Bid Notice.pdf

PDF 129 KB Posted

Attached to
Powell Street Improvement Project
Solicitation number
SFGOV-0000012112
Issued by
San Francisco County, San Francisco City, California

About this file

Summary

This is a Bid Notice issued by the City and County of San Francisco Department of Public Works for the Powell Street Improvement Project. The procurement seeks Construction Manager/General Contractor (CM/GC) teams consisting of a CM/GC and specified Core Trade Subcontractors to provide design-assist preconstruction and construction services. The project requires compliance with all applicable City requirements, building codes, and regulatory standards governing the design, construction, and operation of the Powell Street Improvement Project. The current advertisement became effective September 23, 2026, with a trade package submission deadline of May 26, 2029, at 12:00 AM PDT. The scope includes 16 identified trade packages: 3rd Party Testing, Concrete, Decorative Metals & Glazing, Basements, Waterproofing, Fireproofing, Site Furnishings, Site Electrical (Power & Low Voltage), Wet Utilities (Storm & Sewer), Wet Utilities (AWSS & Water), Landscaping, Golden Lantern & Specialty Lighting, Unit Pavers, Asphalt Paving, Earthwork, Deep Foundations, and Industrial Hygienist services.

The project is subject to a Project Labor Agreement as detailed in Project Manual sections 00 52 10 and 00 73 34. Bid documents are located in Clark's Public Planroom on the BuildingConnected bid portal. Multiple bids are allowed, and edits to submitted bids are permitted. The point of contact for inquiries is Alyssa Estrada Marquez at alyssa.estradamarquez@clarkconstruction.com. The City of San Francisco Department of Public Works disclaims liability for damages or costs resulting from reliance on website information and notes that bid information is subject to typographical error.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Events Search Event :

SFGOV-

0000012112

(mailto:?subject=Sharing CCSF Event&body=I'm sharing a CCSF Event with you, you can

EXT DPW | CM/GC Powell St Imprv Prjt Trade Package Due by: 05/26/2029 12:00 AM PDT Start Date: 09/23/2026 12:00AM PDT

Details

Construction Manager/General Contractor - Powell Street Improvement Project [Citywide PLA] Trade Package

Construction Manager/General Contractors (“CM/GC”) teams consisting of the CM/GC and specified Core Trade Subcontractors in a design-assist capacity capable of performing preconstruction and construction services.

Work shall comply with all applicable City requirements, building codes and regulatory agencies’ standards having jurisdiction over the design, construction, and operation of the Powell Street Improvement Project.

Link to Clark's Public Planroom on BuildingConnected bid portal, where all bid documents are located:

Current Advertisement:

9/23/2026 - Trade Package:

• 3rd Party Testing

• Concrete

• Decorative Metals & Glazing

• Basements

• Waterproofing

• Fireproofing

• Site Furnishings

• Site Electrical – Power & Low Voltage

• Wet Utilities – Storm & Sewer

• Wet Utilities – AWSS & Water

11/2/26, 9:05 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012112&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012112&AUC_ROUND=1… 1/3 javascript:void(0);

javascript:void(0);

mailto:?subject=Sharing%20CCSF%20Event&body=I%27m%20sharing%20a%20CCSF%20Event%20with%20you,%20you%20can%20view%20it%20here:%20%20sfcitypartner.sfgov.org%2Fpages%2FEvents-BS3%2Fevent-redirect.aspx%3FeventId%3D0000012112

Payment Terms

• Landscaping

• Golden Lantern & Specialty Lighting

• Unit Pavers

• Asphalt Paving

• Earthwork

• Deep Foundations

• Industrial Hygienist

Project Labor Agreement: Please refer to Project Manual sections 00 52 10 & 00 73 34.

DPW is not liable for damages or costs incurred in connection with the use of, or any reliance upon, any information contained on this website. The bid information is subject to typographical error.

Event ID: SFGOV-0000012112 Format/Type: Sell Event RFx Round: 1 Version: 1

My Bids: 0 Edits to Submitted Bids: Allowed Multiple Bids: Allowed

Bid Package

See Attachments

To ensure that your bid is successfully placed please review the attachments and submit the required documents.

Place Bid

Find Partner

View Partner Requests

Contact Information

Alyssa Estrada Marquez Phone:

11/2/26, 9:05 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012112&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012112&AUC_ROUND=1… 2/3

Email alyssa.estradamarquez@clarkconstruction.com (mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20-- %20Construction%20Manager%2FGeneral%20Contractor%20- %20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20servic %20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete

Requirements

Line Description Unit Requested Quantity Status

1 CM/GC Powell St Imprv Prjt Trade Package EA 1.0000

Showing Results 1-1 of 1

Download

(https://sfgov.org/)

11/2/26, 9:05 AM sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012112&AUC… https://sfcitypartner.sfgov.org/pages/Events-BS3/event-details.aspx?Page=AUC_RESP_INQ_DTL&Action=U&AUC_ID=0000012112&AUC_ROUND=1… 3/3 mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20--%20Construction%20Manager%2FGeneral%20Contractor%20-%20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A%0AConstruction%20Manager%2FGeneral%20Contractors%20(%E2%80%9CCM%2FGC%E2%80%9D)%20teams%20consisting%20of%20the%20CM%2FGC%20and%20specified%20Core%20Trade%20Subcontractors%20in%20a%20design-assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20services.%C2%A0%20%0A%0AWork%20shall%20comply%20with%20all%20applicable%20City%20requirements%2C%20building%20codes%20and%20regulatory%20agencies%E2%80%99%20standards%20having%20jurisdiction%20over%20the%20design%2C%20construction%2C%20and%20operation%20of%20the%20Powell%20Street%20Improvement%20Project.%0A%0ALink%20to%20Clark%27s%20Public%20Planroom%20on%20BuildingConnected%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located%3A%0A%0ACurrent%20Advertisement%3A%0A9%2F23%2F2026%20-%20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete%0A%E2%80%A2%20Decorative%20Metals%20%26%20Glazing%0A%E2%80%A2%20Basements%0A%E2%80%A2%20Waterproofing%0A%E2%80%A2%20Fireproofing%0A%E2%80%A2%20Site%20Furnishings%0A%E2%80%A2%20Site%20Electrical%20%E2%80%93%20Power%20%26%20Low%20Voltage%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20Storm%20%26%20Sewer%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20AWSS%20%26%20Water%0A%E2%80%A2%20Landscaping%0A%E2%80%A2%20Golden%20Lantern%20%26%20Specialty%20Lighting%0A%E2%80%A2%20Unit%20Pavers%0A%E2%80%A2%20Asphalt%20Paving%0A%E2%80%A2%20Earthwork%0A%E2%80%A2%20Deep%20Foundations%0A%E2%80%A2%20Industrial%20Hygienist%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20--%20Construction%20Manager%2FGeneral%20Contractor%20-%20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A%0AConstruction%20Manager%2FGeneral%20Contractors%20(%E2%80%9CCM%2FGC%E2%80%9D)%20teams%20consisting%20of%20the%20CM%2FGC%20and%20specified%20Core%20Trade%20Subcontractors%20in%20a%20design-assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20services.%C2%A0%20%0A%0AWork%20shall%20comply%20with%20all%20applicable%20City%20requirements%2C%20building%20codes%20and%20regulatory%20agencies%E2%80%99%20standards%20having%20jurisdiction%20over%20the%20design%2C%20construction%2C%20and%20operation%20of%20the%20Powell%20Street%20Improvement%20Project.%0A%0ALink%20to%20Clark%27s%20Public%20Planroom%20on%20BuildingConnected%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located%3A%0A%0ACurrent%20Advertisement%3A%0A9%2F23%2F2026%20-%20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete%0A%E2%80%A2%20Decorative%20Metals%20%26%20Glazing%0A%E2%80%A2%20Basements%0A%E2%80%A2%20Waterproofing%0A%E2%80%A2%20Fireproofing%0A%E2%80%A2%20Site%20Furnishings%0A%E2%80%A2%20Site%20Electrical%20%E2%80%93%20Power%20%26%20Low%20Voltage%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20Storm%20%26%20Sewer%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20AWSS%20%26%20Water%0A%E2%80%A2%20Landscaping%0A%E2%80%A2%20Golden%20Lantern%20%26%20Specialty%20Lighting%0A%E2%80%A2%20Unit%20Pavers%0A%E2%80%A2%20Asphalt%20Paving%0A%E2%80%A2%20Earthwork%0A%E2%80%A2%20Deep%20Foundations%0A%E2%80%A2%20Industrial%20Hygienist%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20--%20Construction%20Manager%2FGeneral%20Contractor%20-%20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A%0AConstruction%20Manager%2FGeneral%20Contractors%20(%E2%80%9CCM%2FGC%E2%80%9D)%20teams%20consisting%20of%20the%20CM%2FGC%20and%20specified%20Core%20Trade%20Subcontractors%20in%20a%20design-assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20services.%C2%A0%20%0A%0AWork%20shall%20comply%20with%20all%20applicable%20City%20requirements%2C%20building%20codes%20and%20regulatory%20agencies%E2%80%99%20standards%20having%20jurisdiction%20over%20the%20design%2C%20construction%2C%20and%20operation%20of%20the%20Powell%20Street%20Improvement%20Project.%0A%0ALink%20to%20Clark%27s%20Public%20Planroom%20on%20BuildingConnected%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located%3A%0A%0ACurrent%20Advertisement%3A%0A9%2F23%2F2026%20-%20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete%0A%E2%80%A2%20Decorative%20Metals%20%26%20Glazing%0A%E2%80%A2%20Basements%0A%E2%80%A2%20Waterproofing%0A%E2%80%A2%20Fireproofing%0A%E2%80%A2%20Site%20Furnishings%0A%E2%80%A2%20Site%20Electrical%20%E2%80%93%20Power%20%26%20Low%20Voltage%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20Storm%20%26%20Sewer%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20AWSS%20%26%20Water%0A%E2%80%A2%20Landscaping%0A%E2%80%A2%20Golden%20Lantern%20%26%20Specialty%20Lighting%0A%E2%80%A2%20Unit%20Pavers%0A%E2%80%A2%20Asphalt%20Paving%0A%E2%80%A2%20Earthwork%0A%E2%80%A2%20Deep%20Foundations%0A%E2%80%A2%20Industrial%20Hygienist%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20--%20Construction%20Manager%2FGeneral%20Contractor%20-%20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A%0AConstruction%20Manager%2FGeneral%20Contractors%20(%E2%80%9CCM%2FGC%E2%80%9D)%20teams%20consisting%20of%20the%20CM%2FGC%20and%20specified%20Core%20Trade%20Subcontractors%20in%20a%20design-assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20services.%C2%A0%20%0A%0AWork%20shall%20comply%20with%20all%20applicable%20City%20requirements%2C%20building%20codes%20and%20regulatory%20agencies%E2%80%99%20standards%20having%20jurisdiction%20over%20the%20design%2C%20construction%2C%20and%20operation%20of%20the%20Powell%20Street%20Improvement%20Project.%0A%0ALink%20to%20Clark%27s%20Public%20Planroom%20on%20BuildingConnected%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located%3A%0A%0ACurrent%20Advertisement%3A%0A9%2F23%2F2026%20-%20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete%0A%E2%80%A2%20Decorative%20Metals%20%26%20Glazing%0A%E2%80%A2%20Basements%0A%E2%80%A2%20Waterproofing%0A%E2%80%A2%20Fireproofing%0A%E2%80%A2%20Site%20Furnishings%0A%E2%80%A2%20Site%20Electrical%20%E2%80%93%20Power%20%26%20Low%20Voltage%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20Storm%20%26%20Sewer%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20AWSS%20%26%20Water%0A%E2%80%A2%20Landscaping%0A%E2%80%A2%20Golden%20Lantern%20%26%20Specialty%20Lighting%0A%E2%80%A2%20Unit%20Pavers%0A%E2%80%A2%20Asphalt%20Paving%0A%E2%80%A2%20Earthwork%0A%E2%80%A2%20Deep%20Foundations%0A%E2%80%A2%20Industrial%20Hygienist%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20--%20Construction%20Manager%2FGeneral%20Contractor%20-%20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A%0AConstruction%20Manager%2FGeneral%20Contractors%20(%E2%80%9CCM%2FGC%E2%80%9D)%20teams%20consisting%20of%20the%20CM%2FGC%20and%20specified%20Core%20Trade%20Subcontractors%20in%20a%20design-assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20services.%C2%A0%20%0A%0AWork%20shall%20comply%20with%20all%20applicable%20City%20requirements%2C%20building%20codes%20and%20regulatory%20agencies%E2%80%99%20standards%20having%20jurisdiction%20over%20the%20design%2C%20construction%2C%20and%20operation%20of%20the%20Powell%20Street%20Improvement%20Project.%0A%0ALink%20to%20Clark%27s%20Public%20Planroom%20on%20BuildingConnected%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located%3A%0A%0ACurrent%20Advertisement%3A%0A9%2F23%2F2026%20-%20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete%0A%E2%80%A2%20Decorative%20Metals%20%26%20Glazing%0A%E2%80%A2%20Basements%0A%E2%80%A2%20Waterproofing%0A%E2%80%A2%20Fireproofing%0A%E2%80%A2%20Site%20Furnishings%0A%E2%80%A2%20Site%20Electrical%20%E2%80%93%20Power%20%26%20Low%20Voltage%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20Storm%20%26%20Sewer%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20AWSS%20%26%20Water%0A%E2%80%A2%20Landscaping%0A%E2%80%A2%20Golden%20Lantern%20%26%20Specialty%20Lighting%0A%E2%80%A2%20Unit%20Pavers%0A%E2%80%A2%20Asphalt%20Paving%0A%E2%80%A2%20Earthwork%0A%E2%80%A2%20Deep%20Foundations%0A%E2%80%A2%20Industrial%20Hygienist%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

mailto:alyssa.estradamarquez@clarkconstruction.com?subject=SFGOV-0000012112%20--%20Construction%20Manager%2FGeneral%20Contractor%20-%20Powell%20Street%20Improvement%20Project%20%5BCitywide%20PLA%5D%20Trade%20Package%0A%0AConstruction%20Manager%2FGeneral%20Contractors%20(%E2%80%9CCM%2FGC%E2%80%9D)%20teams%20consisting%20of%20the%20CM%2FGC%20and%20specified%20Core%20Trade%20Subcontractors%20in%20a%20design-assist%20capacity%20capable%20of%20performing%20preconstruction%20and%20construction%20services.%C2%A0%20%0A%0AWork%20shall%20comply%20with%20all%20applicable%20City%20requirements%2C%20building%20codes%20and%20regulatory%20agencies%E2%80%99%20standards%20having%20jurisdiction%20over%20the%20design%2C%20construction%2C%20and%20operation%20of%20the%20Powell%20Street%20Improvement%20Project.%0A%0ALink%20to%20Clark%27s%20Public%20Planroom%20on%20BuildingConnected%20bid%20portal%2C%20where%20all%20bid%20documents%20are%20located%3A%0A%0ACurrent%20Advertisement%3A%0A9%2F23%2F2026%20-%20Trade%20Package%3A%20%0A%E2%80%A2%203rd%20Party%20Testing%0A%E2%80%A2%20Concrete%0A%E2%80%A2%20Decorative%20Metals%20%26%20Glazing%0A%E2%80%A2%20Basements%0A%E2%80%A2%20Waterproofing%0A%E2%80%A2%20Fireproofing%0A%E2%80%A2%20Site%20Furnishings%0A%E2%80%A2%20Site%20Electrical%20%E2%80%93%20Power%20%26%20Low%20Voltage%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20Storm%20%26%20Sewer%0A%E2%80%A2%20Wet%20Utilities%20%E2%80%93%20AWSS%20%26%20Water%0A%E2%80%A2%20Landscaping%0A%E2%80%A2%20Golden%20Lantern%20%26%20Specialty%20Lighting%0A%E2%80%A2%20Unit%20Pavers%0A%E2%80%A2%20Asphalt%20Paving%0A%E2%80%A2%20Earthwork%0A%E2%80%A2%20Deep%20Foundations%0A%E2%80%A2%20Industrial%20Hygienist%0A%0AProject%20Labor%20Agreement%3A%20Please%20refer%20to%20Project%20Manual%20sections%2000%2052%2010%20%26%2000%2073%2034.%0A%0ADPW%20is%20not%20liable%20for%20damages%20or%20costs%20incurred%20in%20connection%20with%20the%20use%20of%2C%20or%20any%20reliance%20upon%2C%20any%20information%20contained%20on%20this%20website.%20The%20bid%20information%20is%20subject%20to%20typographical%20error.

https://sfgov.org/ https://sfgov.org/

File details come from the government source that posted it. Updated .