This is a Bid Notice and Expression of Interest (EOI) solicitation issued by the Dormitory Authority of the State of New York (DASNY) on behalf of the City University of New York (CUNY) Lehman College for a campus-wide technology infrastructure upgrade project located at 250 Bedford Park Boulevard West, Bronx, New York. The project involves upgrading the campus IT network infrastructure by replacing existing network equipment and campus IT network cabling that connects campus buildings to two Main Data Center (MDF) installations in Carman Hall and Shuster Hall. A new smaller Main Data Center will be created in Carman 135 to replace the existing installation in Carman 136, with Carman 136 subsequently modified to provide office space for IT staff. Individual building MDF and IDF installations will be upgraded to include new cooling systems and uninterruptible power supply (UPS) devices. The solicitation is restricted to an EOI phase only, with proposal submissions due on October 9, 2026, at 2:00 PM. Qualified firms from the EOI phase will be included on a short list and invited to submit formal bids in the near future. The construction contract will be held by DASNY, and the project is governed by an approved Project Labor Agreement (PLA) that all subcontractors of every tier must execute.

The estimated project cost ranges from $6,000,000 to $7,000,000. The solicitation establishes specific participation goals for Equal Employment Opportunity (EEO) and Minority and Women Business Enterprise (M/WBE) participation: 45% minority and women workforce goal for all trades, 18% Minority Business Enterprise goal, 12% Women's Business Enterprise goal, and 6% Service-Disabled Veteran Owned Businesses participation. The owner will determine final EEO and M/WBE participation goals when finalized construction and bid documents are distributed to qualified contractors. The EOI package must include ten required tabs covering company profile, relevant project experience (minimum five projects within ten years of similar size and scope), project schedules, safety program documentation, project team resumes, potential subcontractor information, anticipated workload and capacity analysis, Experience Modification Rating (EMR) documentation, bonding capacity certification, and a current NYS Vendor Responsibility Questionnaire. Firms must comply with New York State business registration requirements and provide submissions in PDF format to ccontracts@dasny.org. Communication with DASNY personnel is restricted to designated staff including the Project Manager and specified email address, with unauthorized contacts potentially resulting in disqualification.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPPORTUNITIES (/OPPORTUNITIES) / RFPS BIDS (/OPPORTUNITIES/RFPS-BIDS)

CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1

Solicitation #:

375250

Issue Date:

09/11/2026

Proposal Due:

10/09/2026 - 2:00 PM

Classification:

Construction Contracts

Type:

Expression of Interest (EOI)

Status:

New

Location Where Goods to be Delivered or Service Performed Lehman College, 250 Bedford Park Boulevard West, Bronx, New York 10468

Ad Notice

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLY

See the Eligibility Requirements further down in this document.

The project will upgrade the campus IT network infrastructure, replacing existing network equipment and campus IT network cabling connecting campus buildings with the two campus Main Data Centers (MDF) installations in Carman Hall and Shuster Hall. A new, smaller, campus Main Data Center will be created in Carman 135 to replace the existing in Carman 136. Carman 136 will be modified to provide office space for IT staff. Individual building MDF and IDF installations will be upgraded to include new cooling systems and UPS devices.

Estimated Cost Range: $6,000,000 - $7,000,000

Project Labor Agreement

The successful low bidder as a condition of being awarded this Contract, must execute the PLA included in the Contract Documents following the Form of Bid. The Work undertaken in connection with this Project will be governed by, and subject to the conditions set forth in the PLA. All Subcontractors of every tier, will be required to execute a Letter of Assent, included in the enclosed PLA, agreeing to be bound by the PLA. The PLA has been approved by the Building and Construction Trades Department, AFL-CIO.

Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice.

Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid.

Please find links to the specifications and drawings below:

Project Manual (https://dasnypowerapps.blob.core.windows.net/rfps/56fe38db6bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Upgrade%20Project%20Manual.pdf?

sv=2023-11-03&st=2026-09-09T15%3A31%3A20Z&se=2026-12- 18T16%3A31%3A20Z&sr=b&sp=r&sig=hNsv8AR3Fjtx9M5qb6Pb0y4wztXZCIE2TctfELHWG8M%3D)

Drawings (https://dasnypowerapps.blob.core.windows.net/rfps/d410c6f46bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Infrastructure%20Upgrade%20- %20CD%20Plans.pdf?sv=2023-11-03&st=2026-09-09T15%3A32%3A04Z&se=2026-12- 18T16%3A32%3A04Z&sr=b&sp=r&sig=Xi4gcG1fEoSkNPy%2BwqwrtWR7a3skc671%2FiH9FXnGDD0%3D)

General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.

The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:

Percent of Total Work Force (EEO):

Minority & Women Workforce Goal (for all trades) 45%

Percent of Total Contract (M/WBE):

Minority Business Enterprise Goal 18%

Women's Business Enterprise Goal 12%

Service-Disabled Veteran Owned Businesses 6%

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 1/7 https://www.dasny.org/opportunities https://www.dasny.org/opportunities https://www.dasny.org/opportunities/rfps-bids https://www.dasny.org/opportunities/rfps-bids https://dasnypowerapps.blob.core.windows.net/rfps/56fe38db6bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Upgrade%20Project%20Manual.pdf?sv=2023-11-03&st=2026-09-09T15%3A31%3A20Z&se=2026-12-18T16%3A31%3A20Z&sr=b&sp=r&sig=hNsv8AR3Fjtx9M5qb6Pb0y4wztXZCIE2TctfELHWG8M%3D https://dasnypowerapps.blob.core.windows.net/rfps/56fe38db6bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Upgrade%20Project%20Manual.pdf?sv=2023-11-03&st=2026-09-09T15%3A31%3A20Z&se=2026-12-18T16%3A31%3A20Z&sr=b&sp=r&sig=hNsv8AR3Fjtx9M5qb6Pb0y4wztXZCIE2TctfELHWG8M%3D https://dasnypowerapps.blob.core.windows.net/rfps/56fe38db6bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Upgrade%20Project%20Manual.pdf?sv=2023-11-03&st=2026-09-09T15%3A31%3A20Z&se=2026-12-18T16%3A31%3A20Z&sr=b&sp=r&sig=hNsv8AR3Fjtx9M5qb6Pb0y4wztXZCIE2TctfELHWG8M%3D https://dasnypowerapps.blob.core.windows.net/rfps/56fe38db6bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Upgrade%20Project%20Manual.pdf?sv=2023-11-03&st=2026-09-09T15%3A31%3A20Z&se=2026-12-18T16%3A31%3A20Z&sr=b&sp=r&sig=hNsv8AR3Fjtx9M5qb6Pb0y4wztXZCIE2TctfELHWG8M%3D https://dasnypowerapps.blob.core.windows.net/rfps/d410c6f46bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Infrastructure%20Upgrade%20-%20CD%20Plans.pdf?sv=2023-11-03&st=2026-09-09T15%3A32%3A04Z&se=2026-12-18T16%3A32%3A04Z&sr=b&sp=r&sig=Xi4gcG1fEoSkNPy%2BwqwrtWR7a3skc671%2FiH9FXnGDD0%3D https://dasnypowerapps.blob.core.windows.net/rfps/d410c6f46bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Infrastructure%20Upgrade%20-%20CD%20Plans.pdf?sv=2023-11-03&st=2026-09-09T15%3A32%3A04Z&se=2026-12-18T16%3A32%3A04Z&sr=b&sp=r&sig=Xi4gcG1fEoSkNPy%2BwqwrtWR7a3skc671%2FiH9FXnGDD0%3D https://dasnypowerapps.blob.core.windows.net/rfps/d410c6f46bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Infrastructure%20Upgrade%20-%20CD%20Plans.pdf?sv=2023-11-03&st=2026-09-09T15%3A32%3A04Z&se=2026-12-18T16%3A32%3A04Z&sr=b&sp=r&sig=Xi4gcG1fEoSkNPy%2BwqwrtWR7a3skc671%2FiH9FXnGDD0%3D https://dasnypowerapps.blob.core.windows.net/rfps/d410c6f46bacf111aaac6045bdd9b372/13732%20Lehman%20College%20IT%20Infrastructure%20Upgrade%20-%20CD%20Plans.pdf?sv=2023-11-03&st=2026-09-09T15%3A32%3A04Z&se=2026-12-18T16%3A32%3A04Z&sr=b&sp=r&sig=Xi4gcG1fEoSkNPy%2BwqwrtWR7a3skc671%2FiH9FXnGDD0%3D

Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.

Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to ccontracts@dasny.org (mailto:ccontracts@dasny.org).

Instructions for Submission of the EOI Packages:

Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection.

Each package shall be submitted with:

1. A Cover Page that clearly identifies:

The Legal Name of the Company submitting the EOI The Project Name for which the EOI is being submitted The Date of Submission

2. Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number.

3. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow.

Tabs should correspond to the order of the items specified in the solicitation.

4. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation.

Tabs must be in the following sequence:

Tab 1 – Company Profile

Provide a company profile that includes the following information:

Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project.

Date Established – When the company was founded.

Company Address – Primary business location.

Ownership Information – Name and resumes of all principal owners.

Client List – Summary of public and private sector clients Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers.

Equipment - Overview of all equipment owned by the company.

Self-Performed Services - Description of all services the company performs directly (not subcontracted).

MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable).

Tab 2 – Experience

Provide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed.

Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years.

For each project, include the following information:

Name of the project designer Firm name and contact information Project title and location/facility Brief description of the project Total construction cost Construction start date Substantial completion date Indicate role as prime contractor or subcontractor Percentage of the work that was self-performed

If applicable, also include a list of all DASNY projects completed within the last 5 years.

Tab 3 – Project Schedules

Provide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project.

Tab 4 – Safety Program

Provide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.

Tab 5 – Résumés

Provide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 2/7 mailto:ccontracts@dasny.org mailto:ccontracts@dasny.org

Tab 6 – Potential Subcontractors

Provide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.

Tab 7 – Anticipated Workload

Provide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe.

Tab 8 – Experience Modification Rating

Provide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation.

Tab 9 – Bonding Capacity

Provide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements.

Tab 10 – NYS Vendor Responsibility Questionnaire

Provide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy.

Eligibility/Qualifications Requirements/Preferences:

Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY.

Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.

In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and ccontracts@dasny.org (mailto:ccontracts@dasny.org). Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org (http://www.dasny.org/)) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil (http://www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil)) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Contacts

Interested Subs / Suppliers

Create or Log In to your Vendor Profile to Express Interest in Bid Opportunities (/index.php/user/login)

Current RFP, RFI and Bid Opportunities (/index.php/opportunities/rfps-bids)

In Progress RFPs and Bids (/index.php/opportunities/rfps-bids-in-progress)

Recently Awarded RFPs and Bids (/index.php/opportunities/bid-results-and-awards)

Archived RFPs and Bids (/index.php/opportunities/archived-rfps-bids)

Bid Opening Schedule (/index.php/opportunities/bid-opening-schedules)

Bid Forecast (/index.php/opportunities/rfps-bids/bid-forecast)

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 3/7 mailto:ccontracts@dasny.org mailto:ccontracts@dasny.org http://www.dasny.org/ http://www.dasny.org/ http://www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil http://www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil https://www.dasny.org/index.php/user/login https://www.dasny.org/index.php/opportunities/rfps-bids https://www.dasny.org/index.php/opportunities/rfps-bids-in-progress https://www.dasny.org/index.php/opportunities/bid-results-and-awards https://www.dasny.org/index.php/opportunities/archived-rfps-bids https://www.dasny.org/index.php/opportunities/bid-opening-schedules https://www.dasny.org/index.php/opportunities/rfps-bids/bid-forecast

Job Order Contracting (JOC) Overview (https://www.dasny.org/JOC%20Program)

Community Minor Maintenance Contractors (/index.php/opportunities/rfps-bids/current-community-minor-maintenance-contractors)

Professional Services Term Contracts and Consultants (/index.php/opportunities/rfps-bids/professional-services-term-contracts)

Browse the DASNY Business Registry (/index.php/opportunities/rfps-bids/dasny-business-registry)

Resources

Follow these links to view policies, forms, guidelines and procedures for doing business with DASNY.

Forms (/index.php/forms)

Policies and Guidelines (/index.php/tools-forms/policies-guidelines)

Project Sunlight (https://www.dasny.org/public-information/project-sunlight)

Project Labor Agreements (/index.php/services/diversity-inclusion/dasny-nyc-project-labor-agreements-plas)

Construction Resources (/index.php/tools-forms/construction-resources)

Design Resources (/index.php/tools-forms/design-resources)

MWSBE Resources (/index.php/services/mwbesvdob/mwsbe-resources)

Approved Utilization Plans and Waivers (/sites/default/files/listpanel-link-files/2026/FINAL-MWBE- Common%20format%20online%20Utilization%20Plan%20table- 040123-123125.pdf)

MWBE Approved Utilization Plans & Waivers (/sites/default/files/listpanel-link-files/2026/FINAL-MWBE- Common%20format%20online%20Utilization%20Plan%20table- 040124-063026.pdf)

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 4/7 https://www.dasny.org/JOC%20Program https://www.dasny.org/index.php/opportunities/rfps-bids/current-community-minor-maintenance-contractors https://www.dasny.org/index.php/opportunities/rfps-bids/professional-services-term-contracts https://www.dasny.org/index.php/opportunities/rfps-bids/dasny-business-registry https://www.dasny.org/index.php/forms https://www.dasny.org/index.php/tools-forms/policies-guidelines https://www.dasny.org/public-information/project-sunlight https://www.dasny.org/index.php/services/diversity-inclusion/dasny-nyc-project-labor-agreements-plas https://www.dasny.org/index.php/tools-forms/construction-resources https://www.dasny.org/index.php/tools-forms/design-resources https://www.dasny.org/index.php/services/mwbesvdob/mwsbe-resources https://www.dasny.org/sites/default/files/listpanel-link-files/2026/FINAL-MWBE-Common%20format%20online%20Utilization%20Plan%20table-040123-123125.pdf https://www.dasny.org/sites/default/files/listpanel-link-files/2026/FINAL-MWBE-Common%20format%20online%20Utilization%20Plan%20table-040124-063026.pdf

New York State Life Sciences Public Health Laboratory Wadsworth Center, New York State Department of Health

SEQRA Documentation (/index.php/Wadsworth-Lab)

Notices of Public Hearings

Notices of Public Hearings (/index.php/tefra)

NYS Freedom of Information Law (FOIL)

FOIL Requests (https://www.dasny.org/foil)

How Can We Help

Find out how DASNY can assist your institution, or the institution you represent, with financing, design and/or construction services.

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 5/7 https://www.dasny.org/index.php/Wadsworth-Lab https://www.dasny.org/index.php/tefra https://www.dasny.org/foil

Kathy Hochul -- Governor

Lisa Gomez -- Chair

Robert J. Rodriguez -- President & CEO

Learn More (https://www.dasny.org/about)

Construction Contracts (/index.php/opportunities/rfps-bids/construction-contracts) Professional Services: Construction (/index.php/opportunities/rfps-bids/professional-services-construction) Professional Services (/index.php/opportunities/rfps-bids/professional-services) Purchasing / Commodities (/index.php/opportunities/rfps-bids/purchasing)

RFPS & BIDS

DASNY Bonds (/index.php/services/financial/dasny-bonds) Investor Relations (/index.php/investor-relations) Official Statements (/index.php/investor-relations/official-statements) Reports (/index.php/about/corporate-info/annual-reporting)

INVESTOR RELATIONS

Overview (/index.php/services) Construction (/index.php/services/construction) Financial (/index.php/services/financial) MWBE & SDVOB (/index.php/OPG)

SERVICES

Accessibility / Privacy (/index.php/accessibility) Board & Committee Meetings (/index.php/about-us/corporate-info/board/committees-subsidiaries/board-meetings) Board Members (https://www.dasny.org/about/dasny-board-members) Careers (/index.php/opportunities/careers-dasny) FOIL Requests (/index.php/foil) Governance (/index.php/about/corporate-info/board) Grant Administration (https://www.dasny.org/about/what-we-do/grants-administration) Reports (/index.php/about/corporate-info/annual-reporting)

PUBLIC INFORMATION

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 6/7 https://www.dasny.org/about https://www.dasny.org/index.php/opportunities/rfps-bids/construction-contracts https://www.dasny.org/index.php/opportunities/rfps-bids/construction-contracts https://www.dasny.org/index.php/opportunities/rfps-bids/professional-services-construction https://www.dasny.org/index.php/opportunities/rfps-bids/professional-services-construction https://www.dasny.org/index.php/opportunities/rfps-bids/professional-services https://www.dasny.org/index.php/opportunities/rfps-bids/professional-services https://www.dasny.org/index.php/opportunities/rfps-bids/purchasing https://www.dasny.org/index.php/opportunities/rfps-bids/purchasing https://www.dasny.org/index.php/services/financial/dasny-bonds https://www.dasny.org/index.php/services/financial/dasny-bonds https://www.dasny.org/index.php/investor-relations https://www.dasny.org/index.php/investor-relations https://www.dasny.org/index.php/investor-relations/official-statements https://www.dasny.org/index.php/investor-relations/official-statements https://www.dasny.org/index.php/about/corporate-info/annual-reporting https://www.dasny.org/index.php/about/corporate-info/annual-reporting https://www.dasny.org/index.php/services https://www.dasny.org/index.php/services https://www.dasny.org/index.php/services/construction https://www.dasny.org/index.php/services/construction https://www.dasny.org/index.php/services/financial https://www.dasny.org/index.php/services/financial https://www.dasny.org/index.php/OPG https://www.dasny.org/index.php/OPG https://www.dasny.org/index.php/accessibility https://www.dasny.org/index.php/accessibility https://www.dasny.org/index.php/about-us/corporate-info/board/committees-subsidiaries/board-meetings https://www.dasny.org/index.php/about-us/corporate-info/board/committees-subsidiaries/board-meetings https://www.dasny.org/about/dasny-board-members https://www.dasny.org/about/dasny-board-members https://www.dasny.org/index.php/opportunities/careers-dasny https://www.dasny.org/index.php/opportunities/careers-dasny https://www.dasny.org/index.php/foil https://www.dasny.org/index.php/foil https://www.dasny.org/index.php/about/corporate-info/board https://www.dasny.org/index.php/about/corporate-info/board https://www.dasny.org/about/what-we-do/grants-administration https://www.dasny.org/about/what-we-do/grants-administration https://www.dasny.org/index.php/about/corporate-info/annual-reporting https://www.dasny.org/index.php/about/corporate-info/annual-reporting

Press Releases (/index.php/news) Newsletters (/index.php/news/newsletters) Success Stories (/index.php/our-clients/success-stories) Contact Us (/index.php/contact-us)

NEWS

(https://www.facebook.com/NYSDASNY/) (https://www.instagram.com/nys_dasny/) (https://twitter.com/NYS_DASNY) (https://www.linkedin.com/company/dormitory-authority-state-of-ny/)

CONNECT WITH US

9/15/26, 5:30 PM CUNY Lehman College Campus Wide Technology Infrastructure Upgrade Phase 1 | DASNY https://www.dasny.org/index.php/opportunities/rfps-bids/2026/cuny-lehman-college-campus-wide-technology-infrastructure-upgrade 7/7 https://www.dasny.org/index.php/news https://www.dasny.org/index.php/news https://www.dasny.org/index.php/news/newsletters https://www.dasny.org/index.php/news/newsletters https://www.dasny.org/index.php/our-clients/success-stories https://www.dasny.org/index.php/our-clients/success-stories https://www.dasny.org/index.php/contact-us https://www.dasny.org/index.php/contact-us https://www.facebook.com/NYSDASNY/ https://www.facebook.com/NYSDASNY/ https://www.instagram.com/nys_dasny/ https://www.instagram.com/nys_dasny/ https://twitter.com/NYS_DASNY https://twitter.com/NYS_DASNY https://twitter.com/NYS_DASNY https://www.linkedin.com/company/dormitory-authority-state-of-ny/ https://www.linkedin.com/company/dormitory-authority-state-of-ny/

File details come from the government source that posted it. Updated .