Bid Notice.pdf

PDF 292 KB Posted

Attached to
San Francisco Fire Department Division of Training Project - CM/GC: Trade Package
Solicitation number
SFGOV-0000010917
Issued by
San Francisco County, California

About this file

Summary

This is a Bid Notice for a state and local construction contract opportunity issued by the San Francisco Fire Department (SFFD) for a Division of Training Project using a Construction Manager/General Contractor (CM/GC) delivery method. The project involves consolidating, replacing, and relocating current SFFD training facilities from Treasure Island and 2310 Folsom Street to a new 8-acre site at 1200-1298 Carroll Avenue in the Hunters Point/Bayview neighborhoods. The development will include approximately 12 primary buildings totaling 147,531 gross square feet, comprising 58,432 square feet of occupied buildings (offices, classrooms, training, and support facilities), 53,134 square feet of unoccupied training structures (simulated buildings for fire and rescue training), and 4,132 square feet of campus shared spaces. Multiple bid packages are being released on a staggered schedule beginning July 1, 2025, through June 30, 2026, with the first two packages (Design-Build Pile System and Elevators) due July 7, 2028. Bid packages cover specialized trade work including earthwork, HVAC, electrical, plumbing, structural steel, waterproofing, glazing, acoustic ceilings, resilient flooring, site concrete, and landscaping. All bid documents are located on Swinerton's BuildingConnected.com portal.

All subcontractors must complete prequalification with Swinerton before submitting bids, and all bidders are expected to enter into a Master Service Agreement upon award. A Project Labor Agreement applies to the work, with requirements detailed in Project Manual sections 00 52 10 and 00 73 34. Edits to submitted bids are allowed, and multiple bids per bidder are permitted. The primary contact for the opportunity is Lew Price at lprice@swinerton.com. Subcontractor prequalification inquiries should be directed to subcontractorprequal@swinerton.com. The City and County of San Francisco Department of Public Works (DPW) disclaims liability for damages or costs related to the use of or reliance upon information contained on the bidding website, and bid information is subject to typographical error.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Events Search Event :

SFGOV-

0000010917

(mailto:?subject=Sharing CCSF Event&body=I'm sharing a CCSF Event with you, you can

EXT DPW | SFFD DOT Project - CM/GC: Trade Package Due by: 07/07/2028 12:00 AM PDT Start Date: 07/07/2025 12:00AM PDT

Details

San Francisco Fire Department Division of Training Project - CM/GC: Trade Package

The San Francisco Fire Department (SFFD) is consolidating, replacing and relocating its current training facilities at Treasure Island and 2310 Folsom Street, San Francisco to a new state-of-the art, 8-acre site at 1200-1298 Carroll Avenue in the Hunters Point/Bayview neighborhoods. The new SFFD DOT will have approximately 12 primary buildings, totaling approximately 147,531 gross square feet.

58,432 square feet of buildings will be Occupied Buildings (offices, classrooms, training and support buildings), while 53,134 square feet of buildings will be Unoccupied Training Structures (simulated buildings for fire and rescue training), while another 4,132 square feet of buildings will be Campus Shared Spaces.

Link below is to Swinerton’s BuildingConnected.com bid portal, where all bid documents are located.

https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f3 36b3de (https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f 336b3de)

Current Advertisement:

7/1/2025 - Bid Package 01 – Design-Build Pile System & Bid Package 02 – Elevators

7/23/2025 - Bid Package:

- Bid Package 03.1 – Earthwork, Erosion Control/SWPPP, Site Demolition

- Bid Package 03.2 – Fine Grading

- Bid Package 04 – Water Based Fire Suppression System

- Bid Package 05 – Plumbing

11/2/26, 9:01 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC_ROUND=1… 1/5 javascript:void(0);

javascript:void(0);

mailto:?subject=Sharing%20CCSF%20Event&body=I%27m%20sharing%20a%20CCSF%20Event%20with%20you,%20you%20can%20view%20it%20here:%20%20sfcitypartner.sfgov.org%2Fpages%2FEvents-BS3%2Fevent-redirect.aspx%3FeventId%3D0000010917 https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f336b3de https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f336b3de https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f336b3de https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f336b3de https://app.buildingconnected.com/public/565395ced928350a00e70b61/projects/683f9409ea160160f336b3de

- Bid Package 06 – HVAC

- Bid Package 07 – Electrical

- Bid Package 08 – Site Utilities and Relocation, Temp Power

- Bid Package 09 – SF Fire Props

8/13/2025 - Bid Package 02 - Addendum No. 1 issued.

12/10/2025 - Bid Package 14 - Misc. Metal Rebid R1

1/27/2026 - Bid Package 16 – Deep Soil Mixing

2/11/2026 - Bid Package 12 & 14 - Structural Steel & Miscellaneous Metal Fabrications Extension

3/19/2026 - Bid Package 19-32:

• Bid Package 19 – Polished Concrete

• Bid Package 20 – Waterproofing, Roofing & Pavers

• Bid Package 21 – Flashing & Sheet Metal

• Bid Package 22 – Exterior Tile

• Bid Package 23 – Interior Tile

• Bid Package 24 – Rainscreens Facades & Metal Panels

• Bid Package 25 – Glass Glazing, Entrances & Storefronts

• Bid Package 26 – Coiling Doors & Bi-Folding Doors

• Bid Package 27 – Glazing Testing

• Bid Package 28 – Glazing Surface Film

• Bid Package 29 – Façade Access Equipment

• Bid Package 30 – Walk-Off Mats & Grates

• Bid Package 31 – Acoustic Ceilings

• Bid Package 32 – Operable Partitions

4/3/2026 - Bid Package

• Bid Package 30 – Walk-Off Mats & Grates

• Bid Package 32 – Operable Partitions

• Bid Package 34 – Resilient Flooring and Base

6/25/2026 - Bid Package

• Bid Package 40 – Thermal Liners

6/30/2026 - Bid Package

• Bid Package 42 – Site Concrete and Paving

• Bid Package 43 – Fences, Gates, and Landscaping

Subcontractors Prequalification:

All subcontractors must be prequalified with Swinerton before submitting bids. Bids will not be accepted if the subcontractor has not initiated the prequalification process.

Please use the link below to start the process. Send any questions to subcontractorprequal@swinerton.com (mailto: subcontractorprequal@swinerton.com).

11/2/26, 9:01 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC_ROUND=1… 2/5 mailto: subcontractorprequal@swinerton.com mailto: subcontractorprequal@swinerton.com

Payment Terms

Prequal Link: https://swinerton.com/subcontractor-prequalification/ (https://swinerton.com/subcontractor-prequalification/) All bidders will be expected to enter into a Master Service Agreement upon award.

Project Labor Agreement: Please refer to Project Manual sections 00 52 10 & 00 73 34.

DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.

Event ID: SFGOV-0000010917 Format/Type: Sell Event RFx Round: 1 Version: 11

My Bids: 0 Edits to Submitted Bids: Allowed Multiple Bids: Allowed

Bid Package

See Attachments

To ensure that your bid is successfully placed please review the attachments and submit the required documents.

Place Bid

Find Partner

View Partner Requests

Contact Information

Lew Price Phone:

Email lprice@swinerton.com (mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20-- %20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20- %20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SF of-the%20art%2C%208-acre%20site%20at%201200- 1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20

11/2/26, 9:01 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC_ROUND=1… 3/5 https://swinerton.com/subcontractor-prequalification/ https://swinerton.com/subcontractor-prequalification/ https://swinerton.com/subcontractor-prequalification/ mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

%20Bid%20Package%2001%20%E2%80%93%20Design- Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2 %20Bid%20Package%3A%20%0A- %09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20 %09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A- %09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A- %09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A- %09Bid%20Package%2006%20%E2%80%93%20HVAC%0A- %09Bid%20Package%2007%20%E2%80%93%20Electrical%0A- %09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Po %09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20- %20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20- %20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20- %C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026% %20Bid%20Package%C2%A0%2012%20%26%2014%20- %20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19 %C2%A0%C2%A0%20Bid%20Package%2019- 32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80% Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A% Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%2 %20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk- Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable% %20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A %20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20a prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Maste

Requirements

Line Description Unit Requested Quantity Status

1 San Francisco Fire Department Division of Training Project

- CM/GC: Trade Package

EA 1.0000

Showing Results 1-1 of 1

Download

11/2/26, 9:01 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000010917&AUC_ROUND=1… 4/5 mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:lprice@swinerton.com?subject=SFGOV-0000010917%20--%20San%20Francisco%20Fire%20Department%20Division%20of%20Training%20Project%20-%20CM%2FGC%3A%20Trade%20Package%0A%0AThe%20San%20Francisco%20Fire%20Department%20(SFFD)%20is%20consolidating%2C%20replacing%20and%20relocating%20its%20current%20training%20facilities%20at%20Treasure%20Island%20and%202310%20Folsom%20Street%2C%20San%20Francisco%20to%20a%20new%20state-of-the%20art%2C%208-acre%20site%20at%201200-1298%20Carroll%20Avenue%20in%20the%20Hunters%20Point%2FBayview%20neighborhoods.%20The%20new%20SFFD%20DOT%20will%20have%20approximately%2012%20primary%20buildings%2C%20totaling%20approximately%20147%2C531%20gross%20square%20feet.%2058%2C432%20square%20feet%20of%20buildings%20will%20be%20Occupied%20Buildings%20(offices%2C%20classrooms%2C%20training%20and%20support%20buildings)%2C%20while%2053%2C134%20square%20feet%20of%20buildings%20will%20be%20Unoccupied%20Training%20Structures%20(simulated%20buildings%20for%20fire%20and%20rescue%20training)%2C%20while%20another%204%2C132%20square%20feet%20of%20buildings%20will%20be%20Campus%20Shared%20Spaces.%0A%0ALink%20below%20is%20to%20Swinerton%E2%80%99s%20BuildingConnected.com%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located.%20%0Ahttps%3A%2F%2Fapp.buildingconnected.com%2Fpublic%2F565395ced928350a00e70b61%2Fprojects%2F683f9409ea160160f336b3de%0A%0ACurrent%20Advertisement%3A%0A%0A7%2F1%2F2025%20-%20Bid%20Package%2001%20%E2%80%93%20Design-Build%20Pile%20System%20%26%20Bid%20Package%2002%20%E2%80%93%20Elevators%20%0A%0A7%2F23%2F2025%20-%20Bid%20Package%3A%20%0A-%09Bid%20Package%2003.1%20%E2%80%93%20Earthwork%2C%20Erosion%20Control%2FSWPPP%2C%20Site%20Demolition%0A-%09Bid%20Package%2003.2%20%E2%80%93%20Fine%20Grading%20%0A-%09Bid%20Package%2004%20%E2%80%93%20Water%20Based%20Fire%20Suppression%20System%0A-%09Bid%20Package%2005%20%E2%80%93%20Plumbing%0A-%09Bid%20Package%2006%20%E2%80%93%20HVAC%0A-%09Bid%20Package%2007%20%E2%80%93%20Electrical%0A-%09Bid%20Package%2008%20%E2%80%93%20Site%20Utilities%20and%20Relocation%2C%20Temp%20Power%0A-%09Bid%20Package%2009%20%E2%80%93%20SF%20Fire%20Props%0A%0A8%2F13%2F2025%20-%20Bid%20Package%2002%20-%20Addendum%20No.%201%20issued.%0A%0A12%2F10%2F2025%20-%20Bid%20Package%2014%20-%20Misc.%20Metal%20Rebid%20R1%0A%0A1%2F27%2F2026%20-%C2%A0%20Bid%20Package%2016%20%E2%80%93%20Deep%20Soil%20Mixing%0A%0A2%2F11%2F2026%20-%20Bid%20Package%C2%A0%2012%20%26%2014%20-%20Structural%20Steel%20%26%20Miscellaneous%20Metal%20Fabrications%20Extension%0A%0A3%2F19%2F2026%20-%C2%A0%C2%A0%20Bid%20Package%2019-32%3A%0A%E2%80%A2%20Bid%20Package%2019%20%E2%80%93%20Polished%20Concrete%0A%E2%80%A2%20Bid%20Package%2020%20%E2%80%93%20Waterproofing%2C%20Roofing%20%26%20Pavers%0A%E2%80%A2%20Bid%20Package%2021%20%E2%80%93%20Flashing%20%26%20Sheet%20Metal%0A%E2%80%A2%20Bid%20Package%2022%20%E2%80%93%20Exterior%20Tile%0A%E2%80%A2%20Bid%20Package%2023%20%E2%80%93%20Interior%20Tile%0A%E2%80%A2%20Bid%20Package%2024%20%E2%80%93%20Rainscreens%20Facades%20%26%20Metal%20Panels%0A%E2%80%A2%20Bid%20Package%2025%20%E2%80%93%20Glass%20Glazing%2C%20Entrances%20%26%20Storefronts%0A%E2%80%A2%20Bid%20Package%2026%20%E2%80%93%20Coiling%20Doors%20%26%20Bi-Folding%20Doors%0A%E2%80%A2%20Bid%20Package%2027%20%E2%80%93%20Glazing%20Testing%0A%E2%80%A2%20Bid%20Package%2028%20%E2%80%93%20Glazing%20Surface%20Film%0A%E2%80%A2%20Bid%20Package%2029%20%E2%80%93%20Fa%C3%A7ade%20Access%20Equipment%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2031%20%E2%80%93%20Acoustic%20Ceilings%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%0A4%2F3%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2030%20%E2%80%93%20Walk-Off%20Mats%20%26%20Grates%0A%E2%80%A2%20Bid%20Package%2032%20%E2%80%93%20Operable%20Partitions%0A%E2%80%A2%20Bid%20Package%2034%20%E2%80%93%20Resilient%20Flooring%20and%20Base%0A%0A6%2F25%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2040%20%E2%80%93%20Thermal%20Liners%0A%0A6%2F30%2F2026%20-%20Bid%20Package%0A%E2%80%A2%20Bid%20Package%2042%20%E2%80%93%20Site%20Concrete%20and%20Paving%0A%E2%80%A2%20Bid%20Package%2043%20%E2%80%93%20Fences%2C%20Gates%2C%20and%20Landscaping%0A%0ASubcontractors%20Prequalification%3A%20%0AAll%20subcontractors%20must%20be%20prequalified%20with%20Swinerton%20before%20submitting%20bids.%20Bids%20will%20not%20be%20accepted%20if%20the%20subcontractor%20has%20not%20initiated%20the%20prequalification%20process.%20%0APlease%20use%20the%20link%20below%20to%20start%20the%20process.%20Send%20any%20questions%20to%20subcontractorprequal%40swinerton.com.%0APrequal%20Link%3A%20https%3A%2F%2Fswinerton.com%2Fsubcontractor-prequalification%2F%0AAll%20bidders%20will%20be%20expected%20to%20enter%20into%20a%20Master%20Service%20Agreement%20upon%20award.%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Pr…