Bid Notice-Canterbury Reservoir Site 1 Generator Replacement.pdf

PDF 5 MB Posted

Attached to
Canterbury Reservoir Site 1 Generator Replacement
Solicitation number
2027-07
Issued by
Washington County, Toledo City, Oregon

About this file

Bid Notice Summary

This bid notice from the City of Tigard, Oregon (Invitation to Bid No. 2027-07, Project No. CIP 2026-96060) solicits sealed bids for the Canterbury Reservoir Site 1 Generator Replacement Project. The scope of work includes providing a new diesel engine generator above 200 kW, automatic transfer switch, electrical equipment, and electrical infrastructure improvements; constructing equipment pads and perimeter security fencing with access gates and canopy structure; demolishing existing generator, automatic transfer switch, and related equipment; installing a new PLC control panel and Remote I/O module; and performing site landscaping with temporary irrigation and facility repairs. Bids are due electronically by 2:00 PM local time on Thursday, November 19, 2026, with the deadline for questions at 2:00 PM on Thursday, November 12, 2026. A pre-bid conference will be held at 10:00 AM on Tuesday, November 10, 2026, at the project site located at 10490 SW Canterbury Lane, Tigard, OR 97224. Bid opening and public reading will occur immediately after closing via conference call. The work must be substantially completed by January 31, 2028. The project is organized as an 11-item lump-sum bid schedule covering mobilization, erosion control, demolition, clearing and grubbing, equipment pads and enclosure, generator, electrical equipment and installation, electrical conduit and related systems, PLC controls, and site landscaping.

The City's engineer's estimate is $998,350. Bidders must submit bid security equal to 10 percent of their total bid amount and a First-Tier Subcontractor Disclosure Form within two hours of the bid closing deadline. All bidders must be registered with the Oregon Construction Contractors Board and disclose their CCB registration number. A public works bond of $30,000 must be filed with the Construction Contractors Board prior to work commencement. Upon award, the successful contractor must provide Performance and Payment Bonds each equal to 100 percent of the contract sum within ten days of receiving contract forms. The project is subject to Oregon prevailing wage rate requirements under ORS Chapters 279A and 279C. Contractors must maintain comprehensive general liability insurance with a general aggregate limit of $4,000,000, commercial automobile liability insurance with a combined single limit of $2,000,000 per occurrence, and workers' compensation insurance as required by Oregon law. The City reserves the right to reject any or all bids and may modify the bid schedule if necessary. No bid will be accepted after the stated closing time, and facsimile bids will not be accepted.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

City of Tigard 13125 SW Hall Boulevard

Tigard, Oregon 97223 Phone: (503) 639-4171 Fax: (503) 684-7297

CONTRACT DOCUMENTS

for the construction of

Canterbury Reservoir Site 1 Generator Replacement Project City Project No.: CIP 2026-96060

Invitation to Bid No.: 2027-07

Single Point of Contact: Toni Riccardi Purchasing Specialist Email: contractspurchasing@tigard-or.gov

Submit one (1) copy in portable document format (.pdf)

Submit bid to: contractspurchasing@tigard-or.gov

Bid Due: Thursday, November 19, 2026 - 2:00 PM Local Time.

Deadline for Questions: Thursday, November 12, 2026 - 2:00 PM Local Time.

A Pre-Bid Conference will be held at 10:00 a.m. local time on Tuesday, November 10, 2026, at the Project Site, 10490 SW Canterbury Lane, Tigard OR 97224

2 | P a g e

ADVERTISEMENT FOR BIDS

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

The City of Tigard will receive sealed Bids from qualified firms submitted electronically to the Contracts and Purchasing Department at contractspurchasing@tigard-or-gov until 2:00 pm local time, Thursday, November 19, 2026 for the Canterbury Reservoir Site 1 Generator Replacement project. Bids will be opened and publicly read aloud immediately after the Bid Closing time and date via conference call at (971) 203- 2862. Conference ID 915 693 114#.

The project generally consists of the following (the Work):

1. Provide new generator, automatic transfer switch, electrical equipment, electrical infrastructure improvements, and associated equipment pads.

2. Provide generator and electrical equipment perimeter security fencing, access gates. Provide canopy structure for new outdoor electrical equipment.

3. Demolition of existing generator, automatic transfer switch, electrical equipment.

4. Install new PLC control panel and Remote I/O module to replace existing PLC.

5. Repair and reconstruction of existing facilities affected by the Work, and incidentals for complete and usable facility.

6. Perform additional and incidental Work as called for by the Specifications and Plans.

Basis of Bid Award shall incorporate all items identified on the Bid Schedule. The engineer’s estimate is $998,350. Pursuant to Tigard Public Contracting Rule 30.055, all Bidders must submit a Bid security to the City along with their Bid in an amount equal to ten percent (10%) of their Bid. Because the City’s estimate of contract value exceeds $100,000, Bidders must submit a First-Tier Subcontractor Disclosure Form, provided in this Bid Booklet, to the City no later than 4:00 pm local time, Thursday, November 19, 2026.

A Pre-Bid Conference will be held at 10:00 am, local time, on Tuesday, November 10, 2026, at the project site, 10490 SW Canterbury Lane, Tigard OR 97224.

The provisions of Oregon Revised Statutes (ORS) Chapters 279A and 279C and all other Oregon and Federal provisions pertaining to minimum salaries and wages shall be incorporated by reference as if fully set forth in any Contract resulting from this Advertisement for Bids. Contractor shall provide proof to the City prior to the beginning of any of the Work that the Contractor has filed a public works bond with a corporate surety in the amount of $30,000 with the Construction Contractors Board as required under Oregon Prevailing Wage Rate (PWR) law.

No Bid will be considered unless fully completed in a manner provided in the Bid Packet. Facsimile Bids will not be accepted nor will Bids be accepted after the stated Bid Closing. Bids received after the Bid Closing will be returned to the submitting firm unopened after a Contract has been awarded for the required services.

Bid Documents may be downloaded from the City of Tigard website at www.tigard-or.gov/bids. The City may reject any Bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all Bids upon a finding of the City if it is in the public interest to do so.

All questions about the meaning or intent of the Bid Documents shall be submitted in writing to the Contracts and Purchasing Department at contractspurchasing@tigard-or.gov. Clarifications to the Bid

3 | P a g e

Documents will be made by addenda only. Oral statements may not be relied upon by Bidders and will not be binding or legally effective.

Published: Daily Journal of Commerce Date: November 2, 2026

4 | P a g e

TABLE OF CONTENTS

ADVERTISEMENT FOR BIDS 2

ATTACHMENT A – BIDDER’S CHECKLIST 5

ATTACHMENT B – BID 6

ATTACHMENT C – BID CERTIFICATION 16

ATTACHMENT D – FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM 17

ATTACHMENT E – BID BOND 18

ATTACHMENT F – BIDDER’S STATEMENT OF QUALIFICATIONS 19

ATTACHMENT G – PUBLIC IMPROVEMENT CONTRACT – PWR-COVERED PROJECT 21

ATTACHMENT H – PUBLIC IMPROVEMENT CONTRACT – PERFORMANCE BOND 27

ATTACHMENT I – PUBLIC IMPROVEMENT CONTRACT – PAYMENT BOND 29

ATTACHMENT J – OREGON PREVAILING WAGE RATES 31

ATTACHMENT K – GENERAL CONDITIONS 32

ATTACHMENT L – SPECIAL PROVISIONS 159

ATTACHMENT M –TECHNICAL SPECIFICATIONS 171

DRAWINGS

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT DATED: APRIL 2026

5 | P a g e

ATTACHMENT A – BIDDER’S CHECKLIST

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

FORMS TO EXECUTE FOR SUBMISSION OF BID

The Bidder's attention is especially called to the following forms, which must be executed in full before Bid is submitted:

ATTACHMENT B – BID

ATTACHMENT C – BID CERTIFICATION

ATTACHMENT D – FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM: within two hours of Bid Closing.

ATTACHMENT E – BID BOND

ATTACHMENT F – BIDDER’S STATEMENT OF QUALIFICATIONS

FORMS TO EXECUTE AFTER AWARD OF BID

ATTACHMENT G – PUBLIC IMPROVEMENT CONTRACT – PWR-COVERED CONTRACT

ATTACHMENT H – PUBLIC IMPROVEMENT CONTRACT – PERFORMANCE BOND

ATTACHMENT I – PUBLIC IMPROVEMENT CONTRACT – PAYMENT BOND

Certificate of Insurance including Additional Insured Provision in accordance with the Public Improvement Contract.

6 | P a g e

ATTACHMENT B – BID

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1

GENERATOR REPLACEMENT PROJECT

This Bid must be signed in ink by an authorized representative of the Bidder; any alterations or erasures to the Bid must be initialed in ink by the undersigned authorized representative.

Project: CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT.

Bid Due Date: Thursday, November 19, 2026

Name of Submitting Firm: _________________________________________________________________

The Contractor hereby acknowledges receipt of Addendum Nos. ___,___,___,___,___ to this ITB.

The Undersigned (check one of the following and provide additional information):

____ An individual doing business under an assumed name registered under the laws of the State of

__________________; or ____ A partnership registered under the laws of the State of __________________; or ____ A corporation organized under the laws of the State of __________________; or ____ A limited liability corporation organized under the laws of the State of __________________;

hereby proposes to furnish all material and labor and perform all work hereinafter indicated for the above project in strict accordance with the Contract Documents for the Basic Bid as follows:

___________________________________________________ and ____/100 Dollars ($____________) and the Undersigned agrees to be bound by all documents comprising the Contract Documents as defined in the Contract. The Undersigned declares that it has carefully examined the site(s) of the work, the Contract Documents, and forms. Submission of this Bid shall be conclusive evidence that the Undersigned has investigated and is satisfied as to the condition to be encountered, as to the character, quality and scope of work to be performed, the quantities of materials to be furnished, and as to the requirement of the Contract Documents.

Accompanying herewith is a Bid Security which is equal to ten percent (10%) of the total amount of the Bid.

7 | P a g e

BID SCHEDULE

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

BASE BID

Item No

Spec Section Description Unit Quantity Unit Price Item Total

1. 00196 Extra Work as Authorized AA 1 $100,000.00 $100,000.00

2. 00210 Mobilization LS 1

3. 00280 Erosion Control LS 1

4. Div 01 Remove And Dispose of Existing Generator and Fuel Tank LS 1

5.

Div 01, Div 31

Clearing and Grubbing, Including Tree Removal and Tree Protection LS 1

6.

Div 03, Div 05, Div 31, Div 32

Equipment Pads and Enclosure for Generator and Electrical Equipment

LS 1

7. Div 26 Diesel Engine Generator LS 1

8. Div 26, Div 33

Electrical Equipment and Installation LS 1

9. Div 33, Div 40

Electrical Conduit/Cable/Wire, Lighting, Grounding, and Misc.

Demolition

LS 1

10. Div 40 PLC Control Panel and Instrumentation

LS 1

11.

Div 01, Div 22, Div 32, Div 33

Site Landscaping, Including Temporary Irrigation

LS 1

Grand Total Bid (in numerals) $ ____________________________________________________

Grand Total Bid in Writing (in script) _______________________________________________

8 | P a g e

BID SCHEDULE

The Undersigned agrees, if awarded the Contract, to execute and deliver to the City of Tigard, within ten (10) days after receiving the Contract forms, a satisfactory Performance Bond and a satisfactory Payment Bond each in an amount equal to one hundred percent (100%) of the Contract sum, using the forms provided by the City.

The surety(ies) requested to issue the Performance Bond and Payment Bond will be _____________________________________________. The Undersigned hereby authorizes said surety(ies) company(ies) to disclose any information to the City concerning the Undersigned’s ability to supply a Performance Bond and Payment Bond each in the amount of the Contract.

The Undersigned further agrees that the Bid Security accompanying the Bid is left in escrow with the City; that the amount thereof is the measure of liquidated damages which the City will sustain by the failure of the Undersigned to execute and deliver the above-named Agreement Form, Performance Bond, and Payment Bond, and that if the Undersigned defaults in either executing the Agreement Form or providing the Performance Bond and Payment Bond within ten (10) days after receiving the Contract forms, then the Bid Security may become the property of the City at the City’s option; but if the Bid is not accepted within sixty (60) days of the time set for the opening of the Bids, or if the Undersigned executes and timely delivers said Agreement Form, Performance Bond, and Payment Bond, the Bid Security shall be returned.

The Undersigned certifies that: (1) This Bid has been arrived at independently and is being submitted without collusion with and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment, or services described in the solicitation documents designed to limit independent Bidding or competition; and (2) The contents of the Bid have not been communicated by the Undersigned or its employees or agents to any person not an employee or agent of the Undersigned or its surety on any bond furnished with the Bid and will not be communicated to such person prior to the official opening of the Bid.

The Undersigned HAS HAS NOT (check applicable status) paid unemployment or income taxes in Oregon within the past 12 months and HAS HAS NOT (check applicable status) a business address in Oregon.

The Undersigned HAS HAS NOT (check applicable status) complied with any Affirmative Action Requirements included within the procurement documents.

The Undersigned agrees, if awarded a Contract, to comply with the provisions of ORS 279C.800 through 279C.870 pertaining to the payment of the prevailing rates of wage.

The Undersigned’s CCB registration number is ________________ with an expiration date of ________________. As a condition to submitting a Bid, a Contractor must be registered with the Oregon Construction Contractors Board in accordance with ORS 701.035 to 701.055 and disclose the registration number. Failure to register and disclose the number will make the Bid unresponsive and it will be rejected unless contrary to federal law. The Undersigned further certifies that Undersigned shall provide proof to the City prior to the beginning of any of the work that the Undersigned has filed a public works bond with a corporate surety in the amount of $30,000 with the Construction Contractors Board as required under Oregon PWR law.

The successful Bidder hereby certifies that all subcontractors who will perform construction work as described in ORS 701.005(2) were registered with the Construction Contractors Board in accordance with ORS 701.035 to

701.055 at the time the subcontractor(s) made a Bid to work under the Contract.

9 | P a g e

The successful Bidder hereby certifies that, in accordance with the Worker’s Compensation Law of the State of Oregon, its Worker’s Compensation Insurance provider is ______________________________, Policy No.

________________, and that Undersigned shall submit Certificates of Insurance as required.

Name of Company: ____________________________________

Company Address: ____________________________________

Federal Tax ID: ____________________________________

Telephone: ____________________________________

Email: ____________________________________

I attest that I have the authority to commit the firm named above to this Bid amount and acknowledge that the firm meets the qualifications necessary to perform this Work as outlined in the Invitation to Bid. I understand that I will be required to provide necessary information to verify that the firm meets these qualifications if selected for the subsequent Contract.

Authorized Signature: ____________________________________

Printed Name & Title: ____________________________________

Date: ____________________________________

Payment information will be reported to the IRS under the name and federal taxpayer ID number provided above. Information not matching IRS records or not provided to the City could subject the successful Contractor to a twenty eight percent (28%) backup withholding.

1 0 | P a g e

SCOPE FOR BID SCHEDULE

Measurement and payment for all Work shown or specified herein will be made on a unit or lump sum price basis in accordance with the prices set forth in the Bid Schedule for individual items of Work. Contractor shall make a careful assessment when preparing the Bid.

The items listed below refer to and are the same pay items listed in the Bid Schedule. They constitute all of the pay items for the completion of the Work. No direct or separate payment will be made for providing miscellaneous temporary or accessory services or all other items not specifically named in specific Bid item description and needed for prosecution of the Work, and all other requirement of the Contract Documents.

Compensation for all such services, things and materials shall be included in the prices stipulated for the lump sum and unit price pay items listed herein.

The prices stated in the Bid Schedule, include overhead and profit and all costs and expenses for bonds, insurance, taxes, labor, equipment, materials, commissions, transportation charges and expenses, patent fees and royalties, labor for handling materials during inspection, together with any and all other costs and expenses for performing and completing the Work, complete and in place, as shown on the Plans and specified herein. The basis of payment for an item at the lump sum or unit price shown in the Bid Schedule shall be in accordance with the description of that item in this Section.

BID ITEM DESCRIPTIONS

The following Bid Item Descriptions summarize the measurement and payment for each of the items in the Bid Schedule for CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT and are included below for the Contractor’s convenience. For specific details of measurement and payment, see the Special Provisions and Technical Specifications.

Following are the measurement and payment descriptions for the various Bid items included in the

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT.

Descriptions reference and/or modify sections of the 2024 Oregon Standard Specifications for Construction where applicable.

BID ITEM NO. 1: EXTRA WORK AS AUTHORIZED

Extra work as authorized bid item includes materials, labor, tools, and equipment necessary to perform additional work as directed by the Engineer. Bid item amount is predetermined by City. All authorized items of extra work will be paid per Section 00196.

Measurement and payment of work under this bid item shall be on a negotiated basis between the Contractor and Engineer agreed upon prior to the work being performed. No work under this bid item shall be paid unless authorized in writing by the Engineer.

BID ITEM NO. 2: MOBILIZATION

Comply with Section 00210 of the Standard Specifications and as modified in the Special Provisions.

No measurement of quantities will be made for work performed under this bid item.

1 1 | P a g e

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, and equipment necessary to perform the work per the construction plans. Payment for this bid item shall include:

• Obtaining all bonds, insurance, and licenses.

• Moving all personnel, equipment, supplies, and incidentals to the project site.

• Establishing offices, buildings, and other facilities.

• Providing all required light, power, and water.

• Demobilization, including removal of all facilities and cleanup.

• Notifying occupants of adjacent property to the work before work begins.

• Performing all other work necessary to complete the project that is not covered in other bid items.

Payment shall be per Section 00210.90 of the Standard Specifications, including all preparatory work and operations necessary for the movement of personnel, equipment, materials, and incidentals to the project site and for all other costs incurred before the beginning of work as well as any other work included in the Contract Documents which is not specifically listed in other Bid items.

The amounts paid for mobilization in the Contract progress payment will be based on the percentage of the Original Contract amount that is earned from other Contract items.

When 5% is earned, either 50% of the amount for mobilization or 5% of the original Contract amount, whichever is the least.

When 10% is earned, either 100% of mobilization or 10% of the original Contract amount, whichever is the least.

When all work is completed, amount of mobilization exceeding 10% of the original Contract amount.

This schedule of mobilization progress payments will not limit or preclude progress payments otherwise provided by the Contract.

BID ITEM NO. 3: EROSION CONTROL

Comply with Section 00280 of the Standard Specifications, all Clean Water Services Erosion and Sediment Control notes and requirements, and all requirements of the Oregon Department of Environmental Quality (DEQ) 1200-CN Construction Stormwater permit, if required.

No measurement of quantities will be made for work performed under this bid item.

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, and equipment necessary to develop an Erosion and Sediment Control Plan and submit for review by Agency, install, maintain, and remove all temporary water pollution prevention and erosion and sediment control devices required for the duration of the project. Payment shall include, but is not be limited to:

• Maintaining erosion and sediment control at the project site daily

• Daily street sweeping of work area if sediment is tracked onto paved surfaces

• Application of dust control measures as required

• Inlet protection

• Sediment fence installation and maintenance

1 2 | P a g e

• Slope stabilization and/or slope matting

• Weekly cleanup and disposal of construction debris and waste materials

• Weekly cleanup of the debris captured by erosion and sediment control devices

• Replacement of erosion and sediment control devices when necessary or directed

• Removal of all erosion and sediment control devices at the completion of the project

• Protection of wetlands and waters not permitted for disturbance

BID ITEM NO. 4: REMOVE AND DISPOSE OF EXISTING GENERATOR AND FUEL

TANK

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

Comply with the following sections of the Technical Specifications and as indicated on the Drawings.

• 01_35_21 SELECTIVE ALTERATIONS AND DEMOLITION.

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals necessary to perform the work per the construction plans. Payment for this bid item shall include:

• Site safety.

• Pollution Prevention.

• Removal and disposal of the existing Cummins Onan 200 kW generator and 400 gallon diesel fuel tank.

• Exterior and interior wall repair, patch, paint, and related repairs.

BID ITEM NO. 5: CLEARING AND GRUBBING, INCLUDING TREE REMOVAL AND

TREE PROTECTION

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

• 01_56_39 TEMPORARY TREE AND PLANT PROTECTION

• 31_10_00 SITE CLEARING

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

• Tree, stump, and root removal; clearing and grubbing, and removed materials recycling/disposal.

• Temporary construction fencing furnishing, maintenance, and removal as required for tree protection.

BID ITEM NO. 6: EQUIPMENT PADS AND ENCLOSURE FOR GENERATOR AND

ELECTRICAL EQUIPMENT

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

• 03_30_01 CONCRETE WORK

1 3 | P a g e

• 05_12_00 STRUCTURAL STEEL FRAMING

• 05_31_00 STEEL DECKING

• 31_00_00 EARTHWORK

• 31_05_15 SOILS AND AGGREGATES FOR EARTHWORK

• 32_31_00 FENCES AND GATES

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

• Temporary construction fencing furnishing, maintenance, and removal.

• Excavation, site prep, and finish grading.

• Reinforced and all other concrete work.

• Fencing and gates.

• Weather cover for equipment pad.

• Site and disturbed areas restoration and cleanup.

BID ITEM NO. 7: DIESEL ENGINE GENERATOR

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

• 26_32_14 SINGLE DIESEL FUELED ENGINE GENERATOR ABOVE 200 KW

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

• All crane and rigging work

• Diesel engine generator

BID ITEM NO. 8: ELECTRICAL EQUIPMENT AND INSTALLATION

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

Comply with Sections below of the Technical Specifications and as indicated on the Drawings, as modified in the Special Provisions.

• 26_28_17 DISCONNECT SWITCHES

• 26_36_24 AUTOMATIC TRANSFER SWITCH

• 26_32_14 ENGINE GENERATOR

• 26_24_16 PANELBOARDS

• 26_22_14 TRANSFORMER

• 26_05_34 BOXES

• 26_08_50 ELECTRICAL TESTING AND STUDIES

• 33_05_01 SUBSURFACE UTILITY ENGINEERING

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

1 4 | P a g e

• Electrical power and equipment, all inclusive

• Electrical system startup and troubleshooting, all inclusive, including diesel engine generator

BID ITEM NO. 9: ELECTRICAL CONDUIT/CABLE/WIRE, LIGHTING, GROUNDING,

AND MISC. DEMOLITION

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

Comply with Sections below of the Technical Specifications and as indicated on the Drawings, as modified in the

• 26_50_10 LIGHTING

• 26_05_26 GROUNDING

• 26_05_33 CONDUIT

• 26_05_21 LOW VOLTAGE WIRE AND CABLE

• 26_05_00 ELECTRICAL DEMOLITION

• 33_05_01 SUBSURFACE UTILITY ENGINEERING

• 33_71_21 PRECAST ELECTRICAL HANDHOLES AND ELECTRICAL MANHOLES

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

• Demolition of existing electrical equipment, as required.

• Conduits, fittings, and fixtures, all inclusive

BID ITEM NO. 10: PLC CONTROL PANEL AND INSTRUMENTATION

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

Comply with Sections below of the Technical Specifications and as indicated on the Drawings, as modified in the

• 40_91_00 PROCESS INSTRUMENTATION AND CONTROL

• 40_91_06 LEVEL SENSOR

• 40_92_00 CONTROL PANELS AND COMPONENTS

• 40_92_01 PLC CONTROL SYSTEM HARDWARE AND SOFTWARE

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

• Demolition of existing control and instrumentation equipment, as required.

• Process instrumentation and controls, all inclusive

• Conduits, fittings, and fixtures, all inclusive

• Electrical, low voltage and data, all inclusive

• Controls system startup and troubleshooting, all inclusive

BID ITEM NO. 11: SITE LANDSCAPING, INCLUDING TEMPORARY IRRIGATION

No measurement of quantities will be made for work performed under this bid item. This is a lump sum bid item.

1 5 | P a g e

• 22_11_16 DOMESTIC WATER PIPING AND VALVES

• 32_93_00 PLANTS

• 33_12_13 WATER SERVICE CONNECTIONS

• 33_84_00 IRRIGATION SYSTEMS

Payment for this bid item shall be full payment for furnishing all materials, labor, tools, equipment, and incidentals

• Connection to existing potable water service, including piping, fittings, fixtures, and covers

• Installation of temporary irrigation system

• Planting of trees

1 6 | P a g e

ATTACHMENT C – BID CERTIFICATION

Non-discrimination Clause

The Bidder agrees not to discriminate against any client, employee or applicant for employment or for services, because of race, color, religion, sex, national origin, handicap or age with regard to, but not limited to, the following: employment upgrading, demotion or transfer; recruitment or recruitment advertising; layoffs or termination; rates of pay or other forms of compensation; selection for training; rendition of services. It is further understood that any contractor who is in violation of this clause shall be barred from receiving awards of any purchase order or Bidder from the City, unless a satisfactory showing is made that discriminatory practices have terminated and that a recurrence of such acts is unlikely.

Agreed by: __________________________________________________________________________

Firm Name: __________________________________________________________________________

Address: __________________________________________________________________________

Officer’s signature: _______________________________________________________________________

Type or print officer’s name: _______________________________________________________________

1 7 | P a g e

ATTACHMENT D – FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

BID #: 2027- 07 CLOSING DATE: 11/19/2026 Time: 2:00 PM PST

This form must be submitted at the location specified in the Advertisement for Bids on the advertised Bid closing date and within two working hours after the advertised Bid closing time.

List below the name of each subcontractor that will be furnishing labor or will be furnishing labor and materials and that is required to be disclosed, the category of work that the subcontractor will be performing, and the dollar value of the subcontract. Enter "NONE" if there are no subcontractors that need to be disclosed. (ATTACH

ADDITIONAL SHEETS IF NEEDED).

NAME DOLLAR VALUE CATEGORY OF WORK

1) _________________________ $ ______________________ ____________________________

2) _________________________ $ ______________________ ____________________________

3) _________________________ $ ______________________ ____________________________

4) _________________________ $ ______________________ ____________________________

Failure to submit this form by the disclosure deadline will result in a nonresponsive Bid. A nonresponsive Bid will not be considered for award.

Form submitted by (Bidder name): _______________________________________________________

Contact name: ___________________________________ Phone #: ____________________________

1 8 | P a g e

ATTACHMENT E – BID BOND

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

We, ________________________________________, as “Principal,” (Name of Principal) and ________________________________________, an _____________________ Corporation, (Name of Surety) authorized to transact Surety business in the State of Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors, and assigns to pay unto the City of Tigard (“Obligee”) the sum of __________________________________________________ and _____/100 Dollars

WHEREAS, the condition of the obligation of this bond is the Principal has submitted a Bid to the Obligee in response to Obligee’s solicitation for the project identified as CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT, which Bid is made a part of this bond by reference, and Principal is required to furnish Bid security in an amount equal to 10 percent of the total amount of the Bid pursuant to the solicitation document.

NOW, THEREFORE, if the Bid submitted by Principal is accepted, and if a Contract pursuant to the Bid is awarded to Principal, and if Principal enters into and executes such Contract within the time specified in the said documents and delivers to Obligee its good and sufficient Performance Bond and Payment Bond required by Obligee within the time fixed by Obligee, then this obligation shall be void; otherwise, it shall remain in full force and effect.

IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by our duly authorized legal representatives this _____________ day of _______________________, __________.

PRINCIPAL: ____________________________ SURETY: _________________________________

By: _____________________________________ BY ATTORNEY-IN-FACT Signature Printed Name & Title Printed Name

Attest: __________________________________ __________________________________________ Signature

Address

City State Zip

1 9 | P a g e

ATTACHMENT F – BIDDER’S STATEMENT OF QUALIFICATIONS

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

Instructions:

1. The information provided in this form is part of the City’s inquiry concerning bidder responsibility.

Please print clearly or type. If you need more space, use plain paper.

2. This form supplements any information submitted in a “Prequalification Application.” This form is not an amendment to a “Prequalification Application.” Do not use this form as a bidder pre-qualification application.

3. Answer all questions. Submission of a form with unanswered questions, incomplete or illegible answers may result in a finding that you are not a responsible bidder.

4. Submit completed Bidder Responsibility Form with bid. Failure to submit this form with bid proposal packet may result in a non-responsive bid.

Contractor’s number of years of Utility experience: years

List five Utility projects, with a similar nature and scale, that the Contractor has successfully completed within the last 10 years:

Project Name & Owner Year Completed

Contract Value

1.

2.

3.

4.

5.

Contractor’s Superintendent:

Superintendent’s number of years of Utility experience: __________________ years

List verifiable references for three recent projects:

Project Name & Owner Owner Contact Name

Contact Phone

Contact Email Year Completed

1.

2.

3.

1. Has your company ever been in breach of any contract for unperformed or defective work, or for lack of completing and submitting necessary contract documentation and/or proper invoicing?

☐Yes ☐No If “yes,” please explain.

2 0 | P a g e

2. Has any employee or agent of your company ever been convicted of a criminal offense arising out of obtaining, attempting to obtain, or performing a public or private contract or subcontract?

3. Has any employee or agent of your company been convicted under state or federal law of embezzlement, theft, forgery, bribery, falsification, or destruction of records, receiving stolen property or any other offense indicating a lack of business integrity or business honesty?

4. Has your company or any employee or agent of your company been convicted under state or federal antitrust laws?

5. Has any Officer or Partner of your organization ever been an Officer or Partner of another Organization that failed to complete a construction contract?

6. During the past five years, has your company been charged with a failure to meet the claims of your subcontractors or suppliers?

☐Yes ☐No

Additional Remarks: List the question each additional remark relates to. If more space needed, attach additional sheet(s) and check the following box: ☐ Additional pages are attached to this Bidder Responsibility Form

The undersigned hereby declares that he or she is duly authorized to complete and submit this Bidder Statement of Qualifications Form and that the statements contained herein are true and correct as of the date set forth below. Incomplete, incorrect, or misleading information will be reason for a determination by City of non-responsibility.

Name of Company: ____________________________________

Authorized Signature: ____________________________________

Printed Name & Title: ____________________________________

Date: ___________________________________________

2 1 | P a g e

ATTACHMENT G – PUBLIC IMPROVEMENT CONTRACT – PWR-COVERED PROJECT

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

THIS CONTRACT, made and entered into by and between the City of Tigard, a municipal corporation of the State of Oregon, hereinafter called "City" and (Full Name) hereinafter called "Contractor", duly authorized to perform such services in Oregon.

RECITALS

WHEREAS, the City requires services which Contractor is capable of providing, under terms and conditions hereinafter described; and

WHEREAS, time is of the essence in this contract and all work under this contract shall be completed within the time period stated in the Contract Documents;

THEREFORE, in consideration of the promises and covenants contained herein, the parties hereby agree as follows:

TERMS OF AGREEMENT

1. Services to be Provided

The project generally consists of the following (the Work):

1. Provide new generator, automatic transfer switch, electrical equipment, electrical infrastructure improvements, and associated equipment pads.

2. Provide generator and electrical equipment perimeter security fencing, access gates. Provide canopy structure for new outdoor electrical equipment.

3. Demolition of existing generator, automatic transfer switch, electrical equipment.

4. Install new PLC control panel and Remote I/O module to replace existing PLC.

5. Repair and reconstruction of existing facilities affected by the Work, and incidentals for complete and usable facility.

6. Perform additional and incidental Work as called for by the Specifications and Plans.

2. Contract Documents

The Contractor is hereby bound to comply with all requirements of the Contract Documents prepared by the City and performance pertaining to this Agreement, in the City of Tigard, Oregon, and by this reference made a part hereof to the same legal force and effect as if set forth herein in full.

3. Effective Date and Duration This Agreement is effective upon notice to proceed issued by the City and shall be substantially completed by January 31, 2028.

4. Compensation A. City agrees to pay Contractor $Total Amount for performance of those services provided herein.

B. City certifies that sufficient funds are available and authorized for expenditure to finance costs of this

Contract during the current fiscal year. Funding in future fiscal years shall be contingent upon budgetary approval by the Tigard City Council.

2 2 | P a g e

5. Early Termination A. This Agreement may be terminated without cause prior to the expiration of the agreed upon term by mutual written consent of the parties and for the following reasons:

1) If work under the Contract is suspended by an order of a public agency for any reason considered to be in the public interest other than by a labor dispute or by reason of any third party judicial proceeding relating to the work other than a suit or action filed in regard to a labor dispute; or

2) If the circumstances or conditions are such that it is impracticable within a reasonable time to proceed with a substantial portion of the Contract.

B. Payment of Contractor shall be as provided by ORS 279C.660 and shall be prorated to and include the day of termination and shall be in full satisfaction of all claims by Contractor against City under this Agreement.

C. Termination under any provision of this paragraph shall not affect any right, obligation, or liability of

Contractor or City which accrued prior to such termination.

6. Cancellation with Cause

A. City may terminate this Agreement effective upon delivery of written notice to Contractor, or at such later date as may be established by City, under any of the following conditions:

1) If City funding from federal, state, local, or other sources is not obtained and continued at levels sufficient to allow for the purchase of the indicated quantity of services. This Agreement may be modified to accommodate a reduction in funds,

2) If Federal or State regulations or guidelines are modified, changed, or interpreted in such a way that the services are no longer allowable or appropriate for purchase under this Agreement,

3) If any license or certificate required by law or regulation to be held by Contractor, its Subcontractors, agents, and employees to provide the services required by this Agreement is for any reason denied, revoked, or not renewed, or

4) If Contractor becomes insolvent, if voluntary or involuntary petition in bankruptcy is filed by or against Contractor, if a receiver or trustee is appointed for Contractor, or if there is an assignment for the benefit of creditors of Contractor.

Any such termination of this Agreement under paragraph (A) shall be without prejudice to any obligations or liabilities of either party already accrued prior to such termination.

B. City, by written notice of default (including breach of Contract) to Contractor, may terminate the whole or any part of this Agreement:

1) If Contractor fails to provide services called for by this Agreement within the time specified herein or any extension thereof, or

2) If Contractor fails to perform any of the other provisions of this Agreement or so fails to pursue the work as to endanger performance of this Agreement in accordance with its terms, and after receipt of written notice from City, fails to correct such failures within ten (10) days or such other period as City may authorize.

The rights and remedies of City provided in the above clause related to defaults (including breach of Contract) by Contractor shall not be exclusive and are in addition to any other rights and remedies provided by law or under this Agreement.

2 3 | P a g e

If City terminates this Agreement under paragraph (B), Contractor shall be entitled to receive as full payment for all services satisfactorily rendered and expenses incurred, an amount which bears the same ratio to the total fees specified in this Agreement as the services satisfactorily rendered by Contractor bear to the total services otherwise required to be performed for such total fee; provided, that there shall be deducted from such amount the amount of damages, if any, sustained by City due to breach of Contract by Contractor. Damages for breach of Contract shall be those allowed by Oregon law, reasonable and necessary attorney fees, and other costs of litigation at trial and upon appeal.

7. Force Majeure

Neither City nor Contractor shall be considered in default because of any delays in completion of responsibilities hereunder due to causes beyond the control and without fault or negligence on the part of the party so disenabled, including, but not restricted to, an act of God or of a public enemy, volcano, earthquake, fire, flood, epidemic, quarantine, restriction, area-wide strike, freight embargo, unusually severe weather or delay of Subcontractor or suppliers due to such cause; provided that the party so disenabled shall within ten

(10) days from the beginning of such delay, notify the other party in writing of the causes of delay and its probable extent. Such notification shall not be the basis for a claim for additional compensation. Each party shall, however, make all reasonable efforts to remove or eliminate such a cause of delay or default and shall, upon cessation of the cause, diligently pursue performance of its obligation under Contract.

8. Nonwaiver

The failure of the City to insist upon or enforce strict performance by Contractor of any of the terms of this Contract or to exercise any rights hereunder shall not be construed as a waiver or relinquishment to any extent of its right to assert or rely upon such terms or rights on any future occasion.

9. Attorney's Fees

In case suit or action is instituted to enforce the provisions of this contract, the parties agree that the losing party shall pay such sum as the Court may adjudge reasonable attorney's fees and court costs including attorney's fees and court costs on appeal.

10. Governing Law

The provisions of this Agreement shall be construed in accordance with the provisions of the laws of the State of Oregon. Any action or suits involving any questions arising under this Agreement must be brought in the appropriate court of the State of Oregon.

11. Indemnification

Contractor agrees to indemnify and defend the City, its officers, agents and employees and hold them harmless from any and all liability, causes of action, claims, losses, damages, judgments or other costs or expenses including attorney's fees and witness costs and (at both trial and appeal level, whether or not a trial or appeal ever takes place) that may be asserted by any person or entity which in any way arise from, during or in connection with the performance of the work described in this Contract, except liability arising out of the sole negligence of the City and its employees. If any aspect of this indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the validity of the remainder of this indemnification.

12. Insurance

Contractor shall maintain insurance acceptable to City in full force and effect throughout the term of this Contract. Such insurance shall cover all risks arising directly or indirectly out of Contractor's activities or work hereunder, including the operations of its Subcontractors of any tier. Such insurance shall include provisions that such insurance is primary insurance with respect to the interests of City and that any other insurance maintained by City is excess and not contributory insurance with the insurance required hereunder.

2 4 | P a g e

The policy or policies of insurance maintained by the Contractor shall provide at least the following limits and coverages:

A. Commercial General Liability Insurance: Contractor shall obtain, at contractor’s expense, and keep in effect during the term of this Contract, Comprehensive General Liability Insurance covering Bodily Injury and Property Damage on an “occurrence” form (CG 2010 1185 or equivalent). This coverage shall include Contractual Liability insurance for the indemnity provided under this Contract. The following insurance will be carried:

Coverage Limit General Aggregate $4,000,000 Products-Completed Operations Aggregate $2,000,000 Personal & Advertising Injury $1,000,000 Each Occurrence $3,000,000 Fire Damage (Any one fire) $50,000

B. Commercial Automobile Insurance: Contractor shall also obtain, at Contractor’s expense, and keep in effect during the term of the Contract, “Symbol 1” Commercial Automobile Liability coverage including coverage for all owned, hired, and non-owned vehicles. The Combined Single Limit per occurrence shall not be less than $2,000,000.

C. Workers’ Compensation Insurance: The Contractor, its Subcontractors, if any, and all employers providing work, labor or materials under this Contract are subject employers under the Oregon Workers’ Compensation Law and shall comply with ORS 656.017, which requires them to provide workers’ compensation coverage that satisfies Oregon law for all their subject workers. Out-of-state employers must provide Oregon workers’ compensation coverage for their workers who work at a single location within Oregon for more than 30 days in a calendar year. Contractors who perform work without the assistance or labor of any employee need not to obtain such coverage.” This shall include Employer’s Liability Insurance with coverage limits of not less than $1,000,000 each accident.

D. Additional Insured Provision: The City of Tigard, Oregon, its officers, directors, and employees shall be added as additional insureds with respect to this contract. All Liability Insurance policies will be endorsed to show this additional coverage.

E. Insurance Carrier Rating: Coverage provided by the Contractor must be underwritten by an insurance company deemed acceptable by the City. The insurance carrier shall have a minimum of an AM Best Rating “A” with a financial strength of VII or better. The City reserves the right to reject all or any insurance carrier(s) with an unacceptable financial rating.

F. Certificates of Insurance: A copy of each insurance policy, certified as a true copy by an authorized representative of the issuing insurance company, or at the discretion of City, in lieu thereof, a certificate in form satisfactory to City certifying to the issuance of all such insurance provisions of this Contract shall be forwarded to:

City of Tigard Attn: Office of Contracts and Purchasing contractspurchasing@tigard-or.gov

Such policies or certificates must be delivered prior to commencement of the work and no Contract shall be affected until the required certificates have been received and approved by the City. Ten days

2 5 | P a g e cancellation notice shall be provided City by certified mail to the name at the address listed above in event of cancellation or non-renewal of the insurance. A renewal certificate will be sent to the above address 10 days prior to coverage expiration. The procuring of such required insurance shall not be construed to limit Contractor’s liability hereunder. Notwithstanding said insurance, Contractor shall be obligated for the total amount of any damage, injury, or loss connected with this Contract.

G. Primary Coverage Clarification: All parties to this contract hereby agree that the contractor's coverage will be primary in the event of a loss.

H. Cross-Liability Clause: A cross-liability clause or separation of insureds clause will be included in all general liability policies required by this Contract.

13. Method and Place of Giving Notice, Submitting Bills and Making Payments

All notices, bills and payments shall be made in writing and may be given by personal delivery or by email.

Notices, bills and payments sent by email should be addressed as follows:

CITY OF TIGARD (CONTRACTOR)

Attn: Ross Horton Attn: (insert contract manager's name) Address: 13125 SW Hall Boulevard

Tigard, Oregon 97223 Address: (insert contract manager's address)

Phone: 503-639-4171, ext 2580 Phone: (insert #) Email: ross.horton@tigard-or.gov Email: (insert address) and when so addressed, shall be deemed given upon deposit in the United States mail, postage prepaid. In all other instances, notices, bills and payments shall be deemed given at the time of actual delivery. Changes may be made in the names and addresses of the person to whom notices, bills and payments are to be given by giving written notice pursuant to this paragraph. Invoices shall list each project separately with work completed and amount due for each.

14. Severability

In the event any provision or portion of this Agreement is held to be unenforceable or invalid by any court of competent jurisdiction, the remainder of this Agreement shall remain in full force and effect and shall in no way be affected or invalidated thereby.

15. Complete Agreement

This Agreement constitutes the entire Agreement between the parties. No waiver, consent, modification, or change of terms of this Agreement shall bind either party unless in writing and signed by both parties. Such waiver, consent, modification, or change if made, shall be effective only in specific instances and for the specific purpose given. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Agreement. Contractor, by the signature of its authorized representative, hereby acknowledges that he has read this Agreement, understands it and agrees to be bound by its terms and conditions.

2 6 | P a g e

IN WITNESS WHEREOF, City and Contractor have caused this Agreement to be executed by their duly authorized officials. Awarded by Tigard’s Local Contract Review Board at their ________________ meeting.

CITY OF TIGARD CONTRACTOR

By: __________________________________

By: __________________________________

Name: _______________________________

Name: _______________________________

Title: ________________________________

Title: ________________________________

Date: ________________________________

Date: ________________________________

2 7 | P a g e

ATTACHMENT H – PUBLIC IMPROVEMENT CONTRACT – PERFORMANCE BOND

CITY OF TIGARD

CANTERBURY RESERVOIR SITE 1 GENERATOR REPLACEMENT PROJECT

Bond Number: ______________________________ Project Name: _______________________________

__________________________________ (Surety #1) Bond Amount No. 1: $ ____________ __________________________________ (Surety #2)* Bond Amount No. 2:* $ ____________

* If using multiple sureties Total Penal Sum of Bond: $ ____________

We, _____________________________________________ as Principal, and the above identified Surety(ies), authorized to transact surety business in Oregon, as Surety, hereby jointly and severally bind ourselves, our respective…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .