Bid Item Cost Breakdown WS.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- J045--Replace Cooling Tower #2 Re-Posting as IFB Federal contract opportunity
- Solicitation number
- 36C24622B0028
About this file
This document contains a bid template and details of a federal contract opportunity for replacement of a cooling tower. The bid template provides a cost breakdown structure by construction division for a project with an assigned number to replace Cooling Tower #2 at the VA Medical Center in Asheville, North Carolina. Offerors are to provide labor and material costs by division as well as overhead, profit and bond percentages.
The related federal contract opportunity is a solicitation to provide general construction and construction services for the replacement of Cooling Tower #2. The project involves removal of an existing cooling tower and sump and installation of a new cooling tower and sump, with some reuse and new construction of support structures. Modifications to piping, controls, and electrical feeds for the new cooling tower are required. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract pg2 - Cooling Tower 2.pdf | ||
| 36C24622B0028 0003.docx | DOCX document | |
| Bid Abstract pg1 - Cooling Tower 2.pdf | ||
| 36C24622B0028 0002.docx | DOCX document | |
| 36C24622B0028 0001.docx | DOCX document | |
| Subcontractor Certification VAAR 852.219-77.pdf | ||
| Questions and Responses - Cooling Tower 2 7.07.2022.pdf | ||
| Sign-in Sheets 6.14.2022.pdf | ||
| Map of Hospital - Path to B15.pdf | ||
| Drawings .pdf | ||
| Spec - Final.pdf | ||
| 36C24622B0028_1.docx | DOCX document | |
| SOW - Final.pdf | ||
| NC WAGE RATES 2.25.2022.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid
Base Bid Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .