Hauke Park Softball Field Renovation Project Summary
This is a Bid Notice and contract documents package issued by the City of Mill Valley Department of Public Works for the renovation of the existing softball field at Hauke Park, located on the northeasterly side of the park in Marin County, California. The scope of work includes replacement of two dugouts, the existing backstop, fencing, and aluminum bleachers; construction of a new bullpen; installation of a prefabricated Tuff Shed; rehabilitation of the existing decomposed granite pathway; and adjustment of utility frames and covers to finished grade. The project also encompasses demolition, excavation, site preparation, grading, and removal and disposal of excess and unsuitable materials at an off-site location approved by the City. A non-mandatory pre-bid meeting will be held on November 4, 2026, at 11:00 AM at Hauke Softball Park to allow prospective bidders to review site conditions and ask questions. Sealed proposals must be received by 2:00 p.m. on November 17, 2026, at the City of Mill Valley Department of Public Works, 26 Corte Madera Avenue, Mill Valley, California 94941. The contract shall be completed within thirty-five working days from the Notice to Proceed, with a firm completion deadline of February 20, 2027. Contract award will be made to the lowest responsible bidder within thirty days after receipt of proposals.
The Engineer's Estimate for the Base Bid is $260,000, excluding Bid Alternates. Bidders must submit a Bid Bond of at least 10 percent of the total bid amount payable to the City of Mill Valley. The successful bidder must furnish both a Performance Bond and a Payment Bond, each in an amount equal to 100 percent of the total bid. Liquidated damages are assessed at $1,000.00 per calendar day for delays exceeding the specified working-day duration beyond February 20, 2027. Contractors must possess a valid Class "A" License at the time of contract award. The contract is subject to prevailing wage requirements established by the Director of the California Department of Industrial Relations for Marin County. Bidders must comply with all applicable state nondiscrimination and compliance requirements, including provisions for employment of apprentices and wage rate compliance. The City reserves the right to reject any or all bids and to award any, all, or none of the three Bid Alternatives based on available funding and the City's determination of project needs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS INCLUDING:
NOTICE TO CONTRACTORS PROPOSALS
SPECIAL PROVISIONS
CONTRACT DOCUMENTS
FOR
HAUKE PARK SOFTBALL FIELD
RENOVATION PROJECT
PROJECT NUMBER PW26-11
LOCATED IN
CITY OF MILL VALLEY - MARIN COUNTY - CALIFORNIA
OCTOBER 2026
DEPARTMENT OF PUBLIC WORKS
CITY OF MILL VALLEY
26 CORTE MADERA AVENUE
MILL VALLEY, CA 94941
(415) 384-4800
THIS PAGE INTENTIONALLY LEFT BLANK
HAUKE SOFTBALL FIELD RENOVATION PROJECT
PROJECT AUTHORIZATION
HAUKE PARK SOFTBALL FIELD
RENOVATION PROJECT
Engineer’s Attest:
The following plans and specifications have been prepared under the supervision of the undersigned who hereby certifies that he is a Registered Engineer in the State of California:
Richard Souza, PE
CSWST2
504 Redwood Blvd, Suite 310
Novato, CA 94947
THIS PAGE INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS
ATTENTION BIDDERS
NOTICE TO CONTRACTORS
INSTRUCTIONS TO BIDDERS
PROPOSAL
NONCOLLUSION AFFIDAVIT
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
DEBARMENT AND SUSPENSION CERTIFICATION
SUBCONTRACTOR DEBARMENT AND SUSPENSION CERTIFICATION
NOTICE
PUBLIC CONTRACT CODE
A. Public Contract Code Section 10285.1 Statement B. Public Contract Code Section 10162 Questionnaire C. Public Contract Code 10232 Statement D. Tax, California Nonresident Income & Franchise Tax Withholding
GENERAL PROVISIONS
A. DEFINITIONS AND TERMS
B. PROPOSAL REQUIREMENTS AND CONDITIONS
C. AWARD AND EXECUTION OF CONTRACT
D. TIME LIMIT AND LIQUIDATED DAMAGES
E. SCOPE OF WORK
F. CONTROL OF WORK
G. CONTROL OF MATERIALS
H. LEGAL RELATIONS AND RESPONSIBILITY
I. PROSECUTION AND PROGRESS
J. MEASUREMENT AND PAYMENT
K. INDEMNITY AND INSURANCE REQUIREMENTS
L. FORCE ACCOUNT AND EQUIPMENT RENTAL
M. SANITARY FACILITIES & STORM WATER POLLUTION PREVENTION
N. FINAL CLEANUP
O. AUTHORITY OF ENGINEER AND CONDUCT OF WORK
P. EXCAVATION AND SHORING
Q. OVERTIME, WEEKEND WORK, AND LEGAL HOLIDAYS
R. PROTECTION OF UNDERGROUND FACILITIES
S. SOUND CONTROL REQUIREMENTS
T. CONSTRUCTION MATERIALS AND TESTING
U. PUBLIC CONTRACTS CODE 7104: EXCAVATIONS DEEPER THAN FOUR FEET
V. ARCHAEOLOGICAL DISCOVERIES
W. REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES
X. INTEGRATED PEST MANAGEMENT (IPM)
Y. ORDER OF PRECEDENCE
SPECIAL PROVISIONS
10.01 GENERAL
10.02 ORDER OF WORK AND PROGRESS SCHEDULE
10.03 TRAFFIC CONTROL SYSTEMS AND CONSTRUCTION SIGNS
10.04 CLEARING AND GRUBBING
10.05 MOBILIZATION
10.06 WATER POLLUTION CONTROL PROGRAM
10.07 EXISTING FACILITIES/COOPERATION
10.08 PRESERVATION OF PROPERTY
10.09 DUST CONTROL
10.10 CONSTRUCTION STAKING
10.11 DEMOLITION
10.12 DISPOSALS OF MATERIALS
10.13 EARTHWORK
10.14 DECOMPOSED GRANITE
10.15 BAT STORAGE RACK
10.16 HELMET STORAGE RACK
10.17 STORAGE SHED
10.18 ALUMINUM BLEACHER
10.19 DUGOUT WITH BENCHES
10.20 SOFTBALL BACKSTOP
10.21 BULLPEN
10.22 MINOR CONCRETE
10.23 CHAIN LINK FENCE
10.24 UTILITY ADJUSMENT TO GRADE
10.25 PAINTING BACKSTOP AND REPLACE CHAIN LINK MESH – BID ALT #2
10.26 WATER FOUNTAIN REPLACEMENT – BID ALT #1
Appendix A – Sample Contract/Agreement
Appendix B – Low Carbon Concrete Ordinance
Appendix C – Pedestrian Accommodation in Work Zones
ATTENTION BIDDERS
A. MINORITY BUSINESS ENTERPRISE REQUIREMENT
It is the policy of the City of Mill Valley to take positive steps to maximize the utilization of minority and women's business enterprises in all contract activity administered by the City of Mill Valley.
The Contractor shall utilize his best efforts to carry out this policy in the award of his subcontracts to the fullest extent consistent with the efficient performance of this contract.
As used in this contract, the term "minority or women's business enterprise" means a business, at least 50 percent of which is owned by minority group members or women or, in the case of publicly owned businesses, at least 51 percent of the stock is owned by the minority group members or women. For the purpose of this definition, minority group members are Black, Hispanics, Asians, Native Americans, Alaskans or Pacific Islanders.
B COMPLETENESS OF BID
Bidders should take care to complete all details in a legible manner in the bid documents.
Failure to do so may be cause for rejection of the bid.
C. ENVIRONMENTAL CONTROL
The Contractor shall comply with all air pollution and environmental control rules, regulations, ordinances and statutes which apply to the project and any work performed pursuant to the contract.
D. WAGE RATES
The Contractor's attention is directed to the applicability of State requirements concerning requirements for Wage Rates.
DEPARTMENT OF PUBLIC WORKS
MILL VALLEY, CALIFORNIA
NOTICE TO CONTRACTORS
INVITING SEALED PROPOSALS OF BIDS
City Project No. PW26-11
Sealed Proposals will be received by the City of Mill Valley Department of Public Works, 26 Corte Madera Avenue, Mill Valley, California 94941, until 2:00 p.m. on November 17, 2026.
Proposals will be collected by City staff at 2:00 p.m. and will be opened and read publicly.
Work shall be done in accordance with official plans and specifications, which are on file at the City of Mill Valley and are available at no cost to the Contractor on the City’s website www.cityofmillvalley.org.
Project Description: The proposed scope of work consists of renovation of the existing softball field at Hauke Park. Project improvements generally include replacement of two dugouts, the existing backstop, fencing, and aluminum bleachers; construction of a new bullpen; installation of a prefabricated Tuff Shed; rehabilitation of the existing decomposed granite pathway; and adjustment of utility frames and covers to finished grade. The work also includes, but is not limited to, demolition, excavation, site preparation, grading, and removal and disposal of excess and unsuitable materials at an off-site location approved by the City of Mill Valley Department of Public Works.
The project is located roughly at the northeasterly side of Hauke Park in the City of Mill Valley.
The Project shall be completed within thirty-five (35) working days from the effective date of the Notice to Proceed. Notwithstanding the specified number of working days, all work shall be fully completed no later than February 20, 2027. The February 20, 2027, completion deadline shall take precedence over the specified working-day duration. The Contractor shall provide sufficient labor, equipment, materials, and resources to meet this deadline. No additional compensation or extension of time shall be granted solely because the specified working-day duration would otherwise extend beyond February 20, 2027, except as expressly authorized by the City in accordance with the Contract Documents.
A Bid Bond in the amount of 10% of the total bid amount payable to the City of Mill Valley shall accompany the Proposal.
Award of contract, if awarded, will be to the lowest responsible bidder whose proposal complies with prescribed requirements, and will be within thirty (30) days after receipt of proposals.
The City of Mill Valley reserves the right to reject any or all bids and the right to waive any irregularities.
The provisions of Public Contract Code 22300, regarding substitution of securities for monies withheld to ensure performance shall apply to this contract.
A non-mandatory pre-bid meeting will be held on Wednesday, November 4, 2026, at 11:00 AM, at Hauke Softball Park, Mill Valley, California. Prospective bidders are encouraged to attend to review existing site conditions, discuss the proposed improvements, and ask questions regarding the project. Any clarifications or modifications to the Contract Documents resulting from the meeting will be issued by written addendum.
The Contractor shall possess a valid Class “A” License at the time contract is awarded.
The Engineer's Estimate for the Base Bid is $260,000. This estimate excludes the Bid Alternates. The estimate is provided for informational purposes only and does not establish a maximum bid amount or limit the City's discretion in evaluating and awarding the Contract.
Bids are required for the entire scope of work described herein. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990.
The City of Mill Valley hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business and woman owned business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award.
Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates for City of Mill Valley where the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at the Department of Public Works. Prevailing Wage Rates are also available at the State of California Division of Labor Statistics and Research website http://www.dir.ca.gov/DLSR/PWD/index.htm
MILL VALLEY DEPARTMENT OF PUBLIC WORKS
MILL VALLEY, CALIFORNIA
INSTRUCTIONS TO BIDDERS
A. INSPECTION OF PLANS – The project documents will be available for Bidders at www.cityofmillvalley.org under “Bids and RFPs”
B. ELIGIBILITY - All bidders must be Contractors holding a valid license to perform the required work as provided by the Business and Professions Code and may be required to submit evidence to the City of Mill Valley as to their ability, financial responsibility, and experience, in order to be eligible for consideration of their proposal.
C. PROPOSAL GUARANTY - All bids must be submitted on the Proposal Form obtained from the Department of Public Works and shall be accompanied by a Proposal Guaranty of at least ten (10%) of the base bid. Guaranties shall be in the form of a certified or cashier's check or Bid Bond payable to the City of Mill Valley. Failure of the successful bidder to execute and return the contract, or to file acceptable bond, as required, within the time allotted shall be cause for the annulment of the award and forfeiture of the Proposal Guaranty.
D. BID BONDS - The bid bond of bidders, other than the successful bidder, may be retained by the City of Mill Valley for a period of thirty (30) days after award or until fifteen (15) days after the successful bidder executed the contract and furnished bonds, whichever occurs first.
If a bidder to whom the contract is awarded fails, or refuses, to execute the contract within ten (10) days of notice of award, as herein provided, the City Manager may award to the next lowest bidder and apply the bid bond of the bidder failing, or refusing, to execute contract as herein required. The bid bonds of bidders to whom no award was made will be returned upon request.
E. BIDS AND BID OPENING - Only the total bid amount will be read at the bid opening and not specific item unless requested, in writing, at the time of the submission of proposals.
Bidders will be at liberty to inspect and review bids at the Department of Public Works, to which they will be removed for the purpose of checking after opening and reading of totals.
Bids are required for the entire work described herein, and neither partial nor contingent bids will be considered.
F. ADDENDUM - Every interpretation of the specifications, changes, additions or corrections will be in the form of an addendum to the contract documents, and when issued will be posted on the Department of Public Works Bids & RFPs webpage https://www.cityofmillvalley.gov/772/Bids-RFPs at least seventy-two (72) hours before bids are opened. It shall be the bidder's responsibility to check the City’s website for addenda prior to bid submission. The City does not maintain a plan holders list. Failure to acknowledge addenda may result in a bid being deemed non-responsive. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda.
G. TIME LIMIT AND LIQUIDATED DAMAGES - The Contractor shall commence work on or before the tenth (10th) working day following date of mailing of written notification by the Department of Public Works that the contract has been awarded by the City Manager.
During this ten-(10) working day interval, the necessary contract documents shall be executed by the Contractor and returned to the Department of Public Works.
1. Final Completion of this project shall be completed no later than February 20, 2027.
Please see Section 10.02 ORDER OF WORK of these Special Provisions for additional information.
2. The Contractor shall pay to the City of Mill Valley the sum of $1,000.00 per each and every calendar day delay in completing the Hauke Softball Field Renovation work in excess of the number of working days specified above. The Contractor shall pay said amount to the City in accordance with the requirements of Section D, General Provisions, of the specifications. It is understood that additional crews may be needed to complete the work within the timeline specified.
H. LEGAL REQUIREMENTS: - See the provisions of the specifications regarding legal relations and responsibility.
I. SPECIFICATIONS: - Attention is directed to the correlation of the specifications with the Standard Specifications of the State of California, Department of Transportation (Caltrans), dated 2025 (unless otherwise noted) and any amendments, as to materials, methods and workmanship.
J. CONTRACT BONDS: - The Contractor whose bid is accepted shall furnish the following bonds to the City (at no expense to City), executed by a responsible surety in a form acceptable to the City:
a) Performance Bond
b) Payment Bond
The Performance Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in his proposal.
The Payment Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in his proposal.
K. EMPLOYEES AND NON-DISCRIMINATION: - See Notice that is required by Chapter 5 of Division 4 of Title 2, California Code of Regulations.
NOTICE OF REQUIREMENT FOR NONDISCRIMINATION PROGRAM (GOV. CODE,
SECTION 12990)
See “Nondiscrimination” set forth in Section 7-1.02I(2) of the Standard Specifications, which is applicable to all-nonexempt state contracts and subcontracts, and to the "Standard California Nondiscrimination Construction Contract Specifications" set forth therein. The Specifications are applicable to all nonexempt state construction contracts and subcontracts of $5,000 or more.
Contractor shall not discriminate against any employee or applicant because of race, religion, color or national origin. This shall include employment, demotion or transfer, recruitment or recruitment advertisement, layoff or termination, rates of pay or other compensation, and selection for training and apprenticeship. Contractor shall post, in conspicuous places during the period of contract and available to applicants for employment, notices setting forth the provisions of this clause. Contractor shall insert the foregoing provisions in all subcontracts thereunder, except subcontracts for standard commercial supplies or raw materials. The hiring of all labor for work shall be in accordance with applicable directives of the Fair Employment Practices Commission of the State of California. The Contractor shall forfeit, as a penalty, in addition to any other penalty provided by law, to City, the sum of $25.00 for each calendar day, or portion thereof, during which the Contractor knowingly allows any conditions of discrimination to exist in connection with the work, provided, however, that such penalty shall not be imposed without a full investigation and determination by the Fair Employment Practices Commission.
Contractor shall cooperate fully with the City of Mill Valley and affected Unions to promote and insure the maximum employment of minorities in accordance with State Standard Specifications, Section 7-1.021(2), “Nondiscrimination,” with particular emphasis on residents of Marin County, in all phases and at all levels of the work.
L. APPRENTICESHIP – See Sections 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under him.
Section 1777.5, as amended required the Contractor or subcontractor employing tradesmen in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases shall not be less than one to five except:
1. When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days prior to the request for certificate, or
2. When the number of apprentices in training in the area exceeds a ratio of one to five, or
3. When the trade can show that it is replacing at least 1/30th of its membership through apprenticeship training on an annual basis statewide or locally, or
4. When the assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.
The Contractor is required to make contributions to funds established for the administration of apprenticeship program if he employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other Contractors on the public works site are making such contributions. The Contractor and any subcontractor under him shall comply with the requirements of Sections 1777.5 and 1777.6 in the employment of apprentices.
Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, Standards and its branch office.
M. PREVAILING WAGES - In compliance with the provisions of Section 1776 of the Labor
Code of the State of California, as amended, the Contractor and each of his subcontractors shall keep an accurate payroll record, showing the name, address, social security number, work classifications, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice or worked employed by them in connection with the Project. Said records shall be available for inspection at all reasonable hours, and copies shall be made available to the employer or his authorized representative, the State Division of Labor Standards Enforcement, the State Division of Apprenticeship Standards, and the City.
See Section 7-1.02K(2) “Wages” of the Standard Specifications.
The general prevailing wage rates determined by the Director of Industrial Relations, for Marin County where the work is to be completed, are available at the Labor Compliance Office at the offices of the District Director for Caltrans District IV and at the Department of Public Works, City of Mill Valley. These wage rates are not included in the Proposal and Contract for the project. Changes, if any, to the general prevailing wage rates will be available at the same location.
PROPOSAL
TO THE DIRECTOR OF PUBLIC WORKS MILL VALLEY
MILL VALLEY, CALIFORNIA
FOR: Hauke Softball Field Renovation Project
The proposed scope of work consists of renovation of the existing softball field at Hauke Park.
Project improvements generally include replacement of two dugouts, the existing backstop, fencing, and aluminum bleachers; construction of a new bullpen; installation of a prefabricated Tuff Shed; rehabilitation of the existing decomposed granite pathway; and adjustment of utility frames and covers to finished grade. The work also includes, but is not limited to, demolition, excavation, site preparation, grading, and removal and disposal of excess and unsuitable materials at an off-site location approved by the City of Mill Valley Department of Public Works.
Name of Bidder
Business Address
Place of Residence
TO THE DIRECTOR OF PUBLIC WORKS OF MILL VALLEY:
The undersigned, as bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firm or corporations; that they have carefully examined the location of the proposed work, plans and specifications; and they propose and agree, if this proposal is accepted, that they will contract with the City of Mill Valley to provide all necessary machinery, tools, apparatus, and other means of construction, and to do all the work and furnish all the materials specified in this contract in the manner and time prescribed, and according to the requirements of the Engineer as therein set forth; and that they will take in full payment therefor an amount based on the unit prices specified herein below for the various items of work.
BASE BID ITEMS
DESCRIPTION QTY UNIT UNIT
PRICE TOTAL
1 Mobilization
1 LS
2 Traffic Control Systems and Construction Signs
3 Water Pollution Control Program
4 Clearing and Grubbing
5 Remove Knack Boxes
2 EA
6 Remove Trash Bins
4 EA
7 Remove Concrete Mow Strip with Gutter
74 LF
8 Remove Cyclone Fencing (incl Foundations)
Remove Cyclone Fence Dugout & Concrete Slabs
2 EA
10 Remove Bleacher
1 EA
11 Decomposed Granite 15 CY
12 Aluminum Bleacher 2 EA
13 Dugout with Benches 2 EA
14 Concrete Pad (Dugout) 2 EA
15 Bat Storage Rack 2 EA
16 Helmet Storage Racks 6 EA
17 Bullpen Area 1 LS
18 Concrete Mow Strip with Gutter 22 LF
19 8' High Fence (incl swing gate) 189 LF
20 16' High Fence 20 LF
21 20' High Backstop (Revocable Item) 1 LS
22 Storage Shed 1 EA
23 Concrete Pad (Tuff Shed) 1 EA
24 Adjust Utility Box to Grade 1 LS
Total Base Bid =
BID ALTERNATIVE ITEMS
DESCRIPTION QTY UNIT UNIT
PRICE TOTAL
A-1 Bid Alt # 1 - Replace Water Fountain 1 LS A-2 Bid Alt # 2 - Paint Backstop 1 LS A-3 Bid Alt #2 - Deduct 20' High Backstop 1 LS
Total Alternative Bid = The unit price for deduct item shall be the same as the associate base bid item
Total Base Bid + Alternative Bid =
The City reserves the right to award any, all, or none of the Bid Alternatives based on available funding and the City's determination of the best interest of the Project. Award of the Contract, if awarded, shall be made to the lowest responsive, responsible bidder based on the Total Base Bid amount. The City may elect to include or exclude Bid Alternatives at its sole discretion, subject to available budget and applicable procurement requirements.
BID GUARANTY BOND
KNOW ALL PERSONS BY THESE PRESENTS:
THAT WE, AS PRINCIPAL, AND
AS SURETY, are held and firmly bound unto the City of Mill Valley in the penal sum of 10 PERCENT OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the City of Mill Valley for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made to the City of Mill Valley to which said bid was submitted, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents, in no case shall the liability of the surety hereunder exceed the sum of $
THE CONDITION OF THIS OBLIGATION IS SUCH
THAT WHEREAS, the Principal has submitted the above-mentioned bid to the City of Mill Valley aforesaid, for certain construction specifically described as follows, for which bids are to be opened at Mill Valley City Hall, 26 Corte Madera Avenue, Mill Valley, CA 94941.
FOR: HAUKE SOFTBALL FIELD RENOVATION PROJECT
NOW, THEREFORE, if the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him/her for signature enters into a written contract in the prescribed form, in accordance with the bid, and files two bonds with the City of Mill Valley, one to guarantee faithful performance, and the other to guarantee payment for labor and materials as required by law, and provide certificate of insurance coverage required by the Contract Documents, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue.
IN WITNESS WHEREOF, we have hereunto set our hands on this day of
, 2026.
Title of Signator: Title of Signator:
Signature of Principal Signature of Surety
Address Address
Note: Signatures of those executing for the surety must be properly acknowledged.
The award of contract, if awarded, shall be based on budget requirements, and shall be made to the lowest responsible, responsive bidder on the Total Base Bid amount alone.
In case of discrepancy between prices and totals, the unit prices shall prevail.
It is understood and agreed that the quantities of work under each item are approximate only, being given for a basis of comparison of proposals, and the right is reserved to the City to increase or decrease the amount of work under any item as may be required, in accordance with provisions set forth in the specifications for this project.
It is further understood and agreed that the total amount of money set forth for each item of work or as the total amount bid for the project does not constitute an agreement to pay a lump sum for the work unless it specifically so states.
No person, firm or corporation shall be allowed to make, file or be interested in more than one
(1) bid for the same project unless such alternate bids are called for. However, a person, firm or corporation who has submitted a sub-proposal to one bidder is not hereby disqualified from submitting a sub-proposal or quoting prices to other bidders.
If this proposal is accepted and the undersigned shall fail to contract as aforesaid and to give the two bonds in the sums to be determined as aforesaid with surety satisfactory to the Director of Public Works within three (3) working days of notice of award, the City Manager may, at his option, determine that the bidder has abandoned the contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Mill Valley.
It is hereby agreed that the undersigned, as bidder, shall furnish a faithful performance bond of the total amount of this proposal and a labor and materials bond in the amount of one hundred percent (100%) of the total amount of this proposal to the City of Mill Valley and at no expense to said City, in the event that this proposal is accepted by said City of Mill Valley.
SUBCONTRACTS
The following "Specialty Item" of work is hereby exempted from percentage requirements of work performed by the Contractor’s own organization and workmen under his immediate supervision:
NONE
Attention is directed to the provisions in Section 5-1.13, "Subcontracting," of the Standard Specifications, and Section B. PROPOSAL REQUIREMENTS AND CONDITIONS of the General Provisions contained within the Contract Documents.
DESIGNATION OF SUBCONTRACTORS
[Public Contract Code Section 4104]
List all Subcontractors who will perform work or labor or render service to the Contractor in or about the construction of the work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half percent (0.5%) of the Contractor’s total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half percent (0.5%) of the Contractor’s total Bid or $10,000, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.
Name under which Subcontractor is Licensed and Registered
CSLB License Number(s) and Class(is)
DIR
Contractor Registration Number
Address and Phone Number
Type of Work (e.g.
Electrical)
Percentage of Total Bid (e.g.10%)1
The percentage of the total Bid shall represent the “portion of the work” for the purposes of Public Contract Code Section 4104(b).
NOTE:
Failure to comply with the listing requirements of the California Public Contract Code may deem a bid non-responsive.
No substitution or additions may be made without prior approval.
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
“NONCOLLUSION AFFIDAVIT TO BE
EXECUTED BY BIDDER AND SUBMITTED
WITH BID
State of California )
County of ) ss.
To the CITY of MILL VALLEY
DEPARTMENT OF PUBLIC WORKS.
, being first duly sworn, deposes and says that he or she is of the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.”
Note: The above Noncollusion Affidavit is part of the Proposal.
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
Place Notary Seal Above
Signature of Notary Public
Signature of Document Signer
(THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF
THIS PROPOSAL SHALL ALSO CONSTITUTE AN ENDORSEMENT
AND EXECUTION OF THOSE CERTIFICATIONS WHICH ARE A PART
OF THIS PROPOSAL)
EQUAL EMPLOYMENT OPPORTUNITY
CERTIFICATION
The bidder , proposed subcontractor , hereby certifies that he has , has not , participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime Contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such Contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.
DEBARMENT AND SUSPENSION
CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, and manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past
3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Notes: Providing false information may result in criminal prosecution or administrative sanctions.
The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
SUBCONTRACTOR DEBARMENT AND
SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The Subcontractor, under penalty of perjury, certifies that, except as noted below, he/she or any other person including subcontractors associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Authorized Representative
Name (typed) Signature
Title Date
Name of Company Project Name
BIDDER SHALL SUBMIT A SIGNED “SUBCONTRACTOR DEBARMENT AND SUSPENSION
CERTIFICATION” NO LATER THAN 4:00 P.M. ON THE 4TH BUSINESS DAY AFTER BID OPENING FOR
EACH SUBCONTRACTOR LISTED IN THE BID. FAILURE TO SUBMIT SUBCONTRACTOR
CERTIFICATION MAY DEEM A BID NON-RESPONSIVE.
Notes: The certification of this provision is a material representation of fact upon which reliance was place. Providing false information may result in criminal prosecution or administrative sanctions and the termination of the contract for default.
NOTICE
Section 7028.15 of the Business and Professions Code provides that it is a misdemeanor for any person to submit a bid to a public agency in order to engage in the business or act in the capacity of a Contractor within the state without having a license therefor except in certain cases.
Therefore you must sign one of the following two statements:
1. I am familiar with the provisions of Section 7028.15 of the California Business and Professions Code and in my opinion the following exceptions contained within the Code section apply:
I declare under penalty of perjury that the foregoing is true and correct. Executed this day of , 2025, at , California.
(Signature)
2. I am a licensed Contractor possessing the following license, , the number of which is , the license expiration date is .
I declare under penalty of perjury that the foregoing is true and correct. Executed this day of , 2025, at , California.
Signature)
ANY BID NOT CONTAINING THE FOREGOING INFORMATION, OR A BID
CONTAINING INFORMATION WHICH IS SUBSEQUENTLY PROVEN FALSE, SHALL BE CONSIDERED
NON-RESPONSIVE AND SHALL BE REJECTED BY THE PUBLIC AGENCY.
PUBLIC CONTRACT CODE
A. Public Contract Code Section 10285.1 Statement
In accordance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has , has not been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.
Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
B. Public Contract Code Section 10162 Questionnaire
In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes No
If the answer is yes, explain the circumstances on a separate sheet of paper and attach it after this page.
C. Public Contract Code 10232 Statement
In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
D. Tax, California Nonresident Income & Franchise Tax Withholding
The California Franchise Tax Board through the California Revenue and Taxation Code (R&TC) Section 18662 and the related regulations requires the withholding of California income and franchise taxes from payment made to nonresident California vendors performing services in this state. A withholding of 7% (the 2011 rate which is applicable to change) of all service related invoices will be withheld and remitted to the state; there is no required withholding on goods provided. In addition, there are higher applicable rates that apply to nonresident foreign non-corporate partners, corporate partners and foreign bank (including financial institution partners.
Non-California Contractor/Vendor Yes No
Note: The above Statements and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire.
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
Accompanying this proposal is (Notice: Insert the words "Cash ($ )", "Cashier's Check”, “Certified Check," or "Bidder's Bond.") in amount equal to at least 10 percent of the total of the bid.
The names of all persons interested in the foregoing proposal as principals are as follows:
IMPORTANT NOTICE: If bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if bidder or other interested person is an individual, state first and last names in full.
ADDENDA: This Proposal is submitted with respect to the changes to the contract included in addenda number(s)
(Fill in any addenda numbers if addenda have been received.)
By my signature on this proposal I certify, under penalty of perjury under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Sections 10162, 10232 10285.1 are true and correct and that the bidder has complied with the requirements of Section 8103 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this proposal I further certify, under penalty of perjury under the laws of the State of California and the United States of America, that the Non-collusion Affidavit required by Title 23 United States Code, Section 112 and Public Contract Code Section 7106; and the Title 49 Code of Federal Regulations, Part 29 Debarment and Suspension Certification are true and correct.
Date:
SIGN HERE:
Signature of Bidder
Business address:
Business Phone No.
Place of business:
Place of residence:
(E/Engforms/propsign)
GENERAL PROVISIONS
A. DEFINITIONS AND TERMS
CITY: City shall mean the City of Mill Valley (hereinafter CITY), a political subdivision of the State of California, acting as the public entity awarding this contract by action of the City Council sitting as the governing body.
CITY COUNCIL: City Council shall mean governing body of CITY, the public entity awarding this contract.
DIRECTOR OF PUBLIC WORKS/ENGINEER: Director of Public Works/Engineer shall mean the Director of the Department of Public Works of Mill Valley, acting on behalf of the awarding entity as described under the definition of "City", or his/her authorized agent acting within the scope of his/her authority, who shall act as the representative to the public entity during the term of the contract.
STANDARD SPECIFICATIONS: Standard Specifications shall mean the Standard Specifications of the State of California, Business, Transportation and Housing Agency, Department of Transportation, dated 2025 unless otherwise specified. Any reference therein to a State Agency or officer shall be interpreted as if the corresponding City Office or officer acting under this contract were so specified.
STANDARD PLANS: Standard Plans shall mean the standard plans of the State of California, Business and Transportation Agency, Department of Transportation, dated 2025, unless otherwise noted.
UNIFORM CONSTRUCTION STANDARDS: Uniform Construction Standards shall mean the Uniform Construction Standards approved and adopted by the Cities of Marin and City of Mill Valley, in July 2018.
CONTRACT DOCUMENTS: The work shall conform to the requirements of all the following contract documents:
Project Plans.
The Standard Specifications, insofar as they may apply.
The Standard Plans, insofar as they may apply.
The Uniform Construction Standards, insofar as they may apply.
These specifications, including the Notice to Contractors.
The Proposal and the Contract (or Agreement).
The two (2) contract bonds required herein.
Any supplemental agreements amending or extending the work.
Any working drawings, sketches, or instructions clarifying or enlarging upon the work specified herein.
Pertinent portions of any other documents included by reference thereto in these specifications, the Standard Specifications, or the Plans.
In case of conflict between the Standard Specifications and these following provisions, these provisions shall take precedence over and be used in lieu of such conflicting portions. It is the intent of this contract to obtain a finished, workmanlike job, complete in place.
B. PROPOSAL REQUIREMENTS AND CONDITIONS
The bidder's attention is directed to the provision of Section 2 of the Standard Specifications as modified herein.
All proposals shall be made in strict accordance with the Instructions to Bidders.
Unless otherwise required by the Special Provisions, the Contractor shall guarantee all work done under the Contract to be free from faulty materials and workmanship for a period of one
(1) year from the date of acceptance, and shall furnish a performance bond as provided in “Contract Bonds” of the Instructions to Bidders.
The Contractor hereby agrees to repair or replace any and all work, together with any other adjacent work which may be displaced in so doing, that may prove to be not in accordance with the requirements of the Contract or that may be defective in its workmanship or material within the guarantee period specified, without any expense whatsoever to the City.
The Contractor further agrees, that within ten (10) calendar days after being notified in writing by the City of any work not in accordance with the requirements of the Contract or any defects in the work, he will commence and prosecute with due diligence all work necessary to fulfill the terms of this guarantee, and to complete the work within a reasonable period of time. In the event the Contractor fails to comply, it does hereby authorize the City of Mill Valley to proceed to have such work done at the Contractor’s expense and he will honor and pay the costs and charges upon demand. The City shall be entitled to all costs and expenses, including reasonable attorney’s fees, necessarily incurred upon the Contractor’s refusal to honor and pay the above costs and charges.
No person, firm, or corporation shall be allowed to make, file or be interested in more than one
(1) bid for the same project unless such alternate bids are called for. However, a person, firm or corporation who has submitted a sub-proposal to one bidder is not hereby disqualified from submitting a sub-proposal or quoting prices to other bidders.
C. AWARD AND EXECUTION OF CONTRACT
Attention is directed to the provisions of Section 3 of the Standard Specifications and the following provisions:
The City Council has elected to let this contract under the terms and provisions of the State Contract Act, as provided in Section 10180 of the Public Contract Code.
The award of the contract, if it be awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed.
The City reserves the right to reject any and all bids.
The contract shall be executed by the successful bidder and shall be returned, together with the contract bonds, to the Agency so that it is received within 10 days, not including Saturdays, Sundays and legal holidays, after the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty.
Upon execution of the contract by the Contractor and the City, the Contractor shall furnish the City (1) a Certificate of Consent to self-insure issued by the Director of Industrial Relations, or
(2) a Certificate of Workers' Compensation Insurance issued by an admitted insurer, or (3) an exact copy or duplicate thereof certified by the Director or the insurer.
D. TIME LIMIT AND LIQUIDATED DAMAGES
The Contractor shall commence work and complete the project, in accordance with the time limits specified in the Instructions to Bidders.
The Contractor shall notify the Director of the Department of Public Works, in writing, three
(3) calendar days in advance of the time that he plans to commence work.
Should the Contractor prepare to begin work at the regular starting time in the morning of any days on which inclement weather or the condition of the site prevents the work from beginning at the usual starting time, and the crew is dismissed, the Contractor will not be charged for a working day whether or not conditions should change thereafter and the major portion of the day could be considered to be suitable for construction operations.
Reference is made to Section 8 of the Standard Specifications, Section 8-1.05 “Time” and Section 8-1.10 “Liquidated Damages”, which provisions, except as modified herein shall apply in case of failure to complete the work within the time limits specified. On the project to be constructed under these specifications, it has been determined that Mill Valley will be damaged to the extent of the amount specified in the Instruction to Bidders for each day of delay in completing the work in excess of the number of days specified, and the Contractor agrees to pay liquidated damages at that rate per day for any such delay, as provided in said Section 8.
However, the Contractor shall not be assessed liquidated damages for delay in completion when such delay was caused by failure of the City or the owner of any utility to provide for removal or relocation of existing utility facilities.
E. SCOPE OF WORK
Reference is made to Section 4 of the Standard Specifications.
F. CONTROL OF WORK
Reference is made to Section 5 of the Standard Specifications.
G. CONTROL OF MATERIALS
Reference is made to Section 6 of the Standard Specifications.
H. LEGAL RELATIONS AND RESPONSIBILITY
In connection with laws to be observed and responsibility of the Contractor, attention is directed to Section 7 of the Standard Specifications, and to the laws therein referred to, all of which are applicable to this contract.
The contract prices paid for the work shall include full compensation for all taxes which the Contractor is required to pay, whether imposed by Federal, State or local government, including, without being limited to, Federal excise tax and Federal transportation tax.