Bid Notice.pdf

PDF 3 MB Posted

Attached to
Magnolia Storm Drain Improvement Project
Solicitation number
27-302
Issued by
Marin County, California

About this file

Magnolia Storm Drain Improvement Project Summary

This is a Technical Provisions and Bid Notice document for the Magnolia Storm Drain Improvement Project (CIP# 27-302) issued by the City of Larkspur, California. The project involves construction of a new gravity storm drain system, modification of existing catch basins, and associated concrete work including replacement of pathways, ditches, curbs, gutters, and sidewalks on existing roadways within street rights-of-way and private property easements. The work scope includes surveying and staking, utility locating and potholing, removal of existing storm drain pipe, construction of new storm drain pipes and inlets with closed-circuit television (CCTV) inspection, backfilling and paving, replacement of sidewalks, grading, bypass pumping, stormwater pollution prevention measures, traffic and pedestrian control, and site restoration. The project requires extensive coordination with property owners, the City of Larkspur, Marin Municipal Water District, and other utility companies. Major bid items include mobilization and demobilization (lump sum), sheeting and shoring (lump sum), modification of existing storm drain inlets, installation of 12-inch HDPE storm drain pipe (linear foot pricing), new storm drain inlets (unit pricing), concrete channel and curb replacement (linear foot pricing), and concrete pathway and sidewalk replacement (linear foot pricing).

The contract specifications require the contractor to submit a comprehensive work plan, traffic control and detour plan, construction schedule with milestone completion dates, erosion and sediment control plan, and tree protection plan prior to the preconstruction conference. The contractor must comply with all applicable federal, state, and local safety regulations, including OSHA requirements and California Labor Code Section 6707 for excavation safety. The contractor is responsible for all surveying, staking, utility locating, potholing, hazardous materials testing and disposal, dewatering, environmental controls, erosion and sediment control, traffic control measures, temporary facilities (sanitary, water, electricity), and tree protection. Work restrictions include designated non-workdays (Veterans Day, Thanksgiving, Christmas week, New Year's Day, and Martin Luther King Day), and at least one lane of traffic in each direction must be maintained at all times. All costs for mobilization, demobilization, permits, insurance, bonds, surveying, traffic control, temporary facilities, environmental compliance, and hazardous materials management are included in the bid items and mobilization line item with no additional compensation allowed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL PROVISIONS

FOR

MAGNOLIA STORM DRAIN IMPROVEMENT PROJECT

CIP# 27-302

CITY OF LARKSPUR, CALIFORNIA

September 1, 2026

2200 Range Avenue, Suite 201 Santa Rosa, CA 95403

Telephone: (707) 528-4848

TABLE OF CONTENTS 01020 - 1

MAGNOLIA STORM DRAIN IMPROVEMENT PROJECT (CIP 27-302)

SECTION 01010

TABLE OF CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS

SECTION

NO. TITLE

01020 CONTRACT TIME AND ORDER OF WORK

01110 SUMMARY OF WORK

01120 WORK CONSTRAINTS

01125 MEASUREMENT AND PAYMENT

01300 CONTRACTOR SUBMITTALS

01354 HAZARDOUS MATERIALS PROCEDURES

01505 MOBILIZATION/DEMOBILIZATION

01532 TREE CARE & PROTECTION

01550 TEMPORARY FACILITIES CONTROLS

01572 EROSION AND SEDIMENT CONTROL

DIVISION 2 - SITE CONSTRUCTION

SECTION

NO. TITLE

02100 CLEARING AND DEMOLITION

02200 EXCAVATION AND BACKFILL

02318 TRENCHING

02722 AGGREGATE BASE COURSE

02730 HIGH DENSITY POLYETHYLENE (HDPE) PIPE

02742 ASPHALTIC CONCRETE PAVING

02760 CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION

02772 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

DIVISION 3 - CONCRETE

SECTION

NO. TITLE

03100 CONCRETE FORMWORK

03150 CONCRETE ACCESSORIES

03200 REINFORCING STEEL

03300 CAST-IN-PLACE CONCRETE

03400 PRECAST CONCRETE

03600 GROUTS

TABLE OF CONTENTS 01020 - 2

APPENDIX

APPENDIX

NO. TITLE

A CMSA GROUNDWATER DISCHARGE PERMIT

B MARIN COUNTY STORM WATER POLLUTION PREVENTION PROGRAM,

CONSTRUCTION EROSION AND SEDIMENT CONTROL PLAN APPLICANT

PACKAGE

END OF SECTION

CONTRACT TIME AND ORDER OF WORK 01020 - 1

SECTION 01020

CONTRACT TIME AND ORDER OF WORK

PART 1 GENERAL

1.01 SUMMARY

A. Section includes description and requirements for order of work.

B. Section includes restrictions on the start of work and potential contract modifications.

1.02 COMMENCEMENT OF WORK

A. Work shall commence after the pre-construction conference and the City has issued a Notice to Proceed to the contractor per the Construction Agreement.

1.03 TIME FOR COMPLETION

A. Time required for actions required by the Engineer in performing quality assurance, testing, review, inspection, and other contract administration duties shall be considered as included in the Contract Time, and no extensions of Contract Time will be granted for such actions, except as specified elsewhere in the Contract Documents.

B. The time limits specified for the completion of Work contemplated may be insufficient to permit completion of the Work by the Contractor working a normal number of hours per day or week on a single shift basis. It is the responsibility of the Contractor to evaluate the overall terms and conditions described in the Contract documents and budget its shift work accordingly. Where additional shifts or premium pay are necessary to ensure that the Work will be completed within the time limits specified, any resulting additional costs will be considered to be included in the price paid for the various Contract items of work and no additional compensation shall be allowed therefor.

1.04 RESTRICTIONS

A. Work at the site, or work that requires oversight, inspection, or support of any kind by the City shall not be performed on the following designated non-workdays unless granted permission by the City Engineer. Non-workdays shall be considered as included in the Contract Time and no extension of Contract Time will be granted for days on which work is not allowed as specified herein.

1. November 11, 2026 – Veterans Day

2. November 26-27, 2026– Thanksgiving and day after Thanksgiving

3. December 21-25, 2026 – Christmas Week

4. January 1, 2027 – New Year’s Day

5. January 18, 2027 – Martin Luther King Day

CONTRACT TIME AND ORDER OF WORK 01020 - 2

B. Upon receipt of the Notice to Proceed with Site Work, the Contractor shall have full access to perform the Work subject to the conditions of the Contract Documents.

C. The Contractor shall not order any materials before a written notice to proceed with site work is obtained from the City.

D. Regardless of the scope of work to be constructed, all work included within the contract shall be completed by the completion date specified herein.

E. The Contractor shall not be entitled to any additional compensation or adjustment in the unit prices bid because of the above stated alteration of this project.

SUMMARY OF WORK 01110 - 1

SECTION 01110

SUMMARY OF WORK

PART 1 GENERAL

1.01 WORK COVERED BY CONTRACT DOCUMENTS

A. The project consists of constructing a new gravity storm drain, modifying existing catch basins, and other items as detailed in the plans and specifications. Work will take place on existing roadways. The work will require significant pedestrian and traffic control throughout construction.

B. The work includes per plan:

1. Coordination with property owners, the City of Larkspur, Marin Municipal Water

District, and other agencies and utility companies as necessary to complete the work.

2. Surveying and staking of proposed improvements.

3. Utility locating and potholing.

4. Modification of existing catch basins.

5. Removal of existing storm drainpipe.

6. Construction of new storm drainpipes and inlets.

7. Backfilling and paving trenches.

8. Pouring new concrete channels and ditches.

9. Replacing existing sidewalk.

10. Grading site to drain towards roadway.

11. Bypass pumping and/or rerouting of storm drains as necessary for construction of the project per plans and specifications.

12. Stormwater pollution prevention and site protection measures.

13. Traffic and pedestrian control throughout construction in conformance with the plans and as directed by the Engineer.

14. Site restoration.

15. Other miscellaneous and incidental improvements for complete facilities.

1.02 WORK PLAN

A. Contractor shall submit a Work Plan for review and approval by the City, fully describing the proposed procedures to conform to the Contract Documents.

B. The Work Plan shall fully describe the planned sequence of operations at the project site, list major milestones of completion, include a milestone schedule, and include a contingency plan for potential weather delays.

1. The Work Plan and project schedule shall be updated on a routine basis during construction as necessary to accurately reflect the proposed work and schedule.

WORK CONSTRAINTS 01120- 1

SECTION 01120

WORK CONSTRAINTS

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. Site Use and Construction Restrictions.

2. Temporary Construction Access Requirements and Limitations

3. Utility restrictions and requirements.

B. Related Work Specified Elsewhere:

1. Section 01572 - Erosion and Sediment Control

2. Section 02200 – Excavation and Backfill

1.02 SITE USE AND CONSTRUCTION RESTRICTIONS

A. The project site is within existing street right-of-way and within easements on private properties.

B. Contractor is responsible for obtaining any necessary staging or storage areas and shall comply with all jurisdiction regulations for which the work is to occur. No materials or equipment shall be stored on site or within the street right-of-way.

C. Contractor shall visit the site prior to bidding to review project location, site conditions, and restrictions.

D. Site access is extremely limited in locations where work is occurring in side yards, backyards, and outside of the street right-of-way. Access is limited to foot traffic and hand held equipment. Contractor shall visit the site within the street right-of-way during bidding to review project location and access restrictions. Contractor shall consider access issues and limitations when bidding, no additional compensation will be made for difficult and limited site access.

E. Construction impacts due to identified or observable site constraints shall be considered by the Contractor when making his bid, and the costs associated with such constraints shall not be compensated for beyond the provisions contained herein.

F. Contractor shall provide access to residences and businesses at all times during construction. Contractor shall maintain access to driveways to the maximum extent possible.

G. Advance notice to property owners’ is required prior to accessing easements on their property. City will coordinate initial notice at least one month prior to access of the easement based on the Contractor’s Schedule. Contractor shall provide additional notice to the property owner, by delivering or mailing a City approved flyer that lists planned work dates, work hours, work duration, a general description of planned work, and

WORK CONSTRAINTS 01120- 2

contractor’s contact information with phone number approximately one week before working in easement. Workers accessing easements shall have state issued photo identification on them at all times and available to present if requested by property owner(s).

H. See the City’s General conditions for work hours and limitations.

1.03 DOCUMENTATION OF EXISTING CONDITIONS

A. The Contractor is responsible for reviewing and documenting the existing site conditions prior to performing any work. Documentation shall include photographs, videos, notes, and other items as necessary to accurately document the condition of all items that may be affected by the work.

B. The Contractor shall submit the documentation of existing conditions to the City prior to proceeding with the work.

1.04 WORK WITHIN EASEMENTS

A. The Contractor shall provide advance notifications prior to accessing and performing work outside of the street right-of-way as specified herein.

B. Once all advance notifications have been provided the Contractor shall perform the following prior to proceeding with any site work within easements:

1. The Contractor shall locate and mark the locations of all proposed excavations within easements and identify the impacts to private improvements.

2. Mark all private improvements, landscaping, and trees that are proposed to be impacted and/or removed during construction.

3. Review the proposed work and impacts within easements with the City.

4. Receive written approval for proceeding with proposed work within easements prior performing any site work.

5. The Contractor shall anticipate a 72-hour delay from when the site improvements are reviewed with the City until obtaining approval from the City to proceed with the proposed work.

C. Contractor shall minimize impact on property owners during Construction.

1.05 UNDERGROUND FACILITIES

A. The Contractor shall note that not all existing utilities are shown on the plans and the location of the utilities shown are approximate. The location of the utilities shown on the plans are based on utility base maps, original drawings, and pavement markings and are approximate in nature.

B. The Contractor shall have all utilities located by contacting USA, review utility locations, and clearly mark all utilities to be potholed in the field by the Contractor prior to construction. The Contractor shall submit the proposed utilities to be potholed to the City for review. The Contractor shall receive written authorization from the City to proceed with potholing activities prior to construction. The Contractor is responsible for potholing all utilities that may impact or conflict with the work.

WORK CONSTRAINTS 01120- 3

C. Some, but not all potential utility conflicts are shown on the plans. The Contractor shall pothole all potential utility conflicts prior to construction. Potholing results and any identified conflicts shall be submitted to the City for review prior to construction.

D. The Contractor is responsible for coordinating all project documentation, including but not necessarily limited to, the Contract Documents, and existing record drawings for the determination of the location of all underground facilities. Contractor shall have utilities marked in the field by Underground Services Alert a minimum of 48 hours prior to the start of construction.

E. The Contractor shall exercise care in all excavations to avoid damage to existing underground facilities. This shall include potholing or hand digging in those areas where underground facilities are known to exist until they have been sufficiently located to avoid damage to the facilities.

F. The Contractor shall notify the Engineer of any potential utility conflicts as soon as they are known.

G. Contractor shall notify the Marin Municipal Water District prior to excavating within 5 feet of all existing water mains. See Section 01120-1.11.

1.06 TREE AND PLANT PROTECTION

A. Preserve and protect all existing trees and plants at or adjacent to the site unless otherwise indicated on Drawings.

B. The Contractor shall utilize all means necessary to protect existing trees to remain.

Trimming of trees shall not be performed without the presence and authorization of the City or the City’s representative.

C. Trenching within tree dripline is not permitted without approval from the City.

D. All excavation, including trenching for utilities within driplines of trees shall be by hand or air spade only. Tunnel under roots 2" and larger, cleanly cut roots 3/4" diameter to 2".

No tree roots larger than 2” in diameter shall be cut without approval from the City.

E. Use air spade when excavating within driplines when directed by the District.

F. Construct fills so as to prevent disturbance to root zones of existing trees.

G. Store no materials, including topsoil, under tree canopies.

H. The Contractor shall provide adequate protection for all existing trees to remain and is responsible for the maintenance of tree protection barriers during construction. Tree trunks' damage will result in fines based on square inches of damaged bark to be paid by the Contractor. Any repairable damage done to a tree shall be treated by a qualified tree surgeon at no cost to City.

I. The Contractor shall not trim tree branches larger than 2 inches in diameter with approval from the City.

WORK CONSTRAINTS 01120- 4

1.07 WORK SEQUENCE

A. The overall sequence of the Work is at the Contractor’s discretion, subject to City approval.

B. The use of multiple crews is at the sole discretion of the Contractor and no additional compensation will be allowed to meet the contract requirements.

1.08 MAINTAINING STORM DRAIN CAPACITY

A. The Contractor is solely responsible for site protection during periods of inclement weather.

B. The Contractor shall monitor the weather as outlined in Section 01572-3.03.

C. The Contractor shall maintain full flow capacity of all pipes and channels during rainfall events which may require bypass pumping, temporary piping, or other means to adequately protect the existing sites and to maintain flows.

1.09 TRAFFIC CONTROL

A. The Contractor shall supply and install all traffic control devices (including all warning, regulatory, and guide signs) required for the Project. The City will not furnish signs nor any other traffic control devices for the Project.

B. At least one lane of traffic in each direction shall be maintained at all times during construction, unless otherwise specified.

C. The Contractor shall submit for City review and approval its Traffic Control and Detour Plan. Submit said plan a minimum of two (2) full Working Days prior to the Pre- Construction Meeting. The plan shall include (where necessary) lane closures, detours, no parking areas, signing program for construction, access to private property and business establishments, pedestrian traffic, transit routes, loading areas, the proposed routing of the construction vehicles, hours required for access and the safe guards and procedures necessary to carry out the Work, as well as where Contractor plans to park construction vehicles and equipment, and other matters which might be important to the safe movement of traffic. The plan shall also indicate placement and type of warning signs, lights, devices, flag persons; and have a schedule for implementation.

D. It is imperative that field traffic control be handled in such a manner as to direct all traffic movements adequately and safely in the Project area. The Contractor shall not be allowed to proceed with construction at any time that, in the opinion of the Engineer, traffic control is inadequate to meet the field conditions. Traffic control measures, in addition to those indicated on the approved traffic control plans, may be required as field conditions dictate.

E. The Contractor shall not be allowed to restrict vehicle access to any of the properties in the Project area at all times during construction if practical. If restricting vehicle access is absolutely necessary, Contractor shall notify property owners advanced notice of the extent of any delays. Under no circumstance shall the Contractor restrict vehicle access

WORK CONSTRAINTS 01120- 5

outside of the normal working hours of 7 AM and 6 PM without prior approval from the City Engineer.

F. Areas to be posted with “No Parking” signs must be verified as correct by the City Police Department. Signs must be verified by the Police Department and posted a minimum of seventy-two (72) hours prior to the start of construction in each area requiring parking restrictions.

G. The Contractor shall conduct his operations as to cause the least possible obstruction and inconvenience to both vehicular and pedestrian traffic.

H. Traffic Routing and Parking Restrictions: Below are specific City traffic and parking restrictions:

1. Construction Traffic and Vehicles: All inbound and outbound construction related traffic to and from the Site is restricted to public street(s) immediately adjacent to the Site.

2. Construction Parking: Construction vehicles and equipment parking is restricted to areas within the Site and other areas as determined by the City.

3. Alternative Parking: The Contractor can negotiate with any other entity to accommodate parking by its workers. However, the City does not make any guarantee that such parking is available to the Contractor.

I. Street Lane and Sidewalk Closures: Below are specific lane and sidewalk closure requirements and restrictions which shall apply unless specifically modified by an approved Traffic Control Plan. Said Plan may be reviewed or modified by the Engineer at any time when, in the opinion of the Engineer, changes are necessary to provide for the safety, health, welfare, or convenience of the public.

1. Street Lane Closures: Contractor shall provide continuous pedestrian traffic access. All traffic lanes shall remain open during the non-working hours as defined in the City’s General Conditions. Lanes may individually be closed during working hours.

2. Residents and businesses along the road or street shall be provided with passage.

Convenient access to driveways, houses, and buildings along the road or street shall be maintained. Temporary crossings shall be provided and maintained in good condition.

3. The blocking of industrial, commercial, or institutional driveways shall not be allowed. Access shall be provided to permit the movement of vehicles to and from the grounds of such establishments. Contractor shall provide vehicular access to all other types of driveways at all times except during actual construction.

4. Wherever it is necessary that trenches, and excavation be bridged, these bridges shall permit unobstructed flow of traffic or pedestrians (ADA compliant) and shall meet the following criteria:

a. Bridging shall be secured against displacement by using adjustable cleats, angles, bolts, or other devices.

b. Bridging shall be installed to operate with minimum noise.

c. The trench shall be adequately shored, to support the bridging and traffic.

d. Only steel plates shall be used for bridging. Steel plates used for bridging shall extend one foot (minimum) beyond the edges of the trench.

WORK CONSTRAINTS 01120- 6

J. Sidewalk Closures: Contractor must comply with the following requirements.

1. Where walks, pathways, or access ways are closed by the Work, an ADA complaint, alternate walkway shall be provided, preferably within the immediate location of the pathway or access to be closed. Where it is necessary to divert pedestrians into a major detour and/or into a parking lane or traffic area, at no time shall pedestrians be diverted into a portion of a street used for vehicular traffic.

Any deviation from the above must have prior approval of the Engineer.

2. At locations where adjacent alternate walkways cannot be provided (i.e., where no pathway or access is available within the immediate location of the interruption) ADA compliant detours shall be clearly planned, marked, and constructed.

Appropriate signs and barricades must be installed at the limits of construction and in advance of the closure (or detour) in order to divert pedestrians to the appropriate walkway or detour.

3. Contractor shall provide sufficient signage, indicating by way of arrows and text, pedestrian route closures, and new pathways and detours required for alternate pedestrian routes around the construction. Alternate pedestrian routes, the final sign configuration, the exact wording of the base sign and all mounting locations shall be approved by the City.

K. The Contractor shall pay for all street and sidewalk closures, including but not limited to, the appropriate street closure and temporary directional signage, crosswalks, flag persons as required to control construction traffic and implement the Traffic Control and Detour Plan. Contractor shall take all necessary precautions to protect the public from construction activities.

L. The Contractor shall observe all posted traffic signage on and in adjacent neighborhoods.

M. The Contractor shall not be relieved from responsibility for public safety by City’s direction, lack of same, or approval of the Traffic Control and Detour Plan with respect to signs, lights, and/or protective devices.

N. Reference the General Provisions for additional traffic control requirements.

1.10 WATER MAIN SEPARATION REQUIREMENTS

A. The Contractor shall identify all locations where the horizontal clearance between existing water mains and new storm drain line is less than five (5) feet. Following utility locating performed prior to Construction, the Contractor shall notify the City and Engineer immediately of all locations where the horizontal distance is less than 5 feet.

B. The Contractor shall notify the Marin Municipal Water District five (5) working days in advance of any work requiring excavation within five (5) feet of an existing water main.

C. The storm drain alignment may need to be adjusted if there is less than 5 feet of horizontal clearance, except for water/storm drain crossing locations.

D. The Contractor shall use extreme caution to properly support and restrain all water mains, service lines, and connections that are exposed. Contractor shall prepare a detailed plan for supporting all exposed water mains during construction. The plan shall

WORK CONSTRAINTS 01120- 7

be submitted to the City and the Marin Municipal Water District for review and approval prior to construction.

1.11 FIELD SURVEYS AND CONSTRUCTION STAKING

A. Surveying and construction staking shall be the responsibility of the Contractor. Full compensation for all surveying and construction staking shall be paid for under the Mobilization bid item.

B. Contractor is responsible for laying out the work to the lines, grades, and dimensions shown on the plans. The alignment and elevations shall be adjusted to accommodate existing field conditions and utilities. Any adjustments or modifications to the plans shall be approved by the City and Engineer prior to construction.

C. Once construction staking has been completed the Contractor shall review the proposed work in the field with the City prior to construction.

MEASUREMENT AND PAYMENT 01125 - 1

SECTION 01125

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.01 SUMMARY

A. Section includes description of requirements and procedures for determining amount of Work performed and for obtaining payment for Work performed.

1.02 REFERENCES

A. California Public Contract Code

B. California Code of Civil Procedure

C. California Government Code

1.03 SCOPE OF WORK

A. Work under Contract Documents, or under any Bid Item, allowance, or alternate, shall include all labor, materials, taxes, transport, handling, storage, supervision, administration, and all other items necessary for the satisfactory completion of Work, whether or not expressly specified or indicated.

1.04 DETERMINATION OF QUANTITIES

A. Quantity of work to be paid for under any item for which a unit price is fixed in the Contract Documents shall be, as determined by the Engineer, the number of units of work satisfactorily completed in accordance with Contract Documents or as directed by City. Unless otherwise provided, determination of number of units of work so completed will be based, so far as practicable, on actual measurement or count within prescribed or ordered limits, and no payment will be made for work done outside of limits.

Measurements and computations will be made by methods set forth in Contract Documents. If methods are not so set forth, measurements shall be made in any manner which the City considers appropriate for class of Work measured (e.g., preassigned values, percentage completion, units completed or incremental milestones). Contractor must immediately inform City of any disputes regarding quantity measurements and shall immediately supply City with any documentation supporting the disputed measurements.

1.05 UNITS OF MEASUREMENT

A. Measurements shall be in accordance with U.S. Standard Measures. A pound is an avoirdupois pound. A ton is 2,000 pounds avoirdupois. The unit of liquid measure is the U.S. gallon.

MEASUREMENT AND PAYMENT 01125 - 2

1.06 CERTIFIED WEIGHTS

A. When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales, or when approved by the Engineer, on a completely automated weighing and recording system. The Contractor shall furnish the Engineer with duplicate licensed weighmaster's certificates showing the actual net weights. The Engineer will accept the certificates as evidence of the weights delivered.

1.07 METHODS OF MEASUREMENT

A. Materials and items of work, which are to be paid for on the basis of measurement, shall be measured in accordance with the method stipulated in the particular sections involved. In determining quantities, all measurements shall be made in a horizontal plane unless otherwise specified.

B. Material not used in the work and remaining on a transporting vehicle shall be determined by the Engineer and deducted from the certified tag.

C. When material is to be measured and paid for on a volume basis and it would be impractical to determine the volume, or when requested by the Contractor in writing and approved by the City in writing, the material will be weighed and converted to volume measurement for payment purposes. Factors for conversion from weight measurement to volume measurement will be determined by the City and shall be agreed to by the Contractor before such method of measurement of pay quantities will be adopted.

D. Full compensation for all expense involved in conforming to the above requirements for measuring and weighing materials shall be considered as included in the unit prices paid for the materials being measured or weighed and no additional allowances will be made therefore.

E. Quantities of material wasted or disposed of in a manner not called for under the Contract; or rejected loads of material, including material rejected after it has been placed by reason of failure of the Contractor to conform to the provisions of the Contract; or material not unloaded from the transporting vehicle; or material placed outside the lines indicated on the plans or given by the Engineer; or material remaining on hand after completion of the Contract, will not be paid for and such quantities will be deducted from the final total quantities. No compensation will be allowed for hauling rejected material.

1.08 BASIS OF PAYMENT

A. Unit Price Quantities: When estimated quantity for specific portions of Work is listed in the Bid, quantity of Work to be paid for shall be actual number of units satisfactorily completed, as determined by City and agreed to by Contractor, in accordance with Contract Documents.

B. Lump Sum: When estimated quantity for specific portion of Work is not indicated and unit is designated as lump sum, payment will be on a lump sum basis for Work satisfactorily completed in accordance with Contract Documents and the approved Schedule of Values.

MEASUREMENT AND PAYMENT 01125 - 3

C. City does not expressly, or by implication, agree, warrant, or represent in any manner, that actual amount of Work will correspond with amount shown or estimated and reserves right to increase or decrease amount of any class or portion of Work, to leave out entire Bid Item or Items, or to add work not originally included in Bid or Contract Documents, when in its judgment such change is in best interest of City. No change in Work shall be considered a waiver of any other condition of Contract Documents. No claim shall be made for anticipated profit, for loss of profit, for damages, or for extra payment whatsoever, except as otherwise expressly provided for in Contract Documents, because of any differences between the amount of work actually done and estimated amount as set forth herein, or for elimination of Bid Item.

PART 2 DESCRIPTION OF BID ITEMS

2.01 GENERAL

A. The bid items are presented to indicate major categories of the work for purposes of comparative bid analyses, and a preliminary breakdown for monthly progress payments.

Bid items are not intended to be exclusive descriptions of work categories and the Contractor shall determine and include in its pricing all materials, labor, and equipment necessary to complete each Bid Item as shown and specified.

B. Contractor shall perform all work depicted in the Contract Documents whether it is specifically mentioned in the Bid Schedule and bid item descriptions or not. The Bid Schedule and the Bid Item Descriptions below are intended to cover any and all Work depicted in the Contract Documents. Not all elements of every part of the Work are explicitly listed. It is the intention of City and a provision of this Contract, that any and all of the Work depicted shall be included in Contractor’s bid and installed complete at a price included in a Bid Item submitted with Contractor’s bid. No adjustments will be made to unit, extended, or total prices for an item that is depicted in the contract documents but is not specifically described or itemized. Such items may be included for payment in a bid item of the Contractors’ choice, as long as the chosen bid item is closely related.

C. The locations referenced in the bid item descriptions below are shown in more detail on the project plans,

2.02 BID ITEM DESCRIPTIONS

1. MOBILIZATION AND DEMOBILIZATION

The contractor shall include in this lump sum bid item full compensation for all labor, supervision, materials, tools, equipment and incidentals, and for all the work involved in mobilization, including, but not limited to, furnishing all specified contract bonds and insurance certificates, required project forms, public notification, transporting equipment, establishing a storage area, sanitary restroom facilities, and all other work not otherwise attributable to any specific bid item and as directed by the Engineer. This bid item includes surveying and staking as necessary to complete the work.

This bid item also includes all pedestrian and traffic control measures per the specifications and all work necessary to prepare and implement a Erosion and

MEASUREMENT AND PAYMENT 01125 - 4

Sediment Control Plan (ESCP) and erosion controls plan in conformance with the applicable permits, including the City’s NPDES permit for Storm Water Pollution Prevention.

No additional compensation will be allowed therefore. This item shall also include all costs necessary to demobilize at the conclusion of all work. This item may be paid in installments as determined by the Engineer.

2. SHEETING, SHORING, AND BRACING

Shall include all bracing, shoring, and sheathing for all excavation as necessary to protect workers pursuant to applicable safety orders and prevent movement of trench and adjacent improvements. This includes all work necessary to comply with OSHA, Cal OSHA, and California Labor Code Section 6707, including the preparation of an excavation safety plan. This item includes full compensation for completion of all planning, design, engineering fees, furnishing and construction, and removal and disposal of such temporary sheeting, shoring, and bracing, complete, as required under the provisions of any permits, and in accordance with the requirements of OSHA and the Construction Safety Orders of the State of California, pursuant to the provisions of Section 6707 of the California Labor Code.

Payment for shoring shall be by lump sum (LS) shall constitute full compensation for completion of all such work as required per contract documents.

3. MODIFY STORM DRAIN INLET

The unit price bid per each for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to furnish and properly modify existing catch basins as shown on the Plans and specified herein. This price includes locating and potholing utilities, excavation, bedding, backfill, dewatering, compaction, concrete, rebar reinforcement, removal of existing casting and installation of new solid bolt down storm drain casting and other items as required to facilitate the construction of the work.

This bid item is for modifying existing storm drain inlet MAGNOL665A.

4. 12-INCH OPEN TRENCH STORM DRAIN

The unit price bid per linear foot for the following bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to furnish and properly install new 12-inch fused HDPE storm drain pipe using open trench construction methods. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, site restoration, pipe fittings, CCTV inspection, and other items as required to facilitate the construction of the work.

This bid item also includes all demolition, removal, and disposal of existing storm drain pipes, excavated material, and appurtenances as necessary to facilitate the construction of the work.

5. STORM DRAIN INLET MAGNOL665C

The unit price bid per each for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to furnish and properly

MEASUREMENT AND PAYMENT 01125 - 5

install storm drain inlet MAGNOL665C as shown on the Plans and specified herein. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, site restoration, AC Paving, pipe connections, and other items as required to facilitate the construction of the work.

6. STORM DRAIN INLET MAGNOL665B

The unit price bid per each for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to furnish and properly install storm drain inlet MAGNOL665B as shown on the Plans and specified herein. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, site restoration, connection to adjacent new concrete channel, pipe connections, and other items as required to facilitate the construction of the work.

7. CONNECT PIPE TO EXISTING STORM DRAIN INLET

The unit price bid per each for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to connect the new storm drain pipe to an existing storm drain inlet as shown on the Plans. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, site restoration, modifying the existing storm drain inlet, new pipe penetration, and other items as required to facilitate the construction of the work.

8. REMOVE AND REPLACE CONCRETE CHANNEL

The unit price bid per linear foot for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to remove existing concrete channel over existing storm drain, and replace with new concrete channel as shown on the Plans. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, new reinforced concrete channel, site restoration, and other items as required to facilitate the construction of the work.

9. REMOVE AND REPLACE CONCRETE CURB AND DITCH

The unit price bid per linear foot for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to remove existing concrete curb and ditch, and replace with new concrete curb and ditch as shown on the Plans. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, new reinforced concrete curb and ditch, site restoration, and other items as required to facilitate the construction of the work.

10. REMOVE AND REPLACE CONCRETE PATHWAY / SIDEWALK

The unit price bid per linear foot for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to remove existing concrete pathway/sidewalk and replace with new concrete pathway/sidewalk as shown on the Plans. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, site restoration, and other items as required to facilitate the construction of the work.

MEASUREMENT AND PAYMENT 01125 - 6

11. REMOVE AND REPLACE CONCRETE CURB AND GUTTER

The unit price bid per linear foot for this bid item shall constitute full compensation for all material, labor, equipment, tools, and services necessary to remove existing curb and gutter and replace with new concrete curb and gutter as necessary for construction. This price includes locating and potholing utilities, excavation, dewatering, backfilling, compacting, site restoration, and other items as required to facilitate the construction of the work.

2.03 CONTRACTOR'S COST BREAKDOWN

A. The Contractor shall submit a Schedule of Values to the Engineer at the preconstruction conference. The price breakdown, as agreed upon by the Contractor and the Engineer, shall be used for preparing future estimates for partial payments to the Contractor, and shall list the major items of work with a price fairly apportioned to each item. Overhead and other general costs and profit shall be prorated to each item so that the total of the prices for all items equal the lump sum price.

B. The price breakdown shall be generally in the same format as the Contract specifications divisions and subdivisions, with major items of work listed individually. The price breakdown shall be by structural, civil, landscaping, or other logical division of work.

The price breakdown shall include separate allowances for any testing and startup work required. Measurable approximate quantities of work performed by the Contractor or its subcontractors shall be provided. For quantities that are the sum total of several individual quantities, backup summaries shall be provided which list the individual descriptions and quantities. These summaries will then be used to determine the quantities of work in place in subsequent progress payment requests.

C. The above is a statement of the intent of the Contract Documents to provide a moderate level of detail, acceptable to the Engineer, to allow a fair and reasonable estimate to be made of the value of work installed. The detail of the price breakdown must be sufficient to provide timely processing of the monthly progress payment request.

D. The price breakdown will be subject to the approval of the Engineer, and upon request, the Contractor shall substantiate the price for any or all items and provide additional level of detail, including quantities of work. The price breakdown shall be sufficiently detailed to permit its use by the Engineer as one of the bases for evaluating requests for payments. The Engineer shall be the sole judge of the adequacy of the price breakdown.

E. The Schedule of Values shall be solely used to determine progress payments. The Schedule of Values shall not be considered in determining payment or credit for additional or deleted work.

CONTRACTOR SUBMITTALS 01300 - 1

SECTION 01300

CONTRACTOR SUBMITTALS

PART 1 - GENERAL

1.01 GENERAL

A. Wherever submittals are required hereunder, all such submittals by the CONTRACTOR shall be submitted to the ENGINEER.

B. The City prefers to receive all submittals via electronic submission. Any submittal requiring a stamp or signature may be submitted on hard copy. Any video or picture submittals must be sent via an internet link used to download the files or on a USB drive.

C. Within 14 days after the date of commencement as stated in the Notice to Proceed or at Preconstruction Conference, which may occur within 10 days of the date of commencement, the CONTRACTOR shall submit the following items to the ENGINEER for review:

1. A preliminary schedule of Shop Drawings, Samples, and proposed Substitutes ("Or- Equal") submittals listed in the Bid.

2. A list of all permits and licenses the CONTRACTOR shall obtain indicating the agency required to grant the permit and the expected date of submittal for the permit and required date for receipt of the permit.

1.02 MEASUREMENT AND PAYMENT

A. Full compensation for conforming to the Provisions of this Section will be considered as included in the prices paid for the various items of Work and no additional compensation will be allowed, therefore.

1.03 SUBMITTAL TIMING

A. The CONTRACTOR shall submit the following items to the ENGINEER for review one week prior to the pre-construction conference:

1. Proposed construction schedule for entire project.

2. Proposed Traffic Control Plans (see Section 01120-1.09)

B. At the pre-construction conference referred to in the Special Provisions, the CONTRACTOR shall submit the following items to the ENGINEER for review:

1. A preliminary schedule of Shop Drawings, Samples, and proposed Substitute ("Or-Equal") submittals listed in the Bid.

2. A list of all permits and licenses the CONTRACTOR shall obtain indicating the agency required to grant the permit, the expected date of submittal for the permit, and required date for receipt of the permit.

3. Proposed Resident notification letter

4. A 21-day plan of operation.

5. Erosion and Sediment Control Plan (ESCP)

CONTRACTOR SUBMITTALS 01300 - 2

6. All other submittals as identified in the contract documents and as required to execute the work.

1.04 SHOP DRAWINGS

A. Wherever called for in the Contract Documents, or where required by the ENGINEER, the CONTRACTOR shall furnish to the ENGINEER for review, 4 copies of each shop drawing submittal. The term "Shop Drawings" as used herein shall be understood to include detail design calculations, shop drawings, fabrication, and installation drawings, erection drawings, list, graphs, catalog sheets, data sheets, and similar items. Whenever the CONTRACTOR is required to submit design calculations as part of a submittal, such calculations shall bear the signature and seal of an ENGINEER registered in the appropriate branch and in the state wherein the project is to be built, unless otherwise directed.

B. Normally, a separate transmittal form shall be used for each specific item or class of material or equipment for which a submittal is required. Transmittal of a submittal of various items using a single transmittal form will be permitted only when the items taken together constitute a manufacturer's "package" or are so functionally related that expediency indicates review of the group or package as a whole. A multiple-page submittal shall be collated into sets, and each set shall be stapled or bound, as appropriate, prior to transmittal to the ENGINEER.

C. Except as may otherwise be indicated herein, the ENGINEER will return prints of each submittal to the CONTRACTOR with its comments noted thereon, within 14 working days following their receipt by the ENGINEER. It is considered reasonable that the CONTRACTOR shall make a complete and acceptable submittal to the ENGINEER by the second submission of a submittal item. The OWNER reserves the right to withhold monies due to the CONTRACTOR to cover additional costs of the ENGINEER's review beyond the second submittal. The ENGINEER'S maximum review period for each submittal, including all resubmittals, will be 14 working days per submittal. In other words, for a submittal that requires two resubmittals before it is complete, the maximum review period for that submittal could be 28 working days. No extension of Contract Time will be granted for delays due to resubmittals that are reviewed within the number of days specified.

D. If the submittal is returned to the CONTRACTOR marked "NO EXCEPTIONS TAKEN," formal revision and resubmission of said submittal will not be required.

E. If the submittal is returned to the CONTRACTOR marked "MAKE CORRECTIONS NOTED," formal revision and resubmission of said submittal will not be required.

F. If the submittal is returned to the CONTRACTOR marked "REVISE AND RESUBMIT," the CONTRACTOR shall revise said submittal and shall resubmit the required number of copies of said revised submittal to the ENGINEER.

G. If a submittal is returned to the CONTRACTOR marked "REJECTED-RESUBMIT," the CONTRACTOR shall revise said submittal and shall resubmit the required number of copies of said revised submittal to the ENGINEER.

H. Fabrication of an item shall be commenced only after the ENGINEER has reviewed the pertinent submittals and returned copies to the CONTRACTOR marked either “NO EXCEPTIONS TAKEN” or “MAKE CORRECTIONS NOTED.” Corrections indicated on submittals shall be

CONTRACTOR SUBMITTALS 01300 - 3

considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis for changes to the contract requirements.

I. All CONTRACTOR shop drawings submittals shall be carefully reviewed by an authorized representative of the CONTRACTOR, prior to submittal to the ENGINEER. Each submittal shall be dated, signed, and certified by the CONTRACTOR, as being correct and in strict conformance with the Contract Documents. In the case of shop drawings, each sheet shall be so dated, signed, and certified. No consideration for review by the ENGINEER of any CONTRACTOR submittals will be made for any items which have not been so certified by the CONTRACTOR. All non-certified submittals will be returned to the CONTRACTOR without action taken by the ENGINEER, and any delays caused thereby shall be the total responsibility of the

CONTRACTOR.

J. The ENGINEER's review of CONTRACTOR shop drawings submittals shall not relieve the CONTRACTOR of the entire responsibility for the correctness of details and dimensions. The CONTRACTOR shall assume all responsibility and risk for any misfits due to any errors in CONTRACTOR submittals. The CONTRACTOR shall be responsible for the dimensions and the design of adequate connections and details.

1.05 CONTRACTOR'S SCHEDULE

A. Prepare construction schedule showing sequence of activities and proposed shutdowns.

B. Preliminary construction schedule submitted five days prior to Pre-Construction Meeting.

C. Update construction schedule on monthly basis and submit with request for Progress Payment.

1.06 RECORD DRAWINGS

A. The CONTRACTOR shall keep and maintain, at the job site, one record set of Drawings. On these, it shall mark all project conditions, locations, configurations, and any other changes or deviations which may vary from the details represented on the original Contract Drawings, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Contract Drawings. Said record drawings shall be supplemented by any detailed sketches as necessary or directed to indicate, fully, the WORK as actually constructed. These master record drawings of the CONTRACTOR's representation of as-built conditions, including all revisions made necessary by addenda and change orders shall be maintained up to date during the progress of the WORK.

B. Record drawings shall be accessible to the ENGINEER at all times during the construction period.

C. Final payment will not be acted upon until the CONTRACTOR prepared record drawings have been prepared and delivered to the ENGINEER. Said up-to date record drawings shall be in the form of a set of Contract Documents prints with any changes from the original Contract Documents carefully plotted on the prints in red ink.

CONTRACTOR SUBMITTALS 01300 - 4

D. Upon substantial completion of the WORK and prior to final acceptance, the CONTRACTOR shall finalize and deliver a complete set of record drawings to the ENGINEER for transmittal to the OWNER, conforming to the construction records of the CONTRACTOR. This set of drawings shall consist of corrected drawings showing the reported location of the WORK and shall become the property of the OWNER. The information submitted by the CONTRACTOR and incorporated by the ENGINEER into the Record Drawings will be assumed to be correct, and the CONTRACTOR shall be responsible for the accuracy of such information, and for any errors or omissions which may appear on the Record Drawings as a result.

HAZARDOUS MATERIALS CONDITIONS AND PROCEDURES 01354 - 1

SECTION 01354

HAZARDOUS MATERIALS CONDITIONS AND PROCEDURES

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. CONTRACTOR shall provide plans, procedures, and controls to be used when encountering hazardous substances during performance of the work.

CONTRACTOR shall perform all testing to determine if soil or ground water is contaminated. All costs associated with testing and disposing of contaminated soil, water or material shall be borne by the CONTRACTOR.

2. CONTRACTOR shall be solely responsible for compliance with all local, state, and federal laws pertaining to the testing, handling, storage, treatment, transportation, or disposal of any hazardous material relating to CONTRACTOR’s work on this project.

This is the start of the file's text. The full file is on GovTribe.