Cold-In-Place Recycling - SR-234 Contract Summary
This is a Bid Notice issued by the Indiana Department of Transportation (INDOT) for a Cold-In-Place Recycling construction project located in Fountain County on State Road 234 from SR-63 to 2.5 miles west of US-41, with work also extending into Parke and Vermillion counties. The project involves comprehensive roadway rehabilitation including milling, cold-in-place recycling, pavement reconstruction, drainage improvements, guardrail installation, erosion and sediment control, and traffic control measures. The contract includes 111 line items with varying quantities, including approximately 114,427 square yards of cold-in-place recycling, 14,508 tons of HMA surface course, 131,892 square yards of asphalt milling, and extensive traffic control signage and temporary pavement markings. The bid letting date is May 7, 2026, at 10:00 AM at the Indiana Government Center North in Indianapolis. A pre-bid meeting location is identified in the Crawfordsville District. The project has multiple intermediate completion dates: October 31, 2026 (for sections 246+75 to 48+20 and 51+84 to 270+65), November 30, 2026 (for tree clearing), and a final completion date of May 31, 2028, with liquidated damages ranging from $1,000 to $3,000 per day depending on the completion milestone.
Pricing is submitted on a unit price basis for individual line items, with a lump sum required for Construction Engineering, Mobilization and Demobilization, Stormwater Management Implementation, Inertial Profiler HMA work, and Retro-Reflectivity Testing. The contract establishes a Disadvantaged Business Enterprise (DBE) contract provision goal, though the specific percentage is not clearly specified in the document. The initial payment for clearing right-of-way is limited to a specified percentage of the original total bid. The project is funded through Federal-Aid Highway funding, requiring compliance with Davis-Bacon prevailing wage determinations (General Decision Number IN20250006), Federal Highway Administration Form FHWA-1273 requirements, and Executive Order 11246 nondiscrimination provisions. The contract incorporates the 2026 INDOT Standard Specifications effective September 1, 2025, and references INDOT Qualified Materials Lists and Certified Sources Lists. The consulting firm managing the project is EGIS Group (Brett Walls, 317-806-2414), with INDOT Project Manager Jessica Massing (765-361-5243) and Area Engineer Brian Newman (765-918-6727) providing oversight.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDIANA
DEPARTMENT OF TRANSPORTATION
CONTRACT INFORMATION
BOOK (CIB)
PART I
CONTRACT NO.
LETTING DATE:
Certified By:
Date:
Covering Items in Table of Contents, PART I For Release for Bidding Purposes
R -43687-A
MAY 7, 2026
4-1-2026
CONTRACT INFORMATION
TABLE OF CONTENTS
CONTRACT NO.
This book shall be examined to determine that each page set out in the Contract Information Table of Contents, and the Special Provisions Table of Contents is attached, legible, and current.
PART I PAGES
PROPOSAL PAGE 1
SCHEDULE OF PAY ITEMS 1 –
RECURRING PLAN DETAILS 1 -
TRAFFIC CONTROL DEVICE REPORT 1
SPECIAL PROVISIONS 1 –
PART II
CONTACTS FOR DISTRICT PERSONNEL ONLY
Contractors shall submit contract specific questions by completing the Question Form accessed from http://entapps.indot.in.gov/cqa/ The Department will attempt to have an answer on-line within two business days. Contract specific questions asked by any other method will not be answered by the Department.
Retrieve the Question and Answer Form for a specific contract by going on–line in the same manner you retrieve Contract Information Books and Plans. http://erms.indot.in.gov/viewdocs/ will display the interface used for selection of contract letting documents. For the document category, Select "Q and A Form".
CONTRACT SPECIFIC QUESTIONS
R -43687-A
(intentionally left blank) --
CONSULTING FIRM: EGIS GROUP PHONE: 317-806-2414
CONSULTING FIRM CONTACT: BRETT WALLS 317-806-2414
EMAIL: brett.walls@egis-group.com
PROJECT MANAGER: JESSICA MASSING PHONE: 765-361-5243
AREA ENGINEER: BRIAN NEWMAN PHONE: 765-918-6727
EMAIL: bnewman@indot.IN.gov
DBE GOAL: A contract provision goal of percent of the contract bid price has been established as the minimum amount for contracting to disadvantaged business enterprises.
The initial payment for clearing right-of-way will be limited to % of the original total bid.
Indiana Department of Transportation
10:00 AM
Date of Letting:
Location of Letting: INDIANA GOVERNMENT CENTER NORTH
100 N. SENATE AVENUE, N758-CONTRACTS
INDIANAPOLIS, IN 46204
May 07, 2026 Time of Letting:
Proposal
0.00
R -43687-A
Counties:
Districts:
FOUNTAIN, PARKE, VERMILLION
Not Applicable
COLD-IN-PLACE RECYCLING
Pre-Bid Meeting Date:
Contract Number: Crawfordsville
Description:
The following documents are included in the Contract:
2026 INDOT Standard Specifications effective 9-1-2025 INDOT Standard Drawings listed on Standard Drawings Index effective 9-1-2025 INDOT Qualified Materials Lists and Certified Sources Lists Pre-bid Questions and Answers published on the INDOT website
Additional reference material may be available on the INDOT website, which may include, but is not limited to permits, asbestos reports, geotechnical reports and utilities information. The contractor shall consider the available additional reference material when preparing their proposal bid.
Location: ON SR 234 FROM SR 63 TO 2.5 MILES WEST OF US 41
1.0
Project Control No. LocationFederal/State No.
2100194 COLD-IN-PLACE RECYCLING2100194
FOUNTAIN COUNTY - ON SR 234 FROM SR 63 TO 2.5 MILES WEST
OF US 41
Time ID Completion Date or Number of Units Time Type Liquidated Damages RateDescription
00 5/31/2028 DT $3,000.00 per DayCOMPLETION DATE
01 10/31/2026 DT $2,500.00 per DayINTERMEDIATE
COMPLETION DATE 246+75
TO 48+20
02 11/30/2026 DT $1,000.00 per DayINTERMEDIATE
COMPLETION DATE TREE
CLEARING
03 10/31/2027 DT $2,500.00 per DayINTERMEDIATE
COMPLETION DATE 51+84
TO 270+65
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
3/24/2026 11:13 AM
Letting Date: May 07, 2026Indiana Department of Transportation
Proposal ID: R -43687-A Project(s): 2100194
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
LUMP SUMLUMP SUM _________._____
0001 105-06845
CONSTRUCTION ENGINEERING
1.00 1.00 0002 109-08359
LIQUIDATED DAMAGES DOL
1.000
1.00 1.00 0003 109-08360
CONTRACT LIENS DOL
1.000
1.00 1.00 0004 109-08440
QUALITY ADJUSTMENTS, HMA DOL
1.000
1.00 1.00 0005 109-08443
QUALITY ADJUSTMENTS,
TEMPORARY TRAFFIC CONTROL
DEVICES
DOL
1.000
1.00 1.00 0006 109-08444
QUALITY ADJUSTMENTS, FAILED
MATERIALS
DOL
1.000
1.00 1.00 0007 109-09377
QUALITY ADJUSTMENTS, PAVEMENT
TRAFFIC MARKINGS
DOL
1.000
1.00 1.00 0008 109-11362
QUALITY ADJUSTMENTS, FAILURE TO
MAINTAIN TEMPORARY EROSION
AND SEDIMENT CONTROL
MEASURES
DOL
1.000
LUMP SUMLUMP SUM _________._____
0009 110-01001
MOBILIZATION AND DEMOBILIZATION
LUMP SUMLUMP SUM _________._____
0010 201-52370
CLEARING RIGHT-OF-WAY
0011 202-02271
HEADWALL, REMOVE EACH
7.000
0012 202-91385
INLET, REMOVE EACH
2.000
Schedule of Pay Items Page 1 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0013 202-93741
GUARDRAIL END TREATMENT,
REMOVE
EACH
13.000
0014 202-96133
PIPE, REMOVE LFT
719.000
0015 202-99187
FENCE, FARM FIELD, REMOVE LFT
70.000
0016 203-02000
EXCAVATION, COMMON CYS
4,040.000
0017 203-08607
LINEAR GRADING LFT
2,450.000
0018 205-11626
PUMP AROUND EACH
11.000
1.00 93,682.00 0019 205-12108
STORMWATER MANAGEMENT
BUDGET
DOL
93,682.000
LUMP SUMLUMP SUM _________._____
0020 205-12616
STORMWATER MANAGEMENT
IMPLEMENTATION
0021 207-09935
SUBGRADE TREATMENT, TYPE IC SYS
2,073.000
0022 211-09265
STRUCTURE BACKFILL, TYPE 2 CYS
599.000
0023 211-09268
STRUCTURE BACKFILL, TYPE 5 CYS
29.000
0024 214-11796
GEOGRID, TYPE IB SYS
574.000
0025 301-12233
COMPACTED AGGREGATE, NO. 8 CYS
203.000
Schedule of Pay Items Page 2 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0026 303-01180
COMPACTED AGGREGATE, NO. 53 TON
8,008.000
0027 304-07493
WIDENING WITH HMA, TYPE B TON
272.000
0028 304-12623
HMA PATCHING, FULL DEPTH, TYPE B TON
1,075.000
0029 306-08036
MILLING, ASPHALT, 2 IN. SYS
131,892.000
0030 306-08042
MILLING, SCARIFICATION SYS
114,427.000
0031 306-08432
MILLING, APPROACH SYS
3,642.000
0032 306-11872
MILLING, PROFILE SYS
114,427.000
0033 401-000002
QC/QA-HMA, 3, 58S, SURFACE, 9.5
mm
TON
14,508.000
0034 401-11526
JOINT ADHESIVE LFT
719.000
LUMP SUMLUMP SUM _________._____
0035 401-12169
INERTIAL PROFILER, HMA
0036 401-12439
VOID REDUCING ASPHALT
MEMBRANE FOR HMA
LFT
75,787.000
0037 402-07451
HMA WEDGE AND LEVEL, TYPE B TON
156.000
0038 406-05520
ASPHALT FOR TACK COAT TON
47.000
0039 408-12028
CRACKS IN ASPHALT PAVEMENT, FILL TON
1.000
Schedule of Pay Items Page 3 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0040 416-12129
COLD IN-PLACE RECYCLING SYS
114,427.000
0041 416-12262
CORRECTIVE AGGREGATE, CIR TON
1,589.000
0042 416-12263
STABILIZING MATERIAL, ASPHALT
EMULSION
TON
644.000
0043 416-12468
STABILIZING MATERIAL, PORTLAND
CEMENT
TON
99.000
0044 601-02241
GUARDRAIL, REMOVE LFT
1,982.000
0045 601-12281
GUARDRAIL, MGS W-BEAM, 6 FT 3 IN.
SPACING
LFT
1,475.000
0046 601-12292
GUARDRAIL TRANSITION, MGS
WITHOUT CURB
EACH
13.000
0047 601-94689
GUARDRAIL END TREATMENT, TYPE
OS
EACH
13.000
0048 603-06040
FENCE, FARM FIELD, 47 IN. LFT
101.000
0049 606-12399
MILLED HMA CORRUGATIONS,
CONVENTIONAL
LFT
27,726.000
0050 606-12400
MILLED HMA CORRUGATIONS,
SINUSOIDAL
LFT
43,441.000
0051 610-07487
HMA FOR APPROACHES, TYPE B TON
300.000
Schedule of Pay Items Page 4 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0052 615-06490
RIGHT-OF-WAY MARKER EACH
42.000
0053 615-06505
MONUMENT, TYPE B EACH
64.000
0054 615-06510
MONUMENT, TYPE C EACH
4.000
0055 615-06527
MONUMENT, SECTION CORNER EACH
2.000
0056 616-05688
RIPRAP, CLASS 1 TON
77.000
0057 616-05689
RIPRAP, CLASS 2 TON
19.000
0058 616-06405
RIPRAP, REVETMENT TON
510.000
0059 616-12246
GEOTEXTILE FOR RIPRAP, TYPE 1A SYS
1,069.000
0060 616-12248
GEOTEXTILE FOR RIPRAP, TYPE 2A SYS
983.000
0061 621-01004
MOBILIZATION AND DEMOBILIZATION
FOR SEEDING
EACH
4.000
0062 621-06559
MULCHED SEEDING, TYPE R SYS
2,216.000
0063 621-06560
MULCHED SEEDING, TYPE U SYS
372.000
0064 628-09403
FIELD OFFICE, TYPE C MOS
24.000
0065 628-11976
COMPUTER SYSTEM EQUIPMENT EACH
1.000
Schedule of Pay Items Page 5 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0066 629-000149
TOPSOIL PROCESSING AND
DISTRIBUTION
SYS
2,588.000
1.00 5,176.00 0067 629-000150
TOPSOIL AMENDMENT BUDGET DOL
5,176.000
0068 714-11192
STRUCTURE, REINFORCED
CONCRETE, BOX SECTIONS, 4 FT X 3
FT
LFT
68.000
0069 714-11197
STRUCTURE, REINFORCED
CONCRETE, BOX SECTIONS, 3 FT X 2
FT
LFT
94.000
0070 715-05119
PIPE, TYPE 1, CIRCULAR, DIAMETER
15 IN.
LFT
34.000
0071 715-05121
PIPE, TYPE 1, CIRCULAR, DIAMETER
18 IN.
LFT
195.000
0072 715-05123
PIPE, TYPE 1, CIRCULAR, DIAMETER
24 IN.
LFT
44.000
0073 715-05124
PIPE, TYPE 1, CIRCULAR, DIAMETER
27 IN.
LFT
105.000
0074 715-05127
PIPE, TYPE 1, CIRCULAR, DIAMETER
42 IN.
LFT
64.000
0075 715-05233
PIPE, TYPE 1, DEFORMED, MIN. AREA
3.3 SFT
LFT
91.000
0076 715-05325
PIPE, TYPE 2, DEFORMED, MIN. AREA
1.0 SFT
LFT
46.000
Schedule of Pay Items Page 6 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0077 715-05595
PIPE EXTENSION, CIRCULAR,
DIAMETER 15 IN. , CORRUGATED
METAL
LFT
4.000
0078 715-08305
HMA FOR STRUCTURE
INSTALLATION, TYPE B
TON
252.000
0079 715-09064
VIDEO INSPECTION FOR PIPE LFT
745.000
0080 715-46005
PIPE END SECTION, DIAMETER 15 IN. EACH
3.000
0081 715-46010
PIPE END SECTION, DIAMETER 18 IN. EACH
6.000
0082 715-46020
PIPE END SECTION, DIAMETER 24 IN. EACH
2.000
0083 715-46025
PIPE END SECTION, DIAMETER 27 IN. EACH
3.000
0084 715-46045
PIPE END SECTION, MIN. AREA 1.1
SFT
EACH
1.000
0085 718-12307
GEOTEXTILE FOR UNDERDRAINS,
TYPE 2A
SYS
300.000
0086 720-02442
PIPE, PLUG EXISTING EACH
1.000
0087 720-45030
INLET, TYPE E7 EACH
1.000
0088 801-04308
ROAD CLOSURE SIGN ASSEMBLY EACH
17.000
0089 801-06209
TEMPORARY PAVEMENT MARKING,
REMOVABLE, 6 IN.
LFT
57,759.000
Schedule of Pay Items Page 7 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0090 801-06211
TEMPORARY PAVEMENT MESSAGE
MARKING, REMOVABLE, LANE
INDICATION ARROW
EACH
2.000
0091 801-06218
TEMPORARY TRANSVERSE
PAVEMENT MARKING, REMOVABLE,
24 IN.
LFT
26.000
0092 801-06625
DETOUR ROUTE MARKER ASSEMBLY EACH
38.000
0093 801-06640
CONSTRUCTION SIGN, TYPE A EACH
66.000
0094 801-06645
CONSTRUCTION SIGN, TYPE B EACH
6.000
LUMP SUMLUMP SUM _________._____
0095 801-06775
MAINTAINING TRAFFIC
0096 801-07118
BARRICADE, TYPE III-A LFT
288.000
0097 801-07119
BARRICADE, TYPE III-B LFT
168.000
0098 802-05704
SIGN POST, SQUARE, TYPE 1,
UNREINFORCED ANCHOR BASE
LFT
43.000
0099 802-07059
SIGN, SHEET, AND SUPPORTS,
REMOVE
EACH
5.000
0100 802-09838
SIGN, SHEET, WITH LEGEND, 0.080
IN. THICKNESS
SFT
16.000
0101 802-09840
SIGN, SHEET, WITH LEGEND, 0.100
IN. THICKNESS
SFT
16.000
Schedule of Pay Items Page 8 of 9
1 COLD-IN-PLACE RECYCLINGSECTION:
Alt Set ID: Alt Mbr ID:
Unit Price Bid Amount Approximate Quantity and
UnitsDescription Item ID
Proposal Line
Number
0102 802-76055
SIGN POST, TYPE A LFT
16.000
0103 804-93726
DELINEATOR EACH
6.000
LUMP SUMLUMP SUM _________._____
0104 808-09381
RETRO-REFLECTIVITY TESTING
0105 808-12764
LINE, PAINT, BROKEN, YELLOW, 6 IN. LFT
8,483.000
0106 808-75007
LINE, PAINT, SOLID, WHITE, 6 IN. LFT
96,137.000
0107 808-75047
LINE, PAINT, SOLID, YELLOW, 6 IN. LFT
49,276.000
0108 808-75297
TRANSVERSE MARKING,
THERMOPLASTIC, STOP LINE,
WHITE, 24 IN.
LFT
26.000
0109 808-75320
PAVEMENT MESSAGE MARKING,
THERMOPLASTIC, LANE INDICATION
ARROW
EACH
2.000
0110 808-75996
SNOWPLOWABLE RAISED PAVEMENT
MARKER, REMOVE
EACH
876.000
0111 808-75998
SNOWPLOWABLE RAISED PAVEMENT
MARKER
EACH
118.000
Section: 1 _________._____Total:
Schedule of Pay Items Page 9 of 9
02-01-15
103-C-584d
103-C-584d DBE JOINT CHECK REQUEST FORM
(Revised 12-11-14)
INDIANA DEPARTMENT OF TRANSPORTATION
DBE JOINT CHECK REQUEST FORM
Name of DBE Contract Number
Name of Prime Contractor Item Number(s)
Name of Material Supplier
INDOT will closely monitor the use of joint checks. To receive DBE credit for performing a commercially useful function with respect to obtaining materials and supplies, a DBE must “be responsible for negotiating price, determining quality and quantity, ordering the material and installing (where applicable) and paying for the material itself.” Only when a DBE meets all of these requirements should credit be counted for the procurement of the items by the DBE. Please refer to the attached Procedures for Using Joint Checks under the Disadvantaged Business Program for qualifying conditions. If proper procedures are not followed or INDOT determines that the arrangement results in lack of independence for the DBE involved, no credit for the DBE’s participation as it relates to the material cost will be counted toward the contract goal requirement.
I have read and understand the above information and have attached a copy of the Joint Check Agreement relating to this request. I hereby acknowledge that the information provided on this form is true and accurate.
Authorized DBE Representative
Signature Title Date
Authorized Prime Contractor Representative
Signature Title Date
Authorized Material Supplier Representative
Signature Title Date
INDOT USE ONLY
Date Received: INDOT Representative:
Approved Denied Note: Do not process this request without a signed copy (all parties) of the Joint Check Agreement, statement of history, and any related policies.
Comments:
Please send the DBE Joint Check Request Form and supporting documentation to promptpayment@indot.in.gov 1
1 Updated March 22, 2021
CRAWFORDSVILLE DISTRICT CONTRACT NO. R -43687
02-01-15
103-C-584d
INDIANA DEPARTMENT OF TRANSPORTATION
PROCEDURES FOR USING JOINT CHECKS UNDER THE DISADVANTAGED BUSINESS
ENTERPRISE (DBE) PROGRAM
A joint check is a “two party” check payable to two parties. Typically, a joint check is issued by a prime contractor to a subcontractor and to a material supplier or another third party for items or services to be incorporated into a project.
INDOT understands that prime contractors, subcontractors and suppliers may wish to use joint check arrangements for a variety of legitimate reasons, such as assuring that timely payment will be for the supplier’s items or dealing with situations in which it is difficult for a subcontractor to obtain bonding at a competitive rate. However, INDOT also understands that that the use of joint checks can raise questions about whether it is proper to count DBE credit for the items purchased using the joint check.
When joint checks are utilized, DBE credit toward the contract goal will only be allowed when the DBE is performing a “commercially useful function” in accordance with 49 CFR 26.55(c)(1):
“A DBE performs a commercially useful function when it is responsible for execution of the work of the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. To perform a commercially useful function, the DBE must also be responsible, with respect to the materials and supplies used on the contract, for negotiating price, determining quality and quantity, ordering the material, and installing (where applicable), and paying for the material itself.”
The following conditions will apply to payments to DBE subcontractors and material vendors using joint checks. INDOT will closely monitor the use of joint checks to ensure that such a practice does not erode the independence of the DBE nor inhibit the DBE’s ability to perform a commercially useful function. Joint checks will not be allowed simply for the convenience of the prime contractor. Failure to follow these conditions may disqualify DBE participation or adversely impact a contractor’s bidding status.
1. Any implementation of a Joint Check Agreement must first be approved by INDOT and requested by the DBE involved using the DBE Joint Check Request Form provided by INDOT;
2. A formalized Joint Check Agreement between the parties involved (including the conditions of the arrangement and expected use of the joint checks) must accompany the DBE Joint Check Request Form;
3. Each party to the Joint Check Agreement must also submit a statement of its history in using joint checks and any related policies with the DBE Joint Check Request Form;
4. Joint checks should be focused on accomplishing the procurement of materials needed for a particular purpose at a particular time (i.e., contract specific).
5. Even with joint checks, the DBE will remain responsible for the other elements of 49 CFR 26.55(c)(1);
6. No requirement by the prime contractor that the DBE is to use a specific supplier nor the prime contractors “negotiated” price;
7. DBE must release the joint check to the material supplier (upon determining that the material supplier or other third party has fulfilled its responsibilities under the contract);
8. DBEs must be more than an extra participant in releasing the check to the material supplier;
9. Prime contractors must make joint checks available to all contract participants, and may not be restrictive to any one participant; and
10. All parties involved in a formalized joint check agreement must provide INDOT (upon request) with any documentation deemed necessary to substantiate compliance.
Storm Water, Erosion, and Sediment Control Inspection Report INDOT (4-2012)
Project Information
INDOT Lead Des Number: Inspection Type Inspection Date:
Contract Number: 024 hr (After a > 0.5" Event) Date of Last Precipitation:
Road/County: []weekly DQAlQC Amount of Last Precipitation:
Areas Inspected
Area Type Inspected Area Type Inspected Area Inspected ,;INA ';INA Type -/INA
Disturbed Areas Areas where Water Leaves the Erosion Project Site Controls
Material Storage Areas Other: Sediment Controls
How was inspection conducted? (check D Windshield D Walking D Other all that apply)
Stationing Inspected Sta. to Sta. to Sta. to [JEntire Project DSelect Stations: Sta. Sta. Sta.
Part A: Erosion and Sediment Control Best Management Practices (BMPs Ins}!ected Except for the instances listed below, all sediment and erosion controls have been inspected and were found to be in working order and do not require maintenance or conective actions.
BMPType Approximate Station
(see table on From To page 3)
Survey Line: Left, BMP Maintenance or Corrective Action Needed Right or centerline Describe required corrective actions, maintenance, additions, or directions. Along with description provide image filename here for any reference pictnres provided.
Page 1 of5
108-C-192d
Storm Water, Erosion, and Sediment Control Inspection Report
Part B: Additional Quantities or Additional BMPs Needed
INDOT
(4-2012)
Any additional control quantities or new BMPs not shown on the SWPPP must be approved by the PEIPS. If multiple locations are involved, identify the exact location of each addition. Justification for the measure must be provided.
BMPType Approximate Station Survey Line: Left, Description/Justification for the additional BMPs (see table on From To
Right or centerline Along with description provide image filename here for any pa2e 3) reference pictures provided.
Part C: Temporarily or Permanently Suspended Construction Activities Where construction activities (grading, excavating, embankment filling, or other land disturbing activities have been suspended either temporarily or permanently, describe why stabilization measures were not initiated within 7 days.
BMPType Approximate Station Survey Line: Left, Description (see table on From To Right or centerline Along with description provide image ftlename here for any pa2e 3) reference pictures provided.
Part D: Compliance Evaluation (check only one) yWith the maintenance and improvement actions noted, the areas inspected will meet the intent of the Erosion and Sediment ontrol Plan and INDOT contract documents and specifications related to temporary erosion and sediment control.
q The areas inspected are not meeting the intent and are in potential noncompliance with the Erosion and Sediment Control Plan and/or INDOT contract documents and specifications related to temporary erosion and sediment control. There is off site sedimentation and/or a high potential for off-site sedimentation on this project. (If this box is checked, complete the following "Part E: Potential Noncompliance Issues" section of this form)
BMPType (see table on page 3)
Part E: Potential Noncompliance Issues Approximate Station
From To
Survey Line: Left, Describe the potential noncompliance issue(s) e.g. failure to
Right or centerline adequately inspect the project, repeated failure of a BMP, failure to install a required BMP, a visible off-site discharge of material (silt, sand, oily water, etc.), or potential off-site discharges or potential failures.
Page 2 of5
108-C-192d
Storm Water, Erosion, and Sediment Control Inspection Report
Part F: Inspection Certification
INDOT
(4-2012)
I certifY that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assme that qualified personnel properly gather and evaluate the infOlmation submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accmate, and complete.
Inspector Name Printed: I Company: I Title: I Date:
Inspector Signature:
If evaluating an inspection performed by another inspector, please check one of the following boxes:
o I concur with the inspector 0 I do not concur with the inspector (please circle any findings that you do not agree with)
Owner Representative Name: Signature:
Date:
A pennanent copy must be filed with the project records and be provided to lNDOT or IDEM personnel according to requirements or upon request.
Table of Types of Erosion and Sediment Control Best Management Practices (BMPs) 1 Diversion Interceptor 8 Check Dam, 15 Filter Berm 22 Concrete Washout
Traversable
2 Temporary Seeding 9 Slope Drain 16 Filter Sock 23 Secondary Spill Containment
3 Permanent Sod or Seed 10 Splash Pad 17 Turbidity Curtain 24
4 Mulch (hydraulic 01' 11 Sediment Trap 18 Smface Roughening 25 bonded fiber mulch)
5 Straw Mulch 12 Sediment Basin 19 Vegetative Filter Strip 26 (blown/laid)
6 Manufactured Surface l3 Retention Pond 20 Inlet Protection 27 Protection Products
7 Check Dam 14 Silt Fence 21 Construction 28 entrance/exit cc: Prime Contractor Superintendent (add Prime Contractor OwnerlPresident when appropriate) INDOT Project Engineer (add INDOT Area Engineer when appropriate) INDOT District E&SC Specialist (add INDOT Central Office E&SC Specialist when appropriate)
Page 3 of5
108-C-192d
Storm Water, Erosion, and Sediment Control Inspection Report INDOT (4-2012)
Instructions for the Contractor's representative: Fill out this document completely including filling out the Project Information, Areas Inspected and Parts A, B, C, D, E and F the day of your field investigation and put it on file for the project. Submit the signed document to the INDOT project representative the same day. Always provide pictures to document site conditions observed in your report.
Instructions for INDOT's representative:
� When you receive a completed and signed inspection report as completed by the contractor, visit the site within 24 hours of receipt of the contractor's inspection to verify the contractor's fmdings. If you concur with the contractor's inspection, fill out part F and sign as the INDOT representative. If you don't concur with the contractor's inspection, fill out parts E, F and circle any areas where you believe the inspection misrepresented the site's state of compliance with the intent ofINDOT standards. If possible, provide pictures to document site conditions observed. Upon completion, sign under Part F, put it on file with the project and copy the prime contractor's representative.
� If you are completing this as an evaluation of an INDOT project without regard to the contractor's inspection, fill out all parts of the form including part D, E and sign as the inspector in part F. Always provide pictures to document site conditions observed in your report. Provide a copy to the INDOT PE/PS for the project and the Area Engineer. It is recommended that the inspection report be provided to the contractor immediately for their information (not their concurrence). It is also recommended another INDOT rep. visit the site within 24 hours to verify the inspection for their records and sign concurrence or non-concunence in Part F.
Additional Explanation:
• Part A - Only put BMPs in Part A that were deemed to be in need of maintenance or alteration. Do not provide a list of every BMP inspected on the project. The intent is to document only those which were deemed in need of maintenance or alteration in order to continue to meet the intent of the measure at the location.
• Part B - Only put additional BMPs not yet installed on the project site in Part B. These can be BMPs intended for a different construction phase of the project or BMPs planned for other areas of the project that make sense to be deployed at additional locations. This is also where recommendations of measures would occur that identify new BMPs not in the contract documents.
• Part C - This is a list of known bare/exposed areas of the project and the justification why they are remaining bare or exposed during the review period despite a lack of construction activities. This especially includes any areas that are or are planned to be exposed for greater than 7 days without immediate plans to stabilize.
• Part D - Checking that the project is not in compliance with the intent ofINDOT standards indicates that despite the additional maintenance measures and BMPs, the project's oversight is failing to ensure that sediment is prevented from leaving the project site or has the potential to leave the project site.
• Part E - List principles of storm water or erosion and sediment control that appear to be lacking on the proj ect which demonstrate the lack of oversight of the proj ect by qualified personnel.
• Part F - The "I certify" signature of the inspector is important in order to document whose opinion is being provided by the filling out of this form.
Page 4 of5
108-C-192d
BMPType (see table on pa2e 3)
Storm Water, Erosion, and Sediment Control Inspection Report
Approximate Station
From To
Additional Information for Part Left, Right or centerline
Page 5 of5
108-C-192d
Description
INDOT
(4-2012)
IN
D
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-245d RPD of 11
S h e e t o f
C O
N S
T R
U C
T
IO
N
E N
D
A H
E A
D
C O
N S
T R
U C
T
IO
N
R O
A D
R O
A D
W O
R K
E N
D
A H
E A
D
W O
R K
R O
A D
O B
S O
L E
T E
S
IG
N S
R E
P L
A C
E M
E N
T S
IG
N
S
X W
-1 -A x
X W
-1 x
X W
-1 A x
X W
-1 -A x
X W
-1 x
X W
-1 A x
X G
-2 x
X G
-2 x
X G
-2
A
X
R O
A D
W O
R K
A H
E A
D S
IG
N
S
R O
A D
C O
N S
T R
U C
T
IO
N A
N re p la c e d w it h a n
E N
D R
O A
D W
O R
K s ig n
A n
E
N D
C O
N S
T R
U C
T
IO
N s ig n s h o w n o n t h e p la n s s h a ll b e
W
O R
K A
H E
A D o r R
O A
D W
O R
K X
F T s ig n
X
F T s ig n s h o w n o n t h e p la n s s h a ll b e r e p la c e d w it h a
R
O A
D
A
R O
A D
C O
N S
T R
U C
T
IO
N A
H E
A D o r
"R O
A D
C O
N S
T R
U C
T
IO
N
-T
C L
C -1
-T
C L
C -1
-T
C L
C -1
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
P A
R -0
-T C
L C
-0
-T
C T
C -0
-T
C F
O -0
-T
C T
C -0
-T
C F
O -0
-T
C S
C -0
-T
C F
O -0
-T
C S
C -0
-T
C F
O -0
-T
C S
C -0
-T
C F
O -0
-T
C S
C -0
-T C
C O
-0
-T
C S
C -0
-T C
T R
-0 in t h e F
H W
A S ta n d a rd
H ig h w a y S ig n s e d it io n re p la c e m e n t s ig n s s h o w n o n t h is s h e e t a n d f u rt h e r d e ta il e d fo ll o w in g S ta n d a rd
D ra w in g s s h a ll b e s u p e rs e d e d b y t h e
T h e X
W
-1 a n d X
G
-2 s e ri e s s ig n s d e p ic te d i n t h e
N
O T
E S
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
S li c e D e ta il
S e e S ta n d a rd
D ra w in g E
-T
C D
V -0 f o r
U -C h a n n e l
S te e l
P o s t s ig n s s h a ll b e a s s h o w n o n S ta n d a rd
D ra w in g E
-T
C D
V -0
T h e m in im u m v e rt ic a l a n d h o ri z o n ta l c le a ra n c e s f o r c o n s tr u c ti o n
G E
N E
R A
L N
O T
E S
IN
D
E X
A N
D G
E N
E R
A L
N O
T E
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IN
D
E X
1 3 4 5 6 7 82
S H
E E
T N
O
S U
B
JE
C T
T e m p o ra ry
P a n e l
S ig n P o s t
S e le c ti o n a n d C o n n e c ti o n
D e ta il s
T e m p o ra ry P a n e l
S ig n P o s t
In s ta ll a ti o n
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n s
T ra ff ic
C o n tr o l
S ig n s
In d e x a n d G e n e ra l N o te s
IN
D
E X
1 3 4 5 6 7 82
S H
E E
T N
O
S U
B
JE
C T
T e m p o ra ry
P a n e l
S ig n P o s t
S e le c ti o n a n d C o n n e c ti o n
D e ta il s
T e m p o ra ry P a n e l
S ig n P o s t
In s ta ll a ti o n
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n D e s ig n D e ta il s
T ra ff ic
C o n tr o l
S ig n s
T ra ff ic
C o n tr o l
S ig n s
In d e x a n d G e n e ra l N o te s
P
E E
D
IN
G
M O
W
IN
G
M
IL
E S
S P
E E
D
IN
G
M A
X
Y R
S
R E
C K
L E
S S
D R
IV
IN
G
M A
IN
S
T A
L L
A T
IO
N
O V
E R
H E
A D
S
IG
N
N E
T
R
IV
IN
G
R E
C K
L E
S S
M A
X
Y R
S
M A
X
A H
E A
D
M O
W
IN
G
X W
-6 a -B
X W
-6 a -A
X W
-6 a
X W
-6 b -B
X W
-6 b -A
X W
-6 b
X W
-Y b -A
X W
-Y b
X G
-2
X G
-1
X W
-1
-A
X W
-1
X W
-1
X W
-4
S
X W
-6
-A
X W
-6
N E
M
IL
E
S
R O
A D
W O
R K
A H
E A
D
W O
R K
R O
T C
H F
O R
T R
A F
F
IC
S T
O P
P E
D
R O
A D
W O
R K
E N
D
X W
-8 -A
X W
-8
IN
D
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8 s it e c o n d it io n s
S h a d e d t e x t in d ic a te s m e s s a g e c o n te n t th a t m u s t b e v a ri e d t o r e fl e c t w it h t h e i n d ic a te d s ig n w o rd
A H
E A
D S u c h s ig n s m a y b e u s e d i n p la c e o f o r in c o n ju n c ti o ig n m a y b e o rd e re d t o r e a d
F T o r
F
T i n p la c e o f th e ro a d w a y d u ri n g n o n -w o rk in g h o u rs
S ig n s h a ll b e r e m o v e d c o v e re d o r tu rn e d t o f a c e a w a y f ro m t h
1N
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
E
T O
U R
D E
T O
U R
S ta te S t
S ta te S t
N O
R T
H
E X
IT
E X
IT
E X
IT
O P
E N
C L
O S
E D
F O
R
E X
IT
O
N L
Y
R
IG
H T
L A
N E
W
ID
E F
T
1L O
A D
S N
O O V
E R
E X
IT
O V
E R
L O
A D
W
ID
E 1
M U
S T F
T
L O
A D
R
ES
TR
IC
TI
O
N M
IL
E
S
W
ID
E
X M
-9 e
X M
-9 d
E
-1
E
-2
E -2 a
X W
-7
X W
-Y
W R
(A
X W
-Y W
R (B
X W
-Y
W R
(C
IN
D
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8 s it e c o n d it io n s
S h a d e d t e x t in d ic a te s m e s s a g e c o n te n t th a t m u s t b e v a ri e d t o r e fl e c t
1N O
T E
T R
A F
F
IC
C O
N T
R O
L S
IG
N
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
W o o d p o s t p e rm it te d
T h e m in im u m d e p th f o r w o o d o r s te e l p o s ts s h a ll b e f t.
A ll d im e n s io n s a re i n i n c h e s
S ig n s
S ta n d a rd
H ig h w y rc e n ta g e a s s h o w n i n t h e F
H W
A d o c u m e t, a c in g b e tw e e n l e tt e rs o f th is w o rd o r li n e s h a ll b e r e d u c e d b y t is
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
D E
S
IG
N D
E T
A
IL
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
W o o d p o s t p e rm it te d
T h e m in im u m d e p th f o r w o o d o r s te e l p o s ts s h a ll b e f t.
A ll d im e n s io n s a re i n i n c h e s
S ig n s
S ta n d a rd
H ig h w rc e n ta g e a s s h o w n i n t h e F
H W
A d o c u m e a c in g b e tw e e n l e tt e rs o f th is w o rd o r li n e s h a ll b e r e d u c e d b y t is
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
D E
S
IG
N D
E T
A
IL
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
W o o d p o s t p e rm it te d
T h e m in im u m d e p th f o r w o o d o r s te e l p o s ts s h a ll b e f t.
A ll d im e n s io n s a re i n i n c h e s
S ta n d a rd
H ig h w a y S ig n s p e rc e n ta g e s h o w n i n t h e F
H W
A d o c u m e a c in g b e tw e e n l e tt e rs o f th is w o rd o r li n e s h a ll b e r e d u c e d b y t
T E
S
T R
A F
F
IC
C O
N T
R O
L S
IG
N
D E
S
IG
N D
E T
A
IL
S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
X
B B m in im u m
A A
18"
4"
C o n c re te E n c a s e m e n t o r
C o m p a c te d S o il
(T y p
A ll
I n s ta ll a ti o n s m in im u m
X
X m in im u m
X m in im u m
Z
Y
Z
Z
Z
-P
O S
T I
N S
T A
L L
A T
IO
N
N O
T E
S
-P
O S
T I
N S
T A
L L
A T
IO
N
-P
O S
T I
N S
T A
L L
A T
IO
N
-P
O S
T I
N S
T A
L L
A T
IO
N
B B
B B
B B
A e q u a l s p a c e s
A e q u a l s p a c e s
A e q u a l s p a c e s
A
A
X
-2 B
A
X
-2 B
A
X
-2 B
A
X
-2 B
A A
A A
A A ty p
P o s t
W o d x
P o s t
(T y p
A ll
B re a k a w a y
P o s ts ty p
P o s t
W o ty p
P o s t
W o o d
P o s t e m b e d m e n t
P o s t e m b e d m e n t
P o s t e m b e d m e n t
P o s t e m b e d m e n t x
P o s t
F ie ld d ri ll e d h o le s t h ro u g h p o s t s h a ll b e p a ra ll e l to s ig n f a c e
S ta n d a rd
D ra w in g E
-T
C D
V -0
T h e m in im u m v e rt ic a l c le a ra n c e s h a ll b e a s s h o w n ta n d a rd
D ra w in g E
-T
C S
N -0
F o r p o s t s e le c ti o n a n d p o s t e m b e d m e n t d e p th s e e t a b le o n d im e n s io n s h a ll b e r o u n d e d u p t o t h e n e a re s t i n c h i n c re m e n t.
X a n d Y d im e n s io n s s h a ll b e i n i n c re m e n ts o f i n c h e s T h e Z b e i n c h e s a n d t h e m a x im u m w id th s h a ll b e A
/2 s p a c in g s h a ll b e
T h e m in im u m o v e rh a n g w id th
B s h a ll
T h e m in im u m p o s t s p a c in g
A s h a ll b e a n d t h e m a x im u m
F ie ld D ri ll e d H o le s
(T y p A ll B re a k a w a y
P o s ts
W o o d
P o s t
(T y p b
C L F ie ld
D ri ll e d H o le s th is f a c e
S ig n a tt a c h
C T
IO
N
A -A d/2 d
P O
S T
I N
S T
A L
L A
T
IO
N
T E
M P
O R
A R
Y P
A N
E L
S
IG
N
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
IA
N
A D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R T
A T
IO
N
Eff. for Letting On or After 03-01-2026
E 801-T-247d RPD of 8
(X
Y
Z in f t
M a x im u m
N u m b e r o f
P o s ts
E m b e d m e n t
P o s t f t
5 6 5 6 7 8 9 x x x x x x x
W o o d
P o s t
C o n n e c to r
T y p e B
P o s t
S ig n P a n e l
C o n n e c to r
Z S h a p e
A n g le
C o n n e c to r
L x x
/2
N O
T E
S
T Y
P E
B P
O S
T C
O N
N E
C T
IO
N
D e s c ri p ti o n
P o s t
S ig n P a n e l
S ig n P a n e l b x d
P o s t
S iz e
N o m in a l
W o o d
P o s t
W o o d
P o s t
6 6
Z S
H A
P E
C O
N N
E C
T
IO
N A
N G
L E
S H
A P
E C
O N
N E
C T
IO
N
B re a k a w a y
P o s t
P o s t
N o n -B re a k a w
M P
O R
A R
Y P
A N
E L
S
IG
N W
O O
D P
O S
T S
E L
E C
T
IO
N T
A B
L E o u ts id e f a c e o f th e p o s t.
A t e x te ri o r p o s ts th e A n g le
C o n n e c to r s h a ll b e i n s ta ll e d o n t h e g u a rd ra il to t ra ff ic s h a ll b e a t le a s t f e e t fr o m t h e f a c e o f th e b a rr ie r o r b e h in d b a rr ie r o r g u a rd ra il
T h e e d g e o f th e p a n e l s ig n a d ja c e n t
N o n -b re a k a w a y p o s ts s h a ll b e p la c e d o u ts id e t h e c le a rz o n e o r
T h e l e n g th o f th e c o n n e c to r s h a ll b e e q u a l to t h e s ig n h e ig h t
Y
C le a r
H e ig h t
(Z b e tw e e n a n d
S ig n H e ig h t
(Y b e tw e e n a n d
S ig n W id th
X b e tw e e n a n d
T h e t a b le i s v a li d f o r d im e n s io n s w it h in t h e f o ll o w in g r a n g e
S e e S ta n d a rd
D ra w in g E
-T
C S
N -0 f o r
X
Y a n d
Z d im e n s io n s
P o s t m a te ri a l s h a ll b e d e n s e s o u th e rn p in e s e le c t n a tu ra l.
W O
O D
P O
S T
S E
L E
C T
IO
N
T A
B L
E
T E
M P
O R
A R
Y P
A N
E L
S
IG
N S
T h is s h e e t re p la c e s S ta n d a rd
D ra w in g E
-T
C S
N -0
T d
1-
T-
0d T
R A
FF
IC
C O
N
TR
O L
D
EV
IC
E
R
EP
O R
T
A d o p t e d
C
N
TR
A C
T:
P R
O
JE
C T:
TE
S:
th ru
LO
C
A
TI
ES
C
R
IP
TI
TE
PL
C
ED
U se if
O .K
D
TE
R
EM
O
V
ED
*R
EM
A
R K
S
M
F
S
If d ev ic e is n ot O
.K de sc rib e de fic ie nc y un de r R em ar ks
D at e C or re ct iv e A ct io n Ta ke n:
R ep or t P re pa re d
B y:
, T itl e:
Contract Number: R -43687-A
CRAWFORDSVILLE DISTRICT Contract No. R -43687
III i
SPECIAL PROVISIONS
TABLE OF CONTENTS
100-C-147 PAYMENT OF PREDETERMINED MINIMUM WAGE DETERMINATION (DAVIS-
BACON ACT) General Decision Number IN20250006
100-C-151A FHWA-1273
100-C-151D EXECUTIVE ORDER 11246
100-C-151E TITLE VI ASSURANCES
100-C-188 STANDARD SPECIFICATIONS
100-C-214 CONSTRUCTION LETTING EMAIL BOX
100-C-246 CARGO PREFERENCE ACT
100-C-281 PG BINDER GRADES
103-C-268 INDIANA-KENTUCKY DBE RECIPROCITY
103-C-269 SUBMITTAL OF DBE QUOTES AND DBE SUPPLIER FORM
106-C-277 BUILD AMERICA, BUY AMERICA ACT REQUIREMENTS
106-C-280 E-TICKETING INCENTIVE
107-B-040 ENVIRONMENTAL RESTRICTIONS
107-C-266 MAINTAINING PEDESTRIAN ACCESSIBILITY DURING CONSTRUCTION
201-C-052 INITIAL PAYMENT FOR CLEARING RIGHT-OF-WAY
203-R-806 EXCAVATION AND EMBANKMENT
205-R-740 PUMP AROUND
416-R-807 COLD IN-PLACE RECYCLING, CIR
505-R-795 EXCEPTIONS TO AASHTO T 152
621-R-800 SEEDING AND SODDING
714-R-801 REINFORCED CONCRETE BOX STRUCTURES
720-R-646 CURB INLET CASTING
801-C-157 CERTIFICATION OF TEMPORARY TRAFFIC CONTROL DEVICES
801-R-542 WORKSITE ADDED PENALTY SIGNS
801-T-198 TRAFFIC CONTROL FOR TRAFFIC BREAKS
801-T-246 ROAD WORK AHEAD SIGNS
CRAWFORDSVILLE DISTRICT Contract No. R -43687
III ii
901-M-069 PORTLAND CEMENTS AND BLENDED CEMENTS
904-M-073 AGGREGATES
913-M-071 WATER
914-M-070 ROADSIDE DEVELOPMENT MATERIALS
918-M-072 GEOGRID
105-C-247 BRIDGE INSPECTION COORDINATION
107-R-169 STATEMENTS ABOUT EXISTING CONDITIONS OF UTILITIES, ADDITIONAL
RIGHT-OF-WAY, AND ENCROACHMENTS
108-C-094 FAILURE TO COMPLETE ON TIME FOR INTERMEDIATE COMPLETION DATE
VERMILLION COUNTY SURVEYOR COORDINATION
ROAD CLOSURE RESTRICTIONS
MAINTENANCE OF TRAFFIC COORDINATION AND ACCESS
NOTIFICATIONS OF TRAFFIC RESTRICTIONS
UNDISTRIBUTED QUANTITIES
BAT AVOIDANCE AND MITIGATION MEASURES
ENVIRONMENTAL COORDINATION
FAILURE TO COMPLETE ON TIME FOR INTERMEDIATE COMPLETION DATE, TREE
CLEARING
BALD EAGLE RESTRICTIONS
LANDSCAPE BOULDER RELOCATION
HEADWALLS AND WINGWALLS FOR CIRCULAR PIPES
PLUG EXISTING DRAINAGE PIPES
100-C-147 PAYMENT OF PREDETERMINED MINIMUM WAGE DETERMINATION (DAVIS-BACON
ACT) General Decision Number IN20250006
(Revised 06-16-22)
General Decision Number IN20250006 shall apply to this contract.
The above referenced wage determination is available from the USDOL at the
SAM internet website https://sam.gov/content/wage-determinations. Any modification published there by the USDOL not later than 10 days prior to letting is applicable to this contract.
The Department will confirm the modification number and publication date for the General Decision effective for the bid opening. Notice of confirmation will be published on the Contract Administration website https://www.in.gov/dot/div/contracts/letting/index.html at least one week prior to the bid opening. The bidder shall acknowledge in applicable wage determination, modification, and publication date in the proposal form.
100-C-151A FHWA-1273
(Revised 10-23-23)
REQUIRED CONTRACT PROVISIONS
FEDERAL - AID CONSTRUCTION CONTRACTS
I. General II. Nondiscrimination III. Non-segregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water Pollution Control Act X. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion XI. Certification Regarding Use of Contract Funds for Lobbying XII. Use of United States-Flag Vessels:
ATTACHMENTS
A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only)
I. GENERAL
1. Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR 633.102(e).
The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e).
Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.
Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b).
2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d).
3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and
FHWA.
4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b) The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors. 23 U.S.C.
101(a).
II. NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part 230, Subpart A, Appendix A; EO 11246)
The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts.
In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The contractor and all subcontractors must comply with the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.
Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627.
The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633.
The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.
1. Equal Employment Opportunity: Equal Employment Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:
a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409(g)(4) & (5).
b. The contractor will accept as its operating policy the following statement:
"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."
2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so.
3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action or are substantially involved in such action, will be made fully cognizant of and will implement the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:
a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official.
b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.
c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.
d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.
e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.
4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived.
a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.
b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.
c. The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees.
5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age or disability. The following procedures shall be followed:
a. The contractor will conduct periodic inspections of project sites to ensure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.
b. The contractor will periodically evaluate the spread of…