Bid Notice-Contract 25-321181 Electric Vehicle Supply Equipment - Edmonston Pumping Plant California Department of Water Resources San Diego_ San Diego County_ Project 13640.pdf
PDF 158 KB Posted
- Solicitation number
- CONTRACT: 25-321181; PROJECT: 13640
- Issued by
- San Diego County, San Diego City, California
About this file
This is a Bid Notice for Contract 25-321181 issued by the California Department of General Services on behalf of the California Department of Water Resources for electric vehicle supply equipment installation at the Edmonston Pumping Plant located in Mettler, Kern County, California. The project encompasses labor, materials, and services necessary to install and electrically connect EVSE infrastructure, including wiring devices and all associated components required for a complete and operational system with required testing. Work also includes saw cutting, trenching, backfilling, and finishing of affected lot surfaces, restoration to original condition, installation of bollards as needed, and installation of all items shown on drawings including ADA-accessible ports. A mandatory virtual pre-bid site inspection is scheduled for August 11, 2026, at 1:00 p.m. via Microsoft Teams, with full attendance required for bid eligibility. Bids must be submitted electronically to Pavan.Randhawa@dga.ca.gov by August 25, 2026, at 2:00 p.m. PDT. The contract term is 60 calendar days.
This project is restricted to Small Business and Micro Business contractors certified through the California Department of General Services, Office of Small Business and DVBE Services, in accordance with Government Code 14838.7. The state's estimated project cost is $210,100.00. Successful bidders must furnish payment and performance bonds, each in the amount of 100 percent of the contract price. A California C-10 Electrical Contractor license is required to bid. Contractors must submit valid Certificates of Reported Compliance (CRC) for any fleet vehicles subject to California Air Resources Board In-Use Off-Road Diesel-Fueled Fleet Regulations prior to contract execution. All contractors and subcontractors must comply with all applicable federal, state, and local health and safety mandates, with costs for compliance being the contractor's responsibility. Bid forms, plans, specifications, and addenda are available for download at caleprocure.ca.gov. The state's Project Director is Janelle Goulding at (916) 823-7059.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All businesses are encouraged to provide voluntary diversity data information in their CaleProcure profiles.
The data will help us shape policies and develop strategies to improve opportunities for all businesses to contract with the state.
Click HERE (https://fiscal.cdn.prismic.io/fiscal/394445b2-9d0e-40a3-b940- 9315c3783793_Diversity+Data+Procedures+%28Registered%29+%281%29.pdf) for instructions. More information is available on the Statewide Supplier Diversity Program (https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Statewide-Supplier- Diversity-Program/Statewide-Supplier-Diversity-Program) page.
Event Details
Event :
0000039692
CONTRACT: 25-321181; ELECTRIC VEHICLE
SUPPLY EQUIPMENT - EDMONSTON PUMPING
PLANT; CALIFORNIA DEPARTMENT OF WATER
RESOURCES;SAN DIEGO, SAN DIEGO COUNTY,
PROJECT: 13640
x
(mailto:?subject=Sharing Cal eProcure Event&body=I'm sharing a Cal eProcure Event with you, you can view it here: https%3A
Details
Event ID
0000039692
Format/Type:
Sell Event / RFx
Published Date
07/03/2026 7:00AM PDT
Dept:
Department of General Services
Event Version
Event End Date:
08/25/2026 2:00PM PDT
Description:
https://fiscal.cdn.prismic.io/fiscal/394445b2-9d0e-40a3-b940-9315c3783793_Diversity+Data+Procedures+%28Registered%29+%281%29.pdf https://fiscal.cdn.prismic.io/fiscal/394445b2-9d0e-40a3-b940-9315c3783793_Diversity+Data+Procedures+%28Registered%29+%281%29.pdf https://fiscal.cdn.prismic.io/fiscal/394445b2-9d0e-40a3-b940-9315c3783793_Diversity+Data+Procedures+%28Registered%29+%281%29.pdf https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Statewide-Supplier-Diversity-Program/Statewide-Supplier-Diversity-Program https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Statewide-Supplier-Diversity-Program/Statewide-Supplier-Diversity-Program https://www.dgs.ca.gov/PD/About/Page-Content/PD-Branch-Intro-Accordion-List/Statewide-Supplier-Diversity-Program/Statewide-Supplier-Diversity-Program mailto:?subject=Sharing%20Cal%20eProcure%20Event&body=I%27m%20sharing%20a%20Cal%20eProcure%20Event%20with%20you,%20you%20can%20view%20it%20here:%20%20https%3A%2F%2Fcaleprocure.ca.gov%2Fevent%2F7760%2F0000039692
STATE OF CALIFORNIA
DEPARTMENT OF GENERAL SERVICES
EXECUTIVE OFFICE ¿ SUSTAINABILITY
ADVERTISEMENT FOR BIDS
ELECTRIC VEHICLE SUPPLY EQUIPMENT - EDMONSTON PUMPING PLANT
CALIFORNIA DEPARTMENT OF WATER RESOURCES
METTLER, KERN COUNTY, CA
CONTRACT:25-321181; PROJECT:13640
This project is being bid in accordance with Government Code 14838.7 and is open only to Small Business and Micro Business contractors certified through the California Department of General Services, Office of Small Business and DVBE Services.
Bids shall be submitted electronically to Pavan.Randhawa@dga.ca.gov before August 25, 2026 2:00 P.M.
Project comprises labor, material and services necessary for: Major components of Project Work consist of install and electrically connect EVSE infrastructure to include wiring devices and all required associated items for a complete and operational system including required testing. Provide the required saw cutting, trenching, backfilling and finishing of the affected lot surface and restore to original condition. Bollards may be required on this contract even if not shown explicitly on the construction drawings. Provide and install all items shown on the drawings including the ADA accessible ports and as specified unless otherwise noted as not in contract or existing to remain.
License required to bid the project: C-10
Certificate of Reported Compliance (CRC) ¿ Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract.
More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link:
https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation
Health and Safety Provisions: Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. The term ¿employee¿, ¿worker¿, ¿state worker¿ or ¿state employee¿ in health and safety mandates includes contractor and subcontractor personnel.
Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request.
Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.
Prospective bidders must attend the mandatory virtual prebid site inspection tour on August 11, 2026 at 1:00 p.m., on Microsoft Teams. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid.
Virtual Pre-bid Site Inspection Link:
https://teams.microsoft.com/meet/286308397971785?p=sRU7gCRJSsPtdAVdKS
Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov/. Click on ¿Start Search.¿ In the Event name field, enter the project number and click search. While viewing the Event Details, click on ¿View Event Package¿ to view bid forms.
It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.
Drawings and Project Manual may also be viewed through Builders' Exchanges.
States estimated cost: $210,100.00. The term of this project is 60 calendar days.
The States Project Director is Janelle Goulding at (916) 823-7059.
View Event Package
View Vendor Ads
Contact Information
Pavan Randhawa Phone:
Email: pavan.randhawa@dgs.ca.gov (mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20-- %20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20% %20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AME 321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20 10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a Use%20Off- Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California% Use%20Off-Road%20Diesel- Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2 work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20s bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3F vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modific 7059.)
Pre Bid Conference mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submit%20a%20bid.%0AVirtual%20Pre-bid%20Site%20Inspection%20Link%3A%0Ahttps%3A%2F%2Fteams.microsoft.com%2Fmeet%2F286308397971785%3Fp%3DsRU7gCRJSsPtdAVdKS%0A%0ABid%20forms%2C%20plans%2C%20specifications%2C%20and%20addenda%20will%20be%20available%20for%20download%20at%20http%3A%2F%2Fwww.caleprocure.ca.gov%2F.%20Click%20on%20%C2%BFStart%20Search.%C2%BF%20In%20the%20Event%20name%20field%2C%20enter%20the%20project%20number%20and%20click%20search.%20While%20viewing%20the%20Event%20Details%2C%20click%20on%20%C2%BFView%20Event%20Package%C2%BF%20to%20view%20bid%20forms.%0A%0AIt%20is%20recommended%20that%20all%20vendors%20register%20as%20a%20bidder%20through%20the%20Cal%20eProcure%20website%20at%20https%3A%2F%2Fwww.caleprocure.ca.gov%2Fpages%2Fbidder-vendor.aspx.%20This%20will%20allow%20for%20automatic%20notifications%20if%20there%20is%20any%20modification%20to%20the%20Event%20such%20as%20the%20posting%20of%20an%20addendum%20or%20additional%20documentation.%0A%0ADrawings%20and%20Project%20Manual%20may%20also%20be%20viewed%20through%20Builders%27%20Exchanges.%20%0A%0AStates%20estimated%20cost%3A%20%24210%2C100.00.%20The%20term%20of%20this%20project%20is%2060%20calendar%20days.%C2%A0%20%0AThe%20States%20Project%20Director%20is%20Janelle%20Goulding%20at%20(916)%20823-7059.
mailto:pavan.randhawa@dgs.ca.gov?subject=0000039692%20--%20STATE%20OF%20CALIFORNIA%0ADEPARTMENT%20OF%20GENERAL%20SERVICES%0AEXECUTIVE%20OFFICE%20%C2%BF%20SUSTAINABILITY%0A%0AADVERTISEMENT%20FOR%20BIDS%0A%0AELECTRIC%20VEHICLE%20SUPPLY%20EQUIPMENT%20-%20EDMONSTON%20PUMPING%20PLANT%0ACALIFORNIA%20DEPARTMENT%20OF%20WATER%20RESOURCES%0AMETTLER%2C%20KERN%20COUNTY%2C%20CA%0ACONTRACT%3A25-321181%3B%20PROJECT%3A13640%0A%0AThis%20project%20is%20being%20bid%20in%20accordance%20with%20Government%20Code%2014838.7%20and%20is%20open%20only%20to%20Small%20Business%20and%20Micro%20Business%20contractors%20certified%20through%20the%20California%20Department%20of%20General%20Services%2C%20Office%20of%20Small%20Business%20and%20DVBE%20Services.%0A%0ABids%20shall%20be%20submitted%20electronically%20to%20Pavan.Randhawa%40dga.ca.gov%20before%20August%2025%2C%202026%202%3A00%20P.M.%0A%0AProject%20comprises%20labor%2C%20material%20and%20services%20necessary%20for%3A%20Major%20components%20of%20Project%20Work%20consist%20of%20install%20and%20electrically%20connect%20EVSE%20infrastructure%20to%20include%20wiring%20devices%20and%20all%20required%20associated%20items%20for%20a%20complete%20and%20operational%20system%20including%20required%20testing.%20Provide%20the%20required%20saw%20cutting%2C%20trenching%2C%20backfilling%20and%20finishing%20of%20the%20affected%20lot%20surface%20and%20restore%20to%20original%20condition.%20Bollards%20may%20be%20required%20on%20this%20contract%20even%20if%20not%20shown%20explicitly%20on%20the%20construction%20drawings.%20Provide%20and%20install%20all%20items%20shown%20on%20the%20drawings%20including%20the%20ADA%20accessible%20ports%20and%20as%20specified%20unless%20otherwise%20noted%20as%20not%20in%20contract%20or%20existing%20to%20remain.%20%0A%0ALicense%20required%20to%20bid%20the%20project%3A%20C-10%0A%0ACertificate%20of%20Reported%20Compliance%20(CRC)%20%C2%BF%20Fleet%20Vehicles%3A%20As%20a%20condition%20of%20Contract%20award%2C%20prior%20to%20Contract%20execution%2C%20Contractor%20shall%20submit%20copies%20of%20the%20valid%20CRCs%20for%20any%20fleet%20retained%20by%20the%20Contractor%20or%20any%20listed%20Subcontractor%2C%20for%20which%20any%20vehicles%20subject%20to%20the%20California%20Air%20Resources%20Board%20In-Use%20Off-Road%20Diesel%20Fueled%20Fleet%20Regulations%2C%20Section%202449(i)%2C%20Title%2012%2C%20California%20Code%20of%20Regulations%2C%20are%20used%20in%20the%20completion%20of%20the%20work%20included%20in%20the%20Contract.%0AMore%20information%20on%20the%20In-Use%20Off-Road%20Diesel-Fueled%20Fleets%20Regulation%20can%20be%20found%20at%20the%20following%20link%3A%20https%3A%2F%2Fww2.arb.ca.gov%2Four-work%2Fprograms%2Fuse-road-diesel-fueled-fleets-regulation%0A%0AHealth%20and%20Safety%20Provisions%3A%20Contractor%20and%20all%20subcontractors%20shall%20abide%20by%20all%20health%20and%20safety%20mandates%20issued%20by%20federal%2C%20state%2C%20and%20local%20governments%20and%2For%20public%20health%20officers%20as%20well%20as%20those%20issued%20by%20DGS%2C%20and%20worksite%20specific%20mandates.%20If%20multiple%20mandates%20exist%2C%20the%20Contractor%20and%20subcontractors%20shall%20abide%20by%20the%20most%20restrictive%20mandate.%20The%20term%20%C2%BFemployee%C2%BF%2C%20%C2%BFworker%C2%BF%2C%20%C2%BFstate%20worker%C2%BF%20or%20%C2%BFstate%20employee%C2%BF%20in%20health%20and%20safety%20mandates%20includes%20contractor%20and%20subcontractor%20personnel.%20%0A%0ACosts%20associated%20with%20adhering%20to%20health%20and%20safety%20mandates%20are%20the%20responsibility%20of%20the%20Contractor.%C2%A0%20Contractor%20is%20responsible%20for%20the%20tracking%20and%20compliance%20of%20health%20and%20safety%20mandates%20and%20may%20be%20audited%20upon%20request.%20%0A%0ASuccessful%20bidder%20shall%20furnish%20payment%20and%20performance%20bonds%2C%20each%20in%20the%20amount%20of%20100%20percent%20of%20the%20Contract%20price.%0A%0AProspective%20bidders%20must%20attend%20the%20mandatory%20virtual%20prebid%20site%20inspection%20tour%20on%20August%2011%2C%202026%20at%201%3A00%20p.m.%2C%20on%20Microsoft%20Teams.%20Attendance%20for%20the%20entire%20inspection%20is%20required%20in%20order%20for%20bidders%20to%20be%20eligible%20to%20submi…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .