Bid Documents S3041.pdf
PDF 8 MB Posted
- Attached to
- Waterford Sewer Upgrade
- Solicitation number
- PE-77050-NONST-2025-000000020
- Issued by
- Cobb County, Georgia
About this file
This is a bid solicitation document package from Cobb County Water System for the Waterford Sewer Upgrade Program (No. S3041) in Marietta, Georgia. The project involves upgrading approximately 2,400 linear feet of undersized sewer lines to provide adequate sewer capacity for the area, including installation of 8-inch, 12-inch, and 16-inch ductile iron gravity sewer pipes at various depths, manholes, service connections, and associated work. Bids are due by February 13, 2025 at 12:00 PM local time through the County's eProcurement Portal, with bid opening at 2:00 PM the same day. Only contractors pre-qualified with Cobb County Water System and holding a Georgia Utility Contractor License may bid. The contract duration is 365 calendar days from Notice to Proceed.
The project will be awarded to the lowest responsive, responsible bidder based on base bid pricing. A 5% bid bond is required with submission, and 100% performance and payment bonds will be required from the successful bidder. Liquidated damages of $750 per day will apply for late completion. The contract includes several allowances: $50,000 for easement stipulations, $75,000 for landscaping, $100,000 for utilities, and $75,000 for specialty traffic control. The work must comply with Georgia Security and Immigration Compliance Act requirements, and the contractor must participate in E-Verify. While there are no specific DBE goals, the County encourages DBE participation and requires monthly reporting of DBE utilization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans S3041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COBB COUNTY WATER SYSTEM
CONTRACT
DOCUMENTS
AND
SPECIFICATIONS
FOR
WATERFORD SEWER UPGRADE
PROGRAM NO. S3041
January 17, 2025
COBB COUNTY, a political subdivision of the State of Georgia Cobb County Water System
Engineering & Records Division 660 South Cobb Drive
Marietta, GA 30060-3113
(770) 419-6325
CCWS Contract Documents Waterford Sewer Upgrade
COBB COUNTY WATER SYSTEM
STANDARD CONTRACT DOCUMENTS
for
WATERFORD SEWER UPGRADE
PROGRAM NO. S3041
TABLE OF CONTENTS
DIVISION 0 - BIDDING AND CONTRACT DOCUMENTS
ADVERTISEMENT FOR BIDS ................................................................................................................ 00 11 13 INSTRUCTIONS TO BIDDERS .............................................................................................................. 00 21 13 BID ............................................................................................................................................................ 00 41 13 MEASUREMENT AND PAYMENT ......................................................................................................... 00 41 13 SPECIAL CONDITIONS .......................................................................................................................... 00 41 13 BID BOND ................................................................................................................................................ 00 43 13 AGREEMENT/CONTRACT ..................................................................................................................... 00 43 14 NON-COLLUSION AFFIDAVIT ............................................................................................................... 00 45 19 GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT………......…… ............................... 00 45 53 DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION ………......…… ................. 00 45 54 PERFORMANCE BOND ................................................................................................................... 00 61 13.13 PAYMENT BOND .............................................................................................................................. 00 61 13.16 GENERAL CONDITIONS ........................................................................................................................ 00 72 13 INSURANCE REQUIREMENTS ............................................................................................................. 00 73 16 BUSINESS LICENSE .............................................................................................................................. 00 73 17 SUBCONTRACTOR NOTIFICATION LIST ............................................................................................ 00 73 18
DIVISION 1 - GENERAL REQUIREMENTS
SUMMARY OF WORK ............................................................................................................................ 01 11 00 PROJECT PROCEDURES ..................................................................................................................... 01 12 00 EASEMENT STIPULATIONS .................................................................................................................. 01 14 00 PAYMENT PROCEDURES ..................................................................................................................... 01 29 00 PROJECT MEETINGS ............................................................................................................................ 01 31 19 CONSTRUCTION PROGRESS DOCUMENTATION ............................................................................ 01 32 16 PHOTOGRAPHIC DOCUMENTATION .................................................................................................. 01 32 33 SUBMITTAL PROCEDURES .................................................................................................................. 01 33 00 NPDES STORM WATER DISCHARGES ............................................................................................... 01 57 23 TEMPORARY FLOW CONTROL............................................................................................................ 01 57 28 PRODUCT REQUIREMENTS ................................................................................................................. 01 60 00 PRECONSTRUCTION SURVEYS .......................................................................................................... 01 72 10 OPERATING & MAINTENANCE DATA .................................................................................................. 01 78 23 WARRANTIES ......................................................................................................................................... 01 78 36 PROJECT RECORD DOCUMENTS....................................................................................................... 01 78 39
DIVISION 31 - SITEWORK
CLEARING AND GRUBBING – SITE PREPARATION ................................................................... 31 11 00.02 TRENCHING AND BACKFILLING .......................................................................................................... 31 23 33 EROSION AND SEDIMENTATION CONTROLS ................................................................................... 31 25 00
DIVISION 32 – EXTERIOR IMPROVEMENTS
PAVING REPAIR AND RESURFACING .......................................................................................... 32 01 17.71
SEEDING……………..……………………………………………………………………………………… 32 92 19
SODDING ................................................................................................................................................. 32 92 23 PLANTS .................................................................................................................................................... 32 93 00
DIVISION 33 – SITE UTILITIES
AUGER BORING……………………………………………………………………………………….. . 33 05 07.23
PRECAST CONCRETE MANHOLES ..................................................................................................... 33 05 13 SANITARY SEWER PIPING ................................................................................................................... 33 31 00
APPENDICES
PERMITS……………………………………………………………………………………. .................... Appendix A EASEMENT DOCUMENTS …………………………………………………………….. ...................... Appendix B OTHER ………………………………………………………………………………………….. .............. Appendix C
DIVISION 0
BIDDING AND CONTRACT DOCUMENTS
(Rev. 06/06/2019) 00 11 13-1
SECTION 00 11 13
ADVERTISEMENT FOR BIDS
WATERFORD SEWER UPGRADE
PROGRAM NO. S3041
for
COBB COUNTY, GEORGIA
Separate, sealed bids for furnishing all materials, labor, tools, equipment, and incidentals necessary for the construction of the aforementioned project will be received by COBB COUNTY, a political subdivision of the State of Georgia, herein referred to as "Owner", through the County’s eProcurement Portal at (https://procurement.opengov.com/portal/cobbcoga), before 12:00 Noon (local time) on before 12:00 PM on February 13, 2025. No bids will be accepted after the 12:00 Noon deadline. Physical, emailed, or telegraphic/faxed bids will not be considered.
Bids will be opened at 2:00 PM (local time) on February 13, 2025, 2024, at the Procurement Services, 122 Waddell Street NE, Marietta, GA 30060.
The Project consists of upgrade of approximately 2,400 linear feet of undersized sewer to provide adequate sewer capacity for the area.
Only contractors who have been prequalified with the Cobb County Water System at the first public notice of this advertisement are invited to bid. Bidders are required to have a State of Georgia Utility Contractor License.
Each bid must be accompanied by cashier's or certified check or a bid bond prepared on accepted form, duly executed by the bidder, in the amount of five per cent (5%) of the bid and scanned in with their bid through the eProcurement Portal.
Owner reserves the right to waive any informality or to reject any or all bids, to evaluate bids, and to accept any bid which in its opinion may be for the best interest of Owner. Owner has the right to add to and delete from the contract once it has been awarded. Award, if award is made, will be to the lowest responsive, responsible bidder.
The successful bidder for this contract will be required to furnish a satisfactory performance bond and labor and material payment bond, each in the amount of one-hundred percent (100%) of the bid.
No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.
END OF SECTION
(Rev. 07/26/2023) 00 21 13-1 Program No. S3041
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
1. RECEIPT AND OPENING OF BIDS
COBB COUNTY, a political subdivision of the State of Georgia, herein called the "Owner", invites bids on the form attached hereto, all blanks of which must be appropriately filled in. Bids from Bidders included on the Cobb County Water System’s Plan Holders List will be received through the OpenGov Portal on the Cobb County Procurement Services’ website. Physical, emailed or telegraphic/faxed bids will not be considered. Unsigned bids will not be considered.
Bids will be received up until the date and at the time indicated on the Advertisement for Bids.
After such time on the same day, bids will be publicly opened and read aloud. Bids received after the designated time will not be considered.
The Owner may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. No bidder may withdraw a bid within 60 days after the actual date of the opening thereof.
2. PREPARATION O F BI D
Bids are to be submitted through the County’s eProcurement Portal at (https://procurement.opengov.com/portal/cobbcoga). Physical, emailed or telegraphic/faxed bids will not be considered.
3. METHOD O F BI DDING
The unit or lump sum price of each of the items in the bid shall include the actual cost to perform the work item and the item's pro rata share of overhead and profit so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price represents the total bid.
Any bid not conforming to this requirement, such as unit prices which in the opinion of the Owner do not represent a reasonable cost for the work, will be considered unbalanced. Unbalanced bids may be rejected at the discretion of the Owner.
A bid in which a unit or lump sum price for an item is not entered, or for which a unit price of $0.00 is entered, will be regarded as non-responsive and the bid will be rejected.
Bid prices shall include everything necessary for the completion of the work including, but not limited to, providing the materials, equipment, tools, plant and other facilities, and the management, superintendence, labor and services. Bid prices shall include allowance for Federal, state and local taxes.
In the event that the product of a unit price and an estimated quantity does not equal the extended amount quoted, the unit price shall govern, and the correct product of the unit price and the estimated quantity shall be deemed to be the amount bid. If the sum of two or more items in the bid schedule does not equal the total amounts quoted, the individual item amounts shall govern and the correct total shall be deemed to be the amount bid.
Bidders must satisfy themselves as to the accuracy of the estimated quantities in the bid schedule by examination of the site and a review of the drawings and specifications including any addenda.
After bids have been submitted, the Bidder shall not assert that there has been any misunderstanding concerning the quantities of work or of the nature of the work to be done.
(Rev. 07/26/2023) 00 21 13-2 Program No. S3041
The quantities listed in the unit price bid form shall be considered as approximate and will be used only for comparison of bids. Payment to the Contractor will be made only for the actual quantities of work performed or materials furnished in accordance with the Contract, and it is understood that the quantities may be increased or decreased as provided in the General Conditions without in any way invalidating the unit bid prices.
4. MODIFICATION OR WITHDRAWAL OF BIDS
A submitted bid may be Unsubmitted by a bidder or its authorized representative, before the scheduled closing time for receipt of bids. If the bid is retrieved for modification, the sealed bid must be resubmitted through the portal prior to the scheduled closing time for receipt of bids. If the bid is not resubmitted, it will be considered as withdrawn.
5. ADDENDA
Addenda will be posted on the OpenGov Portal. Receipt of addenda shall be acknowledged in the submitted proposal. It is the proposer’s ultimate responsibility to ensure that they have all applicable addenda prior to the bid submittal. Each bid schedule shall include specific acknowledgement in the space provided of receipt of all addenda issued by the Owner during the bidding period.
6. LAND ACQUISITION
The Work on this Project is to be performed on property owned and easements acquired by the Owner and within public road right-of-way.
Pursuant to the requirements of OCGA § 36-91-20(b)(4)(B), detailed information on project specific easements can be found in the Summary of Work (Section 01 11 00).
7. BID GUARANTY
Each bid must be accompanied by a bid bond attached hereto, duly executed by the bidder as principal and issued by a surety listed in the latest issue of U.S. Treasury Circular 570, registered in the State of Georgia, and approved by the Owner in the amount of not less than five percent (5%) of the total amount of the base bid, as a guarantee that the Bidder will enter into a Contract and furnish bonds and evidence of insurance coverage, within twenty-one days after the issuance of the Notice of Award of the Contract to him. This bond shall be uploaded along with the bid into the eProcurement Portal.
The successful Bidder, upon his failure or refusal to execute and deliver the Contract, bonds and evidence of insurance coverage required within twenty-one days after the issuance of the Notice of Award of the Contract to him, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his bid.
8. MISTAKES; CORRECTIONS AND WITHDRAWAL OF BIDS
After bids are opened, if the low Bidder claims a serious and honest error in bid preparation, and can support such claim with evidence satisfactory to the Owner, withdrawal of the bid will be permitted. As a condition of this release, the low bidder will be prohibited from:
(Rev. 07/26/2023) 00 21 13-3 Program No. S3041
A. Subcontracting or furnishing labor or equipment on this project.
B. Bidding on any Cobb County Water System projects within ninety (90) days of release by Owner.
9. INTERPRETATIONS
No interpretation of the meaning of the drawings, specifications or other pre-bid documents will be made to any Bidder orally. All questions must be submitted through the County’s eProcurement Portal at (https://procurement.opengov.com/portal/cobbcoga). Note: Multiple questions can be submitted in the same question box on the OpenGov portal. It is not necessary to ask each question in a separate question box. Every request for such interpretation must be received by the close of business on Tuesday, February 4, 2025. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the bid.
All addenda so issued shall become a part of the Contract Documents.
10. SITE EXAMINATION
The site of the proposed work is shown on the drawings. The Bidder, before making his bid, shall examine the drawings, specifications and the site and shall make such examinations on the ground as may be necessary to thoroughly familiarize himself with the nature and extent of the proposed construction and with all local conditions affecting the work. The Bidder shall also accept the premises in its present condition and carry out all work in accordance with the requirements of the specifications and as shown on the drawings. The Owner will not be responsible for Bidder's errors and misjudgment nor for failure to obtain any information on local conditions or general laws or regulations pertaining thereto.
At the time of the opening of bids, each Bidder will also be presumed to have read and to be thoroughly familiar with the drawings, Contract Documents (including all addenda) and the construction specifications. The failure or omission of any Bidder to examine any form, instrument or document shall in no way relieve any Bidder from any obligation in respect to his bid.
11. NOTICE OF SPECIAL CONDITIONS
Attention is particularly called to those parts of the Contract Documents and specifications which deal with the following:
A. Insurance requirements
B. Surveys, permits and regulations
The Federal and state regulations herein referred to supersede all conflicting requirements of the Contract Documents.
12. LAWS AND REGULATIONS; LICENSING
The Bidder's attention is directed to the fact that all applicable Federal and state laws, county and municipal ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.
(Rev. 07/26/2023) 00 21 13-4 Program No. S3041
The State of Georgia has requirements for the licensing of contractors engaged in specific types of construction, including electrical, plumbing, and underground utility work [re: OCGA § 43-14].
Any contractor (or subcontractor of any tier) performing regulated work on this project shall furnish proof of valid and current registration to the Owner. Similarly, the State requirements concerning local business licenses shall be met (see also Section 00 73 17 of these documents).
13. STATUS OF PERMITS
The following status of permits related to this project is presented pursuant to the requirements of OCGA § 36-91-20(b)(4)(A).
A. Refer to the Summary of Work (Section 01 11 00) for the status of permits for which the Owner is responsible.
B. The Contractor is responsible for obtaining any necessary building permits or individual trade permits from the Cobb County Community Development Department. Contact the Development and Inspections Division at (770) 528- 2039 for further information.
C. Other permits necessary for construction shall be the full responsibility of the
Contractor. These may regularly include, but not limited to:
Cobb County Trenching and Excavation Permit Cobb County Department of Transportation Lane Closure / Road Closure
Permit Cobb County and State of Georgia permits associated with the use of explosives (blasting)
14. NON-COLLUSION AFFIDAVIT
The Georgia statute concerning public works construction contracting requires that any person who procures such work by bidding or proposal shall make an oath in writing that he/she has not prevented or attempted to prevent competition in such bidding. [OCGA § 36-91-21(d),(e)].
Pursuant to this requirement, the Bidder shall submit before commencing work, an executed copy of the Non-Collusion Affidavit form included in 00 45 19, completed by all persons materially involved in the procurement on this project. If the Bidder is a partnership, all of the partners and any officer, agent, or other person who may have represented or acted for them in bidding for or procuring the contract shall make the oath and complete the Affidavit. If the Bidder is a corporation, all officers, agents, or other persons who may have acted for or represented the corporation in bidding for or procuring the contract shall make the oath and complete the Affidavit.
If such oath is false, the Contract shall be void, and all sums paid by the County on the Contract may be recovered by appropriate action.
15. GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT
The Georgia Security and Immigration Compliance Act (O.C.G.A. § 13-10-91) requires that contractors who enter into a contract for physical performance of services for a political subdivision of the state must register and participate in the federal work authorization program to verify employment eligibility of all newly hired employees. Further Contract provisions regarding this Act are included herein as Section 00 45 53.
The Contractor Affidavit and Agreement (See Section 00 45 53), signed and notarized by
(Rev. 07/26/2023) 00 21 13-5 Program No. S3041 the Bidder, must be scanned and submitted with the Bid in the eProcurement Portal. Bids received without an executed affidavit will be deemed non-responsive and will be disqualified from further consideration.
16. EXECUTION OF BID DOCUMENTS
The Contractor, in signing his bid on the whole or any portion of the work, shall conform to the following requirements:
A. Bids which are not signed by individuals providing said bid shall have attached thereto a power of attorney evidencing authority to sign the bid in the name of the person for whom it is signed.
B. Bids which are signed for a partnership shall be signed by all of the partners or by an attorney-in-fact. There should be attached to the bid a power of attorney executed by the partners evidencing authority to sign the bid.
C. Bids which are signed for a corporation shall have the correct corporate name thereof and the signature of the president or other authorized officer of the corporation manually written below the corporate name following the wording "By _______." The corporate seal shall also be affixed to the bid.
17. METHOD OF AWARD
The Contract will be awarded to the responsive, responsible Bidder submitting the lowest base bid complying with the conditions of the invitation to bid. Award will be made on the basis of the prices given in the base bid (not including alternates). Alternates may be awarded at the discretion of the Owner. The Bidder to whom the award is made will be notified at the earliest possible date following Board of Commissioners approval. The Owner reserves the right to reject any and all bids and to waive any informality in bids received whenever such rejection or waiver is in its best interest.
A responsive Bidder shall be one who submits his bid in the proper form without qualification as called for in the specifications and on the Contract Drawings; and who binds himself on behalf of his bid to the Owner with the proper bid bond or certified check completed and attached; and who properly completes all forms required to be completed and submitted at the time of the advertised bid opening.
A responsible Bidder shall be one that has the capability in all respects to perform fully and reliably the contract requirements. The responsibility of the Bidder will be adjudged by the Owner based on the information presented in the Contractor's Statement of Qualifications. If the solicitation for this project is limited to Pre-qualified Cobb County Water System Contractors, the Statement of Qualification information on file is used in the evaluation of responsibility. If a Statement of Qualification is included as part of the bidding documents for this project, the form and all attachments must be properly completed and submitted with the Bid.
18. DISADVANTAGED BUSINESS ENTERPRISES (DBE) PARTICIPATION
Cobb County Government encourages the participation of all businesses in offering their services and/or products. The Cobb County Government has the goal to fairly and competitively procure the best product at the most reasonable cost.
(Rev. 07/26/2023) 00 21 13-6 Program No. S3041
A Disadvantaged Business Enterprise (DBE) is generally defined as a Female, Black American, Hispanic American and any other minority owned business. The Federal Government has long had a program in place to ensure participation of DBE vendors and suppliers on federally-funded contracts. The State of Georgia has established a similar program whereby DBE firms are defined, certified, and made known. This effort is managed by the Georgia Department of Transportation (GDOT). Additional information regarding this State program can be found at http://www.dot.state.ga.us/doingbusiness/dbePrograms/Pages/default.aspx.
While the Cobb County Government does not administer a DBE certification program, the County does desire to identify DBE participation in our contracts and to quantify that participation. The Bidder is requested to advise of DBE status (if any) by completing the Disadvantaged Business Enterprise (DBE) Identification Form in Section 00 41 13 of these Documents and to report the participation of any DBE subcontractors (See Section 00 45 54 and Section 00 73 18).
19. CONTRACT PERFORMANCE BOND AND PAYMENT BOND
The Contractor will be required to furnish a contract performance bond and a payment bond executed by a surety company listed in the latest issue of U.S. Treasury Circular 570, registered and duly authorized to do business in the State of Georgia, and signed (or countersigned) by a local agent, each in an amount that is at least equal to one-hundred percent (100%) of the Contract Price, as security for the faithful performance of this contract and as security for the payment of all persons performing labor and furnishing material in connection with the Contract.
The surety shall be acceptable to the Owner and the bond shall be executed on the form attached. In case of default on the part of the Contractor, all expenses incident to ascertaining and collecting losses under the bond, including both engineering and legal services, shall lie against the bond.
The Contractor will be required to provide the Owner a one-year guarantee covering workmanship and materials of the project. The contract performance bond shall remain in force for one year from date of acceptance by the Owner. The cost of this bond shall be paid by the Contractor.
20. INSURANCE PROOF OF COVERAGE
Prior to execution of Contract Documents, a certificate of insurance will be required as outlined in Section 00 73 16 of these specifications, Insurance Requirements for Contractors.
21. AWARD OF CONTRACT
The Bidder to whom the Contract is being awarded will be required to execute the agreement, accompanying affidavits and forms, and obtain the performance bond, payment bond and insurance within twenty-one (21) calendar days from the date when the notice of award is issued to the Bidder. In case of failure of the Bidder to execute the agreement, affidavits and forms, and furnish the required bonds, the Owner may consider the Bidder in default, in which case the bid bond or check accompanying the bid shall become payable to the Owner.
END OF SECTION
Waterford Sewer Upgrade CCWS Contract Documents (Rev. 0 / / ) 00 41 13-1
BID
MADE TO: COBB COUNTY, a political subdivision of the State of Georgia
COBB COUNTY WATER SYSTEM
660 SOUTH COBB DRIVE
MARIETTA, GA 30060-3105
PROJECT NAME: WATERFORD SEWER UPGRADE
PROGRAM NO.: S3041
The undersigned, as Bidder, hereby declares that the only person or persons, company or parties interested in this bid is or are named herein; and that this bid is made without connection with any other person, company or parties making bid; and that it is in all respects fair and in good faith, without collusion or fraud.
The Bidder further declares that he has carefully examined the site of the work, has read and understands the plans, specifications and Contract Documents relative thereto, and has read all special provisions and addenda furnished prior to the opening of bids; and the Bidder further declares that he has informed himself fully in regard to all conditions and requirements pertaining to the work.
The Bidder proposes and agrees, if this bid is accepted, to enter into agreement with the Owner in the form of the Contract specified and to furnish all materials, labor, tools, equipment and incidentals necessary to complete the work in full and in accordance with the shown, noted, described and reasonably intended requirements of the Contract Documents.
Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of bid security. The Bidder agrees that, at the time of signing the Contract, he will furnish the performance bond and payment bond in the forms attached hereto, each in the amount of one-hundred percent (100%) of the Contract Price. Bidder will also furnish all of the required insurance certificates.
The undersigned agrees, unless hereinafter stated otherwise, to furnish all materials shown and specified in the plans, specifications and bid schedule.
THE REMAINDER OF THIS PAGE IS LEFT BLANK INTENTIONALLY
Item No. Description Qty. Unit Unit Price Total Price
G-0100 Project Initiation Fee 1 LS $___________ $____________
S-0208G 8-Inch DI Gravity Sewer Pipe, Depth: 16'-18' 25 LF $___________ $____________
S-0212A 12-Inch DI Gravity Sewer Pipe, Depth: 0'-6' 1,119 LF $___________ $____________
S-0212B 12-Inch DI Gravity Sewer Pipe, Depth: 6'-8' 445 LF $___________ $____________
S-0212C 12-Inch DI Gravity Sewer Pipe, Depth: 8'- 10'
54 LF $___________ $____________
S-0212D 12-Inch DI Gravity Sewer Pipe, Depth: 10'- 12'
42 LF $___________ $____________
S-0212E 12-Inch DI Gravity Sewer Pipe, Depth: 12'- 14'
37 LF $___________ $____________
S-0212F 12-Inch DI Gravity Sewer Pipe, Depth: 14'- 16'
70 LF $___________ $____________
S-0212G 12-Inch DI Gravity Sewer Pipe, Depth: 16'- 18'
58 LF $___________ $____________
S-0216D 16-Inch DI Gravity Sewer Pipe, Depth: 10'- 12'
194 LF $___________ $____________
BID SCHEDULE
WATERFORD SEWER UPGRADE
PROGRAM NO. S3041
CCWS Contract Documents (Rev. 08/13/12) 00300-2 Waterford Sewer Upgrade
Bid Schedule Waterford Sewer Upgrade Program No. S3041
Item No. Description Qty. Unit Unit Price Total Price
S-0216E 16-Inch DI Gravity Sewer Pipe, Depth: 12'- 14'
58 LF $___________ $____________
S-0508 8-Inch DI Sewer Pipe in Casing/Liner 35 LF $___________ $____________
S-0512 12-Inch DI Sewer Pipe in Casing/Liner 55 LF $___________ $____________
S-0516 16-Inch DI Sewer Pipe in Casing/Liner 115 LF $___________ $____________
W-0212 Free Bore for 12-Inch Ductile Iron Pipe 40 LF $___________ $____________
G-0216 16-Inch Bore and Casing (for 8"-10" DIP) 35 LF $___________ $____________
G-0224 24-Inch Bore and Casing (for 16" DIP) 170 LF $___________ $____________
S-0804A 4' Diameter Standard Precast Manhole, Depth: 0'-6'
1 EA $___________ $____________
S-0804B 4' Diameter Standard Precast Manhole, Depth: 6'-8'
3 EA $___________ $____________
S-0804C 4' Diameter Standard Precast Manhole, Depth: 8'-10'
5 EA $___________ $____________
S-0804D 4' Diameter Standard Precast Manhole, Depth: 10'-12'
1 EA $___________ $____________
S-0804E 4' Diameter Standard Precast Manhole, Depth: 12'-14'
1 EA $___________ $____________
(Rev. 08/13/12) 00300-3 Project NameWaterford Sewer Upgrade
Program No. S3041
Item No. Description Qty. Unit Unit Price Total Price
S-0804G 4' Diameter Standard Precast Manhole, Depth: 16'-18'
1 EA $___________ $____________
S-0804H 4' Diameter Standard Precast Manhole, Depth: 18'-20'
1 EA $___________ $____________
S-1011 Diameter Outside Drop Assembly 3 EA $___________ $____________
S-1013 Bolt Down/Water Tight Manhole Ring and Cover
13 EA $___________ $____________
S-1015 Service Stub-out Main (Shallow) 4 EA $___________ $____________
S-1017 Service Stub-out from a Manhole 3 EA $___________ $____________
S-1018 Disconnect/Reconnect Existing Sewer Service 7 EA $___________ $____________
S-1019 Service Cleanout Assembly 7 EA $___________ $____________
S-1020 Connect to Existing Manhole/Wetwell 3 EA $___________ $____________
G-0410 Asphalt Pavement Trench Patch 8 SY $___________ $____________
G-0500 Remove and Replace Concrete Curb & Gutter 60 LF $___________ $____________
G-0520 Remove and Replace Concrete Sidewalk (Width 5 FT)
240 LF $___________ $____________
G-0540 Remove and Replace Paved Concrete Driveway
140 SY $___________ $____________
(Rev. 08/13/12) 00300-4 Project NameWaterford Sewer Upgrade
Program No. S3041
Item No. Description Qty. Unit Unit Price Total Price
G-0600 779 LF $___________ $____________
G-0700 1 LS $___________ $____________
G-0900 2,325 LF $___________ $____________
E-0100 1 LS $___________ $____________
G-1010 3,240 SF $___________ $____________
G-1011 33,847 SF $___________ $____________
G-1020 2 EA $___________ $____________
G-1030 1 LS $___________ $____________
G-0650 580 SY $___95.00___ $__55,100.00_
E-0125 180 SY $___95.00___ $__17,100.00_
A-0100 1 ALL $_50,000.00_ $__50,000.00_
A-0130 1 ALL $_75,000.00_ $__75,000.00_
A-0140 1 ALL $_100,000.00_ $_100,000.00_
A-0150
Remove and Replace Fence ( Type )
Stream/Ditch Crossing Complete: Stations (17+32 - 17+72) (21+36
- 21+56) (22+44 - 22+64)
Site Preparation
Basic Erosion Control
Grassing
Sodding
Protection, Repair, Replacement of Irrigation Systems
Easement Stipulation Items
Rip-Rap (Type 1 and 3) (see Additional Erosion Control)
Additional Erosion Control Device: Rip- Rap Type 3
Easement Stipulation Allowance
Landscape Allowance
Utility Allowance
Specialty Traffic Control Allowance
1 ALL $_75,000.00_ $__75,000.00__
(Rev. 08/13/12) 00300-5 Project NameWaterford Sewer Upgrade
Program No. S3041
Item No. Description Qty. Unit Unit Price Total Price
G-1500 Misc. Abandonments, Line Plugging, etc - Complete
1 LS $___________ $____________
S-1022 Sewer Bypass Pumping 1 LS $___________ $____________
641-1100 Guard Rail, Type T 50 LF $___________ $____________
BID BOND (IS) REQUIRED FOR THIS PROJECT.
THE REMAINDER OF THIS PAGE IS LEFT BLANK INTENTIONALLY
TOTAL BID PRICE $_______________________
TOTAL BID PRICE (IN WORDS) ________________________________________________
Contractor's Name: ________________________________________________
(Rev. 08/13/12) 00300-6 Project NameWaterford Sewer Upgrade
(Rev. 01/07/25) 00 41 13-7
SEWER MEASUREMENT AND PAYMENT
GENERAL
Only those pay items identified in the bid schedule, or added by Addendum or Supplemental Agreement, will be measured for payment by the units listed in the bid schedule and/or supplemental agreement and paid for at the Contract prices.
The cost of all Work not directly covered by the pay items shall be considered incidental to the construction and is to be included and distributed among the bid unit prices of the pay items listed in the Contract.
Contract unit prices represent the installed, complete-in-place, tested and accepted cost, including, but not limited to:
* All required labor, tools, equipment, and materials, unless otherwise noted.
* All required excavation, dewatering, thrust blocking, rodding, sheeting/shoring/bracing, backfill, compaction and restoration to grade, and testing.
* All required normal traffic control.
* Acceptable bedding as detailed or specified.
* Disposal of all surplus or waste materials, unsuitable materials, and debris.
* Protection of existing utilities, including but not limited to locating, diligent care in handling and working around, relocating, and repairing.
* Miscellaneous associated work necessary to complete the work in place.
* Minor manhole adjustments.
* Preconstruction staking.
* Coordination of additional project access as may be desired.
PROJECT INITIATION FEE
Lump sum price is for mobilization, bonding, insurance, and all other fees associated with initiating the project. This line item shall not exceed four (4) percent of the total bid price and is a one-time only payment.
SEWER PIPE
Unit price per linear foot is for each size of sewer pipe installed including connecting the pipe to the proposed manholes and utility tracer system. Pipe will be measured for payment along the horizontal centerline of the pipe from center to center of manholes and by cut classification determined by the difference in elevation between the original ground elevation and the pipe invert. The sewer pipe material shall be as indicated in the Bid Schedule (as entered by Bidder or as pre-printed).
SEWER PIPE IN CASING / TUNNEL
Unit price per linear foot is for installation of sewer pipe through casing pipe or tunnel and includes casing spacers, steel and/or concrete pipe support, brick bulkheads, grouting of the annular space between carrier pipe and interior of casing / tunnel liner (if required), as well as installation to required alignment and grade. Casing pipe / tunnel liner installation is not included and will be paid for under the corresponding items.
(Rev. 01/07/25) 00 41 13-8
BORE AND CASING (SEWER)
Unit price per linear foot is for the installation of casing pipe by boring and jacking to required alignment and grade. Bore and casing will be measured for payment along the horizontal centerline of the casing pipe. Sewer pipe, spacers, supports, bulkheads, grouting, etc. are not included and will be paid for under SEWER PIPE IN CASING / TUNNEL.
STANDARD, STANDARD DEEP, & DOGHOUSE PRECAST MANHOLE
Unit price each by cut classification is for installation of the base, risers, cone, boots and invert.
Manholes will be measured for payment from the invert or flow line of the lowest pipe to the top rim of the manhole ring and cover.
OUTSIDE DROP ASSEMBLY
Unit price each is for each outside drop assembly, including all vertical pipe, fittings, strapping, coring, boot, concrete and reworking of the invert.
MANHOLE RING AND COVER
Unit price each is for the manhole ring and cover as shown in bid schedule, including grouting.
SERVICE STUB-OUT ON MAIN (SHALLOW OR DEEP)
Unit price each is for service stub-out on main including the wye and bend or tee (of the same pipe material as the main), 6-inch PVC (SDR 35) service pipe, and utility tracer system to the permanent easement limits or roadway right-of-way indicated.
SERVICE STUB-OUT FROM A MANHOLE
Unit price each is for service stub-out from a manhole including coring, grouting, boots, and a 6-inch PVC (SDR 35) service pipe, and utility tracer system to the permanent easement limits or roadway right-of-way indicated.
DISCONNECT/RECONNECT EXISTING SERVICE
Unit price each is for disconnecting and reconnecting existing service including the installing the wye or tee on the main or making the connection to the manhole, installing 6-inch service pipe, the disconnecting the existing service line from the customer plumbing, and connecting the new service line to the customer plumbing.
SERVICE CLEANOUT ASSEMBLY
Unit price each is for a service cleanout assembly of PVC (SDR) pipe and fittings with utility tracer system and cast iron frame and cover installed where required.
CONNECT TO EXISTING MANHOLE / WETWELL
Unit price each is for coring into a manhole or wet well, installing a boot, reworking the invert, and installing the connection pipe.
(Rev. 01/07/25) 00 41 13-9
MISCELLANEOUS ABANDONMENTS, LINE PLUGGING, ETC. - COMPLETE
Lump sum price is for all materials, labor, and equipment required to abandon/remove existing manholes, removal and disposal of sewer lines, plug existing sewer lines, and any other work required to complete the item as indicated in the construction documents.
ASPHALT PAVEMENT TRENCH PATCH
Unit price per square yard is for all materials, equipment, and labor required to complete the pavement trench patch at the width and thickness depicted in standard details or as shown on plans.
Asphalt pavement trench patch will be paid at the bid unit price per square yard based on the product of the measured length of the trench and the standard width of the patch as detailed on the plans.
REMOVE AND REPLACE CURB AND GUTTER
Unit price per linear foot is for all required labor, tools, equipment, and material to remove and replace the curb and gutter in kind, between the nearest existing joints.
REMOVE AND REPLACE SIDEWALK
Unit price per linear foot is for all required labor, tools, equipment, and material to remove and replace the sidewalk in kind, between the nearest existing joints.
REMOVE AND REPLACE PAVED DRIVEWAY (ASPHALT OR CONCRETE)
Unit price per square yard is for all required labor, tools, equipment, and material to remove and replace the paved driveway in kind, per the standard detail or as required by field conditions.
REMOVE AND REPLACE FENCE
Unit price per linear foot is for all required labor, tools, equipment, and material to remove and replace existing fence in kind. The fence shall be installed by a qualified individual or firm regularly engaged in such work, in conformance with accepted industry standards for the type of fencing involved.
RIP RAP (Type 1 or Type 3)
Unit price per square yard includes material (Type 1 or Type 3 rip rap, and filter bedding stone or geotextile fabric underlayment), delivery to the site, and placement to the horizontal limits indicated on the plans and in accordance with the standard detail. Payment for rip rap used in stream/ditch crossings and bridge culvert crossings is included in the corresponding bid items.
STREAM/DITCH CROSSING, COMPLETE
Lump sum price is for installation including rip rap, bank stabilization, erosion/sediment control measures and stream flow diversions to assure no sediment transport to the creek, concrete blocking/piers or encasement, all pipe and/or fittings required, and any other work required to complete the item as indicated in the plans. Stream/ditch crossing, complete, as identified by the stationing on the plans and/or in the bid schedule, will be paid on a lump sum basis.
(Rev. 01/07/25) 00 41 13-10
SITE PREPARATION
Unit price per linear foot is for the clearing, grubbing, and stripping of the area within the limits of construction identified in the contract documents for the installation of sewer main and appurtenances. Site preparation shall be measured for payment along the length of pipe.
BASIC EROSION CONTROL
Lump sum price is for installation, maintenance, and the subsequent removal (as required) of any and all temporary and/or permanent erosion control measures as may be indicated on the erosion control plan and details shown on the drawings. Properly installed and successful erosion control measures will be progressively paid from the lump sum amount on the basis of the percentage of the total work in place.
Temporary grassing is considered an erosion control measure and will be paid for under BASIC EROSION CONTROL. Permanent grassing will be paid under GRASSING or SODDING; Channel Stabilization (Rip Rap) will be paid under RIP RAP or STREAM/DITCH CROSSING, as applicable.
ADDITIONAL EROSION CONTROL DEVICES
Unit price items for additional erosion control devices, beyond the recommended erosion control plans shown on the drawings, are for the proper installation, maintenance, and removal of any of these devices as may be required by any City, County, State or Federal agency that has jurisdiction over the area in which the work is being performed. Properly installed erosion control shall be measured and paid for at the unit and unit price established in the bid schedule by the Owner. Additional Erosion Control Devices will be utilized only at the direction of the Owner.
GRASSING
Unit price per square foot includes ground surface preparation, application of fertilizer, lime, mulch, and seed appropriate for soil type and season, and plant establishment to successfully match in kind the preconstruction condition or as required by the plans. The actual area of grassed surfaces will be measured for payment; however, the width of the disturbed area considered for payment shall not exceed the construction easement limits, unless directed by the Project Engineer.
Temporary grassing is considered an erosion control measure and will be paid for under BASIC
EROSION CONTROL.
PROTECTION, REPAIR, REPLACEMENT OF IRRIGATION SYSTEMS
Unit price each per property parcel is for all required labor, tools, equipment, and material to protect, remove, replace, and/or repair any type of irrigation system component encountered within the alignment of the project. Necessary work to sprinkler heads, control valves, wiring, piping, etc. to return the irrigation system of each property parcel to satisfactory operating condition is included.
SODDING
Unit price per square foot includes ground surface preparation, application of fertilizer and lime appropriate for soil type and season, and placement of sod to successfully match in kind the preconstruction condition. The actual area of sodded surfaces will be measured for payment;
(Rev. 01/07/25) 00 41 13-11 however, the width of the disturbed area considered for payment shall not exceed the construction easement limits, unless directed by the Project Engineer.
EASEMENT STIPULATION ITEMS
Lump sum price is for providing all items in the easement stipulations as described in the contract documents. Completion of these will progressively be paid from the lump sum amount on the basis of the percentage of the total project work in place.
EASEMENT STIPULATION ALLOWANCE
Easement stipulation allowance for easement stipulations not included in EASEMENT STIPULATION ITEMS will only be utilized at the direction of the Project Engineer, and the scope and cost must be approved prior to performance of the work.
LANDSCAPE ALLOWANCE
Landscape allowance will only be utilized at the direction of the Project Engineer, and the scope and cost must be approved prior to performance of the work.
UTILITY ALLOWANCE
Utility allowance will only be utilized at the direction of the Project Engineer, and the scope and cost must be approved prior to performance of the work.
SEWER BYPASS PUMPING
Lump sum price is for all materials, labor and equipment to install, test, and maintain a temporary bypass pumping system for the purpose of diverting all sewer flows around the work area.
REMOVE AND REPLACE GUARDRAIL
Unit price per linear foot includes all labor, material, and equipment for the removal and reinstallation of existing guardrail. Guardrail shall be installed per GDOT standards.
THE REMAINDER OF THIS PAGE IS LEFT BLANK INTENTIONALLY
(Rev. 01/07/25) 00 41 13-12
SPECIAL CONDITIONS
The following project specific Special Conditions take precedent over plans and specifications.
Section numbers shown refer to the appropriate section of the Cobb County Water System Contract Documents. All other requirements remain in full effect.
1. Builder's Risk insurance is not required for this project (Section 00 72 13, ¶1.E.).
2. The submittal of a Schedule of Values is not required (Section 01 29 00, ¶1.03.A).
END OF SPECIAL CONDITIONS
(Rev. 01/07/25) 00 41 13-13
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
IDENTIFICATION FORM
A Disadvantaged Business Enterprise (DBE) is generally defined as a Female, Black American, Hispanic American and any other minority owned business. See Instructions to Bidders (Section 00 21 13) and Disadvantaged Business Enterprise (DBE) Participation (Section 00 45 54) for additional information related to periodic reporting guidelines.
If your firm is classified as a Disadvantaged Business Enterprise (DBE), please complete this form and submit with bid response in the eProcurement Portal:
Name of Firm:
Address:
Telephone: Fax:
Email:
DBE Certification Number:
Name of Certifying Organization:
This information is acquired for documentation of participation only and will have no bearing on the award unless otherwise stated in the
Advertisement for Bids.
(Rev. 09/23/14) 00 41 13-14
Bidder hereby agrees to commence work under this Contract promptly after receipt of Notice to Proceed and to complete the work within Three Hundred Sixty-Five (365) calendar days.
Should said work not be completed by that date, the sum of Hundred Dollars ($ 50) per day will be paid by the Contractor to the Owner as liquidated damages for each consecutive calendar day of delay.
Receipt is acknowledged of the following addenda:
No. , Dated .
No. , Dated .
Bidder agrees that the Owner has the right to accept or reject any or all bids and to waive all formalities.
Respectfully submitted, Date:
Company
By:
Signature
Name
Title
Address CORPORATE SEAL
City/State/Zip Code
Telephone
Fax Number
Georgia Utility Contractor License No.
(Rev. 06/27/2024) 00 43 14-1
SECTION 00 43 14
AGREEMENT/CONTRACT
THIS AGREEMENT, made and entered into this day of in the year 2025, by and between COBB COUNTY, a political subdivision of the State of Georgia, hereafter called the Owner, and , hereinafter called the Contractor.
W I T N E S S E T H That the Owner and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows:
1. WORK
The Contractor shall perform all work as specified or indicated in the Contract Documents for the completion of the project generally described as Waterford Sewer Upgrade, Program No.
S3041.
The Owner shall not be liable to the Contractor for any neglect, default, delay or interference of or by any other contractor, nor shall any such neglect, default, delay or interference of any other contract or alteration which may be required in the work, release the Contractor from the obligation to finish the work within the time allowed.
2. CONTRACT TIME AND LIQUIDATED DAMAGES
The Contractor shall commence the Work required by the Contract Documents on the date specified in the Notice to Proceed and shall complete the same within Three Hundred Sixty-Five,
(365) Days, unless the period for completion is extended otherwise by the Contract Documents.
Should said Work not be completed by that date, the sum of Seven Hundred Fifty Dollars, ($750) per Day shall be paid by the Contractor to the Owner as liquidated damages for each consecutive calendar Day of delay. Notwithstanding anything in this Agreement to the contrary, the liquidated damages may be withheld by Owner from any payment owed to the Contractor.
The parties acknowledge and agree that delays in the completion of the Work will result in damages to Owner and that the exact sum of such damages to Owner are impossible to precisely estimate and will be difficult to ascertain. The liquidated damages set forth in this section are intended to be, and the parties acknowledge and agree that (1) the liquidated damages are reasonably proportionate to and are a reasonable estimate of the probable loss that Owner is…
This is the start of the file's text. The full file is on GovTribe.