Bid Notice-Lincoln Area Bridges - I-80 and I-180.pdf

PDF 9 MB Posted

Attached to
Lincoln Area Bridges - I-80 and I-180
Solicitation number
LCLC-55(188)
Issued by
Blaine County, Nebraska

About this file

This is a bid notice for a Nebraska Department of Transportation (NDOT) highway construction project on behalf of the City of Lincoln. The project involves repair and replacement of aging bridges along I-80 and I-180 in the Lincoln area, located in Lancaster County. The scope of work includes grading, concrete pavement, seeding, bridge construction and rehabilitation at seven bridge locations (O Street, North 27th Street, Southwest 40th Street, Sheridan Boulevard, North 10th Street, South Street, and structures at various stations), signing, and general items. The project is identified as Project No. LCLC-55(188) with Contract ID 13491 and a tentative start date of April 1, 2027. The letting date is August 27, 2026, at 1:30 PM, with bids to be opened via an online meeting platform. The contract duration is 487 calendar days. Bidders must be prequalified for Classes 6 and 10 (Bridges and General) and may submit bids via mail to the Nebraska Department of Transportation or electronically through www.bidx.com. All questions regarding special provisions and plans must be submitted in writing through the BidX website prior to the letting, with answers posted exclusively on that platform.

The project has no Disadvantaged Business Enterprise (DBE) goals and includes combined bid requirements across multiple groups (1, 3, 5, 6, 6A through 6F, 8C, and 10). Extensive utility coordination is required, as multiple utilities including water lines, wastewater systems, storm drainage, traffic signals, fiber optic cables, gas lines, electric lines, and telecommunications infrastructure are located within project limits. Contractors must comply with railroad protective provisions for BNSF Railway, including background screening under the e-RAILSAFE Program, contractor safety orientation, on-track safety procedures, and specific insurance requirements including commercial general liability ($5,000,000 single limit), business automobile coverage ($3,000,000 combined single limit), and railroad protective liability ($2,000,000 per occurrence). Environmental commitments include protection of Section 4(f) properties (parks and trails), avoidance of wetlands and sensitive species habitats, maintenance of adjacent property access, and compliance with Bald Eagle protection protocols. The contractor is responsible for obtaining environmental clearances for any off-site borrow or staging areas and must follow Nebraska Game and Parks Commission requirements for threatened and endangered species protection.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL FORM

NEBRASKA DEPARTMENT OF TRANSPORTATION

ON BEHALF OF:CITY OF LINCOLN

LETTING DATE: August 27, 2026

LETTING TIME: 1:30 PM

CALL ORDER: 105

CONTROL NO. SEQ. NO.: 13491 000

TENTATIVE START DATE: 04/01/2027

LOCATION: LINCOLN AREA BRIDGES

IN COUNTY: LANCASTER

CONTRACT ID: 13491

PROJECT NO.: LCLC-55(188)

CONTRACT TIME: 487 Calendar Days

DBE GOAL: N/A

PREQUALIFICATION CLASS: 6,10 - BRIDGES,

GENERAL (ALL CLASSES)

COMBINED BID REQUIREMENTS: N/A

GROUP 1

GROUP 3

GROUP 5

GROUP 6

GROUP 6A

GROUP 6B

GROUP 6C

GROUP 6D

GROUP 6E

GROUP 6F

GROUP 8C

GROUP 10

GRADING

CONCRETE PAVEMENT

SEEDING

BRIDGE AT STATION 214+94.17

BRIDGE AT STATION 610+67.32

BRIDGE AT STATION 112+75.27

BRIDGE AT STATION 405+77.90

BRIDGE AT STATION 406+02.52

BRIDGE AT STATION 506+94.90

BRIDGE AT STATION 306+00.44

SIGNING

GENERAL ITEMS

-1-

P R

O F

E S

IO

NAL CIVIL

E

N G I N

E E

R

S T

A T

E

OF NEBRA

S

K A

S

E-9403

McCULLOUGH

STEVEN

Jul 20, 2026

Lincoln Area Bridges Project No. 55(188)

Contract ID 13491

- 2 -

NOTICE TO ALL BIDDERS

To report bid rigging activities, call: 1-800-424-9071

The U.S. Department of Transportation (DOT) operates the above toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m. eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the “hotline” to report such activities.

The “hotline” is part of the DOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially, and caller anonymity will be respected.

LETTING QUESTIONS

Prior to the letting, any questions pertaining to the Special Provisions or the Plans for this project should be submitted to NDOT in a written format through the Bid Express (BidX) website at https://www.bidx.com/ne/lettings. Likewise, NDOT will post answers exclusively to the BidX website. All official answers will be identified as “Authorized by NDOT.” Questions will not be answered verbally.

The NDOT answers posted in BidX are not a part of the contract documents, are provided for information only, and are subject to change. Only the contract documents, including any addenda thereto, should be relied upon by a potential bidder when submitting a bid.

- 3 -

TABLE OF CONTENTS

DIVISION 100 – GENERAL REQUIREMENTS

STATUS OF UTILITIES

STATUS OF RIGHT-OF-WAY

RAILROAD SPECIAL PROVISIONS

ENVIRONMENTAL COMMITMENTS

DIVISION 100 – GENERAL REQUIREMENTS AND COVENANTS

DIVISION 200 – EARTHWORK

DIVISION 400 – LIGHTING, SIGNS, AND TRAFFIC CONTROL

DIVISION 600 – PORTLAND CEMENT CONCRETE PAVEMENTS

DIVISION 700 – BRIDGES, CULVERTS, AND RELATED CONSTRUCTION

DIVISION 800 – ROADSIDE DEVELOPMENT AND EROSION CONTROL

DIVISION 900 – INCIDENTAL CONSTRUCTION

DIVISION 1000 – MATERIAL DETAILS

FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID

CONSTRUCTION CONTRACTS

EXECUTIVE ORDER 11246

DAVIS-BACON WAGE DETERMINATION

TRAINING SPECIAL PROVISIONS

- 4 -

SPECIAL PROVISIONS

FOR

FEDERAL AID

PROJECT NO. 55(188)

GENERAL CONDITIONS

(1-1-0826)

Bids for the work contemplated in this proposal form will be received at the office of the Nebraska Department of Transportation in Room 109 of the Central Office Building at 1500 Nebraska Parkway at Lincoln, Nebraska, until the date and time shown on page 1 of the Proposal.

a. Bids submitted by mail should be addressed to the Nebraska Department of Transportation, c/o Contract Lettings Section, P.O. Box 94759, Lincoln, NE 68509-4759.

b. Bids submitted electronically over the internet, shall be submitted using www.bidx.com.

Contractors contemplating submitting a bid for this contract must submit a request to bid via the Department’s ‘Request for Bidding Document’ website at: https://dot.nebraska.gov/business-center/bid-request-planholder-registration/. An Authorization to Bid will only be issued to, and bids accepted from, Contractors who are prequalified for the Prequalification Class indicated on page 1 of the Proposal Form.

Bids will be opened, and the bid totals will be read via the Department’s designated online meeting platform immediately following the letting date and time indicated on page 1 of the Proposal. Access information for the online bid opening will be available on the BidX Letting webpage a minimum of 2 days prior to the opening, and can be found by selecting the applicable letting from: https://www.bidx.com/ne/lettings.

The 2017 Edition of the Standard Specifications for Highway Construction, including all amendments and additions thereto effective at the date of the contract, are made a part of these Special Provisions, through reference.

The Required Contract Provisions, Form FHWA 1273, (Rev. 10-23), and the Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity and Standard Federal Equal Employment Opportunity Construction Contract Specifications dated November 3, 1980, are attached to and are a part of this proposal form.

The General Wage Decision issued under the Davis-Bacon and Related Acts is attached to and is a part of this proposal form.

- 5 -

STATUS OF UTILITIES

Project No.: LCLC-55(188) Control No.: 13491 Location: Lincoln Area Bridges

The following information is current as of June 30, 2026.

The Contractor should request a utility status update at the project pre-construction conference, and/or prior to start of work. Any utility adjustments or interruption of service for the convenience of the Contractor shall be the sole responsibility of the Contractor.

To arrange for utilities to locate and flag their underground facilities, contact Nebraska One Call at 1-800-331-5666 or dial 811.

The following utilities have facilities within the project area, and will be provided project plans in the near future:

Lincoln Water System

Contact Information Andy Walker 402-441-5932, awalker@lincoln.ne.gov Initial Contact Date: City GIS Files & PIH Review

Follow up Contact Dates: N/A

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Water lines located along south side of O ST and eastbound lanes near west end of bridge approach. Water lines located along north side of O ST and under north and east legs of 9th and O ST intersection near east bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

Standard utility one call should be completed to verify location and depth.

N 27th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Water lines located along east and west side of 27th ST and under 27th and Theresa ST intersection near north bridge approach. All other areas are located below the bridge deck.

- 6 -

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

SW 40th ST BRIDGE

Description of existing location(s) and facility type:

Water lines located under northbound lanes near south end of bridge approach. Water line located approximately under center of 40th ST near north bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

SHERIDAN BLVD BRIDGE

Description of existing location(s) and facility type:

Water line located under median and crosses under eastbound lanes near west end of bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

SOUTH ST BRIDGE

Description of existing location(s) and facility type:

Water line located under westbound lanes and crosses under 36th and South St and 37th and South St intersections near west end of bridge approach. Water line located behind curb/under sidewalk along westbound lanes and crosses under South St at business drive near east end of bridge approach and under South St near South St and Scott Ave intersection. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Water main is located below a proposed sidewalk replacement panel near Sta. 306+75, Left.

- 7 -

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

LWS, Wastewater

Contact Information

Brian Kramer, 402-441-7987, bakramer@lincoln.ne.gov

Initial Contact Date: City GIS Files & PIH Review

Follow up Contact Dates: N/A

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Wastewater line located under east and south legs of 9th and O ST intersection near east bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Wastewater lines located along east side of 27th ST and under east leg of 27th and Theresa ST intersection near north bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

- 8 -

Description of existing location(s) and facility type:

Wastewater line located along east side of 40th ST and crosses under 40th ST at business drive intersection near north bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

N 10th ST BRIDGE

Description of existing location(s) and facility type:

Two wastewater lines cross underneath 10th ST near south bridge approach.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

Standard utility one call should be completed to verify location and depth.

SOUTH ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Wastewater lines located under eastbound lanes of South ST and under 36th and South ST and 37th and South ST intersections near west bridge approach. Wastewater lines located under eastbound lanes of South ST and Scott Ave. and South ST intersection near east bridge approach.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

- 9 -

Lincoln Watershed Management – Storm Drainage

Jared Nelson, 402-441-4955, jnelson@lincoln.ne.gov

Initial Contact Date: City GIS Files & PIH Review

Follow up Contact Dates: N/A

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Storm sewer lines located under east leg of 3rd and O ST intersection near west bridge approach. Two storm sewer grate inlets located on bridge deck approximately 150’ from east end of bridge with connecting storm sewer pipe crossing under O ST. Storm sewer lines located under 9th and O ST intersection near east bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Storm sewer line located under north leg of 27th and Center ST intersection near south bridge approach. Storm sewer line located under south leg of 27th and Theresa ST intersection near north bridge approach. All other areas are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Storm sewer line located along east side of 40th ST with lateral lines crossing under 40th ST between north end of bridge deck and business drive intersection. All other areas are located below the bridge deck.

- 10 -

Lines are within current project limits. Sidewalk removal over top of storm sewer near Sta. 106+00, Right

Additional coordination with Contractor:

Storm sewer line located along north side of Sheridan Blvd and crosses under Sheridan Blvd near the west bridge approach. Storm sewer inlet and pipe crossing underneath eastbound lane of Sheridan Blvd just west of 33rd and Sheridan Blvd intersection near east bridge approach. Storm sewer line located along south side of Sheridan Blvd near east bridge approach.

Description of conflict(s):

Lines are within current project limits. Sidewalk removal over top of storm sewer near Sta. 404+60, Left

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Storm sewer lines crossing all four legs of 10th and Military Rd intersection near south bridge approach. Storm sewer line located along east side of 10th ST with a lateral line that crosses under 10th ST near north bridge approach.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

Additional Comments: Standard utility one call should be completed to verify location and depth.

- 11 -

Description of existing location(s) and facility type:

Storm sewer trunk line located along south side of South ST with lateral lines crossing underneath South St at 3 locations from 36th ST to 37th ST near west bridge approach.

Storm sewer line crosses underneath South ST near east bridge approach. Storm sewer lines located under east and south legs of Scott Ave and South ST.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Lincoln Traffic Engineering - Signals

Brandon Bugarin, 531-530-7789, bbugarin@lincoln.ne.gov

Initial Contact Date: City GIS Files & PIH Review

Follow up Contact Dates: N/A

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Traffic signal lines located along north side of O ST near the west end of the bridge approach. Overhead traffic signals and underground signal and fiber lines located under all four corners of 9th and O ST intersection. All other areas are located below the bridge deck and potentially attached to bridge.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Underground traffic fiber lines located along east and west side of 27th ST near south bridge approach. Traffic fiber lines located along east side of 27th ST and under south and west legs of 27th and Theresa ST intersection near north bridge approach. All other areas are located below the bridge deck and potentially attached to bridge.

- 12 -

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Traffic fiber line and conduit located along east side of 40th ST near north and south bridge approaches. All other areas are located below the bridge deck and potentially attached to bridge.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Traffic fiber line located along south side of westbound lane of Sheridan Blvd near west and east bridge approaches. All other areas are located below the bridge deck and potentially attached to bridge.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Traffic fiber line and conduit located under east leg of 10th and Military Rd intersection near south bridge approach.

Description of conflict(s):

Lines are within current project limits.

- 13 -

Additional Comments:

Standard utility one call should be completed to verify location and depth.

SOUTH ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Traffic conduit line located along north side of South ST near west and east bridge approaches. Traffic signal line crosses westbound lane of South ST in between 38th ST and Scott Ave. All other areas are located below the bridge deck and potentially attached to bridge.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Allo Communications

Ed Jarrett, 402-414-0621, Ejarrett@allophone.net

Initial Contact Date: 7/2/24

Follow up Contact Dates: N/A

‘O’ ST BRIDGE (All other bridges don’t apply)

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Fiber optic, telephone, and cable located within the City of Lincoln conduit system along north side of O ST near the west end of the bridge approach and crosses under O ST just east of 9th ST on the east bridge approach section. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Standard utility one call should be completed to verify location and depth.

- 14 -

Black Hills Energy

Ashley Erhart, 402-858-3609, Ashley.Erhart@blackhillscorp.com

Initial Contact Date: 7/2/24

Follow up Contact Dates: N/A

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Multiple gas lines located within 9th and O ST intersection near east bridge approach section.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Standard utility one call should be completed to verify location and depth.

N 27th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Distribution gas line located in northwest corner 27th and Center ST intersection near south end of bridge approach. Gas distribution and service lines located along east and west side of 27th ST near north end of bridge approach to Theresa ST intersection.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Standard utility one call should be completed to verify location and depth.

SW 40th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Gas distribution line located along west side of 40th ST near north end of bridge approach.

- 15 -

Additional coordination with Contractor:

TBD

Additional Comments:

Are conflicts with this facility anticipated? MAYBE Description of existing location(s) and facility type:

Gas distribution line located along center of Sheridan Blvd through project area. Service line also located along south side of Sheridan Blvd near east end of bridge approach.

Lines are within current project limits of temporary surfacing in median.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

Standard utility one call should be completed to verify location and depth and if any lines are attached to the bridge deck.

Description of existing location(s) and facility type:

Gas distribution line and service lines located along south side of South ST between 36th and 37th ST near west end of bridge approach. Gas distribution line and service lines located along south side of South ST from east end of bridge approach to Normal Blvd.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

LES

Reed Welke, 402-473-3100, rwelke@les.com

Initial Contact Date: 7/2/24

Follow up Contact Dates: N/A

- 16 -

‘O’ ST BRIDGE

Description of existing location(s) and facility type:

Underground electric lines located along north and south side of O ST near west end of bridge approach. Lighting located along O ST bridge deck. Overhead line located over bridge deck at 8th ST. Underground electric lines located under O ST just east of 9th and O ST intersection near east bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Lighting along O ST bridge deck may be in conflict with deck repair work.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Underground electric lines located along east and west side of 27th and Center ST intersection near south end of bridge approach. Lighting located along 27th ST bridge deck. Lighting and multiple underground electric lines located under 27th and Theresa ST intersection near north bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Lighting along 27th ST bridge deck may be in conflict with deck repair work.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Overhead and underground electric lines located across south end of bridge approach.

Lighting located along east side of 40th ST near south end of bridge approach. Lighting located along 40th ST bridge deck. Lighting located along east side of 40th ST near north end of bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Lighting along 40th ST bridge deck may be in conflict with deck repair work.

- 17 -

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Lighting located along north and south side of Sheridan Blvd near west end of bridge approach. Lighting located along north and south side of Sheridan Blvd near east end of bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Lighting near west and east ends of bridge deck may be in conflict with deck repair work.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Lighting located along east and west side of 10th and Military Rd intersection near south end of bridge approach. Lighting located along east side of 10th ST near south end of bridge approach. Lighting located along 10th ST bridge deck. Lighting and multiple underground electric lines located along east and west sides of 10th ST near north bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Lighting along 10th ST bridge deck may be in conflict with deck repair work.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Are conflicts with this facility anticipated? YES Description of existing location(s) and facility type:

Underground electric lines located across west end of bridge approach between 36th and 37th ST. Lighting and underground electric lines located along north and south sides of South ST near west end of bridge approach. Lighting located along north side of South ST bridge deck. Lighting and underground electric lines located along north

- 18 -side of South ST near east end of bridge approach. Underground electric lines located across South ST east of South ST and Scott Ave intersection near east end of bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits. Lighting along South ST bridge deck may be in conflict with deck repair work.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

OPTK/NE Link

Chris Sittle, 402-817-1883, Chris.Stittle@OPTK.com

Initial Contact Date: 7/2/24

Follow up Contact Dates: N/A

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

All OPTK Network facilities are located within the City of Lincoln conduit system.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

Spectrum

Elisha Holte, 402.421-0346, ELISHA.HOLTE@CHARTER.COM

Initial Contact Date: 7/2/24

Follow up Contact Dates: 8/7/24

ALL BRIDGE LOCATIONS

Are conflicts with this facility anticipated? NO

- 19 -

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Unite Private Network

Shanon Morris, 402-575-1239, SHANON.MORRIS@UPNFIBER.COM

Follow up Contact Dates: 8/7/24, 9/6/24

‘O’ ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Underground lines located along north side of O ST near west end of bridge approach.

All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Description of existing location(s) and facility type:

Underground lines located along north side of South ST near west end of bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Windstream

Nick Farmer, 402-499-0893, Nick.D.Farmer@windstream.com

- 20 -

‘O’ ST BRIDGE

Description of existing location(s) and facility type:

Fiber optic cable located within the City of Lincoln conduit system along north side of O ST near the west end of the bridge approach. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits.

Additional Comments:

No lines attached to bridge deck. In most places the line should be a minimum of 4 feet deep. Standard utility one call should be completed to verify location and depth.

N 27th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Fiber line located under 27th ST just south of 27th and Theresa ST intersection near north bridge approach.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. In most places the line should be a minimum of 4 feet deep. Standard utility one call should be completed to verify location and depth.

SW 40th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Fiber line located in duct along east side of 40th ST near north bridge approach.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. In most places the line should be a minimum of 4 feet deep. Standard utility one call should be completed to verify location and depth.

- 21 -

Description of existing location(s) and facility type:

Fiber line located in duct across South ST between 36th and 37th ST near west bridge approach. Fiber line located in duct along north side of South ST near west bridge approach. Fiber line located in duct along north side of South ST near east bridge approach.

Description of conflict(s):

Lines are within current project limits.

Relocation Work and Schedule:

TBD

No known lines attached to bridge deck. In most places the line should be a minimum of 4 feet deep. Standard utility one call should be completed to verify location and depth.

Lumen/Century Link

4631 BIRCH CREEK DR

LINCOLN, NE 68516

EMAIL: RELOCATIONS@CENTURYLINK.COM

Follow up Contact Dates: 8/7/24; 9/26/24; 10/15/24

SW 40th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Existing underground LEVEL3 conduit along west side of 40th ST near north and south bridge approaches. All other areas of conduit are located below the bridge deck.

Description of conflict(s):

Lines are within current project limits with potential conflicts. Lumen conduit should be located to verify distance from project centerline.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Lumen line is based on 3GIS data and will require locates to be confirmed.

- 22 -

Description of existing location(s) and facility type:

Existing underground LEVEL3 conduit crosses underneath the north bridge approach.

Description of conflict(s):

Lines are within current project limits. Potential conflict. Locates and depths needed.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Lumen line is based on 3GIS data and will require locates to be confirmed.

MCI Telecommunications

Contact Information

Jason Coffman, 402-659-6833, jason.coffman@verizon.com

Initial Contact Date: 7/2/24

Follow up Contact Dates: N/A

O ST, 27TH ST & 40TH ST BRIDGES

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

Buried lines only in areas below bridge decks (O ST, 27th ST, 40th ST).

Description of conflict(s):

No conflicts; Buried lines only in areas below bridge decks.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Standard utility one call should be completed to verify location and depth.

Cogent Communications

Mike Chebul, 402-316-8218, mchebul@cogentco.com

- 23 -

Description of existing location(s) and facility type:

Buried lines only in area below 27th ST bridge deck.

Description of conflict(s):

No conflicts; Buried lines only in area below bridge deck.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Standard utility one call should be completed to verify location and depth.

UNL Utility Plant

Blake France, 402-472-1105, blake.france@nebraska.edu

Initial Contact Date: 7/2/24

Follow up Contact Dates: N/A

N 27th ST BRIDGE

Are conflicts with this facility anticipated? NO Description of existing location(s) and facility type:

One-Call ticket flagged the University of NE utility plant as a potential conflict in the area of this bridge. However, discussions with University representative determined that there are no conflicts with University facilities on this location or any other bridge location along the project.

Description of conflict(s):

Lines are outside current project limits.

Relocation Work and Schedule:

N/A

Additional coordination with Contractor:

N/A

Flagged during One-Call ticket but confirmation with UNL that there are no conflicts.

Magellan

Mike Lenhart, 515-829-5405, michael.lenhart@magellanlp.com

- 24 -

Buried lines only in area below 40th ST bridge deck.

Description of conflict(s):

No conflicts; Buried lines only in area below bridge deck.

Relocation Work and Schedule:

TBD

Additional coordination with Contractor:

TBD

Additional Comments:

No lines attached to bridge deck. Standard utility one call should be completed to verify location and depth.

If any utility facilities are encountered and deemed to be in conflict during construction, the relocation work will be concurrent with construction.

The Contractor is directed to review Subsection 105.06 of the NDOT Standard Specifications for Highway Construction, 2017 Edition for additional information regarding cooperation with utilities.

STATUS OF RIGHT OF WAY

(1-14-1217)

All necessary right-of-way has been acquired for this project.

BNSF RAILWAY SPECIAL PROVISIONS

FOR PROJECTS FOR HIGHWAY IMPROVEMENTS

1. CONTRACTOR REQUIREMENTS

1.1 General

1.1.1 The Contractor must cooperate with BNSF RAILWAY COMPANY, hereinafter referred to as “Railway” where work is over or under on or adjacent to Railway property and/or right-of-way, hereafter referred to as “Railway Property”, during the construction Project LCLC-55(188), Lincoln Area Bridges, CN 13491 USDOT 064127R.

1.1.2 Contractor shall have a background investigation performed on all of its employees, subcontractors and agents who will be performing any services for Railroad under this Agreement which are determined by Railroad in its sole discretion a) to be on Railroad’s property, or b) that require access to Railroad Critical Infrastructure, Railroad Critical Information Systems, Railroad’s Employees, Hazardous Materials on Railroad’s property or is being transported by or otherwise in the custody of Railroad, or Freight in Transit involving Railroad.

- 25 -

The required background screening shall at a minimum meet the rail industry background screening criteria defined by the e-RAILSAFE Program as outlined at http://www.e-railsafe.com, in addition to any other applicable regulatory requirements.

Contractor shall obtain written consent from all its employees, subcontractors or agents screened in compliance with the e-RAILSAFE Program to participate in the Program on their behalf and to release completed background information to Railroad’s designee. Contractor shall be subject to periodic audit to ensure compliance.

Contractor subject to the e-RAILSAFE Program hereunder shall not permit any of its employees, subcontractors or agents to perform services hereunder who are not first approved under e-RAILSAFE Program standards. Railroad shall have the right to deny entry onto its premises or access as described in this section above to any of Contractor's employees, subcontractors or agents who do not display the authorized identification badge issued by a background screening service meeting the standards set forth in the e-RAILSAFE Program, or who in Railroad's opinion, which may not be unreasonable, may pose a threat to the safety or security of Railroad's operations, assets or personnel.

Contractors shall be responsible for ensuring that its employees, subcontractors and agents are United States citizens or legally working in the United States under a lawful and appropriate work VISA or other work authorization.

1.1.3 The Contractor is responsible for determining and complying with all Federal, State and Local Governmental laws and regulations, including, but not limited to environmental laws and regulations (including but not limited to the Resource Conservation and Recovery Act, as amended; the Clean Water Act, the Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health and safety laws and regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for, from and against all fines or penalties imposed or assessed by Federal, State and Local Governmental Agencies against the Company, which arise out of Contractor’s work under this Agreement.

1.1.4 Except as otherwise agreed to between Railway and State, the Contractor must notify the (City) at (402) 580-8438 and Railway’s Manager of Public Projects; telephone number (913) 551-4484 at least thirty (30) calendar days before commencing any work on Railway Property.

Contractor’s notification to Railway must refer to Railroad’s file RRMP 57.400.The contractor shall be required to apply for, execute and comply with all provisions of a permit obtained by accessing the following link: http://bnsf.railpermitting.com.

1.1.5 For any false work above any tracks, any excavations located within twenty-five (25) feet of the nearest track, and any intersecting slope from the plane of the top of rail on a 1-½ horizontal to 1 vertical slope beginning at eleven (11) feet from centerline of the nearest track, both measured perpendicular to centerline of track, the Contractor must furnish the Railway five sets of working drawings showing details of construction affecting Railway Property and tracks. The working drawing must include the proposed method of installation and removal of false work, shoring or cribbing, not included in the contract plans and two sets of structural calculations of any false work, shoring or cribbing. All calculations must take into consideration Railway surcharge loading and must be designed to meet American Railway Engineering and Maintenance-of-Way Association (previously known as American Railway Engineering Association) Coopers E-80 live loading standard. All drawings and calculations must be stamped by a registered professional Engineer licensed to practice in the state the project is located. The Contractor must not begin work until notified by the Railway that plans have been approved. The Contractor will be required to use lifting devices such as, cranes and/or winches

- 26 -to place or to remove any false work over Railway’s tracks. In no case will the Contractors be relieved of responsibility for results obtained by the implementation of said approved plans.

1.1.6 Subject to the movement of Railway’s trains, Railway will cooperate and make reasonable effort to assist the Contractor so that the work may be handled and performed in an efficient manner. The Contractor will have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by necessary Railway operations.

1.2 Contractor Safety

1.2.1 No employee of the Contractor, its subcontractors, agents or invitees may enter Railway Property without first having completed Railway’s Engineering Contractor Safety Orientation, found on the web site www.contractororientation.com. The Contractor must ensure that each of its employees, subcontractors, agents or invitees completes Railway’s Engineering Contractor Safety Orientation through Internet sessions before any work is performed on the Project. Additionally, the Contractor must ensure that each and every one of its employees, subcontractors, agents or invitees possesses a card certifying completion of the Railway Contractor Safety Orientation before entering Railway Property. The Contractor is responsible for the cost of the Railway Contractor Safety Orientation. The Contractor must renew the Railway Contractor Safety Orientation annually. Further clarification can be found on the web site or from the Railway’s Representative.

1.2.2 Each Contractor that will perform work within 25 feet of the centerline of a track must develop and implement a Roadway Worker Protection/On Track Safety Program and work with Railway Project Representative to develop an on-track safety strategy as described in the guidelines listed in the on track safety portion of the Safety Orientation. This Program must provide Roadway Worker protection/on-track training for all employees of the Contractor, its subcontractors, agents or invitees. This training is reinforced at the job site through job safety briefings. Additionally, each Contractor must develop and implement the Safety Action Plan, as provided for on the web site www.contractororientation.com, which will be made available to Railway prior to commencement of any work on Railway Property. During the performance of work, the Contractor must audit its work activities. The Contractor must designate an on-site project Supervisor who will serve as the contact person for the Railway and who will maintain a copy of the Safety Action Plan, safety audits, and Material Safety Datasheets (MSDS), at the job site.

1.3 Railway Requirements

1.3.1 The Contractor must take protective measures as are necessary to keep Railway facilities, including track ballast, free of sand, debris and other foreign objects and materials resulting from his operations. The Railway shall notify the Contractor of any damage to the Railway facilities resulting from Contractor’s operations. The Railway will repair such damages and the cost of such repairs of replacement must be paid for by the Contractor.

1.3.2 The Contractor must notify the Railway’s Division Superintendent and provide blasting plans to the Railway for review seven (7) calendar days prior to conducting any blasting operations adjacent to or on Railway’s Property.

- 27 -

1.3.3 The Contractor must abide by the following clearances during construction:

25’-0” Horizontally from centerline of nearest track

23’-31/2” Vertically above top of rail (Temporary False work Clearance may be reduced to 21’-6” subject to Railway approval)

27’-0” Vertically above top of rail for electric wires carrying less than 750 volts

28’-0” Vertically above top of rail for electric wires carrying 750 volts to 15,000 volts

30’-0” Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts

34’-0” Vertically above top of rail for electric wires carrying more than 20,000 volts

1.3.4 Any infringement within the clearances provided above due to the Contractor’s operations must be submitted to Railway and must not be undertaken until approved in writing by the Railway. No extra compensation will be allowed in the event the Contractor’s work is delayed pending Railway approval.

1.3.5 The details of construction affecting the Railway’s property and tracks not included in the contract plans must be submitted to the Railway by the Contractor for approval before work is undertaken and this work must not be undertaken until approved by the Railway.

1.3.6 At other than public road crossings, the Contractor must not move any equipment or materials across Railway’s tracks until permission has been obtained from the Railway. The Contractor must obtain a “Temporary Private Crossing Agreement” (substantially in the form of Exhibit “F” of this agreement and in the form hereof) from the Railway prior to moving his equipment or materials across the Railway’s tracks. The temporary crossing must be gated and locked at all times when not required for use by the Contractor. The temporary crossing for use of the Contractor will be at the expense of the Contractor.

1.3.7 Discharge, release or spill on the Railway Property of any hazardous substances, oil, petroleum, constituents, pollutants, contaminants or any hazardous waste is prohibited and Contractor must immediately notify the Railway’s Resource Operations Center at 1-800-832-5452, of any discharge, release or spills in excess of a reportable quantity.

Contractor must not allow Railway Property to become a treatment, storage or transfer facility as those terms are defined in the Resource Conservation and Recovery Act or any similar State law.

1.3.8 In the event the Contractor shall in any manner move or disturb other property of the Railway, in connection with the use of the said property, then, and in that event, the Contractor shall, as soon as possible and at its sole expense, restore such property to the same condition as it was in before such property was moved or disturbed.

1.3.9 In addition to Subsection 104.07 of the Standard Specification, the Contractor upon completion of the work covered by this contract, must promptly remove from the Railway’s Property all of Contractor’s tools, equipment, implements and other materials whether brought upon said property by said Contractor or any Subcontractor, employee or agent of Contractor or of any Subcontractor, and must cause Railway’s Property to be left in a condition acceptable to the Railway’s representative.

- 28 -

1.4 Protection of Railway Facilities and Railway Flagger Services:

1.4.1 All flagging requests on BNSF property should be directed through BNSFscheduling@wilsonco.com and not to the individual flagging companies. The flagger(s), the Contractor, and the BNSF Roadmaster must participate in a job safety briefing PRIOR TO the start of any work on/over/under Railway’s right of way. The Railway reserves the right to utilize its employees to provide railroad flagging services when those resources become available.

1.4.2 Unless determined otherwise by Railway’s Project Representative, Railway flagger and protective services and devices will be required and furnished when Contractor’s work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25-feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions:

a- When in the opinion of the Railway’s Representative it is necessary to safeguard

Railway’s Property, employees, trains, engines and facilities.

b- When any excavation is performed below the bottom of tie elevation, if, in the opinion of Railway’s representative, track or other Railway facilities may be subject to movement or settlement.

c- When work in any way interferes with the safe operation of trains at timetable speeds.

d- When any hazard is presented to Railway track, communications, signal, electrical or other facilities either due to persons, material, equipment or blasting in the vicinity.

e- Special permission must be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable.

f- Flagging services will be performed by qualified Railway flaggers.

g- A flagging crew generally consists of one employee. However, additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railway Representative.

h- Each time a flagger is called, the minimum period for billing will be the eight (8) hour basic day.

1.4.3 The cost of flagger services provided by the Railway, when deemed necessary by the Railway’s representative, will be borne by the Contractor. The estimated cost for one (1) flagger is $1,600 for an eight (8) hour basic day with time and one-half or double time for overtime, rest days and holidays. The estimated cost for each flagger includes vacation allowance, paid holidays, Railway and unemployment insurance, public liability and property damage insurance, health and welfare benefits, transportation, meals, lodging and supervision. Negotiations for Railway labor or collective bargaining agreements and rate changes authorized by appropriate Federal authorities may increase actual or estimated flagging rates. The flagging rate in effect at the time of performance by the Contractor hereunder will be used to calculate the actual costs of flagging pursuant to this paragraph.

- 29 -

1.5 Contractor General Safety Requirements

1.5.1 Work in the proximity of Railway track(s) is potentially hazardous where movement of trains and equipment can occur at any time and in any direction. All work performed by Contractors within 25 feet of any track must be in compliance with FRA Roadway Worker Protection Regulations.

1.5.2 Before beginning any task on Railway Property, a thorough job safety briefing must be conducted with all personnel involved with the task and repeated when the personnel or task changes. If the task is within 25 feet of any track, the job briefing must include the Railway’s flagger, as applicable, and include the procedures the Contractor will use to protect its employees, subcontractors, agents or invitees from moving any equipment adjacent to or across any Railway track(s).

1.5.3 Workers must not work within 25 feet of the centerline of any track without an on-track safety strategy approved by the Railway’s Project Representative. When authority is provided, every Contractor employee must know: (1) who the Railway flagger is, and how to contact the flagger, (2) limits of the authority, (3) the method of communication to stop and resume work, and (4) location of the designated places of safety. Persons or equipment entering flag/work limits that were not previously job briefed, must notify the flagger immediately, and be given a job briefing when working within 25 feet of the centerline of track.

1.5.4 When Contractor employees are required to work on the Railway Property after normal working hours or on weekends, the Railroad’s representative in charge of the project must be notified. A minimum of two employees must be present at all times.

1.5.5 Any employees, agents or invitees of Contractor or its subcontractors under suspicion of being under the influence of drugs or alcohol, or in the possession of same, will be removed from the Company’s Property by Contractor and subsequently released to the custody of a representative of Contractor management. Future access to the Railway’s Property by that employee will be denied.

1.5.6 Any damage to Railway Property, or any hazard noticed on passing trains must be reported immediately to the Railway’s representative in charge of the project. Any vehicle or machine which may come in contact with track, signal equipment, or structure (bridge) and could result in a train derailment must be reported immediately to the Railway representative in charge of the project and to the Railway’s Resource Operations Center at 1-800-832-5452.

Local emergency numbers are to be obtained from the Railway representative in charge of the project prior to the start of any work and must be posted at the job site.

1.5.7 For safety reasons, all persons are prohibited from having pocketknives, firearms or other deadly weapons in their possession while working on Railway’s Property.

1.5.8 All personnel protective equipment (PPE) used on Railway Property must meet applicable OSHA and ANSI specifications. Current Railway personnel protective equipment requirements are listed on the web site, www.contractororientation.com, however, a partial list of the requirements include: a) safety glasses with permanently affixed side shields (no yellow lenses); b) hard hats; c) safety…

This is the start of the file's text. The full file is on GovTribe.