About this file

This Bid Notice pertains to a fire restoration and rehabilitation project in California requiring comprehensive restoration of a residential unit damaged by fire, including structural roof truss replacement to achieve code compliance. The scope of work encompasses demolition and removal of fire-damaged materials, debris removal, structural repairs, reconstruction of damaged building components, roof truss replacement, roof repair or replacement, insulation installation, drywall repair, interior finish restoration, and all associated work necessary to return the property to its pre-loss condition. Materials within the units have been tested and no asbestos-contaminated materials were identified, eliminating remediation concerns related to hazardous materials.

Specific details regarding pricing terms, bid due dates, site visit requirements, pre-bid meetings, award timelines, and contract duration are not provided in the available information. The project requires the contractor to manage all phases of restoration work from demolition through final interior finishing to ensure the property meets current building codes and achieves pre-loss condition standards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUOTE FOR SMALL PURCHASE (QSP):

Fire Damage Restoration and Rehabilitation with Roof Truss Replacement: 2336 Olive Avenue, Atwater, CA

QSP #2026-C-41

Quote Due Date:

Thursday, December 17, 2026 by 4:00 P.M. P.S.T.

405 U Street, Merced, CA. 95341

Telephone: (209) 722-3501 ext. 147 Email: evelync@merced-pha.com

Fire Damage Restoration and Rehabilitation with Roof Truss Replacement:

2336 Olive Avenue, Atwater

Section I: Introduction: The Housing Authority of the County of Merced (Authority) has identified the need for fire damage restoration and rehabilitation with structural roof truss repair and/or replacement at 2336 Olive Avenue, Atwater, property located in the County of Merced. The Authority is soliciting quotations from contractors in good standing and whom are appropriately licensed with the California State Licensing Board (CSLB). Qualified contractors with a Class B General Building Contractors, Class A General Engineering Contractors or contractors capable of subcontracting the required specialty trades, Contractor shall provide all labor, materials, equipment, supervision, permits, engineering, inspections and services necessary to complete the required work as detailed within the Scope of Work (SOW) and/or be able to sub-contract as needed. This is a turn-key project. It is the sole responsibility of the contractor to examine and inspect the building(s) in its entirety to provide a complete and accurate proposal.

Due to the estimated cost of this procurement falling under the Small Purchase Threshold of $350,000.00, the Authority is procuring these services using a non-formal request for Quotes for Small Purchase (QSP) process. This informal QSP process means formal Request for Proposals (RFP) requirements and formal protest procedures do not apply (i.e., bid bonds, public bid opening, etc.). The Authority reserves the right to issue modifications to this QSP at any time, reject all proposals, and/or ask for any clarifications or verifications from Proposers at any time.

This QSP is being issued, as well any addenda, by the Authority. The Authority intends to receive Quote submittals now, through and up to Thursday, December 17, 2026, by 4:00 P.M. P.S.T. The contact person for the Authority is:

Evelyn Chavira, Director of Procurement 405 U Street, Merced, CA. 95341

Telephone: (209) 386-4147 Email: evelync@merced-pha.com

Submittals may be mailed or hand-delivered to the main office at:

405 U Street, Merced, CA. 95341, sent via Fax to (209) 722-0106 or emailed to evelync@merced-pha.com

1. Contact with Authority staff, Board Members and/or Residents: Under no circumstances may any Authority Board Member or any Authority staff member other than the contact person specified above and within this solicitation be contacted during this QSP process by any entity intending to submit a response to this QSP. Failure to comply with this request will result in disqualification. All questions shall be in writing and directed to the contact person as noted above

SECTION II: Walkthrough/Request for Interpretations: #2.

2. Interpretations/Questions: During the period between issuance of this QSP and the proposal due date, no oral interpretation of the QSP be given to any prospective respondent. Request for interpretation must be made, in writing, and received no later than Wednesday, December 9, 2026 by 10:00 A.M. P.S.T. Requests for interpretation/Questions received after the posted due date are at the discretion of the Authority to be acknowledged and/or responded

to. Requests for interpretations and/or questions must be submitted to Evelyn Chavira via email: evelync@merced-pha.com or fax: (209) 722-0106 -Attention:

Procurement.

3. Addendum and Update Procedures for the QSP: During the period of advertisement for this QSP, the Authority may wish to amend, add to or delete from, the contents of this QSP. In such situations, the Authority will issue an Addendum to the QSP setting forth the nature of the modification(s). The Authority will email, fax or send via regular U.S. Postal Service Mail (upon written request), to all known Respondents, any Addendum to the Respondents of the QSP solicitation. Interested parties may also view Addendum on the Authority website www.merced-pha.com. It shall be the responsibility of each Respondent to ensure that they have any/all Addendum relative to this QSP.

4. It shall be the responsibility of the Contractor to see that his/her quote is received to the Authority by the date and time set forth for the receiving of the quotes.

Quotes received after the time stated will not be considered. Incomplete submittals are received as non-responsive and will not be considered. All submittals will become the property of the Authority and must be submitted in accordance with the conditions and instructions provided herein.

SECTION II: Walkthrough/Request for Interpretations:

1. The Authority will hold an in-person pre-submittal meeting or walkthrough on

Monday, November 30, 2026 at 10:00 A.M. P.S.T. NOTE: PLEASE DO NOT VISIT

ANY PROPERTY WITHOUT PRIOR AUTHORIZATION FROM AUTHORITY STAFF.

2. Request for interpretations must be received no later than Wednesday, December 9, 2026 by 10:00 A.M. P.S.T. Requests for interpretations and/or questions must be submitted to Evelyn Chavira via email: evelync@merced-pha.com or fax: (209) 722-0106 -Attention: Procurement.

SECTION III: Scope of Work (SOW)/Technical Specifications:

1. Refer to Scope of Work, Attachment 1: QSP Fire Damage Restoration and Rehabilitation with Roof Truss Replacement

2. Construction will be provided/performed during normal business hours from 7:30 A.M. to 5:00 P.M., Monday through Thursday and alternating Friday from 7:30 A.M. to 4:00 P.M., no overtime will be paid on this project.

SECTION IV: Non-Collusion Affidavit with Notarization:

The Contractor must complete and notarize the Form of Non-Collusive Affidavit (Attachment 5). This form certifies that the Contractor has not colluded with any person in a way that could affect the outcome of this award or the submission of quotes for this solicitation.

SECTION V: Business Preference in Co The work under this contract is assisted by the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (section 3) and is subject to Section 3 requirements (24 C.F.R. Part 75) to direct training, employment, and contracting opportunities to low- and very low-income workers and Section 3 businesses, The Contractor agrees implement section 3 to the greatest extent feasible. (Attachment 6 Section 3 Business Preference Form and Explanation).

SECTION VI: Performance Specifications:

1) Company Standards: Contractor shall possess the appropriate License for all work performed. All work performed pursuant to this QSP must conform and comply with all applicable local, state and federal codes, statutes, laws and regulations as well as those provided as Attachments below. If such compliance is impossible for reasons beyond its control, the Contractor shall immediately notify the Authority of that fact and the reasons therefore.

2) Personnel Standards:

A. Services shall be performed by personnel who are trained and otherwise qualified to perform tasks assigned.

B. Contractor s employees shall wear clearly visible identification while performing duties.

C. All personnel shall be neat in appearance and shall conduct their work in a professional manner with minimal disturbance to the contracting party.

If any of the Contractor s personnel are not satisfactory to the Authority or its managers, the Contractor shall replace such personnel with those who are satisfactory.

D. Contractor shall use all reasonable care, consistent with his/her right to manage and control his/her operation, not to employ any persons or use any labor, or use or have any equipment or permit any condition to exist which shall or may cause or be conductive to any labor complaints, troubles, safety issues, disputes or controversies at the Authority s place of business or which interfere or are likely to interfere with the operations of the Authority s business.

E. Contractor shall immediately give such notice to the Authority, to be followed by written reports, as shall be reasonably necessary to advise the manager of any and all impending or existing labor complaints, troubles, disputes, or controversies and the progress thereof that Contractor, in his/her opinion, believes may interfere with the operation of the business. Contractor shall use his/her best efforts to resolve any such complaints, troubles, disputes, or controversies.

3) Supervision: Contractor shall furnish the necessary qualified supervision to oversee all operations.

4) Equipment:

A. Contractor shall furnish all equipment necessary to perform the services in accordance with these specifications and warrants that all equipment will be of such type as to cause no hazard or danger.

B. Contractor shall install all safety signage measures, according to safety standards, throughout the work site in order to aid in stopping unauthorized individuals from entering areas that may pose unseen hazards. These prevention measures shall be installed as-needed for any project.

5) Property Damages: Contractor shall be responsible for repair and/or replacement for any damages to Authority property, damaged as a result of the actions of the Contractor, his/her employees and/or equipment. All repairs of damages shall be at the Contracto s expense. Damaged areas include but are not limited to, existing, adjacent and/or adjoining structures, walls, roofs, ceilings, floors, fences, and/or landscape. All repairs and/or patches must match existing materials and must meet industry standards. All repairs and/or patches must be compatible with design and quality of the existing, adjacent and/or adjoining materials. The Authority shall not incur any monetary responsibility for damage caused by contractor.

6) Industry Standards and Compliance: All work shall be performed according to industry standards, procedures and methods normally accepted in the industry and in compliance with all federal, state and local laws, codes and regulations.

SECTION VII: Award of Contract:

The Authority retains the right to contract with any contractor as a result of this QSP.

Respondents will be notified of results at earliest practical date, no later than 30 days after due date.

1) Subject to Other Documents: The contract is subject to the terms and conditions of the State of California as they exist at the time the agreement is signed.

2) Conflict of Interest: The Contractor warrants that it presently has no interest and will not acquire any interest direct or indirect, which would conflict in any manner or degree with the performance of services under this contract.

3) Rejection of Submittals: The Authority reserves the right to accept or reject any or all Submittals which are determined to be non-responsive.

SECTION VIII: Contract Form:

1) THE AUTHORITY WILL NOT EXECUTE A CONTRACT ON THE CONTRACTOR S FORM.

Contract will only be executed on an Authority form and by submitting a proposal, the Contractor agrees to do so (please note that Authority reserves the right to amend this form as Authority deems necessary). However, the Authority may consider any contract clauses that the Contractor wishes to include therein and requests in writing for the Authority to do so; but the failure of Authority to include such clauses does not give the Contractor the right to refuse to execute the Authority s contract form.

2) Prior to submitting a proposal, it is the responsibility of each prospective Contractor to notify the Authority in writing of any contract clause that he/she is not willing to include in the final executed contract and abide by. The Authority will consider and respond to such written correspondence, and if the prospective Contractor is not willing to abide by the Authority's response (decision), then that prospective Contractor shall be deemed ineligible to submit a proposal.

3) Contract Conditions: The following provisions are considered mandatory conditions of any contract award made by the Authority pursuant to this QSP:

A. Assignment of Personnel: The Authority shall retain the right to demand and receive a change in personnel assigned to the work if the Authority believes that such change is in the best interest of the Authority and the completion of the contracted work. Contractor shall select and employ the replacement personnel.

B. Labor Costs: Quotes will be inclusive billing rates for California State prevailing wage rates, Davis-Bacon and Related Acts wage rates and non-prevailing wage rates as applicable

C. Unauthorized Sub-Contracting Prohibited: The Contractor shall not assign any right, nor delegate any duty for the work proposed pursuant to this QSP (including, but not limited to, selling or transferring the contract) without the prior written consent of the Authority. Any purported assignment of interest or delegation of duty, without the prior written consent of the Authority, shall be void and may result in the cancellation of the contract with Authority, or may result in the full or partial forfeiture of funds paid to the Contractor as a result of the proposed contract; either as determined by the Authority.

D. Right to Negotiate Final Fees: The Authority shall retain the right to negotiate the amount of fees that are paid to the Contractor, meaning the fees proposed by the top-rated Contractor may, at Authority's options, be the basis for the beginning of negotiations. Such negotiations shall begin after the Authority has chosen a top-rated Contractor. If, in the opinion of the Authority, such negotiations are not successfully concluded within five (5) business days, the Authority shall retain the right to end such negotiations and begin negotiations with the next-highest-rated Contractor. The Authority shall also retain the right to negotiate with and make an award to more than one Authority Contractor, as long as such negotiation(s) and/or award(s) are addressed in the above manner (i.e.

top-rated first, then next-rated following until a successful negotiation is reached).

E. Licensing and Insurance Requirements: Prior to award (but not prior to submission of the proposal) the Contractor will be required to provide proof of:

I. Licensing: COST OF ALL LICENSES NEEDED ARE THE SOLE RESPONSIBILITY OF

THE CONTRACTOR AND SHOULD NOT BE BILLED TO THE AUTHORITY. Contractor must hold a valid California Contracto s License for the appropriate trade listed in this QSP with all appropriate insurance required by the State of California and have the ability to obtain all required permitting either through local, state and/or federal agencies and be in good standing with all governing agencies. The Contractor shall provide to the Authority copies of these and any other required current City, State and/or Federal licenses. Failure to maintain these licenses in a current status during the term(s) of this contract shall constitute a material breach thereof.

II. Permits: The Contractor is required and solely responsible to confirm if permits are required for their work performed for the contracted project awarded to them. Contractor shall obtain and pay for all permits required to complete the project. Permit costs shall be included in the bid price.

III. Insurance: Contractor shall procure and maintain throughout the duration of any Contract, resulting from this QSP, insurance against claims for injuries to person or damages to property which may arise from or in connection with the performance of or failure to perform the work hereunder by the Contractor, its agents, representatives, employees or subcontractors, at a minimum, insurance coverage shown on the attached Insurance Requirements for

(Attachment 9). Proof of such coverage must be presented to the Authority prior to or at the time of contract execution.

SECTION IX: General Requirements:

Contractor must maintain records of projects for no less than 5 years. Copies of all permits, certifications or records of receipts shall be submitted to the Authority and easily accessed for no less than 5 years.

SECTION X: Warranty/Guarantee:

All work provided by any Contractor pursuant to any contract that ensues from this QSP shall be guaranteed by that Contractor for a period of time of not less than 365 days or as accepted by industry standards.

SECTION XI: Prevailing Wage Rates:

regulation by the U.S. Department of Housing and Urban Development (HUD) and must comply with the Davis-Bacon Act and Related Acts. Contractors and subcontractors must pay workers no less than the prevailing wage rates and fringe benefits determined by the U.S. Department of Labor (DOL). Prevailing wages shall be paid to all employed throughout this contract period. Where state or local minimum/prevailing wage rates exceed the federal Davis-Bacon basic wage rate, the higher rate must be paid (while maintaining the required Davis-Bacon fringe benefit amount). The determined wage rate for this contract shall be no less than the contractors normal hourly wage paid plus fringe benefits as noted on sam.gov website. The Contractor assumes full responsibility for compliance with all applicable federal, state, and local prevailing wage laws, including all reporting and certified payroll requirements. Any failure by the Contractor to accurately ascertain or calculate prevailing wage rates prior to bid submission shall not relieve the Contractor of its obligation to pay the legally required wages, nor shall it constitute grounds for a change order, price adjustment, or additional compensation. Applicable wage rates can be found at:

Department of Industrial Relations (DIR):

https://www.dir.ca.gov/oprl/dprewagedetermination.htm

Davis-Bacon and Related Acts:

https://sam.gov/wage-determination/CA20260009/1

SECTION XII: Build America, Buy America Requirements:

The Build America, Buy America (BABA) Act was enacted on November 15, 2021, as part of the Infrastructure Investment and Jobs Act (IIJA) (Pub. L. No. 117-58) also known as the Bipartisan Infrastructure Law. BABA establishes a domestic content infrastructure spending. The BAP requires that all iron, steel, manufactured products, and construction materials used in infrastructure projects funded with Federal financial assistance must be produced in the United States, Per the Community and Development Notice: CPD-2023-12. In accordance with these guidelines, the Authority must comply with the requirements of the Build America, Buy America (BABA) Act, 41 USC 8301 note, and all applicable rules and notices, as may be amended, and as applicable to this project. Pursuant to Title 2, CFR Chapter 1, Part 184, materials used are subject to BABA requirements, unless exempted by a waiver.

Contractor must make every effort to ensure any applicable material used for this project is produced in the United States according to the BABA guidelines.

SECTION XIII: Attachments:

All submittals shall return required documents noted with (*) Authority of the County of Merced As-Needed Pest Control Submittal Form (page 9

Attachment 1: Scope of Work Attachment 2: QSP Fire Damage Restoration and Rehabilitation with Roof Truss

Cost Form* Attachment 3: Addendum/Addenda Acknowledgement Form* Attachment 4: Profile of Firm Form* Attachment 5: Form of Non-Collusive Affidavit* (Must be Notarized) Attachment 6: Authority Section 3 Business Preference Form and Explanation

(Return pages 1-3 for submittal, mark N/A if not applicable) * Attachment 7: Authority Contractor/Sub-Contractor Information Form* Attachment 8: Form HUD-5370-EZ: General Contract Conditions for Small

Construction/Development Contracts Attachment 9: Insurance Requirements for Contractors

SECTION XIV: Quote Submittal Instructions:

The Authority is requesting the following page (9) along with above noted (*) attachments be submitted by the due date as stated within this QSP. By submitting a quote response, the Contractor agrees to abide by all applicable laws, ordinances, and regulations.

QSP Fire Damage Restoration and Rehabilitation with Roof Truss Replacement Submittal Form

Base Quote: By submitting a quote response on the Cost Form (Attachment 2), the Contractor agrees to abide by all applicable laws, ordinances, and regulations to complete the QSP Fire Damage Restoration & Rehabilitation with Roof Truss work, in accordance with the specifications found in the Scope of Work.

The undersigned, being familiar with local conditions affecting the cost of work and as described in this informal solicitation including, but not limited to employee (prevailing) wages, costs, profit and overhead, tools, equipment, licensing, permits, and insurance, etc., hereby proposes to furnish all labor and services for the total costs as listed on the accompanying:

Attachment 2: Fire Damage Restoration and Rehabilitation with Roof Truss Replacement Cost form Attachment 3: Addendum/Addenda Acknowledgement

If written notice of the acceptance of this quote is mailed, faxed, or delivered to the undersigned within sixty (60) days after the opening thereof, or at any time thereafter before this quote is withdrawn, the undersigned agrees to execute and deliver a contract in the prescribed form within ten (10) days after the contract is presented for signature.

Quote Submitted By:

Company: __________________________________________________________

By (Print Name) __________________________________ Date: ______________

Address: ___________________________________________________________ (Street, City, State, Zip)

Phone #: ______________ Fax: ___________ Email: _______________________

Signature: __________________________________________________________ (Authorized Principal or Officer)

Attachment 1

Scope of Work Fire Restoration and Rehabilitation with Roof Truss Replacement;

2336 Olive Avenue, Atwater

The Housing Authority of the County of Merced ( Authority ) is seeking quotes from qualified, insured, and appropriately licensed contractors, including California Contractors State License Board (CSLB) with a Class B General Building Contractors, Class A General Engineering Contractors or contractors capable of subcontracting the required specialty trades, to restore a residential unit damaged by fire and perform all necessary repairs, including structural repair roof truss replacement, and related work necessary to return unit to code compliant condition. License must be active and in good standing at time of quote submittal and must be maintained throughout and up to completion of project. This is a prevailing wage project, and all labor costs included in the C applicable prevailing wage requirements.

The awarded contractor shall provide all labor, materials, and equipment, permits, supervision and services necessary to complete the required work as detailed within this Scope of Work (SOW). The selected contractor will be required to obtain a final occupancy permit and submit it to the Authority.

Quotes are required for the entirety of work described herein.

The project consists of fire damage demolition, structural framing roof truss replacement, unit rehabilitation and all associated work necessary to restore the unit to its pre-loss condition in accordance with applicable building codes and requirements set forth herein. Submittals shall include all work necessary to provide a complete, turnkey project.

It is the inspect the unit and submit a complete and accurate quote that includes all labor, materials, permits, licenses, engineering plans, fees, and any other costs necessary to fully restore the structure in accordance with applicable building codes and industry standards. The Scope of Work (SOW) is not all-inclusive, and the Contractor is responsible for identifying and including all work reasonably required to complete the project, whether specifically stated or inferred from field conditions. Change orders must be pre-approved by the Authority and will be limited to work added to the project by the Authority.

The Contractor shall be responsible for performing all work in accordance with all applicable Federal, State, and Local laws, regulations and building codes.

The Contractor will be solely responsible to obtain and pay for all necessary permits, licenses, tests and/or certifications, and engineering plans required to complete this project.

I. Description of Property and Work Required:

1. In general, this scope of work requires the contractor to restore a residential unit damaged by fire and perform all necessary structural roof truss replacement, to return the property to code compliant condition. Work includes, but is not limited to, demolition and removal of fire-damaged materials, debris removal, structural repairs, reconstruction of damaged building components, roof truss replacement, roof repair/replacement, insulation install, drywall repair, interior finish restoration and all associated work required to restore the property to its pre-loss condition.

2. A fire damage report is available. The Authority will supply a copy of the fire damage report at the mandatory walkthrough of the unit. The report is intended as a reference only and does not relieve the Contractor of the responsibility to independently inspect the site, verify existing conditions and include all labor, materials, equipment, permits and services necessary to complete the project. Costs for this project/contract (e.g. restoration, framing, roofing etc.) shall be provided, broken down, as a detailed line-item breakdown identifying all major components of work associated with the fire restoration and roof truss replacement. The submitted pricing shall include all labor, materials, equipment, permits, inspections, subcontractors, and incidental costs necessary to provide a complete turnkey project.

3. The Authority acknowledges that permits take time to acquire and will give time allowance for obtaining permits, this time allowance shall not stop or hinder remodel progress. Authority estimated construction duration is three (3) months.

4. Contractor must include their proposed work schedule for the entire project.

II. Asbestos

1. All materials within the units have been tested and no Asbestos

Contaminated Materials (ACM) were identified. Report available upon request.

2. Authority is not anticipating any removal of transite pipe. If for any reason contractor needs to remove transite pipe during refurbishment such materials will be replaced with approved materials, properly installed, and at the sole expense of the contractor. Contractor must notify the Authority prior to removal and submit a change order for approval.

III. Demolition

1. Any dumpsters required for demo can be placed in adjacent driveway designated for unit 2336 Olive Avenue.

2. Demolish and remove all fire-damaged materials and any building components necessary to facilitate structural replacement of roof truss.

3. Demolition of miscellaneous material which includes, but is not limited to sheet metal, flashing, roof soffits, vents, etc. will be

4. Upon completion of demolition operations for the unit, the Contractor shall inspect the roof structure for rotted or damaged material requiring replacement. Prior to the removal of any damaged material, confirm repair quantities, and approve associated repair costs. The Authority retains the right to engage a separate, competitively solicited contractor to execute any unforeseen material repairs, including dry-rot remediation, as well as any other related or unrelated construction operations.

5. Additional demolition costs are the responsibility of the Contractor and will be included in the total cost of the project.

IV. Restoration

1. Contractor will be responsible for thoroughly cleaning and restoring the unit to the pre-fire condition.

2. Contractor is responsible for thorough cleaning of all materials, including but not limited to, floors, walls, cabinets, doors, trim, plumbing, electrical fixtures, appliances, windows, etc.

3. Contractor will be responsible for odor control by removing, cleaning, scraping away and/or by any means deemed standard of the trades for all burned wood and/or materials.

4. Shellac seal all exposed and/or remaining framing members (damaged or not) by any method and/or process acceptable in the industry to ensure that no odor is detected after restoration has been completed.

5. Pressure wash with an environmentally-safe chemical spray all exterior walls, soffit and entire patio covers. This includes the complete exterior surfaces of the entire building.

6. Contractor to perform remediation for unit, as needed. No water or aqueous suppression agents were utilized during Fire suppression and no water-related damage was sustained.

7. Authority is not anticipating the need for growth remediation;

however, contractor will be responsible to notify the Authority if remediation is a concern upon start of project.

8. Contractor is responsible to use best industry practices to keep unit from gathering microbial growth while exposed during restoration/modification.

V. Framing/Roof Truss

1. Contractor will replace of damaged framing materials, with new materials, to match existing materials, to proper size and type to meet all building codes and engineering requirements. If acceptable methods of sister trussing are recommended and/or approved by City of Atwater Building Department and meets all code requirements, then this will be an acceptable method of repair instead of replacement of framing members.

2. Splicing, sister trussing, or repairs will be a minimum of 4 feet past repair area.

3. Hand nailing or gun nailing is acceptable. Nails will not be counter sunk or protruding from any materials. If gun nailing methods are used, the materials mated will be hand hammered following gun nailing to draw the materials tight to each other, no gaps will be acceptable.

4. Remove and install damaged Soffit vents. New vents must match original. Contractor responsible to confirm total amount of vents needed for replacement

5. Ceiling joists and walls, if repaired, will be flat level, plumb and straight so sheetrock will not have any noticeable waves or imperfections on the interior of the units.

6. Any nails exposed to the elements of the weather will be hot dipped galvanized.

7. All work will be completed to meet or exceed all current building codes.

8. Contractor shall provide approved engineered drawings and calculations for all roof truss repairs or replacements as required by Section VI, Engineering and Structural Plans. All associated engineering, design, calculation, plan preparation, revision and permit support costs shall be included in the submittal.

9. Truss repairs must undergo multi-phase municipal inspections to ensure continuous compliance with city requirements. All work must comply with local municipal building codes.

10. The contractor is responsible for coordinating and passing all required city/county inspections at each phase of the project before moving forward to the next phase of work including after all repairs to all framing members, truss and structural repairs

VI. Engineering and Structural Plans

1. Contractor shall retain and pay for the services of a California-licensed Structural Engineer, as required, to evaluate the fire-damaged roof structure and prepare all engineering drawings, calculations, specifications, and supporting documentation necessary to repair and/or replace the damaged roof trusses and framing.

2. Engineering plans shall address all fire-damaged structural components, including but not limited to burned, charred, weakened, or structurally compromised 2x4 truss members and other load-bearing framing elements.

3. Contractor shall be responsible for submitting all engineering plans, calculations, revisions, and supporting documentation to the City of Atwater and any other applicable jurisdiction for review and approval.

4. All structural repairs, roof truss repairs, roof truss replacements, framing modifications, and related work shall be completed in strict accordance with the approved engineering plans and all applicable building codes.

5. No deviations from the approved engineering plans shall be permitted without written approval from the Engineer of Record, the Authority, and the permitting agency having jurisdiction.

6. Contractor shall be responsible for all costs associated with engineering services, calculations, plan preparation, revisions, responses to plan check comments, and any additional information required by the permitting agency.

7. Contractor shall provide all approved engineering plans and calculations to the Authority prior to commencement of structural repairs.

8. A fire damage report is available for review. Contractor and Engineer of Record shall independently verify all existing conditions, dimensions, structural components, and extent of fire damage prior to preparation and submission of engineering plans.

Reliance solely on the fire damage report shall not relieve contractor of responsibility for a complete and code-compliant design.

VII. Roofing

Authority has not identified any fire damage to the roof at this time.

Roof repair and replacement will be dependent on requirements to replace roof truss and on potential relocation of HVAC unit.

1. All damaged roofing will be removed and replaced. Contractor must dispose of materials properly and offsite.

2. Remove any rooftop antennas and/or satellite dishes present.

Contractor will not be responsible for reinstallation of antennas and/or satellite dishes.

3. Properly terminate abandoned utilities to point of connection (POC) as far back as accessible and remove any curbs and flashings from roof deemed unnecessary and/or abandoned by the Authority.

4. Remove and replace any dry rot roof sheathing with like materials.

Spacing and nailing pattern will follow the Uniform Building Code

Building Department.

5. Replace all fascia with 2x8 Hem Fir re-sawn materials. Contractor will paint all fascia, including scrape, prepare, prime and paint.

6. All exposed wood must be primed, prepared and painted. Color to be determined by the Authority. Replace any damaged wood, including but not limited to, soffits.

7. Replace all drip edge must be painted to match trim color. Pre-finished drip edge matching trim color will be acceptable. Contractor to provide a minimum 2-year warranty against peeling paint.

8. Install a single layer of 30-year modified asphalt underlayment (for example, Layfast TU70, or equal). If multiple layers are required by code, each additional layer will be offset to the center of the lower layer.

9. Contractor will install laminated 30-year asphalt shingle roofing system with fiberglass-based asphalt shingles such as those manufactured by Owens Corning Oakridge® shingles, GAF ual products from other manufacturers. Roofing material must meet Title 24 Cool Roof requirements. Color to be black.

10. Note: Specific brand names as noted herein are used only for establishing design and quality standards; any other products that clearly and demonstrably meet the standard are also acceptable.

Proposed equivalent material will be reviewed and approved by Authority.

11. Replace all flashings and roof jacks with new galvanized materials, primed and painted to match roofing materials, pre-finished matching roof color will be acceptable. Roof jacks to have an integrated rubber seal, caulking will not be acceptable.

Contractor to provide a minimum 2-year warranty against peeling paint.

12. Contractor will properly install new low-profile roof vents, per code. Contractor will prime and paint to match roofing shingles, pre-finished matching roof color will be acceptable. Contractor to provide a minimum 2-year warranty against peeling paint.

13. Shingles will be installed with six (6) nails per shingle; staples will not be accepted. Roof installation must comply with the wind factors of the City of Atwater; no less than six (6) nails per shingle will be accepted.

14. Contractor must comply with all current applicable California Title 24, Part 6 (Building Energy Efficiency Standards) requirements.

Material information must be included in submittal.

15. Remove and install manufacturer ridge cap shingles to match roofing materials on all ridge areas. Contractor will ensure all ridge caps are installed straight and true.

16. All valleys will be flashed with galvanized metal flashing per code, if applicable.

17. Contractor will install new galvanized diverters at all exterior sides. New diverters will be primed and painted to match roofing materials; pre-finished matching roof color will be acceptable.

18. Contractor will install leak barriers around all new and existing vents, pipes, electrical, etc. Flashings will be factory made and have a rubber seal integrated into the roof jack to ensure a water tight seal; a sealant will not be acceptable.

19. Contractor will supply and install all flashing, roof vents and other roofing materials necessary for completion of project.

20. Contractor will provide a three year (3-year) or longer watertight guarantee on roofing material.

21. Contractor will provide all paint. The Authority will provide colors choices to match the adjacent units within the complex.

22. The contractor is responsible to protect and keep water intrusion sole expense once the work has commenced. Contractor must use all available means to plan for rain and/or any other moisture that is forecasted during the project. By no means will this afford the contractor from liability if damage occurs because said means were inaccurate and/or inadequate. The contractor may from time to time discuss with the Authority on weather forecasts and information may be provided, but it will be at the sole discretion of the contractor to use any available information in planning the work. It will not relieve the contractor of liability if information is inaccurate and/or incorrect. If weather causes delays in the project, schedules will be extended to equal amount of time and/or days that the weather caused delays. The extension of time will be reviewed with written requests from the contractor to the Authority for consideration immediately after delay occurs, no later than three (3) calendar days.

23. All work must comply with local municipal building codes. The contractor is responsible for coordinating and passing all required city/county inspections at each phase of the project specifically the pre-deck/roof-nailing (mid-roof) inspection and the final completion inspection before moving forward to the next phase of work especially the following:

A. After demolition of all roofing materials are completely removed and prior to commencement of repairs.

B. After all repairs to all framing members, truss and structural repairs.

C. After all sheeting, fascia, flashing & sheet metal is installed.

VIII. Insulation

1. All attic insulation, blow-in insulation, batts, etc., will be removed and properly disposed of offsite. Contractor will install new insulation in all attic areas. Insulation shall be installed to meet or exceed current California Title 24 energy requirements and all applicable building code requirements. If access is limited, it must be blown-in prior to roof sheeting or insulation batts are to be used.

2. All fire-damaged or smoke-damaged, wall insulation shall be removed and replaced to meet current code requirements in all exposed wall cavities. All penetrations and openings shall be sealed with rodent-resistant foam sealant as required by current codes.

3. All insulation must be installed as required by current codes.

IX. Sheetmetal

1. Remove and replace ductwork as necessary to facilitate roof repairs and restoration of fire-damaged areas. Any damaged ductwork identified during construction shall be replaced with new materials meeting current code requirements. This requirement includes, but is not limited to, HVAC ductwork, exhaust systems, and associated components affected by the fire restoration work.

2. Remove damaged gable vents. Install new gable vents in the same locations. New vents must match original.

3. All joints to have approved tape/sealant/clamps to properly seal joints.

4. All pipe roof jacks to have a rubber seal integrated into the jack to seal pipes. Caulking and sealants will not be allowed.

5. All roof sheet metal to be properly installed and nailed to prevent water intrusions and movement.

6. All sheet metal pipe to be properly sized to code.

X. Electrical

1. All electrical work will meet all current electrical building codes.

2. All appliances must have dedicated circuits as required by code.

3. Remove and replace wiring as needed for fire refurbishment and to bring up to code. New wiring must meet current electrical codes. Aluminum wiring will not be accepted without prior written approval from the Authority.

4. All circuits will be properly sized with proper breakers and wiring to meet all current electrical codes.

5. Contractor will prepare unit electrically and install separate hard-wired smoke detectors and hard-wired carbon monoxide detectors as required by fire and building codes. Combination smoke and carbon monoxide detectors will not be accepted. Detectors must be alternating current (A/C) powered with a battery backup.

6. Electrical wiring for hardwired interconnected A/C smoke detectors and hardwired interconnected A/C carbon monoxide detectors shall be installed in a daisy-chain configuration utilizing 3-conductor cabling (including a dedicated interconnect/signal wire) on a single shared branch circuit, ensuring that if any single detector is triggered, all alarms in the network sound simultaneously.

7. Refer to Section XI, Hardwired Smoke Detector and Hardwired Carbon Monoxide Detector, for further requirements.

8. For subpanel(s) that must be replaced, it will be replaced with a must be a currently manufactured panel, with parts readily available for repairs/replacements. Sub-panel replacement to accommodate all new breakers with a minimum of 2 spare circuits for future use.

9. All wiring will be located within the walls and ceilings, no wire moldings, electrical metallic tubing (EMT) etc., will be allowed unless required by code and accepted in writing by the Authority.

10. Remove and replace all fire damaged light fixtures, wiring devices and associated components as needed only.

A.

glass with white detail or equal. All outside porch lights shall be Black Exterior LED Wall Light with Prismatic Glass Globe or equal.

11. Remove and replace damaged outlets, switches and cover plates with like. Color will be ivory.

12. All wiring will be properly secured and installed in a workmanlike manner. Home runs will be neatly run, secured and with proper spacing on top of ceiling joists.

13. Any wiring penetrating a fire wall will have an appropriately sized schedule 40 electrical conduit for protection per code.

14. All outlets within a 6-foot radius of a water source must have or be Ground Fault Circuit Interrupter (GFCI) breakers, as required by code; bathroom(s), kitchen(s) and exterior receptacles GFCI will be located at the outlets; other outlets may have homeruns as allowable by the electrical code.

15. All finish electrical will be installed after interior painting has been completed.

16. Damaged Junction boxes will be replaced.

XI. Hardwired Smoke Detector and Hardwired Carbon Monoxide

Detector

1. Contractor shall Install new separate hardwired interconnected

A/C smoke detectors and hardwired interconnected A/C carbon monoxide detectors after painting.

2. The installed smoke detectors and carbon monoxide detectors must have devices to alert hearing and/or visually impaired individuals when an alarm goes off. Hardwired detectors must have a battery backup.

3. Smoke and carbon monoxide combination detector shall not be installed.

4. Contractor shall supply and install hardwired interconnected smoke detector in each bedroom and one hardwired, interconnected smoke detectors in the hallway.

5. Contractor must install a hardwired interconnected smoke detector in the living room area.

6. Hardwired interconnected smoke detectors must be wired in a daisy-chain configuration utilizing 3-conductor cabling (including a dedicated interconnect/signal wire) on a single shared branch circuit, ensuring that if any single detector is triggered, all alarms in the network sound simultaneously. The installation must comply with NFPA 72 and local electrical codes.

7. When mounted on the ceiling hardwired interconnected smoke

8. When mounted on the wall hardwired interconnected smoke

9. Contractor must install hardwired interconnected A/C carbon monoxide detectors in the immediate area of the bedrooms in the hallway.

10. Hardwired interconnected A/C carbon monoxide detectors shall be installed on wall at no greater than 8 Feet high.

11. Contractor must test installed hardwired interconnected A/C smoke detectors and hardwired interconnected A/C carbon monoxide detectors upon completion of project and shall ensure units are in working order and are not defective in any way.

XII. Heating, Vents & Air Conditioning (HVAC): Assessment, Repair, Servicing

1. The existing HVAC package unit sustained wiring damage to the thermostat (T-stat). If determined to be salvageable, the existing unit shall be repaired and reused.

2. Contractor shall furnish and install a new, code-compliant, ENERGY STAR-certified programmable thermostat compatible with all unit operations. Install new 18-gauge, sunlight-rated (UV-resistant) thermostat wiring with a minimum of 5 conductors. Include the proposed thermostat make and model with the submittal.

3. The Contractor shall be solely responsible for inspecting, repairing, and performing a comprehensive service on the existing HVAC unit.

Work shall include, but is not limited to, repairing thermostat wiring, inspecting and cleaning the condenser and cooling coils, straightening fins, and testing the system to verify it operates as designed.

4. Upon completion of the inspection and servicing, the Contractor shall submit a written assessment advising the Authority of the unit's operational condition and remaining service life.

5. Heating, Vents & Air Conditioning (HVAC): Alternate Line Item 1: Ground-Level Relocation

A. Contractor shall provide an additive line item to relocate the

HVAC package unit to the existing ground-level concrete back patio location

B. Pricing for this alternate shall be all-inclusive and cover all labor, materials, and equipment required to complete the relocation, including redirecting all associated ductwork and installing a heavy-duty air conditioner (A/C) security cage.

6. Heating, Vents & Air Conditioning (HVAC): Alternate Line Item 2: Full HVAC Unit Replacement

A. Contractor shall provide an additive line item to furnish and install a new HVAC package unit with a minimum efficiency rating of 14 SEER (or current regional SEER2 equivalent).

B. This line item shall include all costs for materials, labor, equipment, overhead, and profit, as well as the lawful recovery, removal, and disposal of existing refrigerant (Freon) in strict accordance with EPA regulations.

C. New Curb Installation: If the roof is replaced, the Contractor shall furnish and install a new pre-manufactured metal roof curb prior to the new roof installation. The curb must be properly flashed and sealed to ensure a completely watertight installation that prevents moisture intrusion.

D. Existing Curb Reuse: If the existing roof curb is left in place, the Contractor shall inspect and verify that it is structurally sound, performs as new, and is sealed to be completely watertight

7. The contractor shall clean and/or replace all registers, ducting, and return grills that have been broken or damaged.

8. All interior vents, registers, return grills and thermostats to be installed/reinstalled after interior painting has been completed.

9. All duct work (if needed) must be properly sized upon installation.

10. Contractor shall furnish and install new non-fused disconnect boxes with built-in GFCI outlets, mounted directly to the unit or roof curb. Contractor shall also install a new circuit breaker in the main or sub-panel in accordance with manufacturer specifications and local electrical codes. Include all material data and product specifications in the submittal.

11. All required testing will be properly conducted. All title 24 HERS testing requirements must be adhered to and copies of the HERS certificates must be submitted to the Authority prior to release of final payment. Cost of tests will be the responsibility of the contractor.

XIII. Sheetrock/Drywall and Texture

1. Properly remove and replace all fire damaged ceiling and wall sheetrock from the laundry room and hallway.

2. Remove any wall sheetrock as needed to replace electrical, plumbing, damaged areas, etc.

3. Properly repair and/or replace all fire-damaged and smoke-damaged drywall, ceilings, and wall assemblies within the laundry room, hallway, and all affected areas as necessary so that no damaged sheetrock remains at project completion.

4. Sheetrock will be replaced as needed for a clean and consistent finish throughout the unit.

5. Sheetrock grabber screws will be used. Nailing will not be allowed.

6. Tape, top, skim sheetrock, and texture (Finish texture to match existing).

7. Sheetrock will be properly primed prior to the texture coat being applied where repairs were made.

8. Fasteners are to be installed per code.

9. Any fasteners that pass-through/tear the sheetrock paper will be considered improperly fastened and will require another fastener.

10.

11. All sheetrock ends must fall on the center of framing members.

If not possible, proper backing will be installed.

12. Sheetrock corner clips will not be allowed.

XIV. Painting and Texture

1. Contractor shall paint all repaired and restored interior surfaces, including walls, ceilings, doors, trim, jambs, and castings as required to provide a consistent finished appearance throughout the unit. The Authority is not anticipating any painting on the unit exterior.

2. The interior paint will be semi-gloss, color: Navajo White or equal specification within submittal.

3. No…