This is a Bid Notice for the Vallejo Sanitation & Flood Control District in Vallejo, California, regarding the Carquinez Effluent Pump Station Electrical Mitigation Project (PEE010). The project scope involves replacing one failed transformer and installing new wiring for 5kV and 480V systems serving four existing effluent pumps and an existing motor control center at Building 74, located at 450 Ryder Street, Vallejo, California 94590. A mandatory pre-bid site visit is scheduled for October 21, 2026, at 10:00 AM to allow prospective bidders and sub-bidders to examine the work site. Bids are being accepted from October 21, 2026, at 10:00 AM through November 12, 2026, at 2:00 PM, with a virtual bid opening meeting to be conducted via Microsoft Teams. Bidders must hold a California Class C-10 license. The project point of contact is Kristine Delos Santos at 707-644-6348 or kdelossantos@vallejowastewater.org, with RSVP requests for the pre-bid site visit directed to EngAdmin@vallejowastewater.org.

The construction cost estimate for this project is $1,620,000. No information regarding pricing terms, set-asides, incumbent contractors, funding sources, or renewal options is provided in the bid notice. The notice does not include details about contract term, payment schedules, or performance requirements. Additional project specifications and requirements are available through the BPX Printing & Graphics online plan room and the referenced NIB.pdf document.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Carquinez Effluent Pump Station Electrical Mitigation Project

(PEE010)

PROJECT DESCRIPTION: Replace 1 failed transformer and install new wiring for 5kV and 480V for four existing effluent pumps and existing motor control center.

Status Accepting Bids

10/21/26 10:00am 11/12/26 2:00pm

Company & Contacts Vallejo Sanitation & Flood Control District Kristine Delos Santos 707-644-6348 kdelossantos@vallejowastewater.org

Location Building 74 - Carquinez Effluent Pump Station, 450 Ryder Street, Vallejo CA 94590

Reference NIB.pdf

VIRTUAL BID

OPENING MEETING:

https://teams.microsoft.com/meet/215306265500955?p=wJbMHMjROExoE32xmO

MEETING ID: 215 306 265 500 955

ACCESS CODE: rf34FE2P

CONSTRUCTION COST ESTIMATE: $1,620,000

The District will hold one mandatory pre-bid site visit at the Vallejo Wastewater Treatment Plant (VWWTP) to allow all prospective Bidders and Sub-Bidders time to examine all work within the project site. October 21, 2026; 10:00 AM, 450 Ryder Street, Vallejo, CA 94590

Please RSVP at EngAdmin@vallejowastewater.org

License Required: C-10

Prebid Date Bid Date

10/10/26, 3:08 PM Carquinez Effluent Pump Station Electrical Mitigation Project (PEE010) :: BPX Printing & Graphics https://www.bpxplanroom.com/projects/2345/details/carquinez-effluent-pump-station-electrical-mitigation-project-pee010 1/1 mailto:kdelossantos@vallejowastewater.org https://www.bpxplanroom.com/preview/document/2345/25911 https://teams.microsoft.com/meet/215306265500955?p=wJbMHMj https://www.google.com/maps/search/450+Ryder+Street,+Vallejo,+CA+94590?entry=gmail&source=g