High School Sanitary Sewer Rehabilitation Phase 1

This is a bid document for Harlingen Consolidated Independent School District (HFISD) in Texas for the rehabilitation and maintenance of the sanitary sewer system at their High School campus located along 2nd Street. The project scope includes installation of inflow protection to existing manholes, cleaning with debris removal and CCTV inspection of manholes and sewer lines, cleaning with debris removal and CCTV inspection of the existing lift station along Alamo Street, and installation of watertight plugs and/or caps to existing clean outs. Alternate items available if awarded include adjustment of manhole ring and covers above grade, existing line repair for various diameters up to 12-inch, waterproof joints and existing connections at the lift station, and lawn repair through sodding. The bid document establishes the framework for contractors to submit proposals for these services as Phase 1 of a larger sanitary sewer rehabilitation initiative.

The document contains the technical specifications, project requirements, and contractual terms necessary for bidders to prepare accurate proposals. Specific pricing terms, bid submission deadlines, award dates, contract duration, and funding sources are detailed within the bid package to enable qualified contractors to respond competitively. The project represents HFISD's commitment to infrastructure maintenance and system improvement at their high school facility to ensure proper sanitary sewer system functionality and compliance with applicable standards.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS &

TECHNICAL SPECIFICATIONS

HIGH SCHOOL

SANITARY SEWER

REHABILITATION

PHASE 1

September 2026

PREPARED FOR

HAMSHIRE FANNETT INDEPENDENT

SCHOOL DISTRICT

HAMSHIRE, TEXAS

TX Board of Prof Engineers Firm No. 1160

Tx Board of Prof Land Surveyors Firm No. 100186

1405 CORNERSTONE COURT

BEAUMONT, TEXAS 77706

(409) 832-7238

FS Proj. No. 26009

26009 HFISD High School Sanitary Sewer Rehabilitation Phase 1 contract.doc

TOC-1

HIGH SCHOOL SANITARY SEWER REHABILITATION PHASE 1

HAMSHIRE FANNETT INDEPENDENT SCHOOL DISTRICT

C O N T E N T S

PAGE

BIDDER INFORMATION

LEGAL NOTICE / Invitation for Bids ............................................................................ L-1

INSTRUCTIONS TO BIDDERS .............................................................................. INST-1

BID FORM AND STATEMENT OF BIDDER’S QUALIFICATIONS

BID FORM .................................................................................................................... BF-1

STATEMENT OF BIDDER’S QUALIFICATIONS ................................................ SOQ-1

BONDS

BID BOND ................................................................................................................... BB-1

CONSTRUCTION PERFORMANCE BOND ........................................................ PERF-1

CONSTRUCTION PAYMENT BOND ................................................................ PAYM-1

AGREEMENT AND CONDITIONS OF AGREEMENT

AGREEMENT BETWEEN OWNER AND CONTRACTOR ....................................... A-1

GENERAL CONTRACT CONDITIONS FOR CONSTRUCTION ........................... GC-1

SUPPLEMENTARY CONDITIONS OF AGREEMENT ............................................ SC-1

TECHNICAL SPECIFICATIONS

BIDDER INFORMATION

LEGAL NOTICE

SEPTEMBER 2, 2026

Notice is hereby given that the following Competitive Sealed Bids (CSB) listed below will be accepted by Hamshire Fannett Independent School District on Thursday, September 24, 2026 no later than 2:00 p.m. Plans and Specifications for this project may be obtained from Fittz & Shipman, 1405 Cornerstone, Beaumont, TX 77706 or by calling 409.832.7238 for a non-refundable deposit of $50.00.

Submitted Competitive Sealed Bids are to state the bid number and name of project on the outside of the envelope. Bidders are invited to bid the project. Bidders shall forward an original and two (2) copies of their bid to the address shown below. Late proposals will be rejected as non-responsive. Proposals will be publicly opened and read aloud at the time/date below.

Bidders are invited to attend the sealed bid opening. Bid specs are located on our website:

https://hfisdnet.finalsite.com/a-z-1/financebusiness/current-bid-opportunities

NON-MANDATORY PRE-BID CONFERENCE:

THURSDAY, SEPTEMBER 17, 2026 AT 2:00 PM

ADMINISTRATION BOARD ROOM

12702 2ND STREET

HAMSHIRE, TX 77622

CSB OPENING: Thursday, September 24, 2026 at 2:00 pm Boardroom - HFISD Administrative Building

CSB NO: 26009 Hamshire Fannett ISD High School Sanitary Sewer Rehabilitation – Phase 1

RFP-26-03

MAIL OR DELIVER TO: Hamshire Fannett Independent School District Jordan Walker Business Specialist HFISD Administration Building 12702 2nd Street Hamshire, Texas 77622

Any questions relating to these requirements please call Ben Tristan, P.E. at 409.832.7238.

The Board of Trustees shall consider the bids for award at the next School Board Meeting to be held during the week of October 19th at the Administration Building Board Room, 12702 2nd Street, Hamshire, Texas 77622.

RESPONDENTS ARE STRONGLY ENCOURAGED TO CAREFULLY READ THE ENTIRE BID.

Published: Beaumont Enterprise Wednesday, September 2, 2026 and Wednesday, September 9, 2026

INST-1

INSTRUCTIONS TO BIDDERS

1. Defined Terms.

Terms used in these Instructions to Bidders have the meanings assigned to them in the General

Conditions.

Certain additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.

1.1 Bidder - one who submits a Bid directly to OWNER as distinct from a sub-bidder, who submits a bid to a Bidder.

1.2 Issuing Office - the office from which the Bidding Documents are to be issued (Fittz &

Shipman, 1405 Cornerstone Court, Beaumont, Texas 77706).

1.3 Successful Bidder - the lowest, responsible and responsive Bidder to whom OWNER (on the basis of OWNER's evaluation as hereinafter provided) makes an award.

2. Copies of Bidding Documents.

2.1 Complete sets of the Bidding Documents in the number and for the non-refundable deposit sum of $50.00 may be obtained from the Issuing Office.

2.2 Complete sets of Bidding Documents must be used in preparing Bids; neither OWNER nor

ENGINEER assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.3 OWNER and ENGINEER in making copies of Bidding Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

3. Qualifications of Bidders.

To demonstrate qualifications to perform the Work, each Bidder must submit along with the Bid detailed written evidence such as financial data, previous experience, present commitments, and other such data called for on the “Statement of Bidder’s Qualifications” form located in the “Bid

Form and Statement of Bidder’s Qualifications” section of this document. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract.

4. Examination of Contract Documents and Site.

4.1 It is the responsibility of each Bidder before submitting a Bid:

4.1.1 To examine thoroughly the Contract Documents and other related data identified in the

Bidding Documents (included "technical data" referred to below);

4.1.2 To visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work;

INST-2

4.1.3 To consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work;

4.1.4 To study and carefully correlate Bidder's knowledge and observations with the Contract

Documents and such other related data; and

4.1.5 To promptly notify ENGINEER of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Contract Documents and such other related documents.

4.2 Reference is made to the Supplementary Conditions for the identification of:

4.2.1 Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by ENGINEER in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the "technical data" contained in such reports but not upon other data, interpretations, opinions or information contained in such reports or otherwise relating to the subsurface conditions at the site, nor upon the completeness thereof for the purposes of bidding or construction.

4.2.2 Drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site have been utilized by ENGINEER in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the "technical data" contained in such drawings but not upon other data, interpretations, opinions or information shown or indicated in such drawings or otherwise relating to such structures, nor upon the completeness thereof for the purposes of bidding or construction.

4.3 Information and data shown or indicated in the Contract Documents with respect to existing

Underground Facilities at or contiguous to the site is base upon information and data furnished to

OWNER and ENGINEER by OWNERS of such Underground Facilities or others, and OWNER and ENGINEER do not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions.

4.4. Provisions concerning responsibilities for the adequacy of data furnished to prospective

Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Contract Documents due to differing or unanticipated conditions appear in paragraph SC- 4 of the Supplemental Conditions.

4.5. Before submitting a Bid each Bidder will be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise, which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents.

4.6. On request, OWNER will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies.

INST-3

4.7. Reference is made to the Supplementary Conditions for the identification of the general nature of work that is to be performed at the site by OWNER or others (such as Utility and other prime CONTRACTORS) that relates to the work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination access to or copies of Contract Documents

(other than portions thereof related to price) for such work.

4.8. The submission of a Bid will constitute an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article 4, that without exception the Bid is promised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Contract Documents and the written resolutions thereof by ENGINEER is acceptable to Bidder, and that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

5. Availability of Lands for Work, etc.

The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the Work are identified in the

Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the

Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.

6. Interpretations and Addenda.

6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to

ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda and transmitted to all parties recorded by

ENGINEER as having received the Bidding Documents. Questions received less than three (3) days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by

OWNER or ENGINEER.

7. Bid Security.

7.1. Each Bid must be accompanied by Bid security made payable to OWNER in an amount of five (5) percent of Bidder's maximum Bid price and in the form of a certified or bank check or a Bid

Bond (on form attached in Bond Section of this document) issued by a surety.

7.2. The Bid security of Successful Bidder will be retained until such Bidder has executed the

Agreement, furnished the required contract security and met the other conditions of the Notice of

Award, whereupon the Bid security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within fifteen (15) days after the

Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh (7th) day

INST-4

after the Effective Date of the Agreement or the sixtieth (60th) day after the Bid Opening, whereupon bid security furnished by such Bidders will be returned. Bid security with Bids which are not competitive will be returned within seven (7) days after the Bid opening.

8. Contract Times.

The number of days within which, or the dates by which, the Work is to be substantially completed and also completed and ready for final payment are set forth in the Agreement (or incorporated therein by reference to the attached Bid Form.)

9. Liquidated Damages.

Provisions for liquidated damages, if any, are set forth in the Agreement.

10. Delete Section

11. Subcontractors, Suppliers and Others.

11.1 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers and other persons and organizations (including those who are to furnish the principal items of material and equipment) to be submitted to OWNER in advance of a specified date prior to the Effective

Date of the Agreement, apparent Successful Bidder, and any other Bidder so requested, shall within five (5) days after Bid opening submit to OWNER a list of all such Subcontractors, Suppliers and other persons and organizations proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each Subcontractor, Supplier, person or organization if requested by OWNER. An OWNER or ENGINEER who after due investigation has reasonable objection to any proposed Subcontractor, Supplier, other person or organization, may before the Notice of Award is given request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit an acceptable substitute, that Bidder's Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution and OWNER may consider such price adjustment in evaluating

Bids and making the contract award.

If apparent Successful Bidder declines to make any such substitution, OWNER may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers and other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. Any Subcontractor, Supplier, other person or organization listed and to whom OWNER and ENGINEER does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER.

11.2 In contracts where the Contract Price is on the basis of Cost-of-the-Work Plus a fee, apparent Successful Bidder, prior to the Notice of Award, shall identify in writing to OWNER those portion of the Work that such Bidder proposes to subcontract and after the Notice of Award may only subcontract other portions of the Work with OWNER's written consent.

11.3 No CONTRACTOR shall be required to employ any Subcontractor, Supplier, other person or organization against whom CONTRACTOR has reasonable objection.

INST-5

12. Bid Form.

12.1 The Bid Form is included with the Bidding Documents; additional copies may be obtained from the Issuing Office.

12.2 All blanks on the Bid Form must be completed by printing in black ink or by typewriter.

12.3 Bids by a corporation or limited liability company must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.

12.4 Bids by partnerships must be executed in the partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.

12.5 All names must be typed or printed in black ink below the signature.

12.6 The Bid shall contain an acknowledgment of receipt of all Addenda (the numbers of which must be filled in on the Bid Form).

12.7 The address and telephone number for communications regarding the Bid must be shown.

12.8 Evidence of authority to conduct business as an out-of-state corporation in the state where the Work is to be performed shall be provided in accordance with paragraph 3 above. State

CONTRACTOR license number, if any, must also be shown.

13. Submission of Bids.

13.1 Bids shall be submitted at the time and place indicated in the Advertisement of Invitation to

Bid and shall be enclosed in an opaque sealed envelope which shall be clearly labeled "Bid

Documents" to guard against opening prior to the time set therefore. The label shall also include the

Project Title, name and address of Bidder, and be accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it.

13.2 The following documents shall be required for a complete bid:

1. Completed Bid Form;

2. Bid Bond in the amount of 5% of the total bid amount (See Bid Bond Form);

3. Completed “Statement of Bidder’s Qualifications” and other information requested in Item

3 of this Section (The “Statement of Bidder’s Qualifications” form has been included immediately after the Instructions to Bidders.); and

4. And any other information required in the contract documents.

13.3 Oral, telegraphic, fax copies, or electronic copies of the bid form or modifications to bid form shall not be considered.

INST-6

14. Modification and Withdrawal of Bids.

14.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.

14.2 If, within twenty-four (24) hours after Bids are opened, any Bidder provides a duly signed, written notice to the OWNER and promptly thereafter demonstrates to the reasonable satisfaction of

OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may be allowed to withdraw its Bid through action of SPISD and the Bid security will considered to be returned. Thereafter, that Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.

15. Opening of Bids.

Bids will be opened and (unless obviously non-responsive) read aloud publicly at the place where

Bids are to be submitted. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids.

16. Bids to Remain Subject to Acceptance.

All Bids will remain subject to acceptance for sixty (60) days after the day of the Bid Opening, but

OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date.

17. Award of Contract.

17.1. OWNER reserves the right to reject any or all Bids, for any reason, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional

Bids and to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the

Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. OWNER also reserves the right to waive all informalities not involving price, time or changes in the Work and to negotiate contract terms with the Successful

Bidder. Discrepancies between the multiplication of units or Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.

17.2. In evaluating Bids, OWNER will consider the qualifications of Bidders, whether or not the

Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

17.3 OWNER may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of

Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the

Supplementary Conditions. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of

Award.

INST-7

17.4 OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of

Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time.

17.5 If the Contract is to be awarded, it will be awarded to the lowest Bidder, based on the Unit

Price Bids and the consideration of any or all Alternates, whose evaluation by OWNER indicates to

OWNER that the award will be in the best interest of the Project. Contractor shall provide costs for base bid and all additive alternates.

17.6 If the contract is to be awarded, OWNER will give Successful Bidder a Notice of Award within sixty (60) days after the day of the Bid opening.

18. Contract Security.

When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required performance and payment Bonds.

19. Signing of Agreement.

When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by six (6) unsigned counterparts of the Agreement with all other written Contract Documents attached.

Within fifteen (15) days thereafter CONTRACTOR shall sign and deliver six (6) counterparts of the

Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter OWNER shall deliver two (2) fully signed counterparts to CONTRACTOR. The

Contractor shall be supplied with three (3) copies of the Plans and Specifications. Additional copies will be supplied at cost.

20. Pre-bid Conference.

A non-mandatory pre-bid conference will be held at 2:00 p.m. on Wednesday, September

9/17, 2026 at the HFISD Administration Board Room, 12702 2nd Street, Hamshire, Texas

77622. Representatives of OWNER and ENGINEER will be present to discuss the Project.

Bidders are encouraged to attend and participate in the conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

21. Sales and Use Taxes.

The OWNER is a tax exempt agency, and is not subject to the payment of State, County and/or City sales taxes only to the extent allowable by law. CONTRACTOR is advised to contact the State

Comptroller's Office and local governmental entities in order to apprize itself of sales tax payment obligations. Contractor shall include a “Separation of Materials Form” with Monthly payment estimates and final payment request.

Only equipment and materials incorporated into the permanent project are tax exempt. All unit contract prices shall include all applicable sales taxes. The Contractor will not be paid separately for sales tax.

INST-8

The CONTRACTOR performing this contract may obtain allowable tax exemptions by issuing to his supplier a re-sale certificate in lieu of the tax. The OWNER will issue the CONTRACTOR an exemption certificate for his records upon request. CONTRACTOR shall submit breakdown for material to be incorporated within the project and other services and the total of the two items shall equal the contract amount. The statement of materials and services should be submitted prior to any payment being made to the contractor.

22. Retainage.

Provision concerning retainage and CONTRACTORS' rights to deposit securities in lieu of retainage are set forth in the Agreement.

23. Drawings and Specifications

Drawings and Specifications, as prepared by the Engineer, shall be taken as complementary and equipment and/or labor shown and/or required by one shall be furnished and performed as if treated by both. Should the Contractor require additional information, details or other instructions concerning any of the work, he shall request such information from the Engineer prior to Bid date.

22. Historically Under-Utilized Business and Minority-Women Business Enterprise Participation

It is the desire of Hamshire Fannett Independent School District to increase the participation of

Historically Under-utilized Business (HUB) including Minority (MBE) and women owned (WBE) businesses in its contracting and procurement programs. While the District does not have any preference or set aside programs in place, it is committed to a policy of equitable participation for these firms. Below are some available resources to include HUM, MBE and WBE in the bidding process:

https://comptroller.texas.gov/purchasing/vendor/hub/

Lamar University SBDC David Mulcahy, Director 801 Pearl Street Beaumont, TX 77701

Phone: 409-880-2367 Fax: 409-880-2201 Email: David.Mulcahy@lamar.edu

Web Site: http://www.lamarbmt.sbdcnetwork.net

Golden Triangle Minority Business Council, Inc.

P.O. Box 5064

Beaumont, Texas 77726-5064 Phone: 409-962-8530 Fax: 409-722-5402

Email: hatcher.beverly@gtmbc.com Web Site: http://www.gtmbc.comhttps://comptroller.texas.gov/purchasing/vendor/hub/

END OF SECTION

https://comptroller.texas.gov/purchasing/vendor/hub/ mailto:David.Mulcahy@lamar.edu http://www.lamarbmt.sbdcnetwork.net/ mailto:hatcher.beverly@gtmbc.com http://www.gtmbc.com/ http://www.gtmbc.com/

BID FORM AND

STATEMENT OF BIDDER’S QUALIFICATIONS

BF-1

BID FORM

for

HIGH SCHOOL SANITARY SEWER REHABILITATION PHASE 1

HAMSHIRE FANNETT INDEPENDENT SCHOOL DISTRICT

1. The Bidder proposes to furnish all labor, material and equipment and perform all work required for the installation, construction and completion of new improvements, in strict accordance with the Contract

Documents, Plans and Specifications, for the prices stated below. The bidder has examined the plans and specifications with related documents and the site of the proposed work, and is familiar with conditions surrounding the construction of the proposed project including the availability of materials and labor. The bidder hereby agrees to commence work under this contract on or before a date to be specified in the “Notice to Proceed” and to fully complete the PROJECT within 45 consecutive calendar days as specified in the “Notice to Proceed”, including, be not limited to, all Saturdays, Sundays, and Federal, State, and City holidays thereafter.

2. The Unit Price Base Bid generally includes: Installation of inflow protection inserts in all manholes, clean, debris removal and video inspection of existing lift station along Alamo Street, install watertight plug and/or cap to existing cleanouts, cleaning, debris removal and video inspection of existing sewer lines and manholes throughout the Project Site located at 12702 2nd Street, Hamshire, Tx 77622 on the High School Campus property. If the Contract is to be awarded, it will be awarded to the lowest Bidder, based on the Unit Price Bid, whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the Project.

3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:

(a) BIDDER has examined and carefully studied the Bidding Documents and the following

Addenda receipt of all which is hereby acknowledged:

Addendum No. ___________ Dated ___________ Received ________________

(b) BIDDER acknowledges that the following documents required for a complete bid in Item 13 of the Instructions to Bidders have been included in his bid package:

________ Completed Bid Form

________ Required Bid Security in the form of _________________________ and the amount of $____________________________. The Bid Security shall become the property of the owner in the event the contract and bonds are not executed within the time set forth above, as liquidated damages for the delay and additional expense caused to the Owner thereby. Bid Bond Form can be found in this document in the

Bond Section.

________ Completed Statement of Bidder Qualifications included in these contract documents and any other information requested in Item 3 of the Instructions to Bidders. A copy of the Statement of Bidder Qualification form can be found in this document behind the Bid Form.

(c) BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work;

BF-2

(d) BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work.

(e) BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site. BIDDER acknowledges that OWNER and

Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and

Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.

(f) BIDDER is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.

(g) BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the

Contract Documents.

(h) BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

(i) This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

BF-3

UNIT PRICE BID

UNIT PRICE BID - PROJECT WORK TO INCLUDE BUT NOT BE LIMITED TO: Installation of inflow protection inserts in all manholes, clean, debris removal and video inspection of existing lift station along

Alamo Street, install watertight plug and/or cap to existing cleanouts, cleaning, debris removal and video inspection of existing sewer lines and manholes. Work shall be done to the limits and as specified in the plans and specifications.

ITEM

NO.

ITEM WITH BID PRICES

WRITTEN IN WORDS

UNIT ESTIMATED

QUANTITIES

UNIT

PRICE

TOTAL

AMOUNT

BID

1 INSTALL MANHOLE INFLOW

PROTECTION INSERTS (STAINLESS

STEEL – VARIOUS SIZES) – in place at _________________________dollars and _______________________cents per Each.

EA. 16

2 INSTALL WATERTIGHT PLUG

AND/OR CAP TO EXIST SANITARY

SEWER CLEANOUTS – in place at _________________________dollars and _______________________cents

EA. 11

3 CLEAN, REMOVE DEBRIS AND

INSPECT EXIST LIFT STATION – in place at _________________________dollars and _______________________cents per Each.

EA. 1

4 CLEAN, REMOVE DEBRIS AND CCTV

EXIST SANITARY SEWER (UP TO 12-

INCH DIAMETER) – in place at _________________________dollars and _______________________cents per Linear Foot.

LF. 3,200

5 CLEAN AND VIDEO INSPECT EXIST

MANHOLE – in place at _________________________dollars and _______________________cents

EA. 16

BF-4

ITEM

NO.

ITEM WITH BID PRICES

WRITTEN IN WORDS

UNIT ESTIMATED

QUANTITIES

UNIT

PRICE

TOTAL

AMOUNT

BID

6 MOBILIZATION

(NOT TO EXCEED 7% OF TOTAL

BASE BID)

at _________________________dollars and _______________________cents per Lump Sum.

LS. 1

7 TRAFFIC CONTROL AND

BARRICADES- complete in place at _________________________dollars and _______________________cents per Lump Sum.

LS. 1

UNIT PRICE BID - (ITEMS 1 THROUGH 7) AS DOLLAR FIGURE:

UNIT PRICE BID - (ITEMS 1 THROUGH 7) AMOUNT IN WORDS:

__________________________________________________________________________ DOLLARS

__________________________________________________________________________ CENTS

ADD ALTERNATE BID ITEMS – These alternate bid items shall be provided for a complete bid. The bid items cost shall include the adjustment of select manholes’ ring and cover above grade, the restoration of disturbed lawn areas via sodding and existing line repair up to 12-inch, and waterproofing joints and connections to existing lift station along Alamo St. Work shall be done to the limits and as specified in the plans and specifications. This bid item to include the removal of temporary parking and restore site to original condition and surface.

ALT.

ITEM

NO.

ALTERNATE #1

ITEM WITH BID PRICES

WRITTEN IN WORDS

UNIT ESTIMATED

QUANTITIES

UNIT

PRICE

TOTAL

AMOUNT

BID

A.1 6” ADJUSTMENT OF EXIST

MANHOLE FRAME AND COVER

ABOVE NATURAL GROUND – in place at _________________________dollars and _________________________cents

EA. 8

BF-5

ALT.

ITEM

NO.

ALTERNATE #1

ITEM WITH BID PRICES

WRITTEN IN WORDS

UNIT ESTIMATED

QUANTITIES

UNIT

PRICE

TOTAL

AMOUNT

BID

A.2 ST. AUGUSTINE SODDING , in place at _________________________dollars and _______________________cents per Square Feet.

S.F. 1,300

A.3 EXISTING LINE REPAIR (VARIOUS

DIAMETERS UP TO 12-INCH) - in place at _________________________dollars per Linear Foot

L.F. 100

A.4 WATERPROOF JOINTS &

CONNECTIONS AT EXIST LIFT

STATION - in place at _________________________dollars

EA. 1

ADD ALTERNATE UNIT PRICE BID - (ITEMS 1 THROUGH 4) AS DOLLAR FIGURE:

ALTERNATE UNIT PRICE BID - (ITEMS 1 THROUGH 4) AMOUNT IN WORDS:

__________________________________________________________________________ DOLLARS

__________________________________________________________________________ CENTS

Amounts are to be shown in both words and figures. In case of discrepancy the amounts shown in words will govern. All unit prices provided on this bid form shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for. Bidder understands that the Owner reserves the rights to reject any and all bids and to waive any informalities in the bidding. Bidder acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents and Specifications.

Bidder agrees that the work will be substantially completed and ready for final payment in accordance with the General Conditions and within the time limits set forth in the Agreement. Bidder accepts the provision of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.

BF-6

If the owner elects to accept and include an additive bid item (if any) in the contract, the additive bid item prices will be added to the prices for the appropriate bid items. Additive bid item prices (if included in the

Bid Form) are not meant to be stand alone prices but will be in addition to the bid items referenced.

Also as a part of this bid, bidders are required to list below subcontractors who will be providing 10% or more of the total dollar amount of the work described herein. Subcontractors providing 10% or more of the total dollar amount of the work described herein are also required to submit a Statement of Qualifications found in the instructions to bidders. Upon award, subcontractors will also be required to have insurance equal to that required of the contractor.

Subcontractor Name

General work to be performed by Subcontractor

CONTRACTOR _________________________

BY_____________________________________

TITLE_________________________________

MAILING ADDRESS_____________________

STREET ADDRESS______________________

COUNTY_______________________________

PHONE_________________________________

SOQ-1

STATEMENT OF BIDDER’S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires.

Name of Bidder:____________________________________ Date Organized:________________

Address:__________________________________________ Date Incorporated:______________

Number of years in contracting business under present name _____________________________

CONTRACTS ON HAND:

Contract Amount $ Completion Date

Type of work performed by your company:____________________________________________

Number of years experience in this type of construction:_________________________________

Have you ever failed to complete any work awarded to you?______________________________

Have you ever defaulted on a contract?_____________

List at least five (5) projects of a similar nature completed by your firm in the past five (5) years (attach additional pages if necessary):

Contract Amount $ Mo/Yr Completed

Major equipment available for this contract:___________________________________________

Attach resume(s) for the principal member(s) of your organization, including the officers as well as the proposed superintendent for the project.

Credit available: $_____________ Bank reference:______________________________________

SOQ-2

The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the _______________________________________________ in verification of the recitals comprising this Statement of Bidder’s Qualifications.

Executed this _____ day of ___________________, 20______ .

By:(signature) _________________________________________ Title:_____________________

(Print name)_______________________________________

BONDS

BB-1

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, _____________

__________________________________________________________________, as Principal, and

________________________________________________________ _____________________, as

Surety, are hereby held and firmly bound unto

_________________________________________________ as Owner in the penal sum of

_______________________________ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.

Signed, this _______________ day of ____________________, 20____.

The Condition of the above obligation is such that whereas the Principal has submitted to

_______________________________________________________________ a certain BID, attached hereto and hereby made a part hereof to enter into a contract in writing, for

NOW, THEREFORE,

(A) If said BID shall be rejected, or

(B) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BID) and shall furnish a Bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated.

BB-2

The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its Bond shall be in no way impaired or affected by any extension of the time within which the

Owner may accept such Bid; and said Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, the Principal and the Surety have unto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above.

______________________________ (L.S.)

Principal

Surety

By: __________________________

IMPORTANT: Surety companies executing Bonds must appear on the Treasury

Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.

PERF-1

CONSTRUCTION PERFORMANCE BOND

1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference.

2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1.

3. If there is no Owner Default, the surety's obligation under this Bond shall arise after:

3.1. The Owner has notified the Contractor and the Surety at its address described Paragraph 10 below, that the Owner is considering declaring Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; and

3.2. The Owner has declared a Contractor Default and formally terminated the Contractor's right to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as provided in Subparagraph 3.1; and

3.3. The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the contract with the Owner.

4. When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions:

4.1. Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction

Contract; or

4.2. Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or

4.3. Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in paragraph 6 in excess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default; or

4.4. Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances:

1. After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, tender payment therefore to the Owner; or

2. Deny liability in whole or in part and notify the Owner citing reasons therefore.

5. If the Surety does not proceed as provided in Paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the

Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner.

PERF-2

6. After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the

Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the

Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. To the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract, the Surety is obligated without duplication for:

6.1. The responsibilities of the Contractor for correction of defective work and completion of the

Construction Contract;

6.2. Additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 4; and

6.3. Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor.

7. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the

Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the

Owner or its heirs, executors, administrators, or successors.

8. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations.

9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after

Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.

10. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page.

11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond.

12. Definitions.

12.1. Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the

Construction Contract after all proper adjustments have been made, including allowance to the

Contractor…