Bid Notice.pdf
PDF 8 MB Posted
- Attached to
- Rowe Ave Reservoir Rehabilitation Project
- Solicitation number
- 25-02
- Issued by
- Tulare County, California
About this file
This Bid Notice is issued by the City of Yuba City, Sutter County, California, for the Rowe Ave Reservoir Rehabilitation Project (Project No. 25-02). The project consists of rehabilitation, structural repairs, safety improvements, and new interior and exterior protective coatings for an existing 1-million gallon welded steel water storage tank. Bids must be received by 2:00 p.m. local time on November 30, 2026, at the City Hall City Clerk's Office, 1201 Civic Center Boulevard, Yuba City, CA 95993. A mandatory pre-bid meeting and site walk-through will be held on Wednesday, November 18, 2026, at 11:00 a.m. at the Rowe Ave Reservoir Tank (638 Rowe Ave, Yuba City, CA 95991). The Contract Time for completion is 150 calendar days from the Notice to Proceed, with work to commence within ten days of that notice. The estimated cost of the work is $1,903,000.00. Bidders must acknowledge receipt of all addenda issued during the bidding period and submit a completed electronic bid set through the Public Purchase on-line bidding service.
Bid security of ten percent (10%) of the Total Bid Price is required in the form of a Bidder's Bond issued by a California-admitted corporate surety, certified check, cashier's check, or cash, all payable to the City of Yuba City. The successful bidder must execute Performance and Payment Bonds, each for one hundred percent (100%) of the Contract Price, also from California-admitted sureties. Bidders must hold a valid California Contractor's License Class A at time of bid submission and remain licensed throughout the contract term. All contractors and subcontractors must be registered with the California Department of Industrial Relations (DIR) pursuant to Labor Code Section 1725.5. The project is subject to California prevailing wage requirements as determined by the DIR and compliance monitoring by the California Department of Industrial Relations. Bidders must certify minimum prior related successful project experience and provide a Certification of Bidder's Experience and Qualifications (Section 00480), with failure to provide this rendering the bid non-responsive. The contractor must perform at least seventy percent (70%) of the Contract Total Base Bid Amount with its own forces; subcontractors may not exceed thirty percent (30%) of the total bid price. Award will be made to the lowest responsible and responsive bidder based on the Base Bid Schedule, and no bid may be withdrawn for sixty (60) days after bid opening except per California Public Contract Code Section 5101.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Yuba City Sutter County, California
CONTRACT DOCUMENTS
and
SPECIFICATIONS
FOR THE CONSTRUCTION OF
ROWE AVE RESERVOIR REHABILITATION PROJECT
Project No. 25-02
AUGUST 2026
Sutter County, California
ROWE AVE RESERVOIR REHABILITATION PROJECT
PROJECT NO. 25-02
BID DOCUMENTS
AUGUST 2026
DESIGN CERTIFICATION
The Technical Specifications contained herein have been prepared by, or under the responsible charge of, the following registered person(s):
Jacobs Buildings, Infrastructure and Advanced Facilities 2525 Airpark Drive, Redding, CA 96001
Public Works Department 1201 Civic Center Blvd.
Yuba City, CA 95993
(THIS PAGE LEFT BLANK INTENTIONALLY)
INTRODUCTORY INFORMATION
August 2026 00010 - 1 City of Yuba City Table of Contents Rowe Avenue Reservoir Rehabilitation
SECTION 00010
TABLE OF CONTENTS
INTRODUCTORY INFORMATION
00001 Project Title Page 00005 Certifications Page 00010 Table of Contents
BIDDING REQUIREMENTS
00100 Notice Inviting Bids 00200 Instructions to Bidders 00300 Supplemental Project Information Available to Bidders 00400 Bid Form 00410 Bidder’s Bond 00420 Site Visit Affidavit 00430 Designation of Subcontractors 00435 Schedule of Major Equipment and Material Suppliers 00440 Non-Collusion Affidavit 00445 Debarment Certification 00450 Certification of Drug Free Workplace 00460 Iran Contracting Act Certification 00480 Certification of Bidder’s Experience and Qualifications 00490 Statement of Safety Compliance
CONTRACTING REQUIREMENTS
00500 Notice of Award 00510 Agreement 00515 Certification of Authorization – Corporation 00520 Certification of Authorization – Partnership 00525 Certification of Authorization – Joint Venture 00530 Certification of Authorization – LLC 00540 Performance Bond 00550 Payment Bond 00560 Contractor’s Certification Regarding Worker’s Compensation 00580 Sample Escrow Agreement for Security Deposits in Lieu of Retention 00600 Notice to Proceed 00680 Final Closeout Agreement and Release of Claims 00700 General Conditions 00800 Supplementary General Conditions
DIVISION 1 – GENERAL REQUIREMENTS
01060 References 011100 Summary of Work 01140 Work Restrictions and Coordination 01200 Measurement and Payment 01250 Contract Modification Process 01300 Submittal Procedures 01310 RFI Procedures 01320 Project Meetings 01325 Project Schedules 01330 Photographs 014533 Special Inspection, Observation, and Testing Supplements:
INTRODUCTORY INFORMATION
August 2026 00010 - 2 City of Yuba City Table of Contents Rowe Avenue Reservoir Rehabilitation
Statement of Special Inspection Table 1, Required Non-Structural Special Inspection Table 2, Requires Structural Special Inspection
Division 2 – Existing Conditions
024100 Demolition 028200 Asbestos Removal 028300 Lead Paint Removal Supplement:
Lead Report, dated June 30, 2025, by AdamLabs, Inc
Division 3-4 – (Not Used)
Division 5 – Metals
050523 Welding Supplemental:
Welding and Nondestructive Testing Table 055000 Metal Fabrication 055219 Steel Railings
Division 6-8 – (Not Used)
Division 9 – Finishes
099713 Steel Tank Coating Supplemental:
Paint System Data Sheet (PSDS) Paint Product Data Sheet (PPDS)
Division 10-32 – (Not Used)
Division 33 – Utilities
331300 Disinfection of Water Utility Distribution Facilities
331613.3 Welded Steel Tank Rehabilitation
Division 34-49 – (Not Used)
DRAWINGS (Bound Separately)
END OF SECTION
BIDDING REQUIREMENTS
August 2026 00100 - 1 City of Yuba City Notice Inviting Bids Rowe Ave Reservoir Rehabilitation Project
SECTION 00100
NOTICE INVITING BIDS
BID OPENING
2.02 NOTICE IS HEREBY GIVEN that the City of Yuba City (hereafter referred to as “City” or “Owner”) invites and will receive sealed Bids at the City Hall, City Clerk’s Office, 1201 Civic Center Boulevard, Yuba City, CA, 95993, until 2:00 p.m. local time, on November 30, 2026, at which time bids will be publicly opened and read aloud in the City’s Board Room for the following project.
ROWE AVE RESERVOIR REHABILITATION PROJECT
PROJECT NO. 25-02
NO LATE BIDS WILL BE ACCEPTED.
PROJECT INFORMATION
3.02 DESCRIPTION OF THE WORK
The Project consists of rehabilitation, structural repairs, safety improvements, and new interior and exterior protective coating for the existing Rowe Avenue 1-million gallon welded steel water storage tank.
3.03 CERTIFICATES OF EXPERIENCE AND QUALIFICATIONS
Due to the complexity and scope of this critically important project, the City requires minimum prior related successful project experience for Contractors and Contractor’s Project Manager.
These requirements are found in Section 00480, Certification of Bidder’s Experience and Qualifications.
3.04 ESTIMATED COST OF THE WORK
The estimated cost for this work is: $1,903,000.00
CONTRACT TIME
The Contract Time for the completion of all the Work of the Project is 150 (one hundred fifty) calendar days.
CONTRACT DOCUMENTS
4.02 Plans, specifications, and proposal forms for bidding this Project can be obtained from the Public Purchase on-line bidding service. Registration is required to use the service. There is no charge to register or obtain bid documents in digital format.
Log onto: https://www.Yuba City.ca.us/bid-project or www.publicpurchase.com
Once you have registered, search for the project title identified on the cover of this specification. The Project Plans and Specifications may be available for viewing at a Contractor’s Exchange. Contact Exchanges directly to inquire about availability. All addenda notifications will be emailed to plan holders by Public Purchase and may be obtained from the Public Purchase on-line bidding service.
All questions and requests for information regarding the project must be submitted through Public Purchase on the project link. Responses to questions will be distributed to plan holders via Public Purchase. Questions and Requests for Information must be submitted five (5) business days prior to bid opening.
4.03 All Bidders must obtain a complete electronic bid set of Contact Documents in order to be considered responsive and to receive addenda notifications.
4.04 Complete sets of Contract Documents must be used in preparing Bids. The City does not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract
August 2026 00100 - 2 City of Yuba City
Documents. Bidders shall develop and submit Bids at their own expense. The City will not reimburse any costs associated with the development and submittal of any and all Bids.
4.05 Bidding procedures are prescribed in the Contract Documents. Bids shall be executed upon the Bid Forms bound and made a part of the Contract Documents. Any exception taken to the Contract Documents and any changes made to terms and conditions of the Bid Forms may render the Bid non-responsive. All prescribed Bid Forms may be removed from the Contract Documents for submission in a sealed envelope.
4.06 The City, in making copies of the Contract Documents available on the above terms, does so only for the purpose of obtaining Bids for the Work and does not confer license or grant for any other use.
MANDATORY PRE-BID MEETING AND SITE WALK
5.02 A mandatory pre-bid meeting and project walk-through will be held on Wednesday, November 18, 2026, at 11:00 a.m. at the Rowe Ave Reservoir Tank (638 Rowe Ave, Yuba City, CA 95991).
Shortly after this pre-bid meeting, a project site walk-through will occur at the project site location.
5.03 At the pre-bid meeting, representatives of City and City’s consultants will discuss the Bid Form documents, site constraints, order of work and other items specific to this Project. The City will transmit to all recipients of complete sets of Contract Documents such Addenda as it considers necessary in response to questions raised at the meeting and project walk-through. Oral statements not confirmed by Addenda may not be relied upon and are not binding or legally effective.
Bidders must acknowledge meeting this site visit requirement (See Section 00420, Site Visit Affidavit).
BID SECURITY AND BONDS
6.02 Each Bid must also be accompanied by security in the form of a Bidder’s Bond issued by a corporate surety, a certified check, or cashier’s check payable to the City, or cash for an amount not less than ten percent (10%) of the Total Bid Price.
6.03 The successful Bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, in conformance with the requirements set forth in the Contract Documents, each for not less than one hundred percent (100%) of the Contract Price.
6.04 Pursuant to California Code of Civil Procedures Section 995.311, the City will verify all bonds for this Project are issued and executed by a California admitted surety.
INQUIRIES
7.02 Inquiries regarding further information about the Project may be directed to Nick Menezes, Deputy Public Works Director at nmenezes@yubacity.net.
LAWS AND REGULATIONS
8.02 CONTRACTOR’S LICENSE CLASSIFICATION AND REQUIREMENTS
Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the work specified in the Contract Documents. Bidders bidding as the prime Contractor shall possess a valid California Contractor’s License Class Aat the time the bid is submitted and throughout the contract term.
The Contractor will also be required to ensure that all subcontractors working on this project are holding valid licenses suitable for their trade.
8.03 DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION
No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the State of California Director of Industrial Relations (DIR) pursuant to California Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under California Labor Code Section 1771.1(a)]. No Contractor or subcontractor may be
August 2026 00100 - 3 City of Yuba City awarded a contract for public work on a public works project unless registered with the DIR pursuant to California Labor Code Section 1725.5. If awarded a contract, the Contractor and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project.
8.04 CALIFORNIA LABOR CODE
This Project is subject to the general prevailing rate of per diem wages as determined by the State of California Director of Industrial Relations, and travel and subsistence pay as such are defined in applicable collective bargaining agreements filed in accordance with Section 1773.8 of said Labor Code, for work needed and performed on this Project. Said determinations, in effect at the time of publishing this notice, are on file at the above identified City office and may be examined at said office. Interested parties shall contact the City office to make arrangements for viewing. These rate determinations may also be found on the DIR’s website at http://www.dir.ca.gov/OPRL/dprewagedetermination.htm .
The successful bidding Contractor and its subcontractors shall employ the appropriate number of apprentices, in each apprentice able craft, on the project site as stipulated in California Labor Code Section 1777.5.
Pursuant to California Labor Code Section 1771.4, this Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.
8.05 CALIFORNIA PUBLIC CONTRACT CODE 22300
Pursuant to California Public Contract Code Section 22300, for monies earned by the Contractor and withheld by the City to ensure the performance of the Contract, the Contractor, may, at its option, choose to substitute securities meeting the requirements of California Public Contract Code Section 22300, or have the retained, earned monies deposited in an escrow account at a federal or state-chartered bank.
8.06 CALIFORNIA PUBLIC CONTRACT CODE 3400
In accordance with California Public Contract Code Section 3400, Bidders may propose equals of products listed in the technical specifications or project plans by manufacturer name, brand or model number, unless the technical specifications or plans specify that the product is necessary to match others in use. Complete information for products proposed as equals must be submitted to the City’s Office for review at least thirty (30) calendar within the date of Notice to Proceed. The City may specify a product by a particular manufacturer on a “sole-sourced” basis for the following reasons:
(1) In order that a field test or experiment may be made to determine the product’s suitability for future use.
(2) In order to match other products in use on a particular public improvement either completed or in the course of completion.
(3) In order to obtain a necessary item that is only available from one source.
CITY’S RIGHTS
9.02 The City reserves the right to award the Contract, to reject any or all Bids, to waive non-material and inconsequential irregularities in any Bid, and to reject nonconforming, nonresponsive, non-responsible, or conditional Bids.
9.03 No Bid received and read aloud may be withdrawn for a period of sixty (60) days after the bid opening date, except pursuant to California Public Contract Code Section 5101.
9.04 Bids are required for the “Base Bid Schedule”. Award will be based on the lowest responsible and responsive bid for the “Base Bid Schedule”.
August 2026 00100 - 4 City of Yuba City
August 2026 00200 - 1 City of Yuba City Instructions to Bidders Rowe Ave Reservoir Rehabilitation Project
SECTION 00200
INSTRUCTIONS TO BIDDERS
Index
Page
ARTICLE GENERAL
WORK TO BE DONE
COMPETENCE OF BIDDERS AND SUB-BIDDERS
COMPLIANCE WITH CONTRACTOR’S LICENSE LAWS
PRIOR DISQUALIFICATION
EXAMINATION OF CONTRACT DOCUMENTS
NOVEL CORONAVIRUS (COVID-19) SAFETY Requirements (NOT USED)
EXAMINATION OF PROJECT SITE AND PRE-BID ACCESS TO THE SITE
INTERPRETATION OF CONTRACT DOCUMENTS AND ADDENDA
BIDDER’S SECURITY
BID FORM
SUBMISSION OF BID FORMS
WITHDRAWAL OF BID
PUBLIC OPENING OF BIDS
REJECTION OF IRREGULAR BIDS
COMPETITIVE BIDDING
ESTIMATED QUANTITIES
SUBSTITUTION OF ALTERNATIVE MATERIALS, ARTICLES, OR EQUIPMENT
LOCAL BUSINESS LICENSE
WORK PERCENTAGES
DESIGNATION OF SUBCONTRACTORS
CONTRACTS TO BE ASSIGNED (NOT USED)
MANUFACTURER CERTIFICATION AND APPROVAL OF CONTRACTOR (NOT USED)
DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
IRAN CONTRACTING ACT CERTIFICATION
SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES
SHEETING, SHORING AND BRACING (NOT USED)
OFFER OF ASSIGNMENT OF ANTITRUST ACTIONS
BIDDERS INTERESTED IN MORE THAN ONE BID
RETURN OF BIDDER’S SECURITY
RELIEF OF BIDDERS
AWARD OF CONTRACT
CONTRACT BONDS
INSURANCE
EXECUTION OF CONTRACT AGREEMENT
FAILURE TO EXECUTE CONTRACT AGREEMENT
NO ORAL AGREEMENTS
BID PROTEST
ESCROW BID DOCUMENTS (NOT USED)
August 2026 00200 - 2 City of Yuba City
ARTICLE 1 ― GENERAL
1.1 Bidder must examine these instructions to Bidders carefully and respond to all requirements and conditions.
1.2 Bidders must be aware of the requirements of codes, permits and standards referenced in the Contract Documents.
ARTICLE 2 ― WORK TO BE DONE
2.1 It is the intention of the City to construct improvements as shown and set forth in the Contract Documents titled: Rowe Ave Reservoir Rehabilitation Project – Project No. 25.02,. All of the Work is particularly set forth in the Contract Documents, and all of said Work, together with all other work incidental thereto, is included. The Work includes the furnishing of all labor, materials, equipment, tools, supervision, incidentals, transportation and services necessary for completion of the Project. Codes and Standards, definition of words and terms, and abbreviations shall be as specified in the Contract Documents.
ARTICLE 3 ― COMPETENCE OF BIDDERS AND SUB-BIDDERS
3.1 All Bidders must complete and submit with their Bid the following Certifications:
A. Section 00480, Certification of Bidder’s Experience and Qualifications.
Failure to provide this information within the prescribed Bid deadlines may render the Bid non-responsive and may be the basis for rejection of the Bid.
ARTICLE 4 ― COMPLIANCE WITH CONTRACTOR’S LICENSE LAWS
4.1 Bidder's attention is directed to the provisions of Chapter 9 of Division 3 of the California Business and Professions Code ("Contractors”), and of California Public Contract Code Section 3300. The Contractor must possess the required classification of Contractor's License at the time the Bid is submitted (per Business and Professions Code Section 7028.15). If federal funds are involved in this project, the Contractor must possess the required classification of Contractor's License at the time of the Contract Award (per California Public Contract Code Section 20103.5).
4.2 If a Bidder does not possess the required Contractor's License at the time a Bid is submitted, in accordance with Business and Professions Code Section 7028.15, the Bid will be considered nonresponsive and will be rejected by the City. The City may require forfeiture of the Bidder's Bond.
4.3 Joint venture Bidders must possess a joint venture license. Each party to a joint venture must be properly licensed for the Work of this Project.
ARTICLE 5 ― PRIOR DISQUALIFICATION
5.1 Bid may be rejected on the basis of a Bidder, any officer of such Bidder, or any employee of such Bidder who has a proprietary interest in such Bidder, having been disqualified, removed or otherwise prevented from Bidding on, or completing a federal, state or local project because of a violation of a law or a safety regulation.
5.2 The City will review the circumstances presented in the Bid Form certification. The City will determine if acceptance of the Bid is in its best interest.
ARTICLE 6 ― EXAMINATION OF CONTRACT DOCUMENTS
6.1 Each Bidder shall thoroughly examine and become familiar with the Contract Documents and Addenda (if any).
6.2 The submission of a Bid shall constitute an acknowledgment upon which the City may rely that the Bidder has thoroughly examined and is familiar with the Contract Documents and that, except as provided in the Pre-Bid Protest Procedures in Article 38 below, the Bidder has waived
August 2026 00200 - 3 City of Yuba City any objections or contentions regarding the Contract Documents and/or the bidding requirements in the Contract Documents.
6.3 The failure or neglect of a Bidder to receive or examine any of the Contract Documents shall in no way relieve it from any obligation with respect to its Bid or to the Contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any Contract Documents.
6.4 The submission of a Bid will be conclusive evidence that the Bidder has investigated and is fully aware of the conditions and difficulties that may be encountered including the availability of labor and materials to be provided, of the character, quality and quantities of Work to be performed, and of the requirements of all Contract Documents.
ARTICLE 7 ― NOVEL CORONAVIRUS (COVID-19) SAFETY REQUIREMENTS – NOT USED
ARTICLE 8 ― EXAMINATION OF PROJECT SITE AND PRE-BID ACCESS TO THE SITE
8.1 Prior to submitting a Bid, it will be the sole responsibility of each Bidder to conduct any additional examination, investigation, exploration, test, study or other inquiry, and obtain any additional information pertaining to the physical conditions (including surface, subsurface, and underground utilities) at or near the Project site that may affect the cost, progress, or performance of the Project, and that the Bidder deems necessary to prepare its Bid for performance of the Project in accordance with the Contract Documents. Bidders seeking any such additional examination or other inquiries or information concerning the Project will do so at the Bidder's sole expense.
8.2 Bidders seeking to conduct any additional examination or other inquiry at the Project site must request site access from the City by contacting at least three (3) working days in advance to:
Nick Menezes City of Yuba City 1201 Civic Center Boulevard Yuba City, CA 95993
(530) 822-44660 nmenezes@yubacity.net
8.3 If, during the course of its site inspection, a Bidder finds conditions which appear to be in conflict with the letter or spirit of the Contract Documents, the Bidder may apply to the City, in writing, for additional information and explanation at least ten (10) calendar days before the time specified for opening the Bids.
8.4 Where investigation of subsurface conditions has been made by City in respect to foundation or other design, Bidders may inspect City's records of such investigation, including examination of samples and drill cores, if any.
8.5 When logs of test borings indicating a record of the data obtained by City's investigation of subsurface conditions are made available, said logs represent only the investigator's opinion as to the character of material encountered in test borings and are made available only for the convenience of Bidders.
8.6 Investigation of subsurface conditions is made for the purpose of design, and City assumes no responsibility, whatsoever, in respect to the sufficiency of test borings, accuracy of the log of test borings, of other preliminary investigations, or in the interpretation thereof. There is no warranty or guarantee, express or implied, that the conditions indicated are representative of those existing throughout the Work, or any part of it, or that unforeseen conditions may not be encountered.
8.7 Making information available to Bidders is not to be construed in any way as a waiver of the aforesaid provisions, and Bidders must satisfy themselves through their own investigations as to conditions to be encountered.
August 2026 00200 - 4 City of Yuba City
8.8 No information derived from such inspection of records of preliminary investigations made by City, or from the maps, Drawings or Contract Documents, relieve Contractor from any risk or from properly fulfilling all the terms of the Contract. Records of such preliminary investigations as may have been made by City may be inspected by contacting the City’s Project Manager identified in the Notice Inviting Bids.
8.9 Failure by Bidder to educate itself with available information will not relieve Bidder from responsibility for estimating properly the difficulty or cost of successfully performing the Work.
The information provided by the City is not intended to be a substitute for, or a supplement to the independent verification by the Bidder to the extent such independent investigation of site conditions is deemed necessary or desirable by the Bidder.
8.10 Submission of a Bid by the Bidder shall constitute conclusive evidence that, if awarded the Contract, it has relied upon and is relying on its own examination of (1) the site of the Work, (2) access to the site, (3) all other data and matters requisite to the fulfillment of the Work and on its own knowledge of existing facilities on and in the vicinity of the site of the Work to be constructed under the Contract, (4) the conditions to be encountered, (5) the character, quality and scope of the proposed Work, (6) the quality and quantity of the materials to be furnished, and (7) the requirements of the Contract Documents, and other related information made available to Bidders by the City (see Section 00300, Supplemental Project Information Available to Bidders).
8.11 Bidders are required to inform themselves fully of the conditions relating to the construction and labor under which the Work will be or is now performed, and, so far as possible, the successful Bidder must employ such means and methods in carrying out its Work as will not cause any interruption or interference with any other contractor.
ARTICLE 9 ― INTERPRETATION OF CONTRACT DOCUMENTS AND ADDENDA
9.1 If any person contemplating submitting a Bid is in doubt as to the intended meaning of any part of the Contract Documents, or finds discrepancies in, or omissions in the Contract Documents, that person must submit a written request for an interpretation or correction thereof at least seven (7) calendar Days before the deadline for receipt of Bids.
9.2 Inquiries regarding further information about the Contract Documents may be submitted electronically to www.publicpurchase.com. It is the Bidder's sole responsibility to ensure that the question is received by the above designated recipient in a timely manner.
9.3 Any request received fewer than seven (7) calendar days before the said deadline may not be answered. The person submitting the request will be responsible for its prompt delivery.
9.4 Any interpretation or correction of the Contract Documents will be made only by Addendum and will be sent to each plan holder by e-mail, to the e-mail where the project documents were sent.
9.5 The City is not responsible for any explanation or interpretation of the Contract Documents not communicated to Bidders in an Addendum. If no Addenda are issued relating to supposed discrepancy, conflict, omissions or errors in figuring the Work, the supposed discrepancies, conflicts, or omissions are governed by Section 00700-1.05, Order of Precedence of the Contract Documents.
9.6 The City reserves the right to revise or amend any part of the Contract Documents, including but not limited to, the specifications, up to the time set for opening the Bids. Such revisions and amendments, if any, shall be announced by written addenda. Copies of such written addenda shall be furnished to all recipients of complete sets of Contract Documents. Addenda issued during the time of bidding shall become a part of the documents furnished Bidders for the preparation of Bids, shall be covered in the Bids, and shall be made a part of the Contract Documents. Each Bid shall include specific acknowledgment in the space provided of receipt of all Addenda issued during the bidding period. Failure to acknowledge may result in the Bid being rejected as not responsive. Failure of any Bidder to receive such Addenda shall not be grounds for non-compliance with the terms of the instructions.
August 2026 00200 - 5 City of Yuba City
9.7 Should the Bidder find patent ambiguities in the Contract Documents, the Bidder shall at once notify the City of such findings in writing prior to opening of the Bids. Replies to such notification of patent ambiguities may be made in the form of Addenda, which will be issued simultaneously to all persons who have obtained a copy of the Contract Documents from the City. Failure of the Bidder awarded the Contract to notify the City of such patent ambiguity shall eliminate any and all recourse, including time extensions and Contract price adjustments the Bidder may have, against the City occurring as a result or arising out of such patent ambiguity.
ARTICLE 10 ― BIDDER’S SECURITY
10.1 Each Bid must be accompanied by cash, a certified or cashier's check, or an original Bidders Bond in an amount not less than ten percent (10%) of the total aggregate of the Total Bid Price to be used in determining the lowest monetary Bid for the Project.
10.2 A Bid will be considered non-responsive if not accompanied by proper Bidder’s Security.
10.3 The original Bid Bond must be provided by an admitted Surety insurer, authorized to issue Surety bonds in the State of California, and it must execute the Bid Bond.
10.4 Bonds and checks must be made payable to “City of Yuba City”.
10.5 All bonds must be provided on the forms included with the Contract Documents or the Bid will be considered non-responsive.
ARTICLE 11 ― BID FORM
11.1 Prospective Bidders are furnished Bid forms which must be submitted as listed below.
BID FORMS FOUND IN INDIVIDUAL SPECIFICATION SECTIONS SHOWN BELOW MUST BE
SUBMITTED AT TIME OF THE BID
1. Bid Form (Section 00400)
2. Bid Bond (Section 00410)
3. Site Visit Affidavit (Section 00420)
4. Designation of Subcontractors (Section 00430)
5. Schedule of Major Equipment and Material Suppliers (Section 00435)
6. Non-Collusion Declaration (Section 00440)
7. Debarment Certification (Section 00445)
8. Certification of Drug Free Workplace (Section 00450)
9. Iran Contracting Act Certification (Section 00460)
10. Certification of Bidder’s Experience and Qualifications (Section 00480)
11. Statement of Safety Compliance (Section 00490)
12. Bidder’s Signature Authority (see item 11.3.C below)
11.2 A Bid not submitted on the Bid forms furnished by the City will be considered non-responsive.
11.3 Completing the Bid Forms:
A. Bidder’s name must be the same as listed on Bidder’s California State Contractor’s license provided by Bidder on its Bid Form and also Bidder’s DIR registration provided on its Bid Form.
B. Bid price(s) must be in the manner required by the Bid Form.
C. Bid Form must be signed by Bidder or duly authorized representative.
August 2026 00200 - 6 City of Yuba City
1. If Bidder is an individual, name must be stated.
2. If Bidder is a partnership, name of the partnership must be stated, and one or more partners must sign the Bid Form.
3. If Bidder is a corporation, name of the corporation must be stated, the state of incorporation must be listed, the title of the person with authority to sign and bind corporation, must be stated, and the corporate seal must be affixed. If the Bid is made by a corporation; a copy of the bylaws or resolution of the Board of Directors of the corporation shall be furnished, showing the authority of the officer signing the Bid, to execute Bid on behalf of the corporation.
4. If Bidder is a Limited Liability Company (LLC), state the name of the LLC exactly as it appears on file with the California Secretary of State, including the entity ending (ex: “Jones & Company, LLC” or “Smith Construction, a Limited Liability Company”. Signature of the LLC’s Managing Partner or Officer must include attached evidence of authority to bind the LLC under the LLC’s articles of organization. Additionally, the Bid shall include a copy of the LLC resolution or agreement empowering the authorized representative to execute the Bid and bind the LLC.
5. If the Bid is made by a joint venture, the Bid shall be signed by an authorized representative of the sponsoring partner of the joint venture. Additionally, the Bid shall include a copy of the joint venture resolution or agreement empowering the authorized representative to execute the Bid and bind the joint venture.
6. Bidder’s business and mailing address must be stated.
11.4 Required Listing of Major Equipment Items
A. Certain items of major equipment to be provided under this Contract are tabulated in the Section 00435, Schedule of Major Equipment and Material Suppliers. The Bidder shall designate the name of the manufacturer of the equipment to be provided for each major equipment item and submit this form with its Bid. By so indicating, the Bidder warrants that equipment manufactured and/or supplied by the designated manufacturer will be provided on the Project. See Section 00435 for additional instructions and requirements.
ARTICLE 12 ― SUBMISSION OF BID FORMS
12.1 Bid Forms must be completed in ink or typed, completely filled out, and submitted on the Bid Form furnished as part of the Contract Documents. Faxed Bids will not be considered by City.
All signatures on the Bid Forms shall be wet signatures.
12.2 It is the sole responsibility of the Bidder to ensure that its Bid is received at the proper time and at the proper location. Bids received after the time fixed for receiving them will not be considered.
12.3 Late Bids will be returned by the City to the Bidder unopened.
12.4 The Bid Form submitted must not contain any erasure, interlinear additions, or other corrections unless each such correction is authenticated. Authentication may be made by affixing in the margin, immediately opposite the correction, the signature of the person submitting the Bid.
12.5 Changes in or additions to the Bid Form, recapitulations of the Work bid upon, alternative or additive bids, or any other modifications of the Bid Form which are not specifically called for in Section 00400, Bid Form, may result in rejection of the Bid by the City. The City may treat all such Bids as not being responsive to the Notice Inviting Bids.
12.6 The City will consider no oral, telephonic or email modification of any Bid submitted.
12.7 Each Bid shall be enclosed in a sealed envelope distinctly marked “BID” and include:
• Project title as given, August 2026 00200 - 7 City of Yuba City
• Date and Time of Bid Opening,
• Name and address of Bidder, and
• Attention: City Clerk
A Federal Express, UPS, or other courier delivery envelope is not considered the sealed “BID” envelope. Such delivery envelope must also be marked with the above required information.
Failure to mark sealed envelopes may result in a premature opening of, or failure to open, such Bid. Bid submissions with improperly marked sealed envelopes may be disregarded.
12.8 Bids shall either be (1) delivered in person at the designated location at the City of Yuba City office located at 1201 Civic Center Boulevard, Yuba City, CA 95993, during normal business hours, being 8 a.m. to 5 p.m., Monday through Thursday, or, (2) mailed to “Office of the City Clerk of the City of Yuba City located at 1201 Civic Center Boulevard, Yuba City, CA 95993, so that either delivery method is received by the Bid submission deadline time and date.
12.9 The preparation of a Bid shall be by and at the expense of the Bidder.
ARTICLE 13 ― WITHDRAWAL OF BID
13.1 Any Bid may be withdrawn at any time before the time fixed in the Notice Inviting Bids, or as postponed by Addenda, for the opening of Bids only by written request of the Bidder or a duly authorized representative.
13.2 Withdrawal of a Bid does not prejudice the right of the Bidder to file a new Bid at any time prior to the time fixed for receiving Bids in the Notice Inviting Bids, or as postponed by Addenda.
13.3 Whether or not Bids are opened exactly at the time stated in the Notice Inviting Bids, or as postponed by Addenda, a Bid will not be accepted after the time stated.
13.4 After the opening of Bids, Bids may only be withdrawn in accordance with the provisions of California Public Contract Code Sections 5100-5107.
ARTICLE 14 ― PUBLIC OPENING OF BIDS
14.1 Bids will be opened and read publicly at the time and place indicated in the Notice Inviting Bids.
Bidders or their authorized agents are invited to be present.
ARTICLE 15 ― REJECTION OF IRREGULAR BIDS
15.1 The City may reject any Bid if there appears to be any alteration of the Bid Form, any addition or condition not called for, or any incompleteness, erasure or irregularity of any kind.
15.2 Bids not completed in Ink or typed will be rejected.
15.3 If the Bid amount or other material information is changed, the change must be authenticated by affixing immediately next to the correction, the initials of the person submitting the Bid.
ARTICLE 16 ― COMPETITIVE BIDDING
16.1 More than one Bid from an individual, firm, partnership, corporation, or combination thereof, as a principal, under the same or different names will not be considered. Reasonable basis for believing that any individual, firm, partnership, corporation, or combination thereof is a principal in more than one Bid for the Work contemplated may cause the rejection of all Bids in which such individual, firm, partnership, corporation, or combination thereof is a principal.
16.2 If there is a reason for believing that collusion exists among the Bidders, any or all Bids may be rejected.
August 2026 00200 - 8 City of Yuba City
16.3 A person, firm, or corporation submitting a sub-bid to a Bidder, or who quoted prices on materials to a Bidder, is not thereby disqualified from submitting a sub-bid or quoting prices to other Bidders or from being a principal Bidder for the same Work.
16.4 Bids in which unit prices are obviously unbalanced may be rejected.
16.5 Bidders are put on notice that any collusive agreement fixing the prices to be Bid so as to control or affect Awarding of the Contract is in violation of competitive bidding requirements of the Public Contract Code and may render void any Contract let under such circumstances.
ARTICLE 17 ― ESTIMATED QUANTITIES
17.1 The quantities stated in a schedule of items for which unit prices are asked to be Bid are approximate only.
17.2 The quantities are given as a basis for the comparison of Bids.
17.3 The City does not, expressly or by implication, represent that the actual amount of Work will correspond with quantities given and reserves the right to increase or decrease the quantities of Work for any Bid item, or to omit portions of the Work, as the City may deem necessary or advisable.
ARTICLE 18 ― SUBSTITUTION OF ALTERNATIVE MATERIALS, ARTICLES, OR EQUIPMENT
18.1 Bids must be based upon use of items named in the Contract Documents.
18.2 By so indicating, the Bidder warrants that equipment manufactured and/or supplied by the named manufacturer will be provided on the Project unless review of submittal information or performance under tests reveals that the equipment does not meet the Contract requirements.
18.3 Failure to indicate a manufacturer for any single item of the equipment listed in the schedule may render the Bid unresponsive to the Notice Inviting Bids and may be a basis for rejection of the Bid.
18.4 In certain cases, specific items have been named (Named Products) because of operational or maintenance considerations; approval of proposed equals should not be assumed.
18.5 Pursuant to California Public Contract Code §3400, alternative material(s), article(s), or equipment that are of equal quality and of required characteristics for the purpose intended may be proposed provided the Bidder complies with the following requirements:
A. The proposal will not be considered unless the submittal is accompanied by complete information and descriptive data necessary to determine equality of offered material(s), article(s) or equipment.
B. Samples must be submitted when requested by the City.
C. Burden of proof as to comparative quality, suitability, and performance of offered material(s), article(s), or equipment is the responsibility of the Bidder submitting the proposal.
D. Requests for approval must comply with the requirements of Section 01605, Product Requirements and Substitutions.
18.6 The City’s Representative is the sole judge as to such matters. In the event the City’s Representative rejects the use of such Alternative(s) submitted, then the Contractor must furnish one of the particular Named Products specified in the Contract Documents.
18.7 Proposals for Alternative material(s), process, article(s), or equipment will not be accepted during the bid period.
August 2026 00200 - 9 City of Yuba City
ARTICLE 19 ― LOCAL BUSINESS LICENSE
19.1 If required by City or County, the Contractor shall have a local business license for the Work contemplated before the Contract can be executed. All subcontractors will be required to secure the appropriate local business license before they commence work on the Project.
ARTICLE 20 ― WORK PERCENTAGES
20.1 The Contractor shall perform at least seventy percent (30%) of the Contract Total Base Bid Amount. This portion of work shall encompass the performance of work by the Contractor’s forces and equipment, the procurement of materials and equipment by the Contractor and field related general conditions required to support and supervise the construction effort.
Subcontractors shall not be responsible for the performance of any work or procurement of materials or equipment within the above Contractor’s work percentage allotment. Materials purchased by the Contractor but installed by a subcontractor will not contribute to the above Contractor’s work percentage allotment.
20.2 The value of the work subcontracted shall be determined by summing all of the percentages identified for the subcontractors listed in Section 00430, Designation of Subcontractors. If the sum of such percentages exceeds thirty percent (30%) the City may treat the Bid as nonresponsive and reject it on that basis.
20.3 By submitting a Bid, the Bidder is certifying that it is in compliance with this obligation. This self-performance requirement is a material term of these Contract Documents and shall be subject to verification upon request. If it is determined that the Bidder’s certification was other than true in all respects, the Bidder agrees that the following shall occur:
A. if the Contract has not been awarded to the Bidder, the Bidder’s Bid shall be deemed non-responsive; or
B. if the Contract has been awarded, at the discretion of the City, Contractor shall be subject to either:
1. A reduction of its Total Original Contract Price by ten (10) percent of the value of the amount by which the certification was in error (e.g., if the Total Bid Price is $10,000,000 and the amount of self-performed work is determined to be $3,000,000 instead of at least $4,000,000, then the amount of the shortfall ($1,000,000) shall be multiplied by 10% to yield the sum of $100,000 to be reduced from the contract price); or
2. Termination of the Contractor’s right to proceed for default.
ARTICLE 21 ― DESIGNATION OF SUBCONTRACTORS
21.1 In accordance with California Public Contracting Code Section 4100, et. seq., “Subletting and Subcontracting Fair Practices Act,” each general Bid shall have listed in Section 00430, Designation of Subcontractors, the name, location of the place of business and the portion of work to be performed by each subcontractor who will perform work or labor or render service to the Bidder in or about the construction of the work or improvement, or of any subcontractor licensed by the State of California who, under subcontract to the Bidder, will specially fabricate and install a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the Bidder's Total Bid Price. If required by City or County, the Contractor shall have a local business license for the Work contemplated before the Contract can be executed. All subcontractors will be required to secure the appropriate local business license before they commence work on the Project.
21.2 If no subcontractor is specified for a portion of the work, or if more than one subcontractor is specified for the same portion of Work, to be performed under the Contract in excess of one-half of one percent (1/2%) of the Bidder’s Total Bid Price, then the Bidder shall be deemed to
August 2026 00200 - 10 City of Yuba City have agreed that it is fully qualified to perform that Work and that it shall perform that portion itself.
21.3 Failure to comply with the provisions of the California "Subletting and Subcontracting Fair Practices Act" shall make the Contractor subject to the sanctions as set forth in the Act.
21.4 The Bidder’s listed subcontractors in Section 00430, Designation of Subcontractors, must be registered with the State of California, Department of Industrial Relations (DIR) accordance with California Labor Code section 1725.5. Bidders shall list all applicable DIR registration numbers contact information on Section 00430, Designation of Subcontractors.
21.5 Bidders’ attention is directed to the provisions of the Subletting and Subcontracting Fair Practices Act, beginning with California Public Contract Code Section 4100, related to penalties for use of unauthorized Subcontractors or by making unauthorized substitutions.
21.6 Alternate subcontractors shall not be listed for the same work.
ARTICLE 22 ― CONTRACTS TO BE ASSIGNED (NOT USED)
ARTICLE 23 ― MANUFACTURER CERTIFICATION AND APPROVAL OF CONTRACTOR (NOT
USED)
ARTICLE 24 ― DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
24.1 In accordance with the provisions of the California Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to section 1777.1 or section 1777.7 of the Labor Code. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor used on the Work.
ARTICLE 25 ― IRAN CONTRACTING ACT CERTIFICATION
25.1 Pursuant to California Public Contract Code Sections 2200 through 2208, Bidders submitting a Bid of one million dollars ($1,000,000) or more shall complete and submit Section 00460, Iran Contracting Act Certification, with their Bid.
25.2 The Bidder shall certify that it is not identified on the list maintained by the California Department of General Services pursuant to Public Contract Code Section 2203(b) and is not a financial institution described in Public Contract Code Section 2202.5(b), as applicable. A Bidder claiming an exception pursuant to Public Contract Code Section 2203(c) or (d) shall submit documentation establishing the applicable exception with its Bid.
25.3 Failure to submit the required certification or documentation establishing an applicable exception may render the Bid nonresponsive. False certification may result in the penalties and remedies provided in Public Contract Code Section 2205.
ARTICLE 26 ― SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES
26.1 Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents. Bidders shall include all applicable taxes and fees that are in effect or reasonably anticipated on the bid date in their bid price.
August 2026 00200 - 11 City of Yuba City
ARTICLE 27 ― SHEETING, SHORING AND BRACING (NOT USED)
ARTICLE 28 ― OFFER OF ASSIGNMENT OF ANTITRUST ACTIONS
28.1 As provided by Public Contract Code Section 7103.5, in submitting a Bid to the City, the Bidder offers and agrees that if the Bid is accepted, it does assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section
15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the Bidder for sale to the City pursuant to the Bid. Such assignment shall be made and become effective at the time the City tenders final payment to the Bidder.
ARTICLE 29 ― BIDDERS INTERESTED IN MORE THAN ONE BID
29.1 No person, firm, or corporation, under the same or different name, shall make, file, or be interested in more than one Bid for the same work unless alternate Bids are called for. A person, firm, or corporation may, however, submit sub-proposals or quote prices on materials to more than one Bidder.
29.2 Pursuant to California Public Contract Code Section 7106, Bidders shall execute and furnish with their Bids Section 00440, Non-Collusion Declaration. Reasonable grounds to believe that any individual, partnership, corporation, or combination is interested in more than one Bid for the proposed Work may cause rejection of all Bids in which that individual, partnership, corporation, or combination is interested.
ARTICLE 30 ― RETURN OF BIDDER’S SECURITY
30.1 The Bid guarantees of the three lowest Bidders will be retained until the Agreement is signed, evidence of insurance provided, and satisfactory bonds furnished, or other disposition made thereof.
30.2 The Bid guarantees of all Bidders except the three lowest, responsive Bids will be returned within twenty-one (21) calendar days after the Bids are opened.
30.3 If all Bids are rejected and no award is made, all Bid guarantees will be returned within ten (10) calendar days of the decision by the City not to award the Contract, and in any event not later than seventy (70) calendar days after the Bids are opened.
ARTICLE 31 ― RELIEF OF BIDDERS
31.1 Attention is directed to the provisions of California Public Contract Code Sections 5100 through 5107 that set forth the criteria and procedures for relief of Bidders, and for authorizing Contract Award to another Bidder.
ARTICLE 32 ― AWARD OF CONTRACT
32.1 After the Bids have been opened and read, they will be checked for accuracy and compliance with the Contract Documents. If a Contract is awarded, it will be to the lowest responsible, Bidder submitting a responsive Bid. All Bids will be compared on the basis of the Engineer’s estimate of the quantities of work to be done. The City reserves the right to reject an unbalanced Bid which is a Bid having nominal or artificially reduced prices for some bid items and enhanced prices for other bid items.
32.2 In the event that an identical Total Lowest Monetary Bid Price, as determined by the City, is received from two or more responsive and responsible Bidders, the City may re-advertise for Bids, or the successful Bidder may be determined by the casting of lots with the tie Bidders in public at a date and time set by City.
32.3 In the evaluation of any Bid, the City shall have the right to consider information provided by sources other than Bidder.
August 2026 00200 - 12 City of Yuba City
32.4 The criteria which will be used to determine the lowest responsible Bidder submitting a responsive Bid are as follows:
A. Responsive Bid: Means a Bid which conforms in all material respects to the Contract Documents.
B. Responsible Bidder: Means a Bidder who has the qualifications, fitness, capacity and experience in all respects to perform fully the requirements under the Contract Documents and who has the integrity and reliability to assure good faith performance, including:
1. Financial, material, equipment, facility, and personnel resources and expertise necessary to meet contractual requirements.
2. A record of integrity.
3. A record of Successful Project Completions defined as:
a. Completion of project on time and without liquidated damages.
b. Completion of project without excessive defective work…
This is the start of the file's text. The full file is on GovTribe.