About this file

This is a project manual and bid notice for the Department of State Hospitals (DSH) Electrical Service Upgrade project at Napa State Hospital in Napa, California, issued by the California Department of General Services (DGS) Real Estate Services Division. The project comprises labor, materials, and services for major electrical infrastructure work including demolition, excavation, trenching, installation of electrical conduit, backfill, fencing, cast-in-place concrete, asphalt patching and paving, electrical raceway, wiring, cable, transformers, panelboards, switchgear, and generator coordination with PG&E. The project is managed by James Villapudua (DGS Project Director) and designed by consultant JC Chang and Associates under electrical engineer Hector Lacsa. The project manual contains comprehensive specifications organized into two books addressing procurement requirements, contracting specifications, facility construction standards, and site infrastructure improvements. Specifications include detailed requirements for selective demolition, concrete reinforcing, cast-in-place concrete, metal fabrications, penetration firestopping, sealants, and door hardware, with referenced standards from ACI, ASTM, and other governing bodies. The project documentation references preinstallation conferences, mock-ups, field samples, and coordination with existing site operations.

The specifications establish detailed material requirements, quality control procedures, and execution standards for all construction activities. Key provisions include requirements for fly ash in concrete mixes, air-entraining admixtures for freeze-thaw protection, nonshrink grout specifications, and penetration firestopping systems rated in accordance with ASTM E814 or UL 1479. The project requires compliance with 2022 California Building Code standards, DSH representative inspections and approvals at critical phases, field quality control testing including concrete cylinder testing at seven and 28 days, and special inspection for reinforcement placement and welding. Contractors must maintain preconstruction photographs, conduct predemolition conferences, provide protection measures for occupied adjacent areas, and implement waste management and recycled content certification procedures. The specifications incorporate requirements for DVBE (Disabled Veteran Business Enterprise) participation, performance and payment bonds, and comprehensive documentation through a web-based project management system.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES

REAL ESTATE SERVICES DIVISION

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

PROJECT MANUAL – Book II of II

SPECIFICATIONS

APPENDICES

FOR:

AUGMENTATION OF ELECTRICAL

SERVICE CAPACITY

DEPARTMENT OF STATE HOSPITALS

NAPA STATE HOSPITAL

NAPA, NAPA COUNTY, CALIFORNIA

JAMES VILLAPUDUA, Project Director West Sacramento, California

Consultants: JC Chang and Associates

December 19, 2025 000000000014109

PROJECT TITLE PAGE

RESDMSTR: 02/03/2014v1 00 01 01 - 1 000000000014109

DOCUMENT 00 01 01

Title : AUGMENTATION OF ELECTRICAL

SERVICE CAPACITY

Client Agency : Department of State Hospitals

Location : 2100 Napa Vallejo Highway

NAPA , NAPA COUNTY, CALIFORNIA..]

Project Number : 000000000014109

Project Director : James Villapudua State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (279) 799-4407 Email: James.Villapudua@dgs.ca.gov

Consultant : JC Chang and Associates Hector Lacsa Telephone Number: (310) 212-7644 Email: HLacsa@jccainc.com mailto:James.Villapudua@dgs.ca.gov mailto:HLacsa@jccainc.com

RESDMSTR: 02/03/2014v1 00 01 01 - 2 000000000014109

THIS PAGE IS INTENTIONALLY LEFT BLANK

CERTIFICATIONS PAGE

RESDMSTR: 02/03/2014v1 00 01 05 - 1 000000000014109

DOCUMENT 00 01 05

PROJECT TITLE : DSH ELECTRICAL SERVICE UPGRADE

NAPA STATE HOSPITAL

CLIENT AGENCY : DEPARTMENT OF STATE HOSPITALS

LOCATION : 2100 NAPA VALLEJO HIGHWAY

NAPA, NAPA COUNTY, CALIFORNIA 94558

PROJECT NUMBER : 000000000014109

OWNER : STATE OF CALIFORNIA

PROJECT DIRECTOR : James Villapudua Department of General Services Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: (279) 799-4407 Email : james.villapudua@dgs.ca.gov

CONSULTANT J.C. Chang & Associates, Inc. Hector Lacsa, P.E.

385 Van Ness Ave., Torrance, CA 90501

(310) 212-7644 HLacsa@jccainc.com

Date Signed: 01/14/2026 Date Signed: 01/14/2026 Date Signed: 01/14/2026

Stephen B. Wagner, LEED AP

ARCHITECT

James Redmond, PE, LEED AP

CIVIL ENGINEER

Robert Onishi, SE

STRUCTURAL ENGINEER

Date Signed: 01/14/2026 Date Signed: 01/14/2026

Hector Lacsa, PE

ELECTRICAL ENGINEER

Robert Nolan, PE

LEED AP, CEM, CMVP, PF

MECHANICAL ENGINEER

RESDMSTR: 02/03/2014v1 00 01 05 - 2 000000000014109

PROJECT TITLE : DSH ELECTRICAL SERVICE UPGRADE

NAPA STATE HOSPITAL

CLIENT AGENCY : DEPARTMENT OF STATE HOSPITALS

LOCATION : 2100 NAPA VALLEJO HIGHWAY

NAPA, NAPA COUNTY, CALIFORNIA 94558

PROJECT NO. : 000000000014109

REGULATORY REVIEWS:

DSA ACCESS COMPLIANCE OSHPD

OSFM

TABLE OF CONTENTS

RESDMSTR: 6/20/2025 00 01 10 - 1 000000000014109

DOCUMENT 00 01 10

TABLE OF CONTENTS

BOOK I

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 only 00 01 10 Table of Contents .......................................................................... 1 through 3 00 01 15 List of Drawings ............................................................................. 1 through 15

BIDDING REQUIREMENTS

Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 10 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3

00 41 00 Bid Form (Sample) ........................................................................ 1 through 9 00 43 13 Bidder’s Bond ................................................................................ 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 3 00 45 46 Payee Data Record ....................................................................... 1 through 2

CONTRACTING REQUIREMENTS

Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 3 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 14

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 Summary ....................................................................................... 1 through 4 01 21 00 Allowances .................................................................................... 1 through 2 01 25 00 Substitution Procedures ................................................................. 1 through 2

RESDMSTR: 6/20/2025 00 01 10 - 2 000000000014109

01 29 00 Payment Procedures ..................................................................... 1 through 3 01 31 00 Project Management and Coordination .......................................... 1 through 7 01 31 25 Web-based Project Management System ...................................... 1 through 4 01 32 00 Construction Progress Documentation .......................................... 1 through 01 32 33 Photographic Documentation ........................................................ 1 through 3 01 33 00 Submittal Procedures .................................................................... 1 through 8 01 35 16 ........................................................................................ Alteration Procedures 1 through 7 01 35 53 Security Procedures ...................................................................... 1 through 3 01 40 00 Quality Requirements .................................................................... 1 through 6 01 60 00 Product Requirements ................................................................... 1 through 5 01 73 00 Execution ...................................................................................... 1 through 6 01 74 19 Construction Waste Management and Disposal ............................ 1 through 4 Form 01 74 19.01 Construction Waste Estimate......................................................... 1 only 01 74 19.02 Waste Management Report ........................................................... 1 through 2 Section 01 74 20 Recycled Content Certification ....................................................... 1 through 4 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 2 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) ...................................................................................................... 1 through 2 01 77 00 Closeout Procedures ..................................................................... 1 through 12 Form STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only Document R1257572 DGS Napa State Hospital Building 168 Hazardous Materials Survey 1 through 98

BOOK II

FACILITY CONSTRUCTION SUBGROUP

DIVISION 02 – EXISTING CONDITIONS

Section 02 41 19 Selective Demolition ...................................................................... 1 through 6

DIVISION 03 – CONCRETE

Section 03 20 00 Concrete Reinforcing ..................................................................... 1 through 4 03 30 00 Cast-in-Place Concrete.................................................................. 1 through 20

DIVISION 05 – METALS

Section 05 55 00 Metal Fabrications ......................................................................... 1 through 8

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 84 13 Penetration Firestopping ................................................................ 1 through 6 07 92 00 Sealants ........................................................................................ 1 through 4

DIVISION 08 – OPENINGS

Section 08 71 00 Door Hardware .............................................................................. 1 through 4

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

RESDMSTR: 6/20/2025 00 01 10 - 3 000000000014109

Section 23 05 29 Hangers and Supports for HVAC Piping and Equipment ............... 1 through 12 23 07 19 HVAC Piping Insulation ................................................................. 1 through 20 23 21 13 Hydronic Piping ............................................................................. 1 through 14

23 22 13 Steam and Condensate Heating Piping ......................................... 1 through 8

DIVISION 26 – ELECTRICAL

Section 26 00 10 Supplemental Requirements for Electrical ..................................... 1 through 14 26 05 13 Medium Voltage Cables ................................................................. 1 through 8 26 05 19 Low Voltage Electrical Power Conductors and Cables .................. 1 through 6 26 05 26 Grounding and Bonding for Electrical Systems .............................. 1 through 8 26 05 29 Hangers and Supports for Electrical Systems ................................ 1 through 6 26 05 33 Raceway and Boxes for Electrical Systems ................................... 1 through 18 26 05 43 Underground Ducts and Raceways for Electrical Systems ............ 1 through 12 26 05 48 Vibration and Seismic Controls for Electrical Systems ................... 1 through 8 26 05 53 Identification for Electrical Systems ............................................... 1 through 12 26 05 73 Power System Studies................................................................... 1 through 14 26 08 00 Commissioning of Electrical Systems ............................................ 1 through 6 26 09 13 Electrical Power Monitoring ........................................................... 1 through 14 26 12 19 Pad Mounted, Liquid-Filled, Medium Voltage Transformers ........... 1 through 12 26 13 26 Medium Voltage Metal-Clad Switchgear ........................................ 1 through 26 26 24 13 Switchboards ................................................................................. 1 through 14 26 24 16 Panelboards .................................................................................. 1 through 10 26 27 13 Electricity Metering ........................................................................ 1 through 8 26 27 16 Electrical Cabinets and Enclosures................................................ 1 through 8

DIVISION 29 – RESERVED (NOT USED)

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 30 – RESERVED (NOT USED)

DIVISION 31 – EARTHWORK

Section 31 10 00 Site Clearing .................................................................................. 1 through 4 31 20 00 Earth Moving ................................................................................. 1 through 8 31 23 33 Trenching and Backfilling ............................................................... 1 through 10

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 12 16 Asphalt Paving .............................................................................. 1 through 8 32 13 13 Concrete Paving ............................................................................ 1 through 14 32 17 23 Pavement Markings ....................................................................... 1 through 4 32 31 13 Chain Link Fences and Gates........................................................ 1 through 10

DIVISION 33 – UTILITIES

Section 33 05 00 Common Work Results for Utilities ................................................ 1 through 10 33 15 15 Site Water Distribution Piping ........................................................ 1 through 10

END OF DOCUMENT

RESDMSTR: 6/20/2025 00 01 10 - 4 000000000014109

LIST OF DRAWINGS

RESDMSTR: 02/03/2014 00 01 15 - 1 000000000014109

DOCUMENT 00 01 15

Sheet Number Description

GENERAL

T0.1 TITLE SHEET

T0.2 FIRE ACCESS SITE PLAN

T0.3 STATE FIRE MARSHALL TRIAGE LIST LOCAL FIRE AUTHORITY

T0.4 BUILDING INFORMATION

CIVIL

C0.1 CIVIL COVER SHEET

C0.2 OVERALL SITE PLAN

C1.1 DEMOLITION PLAN - AREA 1

C1.2 DEMOLITION PLAN - AREA 2

C1.3 ENLARGED DEMOLITION PLAN

C2.1 SITE PLAN - AREA 1

C2.2 SITE PLAN - AREA 2

C2.3 ENLARGED SITE PLAN

C8.1 CIVIL DETAILS

C8.2 CIVIL DETAILS

C8.3 CIVIL DETAILS

STRUCTURAL

S0.1 STRUCTURAL NOTES

S2.1 BASEMENT PLANS – NORTH MECHANICAL & SOUTH MECHANICAL

ROOMS

S2.2 BUILDING 282 FLOOR PLANS

S2.3 FLOOR PLANS

S3.1 STRUCTURAL DETAILS

MECHANICAL

M1.1 MECHANICAL DEMOLITION BASEMENT PLAN – MECHANICAL ROOM

N & S

M1.2 MECHANICAL DEMOLITION AND NEW WORK PLAN – CHILLER

ROOM 282

ELECTRICAL

E0.1 ELECTRICAL SYMBOL LIST

E0.2 ELECTRICAL SITE PLAN

E0.3 ENLARGED ELECTRICAL SITE PLAN

E0.4 ELECTRICAL SINGLE LINE DIAGRAM – DEMOLITION

RESDMSTR: 02/03/2014 00 01 15 - 2 000000000014109

E0.5 ELECTRICAL SINGLE LINE DIAGRAM – NEW

E0.6 ELECTRICAL SINGLE LINE DIAAGRAM – NEW

E0.7 ELECTRICAL PANEL SCHEDULE

E0.8 ELECTRICAL PANEL SCHEDULE

E1.1 ELECTRICAL DEMOLITION BASEMENT PLAN – N &S MECHANICAL

ROOM

E1.2 ENLARGED DEMOLITION BASEMENT PLAN – BLDG.282

E1.3 ENLARGED ELECTRICAL SERVICE DEMOLITION PLAN

E1.4 ELECTRICAL DEMOLITION BASEMENT PLAN – MECHANICAL ROOM

1A & 34

E2.1 ELECTRICAL NEW WORK BASEMENT PLAN – N &S MECHANICAL

ROOM

E2.2 ENLARGED ELECTRICAL NEW WORK PLAN BLDG. 282

E2.3 ENLARGED ELECTRICAL SERVICE - NEW WORK PLAN

E2.4 ELECTRICAL NEW WORK BASEMENT PLAN – MECHANICAL ROOM

1A & 34

E2.5 ENLARGED ELECTRICAL SERVICE – NEW WORK PLAN

E3.1 ELECTRICAL DETAILS

E3.2 ELECTRICAL DETAILS

E3.3 ELECTRICAL DETAILS

E3.4 BLDG. 282 DEMOLITION WORK AND DETAILS

E3.5 ELECTRICAL DETAILS

E7.1 ELECTRICAL SPECIFICATIONS NOTES

E8.1 PG&E DRAWINGS

END OF DOCUMENT

SELECTIVE DEMOLITION

024119 - 1 000000000014109

SECTION 024119

SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. The Work of this Section Includes:

1. Demolition and removal of selected portions of building and site elements.

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage; prepare for reuse; and reinstall where indicated.

C. Existing to Remain: Existing items of construction that are not to be removed.

1.3 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.4 COORDINATION

A. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

6. Review and finalize protection requirements.

7. Review procedures for noise and dust control.

024119 - 2 000000000014109

8. Review storage, protection, and accounting for items to be removed for reinstallation.

1.6 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection and for dust and noise control. Indicate proposed locations and construction of barriers.

1.7 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Notify Owner of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

C. Hazardous Materials:

1. It is not expected that hazardous materials will be encountered in the Work.

a. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Owner. Hazardous materials will be removed by Owner under a separate contract.

D. On-site sale of removed items or materials is not permitted.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

024119 - 3 000000000014109

B. Review Project Record Documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs or video.

1. Inventory and record the condition of items to be removed for reinstallation.

Photograph or video conditions that might be misconstrued as damage caused by removal.

2. Photograph or video existing conditions of adjoining construction including finish surfaces, that might be misconstrued as damage caused by selective demolition operations or removal of items for salvage or reinstallation.

3.2 PREPARATION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.

3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

4. Cover and protect furniture, furnishings, and equipment that have not been removed.

B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Owner, items may be removed to a suitable, protected storage location and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.3 UTILITY SERVICES AND BUILDING SYSTEMS

A. Existing Services/Systems to Remain: Maintain utilities and building systems and equipment to remain and protect against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utilities and building systems serving areas to be selectively demolished.

1. Owner will arrange to shut off indicated utilities when requested by Contractor.

2. If disconnection of utilities and building systems will affect adjacent occupied parts of the building, provide temporary services/systems that bypass area of

024119 - 4 000000000014109 selective demolition and that maintain continuity of services/systems to those parts of the building.

3. Demolish and remove existing building systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment and components.

4. Abandon existing building systems, equipment, and components indicated on Drawings to be abandoned in place.

a. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

b. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

5. Remove and reinstall existing building systems, equipment, and components indicated on drawings to be removed and reinstalled or removed and salvaged:

a. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment and components; when appropriate, reinstall, reconnect, and make equipment operational.

3.4 REINSTALL

A. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

3.5 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required.

Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

024119 - 5 000000000014109

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Maintain fire watch as direction by Owner after flame-cutting operations.

5. Maintain adequate ventilation when using cutting torches.

6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

7. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction.

Provide alternate routes around closed or obstructed trafficways if required by authorities having jurisdiction.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

024119 - 6 000000000014109

CONCRETE REINFORCING

032000 - 1 000000000014109

SECTION 032000

CONCRETE REINFORCING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Steel reinforcement bars.

B. Related Requirements:

1. Section 033000 "Cast-in-Place Concrete”.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Review the following:

a. Special inspection and testing and inspecting agency procedures for field quality control.

b. Steel-reinforcement installation.

1.3 ACTION SUBMITTALS

A. Product Data: For the following:

B. Each type of steel reinforcement. Shop Drawings: Comply with ACI SP-066:

1. Include placing drawings that detail fabrication, bending, and placement.

2. Include bar sizes, lengths, materials, grades, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, location of splices, lengths of lap splices, details of mechanical splice couplers, details of welding splices, tie spacing, hoop spacing, and supports for concrete reinforcement.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage, and to avoid contact with earth.

032000 - 2 000000000014109

PART 2 - PRODUCTS

2.1 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A615/A615M, Grade 60.

2.2 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded-wire reinforcement in place.

1. Manufacture bar supports from steel wire, plastic, or precast concrete in accordance with CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

a. For concrete surfaces exposed to view, where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire, all-plastic bar supports, or CRSI Class 2 stainless steel bar supports.

B. Steel Tie Wire: ASTM A1064/A1064M, annealed steel, not less than 0.0508 inch (1.2908 mm) in diameter.

2.3 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that reduce bond to concrete.

3.2 INSTALLATION OF STEEL REINFORCEMENT

A. Comply with CRSI's "Manual of Standard Practice" for placing and supporting reinforcement.

B. Accurately position, support, and secure reinforcement against displacement.

1. Locate and support reinforcement with bar supports to maintain minimum concrete cover.

2. Do not tack weld crossing reinforcing bars.

C. Preserve clearance between bars of not less than 1 inch (25 mm), not less than one bar diameter, or not less than 1-1/3 times size of large aggregate, whichever is greater.

032000 - 3 000000000014109

D. Provide concrete coverage in accordance with ACI 318 (ACI 318M).

E. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

F. Lap splices minimum length as required for Class B splice (2' – 0"), unless otherwise noted. Splices shall be well staggered.

G. Doweled Joints: Install dowel bars and support assemblies at joints where indicated.

3.3 INSTALLATION TOLERANCES

A. Comply with ACI 117 (ACI 117M).

3.4 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Inspections:

1. Steel-reinforcement placement.

2. Steel-reinforcement mechanical splice couplers.

3. Steel-reinforcement welding.

END OF SECTION 032000

032000 - 4 000000000014109

CAST-IN-PLACE CONCRETE

033000 - 1 000000000014109

SECTION 033000

CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Structural concrete for building and structural elements, concrete floors (supported and unsupported), and exterior concrete flatwork.

2. Expansion and contraction joint devices associated with concrete Work.

3. Equipment pads.

B. Related Sections:

1. Section 03 20 00 - Concrete Reinforcing.

1.2 REFERENCES

A. ACI 117 - Tolerances for Concrete Construction and Materials.

B. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete.

C. ACI 301 - Specifications for Structural Concrete.

D. ACI 302.1R - Guide for Concrete Floor and Slab Construction.

E. ACI 304R - Guide for Measuring, Mixing, Transporting and Placing Concrete.

F. ACI 305R - Hot Weather Concreting.

G. ACI 306.1 - Cold Weather Concreting.

H. ACI 308.1 - Curing Concrete.

I. ACI 318 - Building Code Requirements for Structural Concrete and Commentary.

J. ACI 350 - Code Requirements for Environmental Engineering Concrete Structures.

K. ACI SP-66 - ACI Detailing Manual.

L. AISC - Manual of Steel Construction.

M. ASTM C33 - Concrete Aggregates.

033000 - 2 000000000014109

N. ASTM C39 - Test Method for Compressive Strength of Cylindrical Concrete Specimens.

O. ASTM C94 - Ready-Mixed Concrete.

P. ASTM C150 - Portland Cement.

Q. ASTM C171 - Sheet Materials for Curing Concrete.

R. ASTM C192 - Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory.

S. ASTM C260 - Air-Entraining Admixtures for Concrete.

T. ASTM C309 - Liquid Membrane-Forming Compounds for Curing Concrete.

U. ASTM C330 - Lightweight Aggregates for Structural Concrete.

V. ASTM C494 - Chemical Admixtures for Concrete.

W. ASTM C618 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.

X. ASTM D994 - Preformed Expansion Joint Filler for Concrete (Bituminous Type). Filler Not Exposed to Traffic or Weather.

Y. ASTM C1107 - Packaged Dry, Hydraulic-Cement Grout (Nonshrink).

Z. ASTM D1751 - Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).

AA. ASTM D1752 - Preformed Sponge Rubber Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction.

BB. ASTM D6690 - Joint and Crack Sealants, Hot Applied, for Concrete and Pavements.

1.3 SUBMITTALS

A. Shop Drawings: Indicate locations and details of proposed construction and control joints.

B. Product Data

1. Product data for products and materials indicated.

2. Manufacturer’s technical bulletins and installation/application instructions.

3. Accelerator admixture test results in accordance with 2.2.E.2.

4. Material Safety Data Sheets (MSDS).

C. Samples

1. Submit two, 6-inch long samples of materials used for expansion/contraction

033000 - 3 000000000014109 joints and control joints.

D. Certificates

1. Manufacturer’s Certificate: Certify that products meet or exceed specified requirements.

E. Mix Designs

1. Submit separate mix design for each type of concrete specified.

2. Submit certified mix designs with and without fly ash for comparison.

a. For further Mix Design criteria, refer to Part 2, “Mix Designs” article.

3. Submit test results on three cylinders for each mix design.

a. Prepare, age, and cure in accordance with ASTM C192.

b. Test at seven and 28 days in accordance with ASTM C39.

c. The test cylinders must have been prepared from a batch of the proposed mix design with fly ash.

d. Where the 28-day tests do not meet specified strength requirements, the mix design will not be acceptable.

F. Concrete Placement Checklist: When required by the DSH Representative, provide checklist in a form approved by the DSH Representative. Checklist to indicate items of Work that must be signed by the Contractor and the DSH Representative prior to placement of concrete.

1.4 COORDINATION

A. Coordinate the installation of items to be embedded in concrete and provide openings in the concrete necessary for performance of Work of other Sections.

B. Coordinate the placement of joint devices with erection of concrete formwork and placement of form accessories.

C. Request schedules of items specified under other Sections, but installed under this Section, in addition to templates, template dimensions, and shop drawings required for the installation of those items.

D. Coordinate finish characteristics required by Work of other Sections with curing methods and finishing of concrete surfaces.

E. Concrete which is to receive application of other Work must be water-cured only, and maintained free from other formwork and curing materials, unless otherwise accepted by the DSH Representative.

1.5 MOCK-UP AND FIELD SAMPLES

A. Construct and erect a field sample as follows

033000 - 4 000000000014109

1. For architectural concrete surfaces receiving special treatment or finish as result of formwork.

2. At the requested by the DSH Representative.

B. Sample Panel Requirements

1. Sufficient size to indicate special treatment or finish required.

2. Located as directed by the DSH Representative.

3. Approved sample may remain as part of Work.

C. Approved sample panel is considered basis of quality for the finished Work. Keep sample panel exposed to view for duration of Work.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle packaged materials in the manufacturer’s original, sealed containers, each clearly identified with the manufacturer’s name, and name and type of product.

B. Store materials subject to damage by dirt and moisture in a clean, dry location, off the ground, and suitably protected.

C. Store coarse and fine aggregates in separate, covered bins.

D. Store bulk cement in covered bins.

PART 2 PRODUCTS

2.1 MATERIALS

A. Concrete: Ready-mixed, ASTM C94.

B. Cement: ASTM C150.

1. Type II, or Type V may be used if type is not indicated on Drawings.

2. Type V required at all foundations, retaining walls, fence post footings, and any other concrete in contact with soil.

C. Fly Ash: ASTM C618

D. Aggregate: ASTM C33.

1. Aggregate size for footings, grade beams and pile caps, and filling of steel piles must be 1-1/2 inch maximum.

2. Aggregate for walls, support slabs, beams, pilasters, columns, and slabs on grade must be 1 inch maximum, and be mixed with pea gravel (minimum of 10 percent by weight, maximum of 15 percent by weight).

3. All aggregate must be of a type producing low shrinkage.

033000 - 5 000000000014109

a. Coarse Aggregate: Granite, limestone, or Clayton blue rock.

b. Fines: Clean and well graded sands.

E. Acquire cement, flash, and aggregate from same source for all Work.

F. Water: Potable, clean, not detrimental to concrete, containing less than 500 ppm of chlorides.

2.2 ADMIXTURES

A. Water-Reducing Admixture: ASTM C494.

1. Manufacturers

a. Euclid Chemical Company, Eucon WR.

b. Master Builders/BASF; Pozzolith 200N.

c. Sika Chemical Corp; Plastocrete 161.

B. Water-Reducing and Retarding Admixture: ASTM C494.

1. Manufacturers

a. Euclid Chemical Company; Eucon Retarder-75.

b. Master Builders/BASF; Pozzolith 80N.

c. Sika Chemical Corp; Plastiment.

d. W.R. Grace; #WRDA-64.

C. High Range Water-Reducing Admixture (Superplasticizer): ASTM C494.

1. Manufacturers

a. Euclid Chemical Company; Eucon 37.

b. Nox-crete Products Group; Plastiflow R.

c. W.R. Grace; # ADVA 360, Superplasticizer.

D. Air-Entraining Admixture: ASTM C260.

1. Manufacturers

a. W. R. Grace; DARAVAIR AT 60.

b. Cemix Products, Ltd; Cemix A.E.A.

c. Master Builders/BASF; MBAE90.

E. Accelerator: ASTM C494, Type C or E; Noncorrosive, nonchloride.

1. Manufacturers

a. Euclid Chemical Company; Accelguard 80.

b. Master Builders/BASF; Pozzutec 20.

c. W.R. Grace; Doraset 400.

033000 - 6 000000000014109

2. Submit test report from independent testing laboratory of results of an acceptable accelerated corrosion test method such as that using electrical potential measures, of minimum one year duration, demonstrating noncorrosive nature of product.

F. Bonding Admixture: Acrylic latex, nonrewettable type.

1. Manufacturers

a. Euclid Chemical Company; Flex-Con.

b. Dayon(Burke), Conspec; Strong Bond.

c. Master Builders/BASF; Thoro System Products, Acryl 60.

d. W. R. Grace; Daraweld C.

G. Mineral Admixture: Fly Ash Pozzolan; ASTM C618, Class F supplementary optional chemical and physical requirements of Tables 1A and 2A, except that the maximum sulfur trioxide must be 4 percent and the maximum loss on ignition must be 1.5 percent.

1. Manufacturers

a. Headwaters Resources; Fly Ash.

b. Boral Material Technologies.

c. The SEFA Group.

H. Corrosion Inhibitor: ASTM C494 Type C, All reinforced (including clips and ties) concrete in contact with soil must have a corrosion inhibitor added. The dosage rate for the corrosion inhibiting admixture must protect the reinforcing bars in concrete from chloride concentrations as high as 7,000 ppm. If a calcium nitrite inhibitor is used, the dosage rate must not be less than two gallons per cubic yard of concrete. The calcium nitrite inhibitor solution must contain a minimum of 30 percent calcium nitrite. A corrosion inhibitor is not necessary in any concrete placed without embedded steel.

1. Manufacturers

a. W.R. Grace, DCI.

b. Sika, CNI.

c. Euclid Chemical Company, Arrmatect.

I. Concrete Encasement Coloring Agent: Mix into concrete as required at the rate of 10 pounds of agent per cubic yard of concrete.

2.3 ACCESSORIES

A. Curing Compound: Liquid membrane, ASTM C309, type I; conforming to volatile organic compound (VOC) limits established in South Coast Air Quality Management District (SCAQMD) Rule 1113, Architectural Coatings.

1. Manufacturers

033000 - 7 000000000014109

a. Creteseal.

B. Sheet Curing Material: ASTM C171.

C. Hardeners: Clear, nonmetallic dust-on type.

1. Manufacturers

a. Basalite Concrete; Floor Hardener.

b. Dayton Superior; Emery Tuff.

c. Lambert Corp.; “Colorhard.”

D. Bonding Agent: Polyvinyl acetate, rewettable type, with visible tinted pigment to verify coverage.

1. Manufacturers

a. Euclid Chemical Company; Euco-Weld.

b. Larsen Products Corp.; Weld-Crete.

c. Dayton-Superior; Concrete Bonder J41.

d. CGM Incorporated, Perma Weld.

E. Bond Breaker: Nonstaining type, providing positive bond prevention.

1. Manufacturers

a. Nox-Crete; Silcoseal 2000F.

b. EDOCO Construction Chemical; Clean Lift 90 Bond Breaker WB.

c. Dayton Superior Chemical; Maxi-Tilt “E” WB Bond Breaker.

F. Structural Epoxy Bonding Adhesive: Two component, 100 percent solids compound suitable for use on dry or damp surfaces.

1. Manufacturers

a. Euclid Chemical Company; Eucopoxy LPL, MV or Euco#452 Eprox System, MV.

b. Sika Chemical Corporation; Sikadur 32 Hi-Mod.

c. EDOCO Construction Chemicals; Burkepoxy MV.

d. Dayton-Superior; Resi-Bond J58.

G. Nonshrink Grout: ASTM C1107; nonmetallic; capable of achieving a 95 percent bearing under a 4 by 4-foot baseplate when grout is placed at a fluid consistency.

1. Manufacturers

a. Euclid Chemical Company; Euco N-S Grout, or Hi-Flow Grout.

b. Master Builders/BASF; Masterflow 713 plus, Masterflow 928.

c. EDOCO Construction; EDOCO Nonferrous Nonshrink Grout.

d. W.R. Meadows; “Sealtight 588” Precision Grout.

e. Dayton-Superior; Sure-Grip High Performance Grout.

033000 - 8 000000000014109

f. Sika Chemical Corporation; Sika Grout 212.

H. Injection Grout for Splice Sleeves.

1. Early Strength: 3,000 psi or greater in 24 hours.

2. Ultimate Strength: 9,500 psi or greater in 28 days.

3. Nonshrink; capable of completely filling voids within sleeves.

4. Manufacturers

a. Erico In., Lenton Interlock; Erico Hy10L Grout.

b. Splice Sleeve North America, Inc.; SS Mortar.

c. Dayton Superior, Richmond DB Grout Sleeve Splice System; DBGS Splice

Grout.

I. Patching Mortar: Epoxy type, 100 percent solids, suitable for use on damp or dry surfaces.

1. Manufacturers

a. Euclid Chemical Company; Euco 456 Mortar.

b. Sika Chemical Corporation; Sikadur 43 Patch-Pak.

c. EDOCO Construction Chemicals; Burkepoxy Mortar.

J. Patching Compound for Vertical or Overhead Applications: Free flowing, polymer modified, cementitious topping.

1. Manufacturers

a. Euclid Chemical Company; Verticoat.

b. Dayton-Superior; Poly-Fast FS.

c. ARDEX Engineered Cement; ARDEX Poly-top.

d. Sika Chemical Corporation; Sikatop 121 Plus.

K. Abrasive Aggregate for Nonslip Finish

1. Manufacturers

a. Euclid Chemical Company; Nonslip Aggregate.

b. Lambert Corp; EMAG 20.

c. BASF Construction Chemicals; Frictex-NS.

d. Dayton-Superior; Emery Nonslip.

L. Evaporation Retardant

1. Manufacturers

a. Euclid Chemical Company; Eucobar.

b. Master Builders/BASF; Confilm.

c. W.R. Meadows Inc; Evapre.

d. Dayton-Superior; SureFilm (J-74)

e. Creteseal, CS2000.

033000 - 9 000000000014109

M. Clear Sealer: As specified in Section 09 61 00 for type.

2.4 JOINT DEVICES AND FILLER MATERIALS

A. Joint Filler Type A: ASTM D1751; Asphalt impregnated fiberboard or felt, 1/4 inch thick;

tongue and groove profile.

B. Joint Filler Type B: ASTM D1752; Closed cell polyvinyl chloride foam, resiliency recovery of 90 percent if not compressed more than 50 percent of original thickness.

C. Joint Filler Type C: ASTM D1752; Premolded sponge rubber, fully compressible with recovery rate of minimum 95 percent.

D. Epoxy Joint Filler: Two component, 100 percent solids compound; minimum 50 Shore D Hardness.

1. Manufacturers

a. Euclid Chemical Company; Euco 700.

b. Metzger/McGuire Co.; MM-80.

c. EDOCO Construction Chemicals; Burke Reflex Joint Filler.

E. Construction Joint Devices: Integral galvanized steel formed to tongue and groove profile, with removable top strip exposing sealant trough where indicated.

2.5 MIX DESIGNS

A. Cast-In-Place Concrete

1. Mix Designs must be in accordance with CBC Section 1905 and ACI 318, Section 5.2.

2. Concrete mixes must be designed to meet strengths specified and be of uniform density without segregation when placed.

3. Water-cement ratio which must control the amount of total water added to concrete for the following conditions:

Concrete

With Superplasticizer

Without Superplasticizer

Aggregate Size W/C Ratio W/C Ratio 1 inch 0.385 0.45 3/4 inch 0.375 0.44

4. Air Content

a. 4 to 6 percent for severe exposure such as concrete in exterior or freezing conditions.

b. 1.5 to 3.5 percent for mild exposure of interior condition.

5. Fly Ash

033000 - 10 000000000014109

a. Fly ash must be used only in mix designs with Portland cement Type II and IIA and must not be used with high early strength Portland cement Type III.

b. Reduction of Portland cement, by weight, is acceptable with addition of an equal weight of fly ash provided the cement reduction is not less than 25 percent nor more than 40 percent when compared to the mix design without fly ash.

6. Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

a. 1. Fly Ash: 25 percent.

b. 2. Combined Fly Ash and Pozzolan: 25 percent.

c. 3. Ground Granulated Blast-Furnace Slag: 50 percent.

d. 4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace

Slag: 50 percent portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.

7. Water Reducers

a. Use water-reducing admixtures in all concrete without superplasticizers.

b. Use water-reducing admixtures in all concrete with superplasticizers to allow proper mixing prior to adding superplasticizer.

8. Superplasticizers

a. Use type as recommended by manufacturer in the applicable temperature ranges allowed in all hydraulic structures and headworks.

b. Use superplasticizer in all concrete for pond structures.

c. Accomplish variations in slump, working time, and air content for flowable mixes by increasing or reducing superplasticizer dose or air-entraining admixture dose at the ready-mix plant only. Adjust the slump or air content at the jobsite by adding admixtures for a particular load when approved by the DSH Representative, then the plant dose must be adjusted to meet the specifications for the rest of the placement. This additional dosage at the jobsite must be through an approved dispenser, supplied by the admixture manufacturer and otherwise at the Contractor’s option.

d. Effect on Slump: Maintain required slump throughout time of concrete placement and consolidation. Discontinue use of superplasticizer if it fails to maintain slump in required range.

e. Meet design strengths, slumps, water-cement ratio, and other requirements as specified at slump required for placement.

f. Use water reducers in combination with superplasticizers as required for mixing.

9. Specifically Prohibited Admixtures.

a. Admixtures containing hydrogen chloride, calcium chloride, or thiocyanates.

b. Admixtures containing more than 0.05 percent chloride ions.

10. Unspecified admixtures will not be permitted, unless accepted by the DSH Representative, and under condition that the Independent Testing Agency

033000 - 11 000000000014109 modifies mix design as necessary, and each such modification is approved by the Structural Engineer.

11. Concrete may be designed for either pump or conventional placement. If pumping will be used, the mix must be specifically designed for pumping and must be so designated.

12. Mix designs are subject to review. Final acceptance of materials will depend upon strength testing after placement.

B. Nonshrink Grout: Mix in accordance with the manufacturer’s printed instructions, using potable water from a domestic source.

C. Dry Pack: Mix in proportions, by volume, one part cement to two and one half parts fine aggregate, screening out materials retained on a No. 4 sieve. Mix with water to a consistency such that, when a ball of mixture is compressed in the hand, it will maintain its shape, showing finger marks, but not showing any surface water.

D. Patching Mortar: Mix in proportions, by volume, one part cement to two parts fine aggregate.

1. Design Requirements: As indicated in the Schedule in Part 4.

2.6 MIXING

A. Batch Plant Conditions

1. Equipment and plant must be capable of weighing, proper segregation and efficient handling, and must be subject to approval. Equipment and plant processes not approved must not be used in Work.

2. Use approved automatic metering capable of determining moisture content of sand.

B. General Requirements

1. Concrete mixing must comply with 2022 CBC Section 1905.8 and ACI 318 Section 5.8.

2. Mix cement, fine and coarse aggregates, admixtures, and water to exact proportions of mix designs.

3. Measure fine and coarse aggregates separately in accordance with approved method which provides accurate control and easy checking.

4. Adjust grading to improve workability; do not add water, unless otherwise recommended by the DSH Representative.

5. Maintain proportions, values, and factors of approved mixes throughout Work.

C. Admixtures: Use automatic metering dispenser to introduce admixture into mix.

033000 - 12 000000000014109

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that field conditions are acceptable and are ready to receive the Work. Notify the DSH Representative, in writing, of any conditions requiring corrective action.

B. Verify requirements for concrete cover over reinforcement.

C. Verify that anchors, seats, plates, embeds, reinforcement, and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete.

D. Verify all controlling dimensions, for the Work of this Section and related Work, by field measurement prior to start of construction.

E. If unsatisfactory conditions exist, do not commence the installation until such conditions have been corrected. Beginning installation means acceptance of existing conditions.

3.2 PREPARATION

A. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent in accordance with manufacturer’s written instructions.

B. In locations where new concrete is dowelled to existing work, install dowels as indicated on Contract Documents.

C. Remove loose dirt and foreign matter from excavations and forms; remove standing water and saturated soil from excavations and from cavities. Placing concrete in standing water must not be permitted. Hardened concrete and foreign materials must be removed from the inner surfaces of conveying equipment.

D. Thoroughly clean reinforcement and other embedded items free from loose rust and other objectionable matter.

E. Thoroughly wet wood forms, except coated plywood, and adjacent concrete at least one hour in advance of placing concrete; securely close cleanout and inspection ports;

repeat wetting as necessary to keep forms damp.

F. Moisten subgrade or sand associated with under-slab vapor barrier system one day prior to placing concrete; maintain moisture until concrete placement.

G. Maintain equipment clean and of sufficient quantity and capacity to efficiently execute the Work.

H. Verify subgrade and forms have been checked for line and grade, and the Work areas have been observed and approved by the DSH Representative.

I. Before depositing new concrete on or against hardened concrete, retighten forms and prepare surface of hardened concrete as follows:

033000 - 13 000000000014109

1. Concrete which has been placed longer than 6-1/2 hours: Sandblast to roughen surfaces. Thoroughly clean of foreign matter and laitance, and moisten with water.

2. Concrete which has been placed longer than 3-1/2 hours but less than 6-1/2 hours: Remove all laitance from concrete by wire brushing.

3. Apply bonding agent as required in accordance with manufacturer’s instructions.

3.3 CONCRETE PLACEMENT

A. Transporting

1. Concrete must be handled from the mixer to the place of final deposit as rapidly as practicable by methods which prevent the separation or loss of the ingredients, in accordance with ASTM C94.

2. Concrete must not be dropped freely where reinforcing bars will cause segregation, nor must it be dropped more than 4 feet.

3. Spouts, elephant trunks, or other approved means must be used to prevent segregation.

4. Concrete may be pumped from the transit mixer to places of deposit, provided that information on mix design adjustments, equipment data, procedures, and the entire operation are submitted for the DSH Representative’s prior review.

a. Pumps must be suitable for the mix, aggregate size, and slump required.

b. Pump operators must be experienced in the operation of the equipment to be used.

5. Use of aluminum equipment to transport concrete is not permitted.

B. Depositing

1. Place concrete in accordance with 2022 CBC Section 1905.10.

2. Maintain during placement…