Bid documents.pdf

PDF 199 KB Posted

Attached to
18-0585/20763 Repairs to Land/navigation tower
Solicitation number
RFP-511-180000003208-1
Issued by
Clinton County, Michigan

About this file

This is a Request for Proposal (RFP No. 18000003208) issued by the State of Michigan Department of Military and Veterans Affairs for repairs to the Land/Navigation Tower at Camp Grayling Joint Maneuver Training Center. The scope includes repairs and antenna removal on a 180-foot communication tower located off Military Road in Grayling, Michigan. Key requirements include removing unused antennas and lines, replacing lights, reattaching remaining antenna lines, replacing ice clips, installing missing safety wires, tensioning guy lines, and plumbing the tower. The RFP was issued on August 3, 2018, with questions due by August 7, 2018, and proposals due by August 13, 2018. The anticipated contract start date is September 1, 2018.

The contractor must be registered with the State of Michigan and maintain sufficient workman's compensation, property, and general liability insurance. The tower is a painted steel, guy-supported lattice structure with Point to Point Network Antennas and 800 MHz capabilities, consisting of nine 20-foot sections supported by five sets of three guy cables. Of approximately 15 existing antennas, only three will remain after the project. Proposals must include separate line items for labor and materials costs. The evaluation criteria weights technical components at 80% for work details and 20% for subcontractor disclosure.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MICHIGAN

Department of Military and Veterans Affairs

Repairs to the Land/Navigation Tower Request for Proposal No18000003208

Solicitation Manager Name:

Direct Phone:

Email:noffsinger@michigan.gov@michigan.gov Main Phone: 1-855-MI-PURCH 1-855-647-8724

This is a Request for Proposal (RFP) for:

Repairs to the Land/Navigation Tower

RFP Timeline

Event Time Date RFP issue date N/A 8/3/2018

Deadline for bidders to submit questions about this RFP

3:00 p.m. Eastern 8/7/2018

Anticipated date State will post answers to bidder questions on www.michigan.gov/SIGMAVSS

8/8/2018

Proposal deadline* 3:00 p.m. Eastern 8/13/2018 Anticipated contract begin date N/A 9/1/2018

*A bidder’s proposal received at 3:00:01 p.m. Eastern is late and subject to disqualification.

This RFP is subject to change. Check www.michigan.gov/SIGMAVSS for current information.

http://www.michigan.gov/SIGMAVSS

Version 3 Revised: 4/4/2018

PROPOSAL INSTRUCTIONS

1. PROPOSAL PREPARATION. The State recommends reading all RFP materials prior to preparing a proposal, particularly these Proposal Instructions and the Vendor Questions Worksheet. Bidders must follow these Proposal Instructions and provide a complete response to the items indicated in the table below. References and links to websites or external sources may not be used in lieu of providing the information requested in the RFP within the proposal. Include the bidder’s company name in the header of all documents submitted with your proposal.

RFP Structure and Documentation

Document Description Bidder Response Instructions

Cover Page Provides RFP title and number, important dates, and contact information for Solicitation Manager

Informational

Proposal Instructions Provides RFP instructions to bidders Informational

Schedule A – Statement of Work Statement of work Bidder to complete and submit by proposal deadline

2. CONTACT INFORMATION FOR THE STATE. The sole point of contact for the State concerning this RFP is listed on the Cover Page. Contacting any other State personnel, agent, consultant, or representative about this RFP may result in bidder disqualification.

3. QUESTIONS. Bidder questions about this RFP must be posted on www.michigan.gov/SIGMAVSS. [no later than the time and date specified on the Cover Page. In the interest of transparency, only written questions are accepted. Answers to questions will be posted on www.michigan.gov/SIGMAVSS. Submit questions using the format below; a Microsoft Excel format or similar is suggested.

Q # Document Name Section # Page # Requirement # Bidder Question

4. MODIFICATIONS. The State may modify this RFP at any time. Modifications will be posted on www.michigan.gov/SIGMAVSS . This is the only method by which the RFP may be modified.

5. DELIVERY OF PROPOSAL.

Electronic – The bidder must submit its proposal, all attachments, and any modifications or withdrawals electronically through www.michigan.gov/SIGMAVSS. The price proposal should be saved separately from all other proposal documents. The bidder should submit all documents in a modifiable (native) format (examples include, but are not limited to: Microsoft Word or Excel and Google Docs or Sheets). In addition to submitting documents in a modifiable format, the bidder may also submit copies of documents in PDF.

Bidder’s failure to submit a proposal as required may result in disqualification. The proposal and attachments must be fully uploaded and submitted prior to the proposal deadline. Do not wait until the last minute to submit a proposal, as the SIGMA VSS system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA VSS system will not allow a proposal to be submitted after the proposal deadline identified in the Cover Page, even if a portion of the proposal has been uploaded.

Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 373-4111 or (888) 734-9749.

If you have any difficulty in submitting the RFQ to SIGMA please, email the quotation to the Buyer at noffsingere@michgian.gov

6. MANDATORY MINIMUM REQUIREMENTS. To avoid disqualification, the bidder must provide documentation to support the following:

• Documents as requested in the attached RFP.

Only proposals meeting the mandatory minimum requirements will be considered for evaluation.

7. EVALUATION PROCESS. The State will evaluate each proposal based on the best value to the State of

Michigan:

Technical Evaluation Criteria Weight

1. Schedule A, Statement of Work, Sections 1.1/ Work details 80

2. Schedule A- Disclosure of Subcontractors 20

Total 100

8. NOTICE OF DEFICIENCY. The State reserves the right to issue a Notice of Deficiency to bidders if the State determines after the proposal deadline that a portion of the RFP was deficient, unclear, or ambiguous.

Failure to respond to a Notice of Deficiency timely may be cause for disqualification.

9. CLARIFICATION REQUEST. The State reserves the right to issue a Clarification Request to a bidder to clarify its proposal if the State determines the proposal is not clear. Failure to respond to a Clarification Request timely may be cause for disqualification.

10. RESERVATIONS. The State reserves the right to:

a. Disqualify a bidder for failure to follow these instructions.

b. Discontinue the RFP process at any time for any or no reason. The issuance of an RFP, your preparation and submission of a proposal, and the State’s subsequent receipt and evaluation of your proposal does not commit the State to award a contract to you or anyone, even if all the requirements in the RFP are met.

c. Consider late proposals if: (i) no other proposals are received; (ii) no complete proposals are received; (iii) the State received complete proposals, but the proposals did not meet mandatory minimum requirements or technical criteria; or (iv) the award process fails to result in an award.

d. Consider an otherwise disqualified proposal, if no other proposals are received.

e. Disqualify a proposal based on: (i) information provided by the bidder in response to this RFP; (2) the bidder’s failure to complete registration on www.michigan.gov/SIGMAVSS ; or (3) if it is determined that a bidder purposely or willfully submitted false or misleading information in response to the RFP.

f. Consider prior performance with the State in making its award decision.

g. Consider overall economic impact to the State when evaluating proposal pricing and in the final award recommendation. This includes but is not limited to: considering principal place of performance, number of Michigan citizens employed or potentially employed, dollars paid to Michigan residents, Michigan capital investments, job creation, tax revenue implications, and economically disadvantaged businesses.

h. Consider total-cost-of-ownership factors (e.g., transition and training costs) when evaluating proposal pricing and in the final award recommendation.

i. Refuse to award a contract to any bidder that has failed to pay State taxes or has outstanding debt with the State.

j. Enter into negotiations with one or more bidders on price, terms, technical requirements, or other deliverables.

k. Award multiple, optional-use contracts, or award by Contract Activity.

l. Evaluate the proposal outside the scope identified in Section 8, Evaluation Process, if the State receives only one proposal.

11. AWARD RECOMMENDATION. The contract will be awarded to the responsive and responsible bidder who offers the best value to the State, as determined by the State. Best value will be determined by the bidder meeting the minimum point threshold and offering the best combination of the factors stated in Section 8, Evaluation Process, and price, as demonstrated by the proposal. The State will post a Notice of Recommendation for Award on www.michigan.gov/SIGMAVSS .

12. DEBRIEF MEETING AND BID PROTEST. The State will post a Notice of Recommendation for Award, which will provide instructions on how to request a debrief meeting

If you wish to initiate a protest of the award, you must submit your written protest to noffsingere@michigan.gov no later than 3:00p.m. 7 business days after posting the Notice of Recommendation for Award, or by 10:00a.m. the next business day if that date falls on a state holiday or weekend. The State reserves the right to adjust this timing and will publish any change on the SIGMA VSS system.

Additional information about the protest process is available at www.michigan.gov/micontractconnect under the “Programs and Policies” link.

13. STATE ADMINISTRATIVE BOARD. Contracts in excess of $500,000 require approval by the State Administrative Board. The State Administrative Board’s decision is final; however, its approval does not constitute a contract. The award process is not complete until the awarded contractor receives a contract fully executed by all parties.

14. GENERAL CONDITIONS. The State will not be liable for any costs, expenses, or damages incurred by a bidder participating in this solicitation. The bidder agrees that its proposal will be considered an offer to do business with the State in accordance with its proposal, including the Contract Terms, and that its proposal will be irrevocable and binding for a period of [180] calendar days from date of submission. If a contract is awarded to the bidder, the State may, at its option, incorporate any part of the bidder’s proposal into a contract. This RFP is not an offer to enter into a contract. This RFP may not provide a complete statement of the State’s environment, or contain all matters upon which agreement must be reached. Other than verified trade secrets, proposals submitted via www.michigan.gov/SIGMAVSS are the State’s property.

15. FREEDOM OF INFORMATION ACT. All portions of the bidder’s proposal and resulting Contract are subject to disclosure as required under Michigan’s Freedom of Information Act (FOIA), 1976 PA 442.

However, please note the following:

a. Under MCL 18.1261(13)(b), records containing “a trade secret as defined under section 2 of the uniform trade secrets act, 1998 PA 448, MCL 445.1902, or financial or proprietary information” are exempt from disclosure under FOIA. And under MCL 18.1470(3), “proprietary financial and accounting” information is also exempt from disclosure under FOIA.

b. If information within a bidder’s proposal falls under the aforementioned exemptions, and the bidder seeks to have it withheld from disclosure under FOIA, then by the proposal deadline, the bidder must: (1) save exempt information in a separate file (i.e., document); (2) name the file/document “FOIA-EXEMPT”; (3) label the header of each page of the file/document “Confidential–Trade Secret,” “Confidential–Financial,” or “Confidential–Proprietary” as applicable; (4) clearly reference within the file/document the RFP schedule, section, and page number to which the exempt information applies; and (5) verify within the FOIA-EXEMPT file/document that the information meets the FOIA exemption criteria.

c. The State reserves the right to determine whether information designated as exempt by a bidder falls under the FOIA exemptions.

d. Resumes, pricing, and marketing materials are not trade secrets or financial or proprietary information.

e. Do not identify your entire proposal as “FOIA-EXEMPT,” and do not label each page of your proposal “Confidential.” If a bidder does so, the State may require the bidder to resubmit the proposal to comply with subsection (b) above.

f. If the State requires a bidder to resubmit a proposal for failure to follow these instructions, the State reserves the right to disqualify the bidder if the proposal is materially changed upon resubmission.

In other words, amendments to the proposal should be restricted to that which is necessary to separate confidential from non-confidential information.

http://www.michigan.gov/SIGMAVSS http://www.michigan.gov/micontractconnect http://www.michigan.gov/SIGMAVSS http://www.legislature.mi.gov/(S(b2idoibk3wwdcrok5bm0s021))/mileg.aspx?page=getObject&objectName=mcl-18-1261 http://www.legislature.mi.gov/(S(0maooowvs1ncgfpdbtafkvxy))/mileg.aspx?page=GetObject&objectname=mcl-445-1902 http://www.legislature.mi.gov/(S(ikxtgnlhgrao5zhaug3iprvj))/mileg.aspx?page=getObject&objectName=mcl-18-1470

Bidder must enter company name here.

Version 1 Revised Date: 7/28/2017

Request For Proposal No. 1800003208 Repair of the Land/Navigation Tower

SCHEDULE A

STATEMENT OF WORK

CONTRACT ACTIVITIES

This schedule identifies the anticipated requirements of any Contract resulting from this RFP. The term “Contractor” in this document refers to a bidder responding to this RFP.

The Contractor must respond to each requirement or question and explain how it will fulfill each requirement. Attach any supplemental information and appropriately reference within your response.

BACKGROUND

Camp Grayling Joint Maneuver Training Center (CGJMTC) consists of 147,000 acres in and around Grayling, Michigan. Camp Grayling has 5 main complexes. An integral part of each complex is its communication system and the systems’ ability to communicate with the other complexes; radios, telephones, and computers. The communication systems are used in the coordination of all training and use of the facilities. To safely conduct operations at Camp Grayling, the radio and network equipment, including the towers, cabling and associated equipment must be in good working order at all times. Periodic maintenance and testing is required by regulation.

SCOPE

Camp Grayling JMTC is seeking a properly licensed contractor to perform repairs and antenna removal on the communication tower commonly known at the Land/Navigation Tower, 180’ antenna tower located off Military Road in Grayling, Michigan according to the specifications listed in the Requirement of this RFP

The tower is a painted steel,guy supported, lattice tower which stands approximately 180 feet tall with Point to Point Network Antennas, 800 MHz , consists of nine 20-foot sections. Five sets of three guy cables support the tower. The tower is triangular with approximately 18 inches between vertical members. All the connections on the tower structure are welded, except where bolted connections are used to join adjacent tower sections. The original design drawing and specifications are not available for the tower structure. The original design drawing and specifications are not available for the tower structure. Of the 15 or so antennas on the tower currently, only three will remain.

REQUIREMENTS

1. General Requirements: Contractor to provide all material and labor to complete the RFP activities detailed below:

1. Remove all unused antennas and lines from the tower.

2. Remove and replace all lights. Ensure in working order.

3. Reattach all lines of antennae that will remain

4. Remove and replace ice clips

5. Install missing safety wires at anchors, new wire rope clips

6. Correctly tension guy lines

7. Plumb tower.

8. Contactor must be registered with the State of Michigan

9. Contractor must have sufficient workman’s comp, property and general liability insurances. Awarded contractor will be required to provide proof of sufficient insurance/s.

10. Contractor must be properly licensed to perform the activities detailed in this Statement of Work.

Awarded contractor will be required to provide copies of such.

11. Vendor to provide a quote for the RFP activities detailed in this Statement of Work scope on company letterhead signed by authorized person. The cost of labor and materials must be separate line items.

Bidder must enter company name here.

Version 1 Revised Date: 7/28/2017

12. Deadline to submit responses

2. Additional Requirements

2.1 My submitting a quotation for this Request for Proposal the Contractor certifies the following:

- Abusive Labor Practices. The Contractor certifies that it will not furnish any Deliverable that was produced fully or partially by forced labor, forced or indentured child labor, or indentured servitude.

- Certification of Michigan Business- Public Act 431 of 1984, Sec. 268. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Business Tax Corporate Income Tax Return. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, filed a Michigan Income Tax return showing income generated in, or attributed to the State of Michigan. I certify that the company has, pursuant to the provisions of Sec 268 of Public Act 431 of 1984, withheld Michigan Income Tax from compensation paid to the company’s owners and remitted the tax to the Michigan Department of Treasury.

- Iran Linked Business- Public Act 517 of 2012. I certify that the Company is not an Iran-Linked business as defined by Public Act 517 of 2012.

- Clean Corporate Citizen. I certify that the Company is a Clean Corporate Citizen as defined by the Environmental Protection Act, 1994 PA 451.

- Convict Labor. The Contractor certifies that if using convict labor, it is complying with all applicable state and federal laws and policies.

- SOM Debt/Tax Payment. All SOM tax/debts. I certify that all applicable State of Michigan taxes are paid, and that no outstanding debt is owed to the State of Michigan.

- Authorization to Verify Information provided by Vendor. I authorize the State to verify that all information provided in this registration, in bidding and contracting documents, and any attachments or supplement documents and processes are accurate.

2.2. Environmental and Energy Efficient Products

The Contractor must identify any energy efficient, bio-based, or otherwise environmental friendly products used in the products. Contractor must include any relevant third-party certification, including the verification of a United States department of agriculture certified bio-based product label.

12.3. Hazardous Chemical Identification

In accordance with the federal Emergency Planning and Community Right-to-Know Act, 42 USC 11001, et seq., as amended, the Contractor must provide a Material Safety Data Sheet listing any hazardous chemicals, as defined in 40 CFR §370.2, to be delivered. Each hazardous chemical must be properly identified, including any applicable identification number, such as a National Stock Number or Special Item Number.

The Contractor must identify any hazardous chemicals that will be provided under any resulting contract.

2.4. Mercury Content

Pursuant to MCL 18.1261d, mercury-free products must be procured when possible. The Contractor must explain if it intends to provide products containing mercury, the amount or concentration of mercury, and whether cost competitive alternatives exist. If a cost competitive alternative does exist, the Contractor must provide justification as to why the particular product is essential. All products containing mercury must be labeled as containing mercury.

2.5. Brominated Flame Retardants

The State prefers to purchase products that do not contain brominated flame retardants (BFRs) whenever possible.

The Contractor must disclose whether the products contain BFRs.

File details come from the government source that posted it. Updated .