Bid Docs - Specs - 24-315G.pdf

PDF 85 MB Posted

Attached to
MIS Infrastructure Repairs and Upgrades, Dept of Corrections
Solicitation number
2024-315 G (7-1)
Issued by
Pierce County, Sudden Valley CDP, Washington

About this file

This specification document pertains to Marine Infrastructure Repairs and Upgrades for the Department of Corrections' McNeil Island Stewardship project located on McNeil Island in Pierce County, Washington. The project scope includes removal and storage of 3-0 x 10-0 hot-dipped galvanized wheel track wear strips prior to work commencement at the McNeil Island Barge Slip, with subsequent reinstallation by the contractor. The work encompasses comprehensive improvements and repairs to marine timber and steel piles, concrete floating docks, barge slip infrastructure, and barge mooring anchors. All materials, labor, transportation, equipment, and services necessary for project completion are the contractor's responsibility, including incidental items required to achieve fully operational and integrated marine facilities, even if not explicitly detailed in the design documents.

The contract requires mandatory 15% apprentice labor hours calculated as a percentage of total labor hours. Voluntary numerical Diverse Business goals have been established at 10% for Minority-Owned Businesses (MBE), 6% for Women-Owned Businesses (WBE), 5% for Small Businesses (SBE) or Preferred Washington State Businesses (PWSBE), and 5% for Veterans. While achievement of these goals is encouraged, contractors are expected to apply comprehensive technical training, expertise, and knowledge in interpreting design documents and reviewing the project site to ensure all necessary work elements are included in their bid proposals.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .