This is a Bid Notice for a construction project issued by the City of Crete, Nebraska, for the 2025 New Well and Transmission Main Project (SRF Project No. D311654). The project involves construction of a new public supply well, a well building, and approximately 6,250 linear feet of 12-inch PVC water transmission main. Sealed proposals will be received by the City Administrator at 243 East 13th Street, Crete, Nebraska, until 2:00 PM on May 12, 2026, at which time bids will be read aloud. Proposals must be submitted on forms furnished by the Engineer and shall be taken on a unit price basis or as an aggregate bid for the entire project. Complete digital project bidding documents are available through JEO Consulting Group's website at jeo.com for $30, with an optional paper set available for $100 per set. Interested bidders should contact Sarah Divis at 402.443.7496 or sdivis@jeo.com to coordinate document requests.
The Opinion of Probable Cost for the project is $2,250,000.00. All bids must be accompanied by Bid Security of not less than 5% of the bid amount, made payable to the Treasurer of the City of Crete as liquidated damages should the bidder fail to enter into the contract. The project is federally assisted and subject to prevailing wage requirements established by the U.S. Department of Labor. Bidders and contractors must comply with EPA Form 5700-49 Certification Regarding Debarment, Disadvantaged Business Enterprise (DBE) requirements with fair share objectives for disadvantaged business participation, and Build America Buy America (BABA) Act requirements, which mandate that all iron, steel manufactured products, and construction materials permanently incorporated into the project be produced in the United States unless a waiver is granted. The City reserves the right to waive informalities and irregularities, reject any or all bids, and award based on proposals that best serve the project's interests.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDS
SECTION 00 10 00
INVITATION TO BID
Sea led P roposa l s f o r t he construct ion of “2025 New Well and Transmission Main, SRF Project No. D311654 for the City of Crete,” JEO Project No. 210597.00, QuestCDN No.
9664710, will be received by the City Administrator at 243 East 13th Street, Crete, NE 68333-0086, until 2:00PM on the 12th day of May 2026, and thereafter will be read aloud The work is generally described as follows: Construction of a new public supply we, well building, and approximately 6,250 linear feet of 12” PVC water transmission main.
Opinion of Probable Cost $2,250,000.00
Proposals will be taken for said construction work listed above by unit prices, as an aggregate bid for the entire project.
All Proposals for said construction work must be made on blanks furnished by the Engineer and must be accompanied by Bid Security of not less than 5% of the amount bid. Bid Security to be made payable to the Treasurer of the City of Crete as liquidated damages in case the bid is accepted and the bidder neglects or refuses to enter into contract and furnish bond in accordance herewith.
Copies of the contract documents are on file with the City of Crete for examination by bidders.
Complete digital project bidding documents are available at JEO’s website at jeo.com for $30. An optional paper set of project documents is available for a non-refundable price of $100 per set.
Please contact Sarah Divis at 402.443.7496/sdivis@jeo.com to coordinate your request and send your check to: 1937 North Chestnut Street, Wahoo, NE.
In order to bid the project, the contract documents must be issued directly by JEO Consulting Group, Inc. or QuestCDN to the bidder.
For all further requirements r e g a r d i n g b i d s u b m i t t a l , qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Contractors and subcontractors on USEPA federally assisted c o n s t r u c t i o n p r o j e c t s a r e required to pay their laborers and mechanics wages not less than those established by the U.S. Department of Labor. A current wage decision containing the appropriate building and/ or heavy type rates is included in the specifications for bidding purposes.
The prospective participants must certify by submittal of EPA Form 5700-49, Certification Regarding Debarment, Suspension and Other Responsibility Matters, that to the best of its knowledge and belief that it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency Bidders on this work will be required to comply with the President’s Executive Order No.
11246. Requirements for bidders and contractors under this order are explained in the specifications.
(NOTE: Pursuant to Executive Order 14173, Executive Order 11246 was rescinded on January 21, 2025. Title VII of the Civil Rights Act of 1964 (Title VII), enforced by the Equal Employment Opportunity Commission (EEOC), remains in effect and generally prohibits employment discrimination on the basis of race, color, religion, sex, or national origin.)
Each bidder must fully comply with the requirements, terms and condi t ions of the U.S.
E n v i r o n m e n t a l P r o t e c t i o n Agency, Disadvantaged Business Enterprise (DBE requirements, i n c l u d i n g t h e f a i r s h a r e objectives for disadvantaged business participation during the performance of this contract. The bidder commits itself to the fair share objective for disadvantaged business participation contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid.
On January 17, 2014, H.R. 3547, “Consolidated Appropriations Act, 2014,” was enacted. Section 436 of the Act requires that none of the appropriated funds may be used for the construction, al terat ion, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States, unless a waiver is provided to the recipient by EPA.
Conditions for the waiver are found under the Information for Bidders. The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials.
On November 15, 2021, the infrastructure investment and Jobs Act IIJA) was passed. Section 70901 of Public Law 117-58, et seq., as amended, and Section 70914(a) of the IIJA require that Federal funding for infrastructure, including Wastewater Treatment and Pub l i c Wate r Sys tem projects, complies with the Build America Buy America (BABA) Act. Absent a waiver, all iron, steel manufactured products, and construction materials permanently incorporated into an infrastructure project receiving BIL funding or are an SRF Equivalency project as match for Federal funding, are subject to the BABA requirements and must be produced in the United States. Conditions for the waiver are found under the information for Bidders.
The Owner reserves the right to wa ive in formal i t ies and irregularities and to make awards on bids which furnish the materials and construction that will, in their opinion, serve the best interests of the Project and also reserves the right to reject any and/or all bids
CITY OF CRETE
Dave Bauer Mayor
ATTEST: Tom Ourada, City Administrator CR — April 08, 15, 22, 2026
ZNEZ
Franklin Ave., Entrance #2). The
SECTION 00 10 00 INVITATION TO BID
Crete News Crete, Nebraska, US
Wednesday, April 8, 2026 Page 10, Section: PUBLIC NOTICES 861 words, 85in² in size 1,325 circulation
This document is intended for internal research purposes only.
Copyright remains the property of the content creator.
File details come from the government source that posted it. Updated .