, and other documents designated in the proposal documents will be considered a part of the proposal whether included or not.
following substituted therefore:
The proposal documents will state the location and description of the contemplated construction and will show the estimate of the various quantities and kinds of work to be performed or materials to be furnished, and will have a schedule of items. The proposal documents will state the time in which the work must be completed, the amount of the pronosal quaranty and the date and time of the letting of work The documents will also therefore:
The Notice to Contractors will contain a description of the proposed work, and information regarding access to proposal documents, plans, specifications, and the amount and nature of the proposal guaranty.
Subsection 102.03 is hereby deleted. renamed Contents of Proposal Documents. and the or corporations that is seeking prequalification, has been prequalified, or has entered into a previous or current contract with the Commission may have the prequalification denied, limited, or revoked for the reasons listed in Subsection 102.04(a)-(m).
The last paragraph of Subsection 102.01 is hereby deleted.
The second sentence of Subsection 102.02 is hereby deleted. and the following substituted
Prospective bidders may file a questionnaire at any time; however, prospective bidders will not be given authorization to submit a proposal unless a rating has been extended based on an acceptable questionnaire.
The following paragraph has been added to Subsection 102.01.
A contractor with common officers/owners/partners of any firm. partnerships, ioint ventures.
Section 102 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
The fourth sentence of the second paragraph of Subsection 102.01 is hereby deleted, and the following substituted therefore:
ARKANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
JOB NO. SA3280
BIDDING REQUIREMENTS AND CONDITIONS
03-18-2015
09-09-2016 Rev., 10-27-2017 Rev., 11-16-2017 Rev., 05-03-2018 Rev., 12-06-2018 Rev., 05-24-2024 Rev.
The bidder is expected to examine carefully the site of the proposed work, the proposal documents, plans, specifications, supplemental specifications, and special provisions before submitting a proposal.
The until 4:30 p.m. on the day prior to the scheduled bid opening at the Arkansas Department of
Transportation, 10324 Interstate 30, Little Rock, Arkansas 72209, (501) 569-2261. Payment shall be made at the time services are provided or upon receipt of statement therefore. No refund will be allowed for bids not submitted or for plans or proposal documents returned.
second sentence of the first paragraph of Subsection 102.06 is hereby deleted, and following substituted therefore:
the that the contractor may be allowed to undertake. In the event a contractor submits a low bid on more than one project and the aggregate amount is greater than the amount the contractor may be allowed to undertake, the Commission will exercise its discretion in the award of a particular project or projects.
A charge will be assessed for authorization to submit a proposal, paper copies of the proposal documents, and plans issued. These services are provided during regular business hours current bidding period is on file and the amount of work the contractor may be allowed to undertake is determined. The contractor's prequalification rating, less the unfinished value of all contracts in force, will determine the amount of additional work that the contractor may be allowed to undertake. A contractor will not be allowed to submit a proposal on an individual project for which the estimated cost is more than the amount that the contractor may be allowed to undertake, but the contractor will be allowed to submit a proposal on more than one project, providing that the estimated cost of each project is not more than the amount
4:30 p.m. on the day prior to the scheduled bid opening to request to become eligible to bid specific projects. Only prequalified contractors or their authorized representative may request to become an eligible bidder.
aIf the prospective bidder's prequalification rating is not "unlimited", the bidder shall file certification with the Department citing all contracts in force and the unfinished value of such work. A prospective bidder will not be allowed to submit a proposal until a certification for the
The first through fourth paragraphs of Subsection 102.04 are hereby deleted, and the following substituted therefore:
To become an eligible bidder, prospective bidders must be registered to bid in Arkansas with
Bid Express. Prospective bidders must also contact the Program Management Division at
(501) 569-2261 during regular business hours between the date the project is advertised and
ARKANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
JOB NO. SA3280
BIDDING REQUIREMENTS AND CONDITIONS
03-18-2015
09-09-2016 Rev., 10-27-2017 Rev., 11-16-2017 Rev., 05-03-2018 Rev., The information provided will not be used for contract awarding purposes but must be provided before the Contractor will be given authorization to submit proposals for future lettings.
substituted therefore:
The proposal documents for all federal aid projects will contain a bidders list.
The last sentence of the ninth paragraph of Subsection 102.07 is hereby deleted, and the following substituted therefore:
following substituted therefore:
Those items of Asphalt Binder that are subject to a minimum bid price will bear the note
"(Minimum bid price is $120.00 per ton)" within the Schedule of Items of the proposal documents.
The first sentence of the ninth paragraph of Subsection 102.07 is hereby deleted and the following bidder's Prequalification Questionnaire (Questionnaire Form) as the individual, as a partner of a partnership, or as an officer of a corporation, authorization for such submittal should be on file with the Department prior to the download of bids. This authorization shall be made before the downloading of bids and be in the form of a Power of Attorney duly executed and signed by an official with power to constitute such authority.
The last sentence of the seventh paragranh of Subsection 102.07 is hereby deleted and the individual, one or more members of the partnership, one or more members or officers of each firm representing a joint venture, or one or more officers of a corporation, or by an agent of the Contractor legally qualified and acceptable to the Department.
The sixth paragraph of Subsection 102.07 is hereby deleted, and the following substituted therefore:
If the proposal is submitted with a digital signature of any person who is not listed in the on the unit bid price beyond 1 cent will be dropped.
The second and third paragraphs of Subsection 102.07 are hereby deleted.
The fifth paragraph of Subsection 102.07 is hereby deleted, and the following substituted therefore:
The bidder's proposal must be submitted with a digital sianature containing the name of the
The first paragraph of Subsection 102.07 is hereby deleted, and the following substituted therefore:
The proposal shall only be submitted through the internet bidding service, Bid Express. The bidder shall specify a unit price in figures for each pay item for which a quantity is given. A unit price of "zero" ($0.00) is a valid price and will be considered. A blank unit price is not considered valid. The unit bid price should not be carried beyond 1 cent ($0.01). Any fiqures
ARKANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
JOB NO. SA3280
BIDDING REQUIREMENTS AND CONDITIONS
03-18-2015
09-09-2016 Rev., 10-27-2017 Rev., 11-16-2017 Rev., 05-03-2018 Rev., The proposal shall only be submitted through the internet bidding service, Bid Express.
The following paragraph is hereby added after the first paragraph of Subsection 102.09:
Electronic bid bonds are allowed. The prospective bidder should verify their bid bond in their proposal prior to submission.
Subsection 102.10 is hereby deleted and the following substituted therefore:
The first sentence of Subsection 102.09 is hereby deleted and the following substituted therefore:
No proposal will be considered by the Commission unless a guaranty in the form of a bank draft, certified check, or cashier's check drawn on a solvent bank or trust company, or a bidder's paper bond executed by an approved surety company has been received by the
Program Management Division prior to the download of bids.
(2) Unbalanced proposals in which the prices for some items are out of proportion to the reasonable costs representative of those items.
(3) If there are irregularities of any kind that may tend to make the proposal incomplete, indefinite, or ambiguous as to its meaning.
(5) If the proposal is not accompanied by the Certification to Submit DBE Participation.
(b) Proposals will be considered irregular and may be rejected for the following reasons:
(1) If the proposal is not accompanied by a bid schedule and bid schedule narrative reguired in the proposal documents.
as
(2) If the proposal is not digitally signed by an authorized representative of the firm.
(3) If the proposal is not accompanied by the proper proposal guaranty.
(4) If a proposal is received from an individual, firm, partnership, or corporation with interest. as principal. in another proposal for the same proiect.
an
Subsection 102.08 Irregular Proposals is hereby deleted, and the following substituted therefore:
(a) Proposals will be considered irregular and will be rejected for the following reasons:
(1) If the proposal does not contain a unit price for each pay item listed except in the case of authorized alternate pay items.
ARKANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
JOB NO. SA3280
BIDDING REQUIREMENTS AND CONDITIONS
03-18-2015
09-09-2016 Rev., 10-27-2017 Rev., 11-16-2017 Rev., 05-03-2018 Rev., The last sentence of Subsection 102.15 is hereby deleted, and the following substituted therefore:
In any case, the prospective bidders will be contacted prior to the download of bids.
Subsection 102.12 is hereby deleted, renamed Downloading of Proposals, and the following substituted therefore:
Proposals will be downloaded and then posted on the Department's website at the time and place indicated in the Notice to Contractors.
Subsection 102.11 is hereby deleted, and the following substituted therefore:
A bidder may withdraw or modify a proposal after it has been submitted to Bid Express, up to the time set for the deadline for proposals to be received. A proposal may also be withdrawn if the Commission fails to make an award within 40 calendar days after the date of downloading.
ARKANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
JOB NO. SA3280
BIDDING REQUIREMENTS AND CONDITIONS
03-18-2015
09-09-2016 Rev., 10-27-2017 Rev., 11-16-2017 Rev., 05-03-2018 Rev., Subsection 103.08(d)(5) is hereby deleted, and the following substituted therefore:
The preceding information shall be submitted directly to the Arkansas Department of Transportation, Program Management Division, via Doc Express.
Documentation of the bidder's commitment to use a DBE subcontractor whose participation it submits to meet a contract goal; and
Subsection 103.08(d)(3)e. is hereby deleted, and the following substituted therefore:
Document confirmation from the DBE that it is participating in the contract as provided in the Coptrootor'c
The Contract shall be electronically signed by the successful bidder and electronically submitted to the Program Management Division, Construction Contract Procurement Section, together with the required bonds and proof of liability insurance, within 10 business days after the notice of award has been issued.
Subsection 103.08(d)(3)d. is hereby deleted, and the following substituted therefore:
Section 103 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows.
The first sentence of Subsection 103.06(a) is hereby deleted, and the following substituted therefore:
Paper Contract Documents and Forms will not be accepted.
The Department will only accept and execute an electronic contract for this project through Doc Express, a paperless contracting system. Prospective bidders will need to contact Doc Express to set up an account prior to the bid opening date. The toll-free phone number for Doc Express is 1-888.352-2139 and their website address is wosou docexpress com
SPECIAL PROVISION
JOB NO. SA3280
MANDATORY ELECTRONIC CONTRACТ
04-13-2015
11-16-2017 Rev.
12-06-2018 Rev.
The requirements of this Special Provision shall supersede the requirements of all other Special Provisions unless such Special Provision includes a stated exception to this Special Provision.
Department to Contractor" drawer in Doc Express. Any action taken by the Contractor prior to this notification is taken at the Contractor's own risk.
The Department's System Administration team has no authority to take action on any documents submitted to the system. Access for this team is for management of the application only. Knowledge of any document submitted is not imputed to the Department by the knowledge of Systems Administration.
thewill and published by the Contractor within Doc Express for further action by the Engineer. The Engineer not review or take any actions on any documents submitted by the subcontractor until document has been appropriately submitted by the Contractor.
Any submittals, documents, subcontracts, proposals, working drawings, or any other items submitted by the Contractor within Doc Express are not considered approved by the Engineer until written notification of the approval is published by the Engineer in the "CON-Correspondence-From
Express. The "Contractor Guide to Using Doc Express" is available on the Department's web page at https://ardot.gov/divisions/construction/doc-express/.
The Contractor may provide access for subcontractors to view and submit items in Doc Express by following the instructions provided in the "Contractor Guide to Using Doc Express". Once an organizational account is activated and the Contractor provides access to the contract, a subcontractor may submit documents to the Contractor in Doc Express by uploading the electronic documents as subeoptractor must be thep rotrieveddirected in the Llser Guide Any documents uploaded by the
Material delivery tickets which are used for payment or for field verification shall be submitted on paper as required by the Standard Specifications for Highway Construction, Edition of 2014.
Any document with specific submittal requirements in state and/or federal law or federal regulations that conflict with the requirements of this Special Provision shall be submitted accordance with such state and/or federal law or federal regulations.
in
A user guide is available on the Department's web page to assist Contractors with the use of Doc
Express. The Contractor shall use the same organizational account for project documentation as used to fulfill the requirements of the Mandatory Electronic Contract Special Provision. The toll-free phone number for Doc Express is 1-888-352-2439 and their website address is www.docexpress.com.
Any reference in the Standard Specifications to document submittal in writing or by U.S. Mail, facsimile, or in person is hereby amended to require that such documents be submitted using Doc
Express with the following exceptions:
All
Paper Document Submittals will not be accepted.
a
The Department will only accept electronically-submitted documents for consideration on this project.
correspondence and submittals to the Department shall be submitted through Doc Express, paperless contracting system. When signed originals are required, the original shall be the document uploaded to Doc Express and the signature shall be the electronic signature applied through Doc
ARKANSAS DEPARTMENT OF TRA
SPECIAL PROVISION
JOB NO. SA3280
MANDATORY ELECTRONIC DOCUMENT SUBMITTAL
02-23-2016
07-12-2017 Rev.
11-16-2017 Rev.
12-06-2018 Rev.
02-25-2021 Rev.
04-12-07 12-03-08 Rev. SP-108-1 01-06-11 Rev. 01-28-13 Rev. Page 1 of 1 11-16-17 Rev. 12-06-18 Rev.
01-12-23 Rev.
ARKANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
LIQUIDATED DAMAGES
As specified in the Contract, liquidated damages for this project will be as shown in the following table:
WORKING DAY PROJECTS
ORIGINAL CONTRACT AMOUNT
FROM MORE THAN TO AND INCLUDING RATE
$ 0 $ 100,000 $ 140 100,000 500,000 400 500,000 1,000,000 660 1,000,000 2,000,000 800 2,000,000 5,000,000 1,380 5,000,000 10,000,000 1,800 10,000,000 15,000,000 2,620 15,000,000 20,000,000 2,720 20,000,000 30,000,000 2,940 30,000,000 ------------- 3,500
FIXED DATE PROJECTS
ORIGINAL CONTRACT AMOUNT
FROM MORE THAN TO AND INCLUDING RATE
$ 0 $ 100,000 $ 60 100,000 500,000 80 500,000 1,000,000 220 1,000,000 2,000,000 300 2,000,000 5,000,000 420 5,000,000 10,000,000 1,000 10,000,000 15,000,000 1,200 15,000,000 20,000,000 1,300 20,000,000 30,000,000 1,400 30,000,000 ------------- 1,520
12-02-2015 SS-100-3
10-02-2020 Rev. Page 1 of 1
CONTRACTOR’S LICENSE
Section 102 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
The third paragraph of Subsection 102.01, Prequalification of Bidders, is hereby deleted and the following substituted thereof:
The attention of prospective bidders is directed to Ark. Code Ann. §17-25-101 et seq., Act 150 of the 1965 Acts of Arkansas, being an "Act Regulating the Practice of Contracting in the State of
Arkansas", and any subsequent amendments made thereto. When the work offered is financed in whole with State funds and is estimated to cost $50,000 or more, the prospective bidder must show evidence of its license and evidence of registration or license of its subcontractors with the
Contractors Licensing Board for the State of Arkansas before being furnished with a proposal form.
The third paragraph of Subsection 108.01, Subletting of Contract, is hereby deleted and the following substituted thereof:
It shall be the responsibility of the Contractor to determine that all parties performing work amounting to $50,000 or more are currently licensed or registered by the Contractors Licensing
Board for the State of Arkansas.
08-31-17 11-16-17 Rev.
ss-100-4 Page I of1
ARKANSAS DEPARTMENT OF TRANSPORTATION
SUPPLEMENTAL SPECIFICATION
DEPARTMENT NAME CHANGE
All references to the Arkansas State Highway and Transportation Department contained within the Standard Specifications for Highway Construction (Edition of 2014), the Qualified Products List, the Manual of Field Sampling and Testing Procedures, plan sheets, Supplemental Specifications, and all Special Provisions contained in this proposal are hereby deleted and replaced with the title of Arkansas Department of Transportation.
All references to AHTD contained within the Standard Specifications for Highway Construction (Edition of 2014), the Qualified Products List, the Manual of Field Sampling and Testing Procedures, plan sheets, Supplemental Specifications, and all Special Provisions contained in this proposal are hereby deleted and replaced with the abbreviation AnDOT.
All references to the Arkansas State Highway Commission contained within the Standard
Specifications for Highway Construction (Edition of 2014), the Qualified Products List, the Manual of Field Sampling and Testing Procedures, the Standard Drawings, plan sheets, Supplemental Specifications, and all Special Provisions contained in this proposal remain in effect.
09-22-2016 SS-102-2
11-16-2017 Rev. Page 1 of 1 05-24-2024 Rev.
ISSUANCE OF PROPOSALS
Section 102 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
Subsection 102.04(j) is hereby deleted and the following is substituted therefore:
(j) If the prospective bidder is the Contractor on a current Contract with the Commission on which Liquidated Damages are being assessed, and there are no pending time extensions warranted to remove the project from Liquidated Damages.
Subsection 102.04(k) is hereby deleted and the following is substituted therefore:
(k) If the prospective bidder has a current Contract in default.
Subsection 102.04(n) is hereby added:
(n) If the prospective bidder has an individual, as an officer/owner/partner of any firm, partnerships or corporation, that has entered into a previous or current contract with the Commission that in the Department’s sole discretion, is subject to any of the reasons listed in Subsection 102.04(a)-(m).
05-23-2024 SS-102-3
PREQUALIFICATION OF BIDDERS
Section 102 of the Standard Specifications for Highway Construction, Edition of 2014, is
The following paragraph has been added to Subsection 102.01:
A contractor with common officers/owners/partners of any firm, partnerships, joint ventures, or corporations that is seeking prequalification, has been prequalified, or has entered into a previous or current contract with the Commission may have the prequalification denied, limited, or revoked for the reasons listed in Subsection 102.04(a)-(m).
11-02-2023 SS-103-2
CONTACT INFORMATION FOR MOTORIST DAMAGE CLAIMS
Section 103, AWARD AND EXECUTION OF CONTRACT, of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
The following is added as the fourth paragraph of Subsection 103.05(b), Liability Insurance:
Prior to beginning construction, the Contractor shall provide the Engineer with the name, phone number and e-mail address for the individual within their organization responsible for submission of claims for damages to motorists’ vehicles inside the work zones. This information shall be updated annually or whenever this responsibility changes within the Contractor’s organization.
The information will be made available to the public on the Department’s webpage.
11-09-2021
SS-105-4
MAINTENANCE DURING CONSTRUCTION
Division 100 of the Standard Specifications for Highway Construction, Edition of 2014, is
Subsection 105.15 is hereby modified as follows:
The first paragraph of Subsection 105.15 is hereby deleted and the following substituted therefor:
105.15 Maintenance During Construction. The Contractor shall maintain the work during construction and until the project is accepted. For contracts containing a Flexible Beginning of
Work special provision, the responsibility for maintenance by the Contractor will begin at the earlier date of the following:
when the Contractor begins work, or on the date of the beginning of time charges in accordance with the Work Order if the
Contractor has not commenced work.
This maintenance shall constitute continuous and effective work prosecuted day by day, with adequate equipment and forces, to the end that the roadway or structures are kept in satisfactory condition at all times.
SS-107-2
RESTRAINING CONDITIONS
Section 107 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby
The following is hereby added after the first bullet of the first paragraph of Subsection 107.10
Restraining Conditions (a), General:
Human remains, burials, and/or associated burial artifacts
The following is hereby added after the second paragraph of Subsection 107.10 (b), Restraining
Conditions Within the Right-of-Way:
When restraining conditions under (1) and (2) below are encountered, the following provisions should be executed.
(1) If archeological sites and/or historically significant cultural resources are unexpectedly impacted or subsequently discovered during construction, the Contractor shall stop work with no ground-disturbing activities occurring within a two hundred (200)-foot radius of the location of the discovery. The Engineer shall be notified immediately, who will then notify the Environmental Division. A Department staff archeologist will inspect the discovery and determine if the established buffer radius is appropriate. The radius may be decreased or increased based on the nature of the discovery at the discretion of the archeologist. Work in the buffer radius shall not resume until the Environmental
Division has provided written notification to the Engineer that construction activities can proceed.
(2) If human remains, burials, and/or associated burial artifacts are encountered during construction, the Contractor shall stop work with no ground-disturbing activities occurring within a two hundred (200)-foot radius of the location of the discovery and the location secured and protected by flagging or fencing. The human remains shall be covered with a canvas tarp and shall not be removed or collected. The Engineer shall be notified immediately, who then will notify the Environmental Division. A Department staff archeologist will inspect the remains and determine if the established buffer is appropriate. The radius may be decreased or increased based on the nature of the discovery at the discretion of the archeologist. The local law enforcement and Chief
Medical Examiner will be notified by the Environmental Division. Work in the buffer radius shall not resume until the Environmental Division has provided written notification to the Engineer that construction activities can proceed.
SS-107-2
RESTRAINING CONDITIONS
The following is hereby added after the third sentence of the first paragraph of Subsection
107.10 (c), Restraining Conditions Outside the Right-of-Way, (2) Non-commercially
Operated Site:
The Contractor shall limit the amount of acres submitted for an off-site location to no more than 10 acres, except for commercial areas, previously approved locations, or where previous ground disturbance exists. If a Contractor requires more than 10 acres for a proposed off-site location, the Contractor may, at no cost to the Department, acquire approval for use of the site from the State Historic Preservation Officer and a qualified archeological consultant.
06-22-16 ss-108-2
ARKANSAS DEPARTMENT OF TRANSPORTATION
SUPPLEMENTAL SPECIFICATION
WORK ALLOWED PRIOR TO ISSUANCE OF WORK ORDER
Section 108 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
Subsection 108.02(b)(2) is hereby deleted and the following is substituted therefore:
(2) The delivery to the Department for execution of the Contract and bonds properly executed on behalf of the Contractor and surety and the minimum 72 hours advance notice as required above shall constitute the Contractor's authority to begin the following items of work:
o Mobilization;
o Preparation of shop drawings and other required submissions;
o Ordering, fabrication, assembly, andlor stockpiling of materials;
o Driving Test Piling; and o Contract surveying, when Roadway and/or Bridge Construction Control is included in the
Contract.
o Erection of advance warning signs.
o Installation of netting on structures to prevent nesting of migratory birds in accordance with applicable Special Provisions (if included in the Contract).
o Set up, installation, and testing of Automated Work Zone Information Systems (if included in the Contract).
o Off-site area approval process per Section 107.10(c).
Such advance work shall be subject to the Contractor's assumption of the risk of cancellation of the award and the following:
. The Contractor shall, on commencing such operations, take all precautions required for public safety and shall observe all the provisions in the Contract;
o In the event of cancellation of the award, the Contractor shall at Contractor expense do such work as necessary to leave the site in a neat condition to the satisfaction of the Engineer;
o In the event of cancellation of the award, all work performed shall be deemed to be at the Contractor's expense; and
. All work done under this subsection in accordance with the Contract before its execution by the Commission will, when the Contract is executed, be considered authorized work and will be paid for as provided in the Contract.
Unless otherwise notified in writing, no time will be assessed for work performed prior to the effective date of a Work Order.
No payments will be made prior to the date established by the Engineer under Subsection 109.07, which date will be after the effective date of a Work Order.
The Contractor shall not be entitled to any additional compensation or an extension of time for any delay, hindrance, or interference caused by or attributable to commencement of work before the effective date of a Work Order.
09-21-2023 SS-108-3
WORK ORDER FOR FIXED COMPLETION DATE CONTRACTS
Section 108, Prosecution and Progress, of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
Subsection 108.02(b)(4) a. is hereby deleted, and the following is substituted therefor:
a. Fixed Completion Date Contract. Unless the Contractor is otherwise advised in writing, the Work Order for a fixed completion date contract shall become effective on the second business day following the execution of the Contract by the Department. (Example: If the contract is executed on Wednesday, March 1, the Work Order will be effective on Friday, March 3.) Should the effective date fall on Saturday, Sunday, legal holiday designated in Subsection 101.01(c), Monday following a holiday on Sunday, or Friday preceding a holiday on Saturday, the effective date shall still be on the second business day. The written Work Order from the Engineer will follow with the effective date being as specified.
03-24-16 ss-303-1 Page 1 ofl
ARKANSAS DEPARTMENT OF TRANSPORTATION
SUPPLEMENTAL SPECIFICATION
AGGREGATE BASE COURSE
Section 303 of the Standard Specifications for Highway Construction, Edition 2014, is hereby amended as follows:
The second paragraph of Subsection 303.020 Materials is hereby deleted and the following substituted therefor:
The Contractor shall have the option of using any higher numbered class
Aggregate Base Course than that specified, provided that payment will be for the class specified. Acceptance criteria shall be for the class specified. Different classes of Aggregate Base Course shall not be mixed in the same location.
12-06-18 SS-306-1
QUALITY CONTROL AND ACCEPTANCE
Division 300 of the Standard Specifications for Highway Construction, Edition of 2014, is
The first sentence of the third paragraph Subsection 306.03 Acceptance Testing is hereby deleted and the following substituted therefor:
If the material being furnished is crushed stone the Department will furnish the
PL, LL, and PI for the material, further tests for PL, LL, and PI are waived.
10-14-15 02-11-16 Rev.
11-16-17 Rev.
ss-400-1 Page I of1
ARKANSAS DEPARTMENT OF TRANSPORTATION
SUPPLEMENTAL SPECIFICATION
TACK COATS
Division 400 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
Section 40Lo Prime and Tack Coats and Emulsified Asphalt in Base Course, is hereby modified as follows:
The first sentence of Subsection 401.03(a) is hereby deleted and the following substituted therefore:
The surface to be treated with prime or tack coat shall be cleaned of dust, dirt, and loose or foreign material by sweeping with mechanical brooms immediately preceding the application of the prime or tack coat.
Third sentence of Subsection 401.03(c) is hereby deleted and the following is substituted therefore:
No dilution beyond that which is part of the emulsification process is permitted. The tack coat shall not be diluted, cut, or otherwise thinned after receipt from the manufacturer's facility.
The fifth sentence of Subsection 401.03(c) is hereby deleted and the following substituted therefore:
The rate of application shall be from 0.03 gallon to 0.10 gallon per square yard (0.1 L/sq m to 0.5 L/sq m) of residual asphalt as designated by the Engineer.
Section 4100 Construction Requirements and Acceptance of Asphalt Concrete Plant Mix Courses, is hereby modified as follows:
The sixth paragraph of Subsection 410.05 is hereby deleted and the following substituted therefore:
For foreign material, or when the time lapse between courses is more than 8 hours, the earlier course shall be cleaned and given a tack coat before placing the succeeding course. When directed, the tack coat shall be applied and paid for under Section 401. If directed by the Engineer, atack coat shall be used even though the elapsed time has been less than 8 hours.
08-31-17 SS-400-4
11-16-17 Rev. Page 1 of 2
6-29-23 Rev.
1-17-24 Rev.
DESIGN AND QUALITY CONTROL OF ASPHALT MIXTURES
Division 400 of the Standard Specifications for Highway Construction, Edition of 2014, is hereby amended as follows:
Section 404, QUALITY CONTROL OF ASPHALT MIXTURES, is hereby modified as follows:
The fifth sentence of the second paragraph of Subsection 404.01, Design of Asphalt Mixtures, (a)
General, is hereby deleted and the following substituted therefor:
A mix design that has not been produced on an ARDOT project in the last two years is inactive.
The Contractor may submit a passing field verification test for the inactive asphalt mix design to the Materials Division to be reactivated. Asphalt mix designs with an expiration date may remain in production if they are not inactive.
The third through fifth paragraphs of Subsection 404.04, Quality Control of Asphalt Mixtures, are hereby deleted and the following substituted therefor:
The accepted mix design shall be field verified by the Contractor at the start of mix production or after an interruption of more than 120 calendar days. Production of Department approved mix designs for placement on non-ARDOT projects may be used for mix verification. The Contractor shall be allowed two attempts to verify the mix design if being placed on an ARDOT project and three attempts to verify the mix design if being placed on a non-ARDOT project. The Contractor shall notify the Engineer sufficiently in advance for Department personnel to witness all testing of this production and shall provide copies of all test results to the Department.
Verification will begin with testing the plant produced mix using the aggregate proportions and asphalt binder content shown on the accepted mix design. After the first attempt of verification of the initial design, the Contractor may elect to adjust aggregate proportions to vary the accepted mix design gradations and bring the mix properties near the center of the compliance limits. If the mix is in sublot rejection, all future attempts will only be allowed on non-ARDOT projects.
The mix will be verified if the test values for air voids, asphalt binder content, and VMA are within the compliance limits shown in Table 410-1, and when the accepted mix design has been produced within the gradation tolerances according to Subsection 404.04.
The Contractor may request a one-time field mix design be accepted by the Engineer of Materials.
The Contractor will be notified in writing if the field mix design is accepted. A field mix design allows the Contractor to use the adjusted aggregate proportions for future verification of the mix design. Cold feed adjustments will be allowed to both the initial mix design and field mix design if they do not exceed more than 10% for any single cold feed or 20% overall from the initial mix design. No individual cold feed will be allowed to be eliminated by such changes. Gradation tolerances will be based off the initial job mix formula. All cold feed adjustments exceeding the limits outlined above will require a new mix design.
Once verified, the asphalt binder content shall be adjusted at the plant to obtain the optimum asphalt binder content shown on the mix design during production based on the lot average. At no time shall the asphalt binder content be adjusted in a manner to produce an asphalt binder content lower
08-31-17 SS-400-4
11-16-17 Rev. Page 2 of 2
6-29-23 Rev.
1-17-24 Rev.
DESIGN AND QUALITY CONTROL OF ASPHALT MIXTURES
than the design value. Adjustments to the asphalt binder content are not allowed for control of any volumetric property. All changes to be made to the asphalt binder content must first be reported to the Engineer. If adjustments do not give the intended result, production shall be stopped, and the asphalt plant and equipment shall be recalibrated and adjusted so the asphalt binder content can be successfully obtained.
The test method ARDOT 461, (NOTE 3), and (NOTE 4) in the table of the tenth paragraph of Subsection
404.04, Quality Control of Asphalt Mixtures, are hereby deleted.
The thirteenth and fourteenth paragraphs of Subsection 404.04, Quality Control of Asphalt Mixtures,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .