Bid Notice-Hendricks Hall Elevator Modernization.pdf

PDF 4 MB Posted

Attached to
Hendricks Hall Elevator Modernization
Solicitation number
CP24-066
Issued by
Lane County, Oregon

About this file

This is a project manual for the Hendricks Hall Elevator Modernization project at the University of Oregon in Eugene, Oregon. The project encompasses voluntary modernization of the elevator system and renovation of lobby finishes, including selective demolition, new site work, cast-in-place concrete, metal fabrications, rough and finish carpentry, sheet metal flashing and trim, thermal and moisture protection, openings, gypsum board finishes, resilient flooring, painting and coating, fire suppression systems, plumbing, HVAC, electrical work, and communications systems. The project manual contains detailed specifications organized into multiple divisions covering procurement and contracting requirements, general requirements, existing conditions, concrete, metals, wood, thermal protection, finishes, specialties, conveying equipment (hydraulic passenger elevator), fire suppression, plumbing, HVAC, electrical, and communications. The document was issued on November 3, 2026, with GMA Architects serving as the project architect and Joseph E. Moore as the Architect of Record. The project is located at 1408 University Street, Eugene, Oregon 97401, with the University of Oregon serving as the owner through Renee L. Benoit as the Owner's Representative.

The specifications establish comprehensive requirements for materials, installation standards, quality assurance, testing protocols, and contractor qualifications across all project divisions. Work requirements include compliance with referenced standards from organizations including the American Concrete Institute, American Welding Society, American Society for Testing and Materials, National Association of Architectural Metal Manufacturers, and various building codes and regulations. Specifications mandate contractor experience, with concrete producers requiring membership in the National Ready Mixed Concrete Association and sheet metal fabricators requiring five years of documented experience and SMACNA membership. Materials specifications detail requirements for concrete mix designs, reinforcement, steel fabrications, wood products, flashing, sealants, and finishes, with particular emphasis on durability, corrosion protection, and weathertightness. The document includes detailed execution requirements for preparation, installation, finishing, quality control, and inspection protocols, along with tolerances for various construction elements. Pricing terms, specific contract values, and award information are not contained in this project manual document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HENDRICKS HALL ELEVATOR MODERNIZATION

Eugene, Oregon

Issue Date:

NOVEMBER 03, 2026

GMA Architects

860 West Park Street, Suite 300

Eugene, OR 97401

PROJECT MANUAL

UNIVERSITY OF OREGON SECTION 00 01 01

HENDRICKS HALL ELEVATOR MODERNIZATION TITLE PAGE

00 01 01 - 1

PROJECT TITLE HENDRICKS HALL ELEVATOR MODERNIZATION

1408 University St, Eugene, Oregon 97401

OWNER UNIVERSITY OF OREGON

1276 UNIVERSITY OF OREGON

Eugene, Oregon 97403

Tel (541) 346-5080

Contact: Renee L. Benoit, Owner’s Representative

ARCHITECT GMA ARCHITECTS

860 West Park Street, Suite 300

Eugene, Oregon 97401

Tel (541) 344-9157

Contact: Joseph E. Moore

Architect of Record: Joseph E. Moore, AIA

MEPT ENGINEERS KCL ENGINEERING

309 W. 4th Ave, Suite 201

Eugene, OR 97401

Tel (541) 729-7645

Contact: Kyle Young

ELEVATOR ADVANCED VERTICAL SOLUTIONS

CONSULTANTS Portland, OR 97223

Tel (503) 876-3696

Contact: Frank Stalen

DATE: 03 November 2026

These specifications are instruments of service and as such are the property of GMA Architects. Reuse of these documents without the express written consent of the author is unlawful and a violation of copyright law.

© GMA Architects.

END OF SECTION

UNIVERSITY OF OREGON SECTION 00 01 10

HENDRICKS HALL ELEVATOR MODERNIZATION TABLE OF CONTENTS

00 01 10 - 1

03 NOVEMBER 2026

The following is a list of all Divisions and Sections which are included in the Project Manual

PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 PROCUREMENT AND CONRACTING REQUIREMENTS

00 01 01 Title Page

00 01 10 Table of Contents

00 01 15 List of Drawing Sheets

See Retainer Program - Bidding & Contracting Requirements for additional requirements.

SPECIFICATIONS

DIVISION 01 GENERAL REQUIREMENTS

See Retainer Program - Bidding & Contracting Requirements for additional requirements.

DIVISION 02 EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 CONCRETE

03 30 00 Cast-In-Place Concrete

DIVISION 05 METALS

05 50 00 Metal Fabrications

DIVISION 06 WOOD

06 10 00 Rough Carpentry

06 20 00 Finish Carpentry

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 62 00 Sheet Metal Flashing and Trim

07 92 00 Joint Sealants

DIVISION 08 OPENINGS

08 91 00 Louvers

DIVISION 09 FINISHES

09 21 60 Gypsum Board & Wall Framing

09 26 05 Veneer Plaster Repair

09 65 00 Resilient Flooring and Base

09 90 00 Painting & Coating

DIVISION 10 SPECIALTIES

10 26 00 Corner Guards

DIVISION 14 CONVEYING EQUIPMENT

14 20 00 HYDRAULIC PASSENGER ELEVATOR

DIVISION 21 FIRE SUPPRESSION

21 05 00 Common Work Results for Fire Suppression

21 05 53 Identification for Fire Suppression Piping and Equipment

21 11 00 Facility Fire-Suppression Water Service Piping

UNIVERSITY OF OREGON SECTION 00 01 10

HENDRICKS HALL ELEVATOR MODERNIZATION TABLE OF CONTENTS

00 01 10 - 2

21 13 00 Fire-Suppression Sprinkler Systems

DIVISION 22 PLUMBING

22 05 13 Common Motor Requirements for Plumbing Equipment

22 05 17 Sleeves and Sleeve Seals for Plumbing Piping

22 05 29 Hangers and Supports for Plumbing Piping and Equipment

22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment

22 05 53 Identification for Plumbing Piping and Equipment

22 07 19 Plumbing Piping Insulation

22 10 05 Plumbing Piping

22 10 06 Plumbing Piping Specialties

22 14 29 Sump Pumps

DIVISION 23 HEATING, VENTILATION, AND AIR CONDITIONING

23 05 13 Common Motor Requirements for HVAC Equipment

23 05 17 Sleeves and Sleeve Seals for HVAC Piping

23 05 29 Hangers and Supports for HVAC Piping and Equipment

23 05 53 Identification for HVAC Piping and Equipment

23 09 13 Instrumentation and Control Devices for HVAC

23 09 23 Direct-Digital System for HVAC

23 23 00 Refrigerant Piping

23 81 26 Small-Capacity Split-System Air Conditioners

DIVISION 26 ELECTRICAL

26 05 00 Common Work Results for Electrical

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33 Conduit for Electrical Systems

26 51 00 Interior Lighting

DIVISION 27 COMMUNICATIONS

27 51 29 Rescue Assistance Signaling Systems

UNIVERSITY OF OREGON SECTION 00 01 15

HENDRICKS HALL ELEVATOR MODERNIZATION LIST OF DRAWING SHEETS

00 01 15 - 1

The following is a list of all Drawings which are included in the Project Manual

LIST OF DRAWING SHEETS

GENERAL INFORMATION

G000 COVER

ARCHITECTURAL

A100 DEMOLITION PLAN

A122 BASEMENT FLOOR PLAN

A123 FIRST FLOOR PLAN

A130 ENLARGED FLOOR PLANS

A140 ENLARGED REFLECTED CEILING PLANS

A210 BUILDING SECTIONS

A211 INTERIOR ELEVATIONS

ELECTRICAL

E000 GENERAL SYMBOLS

E001 GENERAL NOTES

E010 DEMOLITION FLOOR PLANS - OVERALL

E100 DEMOLITION FLOOR PLANS

E120 FLOOR PLANS - OVERALL

E130 FLOOR PLANS

E700 ELECTRICAL DETAILS & DIAGRAMS

E701 ELECTRICAL SCHEDULES

FIRE PROTECTION

F000 GENERAL NOTES & SYMBOLS

F010 DEMOLITION FLOOR PLANS - OVERALL

F100 DEMOLITION FLOOR PLANS

F120 FLOOR PLANS - OVERALL

F130 FLOOR PLANS

MECHANICAL

M000 GENERAL SYMBOLS

M010 DEMOLITION FLOOR PLANS - OVERALL

M100 DEMOLITION FLOOR PLANS

M120 FLOOR PLANS - OVERALL

M130 FLOOR PLANS

M500 MECHANICAL DETAILS & CONTROLS

M700 MECHANICAL SCHEDULES

PLUMBING

P000 GENERAL NOTES & SYMBOLS

P010 DEMOLITION FLOOR PLANS - OVERALL

P100 DEMOLITION FLOOR PLANS

P120 FLOOR PLANS - OVERALL

P130 FLOOR PLANS

P500 PLUMBING DETAILS

P700 PLUMBING SCHEDULES

UNIVERSITY OF OREGON SECTION 02 41 00

HENDRICKS HALL ELEVATOR MODERNIZATION DEMOLITION

02 41 00 -1

PART 1 – GENERAL

1.1 RELATED WORK SPECIFIED ELSEWHERE

A. Cutting and Patching

B. Temporary Facilities and Controls

1.2 EXTENT OF WORK

A. Perform demolition required for completion of new work as shown on drawings or specified.

Remove existing construction at areas shown for new work. Remove loose material caused by or remaining from demolition work.

1.3 ALTERATIONS TO EXISTING CONSTRUCTION

A. Remove portions of existing work only as required to install new materials as specified and as shown on drawings. Repair or replace those portions of existing work outside of new work damaged as result of new work. Repairs or replacement work shall reinstate damaged areas to match original conditions.

1.4 REQUIREMENTS OF REGULATORY AGENCIES

A. Coordinate work with Utility companies, Municipal and State agencies as required.

B. Comply with applicable jurisdictional standards, including but not limited to:

1. Occupational Safety and Health Administration (OSHA)

2. Oregon Occupational and Health Administration (OR-OSHA)

3. National Emission Standards for Hazardous Air Pollutants (NESHAPS)

4. National Institute for Occupational Safety and Health (NIOSH)

5. Department of Environmental Quality (DEQ)

6. Lane Regional Air Pollution Authority (LRAPA)

C. Comply with Oregon Administrative Rules (OAR) Chapter 437, for hazardous material communication procedures. Post Material Data Safety Sheets (MSDS) on site in conspicuous location.

D. Dispose of materials contaminated with lead, asbestos, mercury and other heavy metals according to Federal, State and Local jurisdictional regulations.

1.5 CODES AND STANDARDS

A. Conform with applicable portions of National Electric Code, latest edition, and other applicable codes within the jurisdiction of the work.

1.6 PERMITS

A. Obtain and pay for necessary permits and inspections required by local and state authorities having jurisdiction. Make such tests as may be required by law.

1.7 SUBMITTALS

A. Submit demolition and removal procedures and action plans.

1.8 ENVIRONMENTAL CONDITIONS

A. Conduct demolition to minimize interference with adjacent building areas.

B. Provide, erect and maintain temporary barriers and safety devices to ensure protection including ground protection to prevent soil contamination.

1.9 COORDINATION

A. Coordinate with other trades affecting or affected by Work of Section.

B. Coordinate demolition with Owner's Representative.

1.10 PROTECTION

UNIVERSITY OF OREGON SECTION 02 41 00

HENDRICKS HALL ELEVATOR MODERNIZATION DEMOLITION

02 41 00 -2

A. Protect portions of existing building and facilities against damage and discoloration.

B. Protect active utilities and maintain in continuous operation.

C. Provide barriers as required to protect public from areas under demolition.

PART 2 – PRODUCTS

2.1 SALVAGE

A. Salvage items, except items specifically noted, becomes property of Contractor. Salvage may be reused on Work if so specified or scheduled or if Architect judges it equal to new products specified, with the appropriate adjustment in contract sum. Remove material from site.

PART 3 – EXECUTION

3.1 REVIEW OF EXISTING CONDITIONS

A. Visit project site and review existing conditions affecting Work before submitting Bid Proposal.

3.2 PREPARATION

A. Erect and maintain temporary barriers to prevent spread of dust, fumes, noise, and smoke.

B. Protect existing items that are not indicated to be altered.

3.3 DEMOLITION

A. Demolish in orderly and careful manner.

B. Protect existing work to remain.

C. Except where noted otherwise, immediately remove demolished material from site.

D. Remove materials to be reinstalled or retained in manner to prevent damage.

E. Remove, store, and protect for reinstallation materials and equipment listed on the drawings accordingly.

F. Remove and promptly dispose of contaminated, vermin infested, or dangerous materials encountered.

G. Remove demolished materials from site as work progresses.

H. Do not burn or bury materials on site.

J. Leave areas of work in clean condition.

3.4 CLEANING AND REPAIRING

A. Do not allow debris to accumulate in building or on site - haul away from site as soon as removed and dispose of at Contractor's expense.

B. Clean, repair, touch up, or replace when directed, adjacent surfaces which have been soiled, discolored, or damaged by work of Section.

UNIVERSITY OF OREGON SECTION 03 30 00

HENDRICKS HALL ELEVATOR MODERNIZATION CAST-IN-PLACE CONCRETE

03 30 00 -1

PART 1 – GENERAL

1.1 SUMMARY

A. Section Includes:

1. Concrete reinforcement.

2. Miscellaneous concrete elements, including equipment pads, light pole bases, flagpole bases, thrust blocks, and manholes.

3. Concrete curing.

1.2 REFERENCE STANDARDS

A. Reference Standards: Current edition at time of Bid.

B. American Concrete Institute (ACI):

1. ACI SP-16-89, "Field Reference Manual."

2. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass

Concrete; American Concrete Institute International; 1991 (Reapproved 2002).

3. ACI 301 - Specifications for Structural Concrete; American Concrete Institute International; 2010

(Errata 2012).

4. ACI 302.1R - Guide for Concrete Floor and Slab Construction; American Concrete Institute

International; 2004 (Errata 2007).

5. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete; American Concrete

Institute International; 2000.

6. ACI 305R - Hot Weather Concreting; American Concrete Institute International; 2010.

7. ACI 306R - Cold Weather Concreting; American Concrete Institute International; 2010.

8. ACI 308R - Guide to Curing Concrete; American Concrete Institute International; 2001

(Reapproved 2008).

9. ACI 318 - Building Code Requirements for Structural Concrete and Commentary; American

Concrete Institute International; 2011.

C. American Society for Testing and Materials (ASTM) International:

1. ASTM C33/C33M - Standard Specification for Concrete Aggregates; 2013.

2. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete

Specimens; 2014.

3. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete; 2014.

4. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic-Cement Concrete; 2012.

5. ASTM C150/C150M - Standard Specification for Portland Cement; 2012.

6. ASTM C260/C260M - Standard Specification for Air-Entraining Admixtures for Concrete; 2010a.

7. ATSM C330/C330M - Standard Specification for Lightweight Aggregates for Structural Concrete;

2017.

8. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for

Use in Concrete; 2012.

9. ASTM C881/C881M - Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete;

2013.

10. ASTM C979/C979M - Standard Specification for Pigments for Integrally Colored Concrete; 2010.

11. ASTM C1059/C1059M - Standard Specification for Latex Agents for Bonding Fresh to Hardened

Concrete; 2013.

12. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types); 2004 (Reapproved

2013).

13. ASTM E1155 - Standard Test Method for Determining F(F) Floor Flatness and F(L) Floor Levelness

Numbers; 1996 (Reapproved 2008).

1.3 DEFINITIONS

A. Cast-in-Place Concrete: Formed concrete that is concealed or locations where appearance is not critical.

03 30 00 -2

B. Architectural Exposed Concrete: Formed concrete that is exposed to view on surfaces of completed structure or building and that requires special concrete materials, formwork, placement, or finishes to obtain specified architectural appearance.

C. Cementitious Materials: Portland cement alone or in combination with one or more of the following:

blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.

D. Slump: The measurement of the vertical difference in height of the resulting concrete pile and the original 12 inch tall cone after the slump cone is filled then lifted.

E. Slump Flow: The measurement of the resulting horizontal diameter of the concrete pile after the slump cone is filled then lifted. This method measures the unconfined flow of the mixture.

F. Compressive Strength: strength in PSI when tested in accordance with ATSM C39

1.4 PERFORMANCE / DESIGN CRITERIA

A. Do not change brands and sources of cement, aggregates, admixtures, and additives during course of construction, except as accepted by Architect.

B. Supply mix design from same batch plant, using same source for mix ingredients, as submitted for supporting test data.

C. Performance Mix Design:

1. As basis for acceptance, submit new mix design from batch plant indicating that shrinkage, cracking, strength, and other properties are compatible with original mix design.

2. Prepare mix design for each type and strength of concrete by either laboratory trial batch, verified by independent testing laboratory, or field experience methods as prescribed by ACI 301 and as noted on Structural Drawings.

3. Prepare mix design information for concrete batch weights with bulk-specific gravity determinations for aggregates based on saturated surface dry (SSD) condition. Include mix information sufficient to verify through absolute volume calculations:

a. Concrete Yield.

b. Cement Factor.

c. Water/Cement Ratio.

d. Mortar to Voids Ratio.

4. When adjustment to mix design becomes necessary due to job conditions, weather, test results, changes in material properties, or other circumstances, resubmit new mix design for acceptance by Architect and Structural Engineer.

D. Proportioning and Mixing: Conform to requirements of IBC, including Chapter 19.

E. Design Strength:

1. Compressive Strength in PSI when tested in accordance with ATSM C39

2. Exterior Site Work Concrete: Assume 4,000 psi 28 day strength.

F. Length Change: As tested to ASTM C157. Where no test data available, add shrinkage reducing admixture, conforming to manufacturer’s instructions for all Slabs on Grade and Slabs on Metal Deck.

Length Change minimum shall be:

1. Slabs: Maximum 0.035 percent shrinkage in 28 days.

2. Walls, Columns, and Beams: Maximum 0.04 percent shrinkage in 28 days.

3. Footings: No requirements.

G. Fly Ash:

1. Add to batch plant concrete mix as Portland cement replacement. Submit back-up data for mix design.

2. Maximum loss on ignition to be 1%. Use fly ash from one single source for the whole project.

H. Aggregate

1. Aggregate for stone concrete shall conform to ASTM C-33. For low shrinkage aggregate; use limestone or granite. Aggregate for lightweight concrete shall conform to ASTM C-330.

I. Air-Entraining Agent at Exterior Concrete: Conform with ASTM C260

1. Achieve 5 percent entrained air, plus or minus 1-1/2 percent to batch plant concrete mix, for exterior concrete exposed to earth, weather, or freezing temperatures after curing.

03 30 00 -3

J. Concrete Slump: Optimize through performance mix design by batch plant to suit placement conditions, as accepted for each mix design by Architect.

1.5 SUBMITTALS

A. Mix Designs: Sign by batch plant quality control engineer or responsible agent for each design.

Include for each mix design:

1. Method and test data used to establish mix proportions.

a. Include supporting test records for field experience method or trial batch method for each mix design.

b. Include date of test and batch plant location.

2. Concrete compressive strengths.

3. Water/cement ratios, corresponding cement content, and water content.

4. Linear shrinkage. Mix designs with no test data may substitute shrinkage reducing admixture in proportions conforming to manufacturer’s instructions.

5. Admixtures and additives.

6. Fiber reinforcement.

7. Slump or slump flow.

8. Hot and cold weather designs.

9. Air entrainment for each design.

10. Ingredients, proportions, and source of materials.

11. Location and intended use.

B. Product Data: Submit manufacturers data on manufactured products showing compliance with specified requirements and installation instructions.

1. For curing compounds, provide data on method of removal in the event of incompatibility with floor covering adhesives.

2. Admixtures and additives.

3. Fiber reinforcing.

4. Bonding agents.

5. Screeding products and equipment.

6. Hardener densifiers, dry shake.

7. Curing materials.

8. Contraction joints, isolation joints, construction Joints and cold joints.

C. Contractor Qualifications as specified in this Section

1.6 QUALITY ASSURANCE

A. Perform work of this section in accordance with ACI 301 and ACI 318.

B. Follow recommendations of ACI 305R when concreting during hot weather.

C. Follow recommendations of ACI 306R when concreting during cold weather.

D. Concrete Producer Qualifications:

1. Company specializing in manufacturing ready-mixed concrete products conforming to ASTM C94.

2. Producer Member of the National Ready Mixed Concrete Association (NRMCA).

E. Installer Qualifications:

1. Company specializing in work of this Section.

2. Able to show minimum 3 year documented experience in successful commercial quality work of comparable scope and quality when requested by Architect.

F. Applicators for Semi-Rigid Epoxy and Polyurea Joint Sealers, Elastomeric Joint Sealants, Hardener

Densifier, Dry Shake Color Hardeners, and Other Specialized Systems:

1. Trained and authorized by manufacturer as qualified prior to Bid Date.

G. Concrete Mix Design:

1. Do not change brands and sources of cement, aggregates, admixtures, and additives during course of construction, except as accepted by Architect and Structural Engineer.

2. Supply mix design from same batch plant, using same source for mix ingredients, as submitted for supporting test data.

03 30 00 -4

3. As basis for acceptance, submit new mix design from batch plant indicating that shrinkage, cracking, strength, and other properties are compatible with original mix design.

H. Moisture Content and Alkalinity Testing for Concrete Slab:

1. Take measures to control concrete mix design water content, placement, curing, and other procedures as necessary to achieve acceptable moisture and alkalinity content within time period scheduled for installation of finish flooring systems specified under other Sections.

2. Conduct testing as specified under PART 3 of this Section under Field Quality Control testing for concrete slabs. Do not begin testing until after building envelope is fully enclosed and ambient temperature and humidity approximate final interior conditions.

3. Following initial curing period, take necessary measures to control temperature and humidity levels and to remove moisture through ventilation to outside of building as specified by Retainer

Agreement, Bidding & Contracting Requirements. Do not use propane heaters or other moisture generating heating equipment.

1.7 REGULATORY REQUIREMENTS

A. Testing and Special Inspections: Conduct testing under provisions of Retainer Agreement, Bidding &

Contracting Requirements

1. Conform to provisions of IBC Chapter 17, reference standards specified by ACI 318 and procedures specified by ACI 301.

2. Conduct during placement of concrete with specified 28 day strength greater than 2500 psi following procedures conforming to ASTM C31, ASTM C39, and ASTM C143, and as specified

Retainer Agreement, Bidding & Contracting Requirements.

B. Batch Tickets: Retain record of concrete delivered and placed on site.

1. Include exact mix proportions, slumps, test strength, date, time, location of placement, weather conditions at time of placement, and source of concrete.

2. Submit copies to Architect.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Conform to provisions of Retainer Agreement, Bidding & Contracting Requirements and manufacturer's instructions.

B. Mixing and Delivery: Conform to ASTM C94.

C. Sampling at Delivery: Conform to ASTM C172. Cure 4 inch by 8 inch cylinders to provisions of ASTM

C31 and compression test compressive strength of cylinders to ASTM C39 and as specified Retainer

Agreement, Bidding & Contracting Requirements.

D. Batch Tickets: Accompany with each load, fully executed, and signed. Log in with inspector at time of entry. Conform to Source Quality Control requirements specified by this Section.

1. Information: Conform to ASTM C94, Option A or C. Include additional batch ticket information to that required by ASTM C94.

a. Concrete mix design.

b. Water content and water withheld at batch plant.

c. Time to nearest minute that batch was dispatched from plant, when it arrived at site, and when unloading began and was finished.

d. Ambient air temperature and concrete internal temperature of at time of arrival.

e. Written record of water and other additives added to design mix following time that mix truck has left batch plant.

2. Truck load not accompanied with batch tickets will be rejected.

E. Reject concrete that has reached internal temperature of 89 degree F or above and when temperature has risen 5 degrees in 10 minutes, indicating that concrete is setting up prior to discharge.

F. Store products in accordance to ACI 301. Do not use admixtures that have been in storage at project site for more than 6 months or which have subject to freezing, except as accepted by Architect.

1.9 FIELD CONDITIONS

03 30 00 -5

A. Environmental Conditions: Conform to ACI 301, 5.3.2 for placement of concrete weather considerations.

B. Protect concrete during falling rain, sleet, or snow.

1. Remove or repair concrete finish deformed by weather at contractor's expense when directed by

Owner.

1.10 COORDINATION

A. Coordinate with trades affected by work. Commencement with work indicates acceptance of existing conditions.

B. Notify Architect of discrepancies prior to work.

1.11 WARRANTY

A. See Retainer Agreement, Bidding & Contracting Requirements for warranty requirements.

PART 2– PRODUCTS

2.1 REINFORCEMENT

A. See Drawings.

2.2 CONCRETE MATERIALS

A. Cement: ASTM C150, Type II - Moderate Sulfate Resistance.

B. Fine and Coarse Aggregates: ASTM C330.

1. Coarse Aggregate Class Designation: As indicated by Table 3 for Type or Location of concrete for

Moderate Weathering Region.

2. Size: Do not exceed 3/4 distance between reinforcing steel or 1/3 thickness of concrete slabs and toppings.

a. Maximum 3/4 inch to 1 inch

3. Free of deleterious substances that may cause expansion of concrete or react with alkalis in concrete.

C. Cementitious Materials: Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed to reduce the total amount of Portland cement, as indicated in Mix Design specifications on Structural Drawings.

D. Fly Ash: ASTM C618, Class F or Class C.

1. Minimum recommended Fly Ash content by mass of cementitious material: 20%

2. Maximum recommended Fly Ash content by mass of cementitious material: 25%

E. Slag: ASTM C989 Grade 120, ground, granulated blast-furnace slag.

F. Water: Clean and not detrimental to concrete.

2.3 ADMIXTURES

A. Chemical Admixture:

1. Provide products from single manufacturer, or supply manufacturer certification that admixtures are compatible in combination with cement and aggregates.

2. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

3. Retarding Admixture: ASTM C 494/C 494M, Type B.

4. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

B. Do not use chemicals that will result in soluble chloride ions in excess of 0.1 percent by weight of cement. Do not use calcium chloride admixtures.

C. Air Entrainment Admixture: ASTM C260/C260M.

2.4 CURING MATERIALS

A. Accepted Curing Methods:

1. ACI 302.1R Section 9.2 using wet curing, wet covering, moisture retaining coverings, or polyethylene film or waterproof paper curing methods, using materials specified by Section 5.9.

2. ACI 308, Section 2.2 - Water Curing or 2.3 - Sealing Materials using wet film curing methods.

3. Liquid Curing and sealing compounds:

a. Accepted for exterior slabs only.

03 30 00 -6

B. Moisture-Retaining Sheet: ASTM C171.

1. White-burlap-polyethylene sheet, weighing not less than 10 oz/per linear yd, 40 inches wide.

a. Manufacturers/Products:

1) Reef Industries Transguard Reusable Wet Cure Covers, www.reefindustries.com.

2) Or approved.

2. Waterproof Paper (Reinforced Kraft Curing Paper): Two sheets of reinforced kraft paper cemented together with bituminous adhesive with one white reflective surface, non-staining, moisture retentive.

a. Manufacturers/Products:

1) Fortifiber, Orange Label Sisalkraft 280, www.fortifiber.com.

2) Or approved.

C. Water: Potable, not detrimental to concrete.

2.5 SCREEDS

A. Laser Screeding: Preferred and accepted in lieu of base screeds specified by this Section.

B. Ground Set Screed Stakes: Not accepted for interior slabs. Do not penetrate underslab vapor retarder sheeting underlying concrete slabs with screed stakes.

C. Base Set Screed Posts: Non-stake screeds accepted. Following specified for type and quality and as accepted by Architect.

1. Fabricated, removable, 1/4 inch by 12 inch by 12 inch steel base plate with welded steel or all-thread steel screed post.

2.6 MIXING

A. Transit Mixers: Comply with ASTM C94/C94M.

2.7 SOURCE QUALITY CONTROL

A. Conform to provisions and limitations ACI 340R and ASTM C94.

B. Batching and Mixing: Conform to ASTM C94, Option A for exact proportioning of mix design.

C. Admixtures: Add to within accuracy of 3 percent.

1. Add separately and verify compatibility in design mix, conforming to manufacturer’s instructions.

2. Reject concrete that shows signs of segregation due to use of admixtures.

D. Accelerating and Set Retarding Admixtures:

1. Accepted for long hauls for extending transportation time, cold weather, and hot weather conditions conforming to hot and cold weather placement requirements.

E. Mix Water: When feasible, add mix water required for mix design at batch plant.

F. Accelerating and Set Retarding Admixtures:

1. Accepted for long hauls for extending transportation time, cold weather, and hot weather conditions conforming to hot and cold weather placement requirements.

2. Measure concrete temperature and confirm that temperature has not exceeded 89 degrees F or risen 5 degrees F in 10 minutes before acceptance at site.

G. Batching of Dry Materials and Adding Mix Water at Site:

1. Accepted for long hauls and for extending transportation time as an alternate procedure to adding accelerating and set retarding admixtures.

2. Add mix water under pressure at both front and back of mixing drum.

3. Mix at mixing speed for 70 to 100 revolutions before discharging.

H. Adding Mix Water at Project Site: Accepted as needed increase slump of concrete within first 15 minutes after truck arrives at site, under the following conditions:

1. Quantity of water does not exceed specified slump and maximum water/cement ratio and conforms to batch plant mix designer’s written instructions.

2. Special inspector is present to monitor quantity of water added in comparison to that added at batch plant and make written record of that for each truck load delivered.

3. Drum is turned an additional 30 revolutions or more as necessary to uniformly mix water into concrete.

4. Water is not added to concrete batch after:

03 30 00 -7

a. Taking test cylinders, except where new cylinders are taken at Contractor’s expense.

b. Adding high-range water reducing admixtures to concrete mix.

I. Do not use calcium chloride containing products.

2.8 FINISHES

A. Slab Tooling Finishes: Refer to Part 3 of this Section.

3.1 EXAMINATION

A. Verify lines, levels, and dimensions before proceeding with work of this section.

B. Verify that anchors, seats, plates, reinforcement, and other items cast into concrete are accurately located, securely in place, and approved before concrete placement.

3.2 PREPARATION

A. Verify that forms are clean and free of rust before applying release agent.

B. Coordinate placement of embedded items with erection of concrete formwork and placement of form accessories.

C. Where new concrete is to be bonded to previously placed concrete, prepare existing surface by cleaning with steel brush and applying bonding agent in accordance with manufacturer's instructions.

1. Use epoxy bonding system for bonding to damp surfaces, for structural load-bearing applications, and where curing under humid conditions is required.

2. Use latex bonding agent only for non-load-bearing applications.

D. Weather Conditions:

1. Prepare in advance for conditions where ambient temperature necessitates hot or cold weather concrete placements.

2. Do not begin placement when sun, heat, wind, or other limitations may prevent proper consolidation, finishing, and curing.

3. Do not place concrete when rain, sleet, or snow are falling, except where adequate means are taken to cover and protect concrete placements. Do not allow rain water to increase mixing water or to damage concrete surface finish during or following placement.

4. Take measures to prevent rapid evaporation of surface bleed water due to high evaporation conditions, including high winds and low humidity.

3.3 PLACING CONCRETE

A. Place concrete in accordance with ACI 304R.

B. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken.

C. Ensure reinforcement, inserts, waterstops, embedded parts, and formed construction joint devices will not be disturbed during concrete placement.

D. Place Concrete continuously between construction and expansion/contraction (control) joints.

E. Place each lift while previous lift is still plastic.

F. Vibrate to obtain thorough consolidation, and complete filling of forms.

G. Consolidate concrete, except slabs on grade, in forms by mechanical vibration as specified and in accordance with ACI 309, except as applicable for self-consolidating concrete (SCC).

H. Finish floors level and flat, unless otherwise indicated, within the tolerances specified below.

I. Chamfer corners of concrete to prevent damage unless noted otherwise in Drawings.

J. Ensure adequate concrete cover over reinforcement.

3.4 HOT OR WINDY WEATHER CONDITIONS

A. Conform to ACI 305.1, Recommended Practice for Hot Weather Concreting.

B. Under conditions of wind, low relative humidity, temperatures exceeding 85 degrees F, and conditions resulting in insufficient bleed water at concrete surface, spray-apply monomolecular

03 30 00 -8 surface evaporation retarder immediately before, during, and after finishing as required to prevent plastic shrinkage cracking.

C. Temperature of Fresh Concrete: 90 degrees F maximum at time of placement.

1. Cool ingredients before mixing to maintain concrete temperature at time of placement below 90 degrees F, using chilled mixing water, chopped ice, or other accepted means to control temperature provided water contributed conforms to water/cement ratio of mix design.

2. When temperature of steel reinforcement, embedments, or forms exceeds 120 degrees F, fog with water immediately prior to placing concrete. Remove standing water before placing concrete.

3. Dampen subgrade maintaining uniform moisture, free of puddles and dry areas.

4. Use water-reducing retarding admixture when required by high temperatures, low humidity, and other adverse placing conditions, as accepted by Architect/Structural Engineer.

D. Following placement, moist cure for 24 hours whenever ambient temperature exceeds 85 degrees F.

After 24 hours, concrete may be cured by conventional method.

E. During finishing, whenever ambient temperature exceeds 85 degrees F, fog water spray to prevent plastic shrinkage.

3.5 EMBEDDED ITEMS

A. Locate and embed expansion joints, joint fillers, waterstops, anchor bolts, embedded plates, dovetail anchor slots, piping, conduit, radiant heating tubes, and other items required for work for this and other Sections.

B. Use templates, setting diagrams, and Drawings, conforming to manufacturer instructions.

C. Fill voids in sleeves, inserts, and anchor slots with temporarily, easily removable material to prevent entry of concrete.

D. Do not embed aluminum except where protected from contact with concrete.

E. Pipes - plastic or metal (non-aluminum) conduits may be embedded in the slab provided that the following criteria are met:

1. No pipes or conduits, other than electrical, shall be embedded in structural concrete.

2. Maximum conduit size: 1-3/4-inch outside diameter.

3. Conduits to be limited to ten (10) conduits every ten (10) feet.

4. Locate conduits within the middle third of the slab thickness.

5. Provide a minimum of six (6) inches clear spacing between adjacent conduit

6. No conduits to be located withing column drop caps or between stud rails or within a three (3) foot radius of a column.

7. Avoid intersection conduit where possible. Intersecting conduits are to be in stalled perpendicular to each other not more than two (2) conduits per intersections. Do not intersect conduit at post-tensioning tendon or do reinforcement intersections.

8. If denser amounts of conduit occurs. Contact the engineer for assistance. See Drawings for allowable conduit groups and layout.

9. Do not coil excess conduits in slab.

F. Inserts - cast in place all inserts and sleeves where possible. Drilled and power-driven fasteners permitted only where it can be shown that the inserts will not spall the concrete and are allocated to avoid the tendons and anchorages. The contractor must locate the tendon on the surface slab.

3.6 CONSTRUCTION, ISOLATION, AND CONTRACTION JOINTS

A. Isolation Joints:

1. Establish complete separation through floor slabs at junctions with other building elements and points of restraint including walls, columns, equipment foundations, and stairways, except elements requiring lateral restraint from slab.

2. Fill to complete depth of joint with preformed joint filler, leaving 1/2 depth of joint width clearance below top of slab for installation of backer rod and sealant.

B. Saw Cut Contraction Joints: Saw cut interior and exterior slabs using soft cut method over green concrete as soon as slab will support foot traffic and before slab begins to experience shrinkage cracking, conforming to ACI 302.1R Chapter 3.

03 30 00 -9

1. Space saw-cuts at 2 to 3 foot spacing for each 1 inch depth of concrete slab and as accepted by

Architect.

2. Saw-cut joints minimum 1 inch deep and not less than 1/4 depth of concrete slab, except as otherwise shown on Drawings.

3. Saw-cut joints at 45 degree angle from corner of diamond shaped slab panels.

4. Exactly meet corners of cut outs to prevent cracking from corners.

5. Locate contraction joints over structurally supporting beams.

6. Maximum length to width ratio of panels in floor slabs is 1.5 to 1, although 1 to 1 is preferred.

7. Maximum length to width ration of panels in exterior pavement is 1.25 to 1, although 1 to 1 is preferred.

8. Do not form T-shaped or L-shaped saw-cut joints in panels.

9. Make joints continuous. Do not offset or stagger.

10. Space contraction joints equal distance between contraction joints at column lines, over construction joints, supporting structural beams, and change of substrate.

11. Burnish edges of joints while concrete is still green.

12. Do not saw cut slab on metal deck except as specifically shown on Structural Drawings.

C. Cold Joints and Penetrations: Conform to provisions of Section 03 11 00. Install expanding joint strip as instructed by manufacturer.

D. Projections through Prepared Openings: Fill voids with non-shrink grout containing waterproof concrete as instructed by manufacturer.

3.7 FLOOR FLATNESS AND LEVELNESS TOLERANCES

A. Minimum F(F) Floor Flatness and F(L) Floor Levelness Values:

Location

Floor Profile

Quality

Classification

Minimum

Overall

Flatness F(F)

Minimum

Overall Level

F(L)

Minimum

Local

Flatness F(F)

Minimum

Local Level

F(L)

Housekeeping

Slabs

Conventional

Bull Floated or straightedge

(1/2 inch in 10 foot)

F(F) 15

F(L) 13

F(F) 13

F(L) 10

B. Measure F(F) and F(L) in accordance with ASTM E1155, within 48 hours after slab installation; report both composite overall values and local values for each measured section.

C. Correct defects by grinding or by removal and replacement of the defective work. Areas requiring corrective work will be identified. Re-measure corrected areas by the same process.

3.8 CONCRETE FINISHING

A. Repair surface defects, including tie holes, immediately after removing formwork.

B. Unexposed Form Finish: Rub down or chip off fins or other raised areas 1/4 inch or more in height.

C. Concrete Slabs: Finish to requirements of ACI 302.1R, and as follows:

1. Heavy Broom Finish:

a. Provide at exterior paved surfaces and as shown on Drawings.

b. Float finish slab and promptly after initial set, broom finish surface uniformly and perpendicularly to traffic in accepted texture.

c. Slope exterior paved surfaces away from building in slopes to drain without ponding.

3.9 CURING AND PROTECTION

03 30 00 -10

A. Comply with requirements of ACI 308R. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.

B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.

C. Formed Surfaces: Cure by moist curing with forms in place for full curing period.

D. Surfaces Not in Contact with Forms:

1. Initial Curing: Start as soon as free water has disappeared and before surface is dry. Keep continuously moist for not less than three days by water-fog spray or saturated burlap.

a. Saturated Burlap: Saturate burlap-polyethylene and place burlap-side down over floor slab areas, lapping ends and sides; maintain in place.

2. Final Curing: Begin after initial curing but before surface is dry.

a. Moisture-Retaining Sheet: Lap strips not less than 3 inches and seal with waterproof tape or adhesive; secure at edges.

3.10 REPAIRING UNFORMED SURFACES

A. Surface Defects: Patch and repair defects to specified tolerances and specification, including:

1. Crazing and cracks, in excess of 0.01 inch wide or penetrating to reinforcing steel.

2. Spalls, pop-outs, honeycombs, rock pockets, and other objectionable conditions.

B. Floor Slab Flatness and Levelness: Correct floor flatness and floor levelness, not meeting specified tolerances in conformance to ACI 301, to make suitable substrate for finish floor systems.

C. Correct high areas by wet grinding after concrete has cured at least 14 days. Make test on trial area and obtain acceptance from Architect before proceeding.

D. Correct low areas and swales at floors receiving finished flooring systems by cutting out and replacing with fresh concrete.

3.11 REPAIR AND FINISHING FORMED SURFACES

A. Surface Defects: Patch and repair to specified tolerances and specifications.

1. Make smooth and free of fins, bulges, ridges, bug holes, offsets, honeycombing, and unacceptable roughness.

2. Cut out concrete to make patches not less than 1 inch deep.

3. Chip out concrete to 3/4 inch clearance behind and around exposed reinforcing steel.

B. Gravel Pockets and other Voids: Patch and repair to match adjacent surfaces.

1. Saturate cavities and adjacent areas with clean water for 24 hours immediately before patching and repair.

2. Apply commercial bonding agent as instructed by manufacturer

3. Parge surface with commercial repair cement mortar compound to match adjacent areas. Use as little water in mix as possible.

4. Fill voids and finish off to match adjacent surfaces in exposed work.

5. Damp cure patch for 7 days.

3.12 JOINT FILLING

A. Exterior Joints:

1. Install joint sealers and backer rod specified Section 07 92 00 at joints separated by joint filler.

2. Tool to concave configuration, flush to paving surface.

3. Do not install sealant at 1/8 inch wide saw cut joints.

3.13 GROUTING

A. Solid Grouting under Structural Base Plates, Mechanical Equipment and Obstructed Voids and Joints.

1. Mix grout to fluid consistency.

2. Construct liquid tight formwork and pour grout in place.

3. To prevent voids, pour grout from only one side so that flow exits from opposite side. Work poured grout firmly in place.

4. Dry packing not permitted.

B. General Use: Include anchoring, filling cracks, and repairs such as filling rock pockets and pipe penetrations:

03 30 00 -11

1. Mix non-shrink, aggregate grout to optimal fluid, flowable, or plastic consistency as necessary for solid grouting and repair.

2. Trowel grout at plastic consistency at voids and around pipe penetrations to fill voids and to match adjacent surfaces.

C. Cold Weather Grouting: When ambient temperatures are below or are predicted to fall below 45 degrees F, use cold weather grout or build a cold weather enclosure over grouting placement area and maintain minimum enclosure temperature at 60 degrees for 72 hours after grout placement and as instructed by manufacturer.

3.14 TOLERANCES

A. General Tolerances: Conform to ACI 117 and ACI 302.1R for tolerances of construction and materials.

B. Vertical, Lateral, and Relative Alignment and Cross Sectional Dimensions: Conform to ACI 117 and as specified for offset between adjacent formwork facing material.

3.15 CONCRETE SURFACE REPAIRS

A. Promptly report surface defects to Architect for direction prior to making repairs.

B. Repair, patch, and remove stains rust, efflorescence, and surface deposits, as directed by Architect.

C. Where repairs and patching are not practical as a solution to achieve intended results, cut out and replace.

3.16 DEFECTIVE CONCRETE

A. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements.

B. Repair or replacement of defective concrete will be determined by the Architect. The cost of additional testing shall be borne by Contractor when defective concrete is identified.

C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of

Architect for each individual area.

3.17 PROTECTION

A. Do not permit traffic over unprotected concrete floor surface until fully cured.

B. Protect in-place concrete in conformance to ACI 301, Section 1.8.

C. Contain and promptly clean spills to maintain concrete suitable for bonding of finish flooring and final finishing of exposed concrete slabs.

UNIVERSITY OF OREGON SECTION 05 50 00

HENDRICKS HALL ELEVATOR MODERNIZATION METAL FABRICATIONS

05 50 00 -1

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes:

1. Structural framing, supports, and trim

2. Rough hardware.

3. Bearing and leveling plates.

1.2 REFERENCES

A. American Society of Testing and Materials (ASTM)

A27 Specification for Steel Castings, Carbon, for General Application

A36 Specification for Structural Steel

A53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and

Seamless

A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

A153 Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

A307 Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength

A366 Specification for Steel, Sheet, Carbon, Cold-Rolled, Commercial Quality

A446 Specification for Steel Sheet, Zinc-Coated (Galvanized) by Hot-Dip Process, Structural

(Physical) Quality

A510 Specification for General Requirements for Wire Rods and Coarse Round Wire, Carbon Steel

A526 Specification for Steel Sheet, Zinc-Coated (Galvanized) by Hot-Dip Process, Commercial

Quality

A569 Specification for Steel, Carbon (0.15 Maximum, Percent), Hot-Rolled Sheet and Strip, Commercial Quality

A570 Specification for Steel, Sheet and Strip, Carbon, Hot-Rolled, Structural Quality

A780 Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

C1107 Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)

B. American Welding Society (AWS)

D1.1 Structural Welding Code - Steel

D1.3 Structural Welding Code - Sheet Steel

C. National Association of Architectural Metal Manufacturers (NAAMM)

AMP 500 Metal Finishes Manual

MBG 531 Metal Bar Grating Manual

MBG 532 Heavy Duty Metal Bar Grating Manual

1.3 DEFINITIONS

A. Refer to ASTM E985 for railing-related terms that apply to section.

B. Refer to NAAMM publications "References" for definition of terms that apply to section.

1.4 SUBMITTALS

A. Product Data: Submit product data for products used in metal fabrications, including paint products, grout and fasteners.

05 50 00 -2

B. Shop Drawings: Submit detailed shop and erection drawings of metal fabrication indicated. Include plans, elevations, sections, and details of metal fabrications and connections. Show anchorage and accessory items.

C. Welder certificates signed by Contractor certifying that welders comply with requirements specified in 1.05C.

D. Qualification data for firm specified in 1.05B to demonstrate their capabilities and experience.

1.5 QUALITY ASSURANCE

A. Codes and Standards: Comply with provisions following, except as otherwise indicated. Where conflicts occur, comply with more stringent requirements.

1. ANSI 14.3

2. AWS D1.1 and D1.3

3. NFPA 101

B. Fabricator Qualifications: Firm experienced in successfully producing metal fabrications similar to that shown on Drawings, with sufficient production capacity to produce required units without causing delay in Work.

C. Qualify welding processes and welding operators in accordance with AWS D1.1 and D1.3.

1. Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification.

D. Materials used shall be free of lead and asbestos fibers.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to job site in good condition and properly protected against damage to finished surfaces.

B. Storage on Site: Store materials in location and in manner to avoid damage. Stacking shall be done in way which will prevent bending.

1. Store metal components and materials in clean, dry location. Cover with waterproof paper, tarpaulin or polyethylene sheeting in manner that will permit air circulation.

C. Keep handling on-site to minimum. Exercise care to avoid damage to finishes of material.

1.7 PROJECT CONDITIONS

A. Field Measurements: Check actual locations of walls and other construction to which metal fabrications must fit, by accurate field measurements before fabrication; show recorded measurements on final shop drawings. Coordinate fabrication schedule with construction progress to avoid delay of work.

B. Where field measurements cannot be made without delaying work, guarantee dimensions and proceed with fabrication of products without field measurements. Coordinate construction to ensure that actual opening dimensions correspond to guaranteed dimensions. Allow for trimming and fitting.

PART 2 - PRODUCTS

2.1 FERROUS METALS

A. Metal Surfaces, General: Form metal fabrications exposed to view upon completion of work, provide materials selected for their surface flatness, smoothness, and freedom from surface blemishes. Do not use materials whose exposed surfaces exhibit pitting, seam marks, roller marks, rolled trade names, or roughness

B. Steel Plates, Shapes, and Bars: ASTM A36.

1. W Sections: ASTM A992.

05 50 00 -3

2. HSS: ASTM A500 GR B.

C. Rolled Steel Floor Plates: ASTM A786.

D. Steel Bars for Gratings: ASTM A569 or ASTM A36.

E. Wire Rod for Grating Cross Bars: ASTM A510.

F. Steel Pipe: ASTM A53, Type S, Grade B, standard weight (schedule 40), black finish, unless otherwise indicated.

G. Concrete Inserts: Threaded or wedge type; galvanized ferrous castings, either malleable iron, ASTM

A47, or cast steel, ASTM A27. Provide bolts, washers, and shims as required, hot-dip galvanized per

ASTM A153.

H. Welding Rods and Bare Electrodes: Select in accordance with AWS specifications for metal alloy to be welded.

J. Ladder rung: Anti-slip perforated, 13 gauge carbon steel.

2.4 GROUT

A. Nonshrink Nonmetallic Grout: Premixed, factory-packaged, non-staining, non-corrosive, non-gaseous grout complying with ASTM C1107 (formerly referenced as CE CRD C621). Provide grout specifically recommended by manufacturer for interior and exterior applications of type specified in this section.

B. Subject to compliance with requirements, products that may be incorporated in work include, but are not limited to:

1. Euco N-S Grout - Euclid Chemical Co.

2. Kemset - Chem-Masters Corp.

3. Crystex - L & M Construction Chemicals, Inc.

4. Sonogrout - Sonneborn Building Products Div., Rexnord Chemical Products, Inc.

5. Supreme Grout - Cormix, Inc.

6. Sure-Grip High Performance Grout - Dayton Superior, or approved.

2.5 FASTENERS

A. General: Provide zinc-coated fasteners for exterior use. Select fasteners for type, grade, and class required. Suspect/counterfeit bolts will not be accepted and will be replaced at Contractor's expense.

B. Bolts and Nuts: Regular hexagon head type, ASTM A307, Grade A.

C. Lag Bolts: Square head type, FS FF-B-561.

D. Machine Screws: FS FF-S-92.

E. Plain Washers: Round, carbon steel, FS FF-W-92.

F. Expansion Anchors: Expansion anchors complying with FS FF-S-325.

G. Lock Washers: Helical spring type carbon steel, FS FF-W-84.

H. Special Fasteners: Split nuts, indicator washers and others, as indicated.

J. Epoxy: Products as manufactured by Simpson-Tie, SET, SET XP or approved; selection as based on performance criteria.

2.6 PAINT

A. Shop Primer for Ferrous Metal: Red oxide, lead- and cadmium-free, corrosion-inhibiting primer complying with performance requirements of FS TT-P-664.

05 50 00 -4

B. Galvanizing Repair Paint: High zinc dust content paint for re-galvanizing welds in galvanized steel, with dry…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .