Town of Hillsdale Hamlet Park Bandshell Project Summary
This bid notice and project manual is issued by the Town of Hillsdale, a municipality in Columbia County, New York, for the construction of a bandshell facility at Hamlet Park. The project involves installation of a Town-furnished bandshell structure and furnishing of all materials required to install concrete foundations and slabs to support the structure, along with associated site work including grading, excavation, trenching, dewatering, and erosion and sediment control. A pre-bid conference will be held on July 29, 2026, at 12:00 p.m. at the project site located at 2679 State Route 23, Hillsdale, NY 12529. Sealed bids must be received by the Town Clerk by 12:00 p.m. on August 6, 2026, with public bid opening immediately following at the same time and location. Prospective bidders may examine documents at Hillsdale Town Hall between 10:00 a.m. and 2:00 p.m. on weekdays, or obtain electronic copies from Bidnet.com. Written requests for information will be accepted until 2:00 p.m. on August 3, 2026, with any addenda issued by 2:00 p.m. on August 4, 2026. The Town Board will review bids at its August 25, 2026, meeting. The contract time for substantial completion is 60 calendar days from the effective contract date, with final completion required within 90 calendar days, limited to 43 actual working days.
Bids must be accompanied by bid security in the form of a certified check or bid bond from a domestic surety in an amount not less than five percent of the bid submitted. The Town of Hillsdale is exempt from New York State sales and use taxes, and these taxes must not be included in bids. All bids must include the contractor's Certificate of Registration from the New York State Department of Labor. Bids shall remain binding for 60 days after the bid opening date. Bidders must demonstrate at least three years of experience in similar work and must have completed at least three comparable contracts, with at least two projects for municipalities or government agencies. Liquidated damages of $1,000 per day apply for each day of delay beyond the substantial completion date. Prevailing wage rates established by the New York State Department of Labor apply to this project. Performance and payment bonds, as well as required insurance documentation, must be provided by the successful bidder within 15 days of receiving the Notice of Award. The contract will be awarded to the lowest responsive, responsible bidder whose bid best fits the project budget and priorities.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Hillsdale Hamlet Park Bandshell Project
R26.19433.00 PROJECT MANUAL 00 0100 - 1
CPL
PROJECT MANUAL
TOWN OF HILLSDALE
HAMLET PARK BANDSHELL PROJECT
2679 State Route 23 Hillsdale, New York , 12529
CPL PROJECT NO.: R26.19433.00
DOCUMENT DATE: 07/23/2026
NYS PE Expiration: 6/30/2027 NYS Engineering Firm Certificate #0021219 Valid from 01/01/2024 to 12/31/2026
DESIGN PROFESSIONALS CERTIFICATION
The undersigned certifies that, to the best of his or her knowledge, information and belief, that the "Design conforms to all applicable provisions of the current New York State Uniform Fire Prevention Code, Building Code and Energy Conservation Code and that the “Work will not involve known or suspected ACBM”.
ARCHITECT / ENGINEER: OWNER:
CPL Architects, Engineers and Landscape Architect, D.P.C. Town of Hillsdale
26 IBM Road 2609 State Route 23 Poughkeepsie, NY Hillsdale, New York 12529
(845) 686-2301 (518) 325-5073
R26.19433.00 Table of Contents 00 0110 - 1
CPL
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0110 - Table of Contents 00 0115 - List of Drawing Sheets 00 1110 - Advertisement for Bids 00 2000 - Instructions to Bidders 00 4100 - Bid Form 00 4300 - Bid Bond 00 4510 - Qualifications Statement 00 5201 - Agreement 00 6000 - Project Forms 00 6100 - Performance Bond 00 6150 - Payment Bond 00 7000 - Standard General Conditions of the Construction Contract 00 8000 - Supplementary Conditions
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 1000 - Summary 01 2100 - Allowances 01 2500 - Substitution Procedures 01 2519 - Equivalents 01 2600 - Contract Modification Procedures 01 2900 - Payment Procedures 01 3100 - Project Management and Coordination 01 3200 - Construction Progress Documentation 01 3216 - Construction Progress Schedule 01 3300 - Submittal Procedures 01 4000 - Quality Requirements 01 4200 - References 01 5000 - Temporary Facilities and Controls 01 6000 - Product Requirements 01 7300 - Execution 01 7700 - Closeout Procedures 01 7823 - Operation and Maintenance Data
R26.19433.00 Table of Contents 00 0110 - 2
CPL
01 7839 - Project Record Documents
DIVISION 02 -- EXISTING CONDITIONS
02 4100 - Demolition
DIVISION 31 -- EARTHWORK
31 0519 - Geosynthetics for Earthwork 31 2200 - Grading 31 2316 - Excavation 31 2316.13 - Trenching 31 2319 - Dewatering 31 2323 - Fill 31 2500 - Erosion and Sediment Control 31 5000 - Excavation Support and Protection
DIVISION 32 -- EXTERIOR IMPROVEMENTS
32 1120 - Subbase and Aggregate Base Courses 32 9219 - Seeding
R26.19433.00 LIST OF DRAWING SHEETS 00 0115 - 1
CPL
SECTION 00 0115 - LIST OF DRAWING SHEETS
GENERAL
G000 - TITLE SHEET
SITEWORK/CIVIL
C001 - GENERAL NOTES
C100 - EXISTING CONDITIONS & DEMOLITION PLAN
C200 - SITE PLAN
C201 - GRADING & UTILITY PLAN
C202 - ROAD PLAN & PROFILE
C203 - EROSION & SEDIMENT CONTROL PLAN
C300 - DETAILS - 1
END OF SECTION 000115
R26.19433.00 ADVERTISEMENT FOR BIDS 00 1110 - 1
CPL
SECTION 00 1110
ADVERTISEMENT FOR BIDS
PART 1 GENERAL
1.01 SUMMARY
A. Attached is Advertisement for Bids.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION 001110
TOWN OF HILLSDALE
HAMLET PARK BANDSHELL PROJECT
REQUEST FOR PROPOSAL
COUNTY OF COLUMBIA, STATE OF NEW YORK
ADVERTISEMENT FOR BIDS
Sealed Bids for the Town of Hillsdale Hamlet Park Bandshell project must be received, by the Town of Hillsdale, at the office of the Town Clerk by 12:00 p.m. local time on August 6th, 2026. Bids will be publicly opened by the Town Clerk at
12:00 pm on August 6th, 2026; bids will then be reviewed by the Town Board at the August 25th, 2026, Town Board
Meeting.
MAIL: Hillsdale Town Clerk, Town of Hillsdale, PO Box 305,Hillsdale, NY 12529
BY HAND: Hillsdale Town Clerk, Town of Hillsdale, 2609 state Route 23,Hillsdale, NY 12529
EMAIL: Hillsdale Town Clerk,Townclerk@hillsdaleny.com
This Project consists of the installation of a Town-furnished band shell structure as well as furnishing all materials & installing concrete foundations/slabs needed to support said structure.
Bids will be received for one contact.
The Issuing Office for the Bidding Documents is The Town of Hillsdale, 2609 state Route 23, Hillsdale, NY 12529.
Prospective Bidders may examine the Bidding Documents at the Hillsdale Town Hall, Town Clerks Office, Mondays through Fridays between 10:00 am and 2:00 pm.
Electronic copies of the Bidding documents are to be obtained from Bidnet.com, bidders can email the Town Clerk, Robina Ward (Townclerk@hillsdaleny.com) for any questions / comments regarding obtaining bid documents from
Bidnet.
A pre-bid conference will be held on the project site, Hillsdale Hamlet Park, 2679 State Route 23, Hillsdale NY, 12529 on
Thursday July 29th at 12:00 pm (Noon).
Written Requests for Information (RFI) will be accepted until 2:00 p.m. (Local Time) on Monday August 3rd, 2026, at the office of the Town Clerk, by hand, by UPSPS or by email: TownClerk@hillsdaleny.com. If necessary, an Addendum will be issued by 2:00 p.m. (Local Time) on Tuesday August 4th, 2026, from the office of the Town Clerk.
Bid security shall be furnished in accordance with the instructions to the bidder.
Each bid must be accompanied by a certified bank check or a bid bond from a domestic carrier licensed to do business in the State of New York in the amount not less than five percent, (5%) of the amount of the bid submitted.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award refer to the
Instruction to bidders that are included in the Bidding Documents. Bid security shall be furnished in accordance
With the Instructions to Bidders.
Bidders on this work will be required to comply with the President’s Executive Order Nos. 11,246 and 11,375 which prohibit discrimination in employment regarding race, creed, color, sex, or national origin.
The successful bidder must be an equal opportunity employer, must meet all appropriate State and Federal standards, and comply with all relevant governmental regulations.
Statement of non-collusion: bidders on the contract are required to execute a non-collusive bidding certificate pursuant to section 103d of the General Municipal Law of the State of New York.
Sales and Use of Tax Exemptions: The Town of Hillsdale is exempt from the payment of sales and compensation use taxes of the State of New York and of cities and counties on all materials, equipment, and supplies sold to the Town of
Hillsdale pursuant to this contract. Also exempt from such taxes are purchases by the Contractor and his
Subcontractors of materials, equipment, and supplies to be sold to the Town of Hillsdale pursuant to this contract, including tangible personal property to be incorporated in any structure, building, or other real property forming part of the project. These taxes are not to be included in the Bid.
All bids must be accompanied by the contactor’s Certificate of Registration.
All bids shall be binding for a period of sixty (60) days after the bid opening date. The Town of Hillsdale reserves the right to reject any and all bids and to waive any information therein.
Owner: Town of Hillsdale
By: Robina Ward
Title: Town Clerk
Date: July 23rd, 2026
R26.19433.00 INSTRUCTIONS TO BIDDERS 00 2000 - 1
CPL
SECTION 00 2000
INSTRUCTIONS TO BIDDERS
PART 1 GENERAL
1.01 SUMMARY
A. Attached is EJCDC Document C-200 Instructions to Bidders.
1. EJCDC Document C-200 defines the conditions affecting award of contract and procedures with which Bidders must comply.
PART 2 PRODUCTS (NOT USED)
END OF SECTION 002000
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (5/10/2024).
TOC Page1 of 1
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— RETAINAGE
Article 23— FEDERAL REQUIREMENTS
ARTICLE 24 – WAGE RATE REQUIREMENTS
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Deleted.
2.04 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office.
Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Engineer.
2.05 Deleted.
2.06 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.04.A above. However, Bidder assumes all risks associated with differences
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 Bidder is to submit the following information with its Bid to demonstrate Bidder’s qualifications to perform the Work:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications, as deemed necessary by the Owner and Engineer.
3.02 Deleted
3.03 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.04 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.05 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
3.06 In order for the Owner to assure itself that the Bidder has the necessary competence and experience to properly perform the Work, the Bidder shall have at least 3 years’ experience in the performance of contracts similar to the Work of this Contract under its present management. The Bidder shall have completed at least 3 contracts, with at least 2 contracts for municipalities or government agencies, these installations being comparable in size, type, and locality to the Work to be performed under this Contract (e.g., rural areas, residential areas, urban areas, site conditions, etc.). Bidder shall submit Qualifications Statement (EJCDC C- 451/Specification 00451) as required by the Owner and Engineer. The Owner may request
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
further information, which must be supplied by the Bidder that is under consideration for Contract award.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A pre-bid conference will be conducted for this Project. See Advertisements for Bids.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidders visiting the Site are required to arrange their own transportation to the Site.
C. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the following Owner: Mike Dvorchak (supervisor@hillsdaleny.com) or Engineer:
George Schmitt (gschmitt@CPLteam.com) contact for visiting the Site. Bidder must conduct the required Site visit during normal working hours.
D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
E. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
F. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
G. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Engineer on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures are identified in the Advertisement for Bid.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5%) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Bid security must be at least 5% of the Bidder’s maximum Bid price.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Deleted
9.03 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 Deleted
10.02 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer within 10 days of the issuance of the Advertisement for Bids or invitation to Bidders. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders.
Bidders cannot rely upon approvals made in any other manner. Substitutes and “or-equal” materials and equipment may be proposed by Contractor in accordance with Paragraphs 7.05 and 7.06 of the General Conditions after the Effective Date of the Contract.
10.03 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
10.04 If an award is made, Contractor shall be allowed to submit proposed substitutes and “or equals” in accordance with the General Conditions.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 Deleted
11.02 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for all portions of the Work within five days after Bid opening.
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
11.05 – The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC 7.07A.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form. Pursuant to New York State Department of Labor requirements for State Public Work Projects or Covered Private Projects, Contractor must submit with their bid, a copy of their Contractor Certificate of Registration. Refer to DOL for details.
ARTICLE 13—BASIS OF BID
13.01 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
13.02 Allowances
A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 14—SUBMITTAL OF BID
14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the Owner at the address in Article
1.01 of the Bid Form.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid, based on which Bid best fits the project budget and priorities.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Owner is exempt from New York state sales and use taxes on materials and equipment to be incorporated in the Work, under section 1116 of the Tax Law. Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.
ARTICLE 22—RETAINAGE
22.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 23—FEDERAL REQUIREMENTS
23.01 If the contract price is in excess of $100,000, provisions of the Contract Work Hours and Safety Standards Act at 29 CFR 5.5(b) apply.
ARTICLE 24 – WAGE RATE REQUIREMENTS
24.01 The prevailing wage rates of the State of New York apply to this Contract as do any requirements of the State of New York associated with the use of these State Prevailing wages.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
24.02 The prevailing wage rates of the Department of Labor apply to this project. The Labor Standards Provisions found at 209 CFR 5.5(a) apply to this project if the prevailing wage rates of the Department of Labor apply. If the contract cost is in excess of $100,000, provisions of the Contract Work Hours and Safety Standards Act 209 CFR 5.5(b) also apply.
R26.19433.00 BID FORM 00 4100 - 1
CPL
SECTION 00 4100
BID FORM
PART 1 GENERAL
1.01 SUMMARY
A. Attached is EJCDC Document C-410 Bid Form.
PART 2 PRODUCTS (NOT USED)
END OF SECTION 004100
EJCDC® C-410, Bid Form for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
BID FORM FOR CONSTRUCTION CONTRACT
TOWN OF HILLSDALE
HILLSDALE HAMLET PARK – BAND SHELL CONSTRUCTION
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted to: Town of Hillsdale, 2609 State Route 23, PO Box 305, Hillsdale, NY 12529
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. List of Proposed Subcontractors;
C. List of Proposed Suppliers;
D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids; Contractor’s Certificate of Registration.
E. Contractor’s Federal I.D. No.: _______________________.
F. Non-Collusive Bidding Certificate, included within Section 00410A;
G. Sexual Harassment Policy/Training Affirmation, included within Section 00410A;
H. Iran Divestment Act Certification, included within Section 00410A;
I. Required Bidder Qualification Statement with supporting data, included within Section 00451.
ARTICLE 3—BASIS OF BID
3.01 Bidder will complete the Work in accordance with the Contract Documents for the following prices:
A. Bidder acknowledges that:
1. Scope of work for Item No. 1: Base Bid – Band Shell Construction is as described within, but not limited, Specification Section 011000 – Summary and as shown hereon, but not limited to, all Contract Drawings within the G-Series, C-Series & all Contract Specifications plus Band Shell Documents.
HAMLET PARK BANDSHELL PROJECT
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Item No. Description Unit Bid Amount
Base Bid – Band Shell Construction
LS
GC-1
Contingency Allowance (5% of Base Bid)
LS
Total Base Bid
The Owner reserves the right to reject any and all proposals. The Owner reserves the right to award to the lowest, responsive, responsible bidder based on which Bid(s) best fits the project budget and priorities.
ARTICLE 4—TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
4.02 Deleted
4.03 Deleted
4.04 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF
ADDENDA
5.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
5.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
5.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number Addendum Date
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and
(c) Bidder’s (Contractor’s) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
6.02 Bidder’s Certifications
A. The Bidder certifies the following:
1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
3. Bidder has not solicited or induced any individual or entity to refrain from bidding.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 8.02.A:
a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.
b. Fraudulent practice means an…