Bid No. 26-05 - Plans - Great River Park Project.pdf
PDF 27 MB Posted
- Attached to
- Great River Park Improvement Project
- Solicitation number
- Bid No. 26-05
- Issued by
- Hartford County, Connecticut
About this file
This document is a comprehensive set of plans and specifications for Bid No. 26-05 related to Great River Park improvements located in East Hartford, Connecticut, prepared by GEI Consultants, Inc. for Riverfront Recapture, Inc. The project encompasses waterfront improvements, lighting infrastructure, landscape enhancements, and signage installation across multiple phases. The base bid includes demolition of existing timber piers and overlooks, construction of a new concrete pier with mooring piles, installation of timber floats and gangway systems, replacement and installation of electrical site lighting poles (18 total poles: 7 on existing foundations and 11 on new foundations), and landscape preparation and planting at the pier areas. Bid Alternate 1 addresses landscape improvements at the Bulkeley Bridge Overlook; Bid Alternate 2 covers concrete repairs at the Founders Bridge/Pitkin Street entry; and Bid Alternate 3 includes comprehensive wayfinding signage and display installations throughout the park. The document was issued for bid on January 22, 2025, with a base bid and alternate options available. Construction access is designated through the park's shared-use path with staging areas beneath the Founders Bridge, and erosion and sediment control measures, including silt fencing and turbidity curtains, are specified for in-water work.
The project specifications indicate that all work must comply with current applicable codes and the National Electric Code (NFPA 70), with the electrical contractor responsible for obtaining permits, testing systems, and providing one-year warranties on materials and workmanship. The contractor is required to visit the site prior to bidding to assess existing field conditions and coordinate with utility companies and other trades. All disturbed areas must be restored with appropriate base materials, pavement, or loam and seed upon completion. Funding sources and specific contract pricing terms are not detailed in this plans document. The project addresses existing infrastructure replacement, ADA accessibility improvements, and environmental compliance through turbidity control measures and erosion management. The designs incorporate sustainable landscape practices using native floodplain plant mixes and perennial groundcovers, with detailed specifications for tree protection, planting standards, and site restoration included throughout the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
Middlesex New London
New Haven
TollandHartford
Windham
Fairfield
Litchfield
---- B:\Working\RIVERFRONT RECAPTURE, INC\2002828 Great River Park Improvement\00_CAD\Design\Working\FINAL Landside\G-001 G-002 R1.dwg - 4/29/2025
STATE or COUNTY MAP
(NOT TO SCALE)
SITE LOCATION MAP
(NOT TO SCALE)
RIVERFRONT RECAPTURE, INC.
GREAT RIVER PARK IMPROVEMENTS
301 EAST RIVER DRIVE,
EAST HARTFORD, CT 06108
GEI PROJECT NO. 2002828
MAY 8, 2025
SITE
PREPARED FOR:
RIVERFRONT RECAPTURE, INC
50 COLUMBUS BLVD
HARTFORD, CT 06106
(860) 713-3131
Consultants
PREPARED BY:
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
SHEET NO.
G-001
THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED
HEREIN, IS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE
PROPERTY OF GEI CONSULTANTS AND IS NOT TO BE USED, IN WHOLE
OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN
AUTHORIZATION OF GEI CONSULTANTS.
SITE
LANDSCAPE ARCHITECT:
RICHTER & CEGAN INC
8B CANAL COURT P.O. BOX 567
AVON, CT 06001
(860)678-0669
ELECTRICAL ENGINEER:
RZ DESIGN ASSOCIATES
750 OLD MAIN STREET, SUITE 202
ROCKY HILL, CT 06067
(860)436-4336
WAYFINDING/SIGNAGE:
ADAMS/AHERN
120 VANDERBILT AVENUE
WEST HARTFORD, CT 06110
(860)523-8835
SURVEYOR:
BSC GROUP
655 WINDING BROOK DRIVE
GLASTONBURY, CT 06033
(860)652-8227
/2
9/
2:
:4
PM
B:
\W or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
G -0
G
-0
R 1.
dw g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
SHEET INDEX
SHEET NO. SHEET NAME
GENERAL PLANS (COMMON TO ALL PHASES)
G-001 COVER SHEET
G-002 SHEET LIST
G-100 PROJECT AREA
G-101 EXISTING CONDITIONS 1 OF 4
G-102 EXISTING CONDITIONS 2 OF 4
G-103 EXISTING CONDITIONS 3 OF 4
G-104 EXISTING CONDITIONS 4 OF 4
G-105 CONSTRUCTION ACCESS AND STAGING PLAN
BASE BID - WATERFRONT AND LIGHTING
C-002 DEMOLITION OVERLOOKS
C-003 LIMIT OF WORK AND TURBIDITY CURTAINS
C-004 PROPOSED SITE PLAN
C-005 EXISTING FLOAT AND GANGWAY
C-006 PROPOSED PIER
C-007 PROPOSED FLOAT AND GANGWAY
C-008 CONCRETE DETAILS
C-009 FLOAT PLAN & DETAILS
C-100 LIGHTING OVERVIEW PLAN
E0 ELECTRICAL NOTES AND ABBREVIATIONS
E1 ELECTRICAL SITE LIGHTING PLAN
E2 ELECTRICAL SITE LIGHTING PLAN
E3 ELECTRICAL DETAILS
E4 ELECTRICAL DETAILS
L-141 LANDSCAPE PREPARATION PLAN (PIERS)
L-151 LANDSCAPE PLANTING PLAN (PIERS)
L-401 (NOTATED) ENLARGEMENT PLANS
G-106 (NOTATED) EROSION AND SEDIMENT CONTROLS
SHEET INDEX G-002
SHEET INDEX (CONTINUED)
SHEET NO. SHEET NAME
BID ALTERNATE 1 - BULKELEY BRIDGE OVERLOOK
L-111 LANDSCAPE PREPARATION PLAN (BULKELEY BRIDGE OVERLOOK)
L-121 LANDSCAPE LAYOUT AND MATERIALS PLAN (BULKELEY BRIDGE OVERLOOK)
L-131 LANDSCAPE GRADING AND PLANTING PLAN (BULKELEY BRIDGE OVERLOOK)
L-401 (NOTATED) ENLARGEMENT PLANS
G-106 (NOTATED) EROSION AND SEDIMENT CONTROLS
BID ALTERNATE 2 - CONCRETE REPAIRS
L-402 ENLARGEMENT PLAN - BULKELEY BRIDGE/PITKIN STRET ENTRY
C-200 FOUNDERS BRIDGE/PITKIN STREET ENTRY CONCRETE REPAIRS
C-201 FOUNDERS BRIDGE/PITKIN STREET ENTRY CONCRETE JOINT REPAIRS
C-202 CONCRETE REPAIR DETAILS
BID ALTERNATE 3 - SIGNAGE
SP-00 SIGNAGE/DISPLAY DISTRIBUTION PLAN
SP-01 SIGNAGE GRAPHIC DETAILS
SP-02 SIGNAGE GENERAL DETAILS
SP-03 SIGNAGE ENTRY POINT PANEL SIGNS
SP-04 SIGNAGE AMENITY SIGNS POST/PANEL SIGNS
SP-05 SIGNAGE LAMP POST DIRECTIONAL SIGNS
SP-06 SIGNAGE LOOKOUT DISPLAY RAILING MOUNT
SP-07-A SIGNAGE LOOKOUT DISPLAY FREESTANDING GENERAL DETAILS
SP-07-B SIGNAGE LOOKOUT DISPLAY FREESTANDING FRAME & PANEL CONFIGURATION
DETAILS (COMMON TO ALL PHASES)
L-501 LANDSCAPE DETAILS
L-502 LANDSCAPE DETAILS
C-300 MISCELLANEOUS DETAILS
C-301 EROSION AND SEDIMENT CONTROL DETAILS
WOOD
SHED
EAST
RIVER
DRIVE
"G R
EAT R
IVER
PAR
K"
AM
PH
ITH
EATER
D R
IV
E
IVER
RT. 84 E.B.
EXIT RAMP
RT. 84 E.B.EXIT RAMP
METAL
SHED
2 PITKIN
STREET
PUMP
STATION
1 STORY
BRICK BUILDING
HARTLAND
STREE
PITKIN
STR
EET
EXTEN
SIO
N
101 EAST R
IVER
D R
IVE
M U
LTI STO
R
Y O
FFIC
E BU
ILD
IN
G
99 EAST R
IVER
D R
IVE
M U
LTI STO
R
Y O
FFIC
E BU
ILD
IN
G
235 EAST RIVER DRIVE
MULTI STORY
CONDOMINIUM BUILDING
& PARKING GARAGE
M U
LTI STO
R
Y
PAR
KIN
G G
AR
AG
E
CONC. SLAB
(ABOVE)
CONC. SLAB / MULTI
LEVEL PARKING GARAGE
T. 2
RT. 2
(R T. 84 E.B.)
BU
LKELEY BR
ID
G
E
(FORMERLY ASH STREET)
(FORMERLY ASH STREET EXTENSION)
(FORMERLY SULLIVAN DRIVE)
(FORMERLY GILBERT STREET)
(SEE N
O
TE #20)
CONCRETE OFFICE
BUILDING
2 STO
R
Y
6 STO
R Y
6 STO
R
Y
2 STO
R Y
(R T. 84 E.B.)
BU
LKELEY BR
ID
G
E
(R T. 84 W
.B.)
BU
LKELEY BR
ID
G E
(FORMERLY SULLIVAN DRIVE)
(FO
R
M
ER
LY C
O
N N
EC
TIC
U
T BO
U
LEVAR
D
COASTAL JURISDICTION LINE
(ELEV. 3.8)
STATE WETLANDS
FEDERAL WETLANDS
COASTAL JURISDICTION LINE
(ELEV. 3.8)
STATE WETLANDS
FEDERAL WETLANDS
GREAT RIVER PARK
ENTRANCE
P
IT
K
IN
S T
R E
E T
EAST RIVER DRIVE
FOUNDERS
BRIDGE
BULKELEY
BRIDGE
CONNECTICUT RIVER
RIVERPOINT
FLOOD WALL
EA
ST R
IVER
D
R
IVE
EAST
RIV
ER D
RIV
E
BOAT
RAMP
FLOOD ZONE AE (F
LOODWAY)
FLOOD ZONE X - S
HADED
FLOOD ZONE AE (FLOODWAY)
FLOOD ZONE X - SHADED
200' UPLAND REVIEW WATERCOURSE BUFFER
100' UPLAND REVIEW INLAND WETLANDS BUFFER
200' UPLAND REVIEW
WATERCOURSE
BUFFER
FOUNDERS BRIDGE /
PITKIN STREET ENTRY
BULKELEY BRIDGE
OVERLOOK
OVERALL
PROJECT AREA
G-101
G-102
G-103
G-104
PROJECT AREA
(SIGNAGE ONLY)
PROJECT AREA
(SIGNAGE ONLY)
OVERALL
PROJECT AREA
SCALE, FEET
75 150 300
/3
0/
2:
:3 or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
G -1
R
1.
dw g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
PROJECT AREA G-100
48"
TREE
24"
TREE
12"
TREE 42"
MAPLE
36"
MAPLE
30"
MAPLE
30" TWIN
MAPLE
18"
MAPLE
40"
TREE
30"
MAPLE
36"
MAPLE
24"
MAPLE
24"
MAPLE
40"
TREE
30"
MAPLE
16"
MAPLE
20"
MAPLE
16" TWIN
MAPLE
30"
MAPLE
20"
MAPLE
20"
MAPLE
24"
MAPLE
24"
MAPLE
30"
MAPLE
26"
MAPLE
24"
MAPLE
20"
MAPLE
48"
TREE
22"
TREE
10"
ASH
BOAT
LAUNCH
SIGN
PKG.
SIGN
PKG. SIGNS (2)
PKG.
SIGN
PEDESTRIAN
SIGN
BOAT
CAUTION
SIGN
BOAT
CAUTION
SIGN
BOAT
LAUNCH
SIGN
PARK
INFO
SIGN
DIRECTIONAL
SIGN
STOP SIGN
STOP
SIGN
CATCH BASIN
TF=37.19
CATCH BASIN
TF=12.46
INV=9.41(NE)
INV=9.25(SE)
INV
OUT=N/A(SW-HOODED)
WOOD
SHED
GRAN.
CURB
BIT. CURB
CURB
BIT.
BIT. CURB
BIT. CURB
CURB
CO
NC.
BIT. CURB
BIT. CURB
BIT. CURB
CONC. CURB
BIT.CURB.
BIT. CURB
CONC. CURB
BIT. CURB CONC. CURB
BIT. CURB
CONC. CURBBI
T.
C U
R B
CONC. CURB
15" RCP
INV=8.26
TIMBER WALL
(TYP.)
TIMBER
CURB
TIMBER
CURB
TIMBER WALL
(TYP.)TIMBER STEPS
w/HANDRAIL
TIMBER
STEPS
TIMBER STEPS
w/HANDRAIL
TIMBER
STEPS
WOOD POST
GUARDRAIL
WOOD POST
GUARDRAIL
DRAINAGE MH
TF=40.99
10'
APPROX. LOCATIONEASEMENT INFAVOR OF HELT CO.(SEE NOTE #21)
X-SHADED
FLOOD ZONE
18"
MAPLE 30"
MAPLE
INV OUT=17.60(N)INV OUT=
17.03(NW)
TF=36.34
INV OUT=
33.89(NE)
INV=17.13(NE)
INV=17.21(S)
TF=21.92
DRAINAGE MH
TF=22.14
CATCH BASIN
CATCH BASIN
FLOOD ZONE AE
(FLOODWAY)
PARK
INFO
10' BUCKEYE OIL EASEMENT
(PER MAP REF. #1)
TWO 36"
COTTONWOOD
28"
MAPLE
20"
MAPLE
TWO 20"
COTTONWOOD
TWIN 18"
MAPLE 28"
MAPLE
16"
MAPLE
40"
MAPLE
22"
COTTONWOOD
28"
COTTONWOOD
TWO 24"
COTTONWOOD
TWIN 24"
COTTONWOOD
MAPLE
CLUSTER
4"
MAPLE
4"
MAPLE
4"
MAPLE
STOP
SIGN
STOP
SIGN
BENCHES
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
M
AT
C H
L
IN
E
SH
EE
TS
G -1
/G
-1
SURVEY SUBCONSULTANT
1. ALL EXISTING CONDITIONS SURVEY INFORMATION ON SHEETS G-10 THROUGH G-104
PROVIDED BY BSC GROUP, 655 WINDING BROOK DRIVE, GLASTONBURY, CT.
MAP REFERENCE
1. " RIGHT OF WAY SURVEY OF THE EAST HARTFORD DIKE FOR THE EAST HARTFORD FLOOD
CONTROL SYSTEM FEMA ACCREDITATION PROJECT SITUATED IN THE TOWN OF EAST
HARTFORD, COUNTY OF HARTFORD, STATE OF CONNECTICUT JANUARY 24, 2014"
SCALE: 1" = 30 '. PREPARED BY BSC GROUP.
SURVEY NOTES
1. THIS SURVEY AND MAP HAVE BEEN PREPARED PURSUANT TO THE REGULATIONS OF
CONNECTICUT STATE AGENCIES SECTIONS 20 - 300B - 1 THROUGH 20 - 3006 - 20 AND THE
STANDARDS FOR SURVEYS AND MAPS IN THE STATE OF CONNECTICUT AS ADOPTED BY THE
CONNECTICUT ASSOCIATION OF LAND SURVEYORS, INC. ON SEPTEMBER 26, 1996.
TOPOGRAPHIC ACCURACY CONFORMS WITH T- 2 STANDARDS AND IS BASED ON AN ACTUAL
FIELD SURVEY.
THIS IS A NOT A PROPERTY BOUNDARY SURVEY.
2. THE INTENT OF THIS SURVEY AND PLAN: DOCUMENT EXISTING CONDITIONS
3. ADDITIONAL FIELD SURVEY WAS PERFORMED ON THE GROUND BY BSC GROUP IN JUNE 2020.
ADDITIONAL FIELD SURVEY PERFORMED IN THE FOLLOWING LOCATIONS:
A. G-101 PROJECT AREA
B. G-104 MAIN PROJECT AREA FROM LEVEE STATION 131+60 TO 137+92.
4. HORIZONTAL AND VERTICAL DATUM ARE BASED ON MAP REFERENCE #1. HORIZONTAL
DATUM IS APPROXIMATE NORTH AMERICAN DATUM OF 1983 (NAD8 3). VERTICAL DATUM IS
APPROXIMATE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
5. EXISTING UTILITIES, WHERE SHOWN HEREON, ARE APPROXIMATE. NO GUARANTEE IS
IMPLIED OR INTENDED AS TO THE ACCURACY, LOCATION OR THAT ALL UTILITIES AND/OR
SUBSURFACE STRUCTURES ARE SHOWN. CONSULT WITH THE APPROPRIATE UTILITY
COMPANY OR AGENCY PRIOR TO DESIGNING IMPROVEMENTS, COMMENCING DEMOLITION
OR CONSTRUCTION. "CALL BEFORE YOU DIG" 1-800-9 22-4 455 .
6. INLAND WETLANDS WERE FIELD DELINEATED BY REMA ECOLOGICAL SERVICES, LLC FOR BSC
GROUP ON JUNE 22, 2020 .
THE SURVEYED PROPERTY IS PARTIALLY LOCATED WITHIN FLOOD ZONE X (SHADED) AND FLOOD ZONE AE AS SCALED FROM AND DEFINED BY THE FLOOD INSURANCE RATE MAP (FIRM) ENTITLED
"HARTFORD COUNTY. CONNECTICUT (ALL JURISDICTIONS) PANEL 368 OF 675," MAP NUMBER
09003C0368G MAP REVISED SEPTEMBER 16, 2011
FLOOD ZONE AE: SPECIAL FLOOD HAZARD ARE AS (SFHAs) SUBJECT TO INUNDATION BY THE 1%
ANNUAL CHANCE FLOOD. BASE FLOOD ELEVATIONS DETERMINED. THE BASE FLOOD ELEVATION
IS THE WATER-SURFACE ELEVATION OF THE 1% ANNUAL CHANCE FLOOD.
FLOOD ZONE X: AREAS OF 0.2% ANNUAL CHANCE FLOOD; AREAS OF 1% ANNUAL CHANCE FLOOD
WITH AVERAGE DEPTHS OF LESS THAN 1 FOOT OR WITH DRAINAGE AREAS LESS THAN 1 SQUARE
MILE; AND AREAS PROTECTED BY LEVEES FROM 1% ANNUAL CHANCE FLOOD.
SHADED AREA DEPICTS AREA PROTECTED FROM THE 1-PERCENT- ANNUAL-CHANCE OR GREATER
FLOOD HAZARD BY A LEVEE SYSTEM.
1% ANNUAL CHANCE FLOOD ELEVATION = 28.7' ±
2% ANNUAL CHANCE FLOOD ELEVATION = 32. 6 '+
EXISTING CONDITIONS NOTES:
SCALE, FEET
30 60
/2
8/
1:
:1
AM
or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
G -1
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
EXISTING CONDITIONS
1 OF 4 G-101
48"
24"
M
AT
C H
L
IN
E
SH
EE
TS
G -1
/G
-1
M
AT
C H
L
IN
E
SH
EE
TS
G -1
/G
-1
SCALE, FEET
30 60
/2
8/
1:
:1 or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
G -1
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
2 OF 4 G-102
METAL
SHED
2 PITKIN
STREET
PUMP
STATION
PI
TK
IN
S
TR
EE
T
EX
TE
N
SI
O
N
235 EAST RIVER DRIVE
MULTI STORY
CONDOMINIUM BUILDING
& PARKING GARAGE
CONC. SLAB
(ABOVE)
CONC. SLAB / MULTI
LEVEL PARKING GARAGE
R T.
(FORMERLY ASH STREET) (FORMERLY ASH STREET EXTENSION) (FORMERLY SULLIVAN DRIVE)
(FORMERLY GILBERT STREET)
(S
EE
N O
TE
M
AT
CH
L
IN
E
SH
EE
TS
G
-1
/G -1
M
AT
C H
L
IN
E
SH
EE
TS
G -1
/G
-1
SCALE, FEET
30 60
/2
8/
1:
:1 or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
G -1
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
3 OF 4 G-103
24"
ASH
20"
MAPLE
16"
MAPLE
14"
MAPLE 20"
MAPLE
16"
MAPLE
16"
MAPLE
16"
ASH
STATUE
BIT. CURB
CONC. STEPS
24" A
SH
28" A
SH
30" M
APLE
10' BUCKEYE OIL EASEMENT
(PER MAP REF. #1)
10'
12"
MAPLE
20" A
SH
16"
MAPLE
46"
COTTONWOOD
36" D
OUBLE
COTTONWOOD
36"
COTTONWOOD
16"
MAPLE
36"
COTTONWOOD
EA
ST
R
IV
ER
D
R
IV
M U
LT
I S
TO
R
Y O
FF
IC
E
BU
IL
D
E
AS
T
R
IV
ER
D
R
IV
E M
U
LT
I S
TO
R Y
O
FF
IC
E
BU
IL
D
IN
G
M U
LT
I S
TO
R
Y
PA
R
KI
N G
G
AR
AG
E
M
AT
C H
L
IN
E
SH
EE
TS
G -1
/G
-1
SCALE, FEET
30 60
/2
8/
1:
:1 or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
G -1
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
4 OF 4 G-104
WOOD
SHED
EAST
RIVER
RIVER
DRIVE
RIVER
DRIVE
"G
REAT RIVER PARK"
PHITHEATER
HARTLAND
FLOOD ZONE AE (FLOODWAY)FLOOD ZONE X - SHADED
EXISTING PARK GATE - BEGIN
PEDESTRIAN ONLY SHARED-USE PATH
EXISTING PARK GATE -
LIMITED VEHICLE ACCESS
EAST RIVER DRIVE
GREAT RIVER PARK ENTRANCE
RIVERSIDE PARK
PARKING LOT
CONNECTICUT RIVER
ENTRY (ONE - WAY)
EXIT (ONE - WAY)
BOAT
RAMP
M
AT
C H
L
IN
E
SH
EE
T G
-1
PROVIDE MINIMUM 8'
WIDE PATHWAY ON
PAVEMENT FOR
PEDESTRIANS TO PASS
STAGING AREA
RT. 84 E.B.
EXIT RAMP
RT. 84 E.B.
EXIT RAMP
METAL
SHED
2 PITKIN
STREET
PUMP
STATION
N
101 EAST R
IVER
D R
IVE
M U
LTI STO
R
Y O
FFIC
E BU
ILD
IN
G
99 EAST R
IVER
D R
IVE
M U
LTI STO
R
Y O
FFIC
E BU
ILD
IN
G
235 EAST RIVER DRIVE
MULTI STORY
CONDOMINIUM BUILDING
& PARKING GARAGE
M U
LTI STO
R
Y
PAR
KIN
G G
AR
AG
E
CONC. SLAB
(ABOVE)
CONC. SLAB / MULTI
LEVEL PARKING GARAGE
R T. 2
RT. 2
(R T. 84 E.B.)
BU
LKELEY BR
ID
G
E
(FORMERLY ASH STREET)
(FORMERLY ASH STREET EXTENSION)
(FORMERLY SULLIVAN DRIVE)
(FORMERLY GILBERT STREET)
(SEE N
O
TE #20)
CONCRETE OFFICE
BUILDING
2 STO
R
Y
6 STO
R Y
6 STO
R
Y
2 STO
R Y
(R T. 84 E.B.)
BU
LKELEY BR
ID
G
E
(R T. 84 W
.B.)
BU
LKELEY BR
ID
G E
(FORMERLY SULLIVAN DRIVE)
(FO
R
M
ER
LY C
O
N N
EC
TIC
U
T BO
U
LEVAR
D
FEDERAL WETLANDS
STATE WETLANDS
BULKELEY BRIDGE
OVERLOOK
BULKELEY
BRIDGE
200' UPLAND REVIEW
WATERCOURSE BUFFER
FLOOD ZONE AE (FLOODWAY)
FLOOD ZONE X - SHADED
FOUNDERS
BRIDGE
FOUNDERS BRIDGE /
PITKIN STREET ENTRY
RIVERPOINT
FLOOD WALL
EAST RIVER DRIVE
EAST RIVER DRIVE
P
IT
K
IN
S T
R E
E T
STAGE AND STORE
EQUIPMENT AND
MATERIALS UNDER THE
FOUNDERS BRIDGE
CONSTRUCTION
ACCESS ON PARK
SHARED USE PATH.
DO NOT BLOCK
PUBLIC ACCESS (TYP.)
CONNECTICUT RIVER
COASTAL
JURISDICTION LINE
(ELEV. 3.8)
M
AT
CH
L
IN
E
SH
EE
T G-
CONSTRUCTION ACCESS AND STAGING LEGEND
CONSTRUCTION ACCESS ROUTE
STAGING AREA
SCALE, FEET
100 200
2/
/2
:3
1:
A or ki ng
\R
IV
ER
FR
O N
T R
EC
AP
TU
R
E, IN
C \2
G re at
R iv er P ar k
Im pr ov em en t\0
0_ C
AD
\D es ig n\ W or ki ng \F
IN
AL
L an ds id e\ G
-1
_A cc es s an d
St ag in g.
dw g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
CONSTRUCTION
ACCESS AND
STAGING PLAN
G-105
TIMBER WALL (TYP.)
CONCRETE SLAB
EL. 8.4±
TIMBER DECK
EL. 6.8±
TIMBER CURB
CONCRETE SLAB
EL. 6.8±REMOVE & DISPOSE
TIMBER STAIRS
CONCRETE RAMP
TIMBER PILES TO BE
CUT AT MUDLINE
CONCRETE RAMPS
TO BE REMOVED
CT WETLAND BOUNDARY
TIMBER STAIRS
TO BE REMOVED
TIMBER WALL
TO BE REMOVED
EXISTING DECK EL.+6.8±
STEEL BULKHEAD TO REMAIN
CONCRETE WALKWAY
TO BE REMOVED
EXISTING TIMBER PILE EXISTING MUDLINE
CONCRETE SLAB TO BE
REMOVED AND DISPOSED
TIMBER DECKING/ STRINGERS & PILECAPS
TO BE REMOVED & DISPOSED
CUT ALL TIMBER
PILES TO MUDLINE
TIMBER/ ROPE RAILINGS
TO BE REMOVED
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
HTL EL. 6.0
CJL EL. 3.8
/3
0/
:2 1:
P or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
E
XI
ST
IN
G T
IM
BE
R P
IE
R
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-002DEMOLITION
OVERLOOKS
B C-002
A
C-002 SCALE: 1" = 10'-0"
DEMOLITION OVERLOOK - PLAN
B
C-002 SCALE: 1" = 10'-0"
DEMOLITION OVERLOOK - SECTION
REMOVE & DISPOSE TIMBER
WALLS
TIMBER PIER & RAILING TO
BE REMOVED & DISPOSED
(2 LOCATIONS)
REMOVE & DISPOSE ALL
CONCRETE SLABS AND RAMPS
NOTE: BOTH TIMBER PIERS AND THEIR ASSOCIATED
ELEMENTS ARE TO BE REMOVED IN THEIR ENTIRETY
BASE BID
12"
TREE 42"
MAPLE
36"
MAPLE
30"
MAPLE
30" TWIN
MAPLE
18"
MAPLE
40"
TREE
30"
MAPLE
36"
MAPLE
24"
MAPLE
24"
MAPLE
40"
TREE
30"
MAPLE
16"
MAPLE
20"
MAPLE
16" TWIN
MAPLE
30"
MAPLE
20"
MAPLE
20"
MAPLE
24"
MAPLE
24"
MAPLE
30"
MAPLE
26"
MAPLE
24"
MAPLE
20"
MAPLE
48"
TREE
22"
TREE
10"
ASH
16"
ASH
BOAT
LAUNCH
SIGN
PKG.
SIGN
PKG.
SIGN
PKG. SIGNS (2)
SIGN
PKG.
SIGN
PKG. SIGN
PEDESTRIAN
SIGN
BOAT
CAUTION
SIGN
BOAT
CAUTION
SIGN
BOAT
LAUNCH
SIGN
PARK
INFO
SIGN
DIRECTIONAL
SIGN
STOP SIGN
STOP
SIGN
PKG. SIGN
WOOD
SHED
GRAN.
CURB
BIT. CURB
CURB
BIT.
BIT. CURB
BIT. CURB
CURB
CO
NC.
BIT. CURB
BIT. CURB
BIT. CURB
CONC. CURB
BIT.CURB.
BIT. CURB
CONC. CURB
BIT. CURB CONC. CURB
BIT. CURB
CONC. CURBBI
T.
C U
R
TIMBER WALL
(TYP.)
TIMBER
CURB
TIMBER
CURB
TIMBER WALL
(TYP.)TIMBER STEPS
w/HANDRAIL
TIMBER
STEPS
TIMBER STEPS
w/HANDRAIL
TIMBER
STEPS
WOOD POST
GUARDRAIL
WOOD POST
GUARDRAIL
GUARDRAIL
10'
10' BUCKEYE OIL EASEMENT
APPROX. LOCATIONEASEMENT INFAVOR OF HELT CO.(SEE NOTE #21)
X-SHADED
FLOOD ZONE
18"
MAPLE 30"
MAPLE
BIT. CURB
FLOOD ZONE AE
(FLOODWAY)
PARK
INFO
SIGN
10' BUCKEYE OIL EASEMENT
(PER MAP REF. #1)
TWO 36"
COTTONWOOD
28"
MAPLE
20"
MAPLE
TWO 20"
COTTONWOOD
TWIN 18"
MAPLE 28"
MAPLE
16"
MAPLE
40"
MAPLE
22"
COTTONWOOD
28"
COTTONWOOD
TWO 24"
COTTONWOOD
MAPLE
CLUSTER
4"
MAPLE
36"
COTTONWOOD
4"
MAPLE
4"
MAPLE
STOP
SIGN
STOP
SIGN
BENCHES
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CT TIDAL WETLANDS
CONTRACTOR
STAGING AREA
LO
W
LO
W
LOW LOW LOW
LO
W
LOW
LO
W
LOWLOW
LO
W
LO
W
LOW LOW LOW
LO
W
LO
W
LO
W
LOWLOWLOW
X X
X X
X X X X X X X
X X
X X
X X
X X
X X X X X
X X
X X
EXISTING PIER
& LANDING
EXISTING OUTFALL
TO BE REPAIRED
LO
W
LOW LOW LOW
LO
W
LOWLOWLOW
X X
X X X X X X X
X X
EXISTING PIER
& LANDING
TURBIDITY CURTAIN
TURBIDITY CURTAIN
X
X
X
TURBIDITY CURTAIN
B1 (2020)
SUBMERGED AQUATIC VEGETATION (SAV) -
VALLISNERIA AMERICANA BELOW EL. -0.25
/1
6/
:2 6:
or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
L
IM
IT
O
F W
O R
K.
dw g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-003LIMIT OF WORK AND
TURBIDITY CURTAINS
A
1 SCALE: 1" = 30'-0"
LIMIT OF WORK - PLAN
LEGEND:
SUBMERGED AQUATIC VEGETATION (SAV):
VALLISNERIA AMERICANA
12"
TREE 42"
MAPLE
36"
MAPLE
30"
MAPLE
30" TWIN
MAPLE
18"
MAPLE
40"
TREE
30"
MAPLE
36"
MAPLE
24"
MAPLE
24"
MAPLE
40"
TREE
30"
MAPLE
16"
MAPLE
20"
MAPLE
16" TWIN
MAPLE
30"
MAPLE
20"
MAPLE
20"
MAPLE
24"
MAPLE
24"
MAPLE
30"
MAPLE
26"
MAPLE
24"
MAPLE
20"
MAPLE
48"
TREE
22"
TREE
10"
ASH
LAUNCH
SIGN
PKG.
SIGN
PKG. SIGNS (2)
PEDESTRIAN
SIGN
BOAT
CAUTION
SIGN
BOAT
CAUTION
SIGN
BOAT
LAUNCH
SIGN
PARK
INFO
SIGN
DIRECTIONAL
SIGN
STOP SIGN
STOP
SIGN
PKG. SIGN
CATCH BASIN
TF=37.19
CATCH BASIN
TF=12.46
INV=9.41(NE)
INV=9.25(SE)
INV
OUT=N/A(SW-HOODED)
WOOD
SHED
BIT. CURB
CURB
BIT.
BIT. CURB
CURB
CO
NC.
BIT. CURB
BIT. CURB
BIT. CURB
CONC. CURB
BIT.CURB.
BIT. CURB
CONC. CURB
BIT. CURB CONC. CURB
BIT. CURB
CONC. CURBBI
T.
C U
R
15" RCP
INV=8.26
TIMBER WALL
(TYP.)
TIMBER
CURB
TIMBER
CURB
TIMBER WALL
(TYP.)
WOOD POST
GUARDRAIL
WOOD POST
GUARDRAIL
DRAINAGE MH
TF=40.99
10'
APPROX. LOCATIONEASEMENT INFAVOR OF HELT CO.(SEE NOTE #21)
X-SHADED
FLOOD ZONE
18"
MAPLE 30"
MAPLE
INV OUT=17.60(N)INV OUT=
17.03(NW)
TF=36.34
INV OUT=
33.89(NE)
INV=17.13(NE)
INV=17.21(S)
TF=21.92
DRAINAGE MH
TF=22.14
CATCH BASIN
CATCH BASIN
FLOOD ZONE AE
(FLOODWAY)
PARK
INFO
SIGN
10' BUCKEYE OIL EASEMENT
(PER MAP REF. #1)
TWO 36"
COTTONWOOD
28"
MAPLE
20"
MAPLE
TWO 20"
COTTONWOOD
TWIN 18"
MAPLE 28"
MAPLE
16"
MAPLE
40"
MAPLE
22"
COTTONWOOD
28"
COTTONWOOD
TWO 24"
COTTONWOOD
TWIN 24"
COTTONWOOD
MAPLE
CLUSTER
4"
MAPLE
4"
MAPLE
4"
MAPLE
STOP
SIGN
STOP
SIGN
BENCHES
PROPOSED PIER AND LANDING
SEE SHEET C-006
PROPOSED FLOAT SYSTEM
SEE SHEET C-007
PROPOSED OUTFALL
ASPHALT
WALKWAY
6 5 x13 x12.5 x1211.5x
12.5x
151414 13
5 6
121314
RE-ESTABLISH WIDER
DRAINAGE SWALE
SHEET PILING TO REMAINEXISTING TREE TO
REMAIN (TYP.)
24"Ø CONCRETE FILLED
ANCHOR PILE
DEBRIS BOOM
SHEET PILING TO REMAIN
SHEET PILING TO REMAIN
/2
9/
:3 7:
or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
P R
O
PO
SE
D
S
IT
E
PL
AN
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-004PROPOSED SITE PLAN
A
2 SCALE: 1" = 30'-0"
PROPOSED CONDITIONS
DEBRIS BOOM ANCHOR
SEE DETAIL
B C-004
B
2 SCALE: 1/2" = 1'-0"
ANCHOR PLAN C
2 SCALE: 1/2" = 1'-0"
ANCHOR DETAIL
TIMBER FLOATS
ALUMINUM GANGWAY
STEEL PILE
STEEL PILE
CONCRETE WALKWAY
ASPHALT WALKWAY
CONCRETE STAIRS
30'x6' TIMBER FLOAT
30'x8' TIMBER FLOAT
8'x8' TIMBER FLOAT
20'x8' TIMBER FLOAT
12'x8' TIMBER FLOAT
EXISTING FLOAT LAYOUT
FREEBOARD +1.75
EXISTING ABUTMENT El.+7.3
CONCRETE STAIRS AND WALKWAYS
REMOVED AND DISPOSED ASNECESSARY
26' LONG GANGWAY
EXISTING MUDLINEEXISTING STONE SLABS
(AVG. SIZE 2'x5'x1'DEPTH)
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
CJL EL. 3.8
HTL EL.6.0
EXISTING TIMBER PILE SUPPORTS FOR ADA
TO BE REMOVED, DISPOSED AND REPLACED.
EXISTING MOORING PILES
TOP OF PILE El +17.0
/1
6/
:2 8:
or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
E
XI
ST
IN
G G
AN
G
W
AY
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-005EXISTING FLOAT &
GANGWAY
CONNECTICUT RIVER
B C-005
A
C-005 SCALE: 1" = 10'-0"
EXISTING FLOAT & GANGWAY - PLAN
B
C-005 SCALE: 1" = 5'-0"
EXISTING FLOAT & GANGWAY - SECTION
BOAT RAMP
NOTES:
ALL FLOATS SHALL BE REMOVED AND RECONFIGURED AS
SHOWN ON SHEET C-007 BASE BID
85'
10'
CONCRETE PIER DECK
EL.+15.0
20'
16"Ø STEEL PILES (TYP.)
15°
DEBRIS BOOM
INSTALL ANCHOR FOR DEBRIS BOOM
24"Ø w/1/2" WALL DEBRIS BOOM ANCHOR PILE
PROVIDE 6" CLEAR GAP FROM PIER
LOW RAIL - ADA FISHING
10 LOCATIONS
9'14.8'15'15'15'15'
16"Ø STEEL PILE (TYP.)
Approx. TIP EL. -60
CONCRETE ABUTMENT
EXISTING DECK EL.+6.8±
EXISTING GRADE
ASPHALT WALKWAY
CONCRETE PILE CAPS
EXISTING DECKING AND PILE CAPS TO
BE REMOVED. EXISTING TIMBER PILES
TO BE CUT FLUSH TO MUDLINE.
PROPOSED GRADE
CONCRETE SLAB
TO BE REMOVED
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
HTL EL. 6.0
CJL EL. 3.8
3 4 5
CONCRETE DECK EL. +15.0
EXISTING
GRADE VARIES
CONCRETE
DECK EL.+15.0
PILE CAP
RAILING
16"Ø PILE
10'-0"
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
HTL EL. 6.0
CJL EL. 3.8
A B
VARIES
5'-0" MAX
2 1/2 SCH 80 STEEL PIPE
6"
3'-6"
NOTES:
1. ALL STEEL FOR RAILINGS SHALL BE
HOT DIPPED GALVANIZED
2'-10"
4" O.C.
1/2" SOLID ROD PICKETS
LOW RAIL - ADA FISHING
4" GAP
1" RADIUS
1/8" GAP
2 1/2 SCH 80
3/16"
TYP.
3/16"
TYP.
90 DEG BEND (TYP)
(PLAN VIEW)
3/16"
TYP.
3/16"
TYP.
/3
0/
:0 3:
or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
P R
O
PO
SE
D
C O
N C
R
ET
E
PI
ER
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-006PROPOSED PIER
B
A
4 SCALE: 1" = 10'-0"
PROPOSED PIER - PLAN
B
4 SCALE: 1/4" = 1'-0"
PROPOSED PIER - ELEVATION
C
4 SCALE: 1/4" = 1'-0"
PROPOSED PIER - SECTION
C
6"
2 1/2 Sch 80 PIPE
6"x6"x1/2" BASE PLATE
6"
3'-6"6"
4 - 1/2" ANCHOR BOLTS
D
4 SCALE: 1/2" = 1'-0"
RAILING ELEVATION
E
4 SCALE: 1" = 1'-0"
RAILING DETAIL
F
4 SCALE: 1-1/2" = 1'-0"
RAIL DETAILS
D
DEBRIS BOOM
DEBRIS BOOM NOTES:
1. DEBRIS BOOM SHALL BE TUFFBOOM SERIES BY WORTHINGTON
PRODUCTS, INC., OR APPROVED EQUIVALENT.
2. DEBRIS BOOM SHALL NOT HAVE DEBRIS SCREENS OR FINE DEBRIS
PANELS.
CATCH BASIN
TF=12.46
INV=9.41(NE)
INV=9.25(SE)
INV
OUT=N/A(SW-HOODED)
15" RCP
INV=8.26
MAPLE
CLUSTER
4"
MAPLE
4"
MAPLE
CT TIDAL WETLANDS
CONCRETE
ABUTMENT
EXISTING 26' GANGWAY
RELOCATED EXISTING 12'X8' FLOAT
PROPOSED 25'-6"x8' FLOAT
PROPOSED MOORING PILE
PROPOSED 5'x8' FLOAT
EXISTING 20'x8' FLOAT
TO REMAIN
EXISTING 8'x8' FLOAT
TO REMAIN
EXISTING 30'x8' FLOAT
TO REMAIN
EXISTING 30'x6' FLOAT
TO REMAIN
x+12 x+13 x+12.5
SLOPE5%
x+12.5 x+12.5 x+12.5 x+12.5
PROPOSED 30'x6' FLOAT
PROPOSED
MOORING PILE
11.5'
3.1'
EL.+12.0
PROPOSED
25'-6" x 8' FLOAT
EXISTING 26'
GANGWAY
EXISTING FLOAT LAYOUT
RELOCATE EXISTING FLOAT
EXISTING ABUTMENT El.+7.3 TO BE REMOVED
BOTTOM STEP EL.+7.56
TOP STEP El.+12.0
TOP STEP EL.+9.64
BOTTOM STEP
EL.+9.92
PROPOSED 16"
CONCRETE FILLED
MOORING PILE - (TYP.)
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
HTL EL. 6.0
CJL EL. 3.8
EXISTING 16"
MOORING PILE TO
REMAIN - (TYP.)
EXISTING STONE SLABS
TO BE REMOVED TO
INSTALL TIMBER PILES
PROPOSED TIMBER ADA
SUPPORTS = MIN 20'-0" TYP
TOP OF PILE El +17.0
EXISTING MUDLINE
1 2 3 4 5 6 7 8 9 10
TIP EL. -50.0
STAIRS TO BE
REMOVED
STONE SPLASH PAD 5'x6'
5'
REMOVE PIPE TO INV EL.+8.5
REPLACE 8'-0" OF 15"Ø RCP
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
HTL EL. 6.0
CJL EL. 3.8
EXISTING GRADE
MATCH EXISTING GRADE TOP OF HEADWALL AT EL. 12.3
15"
1'-3"
6'-0"
15" RCP OUTFALL PIPE
#6 BARS AT 9" OC EW/EF
6'-0"
3" COVER (TYP.)
12" OF 3/4" CRUSHED STONE
w/GEOTEXTILE FABRIC
8'-0"
10"Ø TIMBER PILE
STAGGERED 3 4" THROUGH
BOLTS
2-2x6 TIMBERS
SEE ELEVATION G
FOR TOP ELEVATION
4"Ø BOLT w/NUT & WASHERS
2X6 TIMBER
10"
PROPOSED 16"
CONCRETE FILLED
MOORING PILE - (TYP.)
NAVD88 EL. 0.0
MHW EL. 2.19
MLW EL. 0.25
HTL EL. 6.0
CJL EL. 3.8
PROPOSED TIMBER ADA
SUPPORTS = MIN 20'-0" TYP
TOP OF PILE El +17.0
EXISTING MUDLINE
1 2 3 4 5 6 7 8 9 10
EL. 7.57
EL. 7.0
EL. 5.63
EL. 5.44
EL. 4.95
12 1
EL. 3.97
EL. 3.76
7.3' 9' 16.5' 3.8'
3' 6.8' 11.7'
4.6' 5'
TIP EL. -50.0
/2
9/
:2 5:
or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
P R
O
PO
SE
D
G
AN
G W
AY
F
LO
AT
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-007PROPOSED FLOAT &
GANGWAY
A
5 SCALE: 1" = 10'-0"
PROPOSED FLOAT & GANGWAY - PLAN
F
5 SCALE: 1" = 8'-0"
PROPOSED FLOAT & GANGWAY - ELEVATION
F,G
B,C
OUTFALL REPAIR
SEE DETAIL
B
5 SCALE: 1" = 8'-0"
PROPOSED OUTFALL REPAIR
C
5 SCALE: 1/2" = 1'-0"
PROPOSED OUTFALL REPAIR REINFORCING
D
5 SCALE: 1/2"=1'-0"
PROPOSED TIMBER ADA SUPPORT - SECTION E
5 SCALE: 1"=1'-0"
PROPOSED TIMBER PILE CAP CONNECTION
G
5 SCALE: 1" = 8'-0"
PROPOSED TIMBER ADA SUPPORTS - ELEVATION
E
G,H C-008
ABUTTMENT
SEE DETAIL
10'-41 2"
2' -0
16"Ø w/1/2" WALL CONCRETE
FILLED STEEL PILE
#8 BARS
#4 STIRRUPS @ 10" OC
3" CLR (TYP)
6"
EMBEDMENT
(TYP)
ALTERNATING
STIRRUPS EXTEND
INTO DECK SLAB
4'
6' -9
12" 18"
6'-6"
9" PIER DECK
EL.+15.0
#4 BARS @ 12" OC
#6 BARS @ 12" OC
3' -1
0"
3" COVER
(TYP)
12"
4'
2' 12" 12"
#6 BARS @ 12"
OC (TYP)
#6 BARS @ 12" OC
#6 BARS @ 12"
OC (TYP)
4 - #6 BARS T&B
2'-6"
2' -0
3" CLR (TYP)
2" CHAMFER (TYP)
5 - #8 BARS
#4 STIRRUPS @ 10" OC
#4 SHRINKAGE/TEMP BARS @ 12"
OC IN THE DECK SLAB
6" PILE EMBEDMENT
5 - #8 BARS EVENLY
SPACED TOP AND
BOTTOM
16"Ø w/1/2" WALL
CONCRETE FILLED
STEEL PILE
4-# 6 L-BARS
12"x36"
10'-41 2"
7'-11"
15° 2'
-6
16" Ø STEEL PILE
CONCRETE PILE CAP
3" CHAMFER
22'-4"
10'-2"
2' -6
16" Ø STEEL PILE
CONCRETE PILE CAP
10'-2" 1'-2"15°
3" CHAMFER
19'-11"
8'-111 2"
16" Ø STEEL PILE
CONCRETE PILE CAP
8'-111 2"
2' -6
15°
3" CHAMFER
22'-4"
2' -0
16"Ø w/1/2" WALL CONCRETE
FILLED STEEL PILE #8 BARS
#4 STIRRUPS @ 10" OC
3" CLR (TYP)
6"
EMBEDMENT
(TYP)
ALTERNATING STIRRUPS
EXTEND INTO DECK SLAB
19'-11"
2' -0
16"Ø w/1/2" WALL CONCRETE
FILLED STEEL PILE
#8 BARS
#4 STIRRUPS @ 10" OC
3" CLR (TYP)
6"
EMBEDMENT
(TYP)
ALTERNATING STIRRUPS
EXTEND INTO DECK SLAB
9"
#4 BARS FOR
SHRINKAGE/TEMP @
12" OC
#6 BARS @ 12" OC
ROUGH BROOM FINISH
w/TROWEL EDGES
/8
/2
4:
:0 or ki ng
\R
IV
ER
FR
O N
T R
EC
AP
TU
R
E, IN
C \2
G re at
R iv er P ar k
Im pr ov em en t\0
0_ C
AD
\D es ig n\ W or ki ng \Is su ed fo r B id \w at er fro nt
\C -0
D
ET
AI
LS
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-008CONCRETE DETAILS
G
6 SCALE: 3/4"=1'-0"
PILE CAP REINFORCING - TYP SECTION
D
6 SCALE: 1/2" = 1'-0"
PILE CAP REINFORCING - SECTION
J
6 SCALE: 1/2" = 1'-0"
PIER ABUTMENT - SECTION
K
6 SCALE: 1/2" = 1'-0"
PIER ABUTMENT REINFORCING - SECTION
L
6 SCALE: 1/2" = 1'-0"
GANGWAY ABUTMENT - SECTION M
6 SCALE: 1/2" = 1'-0"
GANGWAY ABUTMENT REINFORCING - SECTION
H
G
I DECK REINFORCING
SEE DETAIL
H
6 SCALE: 3/4"=1'-0"
PILE CAP REINFORCING OVER PILE - SECTION
A
6 SCALE: 1/2" = 1'-0"
BENTS 1 -4 PILE CAP - PLAN
D
B
6 SCALE: 1/2" = 1'-0"
BENT 5 PILE CAP - PLAN
E
C
6 SCALE: 1/2" = 1'-0"
BENT 6 PILE CAP - PLAN
E
6 SCALE: 1/2" = 1'-0"
BENT 5 PILE CAP - PLAN F
6 SCALE: 1/2" = 1'-0"
BENT 6 PILE CAP - PLAN
F
H
G 6H
G
I
6 SCALE: 1/2" = 1'-0"
DECK REINFORCING - SECTION
25'-6"
8' -0
5'-0" 5'-0" 5'-0" 5'-6"5'-0"
8'-0"
21"±
FREEBOARD
2X8 @ 5'-0" OC 2X10 DECKING
FOAM
FLOTATION
UNIT (TYP)
2X8 (TYP)
2X10
2"
2"
OUTSIDE CORNER
BRACKET- FEMALE
1"
2"
GALVANIZED L-PIN
OUTSIDE CORNER
BRACKET - MALE FLOAT
4"X23
4"X1
2" PLATE
GALVANIZED L-PIN
2"Ø CARRIAGE
BOLT-TYP 31
2" TYP
2" TYP
S.S. BRACKET
S.S. DOUBLE EARS AS
SHOWN
HINGE POCKET WITH PIPEEXISTING ABUTMENT
4"Ø ANCHOR
BOLTS
5'-0"
8' -0
30'-0"
6' -0
5'-0" 5'-0" 5'-0"5'-0" 5'-0" 5'-0"
16"Ø MOORING PILE
4" MIN. THICKNESS GALV. STEEL FRAME
ANCHOR BOLT
CHAIN GUIDE
NOTE: PVC COVER NOT
SHOWN FOR CLARITY
/1
3/
0:
:0 or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\Is su ed fo r B id
\w at er fro nt \C
-0
F
LO
AT
P
LA
N
D
ET
AI
LS
.d w g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
East Hartford, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
MUS
BAP
JSF
Approved: -
2002828
NAVD88 EL. 0.0
MHW EL. +2.19
MLW EL. +0.25
HTL EL. 6.0
DATUM CONVERSION TABLE
CJL EL. +3.8
NGVD EL. -1.0
C-009FLOAT PLAN & DETAILS
A
C-009 SCALE: 1/4" = 1'-0"
25'-6" TIMBER FLOAT - PLAN D
C-009 SCALE: 1/2" = 1'-0"
TIMBER FLOAT SECTION (TYP)
E
C-009 SCALE: 1" = 1'-0"
TIMBER FLOAT CONNECTION - PLAN F
C-009 SCALE: 1" = 1'-0"
TIMBER FLOAT CONNECTION - SECTION
C
C-009 SCALE: 1/4" = 1'-0"
5' x 8' TIMBER FLOAT - PLAN
G
C-009 SCALE: 1" = 1'-0"
PROPOSED GANGWAY ATTACHMENT
B
C-009 SCALE: 1/4" = 1'-0"
30' x 6' TIMBER FLOAT - PLAN
H
C-009 SCALE: 1" = 1'-0"
PILE GUIDE - PLAN
NOTES:
1. FINAL FLOAT CONSTRUCTION & FRAMING
SHALL BE DETERMINED BY MANUFACTURER
D C-007
PROPOSED
TIMBER SUPPORT
SEE DETAIL
SHED
2 PITKIN
STREET
PUMP
STATION
N
101 EAST R
IVER
D R
IVE
M U
LTI STO
R
Y O
FFIC
E BU
ILD
IN
G
99 EAST R
IVER
D R
IVE
M U
LTI STO
R
Y O
FFIC
E BU
ILD
IN
G
235 EAST RIVER DRIVE
MULTI STORY
CONDOMINIUM BUILDING
& PARKING GARAGE
M U
LTI STO
R
Y
PAR
KIN
G G
AR
AG
E
CONC. SLAB
(ABOVE)
CONC. SLAB / MULTI
LEVEL PARKING GARAGE
R T. 2
RT. 2
(R T. 84 E.B.)
BU
LKELEY BR
ID
G
E
(FORMERLY ASH STREET)
(FORMERLY ASH STREET EXTENSION)
(FORMERLY SULLIVAN DRIVE)
(FORMERLY GILBERT STREET)
(SEE N
O
TE #20)
(R T. 84 E.B.)
BU
LKELEY BR
ID
G
E
(R T. 84 W
.B.)
BU
LKELEY BR
ID
G E
(FORMERLY SULLIVAN DRIVE)
(FO
R
M
ER
LY C
O
N N
EC
TIC
U
T BO
U
LEVAR
D
T TPZ TPZ
TPZ
TPZ
TPZ
TPZ
REMOVE EXISTING LIGHT POLE
& FOUNDATAION, INSTALL NEW
FOUNDATION & LIGHT POLE.
FOR ELECTRICAL DETAILS
SEE SHEET NO. E0 THRU E4
RESTORE WALKWAY
M
ATCH LINE
C-100
WOOD
SHED
EAST
RIVER
RIVER
"G R
EAT R
IVER
PAR
K"
AM
PH
ITH
EATER
H
AR
TLAN
D
RIVER DRIVE
REMOVE EXISTING LIGHT POLE,
INSTALL NEW LIGHT POLE ON
EXISTING FOUNDATION (TYP).
SEE E0 THRU E4 FOR DETAILS.
INSTALL NEW PIER LIGHT
ON NEW FOUNDATION
(SEE SHEET E2)
M
ATC
H
LIN
E
C -100
/2
8/
1:
:2 or ki ng \R
IV
ER
FR
O
N T
R
EC
AP
TU
R E, IN
C
\2
G re at R iv er
P ar k Im pr ov em en t\0 0_
C
AD
\D es ig n\
W or ki ng
\F
IN
AL
L an ds id e\
C -1
_L ig ht in g_
R 1.
dw g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
GREAT RIVER PARK
IMPROVEMENTS
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
0 1/22/2025 ISSUED FOR BID JM
1 5/8/2025 BASE BID & BID ALTS JM
EAST HARTFORD, CT
SHEET NAME SHEET NO.
If this scale bar does not measure 1" then drawing is not original scale.
Attention:
0 1"
Designed:
Checked:
Drawn:
P.E. No:
GEI Project
AH
JM
DE
Approved: JM
2002828
C-100LIGHTING OVERVIEW
PLAN
SCALE, FEET
80 160
LEGEND
INSTALL NEW SENTRY LIGHT POLE ON EXISTING
FOUNDATION (7 TOTAL)
INSTALL NEW SENTRY LIGHT POLE ON NEW
FOUNDATION (11 TOTAL)
INSTALL NEW PIER LIGHT ON NEW FOUNDATION
(1 TOTAL)
NOTES:
1. NEW SENTRY LIGHT POLES TO BE PROVIDED BY
RIVERFRONT RECAPTURE.
2. REMOVED OLD POLES TO BE PLACED IN RECYCLING
DUMPSTER ON SITE FOR DISPOSAL BY RIVERFRONT
RECAPTURE.
3. THIS PLAN INTENDED TO SHOW LIGHT POLE
LOCATIONS ONLY. REFER TO ELECTRICAL DRAWING
SET FOR CONSTRUCTION DETAILS.
4. RESTORE ALL DISTURBED AREAS WITH BASE
MATERIAL AND PAVEMENT OR LOAM AND SEED, AS
APPLICABLE.
/8
/2
1:
:2
I:\
\2 0-
G re at R iv er
P ar k\ D ra w in gs
\E le ct ric al \E
0.
dw g
Riverfront Recapture, Inc 50 Columbus Blvd Hartford, CT 06106
Great River Park Improvements
GEI CONSULTANTS, INC.
455 WINDING BROOK DRIVE
SUITE 201
GLASTONBURY, CT 06033
(860)368-5300
Consultants
NO DATE ISSUE/REVISION APP
East Hartford, CT
SHEET NAME SHEET NO.Designed:
Checked:
Drawn:
P.E. No:
GEI Project
RZDesign Associates, Inc.
MECHANICAL, ELECTRICAL,
AND STRUCTURAL ENGINEERING
750 OLD MAIN STREET
SUITE 202
ROCKY HILL, CT 06067
P: (860) 436-4336 F: (860) 436-4450 www.rzdesignassociates.com
Approved:
ELECTRICAL NOTES
AND ABBREVIATIONS E0
CD
BZ
CD
BZ
ABBREVIATIONS
A
AFF
AFG
AFI
AHU
C
CB
CKT
CUH
DAC
EBB
EBU
EF
EM
EMT
ETR
EWC
EWH
FA
FACP
FMC
GFI
IG
JB
KVA
KW
MAU
NL
NLE
OHD
P
PE
PH or Ø
PNL
PVC
RAP
RGS
RLE
RTU
SE
T
TV
TX
UNO
W
WAP
WP
AMPERE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ARC FAULT CIRCUIT INTERRUPTER
AIR HANDLING UNIT
CONDUIT
CIRCUIT BREAKER
CIRCUIT
CABINET UNIT HEATER
DOOR ACCESS CONTROLLER
ELECTRIC BASEBOARD
EMERGENCY BATTERY UNIT
EXHAUST FAN
EMERGENCY POWERED
ELECTRICAL METALLIC TUBING
EXISTING TO REMAIN
ELECTRIC WATER COOLER
ELECTRIC WATER HEATER
FIRE ALARM
FIRE ALARM CONTROL PANEL
FLEXIBLE METALLIC TUBING
GROUND FAULT INTERRUPTER
ISOLATED GROUND
JUNCTION BOX
KILOVOLT-AMP
KILOWATT
MAKE-UP AIR UNIT
NIGHT LIGHT
NEW LOCATION OF EXISTING
OVERHEAD DOOR ELECTRIC OPERATOR
POLE
PRIMARY ELECTRIC SERVICE
PHASE
PANEL
POLYVINYL CHLORIDE CONDUIT
REMOTE ANNUNCIATOR PANEL
RIGID GALVANIZED STEEL CONDUIT
RELOCATE EXISTING
ROOFTOP UNIT
SECONDARY ELECTRIC SERVICE
TELEPHONE SERVICE
TELEVISION
TRANSFORMER
UNLESS NOTED OTHERWISE
WIRE
WIRELESS ACCESS POINT
WEATHER PROOF
ELECTRICAL DEMOLITION NOTES ELECTRICAL GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH CURRENT APPLICABLE CODES, ORDINANCES, THE REGULATORY AGENCIES HAVING
JURISDICTION AND THE SPECIFICATIONS. THE SPECIFICATIONS MAY EXCEED THE REQUIREMENTS OF THE CODE, IN WHICH CASE, THE
SPECIFICATION MUST BE FOLLOWED.
2. THE INTENT OF THESE DOCUMENTS IS FOR THE MEP TRADES TO FURNISH AND INSTALL COMPLETE MECHANICAL AND ELECTRICAL SYSTEMS.
THE SPECIFIED ELECTRICAL SYSTEM SHALL BE COMPLETE IN ALL RESPECTS; OPERATIONAL, TESTED, ADJUSTED, APPROVED BY THE
AUTHORITIES HAVING JURISDICTION AND READY FOR BENEFICIAL USE BY THE OWNER.
3. THE TRADES SHALL OBTAIN AND REVIEW ALL CONTRACT DOCUMENTS BEFORE SUBMITTING A BID. INFORMATION IS PROVIDED ON THE VARIOUS DRAWINGS, SCHEDULES, SPECIFICATIONS AND ALL OF THE VARIOUS DOCUMENTS IN THE BIDDING PACKAGE. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND FORM A TOTAL PROJECT DESIGN AND INFORMATION SOURCE FOR CONSTRUCTION PURPOSES.
4. THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED IN THE CONTRACT.
COORDINATE LOCATIONS OF EQUIPMENT WITH OTHER TRADES BEFORE AND DURING CONSTRUCTION. ANY MODIFICATION TO THE EQUIPMENT LAYOUT, REQUIRED FOR INSTALLATION, IS TO BE PERFORMED UNDER THE CONTRACT AGREEMENT, AT NO ADDITIONAL COST.
REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
5. THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES. THE DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL ARRANGEMENT OF EQUIPMENT AND CONDUITS. THE CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF EQUIPMENT AND CONDUITS INSTALLATION WITH ALL THE TRADES BEFORE COMMENCING WORK.
6. EQUIPMENT SHALL BE INSTALLED IN ACCESSIBLE LOCATIONS, WHEN EQUIPMENT MUST BE LOCATED ABOVE AN INACCESSIBLE CEILING (GYP BOARD OR EQUIVALENT), OR BEHIND A WALL, AN APPROPRIATE ACCESS DOOR SHALL BE PROVIDED. IF AN ACCESS DOOR IS REQUIRED, IT SHALL BE OF A RATING APPROPRIATE FOR THE WALL/CEILING IN WHICH IT IS TO BE INSTALLED. THE CONTRACTOR SHALL COORDINATE LOCATIONS OF ACCESS PANELS FOR ALL DEVICES, REQUIRING ACCESS, WITH THE ARCHITECT, PRIOR TO INSTALLATION OF SUCH DEVICES
OR OTHER APPURTENANCES.
7. WHERE A CONFLICT OCCURS BETWEEN THE DOCUMENTS, IT SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. CARRY AS PART OF
THE BID THE LARGER QUANTITY AND/OR MORE EXPENSIVE ITEM(S).
8. THIS CONTRACT SHALL INCLUDE ALL THE NECESSARY CONDUITS, FITTINGS, TRANSITIONS ETC. AS REQUIRED TO INSTALL CONDUITS AND EQUIPMENT, AND TO AVOID ANY CONFLICTS WITH OTHER TRADES AND THE BUILDING STRUCTURE. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS HE MAKES AS A RESULT OF HIS FAILURE TO COORDINATE WITH OTHER
TRADES OR BECOME FULLY FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES.
9. ALL BRANCH CIRCUITS SHALL BE PROVIDED WITH SEPARATE NEUTRALS. USE OF COMMON NEUTRALS WILL NOT BE ALLOWED.
10. FIELD VERIFY WITH MANUFACTURER'S PROVIDED EXACT ELECTRICAL CHARACTERISTICS AND CONNECTION REQUIREMENTS OF ALL OPERATIONAL EQUIPMENT PRIOR TO MAKING ELECTRICAL POWER CONNECTION. FURNISH AND INSTALL SAFETY DISCONNECT AS REQUIRED
BY NEC.
11. ALL WIRING SHALL BE IN CONDUIT, UNLESS OTHERWISE INDICATED.
12. BRANCH CIRCUIT WIRING IS SHOWN ON THE FLOOR PLANS. NUMERALS ADJACENT TO THE HOMERUN SYMBOLS FOR LIGHTING, RECEPTACLES, MOTORS, APPLIANCES, ETC. INDICATE THE CIRCUIT NUMBER TO WHICH THE ITEMS ARE TO BE CONNECTED. PROVIDE BRANCH CIRCUIT WIRING FOR ALL ITEMS SHOWN IN ACCORDANCE WITH THESE GENERAL NOTES AND THE ELECTRICAL SPECIFICATIONS.
13. ALL 1 POLE, 15 AND 20 AMPERE BRANCH CIRCUITS SERVING RECEPTACLE OR LIGHTING SHALL BE 2 WIRE CIRCUITS PROVIDING AN INDIVIDUAL NEUTRAL CONDUCTOR FOR EACH UNGROUNDED (HOT) CIRCUIT CONDUCTOR. DO NOT SHARE NEUTRAL CONDUCTORS.
14. IT IS NOT THE INTENTION TO SHOW EVERY FITTING, HANGER, WIRE OR DEVICE, ALL SUCH ITEMS SHALL BE FURNISHED AND INSTALLED AS
NECESSARY FOR A COMPLETE SYSTEM.
15. CONTRACTOR SHALL DETERMINE THE QUANTITY OF CONDUCTORS REQUIRED FOR PROPER OPERATION OF ALL SWITCHING SCHEMES.
16. PROVIDE ALL BONDING AND GROUNDING REQUIRED BY THE NATIONAL ELECTRIC CODE, NFPA 70 AND AS REQUIRED BY LOCAL AUTHORITY
HAVING JURISDICTION.
17. ALL REQUIRED BONDING CONDUCTORS SHALL BE MINIMUM #8 SOLID INSULATED COPPER, PROVIDE ALL NECESSARY FITTINGS, JUNCTION
BOXES, END FITTINGS, ETC., FOR A COMPLETE, CONTINUOUS INSTALLATION.
18. ALL BONDING/GROUNDING CONNECTIONS SHALL BE MADE BY LISTED CLAMP OR CONNECTORS AS REQUIRED BY ARTICLE 250 OF NFPA 70, THE NATIONAL ELECTRIC CODE (CURRENT ADOPTED EDITION).
19. SEISMICALLY SUPPORT THE EQUIPMENT AS REQUIRED BY CODE, THE AUTHORITY HAVING JURISDICTION, AND/OR AS SPECIFIED. SUBMIT ENGINEERED INSTALLATION DETAILS PER THE SPECIFICATIONS. THE CONTRACTOR'S SEISMIC ENGINEER SHALL REVIEW THE INSTALLATION
AND PROVIDE A DETAILED REPORT FOR THE RECORD.
20. ALL WORK ON OR NEAR ENERGIZED CONDUCTORS OR EQUIPMENT SHALL BE IN ACCORDANCE WITH NFPA 70E, CHAPTER 1: SAFETY-RELATED
WORK PRACTICES.
21. THIS IS AN EXISTING FACILITY, WITH AN EXISTING SERVICE. THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID TO ASCERTAIN FIELD CONDITIONS AS THEY EXIST AND JUDGE THEIR EFFECT ON THE WORK TO BE DONE. NO ALLOWANCE WILL BE MADE
FOR FAILURE TO VISIT THE JOB SITE AND MAKE THIS DETERMINATION.
22. DO NOT SCALE DRAWINGS; ACTUAL FIELD MEASUREMENTS AND DIMENSIONS TAKE PRECEDENCE IN ALL CASES.
23. THE SCOPE OF WORK IS AS SHOWN ON THE PLANS AND DETAILED IN THE SPECIFICATIONS. ANY DEVIATIONS OR EXCLUSIONS FROM THIS
MUST BE SUBMITTED TO ENGINEER FOR APPROVAL PRIOR TO BEING IMPLEMENTED.
24. ELECTRICAL CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS AND OR
REQUIREMENTS FOR PROPER OPERATION AND MAINTENANCE.
25. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING OF ALL PHASES OF THE WORK AND TO DEMONSTRATE TO OWNER THAT
THE EQUIPMENT IS IN FULL OPERATING ORDER.
26. ELECTRICAL CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED TO THEIR ORIGINAL CONDITION. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING, PATCHING, PAINTING, GRADING, RE-SEEDING, CLEAN-UP, ELECTRICAL DEBRIS REMOVAL AND GENERAL COORDINATION OF THE WORK EFFORT AS REQUIRED FOR THE INSTALLATION OF THE ELECTRICAL ITEMS OF WORK.
27. ALL THE WIRE SIZES ARE BASED ON COPPER, ALUMINUM IS NOT TO BE USED.
28. ELECTRICAL CONTRACTOR TO COORDINATE WITH ARCHITECTURAL, CIVIL, AND MECHANICAL CONTRACTOR FOR ITEMS SUPPLIED BY MECHANICAL OR OTHER DIVISIONS BUT INSTALLED BY THE ELECTRICAL CONTRACTOR. ELECTRICAL CONTRACTOR TO REVIEW ALL THE
PLANS FOR THE PROJECT FOR ELECTRICAL WORK.
29. COORDINATE EXACT PLACEMENT OF EQUIPMENT WITH ARCHITECTURAL CIVIL, AND MECHANICAL PLANS, MAKE FIELD ADJUSTMENTS AS
REQUIRED TO AVOID CONFLICTS, VERIFY WITH OWNER.
30. ELECTRICAL CONTRACTOR SHALL SECURE ALL PERMITS AND PAY FOR ALL REQUIRED FEES, INCLUDING ALL UTILITY FEES.
31. ELECTRICAL CONTRACTOR SHALL WARRANT AND GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM THE
DATE OF FINAL ACCEPTANCE BY THE OWNER.
32. ELECTRICAL CONTRACTOR SHALL PROVIDE PROOF OF LIABILITY AND PROPERTY INSURANCE TO THE OWNER, ALL DEDUCTIBLES SHALL BE
PAID FOR BY THE ELECTRICAL CONTRACTOR IN THE EVENT OF A CLAIM.
33. PERSONNEL SAFETY IS OF PRIME IMPORTANCE. NO HAZARDOUS CONDITION MUST BE ALLOWED. EVERY CARE MUST BE TAKEN TO PROTECT CONSTRUCTION AND OTHER PERSONNEL. CLEANUP IS TO BE DONE ON A DAILY BASIS. ELECTRICAL CONTRACTOR TO REMOVE AND DISPOSE
OF REFUSE FROM SITE.
34. ELECTRICAL CONTRACTOR TO VERIFY LOADS, SETTINGS, OVERCURRENT PROTECTION... ETC. TO INSURE COMPATIBILITY OF EQUIPMENT.
35. ELECTRICAL CONTRACTOR TO VERIFY ALL EQUIPMENT POWER NEEDS WITH THE ACTUAL SHOP DRAWINGS FOR THE EQUIPMENT TO BE
USED, PRIOR TO STARTING ANY ELECTRICAL WORK.
36. PROVIDE LAMINATED PLASTIC NAMEPLATES FOR ALL ELECTRICAL DISTRIBUTION AND DISCONNECT EQUIPMENT. ALTERNATE METHODS
SHALL NOT BE ALLOWED. NAMEPLATES SHALL BE FASTENED TO PANEL WITH SCREWS.
37. THE DISPOSAL OF ALL UNUSED EXISTING ELECTRICAL EQUIPMENT REMOVED IS A PART OF THE SCOPE OF WORK. THE ELECTRICAL CONTRACTOR SHALL LAWFULLY DISPOSE OF ALL SUCH EQUIPMENT, INCLUDING HAZARDOUS PCB CONTAINING BALLASTS.
38. PRIOR TO ACQUISITION OR INSTALLATION GIVE WRITTEN NOTICE TO ARCHITECT AND ENGINEER OF ANY MATERIAL OR APPARATUS THAT IS INADEQUATE, UNSUITABLE FOR THE USE, IN VIOLATION OF LAWS, ORDINANCES, RULES, CODES OR ANY REGULATIONS OF AUTHORITIES HAVING JURISDICTION OR ANY NECESSARY ITEMS OF WORK THAT HAS BEEN OMITTED. CONTRACTOR AFFIRMS THAT ABSENT SUCH NOTICE, ALL SYSTEMS WILL FUNCTION SATISFACTORILY WITHOUT ADDITIONAL EXTRA COMPENSATION.
39. ALL PART NUMBERS ARE PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THEY ARE NOT TO BE CONSIDERED THE COMPLETE SPECIFICATION OF THE PRODUCT. THE PART NUMBER AND DESCRIPTION WILL BE THE COMPLETE SPECIFICATION. IN THE EVENT OF A DISCREPANCY BETWEEN THE TWO, THE MORE STRINGENT, MORE COSTLY FEATURE/PERFORMANCE WILL BE REQUIRED.
40. NO LOW VOLTAGE WIRING SHALL BE PERMITTED IN THE SAME RACEWAY AS POWER WIRING.
41. PROVIDE DRAG LINES IN ALL EMPTY RACEWAYS.
42. DEBRIS REMOVAL FROM THE CONSTRUCTION SITE WILL BE COMPLETED BY A PREDETERMINED ROUTE AT TIMES COORDINATED WITH
OWNER.
43. ELECTRICAL CONTRACTOR SHALL CREATE A NEW TYPE-WRITTEN CIRCUIT DIRECTORY TO BE PLACED IN EACH PANEL ASSOCIATED WITH THIS PROJECT WHICH SHALL INCLUDE PANEL NUMBER AND DATE. ALL EXISTING CIRCUITS IN PANEL SHALL BE FIELD VERIFIED TO ENSURE ENTIRE CIRCUIT DIRECTORY IS ACCURATE. TWO COPIES OF THIS DIRECTORY SHALL BE SUBMITTED TO THE OWNER, AND ONE COPY SHALL BE
SUBMITTED TO THE ELECTRICAL ENGINEER.
44. ALL REMOVED CIRCUITS SHALL BE RE-LABELED IN PANEL AS "SPARE" AND A NEW PANEL CIRCUIT DIRECTORY SHALL BE CREATED.
45. ELECTRICAL CONTRACTOR SHALL PROVIDE CONTROLS FOR ALL LIGHT FIXTURES.
46. IN THE EVENT OF A DISCREPANCY BETWEEN ANY OF THE PROJECT DOCUMENTS PROVIDED BY ENGINEER OR OWNER, THE MORE
STRINGENT, MORE COSTLY FEATURE/PERFORMANCE WILL BE REQUIRED.
47. COORDINATE WITH OWNER AND CIVIL ENGINEER FOR FOR LOCATION OF ALL POLES AND HANDHOLES.
48. INSTALLATION SHALL COMPLY WITH NEC REQUIREMENTS AND BE INSTALLED IN ACCORDANCE WITH NECA-1 STANDARD FOR GOOD
WORKMANSHIP IN ELECTRICAL CONSTRUCTION.
49. THE TERM “PROVIDE” AS USED IN THESE DOCUMENTS SHALL MEAN FURNISH (OR SUPPLY) AND INSTALL AS REQUIRED FOR PROPER
OPERATION OR USE.
1. BEFORE SUBMITTING BID, THE CONTRACTORS SHALL VISIT THE JOB SITE AND BECOME FULLY FAMILIAR WITH THE EXISTING CONDITIONS AND THE DOCUMENTS OF OTHER TRADES UNDER WHICH THEIR WORK WILL BE ACCOMPLISHED.
THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS OR ERRORS MADE AS A RESULT OF
FAILURE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS.
2. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ANY DAILY INTERRUPTIONS OR SHUTDOWNS OF THE EXISTING SYSTEMS IN ADVANCE WITH OWNER'S DESIGNATED REPRESENTATIVE. THIS SHALL INCLUDE SERVICES INTERRUPTIONS AND CONNECTIONS, MECHANICAL AND ELECTRICAL DISRUPTIONS EFFECTING OTHER TRADES. INCLUDE ALL WORK
REQUIRED TO ALLOW PHASED CONSTRUCTION WHERE NECESSARY.
3. DEMOLITION DRAWINGS ARE STRICTLY DIAGRAMMATIC AND SHOW GENERAL ARRANGEMENT AND APPROXIMATE LOCATION OF EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT. IT IS NOT THE INTENT OF THESE DRAWINGS TO SHOW ALL EQUIPMENT, PIPING OR CONDUIT TO BE REMOVED. EQUIPMENT NOT BEING REUSED SHALL BE REMOVED, INCLUDING ALL ASSOCIATED HANGERS, SUPPORTS, PIPES, CONDUITS, WIRES, AND CONTROLS BACK TO THE POINT OF ORIGIN.
4. REFER TO THE ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS. THE FULL EXTENT OF THE DEMOLITION AND RECONSTRUCTION SCOPE OF WORK SHALL BE DETERMINED
BY THE ENTIRE SET OF BID DOCUMENTS.
5. THE CONTRACTORS SHALL COORDINATE THE DEMOLITION SCOPE OF WORK WITH THE GENERAL CONTRACTOR'S OR CONSTRUCTION MANAGER'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF WORK. CARE MUST BE TAKEN SO AS NOT TO DESTROY, REMOVE OR DEMOLISH ANY EQUIPMENT, APPURTENANCES OR DEVICES INTENDED TO REMAIN.
PROVIDE TEMPORARY SERVICES AND SYSTEM MODIFICATIONS TO ACCOMMODATE CONTINUOUS OPERATION OF ACTIVE
SYSTEM.
6. THE LOCATION OF EXISTING ELECTRICAL SYSTEM SHOWN ON FLOOR PLANS, IS BASED ON THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL FIELD VERIFY PRIOR TO COMMENCEMENT OF CONSTRUCTION, EXACT QUANTITY AND LOCATION(S) OF EXISTING EQUIPMENT, PANELS, CONDUITS, LIGHTING, ETC. TO BE REMOVED AND ADJUST AS
NECESSARY.
7. ALL EQUIPMENT, AND ASSOCIATED WIRING, CONDUITS INDICATED TO BE REMOVED OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .