This is a Bid Notice for the Huntington Drive Transmission Main Project, Phase 1, a water infrastructure replacement project conducted by a California water district. The project involves the abandonment of an existing six-inch asbestos cement pipeline and construction of a new twelve-inch PVC water main to improve the district's water distribution system. Scope of work includes installation of 1,470 linear feet of twelve-inch PVC pipeline, replacement of three existing water services, reconnection of one six-inch fire service, tie-ins to existing water mains at five locations, installation of one new fire hydrant and relocation of one existing fire hydrant, installation of two air/vacuum valves, associated testing and inspection activities, and pavement restoration using California Department of Transportation Type II micro surfacing.
The bid notice document provides the formal solicitation for construction services to execute this water main replacement project. Specific information regarding pricing terms, bid submission deadlines, performance schedules, bonding requirements, and contractor qualifications should be detailed within the notice. Funding for the project is anticipated to come from the water district's capital improvement budget or public financing mechanisms typical for municipal water infrastructure upgrades. Interested contractors should review all bid documents, including specifications and contract terms, and may be required to attend a pre-bid meeting or conduct site visits to assess project conditions and scope requirements prior to submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Number: CWO # 21-0011
Bid Title: Huntington Drive Transmission Main
Project, Phase 1
Category: SqCWD Capital Improvement Projects
Status: Open
Description:
The Huntington Drive water main consists of aging six-inch asbestos cement pipe. The proposed project will abandon the existing pipeline and construct a new twelve-inch PVC water main, improving the District’s water distribution system.
The project includes:
1,470 LF of 12” PVC pipeline which will replace the existing 6” asbestos cement pipelines
Replacement of three (3) existing water services
Reconnect one (1) 6” Fire Service
Tie-ins to existing water mains at five (5) locations
Installation of one (1) new fire hydrant and relocation of one (1) existing fire hydrant
Installation of two (2) air/vacuum valves
Associated testing and inspection
Pavement restoration including Cal Trans type II micro surfacing
Contact Person:
Email Eileen
Publication Date/Time:
10/13/2026 11:30 AM
Closing Date/Time:
https://www.soquelcreekwater.org/bids.aspx?bidID=38&PRINT=YES
11/3/2026 2:00 PM
Plan Holders List:
Plan Holders List
Note: The plan holders list is updated once a week.
Related Documents:
Return To Main Bids, RFPs & RFQs Page
Government Websites by CivicPlus® https://soquelcreekwater.sharepoint.com/:x:/r/External%20Sharing/Engineering/Plan%20Holders%20Lists/21-0011%20Huntington%20Drive%20Transmission%20Main%20Replacement,%20Phase%20I/Plan%20Holders%20List%20for%20Huntington%20Drive%20Transmission%20Main%20Replacement%20Phase%20I%20Project.xlsx?d=wdc9d75a1d5c24e09ac429aa0b9aa3f6a&csf=1&web=1&e=s3NNhm https://www.soquelcreekwater.org/bids.aspx https://connect.civicplus.com/referral
File details come from the government source that posted it. Updated .