This bid document package contains contract specifications and bidding requirements for the City of Florence, Texas, for the West Avenue Street Reconstruction project financed through a Texas Community Development Block Grant (TxCDBG Contract No. CDV23-0102). The project involves reconstruction of West Avenue from Martha Street to Bennet Street and includes 18 line items encompassing roadway excavation, pavement, concrete work, drainage, utility adjustments, erosion control, and mobilization. The bid opening is scheduled for 10:00 a.m. on Thursday, October 8, 2026, at City Hall, 851 FM 970, Florence, Texas. Prospective bidders may examine documents at no charge at the office of the Engineer, Eckermann Engineering, Inc., located at 202 Spring Ho Avenue, Lampasas, Texas, during business hours Monday through Friday, 8:00 a.m. to 5:00 p.m., or access digital copies at no cost through CivCast via www.civcastusa.com. The successful contractor must commence work within ten calendar days of receiving the Notice to Proceed and complete all work within 60 consecutive calendar days thereafter. Questions must be submitted through the CivCast Q&A Portal no less than seven days prior to bid opening.

A bid bond of 5 percent of the total bid amount, a certified check, or negotiable U.S. Government Bonds must accompany each bid. The contract is subject to Davis-Bacon prevailing wage requirements as determined by the Texas Department of Agriculture Office of Rural Affairs, with wage rates for Williamson County (TX20260007) specified in the contract documents. The contractor must comply with all federal and state labor standards, equal employment opportunity requirements, and provisions of the Housing and Community Development Act of 1974, including Section 3 preferences for low- and very low-income persons. Performance and payment bonds are required for contracts exceeding $100,000 and $50,000 respectively. Liquidated damages are set at $500 per calendar day for failure to complete within the stipulated timeframe. The project is funded entirely through TxCDBG assistance, and all change orders must receive prior approval from TxCDBG. The contractor must maintain comprehensive insurance coverage including general liability, workers' compensation, builders' risk, and professional liability where applicable, with the City of Florence listed as an additional insured on all policies.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/14/2026

CITY OF FLORENCE

WEST AVENUE STREET RECONSTRUCTION

TXCDBG CONTRACT NO. CDV23-0102

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

TOC Page 1 Table of Contents

INTRODUCTORY INFORMATION

TITLE PAGE

TABLE OF CONTENTS

BIDDING REQUIREMENTS, CONTRACT FORMS, & CONDITIONS OF THE CONTRACT

ADVERTISEMENT AND INVITATION FOR BIDS

INSTRUCTION TO BIDDERS

BID FORM

STANDARD FORM OF AGREEMENT

GENERAL CONTRACT CONDITIONS FOR CONSTRUCTION

ADDENDUM {If any addendum is issued, it will be bound in the front of Contract sets following contract execution.}

FEDERAL LABOR STANDARDS PROVISIONS

A401 – BABA CHECKLIST, INSTRUCTIONS, DEFINITIONS, & FAQs

STATEMENT OF BIDDER’S QUALIFICATIONS (must complete and submit with bid)

CONTRACTOR CERTIFICATIONS

CONCERNING LABOR STANDARDS AND PREVAILING WAGE REQUIREMENTS

WAGE RATES FOR WILLIAMSON COUNTY (TX20260007)

NONCOLLUSION AFFIDAVIT OF PRIME BIDDER (must complete and submit with bid)

BID BOND (must complete and submit with bid)

PAYMENT BOND

PERFORMANCE BOND

ATTORNEY’S REVIEW CERTIFICATION

CERTIFICATION REGARDING LOBBYING

CONFLICT OF INTEREST QUESTIONNAIRE

WEST AVENUE STREET RECONSTRUCTION

TXCDBG CONTRACT NO. CDV23-0102

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

TABLE OF CONTENTS

TOC Page 2 Table of Contents

SPECIFICATIONS

GENERAL REQUIREMENTS

CIP13 SUMMARY OF TESTING (MISCELLANEOUS)

G1 BARRICADES, SIGNS, AND TRAFFIC HANDLING

G2 SITE PREPARATION

G3 SITE CLEARING

G4 PIPE EXCAVATION, TRENCHING, EMBEDMENT, ENCASEMENT AND BACKFILLING

G5 GRANULAR FILL MATERIALS

G6 SEDIMENTATION AND TEMPORARY EROSION CONTROL

G7 LOAMING, HYDROSEEDING AND PERMANENT EROSION CONTROL

G8 MISCELLANEOUS WORK AND CLEANUP

STREETS AND DRAINAGE

SD1 HOT MIX ASPHALTIC CONCRETE PAVEMENT

SD2 ROADWAY EXCAVATION

SD3 EMBANKMENT AND SUBGRADE

SD4 FLEXIBLE BASE

SD5 STRIPING

WATER AND WASTEWATER

W1 DUCTILE IRON PIPE AND FITTINGS

W2 POLYVINYL CHLORIDE (PVC) PIPE – WATER

W3 VALVES, HYDRANTS AND APPURTENANCES

WW1 CONCRETE MANHOLES (WASTEWATER)

WW2 POLYVINYL CHLORIDE (PVC) PIPE – WASTEWATER

CONCRETE

C1 CONCRETE STRUCTURES

C2 CONCRETE FOR STRUCTURES

C3 RIPRAP

C4 CONCRETE CURB AND GUTTER

C5 CONCRETE SIDEWALKS, DRIVEWAYS AND FLATWORK

C6 MEMBRANE CURING

C7 REINFORCING STEEL

C8 REINFORCED CONCRETE PIPE

C9 FLOWABLE BACKFILL

End

Construction

Advertisement and Invitation for Bids

The City of Florence will receive bids for the West Avenue Street Reconstruction Project (TXCDBG Contract No. CDV23-0102) until 10:00 a.m. on Thursday, October 8, 2026 at City Hall, 851 FM 970, Florence, Texas. The bids will be publicly opened and read aloud at 10:00 a.m. on Thursday, October 8, 2026 at City Hall, 851 FM 970, Florence, Texas.

Bids are invited for several items and quantities of work as follows:

1. Reconstruction of West Avenue from Martha Street to Bennet Street.

Bid/Contract Documents, including Drawings and Technical Specifications, are on file at the City of Florence City Hall, 851 FM 970, Florence, TX 76527.

Electronic copies of the Bid Documents, including Drawings and Technical Specifications, are available digitally and free of charge at CivCast via www.civcastusa.com. Hard copies of the bid documents will not be sold. Prospective Bidders may examine the Bidding Documents, Drawings, and Technical Specifications without charge at the office of the Engineer, Eckermann Engineering, Inc., located at 202 Spring Ho Avenue, Lampasas, TX 76550, between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. All questions pertaining to the bidding documents must be submitted through the CivCast Q&A Portal."

A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid. A certified check or bank draft payable to the City of Florence or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

Attention is called to the fact that not less than the federally determined prevailing (Davis-Bacon and Related Acts) wage rate, as issued by the Texas Department of Agriculture Office of Rural Affairs and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin.

The City of Florence reserves the right to reject any or all bids or to waive any informalities in the bidding.

Bids may be held by City of Florence for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.

City of Florence Tamela Louvier, City Administrator

All contractors/subcontractors that are debarred, suspended or otherwise excluded from or ineligible for participation on federal assistance programs may not undertake any activity in part or in full under this project.

Page 1 Instruction to Bidders

INSTRUCTION TO BIDDERS

FOR CONSTRUCTION

1. Use of Separate Bid Forms

These contract documents include a complete set of bid and contract forms which are for the convenience of the bidders and are not to be detached from the contract document, completed or executed. Separate bid forms are provided for your use.

2. Interpretations or Addenda

No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening.

Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than five (5) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders.

If an addendum to the bid package is necessary, it must be distributed to each potential bidder.

The distribution of an addendum shall be verified either by statements of receipt or registered/certified mail receipts, which shall be included in the public works construction file.

The addendum shall allow adequate time for consideration in bid preparation. If adequate time is not available, the bid opening date must be extended and the Grant Recipient must republish the invitation for bids containing the place, time, and date for the new bid opening. Note that any change to the original bid opening date will require republication of the invitation for bids at least once in a locally published newspaper. The republished notice will include the place, time and date for the new bid opening and must be published at least seven days prior to the new bid opening date.

3. Inspection of Site

Each bidder should visit the site of the proposed work and should become acquainted with the existing conditions and facilities, the difficulties and restrictions pertaining to the performance of the contract. The bidder should thoroughly examine and become familiar with the drawings, technical specifications and all other contract documents. The contractor by the execution of the contract shall in no way be relieved of any obligation under it due to failure to receive or examine any form or legal document or to visit the site or the conditions existing at the site. The City will be justified in rejecting any claim based on lack of inspection of the site prior to the bid.

4. Alternate bid items

No alternate bids or bid items will be considered unless they are specifically requested by the technical specifications.

5. Bids

a. All bids must be submitted on the forms provided and are subject to all requirements of the Contract Documents, including the Drawings.

b. All bids must be regular in every respect and no interlineation, excisions or special conditions may be made or included by the bidder.

Page 2 Instruction to Bidders

c. Bid documents, including but not limited to the bid, the bid bond(s), the contractor’s certifications, local opportunity plan, and the statement of the bidder’s qualifications, shall be sealed in an envelope and clearly labeled with the words "Bid Documents”, the project number, name of bidder and the date and time of bid opening.

d. The City may consider as irregular any bid on which there is an alteration of or departure from the bid form and, at its option, may reject any irregular bid.

e. If a contract is awarded, it will be awarded to a responsible bidder on the basis of the lowest/best bid and the selected alternate bid items, if any. The contract will require the completion of the work in accordance with the contract documents.

6. Bid Modifications Prior to Bid Opening

a. Any bidder may modify its bid by submitting a modification or supplemental bid at any time prior to the scheduled closing time for receipt of bids, provided such modification or supplemental bid is received by the locality prior to the closing time.

The modification or supplemental bid should not reveal the original bid price but should provide only the addition, subtractions or other modifications to the original bid so that the final prices or terms will not be known by the locality until the sealed bid is open.

7. Bid Bond

a. A bid bond in the amount of 5% of the bid issued by an acceptable surety shall be submitted with each bid for contracts greater than $100,000. A certified check or bank draft payable to the locality or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

b. The bid bond or its comparable will be returned to the bidder as soon as practical after the opening of the bids.

8. Statement of Bidders Qualifications

Each bidder shall submit on the form furnished for that purpose a statement of the bidder's qualifications. The Grant Recipient shall have the right to take such steps as it deems necessary to determine the ability of the bidder to perform its obligations under the contract, and the bidder shall furnish the Grant Recipient all such information and data for this purpose as it may request.

The right is reserved to reject any bid where an investigation of the available data does not satisfy the Grant Recipient that the bidder is qualified to carry out properly the terms of the contract.

9. Unit Price

The unit price for each of the several items in the bid shall include its pro rata share of overhead so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price bid represents the total bid. Any bid not conforming to this requirement may be rejected as informal. Special attention is drawn to this condition, as the unit prices will be used to determine the amount of any change orders resulting from an increase or decrease in quantities.

10. Corrections

Erasures or other corrections in the bid must be noted over the signature of the bidder.

11. Time for Receiving Bids

Page 3 Instruction to Bidders

Bids received prior to the advertised hour of opening shall be kept securely sealed. The officer appointed to open the bids shall decide when the specified time has arrived and no bid received thereafter will be considered; except that when a bid arrives by mail after the time fixed for opening, but before the reading of all other bids is completed, and it is shown to the satisfaction of the Grant Recipient that the late arrival of the bid was solely due to delay in the mail for which the bidder was not responsible, such bid will be received and considered.

12. Opening of Bids

The City shall, at the time and place fixed for the opening of bids, open each bid and publicly read it aloud, irrespective of any irregularities therein. Bidders and other interested individuals may be present.

13. Withdrawal of Bids

Bidder may withdraw the bid before the time fixed for the opening of bids, by communicating its purpose in writing to the Grant Recipient. Upon receipt of such notice, the unopened bid will be returned to the bidder. The bid guaranty of any bidder withdrawing his bid will be returned promptly.

14. Award of Contract/Rejection of Bids

a. The contract will be awarded to the responsive, responsible Bidder submitting the lowest/best bid. The bidder selected will be notified at the earliest possible date.

The locality reserves the right to reject any or all bids and to waive any informality in bids received where such rejection or waiver is in its interest.

b. The Grant Recipient reserves the right to consider as unqualified to do the work any bidder who does not habitually perform with his own forces the major portions of the work involved in construction of the improvements embraced in this contract.

15. Execution of Agreement/Performance and Payment Bonds

a. Performance Bonds - Requires all prime contractors which enter into a formal contract in excess of $100,000 with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to obtain a Performance Bond in the amount of the contract before commencing with work

b. Payment Bonds- Requires all prime contractors which enter into a formal contract with the State, a county, or a municipality; a department, board, or agency of the state, a county, or a municipality; and a school district or a subdivision thereof, to furnish to the governmental entity a payment bond in the amount of the contract.

The payment bond must be filed within 30 days from the date of the Notice of Award:

o Municipalities: If the contract is in excess of $50,000, a payment bond is required.

o Counties: If the contract is in excess of $25,000, a payment bond is required.

Page 4 Instruction to Bidders

c. The failure of the successful bidder to execute the agreement and supply the required bonds within thirty (30) days from the date of the notice of award-or within such extended period as the locality may grant, shall constitute a default and the locality may, at its option, either award the contract to the next lowest responsible bidder, or re-advertise for bids. In either case, the locality may charge against the bidder the difference between the amount of the bid, and the amount for which a contract is subsequently executed irrespective of whether this difference exceeds the amount of the bid bond. If a more favorable bid is received through re-advertisement, the defaulting bidder shall have no claim against the locality for a refund.

16. Wages and Salaries

Attention is particularly called to the requirement of paying not less than the prevailing Davis Bacon Related Acts (DBRA) wage rates specified in the Contract Documents. These rates are minimums to be paid during the life of the contract. It is therefore the responsibility of the Bidder to inform themselves as to local labor conditions.

17. Equal Employment Opportunity

Attention is called to the requirements for ensuring that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual identity, gender identity, or national origin, and other civil rights requirements.

18. Certification Regarding Lobbying –

Contractors who apply or bid for an award of $100,000 or more shall provide the required certification that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer of employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining and Federal contract, grant or any other award covered by 31 USC § 1352.

Page 1 Bid Form

Bid Form

City Administrator Florence, Texas

The undersigned, in compliance with your invitation for bids for construction of the following Project:

West Avenue Street Reconstruction - TXCDBG Contract No. CDV23-0102 for the City of Florence, Texas, having examined the Project Manual, Drawings and Addenda, the site of the proposed Work and being familiar with all of the conditions surrounding construction of the proposed Project, having conducted all inquiries, tests and investigations deemed necessary and proper; hereby proposes to furnish all labor, permits, material, machinery, tools, supplies and equipment, and perform all Work required for construction of the Project in accordance with the Project Manual, Drawings and Addenda within the time indicated for the lump sum price of:

BASE BID

Bid Item Quantity Unit Item Description and Written Total Unit Price Unit Price Total Amount

1 1190 SY

Construction of Unclassified Roadway Excavation (incl. asphalt, base, etc.), complete in place for Dollars and Cents

2 42 SY Construction of Remove Existing Concrete Driveway, complete in place for Dollars

3 43 LF Construction of Remove Existing 12” CMP Culvert, complete in place for Dollars

4 73 LF Construction of Remove Existing 18” CMP Culvert, complete in place for Dollars

5 1420 SY Construction of Recompact Existing Subgrade (6” Minimum Depth) complete in place for Dollars

6 1420 SY Construction of Crushed Limestone Base (10”), TXDOT Item 247, Type A, Grade 1 or 2), complete in place for Dollars

Page 2 Bid Form

Item Quantity Unit Item Description and Written Total Unit Price Unit Price Total Amount

7 1106 SY Construction of 2” HMAC Pavement, TXDOT Item 340, Type D complete in place for Dollars

8 277 LF Construction of Concrete Ribbon Curb, complete in place for Dollars

9 707 LF Construction of Longitudinal Valley Gutter, Dollars

10 132 SY Construction of Concrete Driveways, complete in place for Dollars

11 112 LF Construction of 18” Arch RCP Culvert, complete in place for Dollars

12 81 SY Construction of Concrete Riprap, complete in place for Dollars

13 6 EA Construction of Relocate Existing Street Sign, Dollars

14 3 EA Construction of Adjust Existing Water Valve to Finished Grade, complete in place for Dollars

15 3 EA Construction of Adjust Existing Wastewater Manhole to Finished Grade, complete in place for Dollars

16 1 LS Construction of Temporary Erosion Controls and Tree Protection Fencing, complete in place for Dollars

Page 3 Bid Form

Item Quantity Unit Item Description and Written Total Unit Price Unit Price Total Amount

17 1 LS Construction of Signs, Barricades, and Traffic Control Devices, complete in place for Dollars

18 1 LS Construction of Mobilization, complete in place for Dollars

TOTAL LUMP SUM BID (Sum of Item Nos. 1 - 18): $

(Figures)

(Written)

Page 1 Standard Form of Agreement

STANDARD FORM OF AGREEMENT

FOR OWNER-CONTRACTOR PROJECTS

STATE of TEXAS }

WILLIAMSON COUNTY }

THIS AGREEMENT, made and entered into this day of , 2026, by and between the City of Florence of the County of Williamson in the State of Texas, hereinafter termed OWNER, and of the City of of the County of in the State of Texas, hereinafter termed CONTRACTOR.

WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the CONTRACTOR and under the conditions expressed in the bond bearing, the parties hereby agree to commence and complete the construction of certain improvements described as follows:

West Avenue Street Reconstruction - TXCDBG Contract No. CDV23-0102 – Plans and Specifications dated September 3, 2026.

and all extra work in connection therewith, under the terms as stated in the General Conditions of the Agreement and at CONTRACTOR’S cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said construction, in accordance with the Notice to Contractors, General and Special Conditions of Agreement, Plans and other drawings and printed or written explanatory matter thereof, and the Specifications and addenda therefore, as prepared by Eckermann Engineering, Inc., herein entitled the ENGINEER, each of which has been identified by the CONTRACTOR and the ENGINEER, together with the CONTRACTOR’S written proposal, the General Conditions of the Agreement, the Performance and Payment Bonds hereto attached; all of which are made a part hereof and collectively evidence and constitute the entire contract.

CONTRACTOR hereby agrees to commence WORK on or before , , and Contractor shall complete the WORK within sixty (60) consecutive calendar days thereafter. The date of completion of all WORK is therefore , 2027.

The OWNER agrees to pay the CONTRACTOR in current funds the price or prices shown in the proposal, which forms a part of this contract, such payments to be subject to the General and Special Conditions of the contract.

IN WITNESS WHEREOF, the parties to these presents have executed this Agreement in the year and day first above written.

OWNER CONTRACTOR

By: By:

Title: Title: ______

Page 4 Bid Form

BID GUARANTY: Enclosed with this Bid is a bid guaranty meeting the requirements established in the Advertisement and Invitation for Bids, in the amount of not less than five percent (5%) of the total Bid. Following the Bid opening, submitted Bids may not be withdrawn for a period of sixty (60) Calendar Days. Award of Contract will occur within this period, unless mutually agreed between the parties. The bid guaranty may become the property of the OWNER, or the OWNER may pursue any other action allowed by law, if: bidder withdraws a submitted Bid within the period stated above; bidder fails to submit the required post-bid information within the period specified in the Advertisement and Invitation for Bids and the Instructions to Bidders, or any mutually agreed extension of that period; or bidder fails to execute the Contract and furnish the prescribed documentation (bonds, insurance, etc.) needed to complete execution of the Contract within Ten (10) Calendar Days after notice of award, or any mutually agreed extension of that period.

TIME OF COMPLETION: The undersigned bidder agrees to commence work within Ten (10) Calendar Days after written notice as specified in a written "Notice to Proceed" to be issued by the OWNER and to finally complete construction of the improvements, as required by the Project Manual, Drawings and Addenda for the Work within sixty (60) Calendar Days. The bidder further agrees that should the bidder fail to finally complete the Work within the number of days indicated in the Bid or as subsequently adjusted, bidder shall pay the liquidated damages for each consecutive day thereafter as provided below; unless the OWNER elects to pursue any other action allowed by law.

LIQUIDATED DAMAGES: The bidder understands and agrees that the timely completion of the described Work is of the essence. The bidder and the OWNER agree that for each and every Calendar Day the Work or any portion thereof, remains incomplete after the final completion date as established by the first sentence of the above paragraph, "Time of Completion", the bidder shall pay the amount of five hundred Dollars ($ 500) per Calendar Day as Liquidated Damages, not as a penalty, but for delay damages to the OWNER. Bidders acknowledge and agree that such amount is fair and reasonable compensation to the OWNER and that such amount shall be deducted by the OWNER from any payment due to the bidder. In the event of a default or breach by the CONTRACTOR and demand is made upon the surety to complete the project, in accordance with the Contract Documents, the surety shall be liable for liquidated damages pursuant to the Contract Documents in the same manner as the CONTRACTOR would have been.

OWNER RESERVES THE RIGHT TO REJECT ANY OR ALL BIDS AND TO WAIVE ANY MINOR

INFORMALITY IN ANY BID OR SOLICITATION PROCEDURE (A MINOR INFORMALITY IS ONE THAT DOES

NOT AFFECT THE COMPETITIVENESS OF THE BIDDERS).

The undersigned acknowledges receipt of the following addenda:

Addendum No. 1 dated Received Addendum No. 2 dated Received Addendum No. 3 dated Received

Secretary, *if bidder is a Corporation Bidder

(Seal) Authorized Signature

Title

Date

* Copy of Corporate Resolution and minutes with certificate of officer of bidder as to authority of signatory to bind bidder is to be signed and dated no earlier than one week before Bid date, and be Address attached to this document.

Telephone Number / Fax Number End

Page 1 General Contract Conditions

GENERAL CONTRACT CONDITIONS

FOR CONSTRUCTION

1. Contract and Contract Documents

(a) The project to be constructed pursuant to this contract will be financed with assistance from the Texas Department of Agriculture - Office of Rural Affairs through a Community Development Block Grant (TxCDBG) and is subject to all applicable Federal and State laws and regulations.

(b) The Plans, Specifications and Addenda shall form part of this contract and the provisions thereof shall be binding upon the parties as if they were herein fully set forth.

2. Definitions

Whenever used in any of the Contract Documents, the following meanings shall be given to the terms here in defined:

(a) The term "Contract" means the Contract executed between the City of Florence hereinafter called the “City” and , hereinafter called “Contractor”, of which these GENERAL CONDITIONS, form a part.

(b) The term "Project Area" means the area within the specified Contract limits of the

Improvements contemplated to be constructed in whole or in part under this contract.

(c) The term "Engineer" means Eckermann Engineering, Inc., Engineer in charge, serving the City with architectural or engineering services, his successor, or any other person or persons, employed by the City for the purpose of directing or having in charge the work embraced in this Contract.

(d) The term "Contract Documents" means and shall include the following: Executed Contract, Addenda (if any), Invitation for Bids, Instructions to Bidders, Signed Copy of Bid, General Conditions, Special Conditions, Technical Specifications, and Drawings (as listed in the Schedule of Drawings).

3. Supervision by Contractor

(a) Except where the Contractor is an individual and personally supervises the work, the

Contractor shall provide a competent superintendent, satisfactory to the Engineer, on the work at all times during working hours with full authority to act as Contractor’s agent. The Contractor shall also provide adequate staff for the proper coordination and expediting of his work.

(b) The Contractor shall be responsible for all work executed under the Contract. Contractor shall verify all figures and elevations before proceeding with the work and will be held responsible for any error resulting from his failure to do so.

4. Subcontracts

(a) The Contractor shall not execute an agreement with any subcontractor or permit any subcontractor to perform any work included in this contract until Contractor has verified the subcontractor is eligible to participate in federally funded contracts.

Page 2 General Contract Conditions

(b) No proposed subcontractor shall be disapproved by the City except for cause.

(c) The Contractor shall be as fully responsible to the City for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them.

(d) Nothing contained in the Contract shall create any contractual relation between any subcontractor and the City.

5. Fitting and Coordination of Work

The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors, or material suppliers engaged upon this Contract.

6. Payments to Contractor

(a) Partial Payments

1) The Contractor shall prepare the requisition for partial payment as of the last day of the month and submit it, with the required number of copies, to the Engineer for approval.

The amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) ten percent (10%) of the total amount, to be retained until final payment, and (2) the amount of all previous payments. The total value of work completed to date shall be based on the estimated quantities of work completed and on the unit prices contained in the agreement. The value of materials properly stored on the site shall be based upon the estimated quantities of such materials and the invoice prices. Copies of all invoices shall be available for inspection of the Engineer.

2) Monthly or partial payments made by the City to the Contractor are advanced for the purpose of assisting the contractor to expedite the work of construction. The Contractor shall be responsible for the care and protection of all materials and work upon which payments have been made until final acceptance of such work and materials by the City.

Such payments shall not constitute a waiver of the right of the City to require the fulfillment of all terms of the Contract and the delivery of all improvements embraced in this Contract complete and satisfactory to the City in all details.

(b) Final Payment

1) After final inspection and the acceptance by the City of all work under the Contract, the

Contractor shall prepare the requisition for final payment which shall be based upon the careful inspection of each item of work at the applicable unit prices stipulated in the Contract. The total amount of the final payment due the Contractor under this Contract shall be the amount computed as described above less all previous payments.

2) Before paying the final estimate, City shall require the Contractor to furnish releases or receipts from all subcontractors having performed any work and all persons having supplied materials, equipment (installed on the Project) and services to the Contractor.

The City may make payment in part or in full to the Contractor without requiring the furnishing of such releases or receipts and any payments made shall in no way impair the obligations of any surety or sureties furnished under this Contract.

3) Any amount due the City under Liquidated Damages shall be deducted from the final payment due the contractor.

Page 3 General Contract Conditions

(c) Payments Subject to Submission of Certificates

Each payment to the Contractor by the City shall be made subject to submission by the Contractor of all written certifications required of it and its subcontractors.

(d) Withholding Payments

The City may withhold any payment due the Contractor as deemed necessary to protect the City, and if so elects, may also withhold any amounts due from the Contractor to any subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed solely for the benefit of the City and will not require the City to determine or adjust any claims or disputes between the Contractor and its subcontractors or material dealers, or to withhold any moneys for their protection unless the City elects to do so. The failure or refusal of the City to withhold any moneys from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract.

7. Changes in the Work

(a) The City may make changes in the scope of work required to be performed by the

Contractor under the Contract without relieving or releasing the Contractor from any obligations under the Contract or any guarantee given pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise. Additionally, all such change orders must be approved by TxCDBG prior to execution of same.

(b) Except for the purpose of affording protection against any emergency endangering health, life, limb or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the City authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract Price will be valid unless so ordered.

(c) If applicable unit prices are contained in the Contract, the City may order the Contractor to proceed with desired unit prices specified in the Contract; provided that in case of a unit price contract the net value of all changes does not increase the original total amount of the agreement by more than twenty-five percent (25%) or decrease the original the total amount by eighteen percent (18%).

(d) Each change order shall include in its final form:

1) A detailed description of the change in the work.

2) The Contractor's proposal (if any) or a confirmed copy thereof.

3) A definite statement as to the resulting change in the contract price and/or time.

4) The statement that all work involved in the change shall be performed in accordance with contract requirements except as modified by the change order.

5) The procedures as outlined in this Section for a unit price contract also apply in any lump sum contract.

Page 4 General Contract Conditions

8. Claims for Extra Cost

(a) If the Contractor claims that any instructions by Drawings or otherwise involve extra cost or extension of time, he shall, within ten days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the City, stating clearly and in detail the basis of his objections. No such claim will be considered unless so made.

(b) Claims for additional compensation for extra work, due to alleged errors in ground elevations, contour lines, or bench marks, will not be recognized unless accompanied by certified survey data, made prior to the time the original ground was disturbed, clearly showing that errors exist which resulted, or would result, in handling more material, or performing more work, than would be reasonably estimated from the Drawings and maps issued.

(c) Any discrepancies which may be discovered between actual conditions and those represented by the Drawings and maps shall be reported at once to the City and work shall not proceed except at the Contractor's risk, until written instructions have been received from the City.

(d) If, on the basis of the available evidence, the City determines that an adjustment of the

Contract Price and/or time is justifiable, a change order shall be executed.

9. Termination, Delays, and Liquidated Damages

(a) Right of the City to Terminate Contract for Convenience

City may at any time and for any reason terminate Contractor’s services and work at City's convenience upon providing written notice to the Contractor specifying the extent of termination and the effective date. Upon receipt of such notice, Contractor shall, unless the notice directs otherwise, immediately discontinue the work and placing of orders for materials, facilities and supplies in connection with the performance of this Agreement.

Upon such termination, Contractor shall be entitled to payment only as follows: (1) the actual cost of the work completed in conformity with this Agreement; plus, (2) such other costs actually incurred by Contractor as are permitted by the prime contract and approved by City;

(3) plus ten percent (10%) of the cost of the work referred to in subparagraph (1) above for overhead and profit. There shall be deducted from such sums as provided in this subparagraph the amount of any payments made to Contractor prior to the date of the termination of this Agreement. Contractor shall not be entitled to any claim or claim of lien against City for any additional compensation or damages in the event of such termination and payment.

(b) Right of the City to Terminate Contract for Cause

In the event that any of the provisions of this contract are violated by the Contractor, or by any subcontractors, the City may serve written notice upon the Contractor and the Surety of its intention to terminate the contract. The notices shall contain the reasons for such intention to terminate the contract, and unless such violation or delay shall cease and satisfactory arrangement of correction be made within ten days, the contract shall, upon the expiration of said ten (10) days, cease and terminate. In the event of any such termination, the City shall immediately serve notice thereof upon the Surety and the Contractor. The Surety shall have the right to take over and perform the contract. Provided, however, that if

Page 5 General Contract Conditions the Surety does not commence performance thereof within ten (10) days from the date of the mailing to such Surety of notice of termination, the City may take over the work and complete the project by bid/contract or by force account at the expense of the Contractor and his Surety shall be liable to the City for any excess cost incurred. In such event the City may take possession of and utilize in completing the work, such materials, appliances, and plant as may be on the site of the work and necessary therefore.

(c) Liquidated Damages for Delays.

If the work is not completed within the time stipulated in the applicable bid for Lump Sum or Unit Price Contract provided, the Contractor shall pay to the City as fixed, agreed, and liquidated damages (it being impossible to determine the actual damages occasioned by the delay) the amount of two hundred fifty dollars ($250) for each calendar day of delay, until the work is completed. The Contractor and Contractor’s sureties shall be liable to the City for the amount thereof.

(d) Excusable Delays.

1) The right of the Contractor to proceed shall not be terminated nor shall the Contractor be charged with liquidated damages for any delays in the completion of the work due to:

2) Any acts of the Government, including controls or restrictions upon or requisitioning of materials, equipment, tools, or labor by reason of war, national defense, or any other national emergency;

3) Any acts of the City;

4) Causes not reasonably foreseeable by the parties to this Contract at the time of execution which are beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God, terrorism, war, acts of another Contractor in the performance of some other contract with the City, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions.

5) Provided, however, that the Contractor promptly notifies the City within ten (10) days in writing of the cause of the delay. Upon receipt of such notification, the City shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this contract, the delay is properly excusable, the City shall extend the time for completing the work for a period of time commensurate with the period of excusable delay.

10. Assignment or Novation

The Contractor shall not assign nor transfer, whether by assignment or novation, any of its rights, duties, benefits, obligations, liabilities, or responsibilities under this Contract without the written consent of the City. No assignment or novation of this Contract shall be valid unless the assignment or novation expressly provides that the assignment of any of the Contractor's rights or benefits under the Contract is subject to a prior lien for labor performed, services rendered, and materials, tools, and equipment supplied for the performance of the work under this Contract in favor of all persons, Contractors, or corporations rendering such labor or services or supplying such materials, tools, or equipment.

Page 6 General Contract Conditions

11. Technical Specifications and Drawings

Anything mentioned in the Technical Specifications and not shown on the Drawings or vice versa shall be of like effect as if shown on or mentioned in both. In case of difference between Drawings and Technical Specifications, the Technical Specifications shall govern. In case of any discrepancy in Drawings, or Technical Specifications, the matter shall be immediately submitted to the City for review. Contractor shall be liable for any issues or expenses in the event the discrepancy is not submitted to the City.

12. Shop Drawings

(a) All required shop drawings, machinery details, layout drawings, etc. shall be submitted to the Engineer in three (3) copies for approval sufficiently in advance of requirements to afford ample time for checking, including time for correcting, resubmitting and rechecking if necessary. The Contractor may proceed, only at Contractor’s own risk, with manufacture or installation of any equipment or work covered by said shop drawings, etc. until they are approved and no claim, by the Contractor, for extension of the contract time shall be granted by reason of his failure in this respect.

(b) Any drawings submitted without the Contractor's stamp of approval will not be considered and will be returned to him for proper resubmission. If any drawings show variations from the requirements of the Contract because of standard shop practice or other reason, the Contractor shall make specific mention of such variation in his letter of transmittal in order that, if acceptable, suitable action may be taken for proper adjustment of contract price and/or time, otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the Contract even though the drawings have been approved.

(c) If a shop drawing is in accordance with the contract or involves only minor adjustment in the interest of the City not involving a change in contract price or time, the engineer may approve the drawing. The approval shall not relieve the Contractor from responsibility to adhere to the contract or for any error in the drawing.

13. Requests for Supplementary Information

It shall be the responsibility of the Contractor to make timely requests of the City for any additional information which should be furnished by the City under the terms of this Contract, and which is required in the planning and execution of the work. Such requests may be submitted from time to time as the need approaches, but each shall be filed in ample time to permit appropriate action to be taken by all parties involved so as to avoid delay. Each request shall be in writing, and list the various items and the latest date by which each will be required by the Contractor. The first list shall be submitted within two weeks after Contract award and shall be as complete as possible at that time. The Contractor shall, if requested, furnish promptly any assistance and information the Engineer may require in responding to these requests of the Contractor. The Contractor shall be fully responsible for any delay in his work or to others arising from his failure to comply fully with the provision of this section.

14. Materials and Workmanship

(a) Unless otherwise specifically provided for in the technical specifications, all workmanship, equipment, materials and articles incorporated in the work shall be new and the best grade of the respective kinds for the purpose. Where equipment, materials, articles or workmanship are referred to in the technical specifications as "equal to" any particular standard, the Engineer shall decide the question of equality.

Page 7 General Contract Conditions

(b) The Contractor shall furnish to the City for approval the manufacturer's detailed specifications for all machinery, mechanical and other special equipment, which he contemplates installing together with full information as to type, performance characteristics, and all other pertinent information as required, and shall likewise submit for approval full information concerning all other materials or articles which he proposes to incorporate.

(c) Machinery, mechanical and other equipment, materials or articles installed or used without such prior approval shall be at the risk of subsequent rejection.

(d) Materials specified by reference to the number or symbol of a specific standard, shall comply with requirements in the latest revision thereof and any amendment or supplement thereto in effect on the date of the Invitation for Bids, except as limited to type, class or grade, or modified in the technical specifications shall have full force and effect as though printed therein.

(e) The City may require the Contractor to dismiss from the work such employee or employees as the City or the Engineer may deem unqualified.

(f) Domestic Preferences - As appropriate and to the extent consistent with law and to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award.

For purposes of this section:

(1) “Produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.

(2) “Manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.

(3) Iron and steel products, Manufactured Products, and Construction Materials used in this project comply with the Build America, Buy America Act (BABA) requirements mandated by Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58.

15. Samples, Certificates and Tests

(a) The Contractor shall submit all material or equipment samples, certificates, affidavits, etc., as called for in the contract documents or required by the Engineer, promptly after award of the contract and acceptance of the Contractor's bond. No such material or equipment shall be manufactured or delivered to the site, except at the Contractor's own risk, until the required samples or certificates have been approved in writing by the Engineer. Any delay in the work caused by late or improper submission of samples or certificates for approval shall not be considered just cause for an extension of the contract time.

(b) Each sample submitted by the Contractor shall carry a label giving the name of the

Contractor, the project for which it is intended, and the name of the producer. The accompanying certificate or letter from the Contractor shall state that the sample complies with contract requirements, shall give the name and brand of the product, its place of origin, the name and address of the producer and all specifications or other detailed information

Page 8 General Contract Conditions which will assist the Engineer in making a prompt decision regarding the acceptability of the sample. It shall also include the statement that all materials or equipment furnished for use in the project will comply with the samples and/or certified statements.

(c) Approval of any materials shall be general only and shall not constitute a waiver of the City's right to demand full compliance with Contract requirements. After actual deliveries, the Engineer will have such check tests made as he deems necessary in each instance and may reject materials and equipment and accessories for cause, even though such materials and articles have been given general approval. If materials, equipment or accessories which fail to meet check tests have been incorporated in the work, the Engineer will have the right to cause their removal and replacement by proper materials or to demand and secure such reparation by the Contractor as is equitable.

(d) Except as otherwise specifically stated in the Contract, the costs of sampling and testing will be divided as follows:

1) The Contractor shall furnish without extra cost, including packing and delivery charges, all samples required for testing purposes, except those samples taken on the project by the Engineer;

2) The Contractor shall assume all costs of re-testing materials which fail to meet contract requirements;

3) The Contractor shall assume all costs of testing materials offered in substitution for those found deficient;

4) The City will pay all other expenses.

16. Permits and Codes

(a) The Contractor shall give all notices required by and comply with all applicable federal and state laws, ordinances, and codes of the Local Government. All construction work and/or utility installations shall comply with all applicable ordinances, and codes including all written waivers. Before installing any work, the Contractor shall examine the drawings and technical specifications for compliance with applicable ordinances and codes and shall immediately report any discrepancy to the City. Where the requirements of the drawings and technical specifications fail to comply with such applicable ordinances or codes, the City will adjust the Contract by Change Order to conform to such ordinances or codes (unless waivers in writing covering the difference have been granted by the governing body or department) and make appropriate adjustment in the Contract Price or stipulated unit prices.

(b) Should the Contractor fail to observe the foregoing provisions and proceed with the construction and/or install any utility at variance with any applicable ordinance or code, including any written waivers (notwithstanding the fact that such installation is in compliance with the drawings and technical specifications), the Contractor shall remove such work without cost to the City.

(c) The Contractor shall at his own expense, secure and pay for all permits for street pavement, sidewalks, shed, removal of abandoned water taps, sealing of house connection drains, pavement cuts, buildings, electrical, plumbing, water, gas and sewer permits required by the local regulatory body or any of its agencies.

(d) The Contractor shall comply…