Bid Notice-Boiler Plant Replacements - Skilled Nursing Facility - Wyoming Dept. of Health.pdf

PDF 4 MB Posted

Attached to
Boiler Plant Replacements - Skilled Nursing Facility - Wyoming Dept. of Health
Solicitation number
Bid #26-0631
Issued by
Campbell County, Wyoming

About this file

Boiler Plant Replacements - Wyoming Retirement Center

This Request for Bid (RFB #26-0631) is issued by the Wyoming State Construction Department, Procurement Section, on behalf of the Wyoming Retirement Center, Wyoming Department of Health. The project consists of the replacement of two boilers and associated components in the Skilled Nursing Facility's boiler plant located at 890 US Hwy 20 South, Basin, Wyoming 82410, along with replacement of the boiler system at the Superintendent Residence. The scope of work includes mechanical, plumbing, HVAC, and building automation system components as detailed in the comprehensive specifications and plans dated April 3, 2026. A mandatory pre-bid meeting is scheduled for 10:00 a.m. Mountain Time on Tuesday, April 28, 2026, at the WRC Basement Training Room, with attendance verification required prior to bid consideration. Bids are due by 1:00 p.m. Mountain Time on May 12, 2026, through the Public Purchase online bidding system. The tentative contract award date is June 1, 2026, with work commencing June 2, 2026, and estimated project completion by October 31, 2026. Written questions and clarifications must be submitted through the Public Purchase system by 3:00 p.m. Mountain Time on April 30, 2026, with answers posted by 5:00 p.m. Mountain Time on May 4, 2026.

Bidders must submit a bid deposit equal to ten percent (10%) of the total bid amount in the form of a bid bond, cashier's check, or certified check made payable to the State of Wyoming. For projects valued at or above $150,000.00, successful bidders must provide a Performance and Payment Bond equal to 100% of the accepted bid amount within twenty (20) calendar days of award notification, with the cost of the bond included in the bid price. Wyoming Prevailing Wage Act requirements apply to contracts valued at $100,000.00 or more, with detailed wage schedules provided for 2025 Building Construction and Heavy and Highway work classifications. Resident bidder preference is available under Wyoming Statutes 16-6-102 through 16-6-107, with resident contractors allowed a bid preference of up to five percent (5%) above the lowest non-resident bidder. A successful resident bidder shall not subcontract more than thirty percent (30%) of the work to nonresident contractors. For projects estimated at $1,000,000 or more, bidders committing to apprentice labor for at least ten percent (10%) of labor hours receive a one percent (1%) bid reduction consideration. Retainage of five percent (5%) shall be withheld from all progress payments until final completion, and warranty coverage commences on the date of Substantial Completion and extends for one (1) year, with all defective work to be corrected or replaced at no cost to the State during this period.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WYO RETIREMENT CENTER

BOILER PLANT REPLACEMENTS

for Wyoming Retirement Center / 890 US Hwy 20 / Basin, WY 82410

April 3RD, 2026

PROJECT MANUAL

for

WYOMING RETIREMENT

CENTER

BOILER REPLACEMENT

for

WYOMING DEPARTMENT of

HEALTH

BASIN, WYOMING

APRIL 2026

DIVISION 00 -

PROCUREMENT AND CONTRACTING REQUIREMENTS

WYOMING RETIREMENT CENTER BOILER REPLACEMENT N26-15

TABLE OF CONTENTS

00 01 10 - 1

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 - TABLE OF CONTENTS

- WYOMING STATE CONSTRUCTION DEPARTMENT PROCUREMENT SECTION

for the BOILER PLANT REPLACEMENTS FOR THE STATE OF WYOMING

WYOMING RETIREMENT CENTER

- CONTRACTOR’S AFFIDAVIT FOR PROGRESS PAYMENTS

- PW-2025 PREVAILING WAGE RATES

- SAMPLE CONTRACT

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 - SUMMARY

01 26 00 - CONTRACT MODIFICATION PROCEDURES

01 29 00 - PAYMENT PROCEDURES

01 31 00 - PROJECT MANAGEMENT AND COORDINATION

01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION (GANTT CHART)

01 33 00 - SUBMITTAL PROCEDURES

01 40 00 - QUALITY REQUIREMENTS

01 42 00 - REFERENCES

01 50 00 - TEMPORARY FACILITIES AND CONTROLS

01 60 00 - PRODUCT REQUIREMENTS

01 73 00 - EXECUTION REQUIREMENTS

01 73 29 - CUTTING AND PATCHING

01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 77 00 - CLOSEOUT PROCEDURES

01 78 23 - OPERATION AND MAINTENANCE DATA

01 78 39 - PROJECT RECORD DOCUMENTS

01 79 00 - DEMONSTRATION AND TRAINING

DIVISION 02 – EXISTING CONDITIONS

02 41 19 - SELECTIVE STRUCTURE DEMOLITION

DIVISION 20 – MECHANCIAL GENERAL REQUIREMENTS

20 05 00 - GENERAL PLUMBING AND HVAC

20 05 05 - SELECTIVE DEMOLITION

20 05 20 METERS AND GAUGES

20 05 25 - GENERAL DUTY VALVES

20 05 30 - HANGERS AND SUPPORTS

20 05 50 - MECHANICAL IDENTIFICATION

20 05 90 - TESTING ADJUSTING AND BALANCING

20 07 10 - MECHANICAL INSULATION

DIVISION 22 - PLUMBING

22 11 10 - DOMESTIC WATER PIPING

22 30 00 - PLUMBING EQUIPMENT

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC)

23 11 10 - FUEL GAS PIPING

23 11 20 - FUEL GAS PIPING SPECIALTIES

WYOMING RETIREMENT CENTER BOILER REPLACEMENT N26-15

TABLE OF CONTENTS

00 01 10 - 2

23 21 10 - HYDRONIC PIPING

23 21 20 - HYDRONIC SPECIALTIES

23 21 30 - HYDRONIC PUMPS

23 25 10 - HVAC WATER TREATMENT

23 51 10 - GAS VENTS AND CHIMNEYS

23 52 10 - MODULATING CONDENSING BOILERS

23 52 30 - FINNED WATER-TUBE BOILERS

DIVISION 25 – INTEGRATED AUTOMATION

25 15 00 - BUILDING AUTOMATION SYSTEM

25 35 00 - CONTROLS INSTRUMENTATION

25 35 50 - VARIABLE FREQUENCY CONTROLLERS

25 95 00 - BAS DRAWINGS AND SEQUENCES

25 95 20 - HEATING WATER SYSTEM

25 95 26 - RESIDENTIAL BOILER SYSTEM

END OF TABLE OF CONTENTS

STATE OF WYOMING

WYOMING STATE CONSTRUCTION DEPARTMENT

PROCUREMENT SECTION

700 WEST 21st STREET

CHEYENNE, WY 82002

REQUEST FOR BIDS

NO. 26-0631

BOILER PLANT REPLACEMENTS

FOR THE

STATE OF WYOMING

WYOMING RETIREMENT CENTER

WYOMING DEPARTMENT OF HEALTH

BASIN, WYOMING

BID DUE DATE AND TIME:

May 12, 2026 – 1:00 P.M. Mountain Time

AGENCY REPRESENTATIVE: Nate Miller

TELEPHONE NO. (307) 431-7905

PROCUREMENT REPRESENTATIVE: Lenora Simpson

TELEPHONE NO. (307) 777-3558

Request for Bid #26-0631 – Boiler Plant Replacements

Wyoming Retirement Center

Wyoming Department of Health

Table of Contents

1. Notice for Request for Bids (Advertisement)

2. Special Provisions

3. Key Dates

4. Specifications and Plans

5. Submission of Bids

6. Evaluation and Award

7. Bid Form Instructions

8. Bid Form-Section 1

9. Bid Form - Section 2

10. Signature Page

11. References and Experience

13. List of Attached Documents

Wyoming Department of Health

1. Notice for Request for Bids (Advertisement)

RFB #26-0631

The Wyoming State Construction Department, Procurement Section, on behalf of the Wyoming

Retirement Center, Wyoming Department of Health (Procuring Agency), will receive bids until

1:00 p.m. Mountain Time on May 12, 2026, through the Public Purchase online bidding system for the Boiler Plant Replacements at the Skilled Nursing Facility, located at 890 US Hwy 20 South, Basin, WY 82410.

Project Description: This project will consist of replacement of two boilers and associated components in the Skilled Nursing Facility’s boiler plant. It will also include replacement of the boiler system at the Superintendent Residence.

Estimated Project Completion date is: October 31, 2026.

A mandatory pre-bid meeting will be conducted at 10:00 a.m. MT on Tuesday, April 28, 2026 starting at Wyoming Retirement Center Basement Training Room, 890 US Hwy 20 South, Basin, WY 82410. Bidders must sign the attendance sheet prior to the commencement of the pre-bid meeting. The Procuring Agency will reject bids from any bidder who has not signed the attendance sheet prior to the commencement of any mandatory pre-bid meeting. Bidders in attendance at the Pre-Bid meeting are required to represent the company from which they are employed.

Bid documents available by download from publicpurchase.com. Companies wishing to download the bid must have a Public Purchase account.

Project Manager: Nate Miller, nate.miller@wyo.gov, (307)-431-7905

Pre-Bid Meeting

Mandatory, starting at 10:00 a.m. MT on Tuesday, April 28, 2026, at WRC Basement Training Room, 890 US Hwy 20 South, Basin, WY 82410.

The Procuring Agency will reject bids from any bidder who has not signed the attendance sheet prior to the commencement of any Mandatory pre-bid meeting.

Bidders in attendance at any Pre-Bid meeting are required to represent the company from which they are employed.

Only the written answers posted officially to the procurement website or official addenda issued by the Procuring Agency are the official position on an issue, and these answers shall become part of the Request for Bid. Verbal clarifications offered during the pre-bid meeting shall not be binding upon the Procuring agency until reduced to writing and published as such, to ensure all bidders have access to the same information.

Wyoming Department of Health

Bidders are cautioned to make careful observations of existing conditions at the site.

Addenda

The Procuring Agency reserves the right to amend this Request for Bid before the submission date through written addenda. Addenda will be published through the Public Purchase online bidding system. It is the bidder’s responsibility to check publicpurchase.com for addenda.

The bidder shall acknowledge their receipt of Addenda on the Bid Form found herein.

Note quality of products specified. Any bidder may submit a Substitution Request that will identify how the proposed substitution is comparable and substantially the same level of quality or better as the specified item. Only substituted items approved equal by the Procuring Agency will be allowed to be bid. Substitution Request must be submitted through the Public Purchase online bidding system no later than the deadline for submission of questions and clarifications. If the

Procuring Agency accepts a bidder’s substitution request, the Procuring Agency must publish all acceptable substitutions in a written Addenda submitted on the Public Purchase online bidding system.

Submission of Bids

Bids for the Boiler Plant Replacements, Basin, Big Horn County, Wyoming, shall be submitted at publicpurchase.com until 1:00 p.m. MT, May 12, 2026.

Bids received after the time and date specified will not be considered. If your submission has not completely uploaded by the 1:00 p.m. deadline, the Public Purchase system will lock and your response will be incomplete and deemed non-responsive and eliminated from the evaluation process.

No bid will be considered which is not submitted on the attached "Bid Form", signed by a proper official of the company bidding in the space provided therefore.

No bid will be considered that modifies, in any manner, any of the contract language included with this RFB and any other related documents.

In case of an error in the extension of prices in the bid the unit prices will govern.

Each project valued equal to or above $150,000.00, a bid is required to have a bid deposit in the amount of ten percent (10%) of the total bid, which shall be in the form of a bid bond, cashier's check, or certified check (a copy will not be accepted) drawn on a reliable bank and made payable to the State of Wyoming (no personal checks will be accepted), or an electronic bid bond with

Surety 2000. The Procuring Agency will release the bid bond if the bidder is awarded the contract;

when the contract is executed; and when all additional documentation required by contract is received and approved.

Each project valued under $150,000.00 shall require the bidder to provide a bid deposit in the amount of ten percent (10%) of the total bid amounts as set forth above. Note: bid bonds and performance and payment bonds are not required by statutes for bids under $150,000.00.

Any bid deposit is given as a guarantee that the bidder will execute the contract document, for the awarded bidder. All other deposits will be returned to the bidders after the successful bidder is determined. In the event that the successful bidder decides not to accept the contract, the second lowest bidder will be given the option of accepting the work. If the second lowest bidder does not elect to accept the award of the bid, the project will be re-bid. The fact that the Department deposits the bid deposit should in no way be taken as acceptance of your bid.

When the bid is equal to or above $150,000.00 the successful bidder must make a good faith attempt, within twenty (20) calendar days after notification of the award, to deliver to the Procuring

Agency an executed Bidder's Performance and Payment Bond in the amount of at least equal to one hundred percent (100%) of the accepted bid as security for the faithful performance of the contract. **Note: The cost of the Performance and Payment Bond must be included in the bid amount. If bidder does not provide the Performance and Payment bond, the Procuring Agency may move forward with next lowest responsible bidder.

The bond shall be submitted on bonding forms as provided by the Department and shall meet all requirements as to form and execution.

If during the contract period change orders increase the original contract amount, it will be necessary for the Bidder to furnish the Procuring Agency additional bonding coverage so that

100% of the Contract Amount is always provided.

Modifications or Withdrawal of Bids

A bid that is in the possession of the Procuring Agency may be modified through the Public

Purchase online bidding system submission bearing the signature or name of the person authorized for bidding, provided it is received prior to the date and time of the bid opening. If project value is equal to or above $50,000.00 the modified bid should not reveal the bid price but should indicate the addition, subtraction, or other change in the bid.

A bid may be withdrawn by the bidder up to the time and date of the bid opening. Bids can be withdrawn through the Public Purchase online bidding system before the due date and time set forth in this document.

Bids may not be withdrawn for a period of thirty (30) days after the bid opening.

Bids which modify any of the provisions of the Bidding or Contract documents will not be considered.

Wyoming Department of Health

If a bid is accepted and the bidder then fails to furnish any portion of the services agreed to in the bid, that bidder may be eliminated from consideration for future projects.

Preparation of Bids

A bid may be rejected if it modifies any of the provisions, contract, specifications, or minimum requirements of the Request for Bid.

Award and Contract Information

The successful bidder shall be required to enter into and sign a formal Contract with the Procuring

Agency containing terms required by the Attorney General. The contract language will control over any language contained within this RFB and any related documents that conflict or are inconsistent with the fully executed Contract.

The Procuring Agency shall account for invoices against the Contract. All payments shall be handled through the Project Representative.

The prime bidder shall post on the construction site a prominent sign citing W.S. 16-2-112, stating that any subcontractor or material man shall give notice to the prime bidder of a right to protection under the bond or guarantee and that failure to provide the notice shall waive the protection.

Failure of the successful bidder to furnish the equipment, materials, supplies, or perform the service awarded from the bid shall eliminate the bidder for a period of time as determined by the

Procurement Section.

Resident bidder preferred: "The contract shall be let to the responsible certified resident making the lowest bid if the certified resident's bid is not more than five percent (5%) higher than that of the lowest responsible non-resident bidder." (W.S. 16-6-102–16-6-107).

"Resident" means a natural person, association or business entity authorized to be formed under title 17 of the Wyoming statutes, or the laws of another state that are functional equivalent, and that is certified as a resident by the Department of Workforce Services following receipt of an affidavit executed and sworn to by a chief executive officer of the entity setting forth information required by the Department to determine compliance with this act and prior to bidding upon the contract or responding to a request for bid. NOTE:

Bidder to include his residency number on their bid form sheet.

All bidders are required to register and/or bond with the following:

Secretary of State, W.S. 17-16-1501 (A foreign corporation may not transact business in this state until it obtains a certificate of authority from the Secretary of

State), (307) 777-7311. All resident bidders are required to contact the Secretary of

State to see if they need to register.

The Department of Workforce Services, Unemployment Tax Division (307) 235-

3217.

The Department of Workforce Services, Worker’s Safety and Compensation

Division (307) 777-6763.

The Department of Workforce Services, Labor Standards Division W.S. 27-1-106,

(307) 777-7261.

The Department of Revenue, Excise Tax Division, W.S. 39-15-303, (307) 777-

5200.

A successful resident bidder shall not subcontract more than thirty percent (30%) of the work covered by this contract to nonresident contractors per W.S. 16-6-103.

Preference is hereby given to materials, supplies, agricultural products, equipment, machinery and provisions produced, manufactured or grown in Wyoming, or supplied by a resident of the state, quality being equal to articles offered by the competitors outside of the state (W.S. 16-6-106).

Wyoming laborers shall be employed exclusively under this contract, provided that non-resident laborers may be used when Wyoming laborers are not available for such employment from within the State or are not qualified to perform the work involved. The

Bidder shall inform the Wyoming Department of Workforce Services Resources Center nearest the construction site of the bidder’s employment needs. As used in this paragraph

"Laborer" means a person employed to perform unskilled or skilled manual labor for wages in any capacity and does not include independent Bidders. "Resident" as used in this paragraph includes any person who is a citizen of the United States or a person who is authorized to work in the United States by an agency of the Federal government, and has resided in the State of Wyoming for at least one (1) year immediately preceding his application for employment (W.S. 16-6-201 to 16-6-206).

For all public works awarded by the state that is equal to or exceeds $1,000,000.00 or more a bidder who commits to ensure that not less than ten percent (10%) of the labor hours shall be worked by apprentices shall have his bid considered as if his bid were one percent (1%) lower than the actual dollar value of his bid (W.S. 16-6-

901 to 16-6-902). Contact the Department of Workforce Services.

The bidder expressly warrants to the Procuring Agency that it has the ability and expertise to perform the contract services if awarded. In doing so it shall use the highest standards of professional workmanship.

Wyoming Department of Health

The Procuring Agency and Department reserve the right to reject any or all bids, to waive any informality or technical defect in the bid, or to award the contract in whole or in part, if deemed to be in the best interest of the State to do so.

2. Special Provisions

State Parties

This Request for Bid is issued by the Wyoming Retirement Center, Wyoming Department of

Health.

Throughout this document and others in connection with this project, various references are made, or will be made to the "State". Generally, whenever this reference appears, the term "State" incorporates all state agencies that will be working on this project. “Department” and the

“Procuring Agency” are more particularly defined in Chapter One of the SCD's procurement rules.

Content and Procurement Points of Contact (includes Questions and Answers)

Point of Contact

The Procuring Agency is the primary point of contact from the Request for Bid release date until the completion of the project.

Questions and Clarifications

Written questions about the procurement process should be submitted through the

Public Purchase online bidding system until 3:00 p.m. MT, April 30, 2026. Any questions received after the deadline may not be accepted or considered. Each question should be submitted individually.

It is the bidder’s responsibility to review the Public Purchase online bidding system for answers to questions, addenda, or bid tabulations. Telephone calls, emails, or faxes may not be accepted.

Responses will not identify the bidder that submitted the question. Only the written answers issued by the Procuring Agency are the official position on an issue, and these answers shall become part of the Request for Bid.

Restrictions on Communication with Procuring Agency Staff

Until a bidder is selected and the selection is announced, bidders are not allowed to communicate with Procuring Agency staff except:

Procuring Agency representative;

Written questions through the Public Purchase online bidding system;

If a bidder violates this restriction, the Procuring Agency reserves the right to reject the bid.

Advertising Award Conditions

A fully executed contract shall be completed with the Procuring Agency before the successful bidder(s) may advertise the award of the contract or the services being provided. Any such publicity shall be made pursuant to the terms of the Contract.

The successful bidder(s) shall not refer to awards in commercial advertising in a manner that states or implies that the firm or its services are endorsed or preferred by the State of Wyoming, the Department or the Procuring Agency.

The Procuring Agency may award contracts to more than one bidder and may divide the award in as many ways as necessary, if it is in the best interest of the

Procuring Agency.

Beginning Work

The successful bidder(s) shall not perform any work that could be billed until a contract has been executed and the successful bidder has received a written notice to proceed. The Procuring Agency will not pay for any work completed by the bidders(s) before the contract execution date.

Cost of Preparing Bids

All costs incurred for preparing the bid and for other procurement related activities are solely the bidder’s responsibility. The Procuring Agency will not provide reimbursement for these costs.

Risks and Liability

By submitting a bid, the bidder assumes any and all risks and liability associated with information in the bid and its release.

Insurance

The bidder is required to furnish insurance documents per the provisions contained in the contract.

Questions regarding the required insurance coverages and limits for this project should be submitted in writing in accordance with instructions outlined in Section

2.

Wyoming Department of Health

Misrepresentation of Information

Misrepresentation of a bidder’s status, experience, or capability in the proposal may result in disqualification of that proposer from the selection process. Discovery of litigation or investigations in a similar area of endeavor may, at the discretion of the Wyoming State Construction Department and Procuring Agency, preclude the bidder from the selection process and consideration for future work with the State.

Disposition of Bids

All material submitted becomes the property of the State of Wyoming, which is under no obligation to return any of the material submitted.

Legal Considerations

This Request for Bid is issued under the provisions of W.S. 9-2-3006.

Bidders are presumed to know all requirements of the Request for Bid and applicable law. Any bid that fails to meet all requirements may, at the option of the

Procuring Agency, be rejected without further consideration.

Liquidated Damages

Liquidated damages will be assessed as per the provisions contained in the contract.

Prevailing Wages

Wyoming Prevailing Wage Act of 1967: Not less than the prevailing hourly rate of wages for work under this bid shall be paid to all workers unless otherwise specified in writing by the State Construction Department Director prior to this bid opening. Applies only if the contract amount is $100,000.00 or more.

Warranty

Warranties required by the contract documents shall commence on the date of

Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. Prior to the expiration of one (1) year after the date of Substantial Completion, or such longer period as may be prescribed by the contract documents, by law, or by the terms of any applicable special guarantee, the Contractor shall promptly, without cost to the State of

Wyoming and in accordance with the State of Wyoming’s written instructions, either correct such defective work or, if it has been rejected by the State of

Wyoming, remove it from the site and replace it with non-defective work. If the

Contractor does not promptly comply with the terms of such instruction, the State of Wyoming may have the defective work corrected or the rejected work removed

Wyoming Department of Health and replaced, and all costs incurred therefore, including compensation for additional professional services, shall be paid by the Contractor and its sureties.

The remedies provided in this section are in addition to all other remedies available to the State of Wyoming under applicable laws and shall not be construed as exclusive of any other legal right or remedy available to the State of Wyoming.

3. Key Dates

The following schedule of events is subject to change at the sole discretion of the Procuring

Agency:

Event Description Date Time

RFB Released 4/9/26 N/A

Pre-Bid Meeting Mandatory 4/28/26 10:00 a.m.

Closing date for questions submitted via Public

Purchase 4/30/26 3:00 p.m.

Answers to questions to be posted on Public

Purchase 5/4/26 3:00 p.m.

Bid Submission Due Date 5/12/26 1:00 p.m.

Tentative Contract(s) Award Date 6/1/26 N/A

Tentative or Estimated Work Begins Date 6/2/26 N/A

Tentative or Estimated Project Completion Date 10/31/26 N/A

Bid documents available by downloading from publicpurchase.com.

4. Specifications and Plans

Scope of services will be tailored to the specific services required for each project as shown in the attached Specifications and Plans. Specifications and Plans dated April 3, 2026 for this project will be included with the project information.

5. Submission of Bids

Bid Content

Bids shall be submitted on the approved Bid Forms with all required documents.

All submissions through an online platform shall be printable and searchable.

Pages shall be numbered consecutively and may not exceed the total number of pages specified, whether printed single-sided or double-sided.

Wyoming Department of Health

Required Bid Form information for this bid is shown in Table 5.1.

Table 5.1

Bid Form Section Equal to or above

$50,000 (Competitive

Sealed Bidding)

1. Bid Form Section 1, which includes:

● Bid Price

● Alternate and deductive alternate

(as applicable)

● Residency Identification

● Apprenticeship training program

(as applicable)

● Date

X

1b. Bid Form Section 2, which includes:

● Acknowledgement of any addenda

● Bonding Capacity

● Signature Page

X

2. References and Experience X

3. Proof of any Required Insurance X

Submission

Bids will be received as follows:

Bids will be received in electronic format and all bidding documents shall be uploaded to publicpurchase.com by 1:00 p.m. MT on May 12, 2026.

The bidder assumes full responsibility for timely delivery at the location specified for receipt of bids.

The bid tabulation can be viewed on publicpurchase.com after the bid opening date and time.

Bids shall be submitted on the Bid Form provided in Section 8.

Wyoming Department of Health

List of Proposed Subcontractors and Suppliers

A list of proposed subcontractors and certificates of residency for each Wyoming resident proposed shall be submitted within twenty-four (24) hours of bid opening. The list for each proposed subcontractor for the project shall include but is not limited to:

Description of work.

Contractor’s full legal name including Doing Business As (DBA) or subsidiaries.

Subcontractor’s anticipated percentage of work on this project (all subcontracts, self-performed work, general conditions and suppliers must equal the bid amount).

Suppliers.

Residency.

Contact information (phone number and email address).

The general contractor is only allowed to change the list of subcontractors after submission with the approval from the Procuring Agency. Changes to bids must be in compliance with SCD Rules

Chapter 3 Section 19(b). Failure to submit the required list and certificates may result in rejection of the bid.

Acceptance of Bids

The Procuring Agency reserves the right to reject any and all bids, and to waive bid irregularities as defined in the SCD Rules, Chapter 1 Section 2 when it is determined to be in the best interest of the State of Wyoming to do so. Bids with improper or missing signatures or lacking legible numerical values shall be rejected by the Department or Procuring Agency.

The Procuring Agency reserves the right to use procurement software and related technology, including but not limited to opening, noting, and time stamping receipt of bids.

Bids received after the exact time noted above will not be accepted on the Public Purchase online bidding system and will be rejected. Any bid modification received after the exact time noted will not be considered.

The Department Director may delegate the exercise of the Department’s discretion to Procuring

Agency.

Nothing in this section shall be construed to supersede, eliminate, or abrogate the authority of a public board, commission, or other such body to similarly exercise discretion in rejecting bids or solicitations.

Wyoming Department of Health

Submission of a bid constitutes bidder’s affirmation that all terms and conditions of the bid constitute a binding offer that shall remain firm for a period of NINETY (90) DAYS from the closing date of the RFB, but Procuring Agency may, at its sole discretion, release any bid.

6. Evaluation and Award

Evaluation of Bids Checklist

Table 6.1

Evaluation Summary MET/NOT MET

Completed Bid Form Section 1 MET/NOT MET

Completed Bid Form Section 2 MET/NOT MET

Completed Bid Bond Form MET/NOT MET

References and Experience MET/NOT MET

Signature Page MET/NOT MET

Required Proof of Insurance MET/NOT MET

Award

The Procuring Agency shall:

Evaluate bids to determine which bidders are responsible in accordance with the evaluation criteria set forth in the invitation for bids and requests for bids.

Determine which bid, submitted by a responsible, qualified bidder, offers the lowest cost to the Procuring Agency; and

If the project is valued equal to or above $50,000.00, the Procuring Agency shall notify the

Department in a written recommendation specifying the apparent responsible, qualified low bidder including justification for the recommendation. The contract shall be awarded to the lowest responsible bidder whose bid meets the requirements and criteria set forth in the solicitation for bids or request for bids.

A contract may not be awarded to a bidder submitting a higher quality item than that designated in the invitation for bids or request for bids, unless such bidder is also the lowest bidder as determined by value analysis or life-cycle cost formulas.

Estimated Quantities. If the Bid schedule herein contains estimated quantities, this provision is applicable. The quantities listed for each of the items in the bid schedule are only estimated quantities. Contractors are required to bid a firm Unit cost for each item specified. The actual quantities ordered may fluctuate up or down. The unit prices proposed by each bidder will remain firm and will not be re-negotiated. For bidding purposes, if there is a conflict between the extended total of an item, the Unit Price as written in words shall prevail.

Wyoming Department of Health

7. Bid Form Instructions

Fill in all blank spaces for bid prices in ink or typewritten words. The Bidder must include all unit cost items, lump sum and all alternates shown on the Bid Form. No segregated or qualified bids will be accepted. Total bid prices are to be written both by words and by figures in case of conflict the written word will apply.

Bids shall be completed and signed in ink or by verifiable electronic signature. Bids by partnerships must be signed with the partnership name by one of the partners, followed by the signature and designation of the partner signing.

The name of the person signing shall be typed or printed below the signature.

If erasures or other changes appear on the bid forms, each erasure or change must be initialed by the person signing the bid. Bid form will only be accepted if signed with ink or electronically. Do not deface or alter any portion of the original bid. Remarks should be shown as annotations to the bid.

Wyoming Department of Health

8. Bid Form-Section 1

RFB #26-0631

STATE OF WYOMING

WYOMING RETIREMENT CENTER

BASIN, WYOMING 82426

The undersigned hereby proposes to furnish all labor and materials and to perform all work necessary for the BOILER PLANT REPLACEMENTS, BASIN, BIG HORN COUNTY, Wyoming, in accordance with the Request for Bids, Special Provisions, Contract Provisions, and

Specifications and Drawings, as applicable for considerations in the following amounts:

WRC BOILER PLANT REPLACEMENTS: The bid number below is inclusive of all work identified within the contract documents. Such work shall include both the Skilled Nursing

Facility and Superintendent Residence work.

LUMP SUM: $____________________________________

(WRITTEN IN WORDS)

SKILLED NURSING BOILER PLANT REPLACEMENT: The bid number below (included in total lump sum above) shall be inclusive of all work identified within the contract documents for the Skilled Nursing Facility.

SUPERINTENDENT RESIDENCE BOILER PLANT REPLACEMENT: The bid number below

(included in total lump sum above) shall be inclusive of all work identified within the contract documents for the Superintendent Residence.

Wyoming Department of Health

If the project’s estimated cost is equal to or exceeds $1,000,000, will apprentices work at least

10% of the labor hours?

____ No

____ Yes

____ Project’s estimated cost is below $1,000,000

Are you submitting this bid as a Wyoming Contractor Resident Bidder?

____ No

____ Yes __________________

(Resident Contractor Certification Number)

My bid complies with W.S. 16-6-103. The project will be awarded based on the Bidder’s statement of meeting the requirements of W.S. 16-6-103. Subsequent information verifying the statute requirements have been met will be required up to and including possible audits. The audit is to confirm that the bidder has not subcontracted more than a total of 30% of the work covered by his contract to non-resident subcontractor and nonresident sub-tier contractors.

Dated_________________________, 2026

Wyoming Department of Health

9. Bid Form - Section 2

STATE OF WYOMING

WYOMING RETIREMENT CENTER

BASIN, WYOMING 82426

Bidder to acknowledge receipt of the Addenda:

Addenda No. # / # / # / # /

That for and in consideration of the amount shown above, this Bidder shall perform the work of

Boiler Plant Replacements in a good workmanlike and substantial manner and to the full satisfaction of and under the supervision of the design professional, or representative, in charge of the Project. In the prosecution of the work, the Bidder shall, at his own cost and expense, furnish all labor, machinery, tools, equipment, materials, and supplies except such equipment and materials which shall be furnished by the State of Wyoming, as provided in the Specifications, Contract, and shall perform the work in strict conformity with the Specifications relative to this work.

In consideration of the covenants and agreements to be kept and performed by the Bidder and for the faithful performance of this Bid and the completion of the work embraced herein according to the plans, specifications, drawings and conditions herein contained and referred to, the Procuring

Agency shall pay and the Bidder shall receive and accept as full compensation for everything furnished and done by the Bidder under this bid and also for all loss or damage arising out of the nature of the work, the action of the elements or from any unforeseen contingencies or difficulties encountered in the prosecution of the work, the prices stipulated above.

Said work shall be commenced upon notice to proceed and shall be completed per contract documents provided, however, that should the Bidder be delayed in the prosecution of the work by any act, neglect or fault of the State of Wyoming, or by any damage caused by fire, flood or other casualty over which the Bidder has no control, then the time herein set for the completion of the work may be extended as determined by mutual agreement of the parties hereto. Weather conditions are not considered as a casualty that will allow an extension. Contractors shall be responsible to consider and include within the Contract Price the climatic conditions of the location of the project that may delay the work. The State of Wyoming hereby reserves the right to accept and make use of any portion of said facilities before completion of the entire work without invalidating the contract, or binding said State of Wyoming, and accept the remainder of the work or any portion thereof, whether completed or not and without in any way thereby releasing the bid bonds of said Bidder.

It is also agreed by the parties hereto that the Request for Bids, Drawings, Contract, and

Specifications, herein referred to, form an essential part of this document and whether the same are attached hereto or on file in the Wyoming State Construction Department at Cheyenne, Wyoming, they shall have the same force and effect as if spread at length herein.

Wyoming Department of Health

If written Notice of Acceptance of this bid is delivered to this bidder within ten (10) calendar days after date of bid opening, this bidder will within twenty (20) calendar days after date of such notice, execute and deliver the Bidder's Bonds and all required insurance documents.

The bidder hereby agrees that should he be awarded this contract, bidder shall not discriminate against any person who performs work there under because of age, race, religion, color, sex, national origin or ancestry.

The bidder also covenants and agrees and that this Bid is made without collusion with any other person, firm or corporation; that he has carefully examined the Request for Bids, Contract, and

Specifications and Plans governing the work included in this Bid, and has inspected the site of the work and fully understands the physical conditions under which the work must be performed.

The bidder may be required to perform extra work as set forth in the contract.

Name of Bidder

Mailing Address City, State, Zip

Remit/Billing Address City, State, Zip

E-mail address

Print Name of Person Signing

Signature

Phone Number

Tax ID Number- please do NOT provide social security number

Name, Title and Email Address of Person Signing the Contract:

Name & Title (Print) _______________________________________

Email Address ____________________________________________

Wyoming Department of Health

10. Signature Page

THIS FORM MUST BE SIGNED AND SUBMITTED WITH YOUR BID

BY SUBMISSION OF A BID, THE BIDDER CERTIFIES:

Prices in this bid have been arrived at independently, without consultation, communication or agreement for the purpose of restricting competition.

No attempt has been made nor will be by the bidder to induce any other person or firm to submit a bid for the purpose of restricting competition.

The person signing this bid certifies that he/she is authorized to represent the company and is legally responsible for the decision as to the price and supporting documentation provided as a result of this request for bid.

OWNERSHIP AND CONTROL:

Bidder's Legal Structure:

_______ Sole Proprietorship _______General Partnership

________Corporation _______Limited Partnership

________Limited Liability Company _______Other______________

If Bidder is a sole proprietorship, list:

Owner Name___________________________ Phone ( ______ )_________________

Mailing Address_______________________________________________

City________________ State______________ Zip________________

Beginning date as owner of sole proprietorship___________________

Wyoming Department of Health

Provide the names of all individuals authorized to sign for the bidder:

NAME (printed or typed) TITLE

VERIFICATION

I certify under penalty of perjury, that I am a responsible official (as identified above) for the business entity described above as Bidder, that I have personally examined and am familiar with the information submitted in this disclosure and all attachments, and that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including criminal sanctions which can lead to imposition of a fine and/or imprisonment.

Signature

Name and Title Date

Wyoming Department of Health

11. References and Experience

⬜ The following page limits apply: 3

Company Name___________________________________

Experience:

If more space is needed, submit on a separate sheet(s) of paper.

Within the last five years, has your organization ever failed to complete any work awarded to it or has any officer of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If “yes”, explain)

Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? (If “yes”, explain)

Has your organization filed any lawsuits or requested arbitration with regard to any contracts within the last five years? (If “yes”, explain)

References:

List only references and projects similar to the type and size of this bid. Projects must have been completed within the past five (5) years.

Describe any scheduling challenges presented by the project and how your company will address these challenges.

Reference Contact Information

Wyoming Department of Health

Provide three (3) current or recent references; information may be in any format

Name of Project

Project Type and Scope

Project Location

Description of work

Reference name and Title

Reference Contact Information (Address, Phone number, Email)

Project Location

Description of work

Project Location

Description of work

Wyoming Department of Health

12. Proof of any Required Insurance

Provided by each bidder as part of their bid; attached to the contract of the selected bidder.

Wyoming Department of Health

13. List of Attached Documents

Sample Contract

Specifications

Plans

Contractor’s Affidavit

Prevailing wages

CONTRACTOR'S AFFIDAVIT

SWORN STATEMENT FOR PROGRESS PAYMENT NO. _____

PURSUANT TO WYOMING STATUTE § 16-6-1001

AMENDED BY EXECUTIVE ORDER 2011-2

RE: ___ ____

PROJECT TITLE

This statement is submitted by _____________________________________ (Contractor) to satisfy Wyoming Statute § 16-6-1001.

I, __________________________________________, the authorized representative of the Contractor, hereby certify that all claims for materials and labor performed under the contract for the above-referenced project have been paid through Progress Payment No. ______, less any contracted amounts held for retainage.

If any claim for material and labor is disputed this sworn statement shall so state, and the amount claimed to be due shall be deducted from the progress payment due the Contractor and retained by the State of Wyoming until the determination of the dispute, either by judicial action or consent of the parties, and then paid by the agent or agency to persons found entitled thereto.

For all amounts billed and paid to date, no known mechanics' or materialmen's liens, or claims for unpaid material, labor or equipment are outstanding, and that there is no known basis for the filing of any mechanics' or materialmen's liens on the work for which applications for payment have been made to date, or for the filing of any claims for unpaid bills for labor, material or equipment on such work, and that the Contractor has obtained from all subcontractors and materialmen waivers in such form as to constitute an effective waiver of lien or claim under the laws of Wyoming.

Claims for material and labor being disputed are stated as follows (list laborer name and amount due below):

Signature Date

Title

STATE OF WYOMING )

COUNTY OF ____________ )

The foregoing instrument was subscribed and sworn to before me by _____________________ who is the _________________ of _____________________ this _____ day of ____________, 20____.

Witness my hand and official seal.

Notary Public

My Commission Expires:

Code No. Craft

Basic Hourly Rate Method

Hourly Fringe Benefit Method

2000 Mechanical, Heat and Frost Insulation $25.50 3 $2.63 3 2050 Asbestos Removal, Abatement, Demolition $23.00 2 $0.00 1 2100 Boilermaker $38.42 4 $32.82 4 2200 Bricklayers and Masons $32.87 1 $14.52 1 2300 Carpenters and Joiners $29.05 3 $5.48 3 2400 Electricians $35.17 4 $14.33 4 2500 Elevator Constructors $56.57 4 $41.83 4 2600 Iron Workers $33.68 2 $12.69 3 2700 General Laborers - Group I $22.77 3 $2.68 3 2800 Semi-Skilled Laborers - Group II $25.40 3 $2.68 4 3000 Tenders - Group IV $25.40 4 $3.99 3 4000 Millwright Machinery Workers $40.19 4 $20.79 4 4100 Operating Engineers - Group I $30.68 3 $7.61 3 4200 Operating Engineers - Group II $30.68 4 $7.61 4 4300 Operating Engineers - Group III $30.68 4 $7.61 4 4400 Operating Engineers - Group IV $30.68 4 $7.61 4 4500 Operating Engineers - Group V $30.68 4 $7.61 4 4600 Operating Engineers - Group VI $41.25 3 $9.91 3 4700 Operating Engineers - Group VII $41.25 4 $9.91 4 5000 Painters and Allied Trades $27.12 3 $0.00 1 5050 Sheetrock and Drywall Installers $29.76 3 $5.16 3 5100 Carpet, Linoleum and Resilient Tile Layers $40.00 1 $0.00 1 5200 Fire Sprinkler Installers $35.69 3 $9.36 3 5250 Fire System Installers (non-water) $31.77 3 $7.05 3 5300 Plumbers and Pipe fitters $36.94 3 $9.49 3 5400 Roofers $22.77 3 $0.00 1 5500 Sheet Metal Workers $31.20 3 $6.59 3 5600 Cement Masons/Plasterers $28.00 2 $4.20 3 5700 Glaziers $24.62 3 $4.64 3 5750 Blinds/Window-covering Installer $11.96 4 $0.00 4 5800 Marble, Tile, and Terrazzo Setters $36.00 1 $12.00 1 6000 Teamsters - Group I $25.96 3 $3.83 3 6100 Teamsters - Group II $29.64 3 $9.22 3 6200 Limited Electricians (90 Volt or Less) $32.62 3 $6.43 3

Notes:

Methods

1 Majority. If 50% of workers or more within a labor group earn the same wage/fringe benefit, this becomes the prevailing wage/fringe benefit benefit for the labor group in the respective district. If two different wages/benefits each account for 50% for a labor group within a district, a weighted average is performed.

2 Significant Minority. If 30% of workers or more within a labor group earn the same wage, this becomes the prevailing wage for the labor group in the respective district. If two different wages each account for 30% for a labor group within a district, a weighted average is performed. This method is not used for benefits.

3 Weighted Average. If no significant minority exists for a wage/fringe benefit, the prevailing wage/fringe benefit is calculated as {[(Total Hourly Wage or Fringe Benefit)/(Number of Workers)] + [(Total Wages Or Benefits Paid)/(Hours Worked)]}/2.

4 Other Adjustments. If no data is received by the survey for a particular classification an inflation adjustment is applied based on the previous year wage and benefit according to rules and regulations of the Department of Workforce Services.

If 30% or more of reported workers and hours were party to a collective bargaining agreement (CBA), the current CBA wage/benefits rates were used ( as long as Method 1 does not apply).

If 50% or more of workers and/or hours were reported with benefits, benefits are computed using Method 3.

Highlighted sections indicate trades where skill adjustment may be necessary to ensure higher skilled positions pay at least equal to lower skilled occupations.

2025 Building Construction Prevailing Wages

Statewide (All Counties)

Code No. Craft Basic Hourly

Rate Method

Hourly Fringe Benefit

Method Basic Hourly Rate Method

Hourly Fringe Benefit Method

Basic Hourly Rate Method

Hourly Fringe Benefit Method

Basic Hourly Rate Method

Hourly Fringe Benefit Method

101 Laborers: Group I $21.80 3 $0.00 1 $21.68 3 $0.00 1 $22.55 3 $3.75 3 $20.99 3 $4.08 3 102 Laborers: Group 2 $23.04 3 $4.57 3 $22.90 3 $4.08 3 $24.15 3 $5.72 3 $22.25 3 $5.56 3 103 Laborers: Group 3 $26.00 3 $8.52 3 $24.50 3 $6.52 3 $28.46 3 $10.70 3 $31.05 1 $11.25 1 201 Truck Drivers: Group

1 $25.96 3 $4.38 3 $26.01 3 $3.69 3 $25.89 3 $10.61 1 $26.48 3 $5.60 3 202 Truck Drivers: Group

2 $27.79 3 $6.50 3 $28.37 3 $5.93 3 $25.89 4 $10.61 4 $28.14 3 $7.20 3 301 Power Equipment

Operators: Group 1 $26.92 3 $5.83 3 $26.90 3 $5.13 3 $27.57 3 $7.24 3 $25.00 2 $6.28 3 302 Power Equipment

Operators: Group 2 $28.88 3 $8.50 3 $28.56 3 $8.01 3 $31.81 3 $12.32 3 $28.60 3 $7.44 3 303 Power Equipment

Operators: Group 3 $32.13 3 $8.58 3 $32.72 3 $8.10 3 $31.81 4 $12.32 4 $30.00 2 $8.56 3 401 Carpenter $30.95 3 $8.16 3 $29.40 3 $5.25 3 $34.26 3 $13.81 3 $27.07 4 $2.37 4 501 Concrete Finisher $30.01 3 $8.84 3 $30.12 3 $7.39 3 $29.75 3 $14.21 3 $28.00 1 $7.46 1 601 Ironworker $46.00 1 $0.00 1 $46.00 1 $0.00 1 $36.94 4 $9.30 4 $35.24 4 $28.33 4 901 Electrician (Inside

Wireman, Outside Lineman and Signal and Lighting work) $58.83 4 $21.89 4 $58.83 4 $21.89 4 $58.83 4 $21.89 4 $58.83 4 $21.89 4

902 Groundman $34.72 4 $17.64 4 $34.72 4 $17.64 4 $37.59 4 $16.42 4 $34.68 4 $16.91 4

Equipment Operator $48.91 4 $20.61 4 $48.91 4 $20.61 4 $53.39 4 $17.73 4 $48.86 4 $18.79 4

Notes:

Methods: 1 Majority. If 50% of workers or more within a labor group earn the same wage/fringe benefit, this becomes the prevailing wage/fringe benefit benefit for the labor group in the respective district. If two different wages/benefits each account for 50% for a labor group within a district, a weighted average is performed.

2 Significant Minority. If 30% of workers or more within a labor group earn the same wage, this becomes the prevailing wage for the labor group in the respective district. If two different wages each account for 30% for a labor group within a district, a weighted average is performed. This method is not used for benefits computations.

3 Weighted Average. If no significant minority exists for a wage/fringe benefit, the prevailing wage/fringe benefit is calculated as {[(Total Hourly Wage or Fringe Benefit)/(Number of Workers)] + [(Total Wages Or Benefits Paid)/(Hours Worked)]}/2.

4 Other Adjustments. If no data is received by the survey for a particular classification an inflation adjustment is applied based on the previous year wage and benefit according to rules and regulations of the Department of Workforce Services.

If 30% or more of reported workers and hours were party to a collective bargaining agreement (CBA), the current CBA wage/benefits rates were used ( as long as Method 1 does not apply).

If 50% or more of workers and/or hours were reported with benefits, benefits are computed using Method 3.

Highlighted sections indicate trades where skill adjustment may be necessary to ensure higher skilled positions pay at least equal to lower skilled occupations.

2025 Heavy and Highway Prevailing Wages including Statewide (all Counties) Wages

Statewide (All Counties) Statewide excluding Laramie and Natrona

Counties (Region 3) Laramie County (Region 2) Natrona County (Region 1)

CONTRACT BETWEEN THE STATE OF WYOMING

STATE CONSTRUCTION DEPARTMENT, CONSTRUCTION MANAGEMENT DIVISION

AND [INSERT CONSULTANT’S LEGAL NAME]

[PROJECT #______/PS#______]

TEMPLATE DATE: 2/28/25, #211661

CONTRACT BETWEEN THE STATE OF WYOMING

STATE CONSTRUCTION DEPARTMENT,

CONSTRUCTION MANAGEMENT DIVISION

AND

[INSERT CONTRACTOR’S FULL LEGAL NAME]

1. Parties. The parties to this Contract are the State of Wyoming, State Construction Department, Construction Management Division (Owner) whose address is 700 West 21st Street, Cheyenne, Wyoming 82002; and [Name] (Contractor), whose address, for the purposes of this Contract, is [Address].

2. Purpose of Contract. The purpose of this Contract is to set forth the terms and conditions by which Contractor shall accomplish all the construction services required (Work) for the [___________] at the [_____________] in [________], Wyoming (Project). The Project Site shall be located at [Address/Coordinates]. All Work shall be performed pursuant to the Contract and Attachment A, [Attachment Name], which is more fully described in Subsection 10.K below, and is incorporated into this Contract by this reference.

3. Term of Contract. This Contract is effective when all parties have executed it (Effective Date). All services shall be completed during the term specified herein. The performance period of this Contract is from the Effective Date through the end of the latest warranty period (Contract Time). The Contract shall remain in effect until Contractor’s services are completed to the satisfaction of Owner or the Contract is terminated, whichever is earlier.

A. The Work to be performed under this Contract shall be commenced within ten (10) calendar days after receiving the Notice to Proceed, and,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .