Bid Notice.pdf
PDF 654 KB Posted
- Attached to
- 2027-2029 Emergency Sanitary Sewer Point Repair
- Solicitation number
- 26-063
- Issued by
- Pueblo County, Colorado
About this file
This is a Public Improvement Invitation for Bid (IFB) #26-063 issued by the City of Pueblo, Colorado, for creating an approved contractor list to perform emergency sanitary sewer point repairs on an as-needed basis. The project scope includes repairing sanitary sewer mains and/or manholes, supplying all materials, and providing traffic control for each individual project awarded. Services requested encompass various repair activities including pipe repairs, manhole rehabilitation, cementitious coating applications, bypass pumping, dewatering, and site restoration. The mandatory pre-bid meeting is scheduled for November 17, 2026, at 10:00 a.m. at the Wastewater Reclamation Facility. The deadline for submitting questions is November 24, 2026, at 4:00 p.m., and bids are due December 2, 2026, at 10:00 a.m., submitted electronically through the OpenGov portal. The initial contract term runs from January 1, 2027, through December 31, 2029, with the option to renew for two additional successive one-year periods. Individual projects will be awarded as needed based on the lowest estimated cost calculated by multiplying estimated quantities by the contractor's submitted unit prices and the contractor's ability to respond to emergency projects within required timeframes.
Bidders must submit a bid security equal to five percent of the grand total bid amount. All prices quoted shall be honored through December 31, 2027, with annual price increases thereafter limited to the lower of three percent or the prior year's Consumer Price Index. Performance and payment bonds are required only for individual emergency repair projects totaling $50,000 or more, with bond costs reimbursed by the City. Payment is made as a single lump sum upon completion, inspection, and approval of each individual project, with no progress payments permitted. Contractors must demonstrate a minimum of five years of experience working with 8", 10", 12", and 15" public sanitary sewer mains more than 10 feet deep, supported by project references or municipal lists. The City retains the right to terminate the agreement at any time without cause. Contractors are responsible for all permits, fees, traffic control, erosion and sediment control, insurance requirements, and site restoration costs. Prepayment of City sales and use tax at forty percent of the total bid is required for projects totaling $100,000 or more within fourteen days of the Notice to Proceed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUBLIC IMPROVEMENT INVITATION FOR BID
26-063
2027-2029 EMERGENCY SANITARY SEWER POINT REPAIR
City of Pueblo
230 S. Mechanic St.
Pueblo, CO 81003
RELEASE DATE: November 10, 2026
DEADLINE FOR QUESTIONS: November 24, 2026, 4:00 pm
RESPONSE DEADLINE: December 2, 2026, 10:00 am
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/pueblo
City of Pueblo
PUBLIC IMPROVEMENT INVITATION FOR BID
2027-2029 Emergency Sanitary Sewer Point Repair
I. ADVERTISEMENT FOR BIDS
II. INTRODUCTION
III. SPECIAL PROVISIONS
IV. LABOR PROVISIONS
V. GENERAL PROVISIONS
VI. VENDOR SUBMISSIONS
VII. PRICING TABLE
Attachments:
A - Sample Contract Documents
B - Licensing and Sales Tax Information
Public Improvement Invitation for Bid #26-063 Title: 2027-2029 Emergency Sanitary Sewer Point Repair
1. ADVERTISEMENT FOR BIDS
(AS PUBLISHED)
The City of Pueblo is soliciting bids for the following project.
Project No.: 26-063
Project Name: 2027-2029 Emergency Sanitary Sewer Point Repair
The purpose of this project is to create an approved contractor list for emergency sanitary sewer point repairs, on an as needed basis. Emergency sanitary sewer point repairs include repairing sanitary sewer mains and/or manholes, supplying all materials, and providing traffic control for each project as contracted. Each contract (site) will be awarded as the need arises, based upon availability and project calculations from submitted unit prices. The term of the approved contractor list is three years, consisting of 2027, 2028, and 2029 with the option to renew for two additional one-year terms.
Complete solicitation information can be obtained on the City of Pueblo Purchasing Department website at www.pueblo.us/purchasing or the OpenGov portal at https://procurement.opengov.com/portal/pueblo.
Published: Tuesday, November 10, 2026, in The Pueblo Chieftain Newspaper
2. INTRODUCTION
2.1. Summary
The purpose of this project is to create an approved contractor list for emergency sanitary sewer point repairs, on an as needed basis. Emergency sanitary sewer point repairs include repairing sanitary sewer mains, supplying all materials, and providing traffic control for each project as contracted. Each contract
(site) will be awarded as the need arises, based upon availability and project calculations from submitted unit prices. The term of the approved contractor list is three years, consisting of 2027, 2028, and 2029 with the option to renew for two additional one-year terms.
2.2. Contact Information
Debby Rivera
Purchasing Contract Administrator
Email: purchasing@pueblo.us
Phone: (719) 553-2350
Department:
Wastewater
2.3. Timeline
Advertisement/Release Project Date November 10, 2026
Pre-Bid Meeting (Mandatory) November 17, 2026, 10:00am
Wastewater Reclamation Facility Engineering
Conference Room
1300 S. Queens Avenue
Pueblo, CO 81001
Question Submission Deadline November 24, 2026, 4:00pm
Bid Opening December 2, 2026, 10:00am
3. SPECIAL PROVISIONS
3.1. GENERAL INSTRUCTIONS
All specifications included in the Special Provisions shall have precedence over and will govern in the event of a conflict with other sections contained in this document.
Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Failure to do so will not relieve a Bidder from any obligation or responsibility to understand and comply with all requirements and conditions for this project.
Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No
Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening.
Downloaded plans/drawings must be printed as “Actual Size”; scaling is NOT correct when printed using other options. It is the Bidder’s sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidder’s failure to follow this requirement.
Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of
Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award.
The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
Bidders must follow the submittal procedures outlined in the bid documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest.
3.2. RESPONSIBILITY AND CAPACITY TO PERFORM CONCURRENT WORK
In determining responsibility, the City may review each Bidder’s capacity to perform multiple City projects concurrently, including staffing, equipment, bonding, financial resources, current workload, and performance history. Bidder’s failure to adequately demonstrate such capacity shall be grounds for determining bidder not responsible.
3.3. BASIS OF AWARD
Approved contractors will be placed on a call list for emergency sanitary sewer point repair projects on an as-needed basis. Wastewater Department staff will estimate the cost of each individual project based on calculations of estimated quantities multiplied by submitted unit prices. Each individual project will be awarded to the contractor who is able to complete the project at the lowest estimated cost within the timeframe necessary to complete the project, as best fits the needs of the City. The City reserves the right to award projects based on Contractor's ability to respond to emergency projects in a timely manner.
A notice of award and notice to proceed will be given for each project.
3.4. TERM/TERMINATION
Term. An initial agreement (in the form of the attached contract documents) with Contractor(s) is anticipated and expected to commence on January 1, 2027, and, unless sooner terminated, will terminate on December 31, 2029. The project may be renewed in two (2) successive one-year periods by a separate written amendment signed by both parties.
All prices quoted shall be honored through December 31, 2027. Requests for annual increases in prices after this date may not exceed 1) three percent (3%) or, 2) the prior year's United States Bureau of Labor
Statistics Consumer Price Index (CPI), whichever of the two options is lower. Price increases greater than this amount will not be considered unless there is an industry-wide price increase, which must be substantiated by a letter from the supplier or manufacturer.
Termination. City reserves the right to terminate this Agreement, in whole or in part, at any time, without cause, by written notice to Contractor. Upon receipt of such notice, Contractor shall immediately stop work under the agreement or with respect to the portion of the Agreement terminated and shall take immediate corresponding action with respect to the Contractor's suppliers and subcontractors; if any.
Fund Appropriation. City would make any such renewal subject to the appropriation of funds for the continuation of agreement. Upon the failure of City to appropriate such funds, the agreement would immediately be terminated without liability.
3.5. BID, PERFORMANCE, AND PAYMENT BONDS
A Bid Bond and Payment and Performance Bonds are not required for the submittal of the bid.
Any and all language regarding bid, performance and payment bonds in General Provisions shall not be applicable for this project if the bid amount is less than $50,000.00.
If the total amount for any individual emergency point repair project is $50,000.00 or more, Performance and Payment Bonds will be required at the time of award (per §38-26-106, C.R.S.).
If Performance and Payment Bonds are required for a repair, the City of Pueblo will reimburse the
Contractor for the cost of the bonds. A copy of the receipt for the bonds must be submitted to the City for reimbursement. No markup will be paid.
3.6. PROGRESS PAYMENTS
Progress payments will not be made. Contractor will be paid only after receipt of a Notice to Proceed, completion of each individually awarded project, and final inspection and approval of each project by
Wastewater personnel.
A single payment for each individual project will be made upon completion of the entire project after all work is completed, inspected, and approved by authorized Wastewater personnel. All retainage provisions will still apply; final payment will not be made until after final advertisement.
3.7. STANDARD CONSTRUCTION SPECIFICATIONS AND STANDARD DETAILS
The 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado, adopted January 12, 2026, and as most recently amended, shall control the construction and quality of materials for this project except where specifically modified by the Special Provisions. Unless specifically modified by the Special Provisions, the 2026 Standard Construction Specifications and Standard Details shall control with respect to any inconsistencies with the Plans. The 2026 Standard Construction
Specifications and Standard Details are not included in this bid package but are available on the City of
Pueblo’s website at 2026 Standard Construction Specifications and Standard Details. By submitting a bid, the Contractor acknowledges possession of a copy of said document.
3.8. SPECIFICATION LANGUAGE
Specifications may be written in abbreviated style with incomplete sentences. Omission of words such as “The General Contractor shall”, “Conforming to”, “shall be”, etc., are intentional; omitted words shall be supplied by inference. Where words “approved”, “satisfactory”, “directed”, “submitted”, etc., are used it shall be assumed that the words “Project Manager” follows, such as “approved by the Project
Manager”.
3.9. APPROVED EQUAL
An approved equal, where noted, may be considered by the City. For consideration as an approved equal, a Request for Substitution must be submitted through the OpenGov portal by Tuesday, November 24, 2026 at 4:00 pm (MT). Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. If approved, an addendum will be issued that lists all approved equal products or materials. No other products or materials will be considered.
3.10. INCONSISTENCIES
Any inquiries regarding seeming inconsistencies between the Plans and Specifications for this project must be made by Tuesday, November 24, 2026 at 4:00 pm (MT).
3.11. PREPAYMENT OF CITY SALES AND USE TAX
(This section applies to public improvement construction projects $100,000 and over.)
The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded, including Base Bid plus those Alternates selected. Application and prepayment shall be made within fourteen (14) days of the date authorized to proceed with construction of the Project as set forth in the Notice to Proceed. All applications and prepayments shall be coordinated directly with City’s Division of Sales and Use Tax, Attention: Tax Audit Manager, 101 W. Riverwalk, Pueblo, Colorado 81003.
Finance Department policy sets the threshold at $100,000. Any contractual obligations below this amount will not generally be required to make a pre-payment of Use Tax.
3.12. PERA LIABILITY
Contractor shall reimburse the City for the full amount of any employer contribution required to be paid by the City of Pueblo to the Public Employees’ Retirement Association (“PERA”) for salary or other compensation paid to a PERA retiree performing contracted services for the City under this Agreement.
Awarded Contractor will be required to submit a completed Colorado PERA Questionnaire form. This form is available to view at Colorado PERA Questionnaire and is included by reference in this Contract.
3.13. CONTRACTOR EVALUATION
The performance of the awarded Contractor will be evaluated using the Contractor Evaluation
Form. This form is available to view at Contractor Evaluation Form and is included by reference in this
Invitation for Bid. The evaluation will be utilized to review Contractor’s performance, increase communication, and foster positive business relationships.
The completed evaluation form will serve to document Contractor’s overall performance. Material failure to perform in accordance with the terms of one or more contracts, or materially unsatisfactory performance of one or more contracts, may be justification for disqualifying future bids by Contractor pursuant to Pueblo Municipal Code, Title 1, Chapter 10, Section 1-10-4(d).
3.14. SAFETY REGULATIONS
The Contractor shall be aware of and shall comply with all State and Federal Safety regulations which are applicable to the work included under this Contract. Enforcement will be by the proper State and
Federal regulatory agencies.
If any construction activity is deemed to be unsafe for inspection, Contractor shall, upon notification, discontinue work until the deficiencies are corrected and the job can be properly inspected.
3.15. EMERGENCY REPAIR OR PROTECTIVE WORK BY THE CITY OF PUEBLO
As referenced in PROTECTION OF THE PUBLIC, WORK, AND PROPERTY and ACCIDENT PREVENTION of the GENERAL PROVISIONS , it is the Contractor’s responsibility to provide adequate barricades, protective devices and safety measures, and to employ other precautionary means for the adequate protection of the public, the work, and public/private property from injury or loss. Should the City become aware of any condition or circumstance arising from the work, or with respect to any excavation or areas disturbed by Contractor which, in the opinion of the Project Manager, creates or results in any imminent or unreasonable risk to the health/safety of the public or to public/private property, the City may undertake emergency work or repairs. Such work may include, by way of illustration, provision of barricades, traffic control devices or flagmen, deployment or warning signs, repair of lines under construction, repair of collapsed excavations or sinkholes, placement of sandbags or dams, and other emergency efforts. The determination of the necessity during the construction and warranty periods for the City to do any such emergency work or repairs shall rest entirely with the Project Manager. The cost of emergency work done by the City, including the actual cost of labor, equipment, and materials, plus
100 percent, shall be deducted from any amounts otherwise owed to Contractor, or may be invoiced to
Contractor, or the same amount shall be recovered from Contractor’s performance bond.
3.16. REPRESENTATIVE AVAILABLE FOR EMERGENCY CALLS
The Contractor shall provide the name, address and phone number of a representative who may be reached at any time during the life of the Contract regarding repairs, detours, barricading, etc. This information shall be furnished in writing to the Project Manager.
3.17. DUST PREVENTION
During construction and until final acceptance by the Project Manager, Contractor shall be responsible for controlling dust emissions in the construction area. No earthwork activities shall be performed when the wind speed exceeds thirty (30) miles per hour. All fill areas shall be compacted on a daily basis to
95% of a Standard Proctor laboratory maximum density. Any mud or dirt carried out onto paved surfaces shall be cleaned up on a daily basis. Contractor shall promptly comply with all directives from the Project Manager relating to dust control. If Contractor fails to comply or provide adequate means to control dust, a stop-work order will be issued until the problem is corrected.
3.18. SITE RESTORATION AND CLEANUP
Contractor shall maintain and/or repair any damage done to all existing properties, public or private, adjacent to site improvements, including but not limited to, asphalt, base course, utilities, sod, irrigation systems and landscaped areas. In general, disturbed areas shall be replaced to the lines, grades, thickness, and like materials of the existing conditions unless otherwise stated on the plans. Restoration shall be consistent with that of areas adjacent to the limits of construction. Grass and other plant areas shall be restored, maintained, and irrigated until final acceptance by the Project Manager. Fabric shall be installed under all rock landscape areas. Any landscape material salvaged by Contractor for reuse will not be acceptable if contaminated by dirt or different landscape material. Slopes to match from the new improvements to existing improvements shall not exceed a 4:1 slope.
All work to relocate existing irrigation sprinklers which conflicts with the new construction shall be considered site restoration. The accuracy of information furnished regarding existing irrigation systems is not guaranteed. The locations are approximate and may not include all irrigation system components.
Contractor shall determine the exact location of all irrigation systems before commencing work and shall be fully responsible for any damage resulting from failure to locate and protect all irrigation systems.
Site restoration and cleanup will not be measured or paid separately but shall be included in the unit prices for each bid item. Partial payments will not be made on any bid item until the restoration and cleanup associated with that item is satisfactorily complete and acceptable to the Project Manager.
3.19. UTILITY LOCATIONS
The accuracy of information furnished in regard to underground utilities is not guaranteed. The utility locations are approximate and may not include all utilities. Contractor shall determine the exact location of all utilities before commencing work. Contractor shall be fully responsible for any damage which might occur due to Contractor’s failure to locate and protect all utilities. Contractor shall repair or have repaired, at no cost to the City, any damage to utilities.
Existing utilities include gas, water, service lines, meters, meter cans, buried telephone cables, buried power lines, pedestals, utility poles, sanitary sewer, manholes and services, and any other existing utility.
3.20. ABANDONED UTILITIES
If during construction an abandoned utility is encountered Contractor shall contact and coordinate with the Project Manager to arrange for the removal of the utility. If Contractor elects to remove the utility without contacting the Project Manager, Contractor shall do so at no cost to the City.
3.21. OVERHEAD AND/OR UNDERGROUND HIGH VOLTAGE POWER LINES
Unless danger against contact with high voltage overhead and/or underground lines has been effectively guarded against, Contractor shall not perform any function/activity upon any land, building, highway, or other premises if at any time during the performance of any function/activity it could move or be placed within ten (10) feet of any high voltage overhead and/or underground line. If work is to be performed within ten (10) feet of high voltage overhead and/or underground lines, the public utility must first be notified to arrange for safety provisions. Contractor may perform the work only after arrangements, including coordination and payment of fees, if applicable, have been made with the utility company.
3.22. CONCRETE PERMITS
The “no fee” permit shall be obtained from the City Engineering Division at 211 E. “D” Street. Any concrete work placed without benefit of both permit and inspection by the Public Works Department will not be paid for.
3.23. COORDINATION OF CONSTRUCTION ACTIVITIES
Contractor and subcontractors shall coordinate work with all other construction activities and contractors; and cooperate with them to facilitate general progress of the work. Each trade shall afford other trades every reasonable opportunity for installation and storage of materials.
3.24. WORK BY OTHERS
Contractor shall coordinate work on the project with all work shown on the plans which is to be done by
“others”. It is the Contractor’s responsibility to coordinate work with each entity and incorporate it into the project schedule
3.25. COMPLETE WORK ON TIME
Failure to complete the work within the amount of time allotted when the repair is needed shall result in the assessing of liquidated damages according to GENERAL PROVISIONS.
3.26. LAYING OUT WORK
Contractor shall locate all general reference points and take such action as necessary to prevent their destruction. Contractor shall lay out their own work and be responsible for all lines, elevations, and measurements of the building, grading, utilities, and other work executed under this Contract.
Contractor shall exercise proper precaution to verify figures shown on the drawing before laying out work and will be responsible for any error resulting from failure to exercise such precautions.
3.27. CONSTRUCTION STAKING
Contractor may request construction staking by the City for all sanitary sewer main line, curb and gutter and crosspan replacement. Contractor shall notify the City 48 hours in advance for staking. Contractor shall protect all stakes from damage during construction and shall be responsible for the cost of replacing any stakes that are damaged. The City shall replace stakes at a cost of $50.00 per stake which may be deducted from the final payment to Contractor.
3.28. HOURS OF WORK
The Project Manager and the Inspection Division are available from 7:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m., Monday through Friday, excluding holidays. Any work done outside of these hours must be approved by the Project Manager.
3.29. MOBILIZATION
This item shall consist of mobilizing of personnel, equipment, and supplies to the project site in preparation for work on the project. Item shall include all costs incurred which must be performed prior to beginning the other items.
Payment for mobilization shall be made by a one-time lump sum amount upon completion of the project.
3.30. CONSTRUCTION TRAFFIC CONTROL
Contractor shall submit a traffic control plan prepared by a Certified Traffic Control Supervisor at the preconstruction conference for approval by the City’s Traffic Engineer.
Where possible, crosspans may be constructed full width with proper street closures; however, the time of closure must be kept to a minimum. To expedite the curing, the minimum 28-day compressive strength shall be increased to 4500 psi (increased to seven (7) sacks per cubic yard). The additional cost for the added cement shall be paid by the Contractor.
All traffic control procedures, signing, lighting and barricades shall conform to the latest edition of the
Manual on Uniform Traffic Control Devices and shall be set up and maintained by a Certified Traffic
Control Supervisor.
Construction traffic control shall be paid for by separate invoices. When a contractor is awarded an individual emergency repair project, the contractor shall obtain a competitive quote from a responsible traffic control provider. Estimate(s) shall be submitted to the Project Manager for review prior to commencing any work. If traffic control is not provided by the contractor, a receipt from the vendor who provided the materials must be submitted with the invoice. Contractor will be paid for the total of the receipt plus 15% additional. If self-performed, a per day price shall be submitted at the beginning of the project.
3.31. TRAFFIC CONTROL SUPERVISOR
The Traffic Control Supervisor shall be certified as a Worksite Traffic Supervisor by the American Traffic
Safety Services Association (ATSSA) or Colorado Contractors Association (CCA). A copy of the Traffic
Control Supervisor's Certification shall be provided to the Project Manager at the project pre construction conference
3.32. TRAFFIC CONTROL DEVICES – SIGNS
Contractor shall be responsible for all permanent traffic control devices (signs) within the construction area. If permanent devices conflict with construction activities, Contractor shall be responsible for placement of temporary traffic control devices and the removal/reinstallation of permanent devices.
All work shall be in accordance with the Manual of Uniform Traffic Control Devices. All regulatory signs
(Stop, Yield, One Way, Do Not Enter, etc.) shall be maintained in either a temporary or permanent manner. Temporary devices shall be in place prior to the removal of permanent devices. Contractor shall be held fully responsible for any claims resulting from negligence in failing to act or maintain any traffic control device.
Contractor shall be responsible for maintaining the condition of any sign that is temporarily removed.
Should there be any damage to devices (signs, poles, bases, and hardware) Contractor shall be financially responsible to the City for replacement of said devices.
Contractor shall contact Traffic Maintenance at (719) 553-2300 for approval of the specific location in which the devices are to be reinstalled. Contractor shall obtain underground utility locates prior to reinstalling devices.
The Traffic Engineer or designee will evaluate existing signage for replacement with new materials. If required, the City will provide all replacement materials to the Contractor prior to reinstallation. Where new devices are required per the construction drawings all signs, posts, bases, and hardware shall be supplied by the City. Contractor shall contact the Traffic Engineer at (719) 553-2722 to order signs providing the City at least two-week notification to obtain the necessary material.
3.33. PRESERVATION OF HISTORIC STREET NAME CURB STAMPS
Older areas within the City may have street names stamped into the top of the concrete curb at street intersections where new curb ramps are to be constructed. Contractor shall preserve the portion of concrete curb with the historic street name and reinstall it behind the new curb and gutter.
Prior to any demolition, the Contractor shall verify if any street names are stamped in the existing curb head. If any street names exist the Contractor shall notify the Construction Inspector for documentation of the curb stamp and condition. If the condition of the existing concrete curb allows, the Contractor shall neatly saw cut the portion of curb containing the street name as needed to remove the portion intact. The Contractor shall reinstall the portion of curb with the street name directly behind the new curb and gutter adjacent to the new curb ramp.
3.34. PROTECTION OF CONCRETE FROM TRAFFIC AND VANDALISM
All concrete shall be protected from traffic for a period of fourteen (14) days, or as directed by the
Project Manager. The Contractor shall provide necessary supervision and/or barriers to protect all concrete from traffic or vandalism. Any concrete damaged by traffic and/or vandalism will be rejected.
Replacement of damaged concrete shall be paid for entirely by the Contractor.
3.35. ASPHALT AND CONCRETE REMOVAL
Asphalt and concrete shall be removed to the lines and grades established by the Project Manager. Any removal outside those lines and grades not approved by the Project Manager, will not be paid for by the
City. Contractor shall properly dispose of all removed items from the construction site.
Saw cutting to remove asphalt and concrete to a neat line shall not be paid for separately but shall be included in the cost of the asphalt and concrete removal bid item.
3.36. CURB AND GUTTER CONSTRUCTION AND PAYMENT
Contractor shall schedule their work to minimize the inconvenience to the public. Property owners shall be notified well in advance of any work that interferes with access to private driveways. Access to driveways shall be restored no later than fifteen (15) days after the concrete is placed.
Sections of curb and gutter shall not be considered for partial payment until backfill and restoration (if applicable) are completed.
Under the bid item labeled “Remove and Replace Standard Curb and Gutter”, the Contractor shall construct curb and gutter to match existing type (6” Std. 9”x30” pan, Roll top, etc.). Payment for all types of curb and gutter will be the unit price in the Bid Schedule.
3.37. TACTILE BAND FOR CURB RAMPS
The base of the curb ramp area only shall include a Tactile Band. The Tactile Band shall be cast iron castings containing truncated domes. Castings shall meet the requirements of Americans with
Disabilities Act Accessibility Guidelines (ADAAG) for Accessible Public Rights-of-Way. Castings shall be cast-in-place truncated dome tactile system, Neenah R-4984, East Jordan Iron Works 7005, or approved equal at the sizes shown on the plans. Radial castings shall be East Jordan Iron Works 7006-20 (20’ radius), 7006-25 (25’ radius), 7006-30 (30’ radius) or approved equal, placed as shown on the plans.
3.38. EROSION AND SEDIMENT CONTROL
Contractor shall submit and comply with an Erosion and Sediment Control Plan (ESCP). This plan is considered incidental to the construction and shall not be paid for separately. Contractor shall take this into consideration in preparing their bid.
To comply with current state and federal permit regulations, the City must meet minimum requirements for all construction sites less than one (1) acre to provide necessary Best Management Practices (BMPs) and prevent illicit discharges from the site. The minimum requirements which the Contractor must provide and comply with are as follows:
A. Provide an Erosion and Sediment Control Plan that shall include the minimum following items:
1. Stockpile protection BMPs.
2. Concrete washout BMPs.
3. Vehicle tracking control BMPs.
4. Site sediment containment & perimeter control BMPs.
5. Downstream secondary defense BMPs, if applicable.
6. Any additional BMPs required due to site specific conditions.
B. Prior to any construction, including site grading and excavation, an approved Erosion and
Sediment Control Plan shall be posted on site and all required BMPs installed.
C. Contractor shall maintain and update the Erosion and Sediment Control Plan as construction dictates. The current and correct plan shall remain on-site and be readily accessible to the City
Stormwater Inspector at all times.
D. Contractor or the Contractor’s representative shall, at a minimum, inspect the site every two (2) weeks and within twenty-four (24) hours of any precipitation or snowmelt event that causes surface erosion. (i.e., that results in stormwater running across the ground).
E. Contractor shall be responsible for maintaining all required BMPs to prevent erosion and sediment from leaving the construction site.
F. Failure to comply with the requirements to prevent illicit discharges from the construction site is unlawful and a municipal offense which may result in the issuance of a summons and complaint to the Pueblo Municipal Court. Persons who are convicted of violating any provision of the
Pueblo Municipal Code are subject to fines of up to one thousand dollars ($1,000) and/or one
(1) year imprisonment for each day the violation continues.
G. Information regarding acceptable BMPs and proper installation can be found in the Mile High
Flood District (MHFD) Urban Storm Drainage Criteria Manual Volume 3, CDOT Erosion Control &
Stormwater Quality Guide, and City of Pueblo approved details.
3.39. PERMITS AND FEES
It shall be the Contractor’s responsibility to investigate and assess the requirements for all necessary environmental, drainage, and construction permits. The total cost of all permits or fees which may be required shall be included in the bid proposal. No additional payment shall be allowed for any permits or fees required to complete the project. Contractor shall comply with all conditions of the permits. City and/or other agency fines are the sole responsibility of the Contractor.
Following is a list of potential permits required for the project. Contractor shall be responsible for verifying this list and adding/obtaining any additional permits needed for the project.
• Air Quality Permit o Permitting Agency: Pueblo County/Colorado Department of Public Health and Environment o Responsibility to Obtain: Contractor
• CDPHE Stormwater Construction Permit o Permitting Agency: Colorado Department of Public Health and Environment o Responsibility to Obtain: Contractor
• Excavation Permit o Permitting Agency: City of Pueblo o Responsibility to Obtain: Contractor
• Concrete Permit o Permitting Agency: City of Pueblo o Responsibility to Obtain: Contractor
• Traffic Control Permit o Permitting Agency: City of Pueblo o Responsibility to Obtain: Contractor
• Fugitive Particulate Emissions Control Plan o Permitting Agency: Colorado Department of Public Health and Environment o Responsibility to Obtain: Contractor
3.40. ADVISING PROPERTY OWNERS OF CONSTRUCTION ACTIVITIES
The contractor shall prepare and hand deliver a door hanger of advisement for each business, residence or apartment unit that fronts on the street to be paved. The contractor shall be responsible for all printing costs. This notification shall be delivered and attached to the front doorknob of the inner door in conjunction with the placement of “NO PARKING” signs in the block such that a minimum 24-hours of advanced warning is given to the residents. Payment for all labor and materials for this item shall be included in the Traffic Control bid item. Separate door hangers shall be used to inform the property owners of additional road closures for each occurrence.
3.41. PAVEMENT IMPACT FEE
Pavement impact fees will be assessed by the City upon completion of the project if applicable. The
Contractor is responsible for payment of this fee and will be billed. The Contractor must provide a copy of the invoice to the City’s Wastewater Department for payment. Impact fee costs can be found in the
City of Pueblo Ordinance 12-6-4.1. Impact Fees are subject to change by Ordinance.
3.42. PIPE COST
If the pipe size required to complete the project is larger than 15”, the City of Pueblo will obtain estimates for cost of pipe by lineal foot from all approved vendors. The City of Pueblo will then determine which vendor has the overall lowest cost to proceed with the emergency repair. Pipe cost shall include but is not limited to, size, trench excavation (width and depth), jointing of pipe and bedding.
3.43. JOINTING PIPE
In addition to section 11.3.11 Jointing Pipe (c), when joining pipes via a coupler, a Fernco Strongback RC
Series repair coupling, or an approved equal shielded coupler shall be used to connect the existing to the new pipe. With PVC to PVC connections, the City of Pueblo requires a PVC Sleeve/Slip Coupler to be used to connect the existing to the new service pipe.
3.44. MANHOLE STEPS
New manholes will not have steps installed.
3.45. REMOVE AND REPLACE MANHOLE
The Remove and Replace item shall include all costs associated with removing the existing manhole and replacing with a new manhole. This shall include ring and cover casting, adjustment sections, precast sections, 5’ section of PVC pipe replaced on each invert, and all items incidental to complete the manhole install in accordance with the 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado adopted January 12, 2026, and as most recently amended.
3.46. RING AND COVER SALVAGE
Contractor shall salvage rings and covers removed from existing manholes. Rings and covers shall become the property of the City and handed over to the City’s Wastewater personnel.
3.47. MANHOLE SURFACE PREPARATION
The surface to be trenchlessly repaired shall be cleaned and abraded to ensure a clean and rough surface with sufficient profile to provide a good bond between the cementitous coating and the substrate per SSPC-SP 13/NACE 6 – Surface Preparation of Concrete. This shall be performed with mechanical cleaning such as sandblasting or water blasting with equipment capable of at least 5,000 psig or an alternate means and methods approved by the Engineer. To prevent debris from entering into the Collection System, screening must be set in downstream invert prior to cleaning. All material removed from concrete surfaces will be removed from the manhole and hauled to the City of Pueblo
Wastewater Treatment Plant at 1300 South Queens Avenue for disposal. The Contractor shall coordinate with the Engineer to perform pre and post-cleaning inspections of the rehabilitated manholes. The Contractor shall not continue the manhole rehabilitation process until the Engineer has performed the post-cleaning inspection and has given authorization to continue with cementitious coating.
It is the Contractor’s responsibility to determine the means and methods of surface preparation for the cementitious coating. All means and methods shall be approved by the Engineer prior to commencing work. Any and all costs associated with preparing the surface for coating shall be included in the line item for the Calcium Aluminate Coat Manhole.
If any material is found in the Collection System refer to Section 3.49 Sanitary Sewer Cleaning Section in the Special Provisions.
Cleaning with equipment that produce pressures of at least 5,000 psig, any other form of surface preparation and the removal of debris shall be incidental to the cost to place calcium aluminate coating.
3.48. REBUILD MANHOLE BENCH AND TROUGH WITH FAST-SETTING
CEMENTITIOUS MATERIAL
The Contractor shall rebuild manhole troughs and bases wherever noted in the plans with a cementitious material that can be epoxy coated. Rehab shall include manhole bases and inverts. The manhole inverts shall have a smooth transition to ensure an unobstructed flow. The contractor shall remove any sharp edges or rough sections that tend to obstruct flow. The surface shall be smooth and free of any deformities. The contractor shall repair inverts and benches with visible damage and where inflow and infiltration are present and form a watertight seal with manhole walls, base and pipe. Fast-
Setting cementitious material shall conform to the following performance testing:
• Compressive Strength, 28-day o Method: ASTM C109 o Results: 9,000 psi
• Flexural Strength, 28-day o Method: ASTM C293 o Results: 1,000 psi
• Bond Strength, 28-day o Method: ASTM C882 o Results: 2,000 psi
• Freeze-Thaw Durability o Method: ASTM C666 o Results: No visible damage after 300 cycles
• Shrinkage at 95% Humidity, 28-day o Method: ASTM C596 o Results: 0%
• Sulfide Resistance o Method: ASTM C267 o Results: No attack
Testing of this area will be performed on an as needed basis at the discretion of the Engineer and
Inspector. The Contractor is responsible to inspect the manhole prior to bidding to determine the severity of deterioration. Any additional patching of rehabilitated areas must have written authorization by the Engineer before any such work begins. Any approved patch work will be paid as a change order and numbers used during original bid process will be used for payment.
Payment for this item shall be paid per each for each manhole bench and trough which is located and repaired as found and accepted in the field under the “Rebuild Manhole Bench and Trough” line item.
3.49. CALCIUM ALUMINATE COATING
All surfaces that show exposed structural steel, spalling greater than 3/4” deep, cracks greater than 3/8” wide or infiltration, groundwater or deemed necessary by the Engineer shall be patched using calcium aluminate. Remove any sharp edges or rough sections that would snag hose or power lines. The surface shall be smooth and free of any deformities. Any and all costs associated with preparing the surface for calcium aluminate patching shall be included in the line item for the Calcium Aluminate Coat Manhole.
Calcium aluminate patching shall conform to the following performance testing:
• Compressive Strength, 28-day o Method: ASTM C109 o Results: 9,000 psi
• Flexural Strength, 28-day o Method: ASTM C293 o Results: 1,000 psi
• Bond Strength, 28-day o Method: ASTM C882 o Results: 2,000 psi
• Freeze-Thaw Durability o Method: ASTM C666 o Results: No visible damage after 300 cycles
• Shrinkage at 95% Humidity, 28-day o Method: ASTM C596 o Results: 0%
• Sulfide Resistance o Method: ASTM C267 o Results: No attack
Testing will be performed on an as needed basis at the discretion of the Engineer. Payment for this item shall be by the vertical foot calcium aluminate coating which is placed, tested and accepted as measured in the field under the “Calcium Aluminate Coat Manhole” line item. Measurement shall be from the invert of the manhole to the top rim of the manhole.
3.50. SANITARY SEWER CLEANING
The Contractor shall be liable for keeping sewers and manholes clean of bedding, backfill material, asphalt, etc., during construction. If cleaning of the sewer lines and manholes are needed, the
Contractor shall clean them at his own expense. If cleaning is done by the City, there will be a charge of
$550.00 per hour. Cleaning costs incurred will be deducted from the amount of the Contractor’s final payment.
3.51. ASPHALT PAVING AND SCHEDULE
Asphalt paving MUST commence no later than 3 working days from TV inspection acceptance. Paving is to be carried out continuously until completed. This is to prevent extra moisture from being introduced into the properly compacted materials that could be detrimental to the future quality of the trench. At no time shall the site be left unattended for more than 24 hours (weekends excluded with Engineer's authorization). If site is abandoned for more than 24 hours, without the Engineer's prior authorization, the Contractor could be liable for traffic control costs during that time.
3.52. MAINTENANCE OF PARTIALLY CONSTRUCTED STREETS
The Contractor shall be responsible for the maintenance of any partially constructed street at all times. In the event that the Contractor is unable to construct the bituminous plant mix pavement during inclement weather, he shall maintain said partially constructed streets to the satisfaction of the
Engineer in accordance with Article 11- Sanitary Sewers, Section 11.3.24, Asphalt or Concrete
Unavailable or Inclement Weather on Completion of Backfill.
3.53. GRAVEL SURFACED ALLEYS
The contractor shall replace surfacing conforming to Article 11 Sanitary Sewers, Section 11.3.18. Class 6 base course material to replace the gravel lost during excavation on gravel surfaced streets or alleys and shall be paid for by the number of tons delivered and placed in accordance with the specifications and accepted by the Engineer. Individual weigh tickets for each truckload from state certified scales shall be furnished to the inspector signed by the driver and include the following information:
• Date
• Time Dispatched
• Gross Weight
• Tare Weight
• Net Weight
• Project
• Destination
• Truck No.
• Material Type
• State allowable Gross Vehicle Weight (GVW)
Material delivered in trucks that exceed the rated GVW will be used but the excess over GVW will not be paid for. Any material delivered to the site without a weight ticket will not be paid for.
3.54. PLACE FLOW-FILL AND PAYMENT
The Contractor will be required to place 2’ of flow-fill in all trenches located in the road of the City of
Pueblo's Right-of-Way in accordance with the City of Pueblo Standard Construction Specifications and
Standard Details adopted January 12, 2026, or the most recently amended and in the road of Colorado
Department of Transportation's Right-of-Way. Payment for this item shall be based upon cubic yards of flow-fill placed from center of manhole to center of manhole or end of length in street in the Colorado
Department of Transportation’s (CDOT) Right-of-Way. Delivery tickets must be submitted with invoice for payment of flow-fill.
Flow-fill placed in CDOT’s Right-of-Way shall conform to Section 206 of CDOT’s Standard Specification
Provision.
3.55. REINSTATE SERVICE
The “reinstate services” pay item shall include locating and reconnecting all lateral service lines to the sanitary sewer main. When reinstating a service via an open trench, the Contractor shall use a a hard tie polyvinyl chloride (PVC) fitting when reinstating an existing PVC service. All other services shall be reinstated using a Fernco Strong Back RC Series Repair Coupling or an approved equal shielded coupler to connect the existing to the new service pipe.
The sanitary sewer service line locations shown on the plans are based on City records and television and may not include all service lines. The Contractor shall be responsible for all costs incurred for a service line tap not properly located, to include but not limited to excavation and restoration of the missed service.
Payment for this item shall be paid by the lump sum for each tap which is located and reinstated as found and accepted in the field.
3.56. BYPASS PUMPING
The “bypass pumping” pay item shall include all costs incurred with ensuring the raw sewage from the upstream line is redirected past the line which is to be rehabilitated, which includes but is not limited to, removing and replacing the cone section of the manhole, backfill, flowfill, asphalt, etc.
The Contractor shall submit a plan for handling existing sewage flows while rehabilitating the pipe at the pre-construction meeting for approval by the City. The bypass plan must be designed in accordance with the approved traffic control plans. Precautions must be taken to ensure that sewage flow control operations do not cause damage to property being served by the sewers involved. At no time shall raw wastewater run freely through any open ditch where point repairs are to be made. The only exception is during a service line reconnection. There must be a hard tie from the rehabilitated pipe to the existing pipe during non-working hours.
The Contractor shall be responsible to obtain existing flows in all mains that will be affected by bypass to determine a bypass plan.
If the City must provide personnel and equipment to minimize damages, in the event of any failure of the Contractor’s sewage flow control operations, the Contractor shall be liable for all costs incurred by the City. The Contractor will be charged on a time and materials basis for this work, which will be deducted from the amount of the Contractor’s final payment.
Payment for this item shall be paid by the lump sum for the entire project.
3.57. DEWATERING
In the event of minor ground water conditions being present, it is the contractor's responsibility to dewater the trench at no cost to the project. A construction dewatering permit must be obtained from the Colorado Department of Public Health (CHPHE). Groundwater shall be pumped, piped, removed, and disposed of in a manner which does not cause flooding of neither existing street nor erosion of abutting properties in order to construct the improvements shown on these plans. The use of any sanitary sewer to dispose of trench water will not be permitted. No concrete shall be placed where groundwater is visible or until the groundwater table has been lowered below the proposed improvements.
3.58. INSURANCE
The successful bidder(s) will be required to furnish comprehensive insurance as detailed in the GENERAL
PROVISIONS.
3.59. CONTRACTOR QUALIFICATIONS
Contractor must include a statement of qualifications with their submittal. This statement must include documentation demonstrating that Contractor has a minimum of five (5) years of experience working with 8”, 10”, 12”, and 15” public sanitary sewer mains more than 10’ deep. This documentation should include a list of projects and/or a list of references from municipalities.
Contractors without the required experience will not be considered for this project.
4. LABOR PROVISIONS
4.1. CONTRACTOR BONDS
Payment and performance bonds are required to be filed prior to issuance of Notice to Proceed. The specific requirements for such bonds are set forth in Section CONTRACT SECURITY of the GENERAL
PROVISIONS.
4.2. NONDISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY
REQUIREMENTS
In accordance with §1.8 of the Pueblo Municipal Code (entire Code included by reference), all contractors shall meet and comply with the following provisions which shall be contained in all municipal contracts:
A. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, ancestry, disability, age, or national origin. The
Contractor will take affirmative action in all areas of employment to ensure that applicants for employment are employed, and that employees are treated during employment, without regard to race, color, religion, sex, sexual orientation, ancestry, disability, age, or national origin. Areas of employment shall mean and include, but shall not be limited to, the following: initial employment, upgrading, demotion, transfer, recruitment, recruitment advertising, layoffs, terminations, rates of pay, terms of compensation and selection for training, including apprenticeship. The Contractor will post in conspicuous places, available to employees and applicants for employment, notices to be provided by the City setting forth the provisions of this nondiscrimination and equal employment opportunity paragraph.