NEW BID DATE*2ND JOB WALK SCHEDULED: Boiler Replacement at Public Operations and Public Safety
Solicitation number
DB378
Issued by
Albany County, Cheektowaga CDP, New York

About this file

This is a Bid Notice and Request for Bid (RFB) document issued by the Town of Colonie, Department of Public Works, Division of Facilities Maintenance, for boiler replacement services at two municipal facilities located in Latham, New York. The project involves replacing boilers at the Public Operations Center (347 Old Niskayuna Road) and the Public Safety Center (312 Wolf Road). The Town will host a mandatory bidders' meeting on June 16, 2026, at 10:00 a.m. at the Public Operations Center to allow prospective bidders to conduct site investigations and pose questions. Sealed bids must be submitted to the Office of Purchasing at Memorial Town Hall, 534 New Loudon Road, Latham, New York 12110, by 11:30 a.m. on June 24, 2026. The contract is divided into two item groups: Item Group 3781 for boiler replacement at Public Operations and Item Group 3782 for boiler replacement at Public Safety. The Town intends to award the contract to the lowest responsive and responsible bidder. The contract term commences on approximately June 26, 2026, with a substantial completion date of September 15, 2026, and a final completion date of October 15, 2026. There are no renewal options.

All bids must include a 5 percent bid bond or certified check, proof of NYSDOL contractor registration, evidence of qualifications to do business in New York State, completed Vendor Responsibility and Bidder's Qualification Questionnaires, and proof of required insurance coverage including Workers' Compensation, Automobile Liability ($1,000,000 per accident), and Commercial General Liability ($2,000,000 per occurrence). The successful bidder must provide Performance and Labor and Materials Bonds equal to 100 percent of the contract amount. Bidders must acknowledge receipt of all addenda and attest that they have examined the project documents and site. Liquidated damages are assessed at $200 per day for failure to achieve substantial completion by September 15, 2026, and an additional amount for failure to achieve final completion by October 15, 2026 (amount not specified in excerpt). This is a fixed unit price contract with no escalation for cost increases. The Town is self-insured for general liability and is exempt from sales and compensating use taxes. All applicable New York State prevailing wage rates and supplements apply to this project per Schedule A of the specifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

TOWN OF COLONIE

The Department of Public Works, Division of Facilities Maintenance

RFB: 2026 Boiler Replacement at Public Operations and Public Safety DB378

ALL BIDDERS TAKE NOTE!

All bids being delivered in person to the Office of Purchasing at Memorial Town Hall must be delivered to the north entrance.

A doorbell has been provided to gain entry.

Notice Regarding Bid Submission:

Bids shall be submitted at the time and place indicated in the Notice to Bidders and shall be enclosed in an opaque, sealed envelope. The opaque envelope shall be marked on the outside with the project title and name and address of the bidder. The submission shall consist of the completed pages of this document marked “TO BE SUBMITTED,” and any other required documents. The submission shall also include, if required in the Notice to Bidders, the bid security. If the bid is sent through the mail or other delivery system, the sealed envelope containing the bid shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face thereof AND the outer envelope shall be marked on the outside with the project title and name and address of the bidder.

Submission Deadline: 6/24/2026 11:30 AM

Office of Purchasing General Services Department

Town of Colonie Memorial Town Hall

534 New Loudon Road Latham, NY 12110

Please Note: The Town will host a meeting for all potential Bidders at 10:00 a.m. on Tuesday, June 16, 2026. Attendance at this meeting is strongly recommended for Bidders. The meeting will begin at the Town of Colonie’s Public Operations Center located at 347 Old Niskayuna Rd., Latham, NY 12110. Attendees will be given opportunities to make investigations and pose questions about the project.

Page ii 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

RFB: 2026 Boiler Replacement at Public Operations and Public Safety DB378

Contents

BID INFORMATION AND INSTRUCTIONS

Project Identification, Submission Deadline, and Project Duration and Bonding Defined Terms Intent of Solicitation Solicitation Distribution Qualification of Bidder Examination of Bidding Documents and Site Visit Addenda and Interpretations Bid Security Contract Time Discussed Liquidated Damages Substitute Material and Equipment Substitute Items - Equals NYSDOL Contractor Registration Requirement Subcontractors, Etc Bid Form Discussed Copies of Solicitation Documents Bid Response Sheet Discussed Marking of Submission Disqualification Modification and Withdrawal of Bids Bids to Remain Open Award and Rejection of Bid/Contract Performance and Other Bonds Assignment Non-Appropriation Clause Indemnification Town Insurance Purchase Order Requirement Delivery Dates Payment Standard Title VI/Non-Discrimination Signing of Contract Sales Taxes Laws and Regulations Minimum Wages, Fringe Benefits and Non-Discrimination in Employment Non-Collusive Bidding and Iranian Energy Sector Divestment Certificates Discussed Escalation of Cost Insurance Requirements When Services Provided

SUBMISSION DOCUMENTS

Bid Form Bid Bond Offer Of Surety Bid Security Non-Collusive Bidding Certification Iranian Energy Sector Divestment

Page iii 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

Vendor Responsibility and Bidder’s Qualification Questionnaires Acknowledgement Of Bidder

SAMPLE CONTRACT FORM

SPECIFICATIONS

SCHEDULE A - Provisions Required by Law

Provision Required by Law Deemed Inserted Funds Received by Contractor Constitute Trust Funds Foreign Contractors Payment By Owner to Contractor Workers’ Compensation Non-Discrimination In Employment Subsurface Structures and All Utilities Exemption From Sales and Local Taxes Prevailing Wage Rates and Supplements

Page 1 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

BID INFORMATION AND INSTRUCTIONS

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

TOWN OF COLONIE

The Department of Public Works, Division of Facilities Maintenance

BID INFORMATION AND INSTRUCTIONS

Project Identification, Submission Deadline, and Project Duration and Bonding

Project Title: RFB: 2026 Boiler Replacement at Public Operations and Public Safety DB378

Project Common Name: 2026 Boiler Replacement at Public Operations and Public Safety

Department Issuing: The Department of Public Works, Division of Facilities Maintenance

Submission Deadline: 06/24/2026 at 11.30 AM (local time)

PRC #: 2026013491

Award Basis: Grand Total Amount Bid for the Item Group

Initial Contract End : 10/15/2026

Renewal Options: none

Bid Bond or Certified Check: 5%

Performance and Labor and Materials Bond: 100%

Payment Bond: 100%

Substantial Completion Date: September 15, 2026

Required Completion Date: October 15, 2026

Defined Terms As used in this bid, the below-listed terms have the ascribed meaning:

Term Definition

Grand Total Amount Bid for the

Item Group:

the amount that the Town intends to utilize to compare the pricing on the various Bids received for the purpose of making an award for the solicitation, or awards for the various parts and/or categories of the solicitation.

Bidder: any individual or legal entity that submits a Bid.

Page 2 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

Bidnet: the Empire State Purchasing Group's Regional Bid Notification System: bidnetdirect.com/new-york.

Business Day:

any day that the Town’s Purchasing Department is open to conduct business during normal business hours.

Contract: the agreement the Successful Bidder enters with the Town once the Town awards and relies on the Bid.

Contractor:

refers to the Successful Bidder after it has entered a Contract with the Town to perform the anticipated work.

Bid:

an offer to furnish materials, supplies, services, and/or equipment in accordance with the terms of this document.

Bid Response Sheet:

the form on which the Bidder submits its offer, see Bid Response Sheet Instructions below.

NTB: the separately published Notice to Bidders for this matter.

NYSDOL the New York State Department of Labor

Owner: the Town of Colonie, Albany County, New York

RFB: this request for bid document.

Public Operations: The Town of Colonie’s Public Operations Center located at 347 Old Niskayuna Rd., Latham, NY 12110

Public Safety: The Town of Colonie’s Public Safety Center located at 312 Wolf Rd., Latham, NY 12110

Specifications:

the detailed description of requirements, materials, supplies, services, and/or equipment found in the Specifications section of this RFB.

Successful Bidder:

the lowest, qualified, responsive, and responsible Bidder or Bidders to whom the Town (based on Town's evaluation as hereinafter provided) makes an award.

Town: the Town of Colonie, Albany County, New York State.

Page 3 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

Intent of Solicitation With this RFB, the Town is requesting bids from qualified, responsive, and responsible bidders to replace the boilers at the Town’s Public Operations Building and Public Safety Center.

Solicitation Distribution The Town officially distributes its solicitation documents from its Office of Purchasing and through Bidnet. Copies of solicitation documents obtained from any other source are not considered official copies. Only those vendors who obtain solicitation documents from either the Office of Purchasing or Bidnet are guaranteed to receive addendum information, if such information is issued. If you have obtained this document from a source other than the Town’s Office of Purchasing or Bidnet, the Town recommends that you obtain an official copy.

Qualification of Bidder

Each Bidder shall submit a completed version of the Bidder Qualification Questionnaire as part of its Bid. Each bid must contain evidence of the Bidder’s qualification to do business in New York State or a covenant to obtain such qualification prior to award of the Contract.

The Town may make such investigations, as it deems advisable to determine the ability of the Bidder to supply the goods bid and/or perform the work. The Bidder shall furnish to the Town, within five days of the Town’s request, all requested information, and data. The Town reserves the right to reject any Bid, if the evidence submitted by, or investigation of, the Bidder fails to satisfy the Town that the Bidder is properly qualified to supply the goods and/or carry out the obligations contemplated in this RFB.

Examination of Bidding Documents and Site Visit Please Note: The Town will host a meeting for all potential Bidders at 10:00 a.m.

on Tuesday, June 16, 2026. Attendance at this meeting is strongly recommended for Bidders. The meeting will begin at the Town of Colonie’s Public Operations Center located at 347 Old Niskayuna Rd., Latham, NY 12110.

Attendees will be given opportunities to make investigations and pose questions about the project.

The lands upon which the work is to be performed, rights-of-way for access thereto, and other lands designated for use by the Bidder in performing the work are identified in the Specifications.

The submission of a Bid will constitute an incontrovertible representation by the Bidder that it has complied with every requirement discussed above and that the RFB is sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the work.

Addenda and Interpretations All questions about the meaning or intent of this RFB shall be submitted to the

Town in writing via email to purchasing@townofcolonie.gov. To be given consideration, such email(s) must be received at least five business days prior to

Page 4 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM the date fixed for the opening of Bids. When appropriate, the Town will issue a reply by addendum to this RFB. Each such addendum will be distributed via either U.S. Mail or by e-mail to known prospective Bidder (at the respective addresses furnished for such purposes) not later than two days prior to the date fixed for the opening of bids. If the Town has made this RFB available for download from Bidnet, addenda shall also be made available for download on such web site. Failure of any Bidder to receive an addendum, to timely submit to the Town an executed copy of an addendum, or to acknowledge the receipt of an addendum, shall not relieve such Bidder from any obligation under its Bid as submitted.

All issued addenda shall become part of the RFB documents.

Only questions answered by a formal written addendum will be binding on the

Town. Oral and other interpretations or clarifications will be without legal effect.

Bid Security

Each bid must be accompanied by a certified check or a bid bond (on form attached) issued by a surety in the amount of 5% of the bid total. Such certified check or bid bond shall be made payable to "Town of Colonie". If any other bonds are required by this RFB, a bidder furnishing a certified check as bid surety must include with its check a letter from a bonding company indicating the bonding company’s intent to act as surety and furnish the required bonds.

The Town will retain the bid security of the Successful Bidder until such bidder has executed its Contract with the Town and furnished all required Contract Security. If the Successful Bidder fails to execute and deliver the required Contract and furnish the required Contract security within 15 business days of the Notice of Award, Town may annul the Notice of Award and the bid security of that bidder will be forfeited. The Town may retain the bid security of any bidder whom the Town believes to have a reasonable chance of receiving the award until the earlier of (a) seven business days after the effective date of the Contract between the Town and the Successful Bidder or (b) the furnishing of the Contract security or (c) 46 business days after the bid opening. The bid securities of other bidders will be returned within seven business days of the bid opening.

Contract Time Discussed The number of days within which, or the date by which, the work is to be undertaken/completed will be set forth in the Contract that the Successful Bidder will enter with the Town, see the sample contract included below. It is intended that the initial term of the contract between the Town and the Successful Bidder will commence on or about June 26, 2026 and terminate on or about October 15, 2026.

Liquidated Damages Provisions for liquidated damages, if any, will be set forth in the Contract. Please see the Sample contract in this document.

Substitute Material and Equipment Substitute Items - Equals Whenever a manufacturer’s name brand is listed in the Bid Response Sheet to indicate a minimum requirement, bidding may be on the brand-named item or an “equal”. A

Page 5 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

Bidder that it wishes to bid an “equal” shall furnish the specifications of the would-be equal item and fully explain its argument for equivalency. The Bidder should do so in a supplemental letter included with its submission. The Town shall give full consideration to the suggested “equal” and shall have the discretion to accept the “equal”, if the Town determines it would be in its best interest to do so.

In the event of any claim by an unsuccessful Bidder concerning or related to the issue of an “equal”, the Successful Bidder agrees, at its cost and expense, to defend such claim or claims and agrees to hold the Town free and harmless from any and all claims for loss or damage arising out of the transaction contemplated by this solicitation.

NYSDOL Contractor Registration Requirement Pursuant to New York State Labor Law § 220-i, all contractors and subcontractors performing construction, reconstruction, demolition, or repair work on a public work project are required to register with the NYSDOL.

Bidders must register with the NYSDOL before submitting a Bid for this project.

Each Bidder must include with its submission a copy a valid, current NYSDOL

Certificate of Registration.

A Bidder‘s failure to provide a copy of a current, valid NYSDOL Certificate of

Registration with its Bid submission may result in the Town rejecting the Bidder‘s Bidder.

The Successful Bidder will be responsible for ensuring that each of its subcontractors are registered with the NYSDOL prior to that subcontractor performing any work.

Subcontractors, Etc.

A subcontractor listing must be included with your Bid. Bidder must provide details regarding their intended subcontractors in response to question five of the Bidder’s Qualification Questionnaire. After the Notice of Award, the Successful Bidder may only subcontract other portions of the work with the Town's written consent.

In contracts where the contract price is calculated on the basis of cost-of-work-plus-a fee, the apparent Successful Bidder, prior to the Notice of Award, shall identify in writing to the Town those portions of the work that such Bidder proposes to subcontract.

After the Contract is signed, the Successful Bidder may only subcontract other portions of the work with the Town's written consent.

No Bidder shall be required to engage any subcontractor, other person, or organization against whom it has reasonable objection.

All subcontractors must follow the requirements stated in this solicitation as though they were the Successful Bidder.

Bid Form Discussed The to-be-completed-and-submitted Bid Form follows; additional copies may be obtained from Town.

The Bid Form must be completed in ink, by typewriter or similar.

Page 6 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

A Bid submitted by a corporation must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the secretary or an assistant secretary must affix the corporate seal. The corporate address and state of incorporation shall be shown below the signature.

A Bid submitted by partnership must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.

A Bid submitted by a limited liability company must be executed in the company’s name and signed by a member, whose title must appear under the signature and the official address of the company must be shown below the signature.

All names must be typed or printed below the signature.

The Bid should contain an acknowledgment of receipt of all addenda (the numbers of which shall be filled in on the Bid Form).

The Bid should contain the mailing and email address to which communications to the Bidder are to be directed.

Copies of Solicitation Documents

A complete set of the solicitation documents may be obtained or examined at the Office of Purchasing, Colonie Memorial Town Hall, 534 New Loudon Road, Latham, NY 12110. A complete set of the solicitation documents may also be available for download from Bidnet.

A complete set of the solicitation documents shall be used in preparing a submission and shall be submitted as a Bid. The Town does not assume any responsibility for errors or misinterpretations resulting from the use of an incomplete set of solicitation documents.

The Town in making copies of solicitation documents available on the above terms, does so only for the purpose of obtaining Bids for the work; the Town does not confer a license or grant to anyone to apply the solicitation documents for any other use.

Bid Response Sheet Discussed The to-be-completed-and-submitted Bid Response Sheet is posted herewith.

Additional copies of the Bid Response Sheet may be obtained from the Town.

Two versions of the Bid Response Sheet have been posted: a version formatted in Microsoft Excel and a PDF version. While the Bidder may begin with either format when it prepares its submission, the Town strongly recommends that Bidders utilize Microsoft Excel software to prepare the Bid Response Sheet. No matter which format the Bidder utilizes, the Bidder must submit a completed, paper version of the Bid Response Sheet.

On the submitted Bid Response Sheet, the Grand Total Amount Bid for the Item Group must be stated in numerals, and where requested, in words. If a statement in words has been requested, in an instance where the statements in words and numerals conflict, the amount stated in words will take precedence.

Page 7 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

Marking of Submission Bids shall be submitted at the time and place indicated in the Notice to Bidders and shall be enclosed in an opaque, sealed envelope. The opaque envelope shall be marked on the outside with the project title and name and address of the bidder. The submission shall consist of the completed pages of this document marked “TO BE SUBMITTED,” and any other required documents. The submission shall also include, if required in the Notice to Bidders, the bid security. If the bid is sent through the mail or other delivery system, the sealed envelope containing the bid shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face thereof AND the outer envelope shall be marked on the outside with the project title and name and address of the bidder.

Disqualification The Town reserves the right to refuse to issue a set of solicitation documents to a prospective Bidder should such Bidder:

Fail to comply with any pre-qualification regulations of the Town, if such regulations are cited or otherwise referenced as a requirement for bidding;

Have failed to pay, or satisfactorily settle, all bills due for labor and/or materials on a previous contract with the Town;

Have defaulted under a previous contract with the Town;

Have made slow, incomplete, or otherwise unsatisfactory deliveries of supplies or services to the Town under a previous contract with the Town; and/or.

Have performed unsatisfactory work on a previous project with the Town.

Modification and Withdrawal of Bids A Bid may be modified or withdrawn by an appropriate document duly executed

(in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.

If, within 72 hours after its Bid is opened, a Bidder files a duly signed written notice with the Town and promptly thereafter demonstrates to the reasonable satisfaction of the Town that there was a material and substantial mistake of the type described in N.Y. Gen. Mun. Law §103 [11], the Bidder may withdraw its Bid and its bid security, if any, will be returned.

Bids to Remain Open All Bids shall remain open for 45 days after the bid submission deadline, but the Town may, in its discretion, release any Bid and return any bid security prior to that date.

Award and Rejection of Bid/Contract

The Town reserves the right: to reject any and all Bids, to waive any and all informalities, to negotiate contract terms with the Successful Bidder, and to disregard all nonconforming, non-responsive, or conditional bids. Discrepancies between an indicated sum of any set of figures and the correct sum thereof will

Page 8 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of words.

For solicitations where the Town has estimated its purchase quantity for an item for which it is soliciting bids, the Town reserves the right to determine the low bid by considering alternate Town’s purchase quantities.

In the case of a solicitation for bids to be awarded based on the Grand Total Amount Bid, the Town reserves the right to eliminate one or more items from the calculation of the Grand Total Amount Bid when one or more Bidders have indicated that the manufacturer of the item is no longer producing it or that the item is otherwise unavailable, and after investigation, the Town concludes that this is likely the case.

In the case of a solicitation for bids for item groups, the Town reserves the right to make its award based on individual items within the group as opposed to the submitted grand total amount bid for the item group. Similarly, in the case of solicitations for bids for item groups, the Town reserves the right to delete one or more items from the calculation of the item group’s total, award those items individually, and award the remaining items in the item group based on the Grand Total Amount Bid for the Item Group calculated without regard to the deleted items.

For solicitations where the Town has estimated its purchase quantity for an item to be zero, the Town reserves the right to determine the low bid for the item, item group, and/or grand total without including the amount bid for the zero-quantity item in the calculation thereof.

In the case of a solicitation that includes additional pricing requests or options, should the Town determine that it wishes to have the work described in the additional pricing request(s) or option(s) performed, the Town reserves the right to make its award based on the grand total amount bid (or base bid) increased by the amount bid for such additional price request or optional pricing.

A Bid may be rejected if the Town considers it to be irregular. Bids shall be considered irregular for the following reasons:

o If the Bid is on a form other than that issued by the Town, or, if text of the Bid Form and/or Bid Response Sheet as issued is altered, or, if any part of the Bid Form and/or Bid Response Sheet is detached.

o If there are unauthorized additions, conditional or alternate pay items, or irregularities of any kind which make the Bid incomplete, indefinite, or otherwise ambiguous.

o If the Bid is not accompanied by the specified bid security, if required.

A Bidder’s Bid will be rejected, if the Town required that the Bidder attend one or more pre-bid meetings and/or site tours and the Bidder failed to do so.

When evaluating Bids, the Town shall consider the qualifications of the Bidders, whether the Bids comply with the prescribed requirements, and include alternates and unit prices, if requested in the Bid document. It is the Town's intent to accept alternates (if any are accepted) in the order in which they are listed in the Bid Response Sheet, nonetheless the Town reserves the right to accept them in any order or combination.

Page 9 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

When evaluating Bids, the Town may consider operating costs, maintenance considerations, performance data, and guarantees on materials and equipment.

When evaluating Bids, the Town may consider the Bidder imposed minimum order and delivery requirements, the reasonableness of a Bidder‘s proposed delivery time, and the reasonableness of the period before a Bidder will be able to complete the required services.

In an instance where the amount bid by the Bidder to whom the Town would otherwise make its award exceeds the amount of funds the Town has appropriated and/or budgeted for the matter; the Town may reject all bids.

The Town may conduct such investigations as it deems necessary to assist in the evaluation of a Bid and to determine the responsibility of the Bidder, i.e., to determine the Bidder’s accountability, reliability, skill, sufficiency of capital resources or liquid assets, judgment, and integrity. Such investigation may include investigation of the responsibility (financial and otherwise), qualifications, and abilities of a Bidder, a Bidder’s proposed subcontractors and other persons and entities. The Town may do so to evaluate the Bidder’s responsibility and ability to complete the work, and/or provide the goods or services, described in this RFB and the Contract to the Town's satisfaction within the prescribed time.

The Town, when determining the responsibility of the Bidder, may consider financial information relative to the Bidder, past performance of the Bidder, information relative to the Bidder’s experience, reliability, business operation capacity and competence; the Bidder’s past or present criminal involvement or corrupt conduct including whether there are pending criminal investigations of or indictments against the Bidder; the Bidder’s lack of candor, misrepresentations, concealments, or failure to disclose information necessary for the determination or responsibility; and the Bidder’s willful violations of the prevailing wage provisions of N.Y. Labor Law. The Town reserves the right to reject the bid of any Bidder who does not pass any such evaluation to the Town's satisfaction.

A Bid may be rejected from a Bidders who has (a) previously failed to complete a contract with the Town within the time required or (b) previously performed work for the Town in an unsatisfactory manner.

A Bid may be rejected if the Bidder cannot demonstrate to the Town’s satisfaction that it has the necessary financial resources, permit(s), license(s), labor force, skill, ability, plant, and equipment to supply the goods and/or to commence the work at the time prescribed and thereafter to prosecute and complete the work at the pace or within the time specified.

A Bid may be rejected if the Bidder is already obligated to perform other work which would delay the commencement, prosecution, or completion of the work detailed in this RFB.

In an instance where two or more Bidders (who the Town determines to be responsive and responsible) submit Bids that are identical in price, are otherwise indistinguishable as far as the best interest of the Town is concerned, are the low bid amount, and otherwise meet all the requirements and criteria set forth in this document, the Purchasing and General Service Director (or his or her designee) shall break the tie by conducting a drawing to determine the bid awardee (i.e., the Successful Bidder). If the drawing is to break a tie between two Bidders, then

Page 10 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM a coin toss may be held. If the drawing is to break a tie among more than two Bidders, then the selection may be determined by drawing a Bidder’s name out of a hat.

If a contract is to be awarded, it will be awarded to the lowest Bidder whose evaluation by the Town indicates to the Town that the award will be in the best interests of the Town.

If a contract is to be awarded, the Town will give the Successful Bidder a Notice of Award within 90 days after the day of the bid opening.

Performance and Other Bonds If required insurance and security is required, within seven days after the date of notice to the Successful Bidder, the Successful Bidder shall provide such bonds, insurance, and security before the Town formally awards the Contract.

Assignment There shall be no assignment of this bid and any resulting contract per N.Y. Gen. Mun.

Law §109 without prior written consent of the Town. If any Successful Bidder, to whom any contract is let, granted, or awarded, shall, without the previous written consent of the Town, assign, transfer, convey, sublet, or otherwise dispose of such contract, or its right, title or interest therein, or its power to execute such contract, to any other person or corporation, the Town may revoke and annul such contract. If the Town does so revoke and annul, it shall be relieved and discharged from any and all liability and obligations growing out of such contract to such Successful Bidder, and to the person or corporation to which such contract shall have been assigned, transferred, conveyed, sublet or otherwise disposed of, and such Successful Bidder, and the Successful Bidder’s assignees, transferees or sublessees shall forfeit and lose all moneys, theretofore earned under such contract, except so must as may be required to pay its employees.

Non-Appropriation Clause Notwithstanding anything contained in this RFB to the contrary, the Town shall not be deemed in default under the Bid/Contract in the event that insufficient funds are appropriated and/or budgeted for, or are otherwise available, to implement the RFB.

The Town will immediately notify the Successful Bidder of such occurrence and the Bid shall terminate on the last day of the fiscal period for which appropriations were received as to the portions of expenditures herein agreed upon for which funds shall have been appropriated and budgeted or are otherwise available.

Indemnification A. To the fullest extent permitted by law, the Successful Bidder shall indemnify and hold harmless the Town and its agents and employees from and against all claims, damages, losses, and expenses including but not limited to attorneys' fees arising out or of resulting from the performance of the work, provided that any such claim damage, loss, or expense: (1) is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the work itself) including the loss of use resulting therefrom and, (2) is caused in whole or in part by any negligent act or omission of the Successful Bidder, any subcontractor of the Successful Bidder, anyone

Page 11 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder.

B. In any and all claims against the Town, or any of its agents or employees, by any employee of the Successful Bidder, any subcontractor of the Successful Bidder, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Successful Bidder, or any subcontractor of the Successful Bidder under workers' or workmen's compensation acts, disability benefits acts, or other employee benefit acts.

Town Insurance Bidders must accept that the Town is self-insured for general liability.

Purchase Order Requirement Purchases of goods and/or materials for the Town are authorized only if a signed purchase order is issued in advance of the transaction, showing that the ordering department has sufficient funds available to pay for the purchase. Time is of the essence regarding matters discussed in this solicitation. An issued purchase order may specify an expiration date on or before which goods or materials must be provided.

Following such expiration date, any award pursuant to this solicitation made to the vendor to whom the purchase order is addressed shall then become null and void with respect to unprovided goods and/or materials. Vendors providing goods or materials without a signed purchase order do so at their own risk. The Town shall not be liable for payment of any goods and/or materials provided under this Bid unless a valid purchase order has been issued to the vendor.

Delivery Dates For all Bids and purchase orders with a specified delivery date and/or delivery time included, time is of the essence for such deliveries.

Payment Prior to payment, the items furnished and/or work performed will be inspected by the Town to determine their conformity to specifications. No payment shall be made for items not meeting specifications. Payment shall be made upon the submission of a completed invoice. Except for a drop shipment from the manufacturer or similar for which the drop-ship freight charge has been pre-approved by the Town, all prices bid shall include freight and shall be quoted F.O.B. destination.

Standard Title VI/Non-Discrimination The Town, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §2000d et seq.) and the interpretive regulations, hereby notifies all Bidders that it will affirmatively ensure that disadvantaged business enterprises will be afforded full and fair opportunity to submit a Bid in response to this solicitation and

Page 12 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

Signing of Contract Shortly after the Town gives a Notice of Award to the Successful Bidder, the Town will provide the Successful Bidder with at least two unsigned counterparts of the Contract and all other contract documents. Within 15 days thereafter, the Successful Bidder shall sign and return to the Town all such documents.

Sales Taxes The Town is an exempt organization and is therefore exempt from payment of sales and compensating use taxes of the State of New York, and of cities, counties, and other subdivisions of the State, on all goods purchased. In the case of a bid of work to be provided, as opposed to simply goods to be provided, please refer to the appended Schedule A for further details.

Laws and Regulations All applicable New York State laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over the project shall apply to the Contract throughout, they will be deemed to be included in the Contract the same as though herein written out in full.

Minimum Wages, Fringe Benefits and Non-Discrimination in Employment The minimum wages paid, the fringe benefits provided, and non-discrimination practices of the Successful Bidder and its subcontractors shall comply with the appended Schedule A.

Non-Collusive Bidding and Iranian Energy Sector Divestment Certificates Discussed

All Bids are subject to provisions of N.Y. Gen. Mun. Law §103. A signed non-collusive certification and Iranian Energy Sector Divestment Certification are required to be submitted with each Bid in the form specified with the RFB.

Escalation of Cost This is a fixed unit price contract, and the Bidder will not be entitled to extra reimbursement due to escalation of its costs due to inflation.

Insurance Requirements When Services Provided If the Successful Bidder and/or its subcontractors will provide services on Town property when satisfying the requirements of this solicitation, it will be required to procure and maintain, solely at its own expense, insurance of the kinds and in the amounts described below and required in the Contract. The Successful Bidder and its subcontractors will be required to maintain such insurance coverages until final acceptance of its goods and/or services by the Town. For the purposes of these insurance requirements, providing “services” includes the act of delivering goods on Town property. Before providing services/commencing work, the Successful Bidder and

Page 13 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM its subcontractors will deliver to the Town Attorney or his designee, proof of insurance satisfactory to the Town Attorney, showing that:

- The insurance is endorsed to provide written notice be given to the Town, at least thirty (30) days prior to the cancellation, non-renewal, or material alteration of such policies; and

- The “Town of Colonie” is covered by such insurance as an additional insured “RFB: 2026 Boiler Replacement at Public Operations and Public Safety DB378” must appear on the certificate of insurance. The additional insured requirement does not apply to Workers Compensation or Professional Liability coverage.

The kinds and amounts of insurance to be maintained are as follows:

A. Worker’s Compensation and Employer’s Liability Insurance meeting all New

York State statutory requirements. Such policy or policies shall provide protection for employees of the Successful Bidder and its subcontractors in the event of job-related injuries.

B. Automobile Liability Policy or Policies with limits of not less than $1,000,000 for each accident because of bodily injury, sickness or disease sustained by any person, including death at any time, caused by accident, and arising out of the ownership, maintenance or use of any automobiles. In addition, the automobile liability policies shall have limits of not less than $1,000,000 for each accident for damage to property, including all resulting loss of use thereof, caused by accident and arising out of the ownership, maintenance, or use of any automobiles.

C. Commercial General Liability and Umbrella/Excess Liability coverage, including comprehensive form, contractual, premises, and operations, products, and completed operations, personal & advertising injury, cross liability coverage, independent contractors, and broad form property damage insurance shall be furnished with limits of not less than:

a. Specific Coverages and Limits. The types of insurance and minimum policy limits shall be as follows:

Commercial General Liability. Commercial General Liability Insurance, (CGL) covering the liability of the Contractor for bodily injury, property damage, and Personal and Advertising Injury arising from all work and operations under the contract, using ISO form CG 00 01 or a policy providing equivalent coverage. The limits under such policy shall not be less than the following:

1. Each Occurrence Limit - $2,000,000.

2. General Aggregate – $2,000,000.

3. Products/Completed Operations - equal to the “General Aggregate” limit

4. Personal and Advertising Injury – $1,000,000

5. Damage to Rented Premises - $50,000

Page 14 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

6. Medical Expense – $5,000

Coverage shall include, but not be limited to, the following:

• premises liability;

• independent contractors/subcontractors;

• blanket contractual liability, including tort liability of another assumed in a contract;

• defense and indemnification obligations, including obligations assumed under the contract;

• cross liability for Additional Insureds;

• Products/Completed Operations for a term of no less than 3 years, commencing upon acceptance of the work, as required by the contract;

• explosion, collapse, and underground hazards,

• contractor means and methods; and

• for contracts involving the erection, demolition, repairing, altering, painting, cleaning, or pointing of a building or structure, liability resulting from Section 240 or Section 241 of the New York State Labor Law.

Limits may be provided through a combination of primary and Umbrella Liability/Excess Liability policies. The CGL aggregate shall be endorsed to apply on a per project basis Policies shall name the Town as Additional Insured, and such coverage shall be extended to afford Additional Insured status to it during the Products/Completed Operations term.

The CGL policy, and any Umbrella Liability/Excess Liability policies used to meet the “Each Occurrence” limits specified above, must be endorsed to be primary with respect to the coverage afforded the Additional Insured, and such polic(ies) shall be primary to, and non-contributing with, any other insurance maintained by the Town. Any other insurance maintained by the Town shall be excess of and shall not contribute with the Contractor’s or subcontractor’s insurance, regardless of the “Other Insurance” clause contained in either party’s policy (ies) of insurance, if applicable.

To determine compliance with these insurance requirements, the Town’s will request and review relevant certificates of insurance and copies of relevant policy jackets, declaration pages, endorsements, and/or riders. Submission of such documents by the Successful Bidder and/or its sub-contractors will not be construed to relieve the Successful Bidder of any obligations, responsibilities, or liabilities under the Contract.

Page 15 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

04 BID-D Boiler Replacement at Public Ops and Safety DB378.docx Last Updated:5/22/2026 12:12 PM

The Successful Bidder will be solely responsible for the payment of all deductibles and self-insured retentions to which any such insurance policies will be subject.

Not less than 30 days prior to the expiration date or renewal date, the Successful Bidder (or subcontractor) shall supply to the Town updated replacement Certificates of Insurance, and amendatory endorsements.

Failure to obtain and/or keep in effect any or all required insurance on behalf of the Town as provided above will constitute a material breach of the Contract and will subject the Successful Bidder to liability for damages, indemnification, and all other legal remedies available to the Town. The insurance requirements will not be construed to conflict with the obligations of the Successful Bidder concerning indemnification.

Failure to obtain and/or keep in effect any or all required insurance shall also provide the basis for the Town’s immediate termination of the Contact, subject only to any applicable cure period. Any such termination by the Town shall in no event be constituted or be deemed to be a breach of the Contract and no liability will be incurred by or arise against the Town, its agents, and employees for such termination for lost profits or any other damages.

Page 16 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM Bid Form

TO BE SUBMITTED

SUBMISSION DOCUMENTS

Bid Form

Project ID: RFB: 2026 Boiler Replacement at Public Operations and Public Safety DB378

Submit Bid to: Office of Purchasing General Services Department Town of Colonie 534 New Loudon Road Latham, NY 12110

Agreement to Contract: The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter a Contract with the Town substantially in the form included in the attached sample contract documents to complete all work as specified or indicated in the Contract Form for the Contract Price and within the Contract Time.

Acceptance of Instructions to Bidders: Bidder accepts all the terms and conditions of the NTB and Bid Information and Instructions, including without limitation those dealing with the disposition of bid security, if any. At the Town’s discretion, this Bid must remain open for up to 45 days after the opening date. Bidder will sign the Contract and submit the defined contract security, if required, and other documents required by the Contract within fifteen days after the date of Town’s Notice of Award.

Acceptance of Addenda: by submitting this bid, Bidder represents that:

Bidder has examined copies of this RFB and of the following addenda (if addenda have been issued, note each addendum’s number and issue date):

Addendum Number Issue Date

Bidder has full knowledge of the site(s) to where deliveries are to be made and/or where the work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations) and the conditions

Page 17 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM affecting its cost, progress, or performance, and has made such independent investigations as Bidder deems prudent;

This Bid is genuine and not made in the interest of, or on behalf of, any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham bid; Bidder has not solicited or induced any person, firm, or a corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over the Town.

Commitment to Complete Work/Supply Goods: Bidder will provide the services, complete the work, and/or supply the goods contemplated by this RFB for the price(s) specified in the Bid Response Sheet.

Work Commencement: Bidder agrees to provide the services and/or to commence the work within the time frames indicated in the Contract. Bidder agrees that all contemplated work will be completed within the specified time period(s) indicated in the Contract.

Pages To Be Completed and Submitted: the following documents are attached to and made a condition of this bid:

these Bid Form pages;

the separately posted Bid Response Sheet;

the Non-Collusive Bidding Certification;

the Iranian Energy Sector Divestment Certification;

the Vendor Responsibility Questionnaire;

the Bidder Qualification Questionnaire;

a copy of the contractor’s NYSDOL Certificate of Registration;

a currently effective ACORD 25 Certificate of Liability Insurance indicating the

Bidder’s commercial general and umbrella liability insurance limits, said ACORD 25 to be supplemented by a completed ACORD 855 Construction Certificate of Liability Insurance, when applicable;

documentation of the Bidder‘s currently effective New York State Workers’ Compensation and Disability Benefits coverages on forms specified by the Chair of the New York State Workers’ Compensation Board; and the Acknowledgment by Bidder.

the required bid security in the form of a bid bond (see discussion below Bid

Bond header), or a certified check and a letter from a bonding company indicating its intent to furnish the bonds required under the Contract.

Page 18 2026 Boiler Replacement at Public Operations and Public Safety Opening: 06/24/26 11:30 AM

Communications to Bidder: communications from the Town to the Bidder concerning this solicitation and any future contract documents to be executed should be addressed to:

Contact Name: ____________________________________________________

Contact Address: ____________________________________________________

Phone: ________________________________

Email: ________________________________

Bid Response Sheet Instructions: Bidders must utilize the separately uploaded Bid Response Sheet. While Bidders may utilize either the Excel-formatted version of the Bid Response Sheet or the PDF-formatted version, the Town strongly encourages Bidders to use Microsoft Excel software to complete the Excel-formatted version of the Bid Response Sheet. The Excel-formatted version is entitled: A. Bid Response Sheet – Excel Formatted. The PDF-formatted version is entitled: B. Bid Response Sheet – PDF Formatted.

A Bid submitted on other than the Town’s supplied Bid Response Sheet will be rejected as void. Similarly, a Bid submitted without a Grand Total Amount Bid for the Item Group or without a bid on all items within an item group (including zero-estimated-quantity items) may be rejected as void with respect to the item or item group at issue.

The Town intends to make separate awards for each item group. The quantities listed in the Bid Response Sheet are estimates of the Town’s…