Bid Manual.pdf (1).pdf
PDF 4 MB Posted
- Attached to
- Nolanville 2026 Street Improvements
- Solicitation number
- 2026-156
- Issued by
- Bell County, Texas
About this file
This Bid Manual documents a sealed competitive bidding process for the City of Nolanville, Texas to construct 2026 Street Improvements. The work includes rehabilitation of North Drive and a portion of 4th Street with cement stabilization, asphalt overlay, replacement of damaged curb, striping, traffic control, and erosion control measures. An alternate pavement section option consists of removal of existing asphalt and base material, installation of geogrid, crushed limestone base material, and asphalt overlay. The project is divided into multiple bid parts: Part A (North Drive base work), Part B (North 4th Street base work), Part A-1 (North Drive alternate paving), and Part B-1 (North 4th Street alternate paving), with the City reserving the right to award any individual part or combination of parts. Bid documents are available beginning Monday, August 3, 2026, from Kasberg, Patrick & Associates LP for a non-refundable fee of $100 per set or free download via www.civcastusa.com. A non-mandatory pre-bid conference will be held at Nolanville City Hall on Tuesday, August 11, 2026 at 10:00 A.M. Sealed bids are due at City Hall by 10:00 A.M. on Tuesday, August 25, 2026, and will be publicly opened and read aloud the same day. The City Council will review bids at their next regularly scheduled meeting and award the contract as practicable thereafter. The contract requires completion of work within 150 calendar days from the Notice to Proceed. All questions and requests for information must be directed to John A. Simcik, P.E. before 12:00 P.M. on Wednesday, August 19, 2026.
Bidders must submit bids on the provided forms accompanied by a bid bond, certified check, or cashier's check in an amount not less than 5 percent of the bid amount as a guarantee to enter into contract and execute performance and payment bonds within ten days of award notification. The successful bidder must execute separate performance and payment bonds, each in an amount equal to 100 percent of the total contract price. Unit prices for each bid item must include a pro rata share of overhead, and payment will be made on measured, in-place, actual work completed using field cross-sections and measurements. Monthly partial payments for work completed through the 25th of each month will be made with 10 percent retained until final completion. The contract is governed by the Texas Department of Transportation Standard Specifications for Construction of Highways, Streets, and Bridges, latest edition. A geotechnical investigation report has been conducted and provided for informational purposes. Construction administration services will be provided by Kasberg, Patrick & Associates LP, with daily on-site representation by the City of Nolanville. The City reserves the right to accept or reject any and all bids, waive informalities, eliminate portions of work or add additional work to keep the total contract amount within budgeted funds.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Nolanville, Texas
CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
FOR
THE CONSTRUCTION OF
2026 STREET IMPROVEMENTS
Prepared By
7/17/2026
KASBERG, PATRICK & ASSOCIATES, LP
CONSULTING ENGINEERS
TEMPLE, TEXAS
July 2026
TOC-1
TABLE OF CONTENTS
ADDENDA (if any)
SPECIAL PROJECT INFORMATION TO BIDDERS/CONTRACTORS
INSTRUCTIONS TO BIDDERS
PROPOSAL AND BID SCHEDULE
BID BOND
STANDARD FORM OF AGREEMENT
PERFORMANCE BOND
PAYMENT BOND
CERTIFICATE OF INSURANCE
CERTIFICATE AS TO CORPORATE PRINCIPAL
GENERAL CONDITIONS
SPECIAL CONDITIONS
TECHNICAL SPECIFICATIONS
GEOTECHNICAL REPORT
NOTICE TO BIDDERS
Sealed bids addressed to the Honorable Mayor and City Council will be received at the Nolanville City Hall; 101 North 5th Street; Nolanville, Texas 76559 until 10:00 A.M. on Tuesday, August 25, 2026 for the construction of 2026 Street Improvements in the City of Nolanville, Texas. The bids shall be labeled:
2026 Street Improvements Nolanville, Texas
The Work includes, but is not necessarily limited to, the following:
Construction of approximately: Rehabilitation of North Drive and a portion of 4th Street. Includes cement stabilization and asphalt overlay, replacement of damaged curb, striping, traffic control, erosion control, etc. There is also an alternate pavement section consisting of removal of existing asphalt/base material, installation of geogrid, base material, and asphalt overlay.
Bids must be submitted on the Bid Form provided and must be accompanied by a cashier's check, certified check or acceptable bidder's bond payable without recourse to the City of Nolanville, Texas in an amount not less than five (5) percent of the bid submitted as a guarantee that the bidder will enter into a contract and execute a Performance Bond and a Payment Bond within ten (10) days after the notification of the award of the contract.
The bids will be publicly opened and read aloud in the meeting room in City Hall at 10:00 A.M. on Tuesday, August 25, 2026. The City Council will officially review the bids at their next regularly scheduled meeting and award the contract as soon thereafter as practical.
The City of Nolanville reserves the right to accept or reject any and all bids, as the best interest of the City may require, and to waive any informality in bids received. The City of Nolanville also reserves the right to award the Contract as may be advantageous to the City.
The City of Nolanville also reserves the right to eliminate a portion of the work or add additional work as required to keep the total contract amount within the funds budgeted. The City also has the right to award any parts or combination of parts of the project it deems necessary. Low bidder shall be established by the sum of the combination of parts chosen by the City.
Plans, specifications and bidding documents may be secured beginning Monday, August 3, 2026 at the office of Kasberg, Patrick & Associates LP; 11 S. 2nd Street, Temple, Texas; (254) 773- 3731 for a non-refundable fee of $ 100.00 per set. Checks shall be made payable to Kasberg, Patrick & Associates LP.
Bidding documents may also be downloaded at no charge via www.civcastusa.com.
A Non-Mandatory Pre-bid conference will be held at the Nolanville City Hall;
101 North 5th Street; Nolanville, Texas at 10:00 A.M. on Tuesday, August 11, 2026.
Killeen Daily Herald & City of Nolanville Website: CITY OF NOLANVILLE, TEXAS August 2, 2026 August 9, 2026
Misha Johnson City Secretary
SPECIAL PROJECT INFORMATION
TO BIDDERS/CONTRACTORS
A. All questions, inquiries and/or requests for information shall be directed to John A. Simcik, P.E.
before 12:00 PM (noon), Wednesday, August 19, 2026. Requests for information or construction drawings interpretations after that date and time will not be addressed and the Engineer nor the City of Nolanville shall be bound by any references or dates obtained by the Bidders/Contractors unless an official Addendum is produced and released by Kasberg, Patrick & Associates, LP
(KPA).
B. Daily, on-site construction representation and observation will be provided by the City of Nolanville.
C. Construction administration services for this project will be provided by KPA Engineers.
D. Unless otherwise specified in the Construction Plans, the work shall be constructed in accordance with the Texas Department of Transportation Standard Specifications for Construction of Highways, Streets, and Bridges, latest edition.
E. A geotechnical investigation has been conducted for this project and is provided for informational purposes only. The Contractor is encouraged to visit the site prior to bidding.
If potholing of the site is desired by the Contractor prior to bidding in order to observe below grade conditions, the Contractor shall coordinate with the City of Nolanville Public Works Director prior to excavating.
F. At least one Addendum will be forwarded to the plan holders of record after the non-mandatory pre-bid conference. Only plan holders will be provided with any Addenda prepared and forwarded by the Engineer.
G. CAD or DWG electronic drawings of the construction plans will not be provided to any potential Bidder/Contractor. Potential Bidders/Contractors could possibly scan the drawings and use those for various purposes over which the Engineer has no control and scanned drawings used by others shall be at the user’s risk with no liability to the Engineer.
H. An electronic Bid Form (Microsoft Excel Format) will be provided to the potential Bidders/Contractors in the Addendum that follows the non-mandatory pre-bid conference.
I. Monthly Partial Payments for construction and materials on hand (if applicable) will be made for items completed through the 25th day of each month.
J. The Engineer will provide an electronic Partial Payment Request Form to the Contractor once the construction contract award is completed.
K. Quantities for items to be requested by the monthly Partial Payment Request will be reviewed by the Construction Inspector & the Contractor, word processed by the Contractor, submitted to the Engineer for review and the Engineer will submit the reviewed request to the City of Nolanville for payment processing.
L. The Bid Schedule shows approximate quantities for the work ITEMS to be accomplished.
Payment for work items will be made on measured, in place, actual work completed using field cross sections, field measurements and calculations deemed necessary to produce accurate, actual installations.
M. A Qualified Bid shall contain a signed, completed Bid Form, a Bid Security, and acknowledgement of all Addenda issued for the project.
N. The City of Nolanville reserves the right to eliminate a portion of the work or add additional work as required to keep the total contract amount within the funds budgeted. The City also has the right to award any parts or combination or parts of the project it deems necessary. Low bidder shall be established by the sum of the combination of parts chosen by the City.
I - 1
INSTRUCTION TO BIDDERS
FOR CONSTRUCTION
1. Use of Separate Bid Forms
These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contact document, completed or executed. Separate bid forms are provided for your use.
2. Interpretations or Addenda
Each request for an interpretation shall be made to the engineer. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than one (1) day prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidder.
3. Inspection of Site
Each bidder should visit the site of the proposed work and fully acquaint himself with the existing conditions there and should fully inform himself as to the facilities involved, the difficulties and restrictions attending the performance of the contract. The bidder should thoroughly examine and familiarize himself with the drawings, technical specifications and all other contract documents. The contractor, by the execution of the contract, shall in no way be relieved of any obligation under it due to his failure to receive or examine any form or legal document or to visit the site or acquaint himself with the conditions there existing. The City will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.
4. Bids
a) All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.
b) All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.
c) The City may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.
d) If contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.
I - 2
5. Bid Bond
a) A bid bond in the amount of 5% of the bid issued by the acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the City may be submitted in lieu of the Bid Bond.
b) The bid bond or its comparable, will be returned to the bidder as soon as practical after the opening of the bids.
6. Unit Price
The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.
7. Corrections
Erasures or other corrections in the bid must be noted over the signature of the bidder.
8. Time for Receiving Bids
Bids received prior to the advertised hour of opening will be kept securely sealed. The officer appointed to open the bids shall decide when he specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to satisfaction of the City that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.
9. Opening of Bids
The City shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.
10. Withdrawal of Bids
Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating his purpose in writing to the City. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.
I - 3
11. Award of Contract/Rejection of Bids
a) The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid. The bidder selected will be notified at the earliest possible date.
The City reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.
12. Execution of Agreement/Performance and Payment Bonds
a) The failure of the successful bidder to execute the agreement and supply the required bonds within ten (10) days after the prescribed forms are presented for signature, or within such extended period as the City may grant, shall constitute a default and the City may, at its option either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the City may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the City for a refund.
BID FORM
PROJECT IDENTIFICATION: City of Nolanville 2026 Street Improvements
THIS BID IS SUBMITTED TO: City of Nolanville 101 North 5th Street Nolanville, Texas 76559
1.
2.
3. In submitting this bid, BIDDER represents, as more fully set forth in the Agreement, that:
a.
Number Date Name b.
c.
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
BIDDER accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for sixty (60) days after the day of Bid opening. BIDDER will sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of OWNER's Notice of Award.
BIDDER has examined copies of all the Bidding Documents and of the following addenda (receipt of all which is hereby acknowledged):
BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.
BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies d.
e.
f.
g.
4. BIDDER will complete work for the following prices:
BIDDER has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents.
BIDDER has given OWNER written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by OWNER is acceptable to BIDDER.
This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid;
BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other BIDDER or over OWNER.
which pertain to the subsurface of physical conditions at the site or otherwise may affect the cost, progress, performance or furnishing of the Work as BIDDER considers necessary for the performance or finishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 8 of the Agreement; and no additional examinations, investigations, explorations, tests, reports, or similar information or data are or will be required by BIDDER for such purposes.
BIDDER has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumed responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said Underground Facilities are or will be required by BIDDER in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 8 of the Agreement.
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
A-1 100% LS
Dollars and Cents per Lump Sum.
A-2 100% LS
Dollars and Cents per Lump Sum.
A-3 100% LS
Dollars and Cents per Lump Sum.
A-4 100% LS
Dollars and Cents per Lump Sum.
BID SCHEDULE
PART A - NORTH DRIVE
Mobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For
For Furnishing Traffic Control Plan Sealed by an Engineer Licensed in the State of Texas, Complete For
For Implementing Traffic Control Plan, Complete For
Implement and Administer Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART A - NORTH DRIVE
A-5 100% LS
Dollars and Cents per Lump Sum.
A-6 54 LF
Dollars and Cents per Linear Foot.
A-7 2,040 SY
Dollars and Cents per Square Yard.
A-8 2,040 SY
Dollars and Cents per Square Yard.
For Sawcutting Existing Asphalt, Complete For
For Pulverizing Existing Asphalt and Furnishing, Placing and Mixing 7" Cement Stabilization (8% Cement, Target Strength 250-500 psi), Complete For
For Milling and Disposing of 2" Existing Asphalt, Complete For
Provide DVD of Right-of-Way Pre- Construction and Post Construction Site Conditions for the Total Project, Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART A - NORTH DRIVE
A-9 2,040 SY
Dollars and Cents per Square Yard.
A-10 224 TN
Dollars and Cents per Ton.
A-11 1 EA
Dollars and Cents per Each.
A-12 4 EA
Dollars and Cents per Each.
Furnish And Install Blue Reflective Buttons in Front of Fire Hydrants.
Complete for
Install Object Marker - OM - 3R.
Complete for
For Grading and Compacting Cement Treated Material, Complete For
For Furnishing and Placing 2" Type 'D' HMAC Pavement with Prime and Tack Coat, Complete For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART A - NORTH DRIVE
A-13 27 LF
Dollars and Cents per Linear Foot.
A-14 16 LF
Dollars and Cents per Linear Foot.
TOTAL BID AMOUNT PART A - (ITEMS A-1 - A-14)
BID AMOUNT $:
(numerals)
(words)
Furnish & Install 12" Wide White Thermoplastic Crosswalk Striping.
Complete for
Furnish & Install 24" Wide White Thermoplastic Stop Bar. Complete for
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
B-1 100% LS
Dollars and Cents per Lump Sum.
B-2 100% LS
Dollars and Cents per Lump Sum.
B-3 100% LS
Dollars and Cents per Lump Sum.
B-4 100% LS
Dollars and Cents per Lump Sum.
Implement and Administer Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For
For Implementing Traffic Control Plan, Complete For
BID SCHEDULE
PART B1 - NORTH 4TH STREET
Mobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For
For Furnishing Traffic Control Plan Sealed by an Engineer Licensed in the State of Texas, Complete For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART B1 - NORTH 4TH STREET
B-5 100% LS
Dollars and Cents per Lump Sum.
B-6 462 LF
Dollars and Cents per Linear Foot.
B-7 924 SY
Dollars and Cents per Square Yard.
B-8 924 SY
Dollars and Cents per Square Yard.
For Furnishing, Placing and Mixing 7" Cement Stabilization (8% Cement, Target Strength 250-500 psi), Complete For
For Milling and Disposing of 2" Existing Asphalt, Complete For
For Sawcutting Existing Asphalt, Complete For
Provide DVD of Right-of-Way Pre- Construction and Post Construction Site Conditions for the Total Project, Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART B1 - NORTH 4TH STREET
B-9 924 SY
Dollars and Cents per Square Yard.
B-10 76 TN
Dollars and Cents per Ton.
B-11 1 EA
Dollars and Cents per Each.
B-12 2 EA
Dollars and Cents per Each.
TOTAL BID AMOUNT PART B - (ITEMS B1 - B12)
BID AMOUNT $:
(numerals)
For Grading and Compacting Cement Treated Material, Complete For
(words)
For Furnishing and Placing 2" Type 'D' HMAC Pavement with Prime and Tack Coat, Complete For
For Adjusting Existing Manholes to Grade, Complete For
Furnish and Install Blue Reflective Buttons in Front of Fire Hydrants, Complete in Place For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
A1-1 -2,040 SY
Dollars and Cents per Square Yard.
A1-2 -2,040 SY
Dollars and Cents per Square Yard.
A1-3 -2,040 SY
Dollars and Cents per Square Yard.
A1-4 -224 TN
Dollars and Cents per Ton.
For Milling and Disposing of 2" Existing Asphalt, Complete For
For Pulverizing Existing Asphalt and Furnishing, Placing and Mixing 7" Cement Stabilization (8% Cement, Target Strength 250-500 psi), Complete For
For Grading and Compacting Cement Treated Material, Complete For
For Furnishing and Placing 2" Type 'D' HMAC Pavement with Prime and Tack Coat, Complete For
BID SCHEDULE
PART A-1 - NORTH DRIVE ALTERNATE PAVING SECTION
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART A-1 - NORTH DRIVE ALTERNATE PAVING SECTION
A1-5 2,040 SY
Dollars and Cents per Square Yard.
A1-6 2,040 SY
Dollars and Cents per Square Yard.
A1-7 2,040 SY
Dollars and Cents per Square Yard.
A1-8 2,040 SY
Dollars and Cents per Square Yard.
Excavate and Dispose of 7.5" Existing Asphalt/Base/Subgrade Material, Complete For
Proofroll Existing Subgrade, Complete For
Furnish & Install Geogrid, Tensar HX5.5, Complete in Place For
Furnish & Install 6" Crushed Limestone Base Material, TxDOT Type A or D, Gr 1-2, Complete in Place For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART A-1 - NORTH DRIVE ALTERNATE PAVING SECTION
A1-9 168 TN
Dollars and Cents per Ton.
TOTAL BID AMOUNT PART A1 - (ITEMS A1-1 - A1-9)
BID AMOUNT $:
(numerals)
(words)
For Furnishing and Placing 1.5" Type 'D' HMAC Pavement with Prime and Tack Coat, Complete For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
B1-1 -924 SY
Dollars and Cents per Square Yard.
B1-2 -924 SY
Dollars and Cents per Square Yard.
B1-3 -924 SY
Dollars and Cents per Square Yard.
B1-4 -102 TN
Dollars and Cents per Ton.
For Milling and Disposing of 2" Existing Asphalt, Complete For
For Furnishing, Placing and Mixing 7" Cement Stabilization (8% Cement, Target Strength 250-500 psi), Complete For
For Grading and Compacting Cement Treated Material, Complete For
For Furnishing and Placing 2" Type 'D' HMAC Pavement with Prime and Tack Coat, Complete For
BID SCHEDULE
PART B1- NORTH 4TH STREET ALTERNATE PAVING SECTION
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART B1- NORTH 4TH STREET ALTERNATE PAVING SECTION
B1-5 924 SY
Dollars and Cents per Square Yard.
B1-6 924 SY
Dollars and Cents per Square Yard.
B1-7 924 SY
Dollars and Cents per Square Yard.
B1-8 924 SY
Dollars and Cents per Square Yard.
Excavate and Dispose of 7.5" Existing Asphalt/Base/Subgrade Material, Complete For
Proofroll Existing Subgrade, Complete For
Furnish & Install Geogrid, Tensar HX5.5, Complete in Place For
Furnish & Install 6" Crushed Limestone Base Material, TxDOT Type A or D, Gr 1-2, Complete in Place For
Total Item Estimated Unit Amount No. Quantity Unit Description Price (in numerals)
BID SCHEDULE
PART B1- NORTH 4TH STREET ALTERNATE PAVING SECTION
B1-9 76 TN
Dollars and Cents per Ton.
TOTAL BID AMOUNT PART B1 - (ITEMS B1-1 - B1-9)
BID AMOUNT $:
(numerals)
(words)
For Furnishing and Placing 1.5" Type 'D' HMAC Pavement with Prime and Tack Coat, Complete For
Addendum No. 1 dated Received Addendum No. 2 dated Received Addendum No. 3 dated Received Addendum No. 4 dated Received
BID SUMMARY
TOTAL PART B - NORTH 4TH STREET (ITEMS B-1 - B-14):
TOTAL PART A - NORTH DRIVE (ITEMS A-1 - A-12): -$
The above prices shall include all labor, materials, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.
The work proposed to be done shall be accepted when fully completed and finished in accordance with the plans, specifications and Project Schedule shown herein to the satisfaction of the Engineer.
TOTAL PART A1 - NORTH DRIVE (ITEMS A1-1 - A1-9):
TOTAL PART B1 - NORTH 4TH STREET (ITEMS B1-1 - B1-9):
TOTAL PART A + PART B:
TOTAL PART A + PART B + PART A1 + PART B1:
This Bid provides for Work to commence on or before the date set forth in the Notice to Proceed and to be ready for final acceptance and payment in 150 calendar days.
Amounts are to be shown in both words and figures. In case of discrepancy, the amount shown in words will govern. The above prices shall include all labor, materials, overhead, profit, insurance, etc., to cover the finished WORK of the several kinds called for.
Receipt is hereby acknowledged of the following addenda to the Contract Documents.
Respectfully submitted: Name:
By:
Address Printed Name:
City, State & Zip Seal & Authorization (if a Corporation) Attest:
Phone Fax
Secretary Email Address
The undersigned bidder hereby declares that he has visited the site of the work and has carefully examined the Contract Documents pertaining to the work covered in the above bid, and that the bid prices contained in the proposal have been carefully checked and are submitted as correct and final.
The City reserves the right to award any individual PART or any combination of PARTS.
The above prices shall include all labor, materials, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.
The work proposed to be done shall be accepted when fully completed and finished in accordance with the plans, specifications and Project Schedule shown herein to the satisfaction of the Engineer.
BB-1
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, as Principal, and as Surety, are hereby held and firmly bound unto as OWNER in the penal sum of for payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.
SIGNED, this day of , 2026. The Condition of the above obligation is such that whereas the Principal has submitted to a certain BID, attached hereto and hereby made a part hereof to enter into a contract in writing, for the
NOW, THEREFORE,
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of
Contract attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.
THE SURETY, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension.
BB-2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.
(L.S.)
Principal
Surety
By:
IMPORTANT - Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.
END OF SECTION
SF-1 © by Texas Section, ASCE 1971
STANDARD FORM OF AGREEMENT
As Adopted By
THE TEXAS SECTION OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS
October 7, 1971
Revised November 17, 1928 Revised April 13, 1932 Revised October 27, 1934 Revised October 19, 1945 Revised April 8, 1954 Revised April 21, 1960 Revised October 7, 1971
Approved as to Legal Form by Legal Council
STATE OF TEXAS
COUNTY OF Bell }
THIS AGREEMENT, made and entered into this day of , A.D., 2026, by and between The City of Nolanville of the County of Bell and State of Texas , acting through
Teresa Chandler thereunto duly authorized so to do, Party of the First Part, hereinafter termed OWNER, and of the City of , County of and State of Texas, Party of the Second Part, Hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (OWNER), and under the conditions expressed in the bond bearing even date herewith, the said Party of the Second Part (CONTRACTOR), hereby agrees with the said Party of the First Part (OWNER) to commence and complete the construction of certain improvements described as follows:
in the amount of and all extra work in connection therewith, under the terms as stated in the General Conditions of the Agreement and at his (or their) own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said construction, in accordance with the conditions and prices stated in the Proposal attached hereto, and in accordance with the Notice to Contractors, General
SF-2 © by Texas Section, ASCE 1971 and Special Conditions of Agreement, Plans and other drawings and printing or written explanatory matter thereof, and the Specifications and addenda therefore, as prepared by Kasberg, Patrick & Associates, LP; 11 S. 2nd Street; Temple, Texas, 76501; (254) 773-3731, herein entitled the ENGINEER, each of which has been identified by the CONTRACTOR and the ENGINEER, together with the CONTRACTOR'S written Proposal, the General Conditions of the Agreement, and the Performance and Payment Bonds hereto attached; all of which are made a part hereof and collectively evidence and constitute the entire contract.
The CONTRACTOR agrees to commence work within ten (10) days after the date written notice to do so shall have been given him, and to complete construction as required in the contract, subject to such extensions of time as are provided by the General and Special Conditions.
The OWNER agrees to pay the CONTRACTOR in current funds the price or prices shown in the proposal, which forms a part of this contract, such payments to be subject to the General and Special Conditions of the contract.
IN WITNESS WHEREOF, the parties to these presents have executed this Agreement in the year and day first above written.
City of Nolanville, Texas Party of the First Part (OWNER) Party of the Second Part (CONTRACTOR)
By:_______________________________ By:_______________________________
ATTEST: ATTEST:
PeB-1
PERFORMANCE BOND
STATE OF TEXAS
COUNTY OF Bell }
KNOW ALL MEN BY THESE PRESENTS: That of the City of
, County of and State of Texas , as principal, and authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto
The City of Nolanville, Texas (OWNER), in the penal sum of
Dollars ($ ) for the payment whereof, the said Principal and
Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, by these presents:
WHEREAS, the Principal has entered into a certain written contract with the OWNER, dated the day of , 2026, to construct which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract and shall in all respects duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said contract agreed and covenanted by the Principal to be observed and performed, and according to the true intent and meaning of said Contract and the Plans and Specifications hereto annexed, then this obligation shall be void; otherwise to remain in full force and effect;
"PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of (Article 5160 for Public Work) (Article 5472d for private Work)* of the Revised Civil Statutes of Texas as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copies at length herein."
PeB-2
Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in anyway affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder.
* Not applicable for federal work. See "The Miller Act," 40 U.S.C. S270
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this ________________day of_______________________________, 2026.
Principal Surety
By___________________________ By
Title_________________________ Title
Address Address
The name and address of the Resident Agent of Surety is:
PaB-1
PAYMENT BOND
STATE OF TEXAS
COUNTY OF Bell }
KNOW ALL MEN BY THESE PRESENTS: That of the City of
, County of and State of Texas , as principal, and authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto The City of Nolanville, Texas (OWNER), in the penal sum of
Dollars ($ ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally, by these presents:
WHEREAS, the Principal has entered into a certain written contract with the OWNER, dated the day of , 2026, to construct:
which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised Civil Statutes of Texas as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein.
PaB-2
Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder.
IN WITNESS whereof, the said Principal and Surety have signed and sealed this instrument this ________________day of_______________________________, 2026.
Principal Surety
By___________________________ By
Title_________________________ Title
Address Address
The name and address of the Resident Agent of Surety is:
Ins-1
CERTIFICATE OF INSURANCE
THIS CERTIFICATE IS ISSUED FOR THE DURATION OF THE PROJECT AS A MATTER OF
INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.
THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE
AFFORDED BY THE POLICIES LISTED BELOW.
NAME AND ADDRESS OF AGENCY COMPANIES AFFORDING COVERAGES
COMPANY A
LETTER
COMPANY B
LETTER
NAME AND ADDRESS OF INSURED COMPANY C
LETTER
COMPANY D
LETTER
COMPANY E
LETTER
This is to certify that policies of insurance listed below have been issued to the insured named above and are in force at this time. Not withstanding any requirement, term or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions and conditions of such policies.
COMPANY
LETTER
TYPE OF INSURANCE
POLICY
NUMBER
POLICY
EXPIRATION
DATE
LIMITS OF LIABILITY IN THOUSANDS
(000)
EACH
OCCURREN
AGGREGATE
GENERAL LIABILITY
___ Comprehensive Form
Bodily Injury
Premises-Operations ___ Explosions and Collapse Hazard
Property Damage
___ Underground Hazard ___ Products/Completed Operations Hazard ___ Contractual Insurance ___ Broad Form Property Damage ___ Independent Contractors ___ Personal Injury
Bodily Injury and Property Damage Combine d
Personal Injury
Ins-2
AUTOMOBILE LIABILITY
___ Comprehensive Form ___ Owned ___ Hired ___ Non-Owned
Bodily Injury (Each Person)
Bodily Injury (Each Accident)
Property Damage
Bodily Injury and Property Damage Combined
EXCESS LIABILITY
___ Umbrella Form ___ Other than Umbrella
WORKERS'
COMPENSATION
AND EMPLOYER'S
LIABILITY
Statutory
(Each Account)
OTHER
Builders Risk
Description of Operations/ Locations/Vehicles PROJECT TITLE: 2026 Street Improvements
PROJECT LOCATION: Nolanville, Texas
The City of Nolanville is named as an additional insured under all insurance, other than Workman's Compensation.
Cancellation: No policies will be cancelled or reduced, restricted, or limited until ten (10) days after the owner has received written notice as evidence by return receipt or registered or certified letter.
NAME AND ADDRESS OF CERTIFICATE HOLDER:
DATE ISSUED: , 2026 AUTHORIZED REPRESENTATIVE
END OF SECTION
GENERAL CONDITIONS
TC-1
© by Texas Section, ASCE 1971
TABLE OF CONTENTS
GENERAL CONDITIONS OF AGREEMENT
1. Definition of Terms Page
1.01 Owner, Contractor and Engineer .........................................................................G-1
1.02 Contract Documents.............................................................................................G-1
1.03 Sub-Contractor .....................................................................................................G-1
1.04 Written Notice ......................................................................................................G-1
1.05 Work ....................................................................................................................G-1
1.06 Extra Work ...........................................................................................................G-1
1.07 Working Day ........................................................................................................G-2
1.08 Calendar Day .......................................................................................................G-2
1.09 Substantially Completed ......................................................................................G-2
2. Responsibilities of the Engineer and the Contractor
2.01 Owner-Engineer Relationship ..............................................................................G-2
2.02 Professional Inspection by Engineer ....................................................................G-2
2.03 Payments for Work ..............................................................................................G-2
2.04 Initial Determinations ..........................................................................................G-3
2.05 Objections ............................................................................................................G-3
2.06 Lines and Grades .................................................................................................G-3
2.07 Contractor’s Duty and Superintendence ..............................................................G-3
2.08 Contractor’s Understanding .................................................................................G-4
2.09 Character of Workmen .........................................................................................G-4
2.10 Contractor’s Buildings .........................................................................................G-4
2.11 Sanitation .............................................................................................................G-5
2.12 Shop Drawings .....................................................................................................G-5
2.13 Preliminary Approval ..........................................................................................G-5
2.14 Defects and Their Remedies ................................................................................G-6
2.15 Changes and Alterations ......................................................................................G-6
3. General Obligations and Responsibilities
3.01 Keeping of Plans and Specifications Accessible .................................................G-6
3.02 Ownership of Drawings .......................................................................................G-6
3.03 Adequacy of Design .............................................................................................G-6
3.04 Right of Entry ......................................................................................................G-7
3.05 Collateral Contracts .............................................................................................G-7
3.06 Discrepancies and Omissions ..............................................................................G-7
3.07 Equipment, Materials and Construction Plant .....................................................G-7
3.08 Damages ...............................................................................................................G-7
3.09 Protection Against Accident to Employees and the Public .................................G-7
3.10 Performance and Payment Bonds ........................................................................G-8
TC-2
3.11 Losses from Natural Causes.................................................................................G-8
3.12 Protection of Adjoining Property .........................................................................G-8
3.13 Protection Against Claims of Sub-Contractors, Etc. ..........................................G-8
3.14 Protection Against Royalties or Patented Invention ............................................G-9
3.15 Laws and Ordinances ...........................................................................................G-9
3.16 Assignment and Subletting ..................................................................................G-9
3.17 Indemnification ....................................................................................................G-10
3.18 Insurance ..............................................................................................................G-10
3.18.1 Certificate of Insurance ........................................................................................G-10
4. Prosecution and Progress
4.01 Time and Order of Completion ............................................................................G-11
4.02 Extension of Time ................................................................................................G-11
4.03 Hindrances and Delays ........................................................................................G-11
5. Measurement and Payment
5.01 Quantities and Measurements ..............................................................................G-11
5.02 Estimated Quantities ............................................................................................G-12
5.03 Price of Work .......................................................................................................G-12
5.04 Partial Payment ....................................................................................................G-12
5.05 Use of Completed Portions ..................................................................................G-13
5.06 Final Completion and Acceptance .......................................................................G-13
5.07 Final Payment ......................................................................................................G-13
5.08 Payments Withheld ..............................................................................................G-14
5.09 Delayed Payments ................................................................................................G-14
6. Extra Work and Claims
6.01 Change Orders .....................................................................................................G-14
6.02 Minor Changes .....................................................................................................G-15
6.03 Extra Work ...........................................................................................................G-15
6.04 Time of Filing Claims ..........................................................................................G-16
6.05 Arbitration ............................................................................................................G-16
7. Abandonment of Contract
7.01 Abandonment by Contractor ................................................................................G-17
7.02 Abandonment by Owner ......................................................................................G-18
G-1
GENERAL CONDITIONS OF AGREEMENT
1. DEFINITIONS OF TERMS
1.01 ... OWNER, CONTRACTOR AND ENGINEER. The OWNER, the CONTRACTOR and the ENGINEER are those persons or organizations identified as such in the Agreement and are referred to throughout the Contract Documents as if singular in number and masculine in gender. The term ENGINEER means the ENGINEER or his duly authorized representative. The ENGINEER shall be understood to be the ENGINEER of the OWNER, and nothing contained in the Contract Documents shall create any contractual or agency relationship between the ENGINEER and the CONTRACTOR.
1.02 ... CONTRACT DOCUMENTS. The Contract Documents shall consist of the Notice to Contractors (Advertisement), Special Conditions (Instructions to Bidders), Proposal, signed Agreement, Performance and Payment Bonds (when required), Special Bonds (when required), General Conditions of the Agreement, Technical Specifications, Plans, and all modifications thereof incorporated in any of the documents before the execution of the agreement.
The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. In case of conflict between any of the Contract Documents, priority of interpretation shall be in the following order: Signed Agreement, Performance and Payment Bonds, Special Bonds (if any), Proposal, Special Conditions of Agreement, Notice to Contractors, Technical Specifications, Plans, and General Conditions of Agreement.
1.03 ... SUB-CONTRACTOR. The term Sub-Contractor, as employed herein, includes only those having a direct contract with the CONTRACTOR and it includes one who furnishes material worked to a special design according to the plans or specifications of this work, but does not include one who merely furnishes material not so worked.
1.04 ... WRITTEN NOTICE. Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives the notice.
1.05 ... WORK. The CONTRACTOR shall provide and pay for all materials, supplies, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and other facilities necessary for the execution and completion of the work covered by the Contract Documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The CONTRACTOR shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words, which so applied, have a well-known technical or trade meaning shall be held to refer to such recognized standards.
1.06 ... EXTRA WORK. The term “Extra Work” as used in this contract shall be understood to mean and include all work that may be required by the ENGINEER or OWNER to be done by the CONTRACTOR to accomplish any change, alteration or addition to the work
G-2 shown upon the plans, or reasonably implied by the specifications, and not covered by the CONTRACTOR’S Proposal, except as provided under “Changes and Alterations”, herein.
1.07 ... WORKING DAY. A “Working Day” is defined as any day not including Saturdays, Sundays or any legal holidays, in which weather or other conditions, not under the control of the CONTRACTOR, will permit construction of the principal units of the work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m.
1.08 ... CALENDAR DAY. “Calendar Day” is any day of the week or month, no days being excepted.
1.09 ... SUBSTANTIALLY COMPLETED. By the term “substantially completed” is meant that the structure has been made suitable for use or occupancy or the facility is in condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment.
2. RESPONSIBILITIES OF THE ENGINEER AND THE CONTRACTOR
2.01 ... OWNER - ENGINEER RELATIONSHIP. The ENGINEER will be the OWNER’S representative during construction. The duties, responsibilities and limitations of authority of the ENGINEER as the OWNER’S representative during construction…