Bid Notice-Johnson Hall Elevator Modernization.pdf

PDF 8 MB Posted

Attached to
Johnson Hall Elevator Modernization
Solicitation number
CP26-137
Issued by
Lane County, Oregon

About this file

Summary of Johnson Hall Elevator Modernization Bid Notice

This bid notice is issued by the University of Oregon, Department of Design and Construction, for a retainer program construction project involving the replacement and modernization of an elevator system in Johnson Hall located at 1098 E. 13th Ave, Eugene, Oregon. The project (CP26-137) requires the replacement of the elevator in Johnson Hall and updating of associated systems, including mechanical, electrical, plumbing, and finish work. A mandatory pre-bid conference and site visit is scheduled for November 9, 2026, at 2:00 PM at Johnson Hall, with attendance required for bid eligibility; bidders arriving more than five minutes late will be prohibited from submitting a bid. Electronic bids must be submitted via Smartsheet by December 2, 2026, at 2:00 PM Pacific Time, with results posted privately to the UO Procurement website. Bids will be opened on December 2, 2026, at 4:00 PM. This opportunity is restricted to contractors with a current University of Oregon retainer contract for construction services. The contract includes performance and payment bonds, and the successful bidder must execute the contract within 20 calendar days of award.

All bidders must be registered with the Oregon Construction Contractors Board and comply with prevailing wage requirements under ORS 279C.800 through 279C.870, with BOLI-issued prevailing wage rates effective as of September 3, 2026, as amended October 5, 2026. Bids will be awarded on a lump-sum basis to the lowest responsive bid from a responsible bidder. The University of Oregon encourages bids from Minority, Women, Veteran, and Emerging Small Businesses but has not established a specific set-aside for these categories. The contract documents incorporate standard UO Retainer General Conditions, which include requirements for insurance coverage, payroll certification, retainage provisions (with 25 percent retention pending prevailing wage compliance), and a comprehensive claims review process. Contractors must provide certificates of insurance, comply with all applicable federal and state laws including civil rights requirements, and maintain record documents for a minimum of ten years.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Retainer Program Construction Bidding Opportunity

For the

UO Johnson Hall Elevator Modernization Project

CP26-137

Architect/Engineer of Record

Rowell Brokaw Architects

Authorized Owner’s Representative Monica Hasek

Department of Design and Construction

1295 Franklin Blvd. / 1276 University of Oregon Eugene OR 97403-1276

2026-11-4

UNIVERSITY OF OREGON

BID PACKAGE

TABLE OF CONTENTS

Johnson Hall

Elevator Modernization mhasek Snapshot mhasek Text Box Bidding & Contract Requirements

Notice of Retainer Contract Opportunity Instructions to Bidders Supplemental Instructions to Bidders Bid Form UO Retainer General Conditions Retainer Contract Supplement Exhibit A – Contractor ID Policy Exhibit B – Reserved Exhibit C – Supplemental GCs BOLI issued September 3, 2026, as amended October 5, 2026 Performance and Payment Bonds mhasek Line

University of Oregon By: Jamie Moffitt, Senior Vice President of Finance and Administration UO Notice of Retainer Contracting Opportunity (03/26)

UNIVERSITY OF OREGON

NOTICE OF RETAINER CONTRACT OPPORTUNITY

THIS OPPORTUNITY IS ONLY AVAILABLE TO CONTRACTORS WITH A CURRENT UNIVERSITY

OF OREGON (UO) RETAINER CONTRACT FOR CONSTRUCTION SERVICES.

The University of Oregon (“Owner”) is accepting electronic bids for a public works project until _____________ Pacific Time, ___________ (“Closing Time and Date”) for the project located on the campus of University or Oregon, in _________________, Oregon (“Project”).

The Project includes:

A pre-bid conference or site visit (refer to bid package for details) is:___________________

If “NOT APPLICABLE” is selected, then the grey section below does not apply.

The pre-bid conference/site visit will be conducted on _______________ at ________________.

Bidders shall meet with Owner’s Representative at ______________________________________________________________________________for that purpose.

[IF ATTENDANCE IS MANDATORY] Attendance will be documented through a sign-in sheet prepared by the Owner’s Representative. Prime bidders who arrive more than 5 minutes after start of time of the meeting (as stated in the Solicitation Document and by the Owner’s Representative’s watch) or after the discussion portion of the meeting (whichever comes first) shall not be permitted to sign in and will not be permitted to submit a bid on the Project.

Bids are to be submitted via the following link:

https://app.smartsheet.com/b/form/f0fbbbf6a0ee4751a8a385e8472ecde6

Bids will be opened on _________ at ________ at ____________________________________________ by the Owner’s Representative or designee. Bid results will be posted to the UO Procurement site where the Bid Notification was originally posted.

Bids will be received on a lump-sum basis for all of the work. Bid packets may be obtained for no charge on the UO Business Opportunities website (https://pcs.uoregon.edu/content/business-opportunities)

All bidders must comply with requirements of the prevailing wage law in ORS 279C.800 through ORS 279C.870. No offer will be received or considered by Owner unless the offer contains a statement by the bidder as a part of the offer that states: “Contractor agrees to be bound by and will comply with the

2PM 12/02/26

Johnson Hall Elevator Modernization

Eugene

MANDATORY

11/09/26 2PM

Johnson Hall, 1098 E. 13th Ave, Eugene, OR 97403

12/02/26 4pm Private

Replacement of Elevator in Johnson Hall and update systems as required.

University of Oregon By: Jamie Moffitt, Senior Vice President of Finance and Administration UO Notice of Retainer Contracting Opportunity (03/26) provisions of ORS 279C.838, 279C.840 or 40 U.S.C. 3141 to 3148.” All bidders must be registered with the Construction Contractor’s Board at the time of bid submission. No bid will be considered unless fully completed in the manner provided in the “Instructions to Bidders” upon the Bid form provided. UO encourages bids from Minority, Women, Veteran, and Emerging Small Businesses.

PUBLICATIONS:

http://pcs.uoregon.edu/content/business-opportunities

UO Retainer Contract Instructions to Bidders (2026) P a g e | 1

RETAINER CONTRACT

INSTRUCTIONS TO BIDDERS

Table of Contents

Article 1. Definitions

Article 2. Scope of Work

Article 3. Examination of Site and Conditions

Article 4. Substitute Materials Approval Process

Article 5. Interpretation of Project Manual

Article 6. Execution of the Bid Form

Article 7. Prohibition of Alterations to Bid

Article 8. Submission of Bid

Article 9. Bid Submission and Opening of Bids

Article 10. Acceptance or Rejection of Bids by Owner

Article 11. Withdrawal of Bid

Article 12. Execution of Contract, Agreement, Performance Bond and Payment Bond

Article 13. Recyclable Products

UO Retainer Contract Instructions to Bidders (2026) P a g e | 2

INSTRUCTIONS TO BIDDERS

The University of Oregon’s policies and procedures govern this procurement process.

Article 1. Definitions

1.1. Capitalized words used herein but not defined shall have the meaning set forth in the UO Retainer General Conditions and Owner’s policies and procedures. The following terms used herein shall have the meaning set forth below:

“Bid”- refers to UO Bid form provided by Owner to be completed by Bidders.

“Project Manual”- The Project Manual includes, but is not necessarily limited to, the following: the Advertisement for Bids or Notice of Contracting Opportunity, these Instructions to Bidders, Supplemental Instructions to Bidders, Bid, UO Retainer General Conditions, Supplemental Retainer General Conditions, Sample Retainer Contract, Sample Supplement, Performance Bond, Payment Bond, and the Plans and Specifications.

Article 2. Scope of Work

2.1 The Work contemplated in this document shall be for the Owner in connection with the Project described in the Project Manual.

Article 3. Examination of Site and Conditions

3.1 Before making a Bid, the Bidder shall examine the Project site to ascertain its physical condition and review the Project Manual to understand the requirements of this Project. The Bidder shall be responsible for being fully informed as to the quality, quantity and sources of supply of the materials listed in the Project Manual and all other requirements included in the Project Manual.

Failure to comply with this Section will not release Contractor from entering into the Contract nor excuse Contractor from performing the Work in strict accordance with the terms of the Contract Documents.

3.2 The Owner will not be responsible for any loss or unanticipated costs which may arise as a result of Contractor's failure to be fully informed in advance with regard to all conditions and requirements pertaining to the Project, the Work, and the character of the Work required.

3.3 No statement made by any officer, agent, or employee of the Owner in relation to the physical conditions pertaining to the Project Manual, Project site or quality, quantity, and supply of materials will be binding on the Owner, unless included in writing in the Project Manual or an Addendum thereto.

Article 4. Substitute Materials Approval Process

4.1 Prior to submitting a Bid including a Substitution, the Bidder must first seek approval of the Substitution from the Consultant, either an architect or engineer, by submitting a written request for approval at least [10] calendar days prior to the Closing Date and Time set forth in the Advertisement for Bids. The Bidder submitting the request shall be responsible for its timely delivery.

4.2 Substitution approval requests shall be accompanied by samples, records of performance, UO Retainer Contract Instructions to Bidders (2026) P a g e | 3 certified copies of tests by impartial and recognized laboratories, and such other information as the Consultant may request.

4.3 Within a reasonable time after receiving such a request the Owner (or Consultant if so designated) will consider whether the Substitution sought by Bidder is of equal value, and utility, as the designated product in the Project Manual. If the requested Substitution is approved, an Addendum to the Project Manual shall be issued. A copy of each Addendum will be posted on the UO Business Opportunities website (https://pcs.uoregon.edu/content/business-opportunities) and shall become a part of the Project Manual.

4.4 When the Consultant approves a Substitution by Addendum, it is with the understanding that the Contractor guarantees the substituted article or material to be equal or better than the one specified.

Article 5. Interpretation of Project Manual

5.1 A Bidder in doubt as to the meaning of any part of the Project Manual may submit a written request for an interpretation to the Consultant at any time prior to [10] calendar days prior to the Closing Date and Time.

5.2 Any interpretation of the Project Manual will be made only by a duly issued Addendum. The Owner will not be responsible for any other explanation or interpretation of the Project Manual nor for any other approval of a particular manufacturer's process or item.

5.3 To establish a basis of quality, the Project Manual may specify processes, machinery, equipment, or materials by describing the process, naming the manufacturer and product, or specifying the material. Whenever a process is designated or a manufacturer named, a brand or item designation given, or whenever a process or material covered by patent is designated or described, it shall be understood that the words "or approved equal" follow such name, designation or description, whether they do so or not.

Article 6. Execution of the Bid Form

6.1 The Bid form relates to Bids on a specific Project Manual. Only the amounts and information asked for on the Bid form furnished by the Owner will be considered as a Bid. Each Bidder shall Bid upon the Project and Work exactly as set forth in the Bid form. The Bidder shall include in the Bid a sum to cover the cost of all items contemplated by the Project Manual. Bids that fail to address alternates set forth on the Bid form may be considered non-responsive.

6.2 Each Bid form must: 1) be completed in accordance with these instructions; 2) include the appropriate signatures as noted on the Bid form; 3) include numbers pertaining to base Bids stated both in writing and in figures; and 4) include the Bidder's typed or clearly printed address.

6.3 When Bidding on an alternate for which there is no charge, the Bidder shall write the words "No Charge" in the space provided on the Bid form. If one or more alternates is shown on the Bid form, the Bidder shall indicate whether each is "add" or "deduct."

Article 7. Prohibition of Alterations to Bid

7.1 Bids which are incomplete, or contain ambiguities or conditions not provided for in the Bid form, may be rejected.

UO Retainer Contract Instructions to Bidders (2026) P a g e | 4

Article 8. Submission of Bid

8.1 Each Bid shall be submitted electronically as directed in Notice of Retainer Contracting Opportunity included in these bidding documents.

Article 9. Bid Submission and Opening of Bids

9.1 All Bids must be received by the Owner before the Closing Date and Time. Any Bids received after the Closing Date and Time will be rejected and returned to the Bidder unopened.

9.2 At the time of opening of Bids, each Bid received, regardless of any irregularities or informalities, will be recorded. Bid results will be posted to the Procurement site where the Bid Notification was originally posted.

Article 10. Acceptance or Rejection of Bids by Owner

10.1 Unless all Bids are rejected, the Owner will award the Project Contract based on the lowest responsive Bid from a responsible Bidder. If that Bidder does not execute the Project Contract, the Project Contract will be awarded to the next lowest responsible Bidder or Bidders in succession.

10.2 The procedures for Contract awards shall be in compliance with the provisions of Owner’s policies and procedures, including Policy IV.07.10 or any successor thereto.

10.3 The Owner reserves the right to reject all Bids and to waive minor informalities.

10.4 The Owner reserves the right to hold the Bid of the three lowest Bidders for a period of 30 calendar days from the time of Bid opening pending award of the Contract.

10.5 In determining the lowest Bidder, the Owner reserves the right to take into consideration any or all authorized Bids as well as alternates or combinations indicated in the Bid form.

10.6 If Owner has not accepted a Bid within 30 calendar days after the opening of the Bids, each of the three lowest Bidders may withdraw the Bid submitted.

Article 11. Withdrawal of Bid

11.1 At any time prior to the Closing Date and Time a Bidder may withdraw its Bid. This will not preclude the submission of another Bid by such Bidder prior to the Closing Date and Time.

11.2 After the Closing Date and Time, no Bidder will be permitted to withdraw its Bid within the time period specified in Article 10 for award and execution, except as provided for in that Article.

Article 12. Execution of Contract, Agreement, Performance Bond and Payment Bond

12.1 The Owner will provide the successful Bidder with Contract Documents within 10 calendar days after the award of the Contract. The Bidder shall be required to execute the Contract as provided, including a Performance Bond and a Payment Bond from a surety company licensed to do surety business in the State of Oregon, within 20 calendar days after the award of the Contract.

The Contract Documents shall be delivered to the Owner in accordance with Owner’s policies and

UO Retainer Contract Instructions to Bidders (2026) P a g e | 5 procedures.

Article 13. Recyclable Products

13.1 Contractors must use recyclable products to the maximum extent economically feasible in the performance of the Contract.

UO Retainer Contract Bid Form (2026) P a g e | 1

RETAINER CONTRACT

BID FORM

PROJECT: Johnson Hall Elevator Modernization

BID SUBMISSION DATE: Wednesday, December 2, 2026 at 2:00PM Pacific Time

PRIVATE BID OPENING: After bid submission. Results will be posted on PCS site.

FROM: ____________________________________________________________________

Name of Contractor

TO: The University of Oregon (“Owner”) 1295 Franklin Blvd. / 1276 University of Oregon Eugene OR, 97403

1. The Undersigned (check one of the following and insert information as requested):

____a. An individual doing business under an assumed name registered under the laws of the State of _____________________________; or

____b. A partnership registered under the laws of the State of _____________________;

or

____c. A corporation organized under the laws of the State of ____________________; or

____d. A limited liability corporation/company organized under the laws of the State of _____________________________;

hereby proposes to furnish all material and labor and perform all Work hereinafter indicated for the above project in strict accordance with the Contract Documents for the Basic Bid as follows:

____________________________________________ Dollars ($__________________) and the Undersigned agrees to be bound by each of the following documents:

• Advertisement for Bids or Notice of Retainer Contract Opportunity

• Instructions to Bidders

• Supplemental Instructions to Bidders, if any

• UO Retainer General Conditions

UO Retainer Contract Bid Form (2026) P a g e | 2

• Supplemental UO Retainer General Conditions, if any

• Sample Retainer Contract Supplement

• Performance Bond and Payment Bond

• Plans and Specifications

• Drawings and Details

• Prevailing Wage Rates

• Payroll and Certified Statement Form

• Any ADDENDA numbered ____ through____, inclusive (fill in blanks).

2. With submission of this bid, Contractor is confirming that they are able to provide Insurance and Builder’s Risk coverage at the limits required in the bid documents and that they will put this coverage in place as a stipulation of receiving an executed contract.

3. The work shall be completed within the time stipulated and specified in Division 1, Section

01 1000 SummaryP, of the Specifications.

4. The Undersigned certifies that: (1) This Bid has been arrived at independently and is being submitted without collusion with and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment or services described in the invitation to bid designed to limit independent bidding or competition; and (2) The contents of the Bid have not been communicated by the Undersigned or its employees or agents to any person not an employee or agent of the Undersigned and will not be communicated to such person prior to the official opening of the Bid.

5. The undersigned HAS, HAS NOT (circle applicable status) paid unemployment or income taxes in Oregon within the past 12 months and HAS, HAS NOT (circle applicable status) a business address in Oregon.

6. The Undersigned agrees, if awarded a contract, to comply with the provisions of ORS

279C.800 through 279C.870 pertaining to the payment of the prevailing rates of wage.

7. Contractor's CCB registration number is ____________________________. As a condition to submitting a bid, a Contractor must be registered with the Oregon Construction Contractors Board in accordance with ORS 701.035 to 701.055, and disclose the registration number. Failure to register and disclose the number will render the bid unresponsive and it will be rejected, unless contrary to federal law.

8. The successful Bidder hereby certifies that all subcontractors who will perform construction work as described in ORS 701.005(2) were registered with the Construction Contractors Board in accordance with ORS 701.035 to 701.055 at the time the subcontractor(s) made a bid to work under the Contract.

9. The successful Bidder hereby certifies that, in compliance with the Worker's Compensation

Law of the State of Oregon, its Worker's Compensation Insurance provider is ______________________________, Policy No. , and that Contractor shall submit Certificates of Insurance as required.

UO Retainer Contract Bid Form (2026) P a g e | 3

10. Contractor’s Project Manager for this project is: ______________________________, Office Phone: _________________________ Cell Phone:

11. The Undersigned certifies that it has not discriminated against minority, women, or emerging small businesses in obtaining any subcontracts for this project.

12. The Undersigned hereby authorizes said surety company to disclose any information to the Owner concerning the Undersigned's ability to supply a Performance Bond and Payment Bond each in the amount of the Contract.

UO Retainer Contract Bid Form (2026) P a g e | 4

By signature below, Contractor agrees to be bound by this Bid.

NAME OF FIRM _______________________________________

ADDRESS _______________________________________

FEDERAL TAX ID _______________________________________

TELEPHONE NO _______________________________________

FAX NO _______________________________________

E-MAIL CONTACT _______________________________________

SIGNATURE 1) _______________________________________

Sole Individual or 2) _______________________________________ Partner or 3) _______________________________________ Authorized Officer of Corporation

(SEAL)

Attested: Secretary of Corporation

Payment information will be reported to the IRS under the name and taxpayer ID # provided above. Information not matching IRS records could subject Contractor to 31 percent backup withholding.

* * * * * E N D O F B I D * * * * *

UO General Retainer Conditions P a g e | 1

GENERAL CONDITIONS

FOR RETAINER CONSTRUCTION SERVICES CONTRACTS

(“UO Retainer General Conditions”)

January 1, 2026

INSTRUCTIONS: The attached University of Oregon General Conditions for Retainer Construction Services Contracts ("UO Retainer General Conditions”) apply to all designated construction contracts.

Changes to the UO General Retainer Conditions (including any additions, deletions or substitutions) should only be made by attaching Supplemental General Retainer Conditions. The text of these UO General Retainer Conditions should not otherwise be altered.

TABLE OF SECTIONS

SECTION A - GENERAL PROVISIONS

A.1 DEFINITION OF TERMS

A.2 SCOPE OF WORK

A.3 INTERPRETATION OF CONTRACT DOCUMENTS

A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE

A.5 INDEPENDENT CONTRACTOR STATUS

A.6 RETIREMENT SYSTEM STATUS AND TAXES

A.7 GOVERNMENT EMPLOYMENT STATUS

SECTION B - ADMINISTRATION OF THE CONTRACT

B.1 OWNER’S ADMINISTRATION OF THE CONTRACT

B.2 CONTRACTOR'S MEANS AND METHODS

B.3 MATERIALS AND WORKMANSHIP

B.4 PERMITS

B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS

B.6 SUPERINTENDENCE

B.7 INSPECTION

B.8 SEVERABILITY

B.9 ACCESS TO RECORDS

B.10 WAIVER

B.11 SUBCONTRACTS AND ASSIGNMENT

B.12 SUCCESSORS IN INTEREST

B.13 OWNER'S RIGHT TO DO WORK

B.14 OTHER CONTRACTS

B.15 GOVERNING LAW

B.16 LITIGATION

B.17 ALLOWANCES

B.18 SUBMITTALS, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

B.19 SUBSTITUTIONS

B.20 USE OF PLANS AND SPECIFICATIONS

B.21 FUNDS AVAILABLE AND AUTHORIZED

B.22 NO THIRD-PARTY BENEFICIARIES

UO Retainer General Conditions P a g e | 2

SECTION C - WAGES AND LABOR

C.1 MINIMUM WAGES RATES ON PUBLIC WORKS

C.2 PAYROLL CERTIFICATION AND FEE REQUIREMENTS, ADDITIONAL RETAINAGE

C.3 PROMPT PAYMENT AND CONTRACT CONDITIONS

C.4 PAYMENT FOR MEDICAL CARE

C.5 HOURS OF LABOR

SECTION D - CHANGES IN THE WORK

D.1 CHANGES IN THE WORK

D.2 DELAYS

D.3 CLAIMS REVIEW PROCESS

SECTION E - PAYMENTS

E.1 SCHEDULE OF VALUES

E.2 APPLICATIONS FOR PAYMENT

E.3 PAYROLL CERTIFICATION REQUIREMENT

E.4 DUAL PAYMENT SOURCES

E.5 RETAINAGE

E.6 INFORMATION TRACKING AND REPORTING REQUIREMENTS

E.7 FINAL PAYMENT

SECTION F - JOB SITE CONDITIONS

F.1 USE OF PREMISES

F.2 PROTECTION OF WORKERS, PROPERTY, AND THE PUBLIC

F.3 CUTTING AND PATCHING

F.4 CLEANING UP

F.5 ENVIRONMENTAL CONTAMINATION

F.6 ENVIRONMENTAL CLEAN-UP

F.7 FORCE MAJEURE

SECTION G - INDEMNITY, BONDING AND INSURANCE

G.1 RESPONSIBILITY FOR DAMAGES/INDEMNITY

G.2 PERFORMANCE AND PAYMENT SECURITY, PUBLIC WORKS BOND

G.3 INSURANCE

SECTION H - SCHEDULE OF WORK

H.1 CONTRACT PERIOD

H.2 SCHEDULE

H.3 PARTIAL OCCUPANCY OR USE

SECTION I - CORRECTION OF WORK

I.1 CORRECTIONS OF WORK BEFORE FINAL PAYMENT

I.2 WARRANTY WORK

UO Retainer General Conditions P a g e | 3

SECTION J - SUSPENSION AND/OR TERMINATION OF THE WORK

J.1 OWNER'S RIGHT TO SUSPEND THE WORK

J.2 CONTRACTOR'S RESPONSIBILITIES

J.3 COMPENSATION FOR SUSPENSION

J.4 OWNER'S RIGHT TO TERMINATE CONTRACT

J.5 TERMINATION FOR CONVENIENCE

J.6 ACTION UPON TERMINATION

SECTION K - CONTRACT CLOSE-OUT

K.1 RECORD DOCUMENTS

K.2 OPERATION AND MAINTENANCE MANUALS

K.3 COMPLETION NOTICES

K.4 TRAINING

K.5 EXTRA MATERIALS

K.6 ENVIRONMENTAL CLEAN-UP

K.7 CERTIFICATE OF OCCUPANCY

K.8 OTHER CONTRACTOR RESPONSIBILITIES

K.9 SURVIVAL

UO Retainer General Conditions P a g e | 4

SECTION A

GENERAL PROVISIONS

A.1 DEFINITION OF TERMS

In the Contract Documents the following terms shall be as defined below:

AMENDMENT, means a writing which, when fully executed by the Parties to this Contract, constitutes a change to a Contract Document. Amendments to Supplements, including change orders, shall be issued in accordance with the provisions of Section D and, if applicable, establish a Contract Price or Contract Time adjustment.

APPLICABLE LAWS, means federal, state and local laws, codes, rules, regulations, ordinances, and Owner policies and procedures applicable to the Work and to the Contract.

BID, means an offer binding on the Bidder and submitted in response to an Instructions to Bidders or a proposal in connection with a Request for Proposals.

BIDDER, means a Person that submits a Bid in response to Instructions to Bidders or a proposal in connection with a Request for Proposals.

CLAIM, means a demand by Contractor pursuant to Section D.3 for review of the denial of Contractor’s initial request for an adjustment of Contract terms, payment of money, extension of Contract Time or other relief, submitted in accordance with the requirements and within the time limits established for review of Claims in these UO General Retainer Conditions.

CONSTRUCTION CHANGE DIRECTIVE, means a written order by the Owner to the Contractor requiring a change in the Work within the general scope of the Contract Documents, issued under the provisions of Section D.

CONSULTANT, means the Person (Architect or Engineer) contracted by the Owner to make drawings and specifications and, to provide contract administration of the Work contemplated by the Contract to the extent provided herein or by supplemental instruction of Owner (under which Owner may delegate responsibilities to the Consultant), in accordance with ORS Chapter 671 (Architects) or ORS Chapter 672 (Engineers) and administrative rules adopted thereunder.

CONTRACT, means the written Retainer Contract between the Owner and the Contractor, including the Contract Documents, which describes the Work to be done and the obligations between the parties.

CONTRACT DOCUMENTS, means the Solicitation Document and addenda thereto, Instructions to Bidders, Supplemental Instructions to Bidders, the Retainer Contract, all Amendments (including, for example, change orders), all Supplements, UO General Retainer Conditions, Supplemental General Retainer Conditions, if any, the accepted Bid, Plans, Specifications, and Construction Change Directives.

CONTRACT PERIOD, as set forth in the Contract Documents, means the total period of time for a Project beginning with the full execution of a Supplement and concluding upon Final Completion.

CONTRACT PRICE, means the total of the awarded Bid amount for a Project, as set forth in a Supplement and increased or decreased by the price of approved alternates or an Amendment, as indicated in the Contract Documents.

CONTRACT TIME, means any incremental period of time allowed under the Contract to complete any portion

UO Retainer General Conditions P a g e | 4 of the Work as reflected in the Project schedule.

CONTRACTOR, means the Person awarded the Contract for the Work contemplated.

CORPORATE ATIVITY TAX, As part of the 2019 Regular Legislative Session, House Bill 3427 was enacted. This bill established the Corporate Activity Tax. This tax is identified as not being a transactional tax, so it is not allowed to be identified by line item in a billing. It shall be incorporated into overhead and profit rates calculated for a project by the party performing services. Our General Conditions, below, are modified to respond to this requirement, by adding the Corporate Activity Tax as a required element of Overhead as defined as part of the Contract.

DAYS, are calendar days, including weekdays, weekends and holidays, unless otherwise specified.

DIRECT COSTS, means, unless otherwise provided in the Contract Documents, the cost of materials, including sales tax, cost of delivery; cost of labor, including social security, Medicare and unemployment insurance, and fringe benefits required by agreement or custom; worker's compensation insurance; any Project-specific insurance required by the Contract Documents (including, without limitation, Builder’s Risk Insurance and Builder’s Risk Installation Floater); bond premiums, rental cost of equipment, and machinery required for execution of the Work; and the additional costs of field personnel directly attributable to the Work.

FINAL COMPLETION, means the final completion, or the date of final completion, of all requirements of Supplement with respect to a Project, including Contract Closeout as described in Section K, but excluding Warranty Work as described in Section I.2, and the final payment and release of all retainage, if any, released.

FORCE MAJEURE, means an act, event or occurrence caused by fire, riot, war, acts of God, nature, sovereign, or public enemy, strikes, freight embargoes or any other act, event or occurrence that is beyond the control of the party to this Contract who is asserting Force Majeure.

HUB REPORT, means an accurate report by the Contractor to the Owner, pursuant to Owner’s policy titled “Equity Contracting, Purchasing, and Data Reporting Procedures,” identifying all Historically Underutilized Businesses (HUBs), which may include certified Minority Business Enterprises (MBE), Women Business Enterprises (WBE), Veteran Business Enterprises (VBE) and Emerging Small Business (ESB), and self-reported HUBs (MBE, WBE, VBE only) as those terms are defined in ORS 200.005, receiving direct contracts with the Contractor or a Subcontractor, to perform one or more items of the Work throughout the course of the Work. HUB Reports are required at the completion of every contract and annually as of July 1 for contracts that extend past June 30 of each year (see Section E.2.10) and as a condition of final payment (see Section K.1).

Each report shall be in the form required by the Owner and shall contain the information required by Owner’s policies and procedures as amended from time to time.

OPERATING SYSTEM – An Operating System refers to any functional system within a building (examples include but are not limited to electrical, mechanical, elevator, fire sprinkler, etc.)

OVERHEAD, means those items which may be included in the Contractor's markup (general and administrative expense and profit) and that shall not be charged as Direct Cost of the Work in accordance with these UO General Retainer Conditions, including without limitation such Overhead expenses as wages or salary of personnel primarily at the Contractor’s principle place of business, Contractor's office costs and supplies at Contractor’s principal place of business, and Commercial General Liability Insurance and Automobile Liability Insurance and Corporate Activity Taxes.

OWNER, means the University of Oregon. Owner may elect, by written notice to Contractor, to delegate certain duties to more than one party, including without limitation, to an Consultant. However, nothing in these UO General Retainer Conditions is intended to abrogate the separate design professional responsibilities of Architects under ORS Chapter 671 or of Engineers under ORS Chapter 672.

UO Retainer General Conditions P a g e | 5

PERSON, means a natural person or entity doing business as a sole proprietorship, a partnership, a joint venture, a corporation, a limited liability company or partnership, or any other entity possessing the legal capacity to contract.

PLANS, means the drawings which show the location, type, dimensions, and details of the Work to be done under the Contract.

PROJECT, means a specific project for which the Contractor will perform Work pursuant to a Supplement and in accordance with the Contract Documents.

PUNCH LIST, means the list of Work yet to be completed or deficiencies which need to be corrected in order to achieve Final Completion of the Contract.

RECORD DOCUMENT, means the electronic as-built Plans, Specifications, testing and inspection records, digital Product Data information, Finish Schedule (see Design Standards division 9 for example), manufacturer and distributor/supplier warranties evidencing transfer of ownership to Owner, operational and maintenance manuals, Shop Drawings, Construction Change Directives, HUB Reports, Apprenticeship reports, correspondence, certificate(s) of occupancy, and other documents listed in Subsection B.9.1 of these UO General Retainer Conditions, recording all Services performed., recording all Services performed.

RETAINER CONTRACT, means the written and fully-executed UO Retainer Contract For Construction Services between the Owner and the Contractor.

SOLICITATION DOCUMENT, means Instructions to Bidders or a Request for Proposal or a Request for Qualifications.

SPECIFICATION, means any description of the physical or functional characteristics of the Work, or of the nature of a supply, service or construction item. Specifications may include a description of any requirement for inspecting, testing or preparing a supply, service or construction item for delivery and the quantities or qualities of materials to be furnished under the Contract. Specifications generally will state the results or products to be obtained and may, on occasion, describe the method and manner of doing the Work to be performed.

Specifications may be included in the Contract, incorporated in the Contract by reference, or attached to the Contract.

SUBCONTRACTOR, means a Person having a direct contract with the Contractor, or another Subcontractor, to perform one or more items of the Work.

SUBSTANTIAL COMPLETION, means the date when the Owner accepts in writing the Project, alteration or repair of the improvement to real property constituting the Work, or any designated portion thereof as having reached that state of completion when it may be used or occupied for its intended purpose. The Owner will only provide written acceptance of a Project that includes facilities with Operating Systems if, along with satisfactory completion of all other portions of the Project, the Operating Systems complete thirty (30) continuous Days of successful, trouble-free operation as provided in Section K. The 30-day period for successful operation of Operating Systems will begin on the Day Owner receives documentation of the date the operating systems began operating and were fully operational.

SUBSTITUTIONS, means items that in function, performance, reliability, quality, and general configuration are the same or better than the product(s) specified. Approval of any substitute item shall be solely determined by the Owner. The decision of the Owner is final.

SUPPLEMENT, means a Supplement to UO Retainer Contract for Construction Services or similar Amendment to the Retainer Contract which, when fully executed by the Owner and the Contractor, constitutes a

UO Retainer General Conditions P a g e | 6 written agreement for the Contractor to perform a Project in accordance with the Contract Documents. A Supplement describes the Work to be done and the obligations between the parties.

SUPPLEMENTAL GENERAL RETAINER CONDITIONS, means a Supplemental General Conditions to the University of Oregon General Conditions for Retainer Construction Services Contracts or a similar Amendment to the UO General Retainer Conditions that includes conditions that remove from, add to, or modify these UO General Retainer Conditions. Supplemental General Retainer Conditions may be included in the Solicitation Document or may be a separate attachment to the Contract.

WARRANTY WORK, means Contractor’s correction of defective Work pursuant to Section I.2.

WORK, means performance of construction-related services, including the furnishing of all materials, equipment, labor, transportation, services and incidentals necessary to successfully complete, as applicable, any individual item, Project, or the entire Contract and the carrying out of duties and obligations imposed by the Contract Documents.

A.2 SCOPE OF WORK

The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction work in connection with any Project described in the Contract Documents. The Contractor shall perform all Work necessary so that the Project can be legally occupied and fully used for the intended use as set forth in the Contract Documents.

A.3 INTERPRETATION OF CONTRACT DOCUMENTS

A.3.1 Unless otherwise specifically defined in the Contract Documents, words which have well-known technical meanings or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. Contract Documents are intended to be complementary. Whatever is called for in one, is interpreted to be called for in all. However, in the event of conflicts or discrepancies among the Contract Documents, interpretations will be based on the following descending order of precedence:

(a) Retainer Contract, Supplement, Amendments, and Construction Change Directives, with those of later date having precedence over those of an earlier date;

(b) The Supplemental General Retainer Conditions;

(c) The UO General Retainer Conditions;

(d) Division One (General Requirements) of the Specifications;

(e) Detailed schedules of finishes, equipment and other items included in the Specifications;

(f) Plans and Specifications (other than Division One and the Detailed Schedules to the Specifications);

(g) Large-scale drawings on Plans;

(h) Small-scale drawings on Plans;

(i) Dimension numbers written on Plans which shall prevail and take precedence over dimensions scaled from Plans;

(j) The Solicitation Document, and any addenda thereto;

UO Retainer General Conditions P a g e | 7

(k) The accepted Bid.

A.3.2 In the case of an inconsistency between Plans and Specifications or within either document not clarified by Amendment, the better quality or greater quantity of Work shall be provided in accordance with the Owner's interpretation in writing.

A.3.3 If the Contractor finds discrepancies in, or omissions from the Contract Documents, or if the Contractor is in doubt as to their meaning, the Contractor shall at once notify the Owner. Matters concerning and interpretation of requirements of the Contract Documents will be decided by the Owner, who may delegate that duty in some instances to the Consultant. Responses to Contractor's requests for interpretation of Contract Documents will be made in writing by Owner (or the Consultant, if so delegated) within any time limits agreed upon or otherwise with reasonable promptness. Interpretations and decisions of the Owner (or Consultant, if so delegated) will be consistent with the intent of and reasonably inferable from the Contract Documents. Contractor shall not proceed without direction in writing from the Owner (or Consultant, if so delegated).

A.3.4 References to standard specifications, manuals, codes of any technical society, organization or association, to the laws or regulations of any governmental authority, or any other Applicable Law, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, laws or regulations in effect in the jurisdiction where the Project is occurring on the first published date of the Solicitation Document, except as may be otherwise specifically stated.

A.4 EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE

A.4.1 It is understood that the Contractor, before submitting a Bid, has made a careful examination of the

Contract Documents; has become fully informed as to the quality and quantity of materials and the character of the Work required; and has made a careful examination of the location and conditions of the Work and the sources of supply for materials. The Owner will in no case be responsible for any loss or for any unanticipated costs that may be suffered by the Contractor as a result of the Contractor's failure to acquire full information in advance in regard to all conditions pertaining to the Work. No oral agreement or conversation with any officer, agent, or personnel of the Owner, or with the Consultant either before or after the execution of this Contract, shall affect or modify any of the terms or obligations herein contained.

A.4.2 Should the Plans or Specifications fail to particularly describe the materials, kind of goods, or details of construction of any aspect of the Work, Contractor shall have the duty to make inquiry of the Owner and Consultant as to what is required prior to performance of the Work. Absent Specifications to the contrary, the materials or processes that would normally be used to produce first quality finished Work shall be considered a part of the Contract requirements.

A.4.3 Any design errors or omissions noted by the Contractor shall be reported promptly to the Owner, including without limitation, any nonconformity with Applicable Laws.

A.4.4 If the Contractor believes that adjustments to cost, Contract Price, or Contract Time is involved because of clarifications or instructions issued by the Owner (or Consultant, if so delegated) in response to the Contractor’s notices or requests for information, the Contractor must submit a written request to the Owner, setting forth the nature and specific extent of the request, including all time and cost impacts against the Contract as soon as possible, but no later than thirty (30) Days after receipt by Contractor of the clarifications or instructions issued. If the Owner denies Contractor’s request for additional compensation, additional Contract Time, or other relief that Contractor believes results from the clarifications or instructions, the Contractor may proceed to file a Claim under Section D.3, Claims Review Process. If the Contractor fails to perform the obligations of Sections A.4.1 to A.4.3, the Contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations.

UO Retainer General Conditions P a g e | 8

A.5 INDEPENDENT CONTRACTOR STATUS

The Work to be performed by the Contractor and all Subcontractors under this Contract are those of an independent contractor as defined in ORS 670.600. Contractor represents and warrants that it is not an officer, employee or agent of the Owner as those terms are used in ORS 30.265.

A.6 RETIREMENT SYSTEM STATUS AND TAXES

Contractor represents and warrants that it is not a contributing member of the Public Employees' Retirement System and will be responsible for any federal or state taxes applicable to payment received under this Contract. Contractor will not be eligible for any employee, retirement, or fringe benefits as a result of Owner’s Contract payments. For example, Contractor will not be eligible for such benefits as federal Social Security, employment insurance, workers' compensation or the Public Employees' Retirement System, except as a self-employed individual. Unless the Contractor is subject to backup withholding, Owner will not withhold from such payments any amount(s) to cover Contractor’s federal or state tax obligations.

A.7 GOVERNMENT EMPLOYMENT STATUS

A.7.1 If this payment is to be charged against federal funds, Contractor represents and warrants that it is not currently employed by the Federal Government. This does not preclude the Contractor from holding another contract with the Federal Government.

A.7.2 Contractor represents and warrants that Contractor is not an employee of the University of Oregon for purposes of performing Work under this Contract.

SECTION B

ADMINISTRATION OF THE CONTRACT

B.1 OWNER’S ADMINISTRATION OF THE CONTRACT

B.1.1 The Owner shall administer the Contract for each Project in each Supplement as described in the Contract

Documents (1) during construction, (2) until final payment is due, and (3) during the one-year period for correction of Work. The Owner will act as provided in the Contract Documents, unless modified in writing by an Amendment in accordance with other provisions of the Contract. In performing these tasks, the Owner may rely on the Consultant or other consultants to perform some or all of these tasks.

B.1.2 The Owner will visit the Project site at intervals appropriate to the stage of the Contractor’s operations (1) to become generally familiar with and to keep the Owner informed about the progress and quality of the portion of the Work completed, (2) to endeavor to guard the Owner against defects and deficiencies in the Work, and (3) to determine in general if Work is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. The Owner will not make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Owner will neither have control over or charge of, nor be responsible for the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work.

B.1.3 Except as otherwise provided in the Contract Documents or when direct communications have been specifically authorized, the Owner and Contractor shall communicate with each other about matters arising out of or relating to the Contract. Communications by and with the Consultant’s sub-consultants shall be through the Consultant. Communications by and with Subcontractors and material suppliers shall be through the Contractor. Communications by and with separate contractors shall be through the Owner.

UO Retainer General Conditions P a g e | 9

B.1.4 Based upon the Consultant’s evaluations of the Contractor’s application for payment, or unless otherwise stipulated by the Owner, the Consultant will review and certify the amounts due the Contractor.

B.2 CONTRACTOR'S MEANS AND METHODS; MITIGATION OF IMPACTS

B.2.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The

Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work for each Project under each Supplement, unless the Contract Documents give other specific instructions concerning these matters. If the Supplement gives specific instructions concerning construction means, methods, techniques, sequences or procedures, the Contractor shall evaluate the Project site safety thereof and, except as stated below, shall be fully and solely responsible for the Project site safety of such means, methods, techniques, sequences or procedures.

B.2.2 The Contractor is responsible to protect and maintain the Work during the course of construction and to mitigate any adverse impacts to the Project, including those caused by Amendments, Construction Change Directives, and other authorized changes, which may affect cost, schedule, or quality.

B.2.3 The Contractor is responsible for the actions of all its employees, personnel, laborers, suppliers, and

Subcontractors on the Project. The Contractor shall enforce strict discipline and good order among Contractor’s employees and other persons carrying out the Work. The Contractor shall not permit employment of persons who are unfit or unskilled for the tasks assigned to them.

B.3 MATERIALS AND WORKMANSHIP

B.3.1 The intent of the Contract Documents is to provide for the construction and completion in every detail of the Work for each Project described. All Work shall be performed in a professional manner and unless the means or methods of performing a task are specified elsewhere in the Contract Documents, Contractor shall employ methods that are generally accepted and used by the industry, in accordance with industry standards.

B.3.2 The Contractor is responsible to perform the Work as required by the Contract Documents. Defective

Work shall be corrected at the Contractor's expense.

B.3.3 Work done and materials furnished shall be subject to inspection and/or observation and testing by the

Owner to determine if they conform to the Contract Documents. Inspection of the Work by the Owner does not relieve the Contractor of responsibility for the Work in accordance with the Contract Documents.

B.3.4 Contractor shall furnish adequate facilities, as required, for the Owner to have safe access to the Work including without limitation walkways, railings, ladders, tunnels, and platforms. Producers, suppliers, and fabricators shall also provide proper facilities and access to their facilities.

B.3.5 The Contractor shall furnish Samples of materials for testing by the Owner and include the cost of the

Samples in the Contract Price.

B.4 PERMITS

Contractor shall obtain and pay for all necessary permits, licenses and fees, except for those specifically excluded in the Supplemental General Retainer Conditions, for the construction of the Work, for temporary obstructions, enclosures, opening of streets for pipes, walls, utilities, environmental Work, etc., as required for the Project. Contractor shall be responsible for all violations of Applicable Law in connection with the Work or caused by obstructing streets, sidewalks or otherwise. Contractor shall give all requisite notices to public authorities. Notwithstanding the first sentence of this paragraph, Owner shall pay for the following: Plan check

UO Retainer General Conditions P a g e | 10 fees and permit fees required for the general building permit, systems development charges, and building department inspection fees. Notwithstanding the foregoing, however, Contractor shall obtain all additional permits, licenses and fees required for the construction of the Work.

B.5 COMPLIANCE WITH GOVERNMENT REGULATIONS

B.5.1 Contractor shall comply with Applicable Laws pertaining to the Work for each Project and the Contract

Documents both in the conduct of Contractor’s business and in its performance of the Work. Failure to comply with such requirements shall constitute a breach of the Contract and shall be grounds for Contract termination. Specifically, but without limiting the foregoing, Contractor understands that Applicable Laws require all new construction to be accessible to individuals with physical limitations, and any failure of the Project to conform to such Applicable Laws due Contractor’s failure to properly perform the Work constitute a breach of the Contract by Contractor and shall be grounds for Contract termination. Without limiting the generality of the foregoing, Contractor expressly agrees to comply with the following, as applicable:

(i) Title VI and VII of Civil Rights Act of 1964, as amended; (ii) Sections 503 and 504 of the Rehabilitation

Act of 1973, as amended; (iii) the Health Insurance Portability and Accountability Act of 1996; (iv) the Americans with Disabilities Act of 1990, as amended; (v) ORS Chapter 659A; as amended; (vi) ORS 279C.800 through 279C.870, as amended; (vii) applicable Oregon Building Codes; (viii) all regulations and administrative rules established pursuant to the foregoing laws; (ix) all laws, regulations, policies, and procedures specifically made applicable by reference in this Contract; and (x) all other Applicable Laws, including, but not limited to, applicable requirements of federal and state civil rights and rehabilitation statutes, rules and regulations, and Owner’s policies and procedures.

B.5.2 Contractor shall comply with all applicable requirements of federal and state civil rights and rehabilitation statutes, rules and regulations, and

(a) Contractor shall not discriminate against Disadvantaged, Minority, Women or Emerging Small

Business…

This is the start of the file's text. The full file is on GovTribe.