This is a Request for Bid (RFB) document issued by the City of Hanford, California for the Water Main Replacement along Mary Street public works project. The project involves site preparation, mobilization, demolition, traffic control, and installation of approximately 2,060 linear feet of 8-inch AWWA C900 PVC water main with associated fittings, thrust blocks, tracer wire, gate valves, new fire hydrants, and necessary appurtenances. Additional work includes reconnecting new water service, abandoning existing water main, trench backfill and compaction, pavement restoration, pressure testing, disinfection, bacteriological testing, and flushing of the new water main. A non-mandatory pre-bid job walk is scheduled for October 29, 2026 at 10:00 a.m. at 1215 Mary Street, Hanford, California. Bids must be submitted digitally through Bidnet Direct's California Purchasing Group website by 3:00 p.m. on November 12, 2026, at which time they will be publicly opened and posted. The contract will be awarded to the lowest responsible bidder within sixty days of bid opening. All bidders must be licensed contractors in accordance with California Business and Professions Code Chapter 9, Division 3.

Bid prices must include all materials, equipment, tools, labor, management, superintendence, services, warranty, and maintenance, as well as allowances for federal, state, and local taxes. Each proposal must be accompanied by a bid guaranty bond or certified cashier's check equal to at least ten percent of the total bid amount, made payable to the City of Hanford. The successful bidder must furnish performance and payment bonds each equal to one hundred percent of the total bid amount and provide evidence of required insurance within twenty calendar days of award notification. This is a public works project subject to California prevailing wage requirements, with rates established by the California Department of Industrial Relations for Kings County. Contractors and subcontractors must be registered with the Department of Industrial Relations and comply with all applicable state and federal wage determinations. Certified payroll records must be submitted electronically through the DIR's certified payroll reporting system, and the contractor must maintain comprehensive payroll documentation for three years. The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations, with strict penalties for prevailing wage violations and overtime violations. All subcontractors exceeding one-half of one percent of the total bid amount or $10,000 minimum must be designated on the bid proposal.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF HANFORD WATER MAIN

REPLACEMENT ALONG MARY STREET

CITY OF HANFORD

CALIFORNIA

SPECIFICATIONS, PROPOSAL AND AGREEMENT

FOR

RFB 2027-11

CITY OF HANFORD WATER MAIN REPLACEMENT ALONG MARY

STREET

Release Date: 10/21/2026

INDEX

CONTRACT DOCUMENTS

PAGE NO.

NOTICE TO CONTACTORS C - 1

PROPOSAL REQUIREMENTS AND CONDITIONS C - 3

1. Proposal Forms

2. Examination of Plans, Specifications, Special Provisions, and Site of Work

3. Interpretation of Project Documents

4. Approximate Estimate C - 4

5. Bid Prices

6. Proposal Guaranty

7. Withdrawal of Proposals

8. Rejection of Proposals

9. Qualification of Bidders C- 5

10. Disqualification of Bidders

11. Designation of Subcontractors

12. Material Guaranty

13. Addenda C - 8

BID PROPOSAL C - 9

BID SCHEDULE C - 11

Bid Guaranty Bond C - 12

Certification of Bidders Experience & Qualifications C - 14

Bidders List C – 15

Designation of Subcontractors C - 16

AWARD AND EXECUTION OF CONTRACT C - 17

1. Award of Contract

2. Contract Bonds

3. Execution of Contract C - 18

4. Failure to Execute Contract

5. Return of Proposal Guaranties c - i

RFB 2027-11

PAGE NO.

6. Insurance

7. Minimum Scope of Insurance

8. Minimum Limits of Insurance

9. Deductibles & Self-Insured Retentions

10. Other Insurance Provisions

11. Acceptability of Insurers C - 21

12. Verification of Coverage

13. Subcontractors C - 22

LABOR COMPLIANCE PROGRAM AND OTHER REQUIREMENTS C - 26

Agreement C - 36

Performance Bond C - 39

Labor and Material Bond C - 41

Guaranty Bond C - 43

Non-Collusion Declaration C - 45

Equal Opportunity C – 46

Subletting or Assigning the Contract C - 48

Safety: Accident Prevention C - 49

Prevailing Wage and Payroll Records

Overtime Requirements C - 51

Partial Payment Requests

Bidder’s Checklist C - 53

EXHIBITS (attached separately)

A. Special Provisions

B. Schematic Planset c - ii

NOTICE TO CONTRACTORS

Bid Submissions will be received through Bidnet Direct’s California Purchasing Group website listed below until 3:00 p.m. on Thursday, November 12, 2026 at which time they will be publicly opened digitally and posted for performing work in accordance with Plans and Specifications, therefore, for the following project:

CITY OF HANFORD WATER MAIN REPLACEMENT ALONG MARY STREET

Bids are required for the entire work as described herein:

Site preparation, mobilization, demolition, traffic control, potholing, saw cutting and removing existing pavement for excavation and earthwork; furnishing and installation of approximately 2,060 linear feet of 8-inch AWWA C900 PVC water main, fittings, thrust blocks, tracer wire, gate valves, new fire hydrants, and all necessary appurtenances; reconnecting new water service and new water main, abandoning in place the existing water main and appurtenances; trench backfill, compaction, and temporary and permanent trench pavement restoration, pressure testing, disinfection, bacteriological testing and flushing of the new water main; surface restoration to match in-kind, including asphalt concrete paving and traffic striping.

There will be a non-mandatory pre-bid job walk at 1215 Mary St, Hanford, CA 93230 at 10:00 a.m. on

Thursday, October 29, 2026.

Plans, specifications, and proposal forms to be used for bidding shall only be obtained through Bidnet

Direct’s California Purchasing Group website:

http://www.bidnetdirect.com/california/cityofhanford

All vendors looking to do business with the City of Hanford are encouraged to register to access bids, related documents, addendum, planholder lists, and award information. All bid documents shall be included in the Bidnet Direct’s California Purchasing Group website submission to be valid at the time of bid open.

Bids must be accompanied by a bidders security made payable to the City of Hanford for an amount equal to at least ten percent (10%) of the amount bid, such guaranty to be forfeited should the bidder to whom the contract is awarded fail to enter into this contract.

All questions regarding this project shall be in writing and shall be submitted through Bidnet, no later than 2:00 p.m. on Thursday, November 5th, 2026.

Any changes to, or clarification of, the project plans and specifications shall be in the form of an addendum issued to plan holders of record. Questions that prompt a change or clarification shall be included in the addendum with the subsequent answer.

All bids are to be compared on the basis of the City Engineers estimate of the quantities of work to be done. No bids will be accepted from a Contractor who has not been licensed in accordance with the provisions of Chapter 9, Division 3 of Business and Professions Code. The City reserves the right to reject any or all bids.

C – 1

In accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City of Hanford has ascertained that the General Prevailing Rate of Wages applicable to the work being done for this project is as per the State of California Prevailing Wage rates for the County of Kings, of which wage scale on file in the City Engineers office and the Department of Industrial Relations prevailing wage rate determinations website at https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html. The Contractor to whom the contract is awarded shall pay not less than the specified prevailing wages to all workmen employed in the execution of the contract. This project will be subject to all applicable State and Federal

Wage Determinations for all trades. The wages are set forth in the General Prevailing Wage Rates for this project, available from the following websites: http://www.dir.ca.gov.dlsr.PWD/index.htm and http://www.wdol.gov/dba.aspx#0.

The City of Hanford, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78

Stat. 252, 42 US. C.§§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, religious creed, color, national origin, ancestry, physical or mental disability, medical condition, genetic information, marital status, gender, gender identity or expression, age, sexual orientation, or military and veteran status in any consideration leading to the award of the contract.

Notice is hereby given that this is a Public Works Project and is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial

Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)). No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial

Relations pursuant to Labor Code section 1725.5.

C – 2

PROPOSAL/BID REQUIREMENTS AND CONDITIONS

This contract is made by and between the City of Hanford, A Municipal Corporation (“City”), and

______________________________________________ (“Contractor”).

The undersigned hereby agrees to perform work as described in the Scope of Work and the following criteria:

1. Proposal Forms

The entire Bid Packet shall be submitted digitally through Bidnet Direct’s California Purchasing

Group website: http://www.bidnetdirect.com/california/cityofhanford. All vendors looking to do business with the City of Hanford are encouraged to register to access bids, related documents, addendum and award information.

It is the sole responsibility of the bidder to see that his bid is submitted electronically by the proper time. All bids received after the scheduled closing time for receipt of the bids shall be rejected.

The bidder is responsible for verifying and submitting with the bid proposal, at minimum, that the bid proposal is signed, that all addenda issued are received, that the bid bond is included with the proposal, and that all forms included in the bid document must be returned with the bid submission.

Bids will be considered non- responsive if these items are not included with the original bid submittal.

2. Examination of Plans, Specifications, Special Provisions and Site of the Work

The bidder shall carefully examine the site of the work contemplated, and the proposal, plans, specifications, and contract forms, therefore. It will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered regarding character, quality, and quantities of work to be performed and the materials to be furnished, and as to the requirements of these specifications, the Special Provisions, and the Contract. It is mutually agreed that submission of a proposal shall be considered "prima facie" evidence that the bidder has made such an examination.

3. Interpretation of Project Documents

Bidders, prospective subcontractors, manufacturers, and suppliers may request interpretation of the project documents prior to bid opening. Requests shall be made through Bidnet in the form of a

Request for Information. Requests to clarify the source of materials, equipment, suppliers or any other such matter which does not modify, change, increase, or decrease the scope of work requires no action by the Owner other than a response to the bidder requesting the clarification. Requests to clarify possible ambiguous, conflicting, or incomplete statements or designs, or any other such clarification which modifies, changes, increases or decreases the scope of work requires issuance of an addendum by the Owner for the interpretation to become effective.

C – 3

4. Approximate Estimate

Any quantities given in the proposal and contract forms are approximate only, being given as a basis for any comparison of bids, and the City Council does not, expressly or by implications, agree that the actual amount of work will correspond therewith but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or expedient by the Engineer.

5. Bid Prices

Bid prices shall include everything necessary for the completion of the work including but not limited to providing the materials, equipment, tools, plant and other facilities, and the management, superintendence, labor and services, and any warranty and maintenance required. Bid prices shall include allowance for federal, state and local taxes.

6. Proposal Guaranty

Each proposal shall be accompanied by one of the following forms of bidder's security: cash, certified cashier's check, or a bidder's bond executed by an admitted surety insurer, made payable to the City of Hanford for an amount equal to at least ten percent (10%) of the total bid amount. No bid will be considered unless such cash, certified cashier's check or bidder's bond is enclosed therewith. Bidder’s Bond shall be furnished from an admitted surety insurer listed in the Federal

Register.

Pursuant to California Code of Civil Procedure Section 995.120 an "Admitted Surety Insurer" is defined as a corporate insurer or a reciprocal or inter-insurance exchange to which the Insurance

Commissioner of the State of California has issued a Certificate of Authority to transact surety insurance in the State of California.

A scanned copy of Bid Bonds must be submitted electronically with the bid through Bidnet prior to bid opening. Original hard copies of Bid Bonds shall be provided by the apparent low bidder within five business days following bid open and can be received at 900 S. 10th Ave. Hanford CA 93230 addressed to City Engineer.

7. Withdrawal of Proposals

Any bid may be withdrawn at any point prior to the hour fixed in the Notice to Contractors for the opening of bids provided that a request in writing, executed by the bidder or his duly authorized representative for the withdrawal of such bid, is filed with the City Director of Finance. The withdrawal of a bid will not prejudice the right of the bidder to file a new bid. Bids will be opened at the time fixed in the advertised Notice to Contractors through Bidnet, and a bid will not be received after that time nor may a bid be withdrawn after the time fixed in such notice.

8. Rejection of Proposals

Proposals may be rejected if they show any alterations of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind. The City of Hanford reserves the right to reject any and/or all proposals.

C – 4

9. Qualification of Bidder

Bidder shall certify that he and his subcontractors are, at the time of bidding and shall be throughout the period of the contract, licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code of the State of California to do the type of work contemplated in the project documents. Bidder shall further certify that they are skilled and regularly engaged in the general class and type of work called for in the project documents.

The bidder also certifies that they are knowledgeable of the unusual and peculiar hazards associated with the general class and type of work required to construct the specified project within the terms given in the project documents. Bidder shall be competent and skilled in the protective measures necessary for the safe performance of the construction work with respect to such unusual and peculiar hazards.

10. Disqualification of Bidders

More than one proposal from an individual, a firm or partnership, a corporation or combination thereof under the same or different names will not be considered. Reasonable grounds for believing that any bidder is interested in more than one proposal for the work contemplated will cause the rejection of all proposals in which such bidder is interested. If there is reason for believing that collusion exists among the bidders, none of the participants in such collusion will be considered in future proposals. Proposals in which the prices obviously are unbalanced may be rejected.

11. Designation of Subcontractors

All subcontractors doing work in excess of one-half of one percent (1/2 %) of the total bid amount, or minimum $10,000, shall be designated on the blank form contained within this volume. Failure to list subcontractors may render a bid nonresponsive and may be grounds for rejection of bids.

Penalties may be assessed per Section 4104(a) of the Public Contract Code.

12. Recovery of Kickbacks by the City

Upon showing that a subcontractor made a kickback to a prime contractor or a higher tier subcontractor in connection with the award of a subcontract or an order, it shall be conclusively presumed that the amount discovered was included in the price of the subcontract or order and ultimately borne by the City and will be recoverable from the recipient. In addition, that amount may also be recovered from the subcontractor making such kickbacks. Recovery from one offending party shall not preclude recovery from other and all offending parties.

It shall be illegal for any payment, gratuity, or offer of employment to be made by or on behalf of a subcontractor under a contract to the prime contractor or higher tier subcontractor or any person associated with contracting, as an inducement for the award of a subcontract or order.

13. Material Guaranty

Before any contract is awarded, the bidder may be required to furnish a complete statement of the origin, composition and manufacture of any and all materials to be used in the construction of the

C – 5 work together with samples, which may be subjected to the tests provided for in these specifications to determine their quality and fitness for the work.

14. Prevailing Wage Requirements

In accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City of Hanford has ascertained that the general prevailing rate of wages applicable to the work being done is as per

State of California, County of Kings wage scale that are current and online with the State of

California Division of Industrial Relations (DIR) at:

https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html

The Contractor to whom the contract is awarded shall pay not less than the specified wages to all workmen employed in the execution of the contract. Each Contractor awarded a contract must have an agent of the firm to sign documents required by the California Labor Code and to receive proper state forms for the reporting of certified payroll. Except as may be otherwise required by law, all claims and disputes pertaining to the classification of labor employed on the Project under the

Contract Documents shall be decided by the District’s Labor Compliance Officer.

Nothing contained herein shall be deemed to supersede any applicable laws, orders or regulations issued by competent authority governing wages, hours of work of the employment of labor, nor to condone any violation of such laws, orders or regulations.

The Contractor shall post at appropriate conspicuous weatherproof points on the site of the Project a schedule showing the Prevailing Wage Determinations published by the Director of the California

Department of Industrial Relations that are applicable to the Project.

Pursuant to the provisions of Division 2, Part 7, Chapter 1, Article 2 of the CALIFORNIA LABOR

CODE at SECTION 1770, et seq., the City has obtained from the Director of the California

Department of Industrial Relations the general prevailing rate of per diem wages and the prevailing rate for straight time, holiday time and overtime work in the locality in which the work is to be performed for each craft, classification or type of worker needed to execute the contract, a copy of which is available in the office of the City Engineer.

There shall be paid to each worker of the Contractor or any subcontractor, of any tier, engaged in the work not less than the general prevailing wage rate, regardless of any contractual relationship which may be alleged to exist between the Contractor or any subcontractor, of any tier, and such worker. The Contractor and subcontractors will be required to pay all workers on a weekly basis and to submit the certified payrolls to the Labor Compliance Office weekly.

The Contractor shall forfeit Two Hundred Dollars ($200.00) to the City for each calendar day or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of the California Department of Industrial Relations for such work or craft in which such worker is employed by the contractor or by any subcontractor, of any tier, in connection with the work. Pursuant to CALIFORNIA LABOR CODE SECTION 1775, the difference between such prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof, for which each worker was paid less than the prevailing wage rate, shall be paid to each worker in the addition to the penalties.

C – 6

CALIFORNIA LABOR CODE SECTION 1742.1 makes the Contractor, any subcontractor and the payment bond insurer jointly and severally liable for liquidated damages equal to the total underpayment of wages remaining uncorrected for sixty (60) days after receipt of the first notice of the underpayment. The underpaid employee will receive both the liquidated damages and the underpayment amount. The District may also request imposition of penalties equal to Fifty Dollars

($50.00) per day per worker in addition to the liquidated damages and underpayment.

Contractors shall maintain payrolls and basic records (e.g., timecards, canceled checks, cash receipts, trust fund forms, accounting ledgers, tax forms, etc.) during the course of the work and shall preserve them for a period of three (3) years for workers of all trades at the District’s project sites. Such records shall contain the name, address, and social security number of each worker, his or her classification, the rate of pay (including the rates of contributions for, or costs assumed to provide, fringe benefits), daily and weekly number of hours worked, deductions made, and actual wages paid.

The prime Contractor shall be responsible for ensuring that the labor standards provisions are followed by its subcontractors and shall be responsible for the Labor Code violations of its subcontractors.

The City, through its Labor Compliance Officer or its designee, shall conduct periodic inspections/audits to determine whether the workers of all trades on project sites have been paid according to the prevailing wage rates.

The City, through its Labor Compliance Officer and its consultants, has the duty to enforce the

Labor Code public works requirements (Chapter 1 of Part 7 of Divisions 2 and 3 of the

CALIFORNIA LABOR CODE). It is the policy of the District to strictly enforce public works prevailing wage requirements set for in the California Labor Code. To that end, Contractors and subcontractors that are found to be repeat violators of the Labor Code are subject to debarment from bidding on, or being awarded, any public works construction contract to the extent provided by law.

Within thirty days of approval, the City shall register the project with the Department of Industrial

Relations of a Public Works Contract being awarded to the Contractor using the online electronic form PWC-100. The Contractor and all sub-contractors on the project shall provide their DIR registration numbers for verification of coverage and notification of the project. Contractors and subcontractors must submit certified payroll records to the Labor Commissioner using the DIR’s electronic certified payroll reporting (eCPR) system.

If a project total cost is $25,000 or less for construction, demolition, installation, or repair work, OR

$15,000 or less for maintenance work, the Contractor is EXEMPT from:

• DIR registration requirements for contactors or subcontractors performing the work

• Requirements for electronic submission of monthly payroll records to the DIR

• Requirements for DIR notification following award of the contract.

15. Overtime Requirements

1. Overtime Requirements. No Contractor or subcontractor contracting for any part of the contract work which may require or permit any laborer or mechanic in any work week in which he is employed on such work to work in excess of eight hours in any calendar day or in excess

C – 7 of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half (1 ½) times his basic rate of pay for all hours worked in excess of eight hours in any calendar day or in excess of forty hours in such workweek, as the case may be.

2. Violation; Liability for Unpaid Wages; In the event of any violation of the clause set forth in subparagraph (1), the Contractor and any subcontractor responsible therefore shall be liable to any affected employee for his unpaid wages.

3. Liquidated Damages. In addition, such Contractor and subcontractor shall be liable to the

United States for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic employed in violation of the clause set forth in subparagraph (1) in the sum of $100 for each calendar day in which such employee was required or permitted to work in excess of eight hours or in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in subparagraph (1).

4. Withholding for Unpaid Wages and Liquidated Damages. The Department of the Treasury may withhold or cause to be withheld from any monies payable on account of work performed by the Contractor or subcontractor such sum as may administratively be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2).

5. Subcontracts. The Contractor shall insert in any subcontracts the clause set forth in subparagraph (1), (2), and (3) of this paragraph and also a clause requiring the subcontractor to include these clauses in any lower tier subcontracts which they may enter into together with a clause requiring the insertion in any further subcontracts that may in turn be made.

16. Addenda

If any person contemplating submitting a bid for the proposed contract is in doubt as to the true meaning of any part of the Plans and Specifications or other proposed Contract Documents or finds discrepancies in or omissions from the drawings or Specifications, he may submit to the City

Engineer through BidNet a request for information for an interpretation or correction thereof. The person submitting the request shall submit said request at least seven (7) days prior to the bid opening date. Any interpretation or correction of the proposed documents will be made only by

Addendum duly issued, and a copy of such Addendum will be mailed or delivered to each person receiving such documents. The City Council will not be responsible for any other explanations or interpretations of the proposed documents.

Each bid form shall include specific acknowledgment in the space provided of receipt of all addenda issued and mailed by the Owner during the bidding period. Failure to acknowledge may result in the bid being rejected as not responsive.

C – 8

(DO NOT DETACH)

BID PROPOSAL

City of Hanford Date:

315 North Douty Street, Hanford, CA 93239-3951

The undersigned, as bidder, declares that we have received and examined the project entitled and will contract with the owner, on the form of agreement provided herewith, to do everything required for the fulfillment of the contract to:

Site preparation, mobilization, demolition, traffic control, potholing, saw cutting and removing existing pavement for excavation and earthwork; furnishing and installation of approximately 2,060 linear feet of 8-inch AWWA C900 PVC water main, fittings, thrust blocks, tracer wire, gate valves, new fire hydrants, and all necessary appurtenances; reconnecting new water service and new water main, abandoning in place the existing water main and appurtenances; trench backfill, compaction, and temporary and permanent trench pavement restoration, pressure testing, disinfection, bacteriological testing and flushing of the new water main; surface restoration to match in-kind, including asphalt concrete paving and traffic striping.

We agree that the contract documents include all parts of this project document, as well as all referenced federal, state and local agency requirements.

We acknowledge that addenda numbers _____________ through __________ have been received and have been examined as part of the project.

Attached is a bid guaranty bond duly completed by a guaranty company authorized to carry on business in the State of California in the amount of at least 10 percent (10%) of the total amount of our bid, or alternatively, there is attached a certified cashiers check payable to the Owner in the amount of at least

10 percent (10%) of the total amount of our bid.

If our bid is accepted, we agree to sign the agreement without qualifications and to furnish the performance and payment bonds and the required evidences of insurance within 20 calendar days after receiving written notice of the award of the contract.

It is further understood and agreed that:

(a) In case of a discrepancy between words and figures, the words shall prevail, and in case of a discrepancy between unit prices and totals, the unit price shall prevail.

(b) The City reserves the right to eliminate any section of this proposal from the contract without claim of the contractor for profits lost.

(c) No verbal agreement or conversation with any officer, agent or employee of the City, either before or after execution of the Agreement, shall affect or modify any of the terms or obligations of this proposal.

C – 9

(d) The City will not be responsible for any errors or omissions on the part of the undersigned in making up his bid nor will the bidder be released on account of errors.

(e) The undersigned bidder is properly licensed in accordance with the State of California Act providing for the registration of Contractors.

(f) If the proposal shall be accepted and undersigned shall fail to contract as aforesaid and to give the bonds in the sums to be determined aforesaid with surety satisfactory to the City

Council within TWENTY (20) CALENDAR DAYS after the bidder has received notice from the City Council that the contract is ready for signature, the City Council may, at its option, determine that the bidder has abandoned the contract, and thereafter, this proposal and the acceptance thereof shall be null and void, and the forfeiture provisions relating to such security accompanying this proposal shall operate and the said security shall be the property of the City of Hanford.

We further agree, if our bid is accepted and a contract for performance of the work is entered into with the Owner, to so plan work and to prosecute it with such diligence that the work shall be completed within the time stipulated.

Name of Bidder

Contractor's License No.

Signature of Bidder

Title of Signator

Witness Address of Bidder

Title of Witness State of Incorporation

C – 10

BID SCHEDULE

PROJECT TITLE: City Of Hanford Water Main Replacement Along Mary Street

ITEM

NO.

EST.

QTY.

UNIT

OF

MEAS.

DESCRIPTION

UNIT

PRICE

TOTAL

AMOUNT

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

2,060

8,020

8,020

2,060

LS

LF

SF

SF

EA

LF

Site Preparation, Mobilization, and Demo.

Traffic Control System

Water Pollution Control

Furnish and Install 8-inch C900 PVC Pipe

Compact Subgrade (12" lifts, 4 feet deep)

Pavement (3" Type B AC/6" Class 2 AB)

Furnish and Install 8-inch Gate Valve

Connect to Existing 12-inch AC Water Main

Connect to Existing 8-inch Steel Water Main

Furnish and Install Fire Hydrant Assembly

Furnish and Install 6-inch Gate Valve

Reconnect Existing Water Service

Perform disinfection of PVC pipe

Perform pressure test on PVC pipe

Abandon Existing 6” Water Main and Valves

Replace Traffic Striping & Markings

Sheeting, Shoring and Bracing

Demobilization and site cleanup

TOTAL SUM WRITTEN IN WORDS: ______________________________________________________

______________________________________________________________ Dollars; $ ________________

TOTAL BID SUM

IN FIGURES

City Reserves the right to reject any and all bids. C – 11

BID GUARANTY BOND

KNOW ALL MEN BY THESE PRESENTS:

That , hereinafter, called the Principal, and , hereinafter called the Surety, are jointly and severally held and firmly bound unto the City of Hanford, hereinafter called the Obligee, each in the penal sum of 10 percent (10%) of the total amount of the bid of the

Principal for the work, this sum not to exceed

Dollars ($_________________) of lawful money of the United States for the payment whereof unto the

Obligee, the Principal and Surety jointly and severally bind themselves forever firmly by these presents.

WHEREAS, the Principal is herewith submitting its offer for the fulfillment of Obligees contract for:

NOW THEREFORE, the conditions of this obligation is such that if the Principal is awarded the contract, and if the Principal, within the time specified in the bid for such contract enters into, executes, and delivers to the Obligee an agreement in the form provided herein complete with evidences of insurance, and if the Principal within the time specified in the bid gives to the Obligee the performance and payment bonds on the form provided herein, then this obligation shall be void; otherwise, the Principal and Surety will pay unto the Obligee the difference in money between the total amount of the bid of the Principal and the amount of which the Obligee legally contract with another party to fulfill the contract if the latter amount be in excess of the former, but in no event shall the Suretys liability exceed the penal sum hereof.

AND IT IS HEREBY DECLARED AND AGREED that the Surety shall be liable under this obligation as Principal, and that nothing of any kind or nature whatsoever that will not discharge the Principal shall operate as a discharge or a release of liability of the Surety.

IT IS HEREBY FURTHER DECLARED AND AGREED that this obligation shall be binding upon and inure to the benefit of the Principal, and Surety, and the Obligee and their respective heirs, executors, administrators, successors and assigns.

C - 12

SIGNED AND SEALED this _____ day of ________________________ 20___.

(SEAL) __________________________________________________

Principal

Signature for Principal

(SEAL) __________________________________________________

Surety

Signature for Surety

C – 13

CERTIFICATION OF BIDDER'S

EXPERIENCE AND QUALIFICATIONS

(To be completed with bid proposal.)

The undersigned bidder certifies that he is, at the time of award, and shall be, throughout the period of the contract, licensed by the State of California to do the type of work required under terms of the contract documents, under California Contractors License Number ____________________, and which has an expiration date of ____________________. Bidder further certifies that he is skilled and regularly engaged in the general class and type of work called for in the contract documents.

In accordance with the requirements of Section 9 on Page C-5, the bidder represents that he is competent, knowledgeable and has special skills on the nature, extent and inherent conditions of the work to be performed. Bidder expressly acknowledges that he is aware of and has the skill and experience to foresee and to adopt protective measures to adequately and safely perform the construction work.

The bidder and its employee or agent signing this Certification declares under penalty of perjury that the foregoing statements and representations are true and correct and will remain true and correct throughout the period of the contract.

The Bidder’s List on Page C-15 should be completed and incorporated with documents submitted at time of bid. After award of contract, all subcontractors’ information on Bidder’s List shall be submitted to

Project Engineer.

Signed this ____ day of _________________________20___.

Name of Bidder

Contractor's License No. & State

Signature of Bidder

C – 14

BIDDER’S LIST

Bidders shall provide the following information for all DBE and non-DBE contractors who provided a proposal, bid, quote or were contacted by the proposed prime. This information is also required from the Bidder (prime contractor) and it shall be submitted with their bid/proposal. The City of Hanford will use this information to maintain and update a “Bidder’s” List to assist in the overall annual DBE goal setting process.

Firm Name: ________________________________________________________________

Type of Firm: Individual ________ Partnership ________ Corporation ________

Contractor’s License Number: __________________________________________________

Department of Industrial Relations Number (DIR Number): ___________________________

Address: ____________________________________________________________

Contact Person: ____________________________________________________________

Phone: ____________________________________________________________

Fax: ____________________________________________________________

E-mail Address: ____________________________________________________________

Number of years in business: _______________________________________________

Is the firm currently certified as a DBE by Caltrans? [ ] Yes [ ] No

Percent of Journeymen working on project? ________________________________________

Type of work/services/materials provided by firm? __________________________________

What was your firm’s Gross Annual receipts for last year?

[ ] Less than $1 million

[ ] Less than $5 million

[ ] Less than $10 million

[ ] Less than $15 million

[ ] More than $15 million

Thank you for your cooperation in completing this survey.

THIS FORM CAN BE DUPLICATED, IF NECESSARY, TO REPORT ALL BIDDER’S (DBEs AND

NON-DBEs) INFORMATION.

C – 15

DESIGNATION OF SUBCONTRACTORS

(Submit with Bid Proposal)

The undersigned certifies that he has used the sub-bids of the following listed subcontractors in making up his bid, and that the duly licensed subcontractors listed will be used for the work for which they bid, subject to the approval of the Engineer, and in accordance with the applicable provisions of these specifications and plans. If no subcontractors will be on the job, write “None” across form. All subcontractors used for the work must be listed per Section 4104(a) of the Public Contract Code.

ITEM #

SUBCONTRACTOR

ADDRESS/TELEPHONE

NO.

STATE

LICENSE NO.

D.I.R.

NUMBER

Date: ________________________ Bidder's Name: ______________________________________

Address Authorized Signature

Type of Organization Telephone Number

(Individual, Partnership or Corporation)

Bidder’s License No. Bidder’s D.I.R. No.

C – 16

AWARD AND EXECUTION OF CONTRACT

1. Award of Contract

Upon review of the proposals, the contract will be awarded and executed per Paragraph 2.07 and

2.08 of Subsection 2 (Proposal and Contract) of Section 1 (General Conditions) of the City

Standards and these contract documents. The award of the contract, if it is awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed.

The City of Hanford, in accordance with the provisions of Title VI of the Civil Rights Act of 1964

(78 Stat. 252) and the Regulations of the Department of Commerce (15 C.F.R., Part 8), issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination on the grounds of age, race, religion, creed, color, national origin, ancestry, physical or mental disability, medical condition, genetic information, marital status, gender, gender identity or expression, sexual orientation, or military and veteran status.

The City Council, however, reserves the right to reject any or all bids and to waive any informality or irregularity in bids received. The City Council also reserves the right to reject the bid of any bidder who has previously failed to perform properly or did not complete on time contracts with the

City of Hanford of a nature similar to this project.

Such award, if made, will be made within sixty (60) days after the opening of the proposals. All bids will be compared on the basis of the Engineer's Estimate of the quantities of work to be done.

2. Contract Bonds

Prior to award, the successful bidder shall furnish a good and sufficient bond listed in the Federal

Register and executed by an "Admitted Surety Insurer," in the amount of one hundred percent

(100%) of the total bid amount to guarantee the faithful Performance of the contract by the

Contractor, and a second bond for Labor and Materials shall be executed in the amount of one hundred percent (100%) of the total bid amount.

Pursuant to California Code of Civil Procedure Section 995.120, an “Admitted Surety Insurer” is defined as a corporate insurer or a reciprocal or inter-insurance exchange to which the Insurance

Commissioner of the State of California has issued a Certificate of Authority to transact surety insurance in the State of California.

The successful bidder shall, in addition, furnish a surety bond in a penal sum of ten percent (10%) of the amount of the contract as security for the correction of deficiencies during the specified

Guaranty period as specified in Paragraph 6.26 of Subsection 6 (Legal Relations and

Responsibilities to the Public) of Section 1 (General Conditions) of the Standard Specifications, Titled "Defective Material and Workmanship Guarantee." Said Bond shall be furnished by the completion of the contract prior to acceptance by the City.

All alterations, extensions of time, extra and additional work and other changes authorized by these specifications may be made without securing the consent of the surety or sureties on the contract bonds.

C – 17

Whenever any surety or sureties on any such bonds required by a law for the protection of the claims of the laborers and material may become insufficient, or the City has cause to believe that such surety or sureties have become insufficient, a demand in writing by the City may be made of the

Contractor for such further bond or bonds or additional surety, not exceeding that originally required as is considered necessary. Thereafter, no payment shall be made upon such contract or change order to the Contractor until such further bond or bonds or additional surety has been furnished.

3. Execution of Contract

The contract shall be signed by the successful bidder and returned together with the contract bonds and satisfactory evidence of insurance as provided in this section within twenty (20) calendar days after the bidder has received notice that the Contract has been awarded for approval by City Council.

No proposal shall be considered binding upon the City until the execution of the contract.

4. Failure to Execute Contract

Failure to execute a contract, file acceptable bonds, and provide insurance as provided herein within twenty (20) calendar days after the bidder has received notice that the contract has been awarded shall be just cause for the annulment of the award and the forfeiture of the bidder’s guaranty.

If the successful bidder refuses or fails to execute the contract, the City Council may award the contract to the second lowest responsible bidder. If the second lowest responsible bidder refuses or fails to execute the contract, the Council may award the contract to the third lowest responsible bidder. On the failure or refusal of the second or third lowest responsible bidder to whom any such contract is so awarded to execute the same, such bidder's guaranties shall be likewise forfeited to the City. The work may then be re-advertised or may be constructed by the day labor, as the City

Council may decide.

5. Return of Proposal Guaranties

Within ten (10) calendar days after the award of the contract, the City Council will return the proposal guaranties accompanying such of the proposals as are not to be considered in making the award. All other proposal guaranties will be held until the contract has been finally executed, after which they will be returned to the respective bidders whose proposals they accompany.

6. Insurance

The Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees AND

Subcontractors. Contractor will maintain the following coverage, and coverage shall be at least as broad as:

7. Minimum Scope of Insurance

a. Contractor, at Contractor’s own cost and expense, shall procure and maintain, for the duration of this Agreement, the following insurance policies.

C – 18

i. Workers Compensation Coverage. As required by the State of California, with

Statutory Limits, and Employer’s Liability Insurance with a limit of no less than ONE MILLION AND

NO/100 DOLLARS ($1,000,000) per accident for bodily injury or disease.

ii. Commercial General Liability (CGL) Coverage. Insurance Services Office (ISO)

Form CG 0001, including products and completed operations, with a limit of no less than TWO

MILLION AND NO/100 DOLLARS ($2,000,000) per occurrence for bodily injury, personal injury, and property damage, and a general aggregate limit of no less than FOUR MILLION AND NO/100

DOLLARS ($4,000,000).

iii. Automobile Liability Coverage. ISO Form Number CA 0001 covering any auto

(Code 1), or if Contractor has no owned autos, Code 8 (hired) and 9 (non-owned),with a limit no less than ONE MILLION AND NO/100 DOLLARS ($1,000,000) per accident for bodily injury and property damage.

iv. Builder’s Risk (Course of Construction) utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.

vi. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or

Errors and Omissions (if project involves environmental hazards) with limits no less than ONE

MILLION AND NO/100 DOLLARS ($1,000,000) per occurrence, and TWO MILLION AND NO/100

DOLLARS ($2,000,000) policy aggregate. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.

If Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by Contractor.

Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this

Agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or

Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non-contributory, additional insured, deductibles and self-insured retentions, indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying insurance. No insurance policies maintained by any additional insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until Contractor’s primary and excess liability policies are exhausted.

b. Any deductibles or self-insured retentions must be declared to and approved by the City.

c. The policies are to contain, or be endorsed to contain, the following provisions:

C – 19

i. The City and its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL and automobile liability policies with respect to liability arising out of work or operations performed by or on behalf of Contractor including materials, parts, or equipment furnished in connection with such work or operations; products used by Contractor; or automobiles owned, leased, hired or borrowed by Contractor. General liability coverage can be provided in the form of an endorsement to Contractor’s insurance at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33 or CG 20 38 and CG 20 37 if a later edition is used. The coverage shall contain no special limitations on the scope of protection afforded to the City and its officers, officials, employees or volunteers.

ii. For any claims related to this Agreement, Contractor’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as to the City and its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City and/or its officers, officials, employees, or volunteers shall be in excess of Contractor’s insurance and shall be non-contributory.

iii. Each insurance policy required above shall provide that coverage shall not be canceled or modified, except with fifteen (15) days prior written notice to the City.

Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII.

Contractor shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

d. Contractor hereby grants to the City and its officers, officials, employees, and volunteers a waiver of any right to subrogation which any insurer of Contractor may acquire against the City and/or its officers, officials, employees, and volunteers by virtue of the payment of any loss under such insurance.

Contractor agrees to obtain endorsements necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

e. Contractor may submit evidence of Builder’s Risk insurance in the form of Course of

Construction coverage. Such coverage shall name City as a loss payee.

If the project does not involve new or major reconstruction, at the option of City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion, or adjustment to existing buildings, structures, processes, machinery, and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery, or equipment damaged, impaired, broken, or destroyed during the performance of this contract, including during transit, installation, and testing at the City-owned site.

f. Contractor’s insurance policies shall be “occurrence” policies and not “claims-made” coverage, except for Professional Liability Coverage. If any coverage required is written on a claims-made coverage form:

C - 20

1. The retroactive date must be shown, and this date must be before the execution date of this contract or the beginning date of contractor work.

2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of contract work.

3. If coverage is canceled or non-renewed and not replaced without another claims-made policy form with a retroactive date prior to the contract effective date, or start of work date, Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.

4. A copy of the claims reporting requirements must be submitted to City for review and approval.

5. If the services involve lead-based paint or asbestos…