Bid Notice.pdf
PDF 725 KB Posted
- Solicitation number
- CS 09-26-07
- Issued by
- Alameda County, Anaheim City, California
About this file
Underground Utility District 38 Overhead-to-Underground Service Conversions – Bid Notice
This is an Invitation for Bid (IFB) issued by Alameda Municipal Power (AMP), a department of the City of Alameda, California, acting through the Public Utilities Board, for the Underground Utility District 38 Overhead-to-Underground Service Conversions Project. The Work consists of converting overhead electric facilities within UUD-38 to underground service, including site assessment, owner coordination, preparation of location-specific Conversion Strategy Plans, furnishing and installing service conductors, modifying service entrances, and associated closeout documentation. Underground service lateral conduits have already been installed to affected properties. The Project is located in Alameda, California. Bids must be submitted electronically via OpenGov Procurement by November 25, 2026, at 9:00 a.m. A mandatory pre-bid conference will be held virtually on November 5, 2026, at 1:00 p.m. Pacific Standard Time via MS Teams. The Work must be fully completed within 365 calendar days from the Notice to Proceed, with an anticipated start date of March 1, 2027. AMP reserves the right to award the Contract to the lowest responsive and responsible bidder, or to reject all bids.
Bidders must submit bid security equal to ten percent of the maximum bid amount and possess a valid California Contractors State License Board C-10 Electrical Contractor license, with DIR registration required for public work pursuant to Labor Code Section 1725.5. The prime contractor must perform at least 50 percent of the Work with its own forces, with remaining work performed by qualified subcontractors exceeding one-half of one percent of the bid price. The Contract Price includes all labor, materials, supplies, equipment, taxes, insurance, and overhead costs. Liquidated damages of $1,000 per day will be assessed for unexcused delays in completion. The successful bidder must provide payment and performance bonds each for 100 percent of the Contract Price within 14 days of Notice of Intent to Award. Prevailing wage requirements apply per California Labor Code Section 1720 et seq. and Alameda Municipal Code Section 2-67. Five percent retention will be withheld from progress payments. Local preference is available for businesses with fixed offices or locally taxable distribution points within Alameda's city boundaries and holding a current business license. Subcontractors must obtain City of Alameda business licenses before performing work and must comply with all applicable laws, regulations, and safety requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/alamedaca
INVITATION FOR BID
CS 09-26-07
UNDERGROUND UTILITY DISTRICT 38 OVERHEAD-TO-UNDERGROUND
SERVICE CONVERSIONS
RELEASE DATE: October 23, 2026
RESPONSE DEADLINE: November 25, 2026, 9:00 am
Please refer to the project timeline in this document for all important deadlines.
CS 09-26-07 Page 2 of 91 Underground Utility District 38 Overhead-to-
Underground Service Conversions
Table Of Contents
1. NOTICE INVITING BIDS
2. INSTRUCTIONS TO BIDDERS
3. AWARD OF CONTRACT AND REJECTION OF BIDS
4. GENERAL CONDITIONS
5. SPECIAL CONDITIONS
6. PUBLIC NATURE OF MATERIALS
7. INSURANCE REQUIREMENTS
8. SCOPE OF WORK
9. BID SCHEDULE
10. BID PROPOSAL
11. VENDOR QUESTIONNAIRE
Attachments:
A - UUD38_Appendix_A_AMP_CSP
B - UUD38_Appendix_B_Rev4 - Typical Service Conversion Options
D - Appendix_C_Service_Location_Information
E - UUD38_Appendix_D_Existing_Service_Location_Photographs
F - UUD38 Appendix E_As-Built Dwg
G - Appendix_F_Project_Stabilization_Agreement
CS 09-26-07 Page 3 of 91 Underground Utility District 38 Overhead-to-
1. NOTICE INVITING BIDS
1.1. Bid Submission
Alameda Municipal Power (“AMP”), a department of the City of Alameda (“City”), acting by and through the
City’s Public Utilities Board (“PUB”), will accept electronically submitted bids for its Underground Utility
District 38 Overhead-to-Underground Service Conversions Project (“Project”), by or before Wednesday, November 25, 2026 at 9:00 am, via OpenGov Procurement, at:
https://procurement.opengov.com/portal/alamedaca/projects/314071 (“Bid Portal”). Bids that are not submitted by a registered vendor via the Bid Portal will not be accepted.
1.2. Project Information
A. Location and Description. The Project is located at City of Alameda, and is described as follows: The conversion of overhead electric facilities within UUD-38 to underground service. The Scope of Work contains the full description of the Work.
B. Time for Final Completion. The Project must be fully completed within 365 calendar days from the start date set forth in the Notice to Proceed. AMP anticipates that the Work will begin on or about
3/1/2027, but the anticipated start date is provided solely for convenience and is neither certain nor binding.
1.3. License and Registration Requirements
A. License. The Bidder and prime Contractor shall possess and maintain a valid California Contractors
State License Board C-10 Electrical Contractor license as required by the Contract Documents. The required C-10 license shall be held by the prime Contractor; use of a C-10 subcontractor does not satisfy this requirement. Subcontractors shall possess the appropriate California contractor license classification for the work they perform.
B. DIR Registration. AMP may not accept a bid from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code section 1725.5, subject to limited legal exceptions.
1.4. Contract Documents
The plans, specifications, bid forms and contract documents for the Project, and any addenda thereto (“Contract
Documents”) are available for viewing or download free of charge solely via the Bid Portal, as specified above.
1.5. Time for Completion
The Project must be completed within 365 calendar days from the start date set forth in the Notice to Proceed.
AMP anticipates that the Work will begin on or about 3/1/2027, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Liquidated damages of $1,000 per day will be assessed for unexcused delay in completion, as further specified in the Contract Documents.
1.6. Bid Security
Each bidder must submit bid security equal to ten percent of the maximum bid amount, in the form of cash; a cashier’s or certified check made payable to Alameda Municipal Power; or a bid bond using the Bid Bond form included with the Contract Documents, and executed by a surety licensed to do business in the State of
CS 09-26-07 Page 4 of 91 Underground Utility District 38 Overhead-to-
California. The bid security must guarantee that within fourteen days after AMP issues the Notice of Intent to
Award, the successful bidder will execute the Contract and submit the insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board’s In-Use Off-
Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 ed seq.) (“Off-Road Regulation”), if applicable and any other submittals required by the Contract Documents and as specified in the Notice of Intend to
Award. Original Payment Bond and Performance Bond can be provided after the City awards and executes the
Contract, however, work cannot start until these bonds are approved by the City Attorney’s Office.
1.7. Prevailing Wage Requirements
A. General. Pursuant to California Labor Code section 1720 et seq., and Alameda Municipal Code section
2-67, this Project is subject to the prevailing wage requirements applicable to the locality in which the
Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes.
B. Rates. These prevailing rates are on file with AMP and are available online at http://www.dir.ca.gov/DLSR. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half.
C. Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code section 1771.4.
1.8. Performance and Payment Bonds
The successful bidder will be required to provide performance and payment bonds, each for 100% of the
Contract Price, as further specified in the Contract Documents.
1.9. Substitution of Securities
Substitution of appropriate securities in lieu of retention amounts from progress payments is permitted under
Public Contract Code section 22300.
1.10. Subcontractor List
Each Subcontractor must be registered with City of Alameda for business license (due prior to start of work) as well as the DIR (due at bid submission) to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its bid, including the name, location of the place of business, California contractor license number, DIR registration number, and percentage of the Work to be performed (based on the base bid price) for each Subcontractor that will perform Work or service or fabricate or install Work for the prime contractor in excess of one-half of 1% of the bid price, using the Subcontractor List form included with the Vendor Questionnaire. The Subcontractor List form must be uploaded electronically in PDF format via the
Bid Portal.
1.11. Instructions to Bidders
All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a bid. The definitions provided in the "Definitions" section of the General Conditions apply to all of the
Contract Documents, as defined therein, including this Notice Inviting Bids.
CS 09-26-07 Page 5 of 91 Underground Utility District 38 Overhead-to-
1.12. Retention
A. Percentage. The percentage of retention that will be withheld from progress payments is 5 %.
1.13. Pre-Bid Conference
A pre-bid conference will be held on Thursday, November 5, 2026 at 1:00 pm (1pm in Pacific Standard Time), virtually to acquaint all prospective bidders with the Contract Documents and the Project. The bidders’ conference is Mandatory. A bidder who fails to attend a mandatory pre-bid conference may be disqualified from bidding.
MS Teams link:
https://teams.microsoft.com/meet/274856059548880?p=h5cKg4i5AokK3WbIRu
Meeting ID: 274 856 059 548 880 Passcode: 3J6Tt3w8
Dial in by phone
+1 773-352-2010,,909636141# United States, Chicago
Find a local number
Phone conference ID: 909 636 141#
CS 09-26-07 Page 6 of 91 Underground Utility District 38 Overhead-to-
2. INSTRUCTIONS TO BIDDERS
Each bid submitted to Alameda Municipal Power (“AMP”), a department of the City of Alameda (“City”), acting by and through the City’s Public Utilities Board, for AMP’s Underground Utility District 38 Overhead-to-Underground Service Conversions Project (“Project”) must be submitted in accordance with the following instructions and requirements:
2.1. Bid Submission
Each bid must be fully completed as directed and submitted via OpenGov Procurement, at https://procurement.opengov.com/portal/alamedaca/projects/314071 (“Bid Portal”), by or before the date and time set forth in "Bid Submission" of the Notice Inviting Bids, or as amended by subsequent addendum (“Bid
Deadline”). Each bidder must be registered to submit bids to AMP via the Bid Portal. AMP will not consider bids that are not submitted via the Bid Portal. The Bid Portal will be closed to bidding after the Bid Deadline, and late submittals will not be accepted. For additional information on using the Bid Portal, please visit the
OpenGov Help Center at https://opengov.my.site.com/support/s/.
A. General. The bids will not be read aloud in public, but bidders will be able to access and view the bid results via the Bid Portal after the Bid Deadline. AMP reserves the right to postpone the date or time of the Bid Deadline by addenda. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from AMP or the City. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead.
B. DIR Registration. Subject to limited legal exceptions for joint venture bids and federally-funded projects, AMP may not accept a bid from a bidder without proof that the bidder is registered with the
DIR to perform public work under Labor Code section 1725.5. If AMP is unable to confirm that the bidder is currently registered with the DIR, AMP may disqualify the bidder. (Labor Code sections
1725.5 and 1771.1(a).)
2.2. Bid Submittals
All bid submittals listed below must be submitted by or before the Bid Deadline. The bid submittals must be uploaded electronically in PDF format via the Bid Portal:
A. Bid Security. Bid security, submitted electronically or physically as specified in Section 2.4 below;
B. Subcontractor List. A completed and executed Subcontractor List using the form included with the
Contract Documents;
C. Non-Collusion Declaration. A completed and executed Non-Collusion Declaration using the form included with the Contract Documents;
D. Bidder’s Qualification Questionnaire. A completed and executed Bidder’s Questionnaire, using the form included with the Contract Documents and including any required attachments; and
E. Additional Submittals. In addition, each bidder must submit the following:
1. Project Stabilization Agreement
CS 09-26-07 Page 7 of 91 Underground Utility District 38 Overhead-to-
2. Signed W-9
2.3. Authorization and Execution
All bids are deemed executed and binding against the bidder when submitted pursuant to an electronic login authorization by a vendor registered to submit bids to the AMP via the Bid Portal.
2.4. Bid Security
Each bid must be guaranteed by bid security of ten percent of the maximum bid amount, in the form of cash;
cashier’s or certified check made payable to Alameda Municipal Power; or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California.
A. Bid Guarantee. The bid security must guarantee for a period of 90 days following the Bid Deadline, that within 14 days after AMP issues the Notice of Intent to Award, the successful bidder will execute and return the Contract using the form provided with the Contract Documents, the insurance certificates and endorsements, and submit valid Certificates of Reported Compliance as required by the Off-Road
Regulation, if applicable and any other submittals required by the Contract Documents, as may be further specified in the Notice of Intent to Award. Payment and Performance bonds for 100% of the maximum Contract Price can be provided after the City awards and executes the Contract; however, work cannot start until these bonds are approved by the City Attorney’s Office.
B. Form of Security and Submission. Bid security in the form of cash, cashier’s or certified check, must be physically received by AMP by or before the Bid Deadline at AMP’s business office at 2000
Grand Street, Alameda, CA, 94501. The bid security must be delivered in a sealed envelope, addressed to the attention of the Utility Procurement Administrator, and clearly labeled with the bidder’s legal name and address, the Project title, Invitation Number, and date and time of the Bid Deadline. While cash security is permitted, it is not encouraged, and cash security in lieu of a bid bond, cashier’s check, or certified check is submitted at the bidder’s sole risk. If a digital copy of a Bid Bond is submitted electronically in the Bid Portal, a wet-inked original bid bond will not be required to be physically received by AMP by or before the Bid Deadline.
2.5. Subcontractor Listing Requirements
Pursuant to Public Contract Code section 4104, for each Subcontractor that will perform a portion of the Work in an amount in excess of one-half of 1% of the bidder’s total Contract Price (or for any subcontract of $10,000 or more, if this Project is for street or highway construction), the bidder must provide the information listed below with its bid via the Bid Portal, in addition to its submission of a Subcontractor List form pursuant to
Section "Bid Submittals", above. If the Subcontractor exists in the Bid Portal, Contractor must confirm the accuracy of the following information and edit, if necessary, to reflect accurate information. If the
Subcontractor does not exist in the Bid Portal, Contractor will need to create a new profile for the
Subcontractor.
A. A description of the Work to be performed by the Subcontractor;
B. The Subcontractor’s name;
C. The Subcontractor’s California contractor license number;
CS 09-26-07 Page 8 of 91 Underground Utility District 38 Overhead-to-
D. The location of the Subcontractor’s place of business; and
E. The Subcontractor’s DIR registration number.
2.6. Subcontractor Work Limits
The prime contractor must perform at least 50% of the Work on the Project, calculated as a percentage of the base bid price, with its own forces, except for any Work identified as “Specialty Work” in the Contract
Documents. The total bid amount for any such Specialty Work may be deducted from the base bid price before computing the 50% self-performance requirement. The remaining Work may be performed by qualified
Subcontractors.
2.7. Withdrawal of Bids
A bid may not be withdrawn for a period of 90 days after the Bid Deadline without forfeiture of the bid security, except as authorized for material error under Public Contract Code section 5100 et seq., or unless the bidder’s bid security has been returned by AMP. A bid may be withdrawn before the Bid Deadline. AMP is not responsible for changes that OpenGov may make to the Bid Portal platform, and online directions for bid withdrawal may differ.
2.8. Bidder Questions or Objections
A. Bid Portal Q & A. All bid-related questions or requests for clarification must be submitted in writing via the Bid Portal under the “Q & A” tab, no later than 12:00 pm, Wednesday, November 11, 2026.
AMP responses will be posted on the Bid Portal. Bidders are responsible for checking the Bid Portal for new information.
B. Objections to Bid Procedures or Contract Documents. Any objection(s) to the bidding procedures, requirements, or the Contract Documents must be submitted in writing at least five Working Days before the Bid Deadline and sent via email to the Senior Procurement Analyst at suto-mcniff@alamedamp.com. The email must clearly identify the specific provision, requirement, or procedure that is the subject of the objection, and must clearly explain the basis for the objection and the requested remedy. Any relevant documents should be attached to the email. Any objections to the bid procedures or Contract Documents that are not submitted in strict compliance with this provision will be deemed waived. (Protests against bids or bidders must be submitted in compliance with Section "Bid
Protests", below.)
2.9. Pre-Bid Investigation
A. General. Each bidder is solely responsible at its sole expense for diligent and thorough review of the
Contract Documents, examination of the Project site, and reasonable and prudent inquiry concerning known and potential site and area conditions prior to submitting a bid. Each bidder is responsible for knowledge of conditions and requirements which reasonable review and investigation would have disclosed. However, except for any areas that are open to the public at large, bidders may not enter property owned or leased by the City or AMP or the Project site without prior written authorization from
AMP. Requests for authorization to access City or AMP property will be addressed at the
Mandatory pre-bid conference and site walk.
CS 09-26-07 Page 9 of 91 Underground Utility District 38 Overhead-to-
B. Document Review. Each bidder is responsible for review of the Contract Documents and any informational documents provided “For Reference Only,” e.g., as-builts, technical reports, test data, and the like. A bidder is responsible for notifying AMP of any errors, omissions, inconsistencies, or conflicts it discovers in the Contract Documents, acting solely in its capacity as a contractor and subject to the limitations of Public Contract Code section 1104. Notification of any such errors, omissions, inconsistencies, or conflicts must be submitted via the Bid Portal Q & A no later than five Working
Days before the Bid Deadline. (See Section "Bid Portal Q & A", above.)
C. Project Site. Questions regarding the availability of soil test data, water table elevations, and the like should be submitted via the Bid Portal Q & A, as specified in Section "Bid Portal Q & A", above. Any subsurface exploration at the Project site must be done at the bidder’s expense, but only with prior written authorization from AMP. All soil data and analyses available for inspection or provided in the
Contract Documents apply only to the test hole locations. Any water table elevation indicated by a soil test report existed on the date the test hole was drilled. The bidder is responsible for determining and allowing for any differing soil or water table conditions during construction. Because groundwater levels may fluctuate, difference(s) in elevation between groundwater shown in soil boring logs and groundwater actually encountered during construction will not be considered changed Project site conditions. Actual locations and depths must be determined by bidder’s field investigation. The bidder may request access to underlying or background information on the Project site in AMP’s possession that is necessary for the bidder to form its own conclusions, including, if available, record drawings or other documents indicating the location of subsurface lines, utilities, or other structures.
D. Utility Company Standards. The Project must be completed in a manner that satisfies the standards and requirements of any affected third-party utility companies or agencies (collectively, “utility owners”). The successful bidder may be required by the third-party utility owners to provide detailed plans prepared by a California-registered civil engineer showing the necessary temporary support of the utilities during coordinated construction work. Bidders are directed to contact the affected third-party utility owners about their requirements before submitting a bid.
2.10. Bidders Interested in More Than One Bid
No person, firm, or corporation may submit or be a party to more than one bid unless alternate bids are specifically called for. However, a person, firm, or corporation that has submitted a subcontract proposal or quote to a bidder may submit subcontract proposals or quotes to other bidders.
2.11. Addenda
Addenda, if any, will be posted under the Addenda section in the Bid Portal. (See tab for Addenda &
Notices.) Subject to the limitations of Public Contract Code section 4104.5, AMP reserves the right to issue addenda prior to the Bid Deadline. Any addenda issued prior to the bid opening are part of the Contract
Documents. Each bidder is solely responsible for ensuring it has received and reviewed all addenda prior to submitting its bid. Bidders should check the Bid Portal and also check for email notifications via OpenGov regarding addenda uploaded to the Bid Portal. Each addendum must be acknowledged by the bidder prior to the
Bid Deadline by clicking the “Acknowledge” button at the bottom of the Addenda Detail window.
2.12. Brand Designations and "Or Equal" Substitutions
CS 09-26-07 Page 10 of 91 Underground Utility District 38 Overhead-to-
Any specification designating a material, product, thing, or service by specific brand or trade name, followed by the words “or equal,” is intended only to indicate quality and type of item desired, and bidders may request use of any equal material, product, thing, or service. All data substantiating the proposed substitute as an equal item must be submitted with the written request for substitution. A request for substitution must be submitted within
14 days after AMP issues the Notice of Intent to Award. This provision does not apply to materials, products, things, or services that may lawfully be designated by a specific brand or trade name under Public Contract
Code section 3400(c).
2.13. Bid Protests
Any bid protest against another bidder must be submitted in writing and sent via email to the Utility
Procurement Administrator at suto-mcniff@alamedamp.com before 5:00 p.m. no later than two Working Days following bid opening (“Bid Protest Deadline”) and must comply with the following requirements:
A. General. Only a bidder who has actually submitted a bid is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest. Pursuant to Public Contract
Code section 4104, inadvertent omission of a Subcontractor’s DIR registration number on the
Subcontractor List form is not grounds for a bid protest, provided it is corrected within 24 hours of the bid opening or as otherwise provided under Labor Code section 1771.1(b).
B. Protest Contents. The bid protest must contain a complete statement of the basis for the protest and must include all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the protesting bidder and any person submitting the protest on behalf of or as an authorized representative of the protesting bidder.
C. Copy to Protested Bidder. Upon submission of its bid protest to AMP, the protesting bidder must also concurrently transmit the protest and all supporting documents to the protested bidder, and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest, by email or hand delivery to ensure delivery before the Bid Protest Deadline.
D. Response to Protest. The protested bidder may submit a written response to the protest via email to the
Utility Procurement Administrator as specified above, provided the response is received before 5:00 p.m., within two Working Days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must attach all supporting documentation.
Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person responding on behalf of or representing the protested bidder if different from the protested bidder. The response and all supporting documents must be concurrently transmitted to the protesting bidder via the contact email provided in the bid protest.
E. Exclusive Remedy. The procedure and time limits set forth in this Section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid protest. A bidder’s failure to comply with these
CS 09-26-07 Page 11 of 91 Underground Utility District 38 Overhead-to-procedures will constitute a waiver of any right to further pursue a bid protest, including filing a
Government Code Claim or initiation of legal proceedings.
F. Right to Award. AMP reserves the right, acting in its sole discretion, to reject any bid protest that it determines lacks merit, to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a Notice to Proceed with the Work notwithstanding any pending or continuing challenge to its determination.
2.14. Reservation of Rights
AMP reserves the unfettered right, acting in its sole discretion, to waive or to decline to waive any immaterial bid irregularities; to accept or reject any or all bids; to cancel or reschedule the bid; to postpone or abandon the
Project entirely; or to perform all or part of the Work with its own forces. The Contract will be awarded, if at all, within 90 days after opening of bids or as otherwise specified in the Special Conditions, to the responsible bidder that submitted the lowest responsive bid. Any planned start date for the Project, represents AMP’s expectations at the time the Notice Inviting Bids was published. AMP is not bound to issue a Notice to Proceed by or before such planned start date, and it reserves the right to issue the Notice to Proceed when AMP determines, in its sole discretion, the appropriate time for commencing the Work. The City and AMP expressly disclaim responsibility for any assumptions a bidder might draw from the presence or absence of information provided by the City or AMP in any form. Each bidder is solely responsible for its costs to prepare and submit a bid, including site investigation costs.
Disclosure of an exception, deviation, or assumption does not mean that AMP is obligated to accept or negotiate
it. An assumption that modifies the Contract Price, Contract Time, Scope, Quality or allocation of risk, or that conditions the bidder's responsibility to perform the Contract, may be considered the bid non-responsive. Post opening modification of a material qualification shall not be permitted.
2.15. Local Preference
Pursuant to the Alameda City Charter and Section 2-62 of the Alameda Municipal Code, preference will be given to a bidder that is a “local business,” which is defined to mean a business with fixed offices or locally taxable distribution points within the boundaries of the City of Alameda, and which holds a current business license with a business address within the City that is not a post office box. As so defined, a bidder that is a local business, is entitled to preference provided that the labor, quality, and price of the Work is equal to that of other responsible, responsive bidders. A bidder must complete optional Local Preference, in the Vendor
Questionnaire to be considered for local preference eligibility.
2.16. Bonds
Within 14 calendar days following AMP’s issuance of the Notice of Intent to Award to the successful bidder, the bidder must submit payment and performance bonds to AMP as specified in the Contract Documents using the bond forms included in the Contract Documents. All required bonds must be calculated on the maximum total Contract Price as awarded, including additive alternates, if applicable. Payment and Performance Bonds can be provided after the City awards and executes the contract, however work cannot start until these bonds are approved by the City Attorney’s Office.
2.17. License(s)
CS 09-26-07 Page 12 of 91 Underground Utility District 38 Overhead-to-
The successful bidder and its Subcontractor(s) must possess the California contractor’s license(s) in the classification(s) required by law to perform the Work. The successful bidder must also obtain a City business license no later than 14 days following AMP’s issuance of the Notice of Intent to Award. Subcontractors must also obtain a City business license before performing any Work. (See Alameda Municipal Code section 5-
4.1(g).)
2.18. Ineligible Subcontractor
Any Subcontractor who is ineligible to perform work on a public works project under Labor Code sections
1777.1 or 1777.7 is prohibited from performing work on the Project.
2.19. In-Use Off-Road Diesel-Fueled Fleets
If the Project involves the use of vehicles subject to the California Air Resources Board’s In-Use Off-
Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 et deq) (“Off-Road Regulation”), then within ten calendar days following AMP’s issuance of the Notice of Intent to Award to the successful bidder, the bidder must submit to AMP valid Certificates of Reported Compliance for its fleet and its listed
Subcontractors, if applicable in accordance with the Off-Road Regulation, unless exempt under the Off-
Road Regulation.
2.20. Unit Pricing
Each bidder must provide unit pricing with its electronic bid as indicated in the Bid Portal. The quantities provided by AMP for each line item are estimated and the actual quantities required to perform the Work may be greater or less than the estimated amounts. The Contract Price will be adjusted to reflect the actual quantities required for the Work based on the itemized or unit prices provided with the bid, with no allowance for anticipated profit for quantities that are deleted or decreased, and no increase in the unit price. If the Project includes construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid must include a bid item for adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which comply with safety orders as required by Labor Code section 6707.
2.21. Bidder's Certifications
By submitting a bid, each bidder certifies and warrants all of the following:
A. Comprehensive Bid Price. The bidder offers to perform and fully complete the Work for the Project as specified in the Contract Documents, within the time required for full completion of the Work, including all labor, materials, supplies, and equipment and all other direct or indirect costs including, but not limited to, taxes, insurance, and all overhead for the amount of its bid price.
B. Bidder Responsibility. The bidder is a responsible bidder, with the necessary ability, capacity, experience, skill, qualifications, workforce, equipment, and resources to perform or cause the Work to be performed in accordance with the Contract Documents and within the Contract Time.
C. Examination of Contract Documents. The bidder has thoroughly examined the Contract Documents and represents that, to the best of the bidder’s knowledge, there are no errors, omissions, or discrepancies in the Contract Documents, subject to the limitations of Public Contract Code section
1104.
CS 09-26-07 Page 13 of 91 Underground Utility District 38 Overhead-to-
D. Examination of Worksite. The bidder has had the opportunity to examine the Worksite and local conditions at the Project location.
E. Addenda. The bidder agrees that it has had access to and has reviewed all addenda issued for this bid and waives any claims it might have against AMP or the City based on its failure to receive, access, or review any addenda for any reason.
F. Responsibility for Bid. The bidder has carefully reviewed its bid and all required submittals entered and uploaded via the Bid Portal and is solely responsible for any errors or omissions contained in its completed bid. All statements and information provided in the bid and bid submittals are true and correct to the best of the bidder’s knowledge.
G. Nondiscrimination. In preparing this bid, the bidder has not engaged in discrimination against any prospective or present employee or Subcontractor on grounds of race, color, ancestry, national origin, ethnicity, religion, sex, sexual orientation, age, disability, or marital status.
H. Iran Contracting Act. If the Contract Price exceeds $1,000,000, bidder is not identified on a list created under the Iran Contracting Act, Public Contract Code section 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
I. Award of Contract. The bidder agrees that if it is awarded the Contract for the Project, within 14 days after AMP issues the Notice of Intent to Award, bidder will do all of the following:
1. Execute Contract. Execute and submit to AMP the Contract prepared by AMP using the form included with the Contract Documents and based on the bidder’s bid;
2. Submit Required Bonds. Submit to AMP a payment bond and a performance bond, issued by an admitted surety, each for 100% of the Contract Price, using the bond forms provided and in accordance with the requirements of the Contract Documents;
3. Insurance Requirements. Submit to AMP the insurance certificate(s) and endorsement(s) as required by the Contract Documents; and
4. City Business License. Ensure that it has a current City business license.
3. AWARD OF CONTRACT AND REJECTION OF BIDS
3.1. Determination of Lowest Responsive and Responsible Bidder
Subject to the conditions of this IFB, AMP will award the Contract, if an award is made, to the lowest responsive and responsible Bidder. In determining whether the Bidder is responsible, AMP will use the criteria set forth below:
• The bidder must have the ability, capacity, experience, and skill to perform the work, or provide the goods and/or services in accordance with the bid specifications;
CS 09-26-07 Page 14 of 91 Underground Utility District 38 Overhead-to-
• The bidder must have the ability to perform the Contract within the time specified. Specifically project must be completed within 365 days from Notice to Proceed date, otherwise the bidder may be disqualified;
• The bidder must have the equipment, facilities, and resources of such capacity and location to enable the bidder to perform the Contract;
• The bidder must have the ability to provide, as required, future maintenance, repair, parts, and service for the use of goods purchased;
• The bidder must have a record of satisfactory or better performance under prior contracts with the city or others; and
• The bidder must have complied with applicable laws, regulations, policies (including city council policies), guidelines, and orders governing prior or existing contracts performed by the bidder.
AMP will afford a bidder determined not to be responsible an opportunity to appeal the determination by Bid
Protest subject to the requirements of state law.
Disclosure of an exception, deviation, or assumption does not mean that AMP is obligated to accept or negotiate
it. An assumption that modifies the Contract Price, Contract Time, Scope, Quality or allocation of risk, or that conditions the bidder's responsibility to perform the Contract, may be considered the bid non-responsive. Post opening modification of a material qualification shall not be permitted.
3.2. Local Preference Rule
The local preference rule is set forth in section 3-17 of the City Charter and Article V. Chapter II of the
Municipal Code. Evaluation of any contract or hiring of any labor for public contract work, preference shall be given to contractors, mechanics, artisans or other laborers of any class, who shall be a local business as defined herein, provided that the labor, quality and price of the work shall be equal to that of others who would be considered for the award of the contract.
Local businesses are defined in the Municipal Code as a business firm with fixed offices or local taxable distribution points within the boundaries of the City of Alameda which hold a current business license with an
Alameda business address which is not a Post Office box. Bidder shall clearly indicate if he or she believes they qualify for this preference and submit the "Local Business Affidavit" form via the Vendor
Questionnaire. The final determination of qualification for Alameda Bidder's preference rests with AMP.
3.3. Waiver of Minor Irregularities
AMP may exercise its discretion to waive minor irregularities, defects or informalities in the Bids, so long as the waiver would not affect the amount of the Bid or give the Bidder an advantage over others.
3.4. Decision to Award
A Contract may be awarded to the Bidder who is determined to be the lowest responsible Bidder, provided, however, as a condition precedent to the obligation of AMP to perform under the Contract, the lowest responsible Bidder shall furnish the necessary Bid Security, proof of valid contractor’s license, such additional information as may be required by these documents or requested by AMP's representatives. Please review the
IFB thoroughly especially Section 9 Vendor Questionnaire. AMP reserves the right to award more than one
CS 09-26-07 Page 15 of 91 Underground Utility District 38 Overhead-to-
Contract with respect to the Project. For purposes of this section, AMP’s decision to award shall be deemed made on the date AMP sends the Notice of Award.
3.5. Decision to Reject
AMP reserves the unfettered right to reject all Bids for any reason or for no reason, to re-advertise a Bid, or to cancel a Bid listing and elect to perform the Project and Work with its own forces. AMP reserves the right to reject as non-responsive any Bid which is incomplete, modified, unsigned, or illegible or which is not otherwise submitted in accordance with the requirements of this Invitation for Bid.
3.6. Execution of Contract
If the lowest responsible Bidder fails to deliver fully executed copies of the Contract(s) and to submit all required documentation, including, without limitation, all bonds and evidence of insurance within ten (10) business days of the date of issuance of the Notice of Intent to Award, AMP may award the Contract to the next lowest responsible Bidder, if any, in accordance with all applicable laws. Subject to applicable laws, AMP shall be entitled to retain the Bid Security Bond of the lowest responsible Bidder in the event that the lowest responsible Bidder fails to timely execute the Contract or submit the required bonds and evidence of insurance as required herein. See "Sample Construction Agreement" under Section 9 Vendor Questionnaire.
4. GENERAL CONDITIONS
4.1. Article 1 - Definitions
The following definitions apply to all of the Contract Documents unless otherwise indicated, e.g., additional definitions that apply solely to the Specifications or other technical documents. Defined terms and titles of documents are capitalized in the Contract Documents, with the exception of the following (in any tense or form): “day,” “furnish,” “including,” “install,” “work day” or “working day.”
Allowance means a specific amount that must be included in the bid price for a specified purpose.
AMP means Alameda Municipal Power, a department of the City of Alameda, acting by and through the Public
Utilities Board.
Article, as used in these General Conditions, means a numbered Article of the General Conditions, unless otherwise indicated by the context.
Board means the Public Utilities Board, as defined below, unless the context clearly indicates otherwise.
Change Order means a written document duly approved and executed by AMP, which changes the scope of
Work, the Contract Price, or the Contract Time.
City means the City of Alameda, acting through its City Council, officers, employees, and any other authorized representatives, including the Public Utilities Board.
Claim means a separate demand by Contractor for a change in the Contract Time or Contract Price, that has previously been submitted to AMP in accordance with the requirements of the Contract Documents, and which has been rejected by AMP, in whole or in part; a written demand by Contractor disputing a unilateral Change
Order or a portion thereof, or a written demand by Contractor objecting to the amount of Final Payment.
Contract means the signed agreement between AMP and Contractor for performing the Work required for the
Project, and all documents expressly incorporated therein.
CS 09-26-07 Page 16 of 91 Underground Utility District 38 Overhead-to-
Contract Documents means, collectively, all of the documents listed as such in Section "Contract
Documents" of the Contract, including the Notice Inviting Bids; the Instructions to Bidders; addenda, if any; the bid, and attachments thereto; the Contract; the Notice of Intent to Award and Notice to Proceed; the payment and performance bonds; the General Conditions; the Special Conditions; the Project Plans and Specifications;
any Change Orders; and any other documents which are clearly and unambiguously made part of the Contract
Documents. The Contract Documents do not include documents provided “For Reference Only,” or documents that are intended solely to provide information regarding existing conditions.
Contract Price means the total compensation to be paid to Contractor for performance of the Work, as set forth in the Contract and as may be amended by Change Order or adjusted for an Allowance. The Contract Price is not subject to adjustment due to inflation or due to the increased cost of labor, material, supplies or equipment after the Contractor’s bid was submitted.
Contract Time means the time specified for complete performance of the Work, as set forth in the Contract and as may be amended by Change Order.
Contractor means the individual, partnership, corporation, or joint-venture that has signed the Contract with
AMP to perform the Work.
Day means a calendar day unless otherwise specified.
Design Professional means the licensed individual(s) or firm(s) retained by AMP to provide architectural, engineering, or other design professional services for the Project. If no Design Professional has been retained for this Project, any reference to Design Professional is deemed to refer to the Engineer.
DIR means the California Department of Industrial Relations.
Drawings has the same meaning as Plans.
Engineer means the Engineering Manager for AMP’s distribution system, and his or her authorized delegees.
Excusable Delay is defined in Section "Excusable Delay".
Extra Work means new or unforeseen work added to the Project, as determined by AMP in its sole discretion, including Work that was not part of or incidental to the scope of the Work when the Contractor’s bid was submitted; Work that is substantially different from the Work as described in the Contract Documents at bid time; or Work that results from a substantially differing and unforeseeable condition.
Final Completion means Contractor has fully completed all of the Work required by the Contract Documents to AMP’s satisfaction, including all punch list items and any required commissioning or training, and has provided AMP with all required submittals, including instructions and manuals, product warranties, and as-built drawings.
Final Payment means payment to Contractor of the unpaid Contract Price, including release of undisputed retention, less amounts withheld or deducted pursuant to the Contract Documents.
Furnish means to purchase and deliver for the Project.
General Manager means the General Manager of AMP or his or her authorized delegee.
Government Code Claim means a claim submitted pursuant to California Government Code § 900 et seq.
CS 09-26-07 Page 17 of 91 Underground Utility District 38 Overhead-to-
Hazardous Materials means any substance or material identified now or in the future as hazardous under any
Laws, or any other substance or material that may be considered hazardous or otherwise subject to Laws governing handling, disposal, or cleanup.
Including, whether or not capitalized, means “including, but not limited to,” unless the context clearly requires otherwise.
Inspector means the individual(s) or firm(s) retained or employed by AMP to inspect the workmanship, materials, and manner of construction of the Project and its components to ensure compliance with the Contract
Documents and all Laws.
Install means to fix in place for materials, and to fix in place and connect for equipment.
Laws means all applicable local, state, and federal laws, regulations, rules, codes, ordinances, permits, orders, and the like enacted or imposed by or under the auspices of any governmental entity with jurisdiction over any of the Work or any performance of the Work, including health and safety requirements and the Alameda City
Charter and Alameda Municipal Code.
Non-Excusable Delay is defined in Section "Non-Excusable Delay".
Plans means AMP-provided plans, drawings, details, or graphical depictions of the Project requirements, but does not include Shop Drawings.
Project means the public works project referenced in the Contract, as modified by any Project alternates elected by AMP, if any.
Project Manager means the individual designated by AMP to oversee and manage the Project on AMP’s behalf and may include his or her authorized delegee(s) when the Project Manager is unavailable. If no Project
Manager has been designated for this Project, any reference to Project Manager is deemed to refer to the
Engineer.
Public Utilities Board or PUB means the City of Alameda’s Public Utilities Board, which is authorized to control, manage, and contract on behalf of AMP, pursuant to Article XII of the Alameda City Charter.
Recoverable Costs is defined in Section "Recoverable Costs".
Request for Information or RFI means Contractor’s written request for information about the Contract
Documents, the Work or the Project, submitted to AMP in the manner and format specified by AMP.
Section, when capitalized in these General Conditions, means a numbered section or subsection of the General
Conditions, unless the context clearly indicates otherwise.
Shop Drawings means drawings, plan details or other graphical depictions prepared by or on behalf of
Contractor, and subject to AMP’s acceptance, which are intended to provide details for fabrication, installation, and the like, of items required by or shown in the Plans or Specifications.
Specialty Work means Work that must be performed by a specialized Subcontractor with the specified license or other special certification, and that the Contractor is not qualified to self-perform.
Specifications means the technical, text specifications describing the Project requirements, which are prepared for and incorporated into the Contract by or on behalf of AMP, and does not include the Contract, General
Conditions or Special Conditions.
CS 09-26-07 Page 18 of 91 Underground Utility District 38 Overhead-to-
Subcontractor means an individual, partnership, corporation, or joint-venture retained by Contractor directly or indirectly through a subcontract to perform a specific portion of the Work. The term Subcontractor applies to subcontractors of all tiers, unless otherwise indicated by the context. A third party such as a utility performing related work on the Project is not a Subcontractor, even if Contractor must coordinate its Work with the third party.
Technical Specifications has the same meaning as Specifications.
Work means all of the construction and services necessary for or incidental to completing the Project in conformance with the requirements of the Contract Documents.
Work Day or Working Day, whether or not capitalized, means a weekday when AMP is open for business, and does not include holidays observed by AMP.
Worksite means the place or places where the Work is performed, which includes, but may extend beyond the
Project site, including separate locations for staging, storage, or fabrication.
4.2. Article 2 - Roles and Responsibilities
A. Alameda Municipal Power (AMP).
1. Public Utilities Board. The Public Utilities Board has final authority in all matters affecting the
Project, except to the extent it has delegated authority to the Engineer and/or Project Manager.
2. Engineer. The Engineer, acting within the authority conferred by the Public Utilities Board, is responsible for administration of the Project on behalf of AMP, including authority to provide directions to the Design Professional and to Contractor to ensure proper and timely completion of the Project. The Engineer’s decisions are final and conclusive within the scope of his or her authority, including interpretation of the Contract Documents.
3. Project Manager. The Project Manager assigned to the Project will be the primary point of contact for the Contractor and will serve as AMP’s representative for daily administration of the Project on behalf of AMP. Unless otherwise specified, all of Contractor’s communications to AMP (in any form) will go to or through the Project Manager. AMP reserves the right to reassign the Project
Manager role at any time or to delegate duties to additional AMP representatives, without prior notice to or consent of Contractor.
4. Design Professional. The Design Professional is responsible for the overall design of the Project and, to the extent authorized by AMP, may act on AMP’s behalf to ensure performance of the Work in compliance with the Plans and Specifications, including any design changes authorized by Change
Order. The Design Professional’s duties with respect to the Project may include review of
Contractor’s submittals, visits to any Worksite, inspecting the Work, evaluating test…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .