Bid Contract_WSDP Magnolia Woods Sec 2.pdf
PDF 10 MB Posted
- Solicitation number
- 41006-22
- Issued by
- Montgomery County, Texas
About this file
Contract Summary
This is a bid contract document for water, sanitary sewer, drainage, and paving facilities construction issued by LGI Homes - Texas, LLC on behalf of Montgomery County Municipal Utility District No. 125 in Montgomery County, Texas. The project encompasses construction of water distribution lines (4-inch through 12-inch), sanitary sewer facilities including pipes ranging from 6-inch to 18-inch diameter with associated cleanouts and manholes, storm drainage systems with polypropylene and reinforced concrete pipes in sizes from 24-inch to 60-inch, and paving infrastructure including concrete pavement, curbing, sidewalks, and site grading. The work includes 81 base bid items organized into water line, sanitary sewer, drainage, storm water pollution prevention, and miscellaneous categories, with additional alternate items for paving and seeding. Bid submission is via electronic format through the CivCastUSA website, with bids due by 10:00 a.m. on Tuesday, July 21, 2026. Contractor mobilization must occur within 10 calendar days of the Notice to Proceed, with stage-specific completion timeframes of 52 days maximum for Stage I items, 15 days maximum for Stage II items, and 60 days maximum for alternate paving items. No pre-bid conference is scheduled. Contract award will be made to the bidder whose bid is in the best interests of the project, with consideration given to bidder qualifications and proposed subcontractor experience.
Bid security is required at 10 percent for bids under $250,000 or 5 percent for bids of $250,000 or more, submitted as a bid bond from an approved surety. Progress payments will be made monthly with 10 percent retainage on completed work until 50 percent completion is achieved, after which remaining payments may be made in full; retainage held beyond 50 percent completion accrues interest at the Owner's depository bank rate. The contract includes economic disincentive provisions of $1,500 per calendar day for failure to meet completion deadlines or for delayed mobilization, and prevailing wage rate requirements apply under Texas Government Code Chapter 2258. Performance and payment bonds equal to 100 percent of the contract amount are required within 5 days of award. The successful bidder must execute the agreement within 9 days of the Notice of Award and provide required insurance certificates and bonds. Contract documents reference the 2018 EJCDC Standard General Conditions and include supplementary conditions addressing insurance, prevailing wages, and state-specific certifications including anti-boycott of Israel, anti-terrorism, anti-boycott of energy companies, and non-discrimination of firearm entities verifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS &
SPECIFICATIONS
FOR
WATER, SANITARY SEWER,
DRAINAGE, AND PAVING
FACILITIES FOR MAGNOLIA
WOODS SEC 2A
Project No. 41006-21 Contract No. 001
JULY 2026
41006-21 00001- 1
CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
FOR THE CONSTRUCTION OF
WATER, SANITARY SEWER, DRAINAGE, AND PAVING FACILITIES FOR MAGNOLIA
WOODS SEC 2A
LOCATED IN
MONTGOMERY COUNTY, TEXAS
PAPE DAWSON PROJECT NO. 41006-21
Seals & Certifications
Pape-Dawson
Texas P.E. Board Firm Registration No. 470
JORDAN C. KONESHECK, P.E.
The Professional Engineer whose signed and dated seal appears above was in responsible charge of preparing the following sections of the Contract Documents, which are fully identified by Section Number and Title in the TABLE OF CONTENTS:
00410, 01005, 01045, 01292, 01330, 01340, 01350, 01410, 01415, 01500, 01550, 01560, 01600, 01640, 01660, 01710, 01780, 01782, 01810, Technical Specifications as listed in the Table of Contents
7/14/26
MAGNOLIA WOODS SEC 2A WSD & PAV
TABLE OF CONTENTS
41006-21 00110 - 1
DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS
00115 LIST OF DRAWING SHEETS
00200 INSTRUCTIONS TO BIDDERS
00410 BID FORM
04336 PROPOSED SUBCONTRACTORS FORM
00520 AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT
00610 PERFORMANCE BOND
00615 PAYMENT BOND
00620 MAINTENANCE BOND
00700 GENERAL CONDITIONS
00750 SUPPLEMENTARY CONDITIONS – INSURANCE
00800 SUPPLEMENTARY CONDITIONS – GENERAL
00810 ADDITIONAL CONDITIONS
00820 WALLER COUNTY ROADWAY PREVAILING WAGE RATES
DIVISION 01 – GENERAL REQUIREMENTS
01005 SUMMARY OF WORK
01045 COORDINATION WITH OWNER’S OPERATIONS
01292 SCHEDULE OF VALUES
01330 SUBMITTALS
01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
01350 CONSTRUCTION SCHEDULE
01410 TESTING LABORATORY SERVICES
01415 OBSERVATION OF CONSTRUCTION
01500 TEMPORARY FACILITIES AND CONTROLS
01550 BARRICADES AND WARNING DEVICES
01560 TRAFFIC SIGNS
01600 MATERIALS AND EQUIPMENT
01640 MANUFACTURERS’ SERVICES
01660 CLEANING AND ADJUSTING
01710 PROJECT RECORD DOCUMENTS
01780 CONTRACT CLOSEOUT
01782 OPERATIONS AND MAINTENANCE DATA
01810 EQUIPMENT TESTING AND FACILITY STARTUP
TECHNICAL SPECIFICATIONS
DIVISION 02 – SITE WORK
02105 VEGETATION STRIPPING
02110 CLEARING AND GRUBBING
02112 REMOVAL OF TREES AND STUMPS
02115 SITE PREPARATION
02120 STRIPPING, STOCKPILING, AND PLACING TOPSOIL
02130 CONSTRUCTION AND MAINTENANCE OF SILT FENCE BARRIERS
41006-21 00110 - 2
02140 CONTROL OF GROUND WATER AND SURFACE WATER
02150 STABILIZED CONSTRUCTION EXIT
02160 TRENCH SAFETY SYSTEM
02200 EXCAVATION
02215 EXCAVATING, TRENCHING AND BACKFILLING FOR UTILITIES
02219 JACKING, BORING OR TUNNELING PIPE
02314 EARTHWORK FOR UTILITIES
02315 EARTHWORK FOR PAVING
02316 EXCAVATION AND BACKFILL FOR STRUCTURES
02318 SCARIFY, PLOW, HARROW, SPRINKLE AND COMPACT EXISTING SUBGRADE OR FILL MATERIALS
02320 BACKFILL MATERIALS
02321 CEMENT STABILIZED SAND
02332 CRUSHED LIMESTONE BASE COURSE
02340 COMPACTED FILL
02401 CRUSHED LIMESTONE BASE COURSE
02402 CEMENT STABILIZED CRUSHED STONE BASE COURSE
02403 PORTLAND CEMENT STABILIZED SUBGRADE
02404 LIME STABILIZED SUBGRADE
02405 LIME FLYASH OR FLYASH STABILIZED SUBGRADE
02406 SUBGRADE STABILZATION
02410 PORTLAND CEMENT CONCRETE PAVING
02411 CONCRETE CURB OR CONCRETE CURB AND GUTTER
02501 DUCTILE IRON PIPE AND FITTINGS
02502 STEEL PIPE AND FITTINGS
02506 POLYVINYL CHLORIDE PIPE
02528 POLYETHYLENE WRAP
02533 CEMENT STABILIZED CRUSHED STONE BASE COURSE
02600 WATER DISTRIBUTION FACILITIES
02601 HYDROSTATIC TESTING OF WATER MAINS
02605 DISINFECTION OF WATER LINES AND WATER PLANTS
02720 STORM SEWER FACILITIES
02735 BYPASS PUMPING
02740 SANITARY SEWER FACILITIES
02751 SANITARY SEWER LINE CLEANING
02763 ADJUSTING MANHOLES AND INLETS
02910 TREE PROTECTION, MAINTENANCE AND EVALUATION
02915 TURF ESTABLISHMENT
02916 BROADCAST SEEDING
02920 HYDROMULCH SEEDING
DIVISION 03 – CONCRETE
03133 CONCRETE FORMWORK
03200 CONCRETE REINFORCEMENT
03303 HOT MIX ASPHALTIC CONCRETE SURFACING
03320 HOT MIX LAID ASPHALTIC CONCRETE
03341 CONCRETE MISCELLANEOUS MATERIALS
03390 CONCRETE CURING
41006-21 00110 - 3
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 – METALS (NOT USED)
DIVISION 06 – WOODS AND PLASTICS (NOT USED)
DIVISION 07 – THERMAL AND MOISTURE PROTECTION (NOT USED)
DIVISION 08 – DOORS AND WINDOWS (NOT USED)
DIVISION 09 – FINISHES (NOT USED)
DIVISION 10 – SPECIALTIES (NOT USED)
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS (NOT USED)
DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 – CONVEYING SYSTEMS (NOT USED)
DIVISION 15 – MECHANICAL (NOT USED)
APPENDIX – FORMS SPECIFIED IN THE CONTRACT
CONTRACTOR’S STATEMENT OF QUALIFICATIONS
AFFIDAVIT OF BILLS PAID
TEXAS CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
TEXAS CONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT
TEXAS UNCONDITONAL WAIVER AND RELEASE ON PROGRESS PAYMENT
TEXAS UNCONDITONAL WAIVER AND RELEASE ON FINAL PAYMENT
Notes:
A. The General Conditions of this Contract is the Engineers Joint Contract Documents Committee (EJCDC) Document C-700 "Standard General Conditions of the Construction Contract", 2018 Edition, hereinafter referred to as the "General Conditions".
B. If a discrepancy occurs between the Technical Specifications in these Contract Documents and the technical specifications of the jurisdiction where the Work is being performed, the more stringent shall take precedence.
* END *
41006-21 00110 - 4
\\pape-dawson\PD-Legacy\K-Drive\Projects\410\06\21\5-0 Construction Project 2\5-1 Bid Phase\4-1-4 Contract Documents\002 TOC.doc
41006-22 00100 - 1
SECTION 00100
INVITATION TO BIDDERS
OWNER LGI HOMES – TEXAS, LLC FOR MONTGOMERY COUNTY MUD NO. 125
1450 Lake Robbins Drive, Suite 430 The Woodlands, Texas 77380
ENGINEER Pape-Dawson 2107 CityWest Blvd., 3rd Floor Houston, Texas 77042 Attn: Jacob Miller, P.E.
Telephone: 713-428-2400
PROJECT/WORK CONSTRUCTION OF WATER, SANITARY SEWER, DRAINAGE, AND PAVING
FACILITIES FOR MAGNOLIA WOODS SEC 2A
BID OPENING TIME Tuesday, July 21, 2026 @ 10:00 a.m.
Solicited bids, addressed to LGI HOMES – TEXAS, LLC FOR MONTGOMERY COUNTY MUNICIPAL UTILITY DISTRICT NO. 125 will be electronically received via Email to Jmiller@pape-dawson.com until 10:00 a.m.
local time, Tuesday, July 21, 2026. Bidders may view the public opening of sealed Bids via CivCastUSA Website (www.CivCastUSA.com). The Apparent Low Bidders will be automatically generated and posted for furnishing all plan, labor, material and equipment and performing all work required for the construction of WATER, SANITARY SEWER, DRAINAGE, AND PAVING FACILITIES FOR MAGNOLIA WOODS SEC 2A. Plans, specifications and bid documents may be viewed and downloaded free of charge (with the option to purchase hard copies) at the CivCastUSA Website. Reproduction charges will apply according to CivCastUSA rates.
The Owner reserves the right to reject any or all PROPOSALS and to waive irregularities in the bidding. In case of ambiguity or lack of clearness in stating the prices in the PROPOSAL, the Owner reserves the right to consider the most advantageous construction thereof or to reject the PROPOSAL.
– END OF SECTION –
mailto:Jmiller@pape-dawson.com http://www.civcastusa.com/
41006-22 00115 - 1
SECTION 00115
LIST OF DRAWING SHEETS
MAGNOLIA WOODS SEC 2A WATER, SANITARY SEWER, DRAINAGE, AND
PAVING FACILITIES FOR MAGNOLIA WOODS
41006-22 00200 - 1
SECTION 00200
INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the Standard General
Conditions of the Construction Contract (General Conditions) and the Supplementary Conditions.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Bidding Documents may be viewed and downloaded free of charge (with the option to purchase hard copies) at the CivCastUSA Website (www.CivCastUSA.com). Reproduction charges may apply according to CivCastUSA rates.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 When requested by either the Owner or Engineer, the apparent most qualified, responsible bidder must submit to Owner, within 5 days of notification of award of the Contract, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualifications or to timely submit the statement of qualifications will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualifications is available from the Engineer upon request.
Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualifications if the bidder’s statement of qualifications is not on the form provided. Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, as applicable, must also be provided and is a consideration in the award of the Contract.
ARTICLE 4 – EXAMINATION OF BIDDING DOCUMENTS AND SITE
4.01 Provisions concerning subsurface conditions and other physical conditions, Underground
Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Articles 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning any potentially Hazardous Environmental Conditions at the Site and possible
41006-22 00200 - 2 changes in the Contract Documents due to any such conditions uncovered or revealed at the Site appear in Article 5.06 of the General Conditions.
4.02 Upon request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid.
Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.03 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all (if available): (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities), and (2) reports and drawings of Hazardous Environmental Conditions at the Site;
E. consider the information known to Bidder; information commonly known to
Contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relate to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
41006-22 00200 - 3
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.04 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – PRE-BID CONFERENCE
5.01 There will be no pre-bid conference for this project.
ARTICLE 6 – SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes to existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing online to the www.CivCastUSA.com system or website. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda, through the www.CivCastUSA.com website. Questions will be received up to 72 hours prior to the time and date for opening of Bids. Addenda, if issued, will be provided 48 hours prior to the time and date for opening bids. No explanation or interpretation of the Contract Documents, other than written addenda, is binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by a Bid security made payable to Owner. The Bid security required is an amount of 10% if the Bidder’s maximum Bid price is less than $250,000. The Bid security required is an amount of 5% if the Bidder’s maximum Bid price is $250,000 or more. The Bid security shall be in the form of a Bid bond issued by a surety meeting the requirements of Articles
6.01 and 6.02 of the General Conditions. CASHIER CHECKS WILL NOT BE ACCEPTED.
41006-22 00200 - 4
8.02 The Bid security is a guarantee that the successful bidder will enter into the Contract within 9 days and execute the required Bonds on the forms provided and provide the required insurance certificates and Bonds within 5 days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the 3 most qualified, responsible bidders within 3 days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents. If the successful bidder does not enter the Contract after notice of award, then the bidder’s Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next lowest qualified bidder.
8.03 The Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within 7 days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which (Milestones are to be achieved and) the Work is to be completed and ready for final payment are set forth in the Agreement (Section 00520). All bidders submitting a Bid must accept the Contract Times as a requirement to the Contract Documents.
ARTICLE 10 – ECONOMIC DISINCENTIVES
10.01 Provisions for economic disincentives, if any, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract, if awarded, will be based on materials and equipment specified or described in the
Bidding Documents. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product or another manufacturer, but to set a definite standard of quality or performance, and to establish an equal basis for the evaluation of the completed Bid Form. In preparing his Bid, the Bidder is expected to include the cost of the item so specified. A Bidder wishing to offer substitute items of equipment or materials for those specified is invited to do so by written request to Engineer explaining the substitutions and any cost savings that would result if the substitute item were accepted by the Owner. Each such request shall conform to the requirements of Article 7.05 and
7.06 of the General Conditions. No item of material or equipment will be considered by Engineer as a substitute or “or-equal” unless written request for approval has been submitted by Bidder.
The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. In some cases, approval of substitute or “or equal” items will be set forth in an Addendum issued to all prospective Bidders.
ARTICLE 12 – PREVAILING WAGE RATE SCALE
12.01 Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall ascertain the general prevailing wage rate received by the classes of Workers employed on Projects like this Project and shall specify in the call for bids and in the Contract the minimum wage rates which shall be paid for each type of Worker. This statute further provides
41006-22 00200 - 5 that the CONTRACTOR or subcontractors shall pay a penalty to the OWNER sixty dollars for each Worker employed for each calendar day or part of the day that the Worker is paid less than the wage rates stipulated in the Contract.
12.02 The OWNER is authorized to withhold from the CONTRACTOR the amount of this penalty from any payment due under the Contract.
12.03 The statute also requires that the CONTRACTOR and subcontractors keep an accurate record of the names and occupations of all persons employed by them in the construction of the Project and to show the actual per diem wages paid to each Worker. These records shall be open to the inspection of the OWNER.
12.04 The minimum wage rates that apply to this Contract are specified in the attachment hereto.
CONTRACTOR and subcontractors shall review and ascertain such wage rates and pay at least such minimum rates.
ARTICLE 13 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
13.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within 5 days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, in which case apparent Successful Bidder shall submit an acceptable substitute, Bidder’s price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
13.02 If the apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make the requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Article 7.07 of the General Conditions.
ARTICLE 14 – PREPARATION OF BID
14.01 The Bid Form is included with the Bidding Documents.
14.02 All blanks on the electronic Bid Form shall be completed. Section 004100 shall also be completed and uploaded to the www.CivCastUSA.com website. Discrepancies between the unit
41006-22 00200 - 6 prices in the electronic Bid Form and the unit prices in Section 00410 will be resolved in favor of the unit prices in the electronic Bid Form. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit price item, and unit price item listed therein. If no amount is to be included, zeroes or the words “No Bid,” “No Change,” or “Not Applicable” shall be entered in the spaces. No segregated bids or assignments will be considered. Unbalanced bids may be rejected. An “unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the same Project.
14.03 A Bid by a CORPORATION shall be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign). The corporate seal shall be affixed in the space provided and attested by the secretary or assistant secretary of the corporation. The official address of the corporation shall be shown.
14.04 A Bid by a PARTNERSHIP shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature). The official address of the partnership shall be shown.
14.05 A Bid by a LIMITED LIABILITY COMPANY shall be executed in the name of the firm by a member authorized to sign. The official address of the firm shall be shown.
14.06 A Bid by an INDIVIDUAL shall be executed by the individual with the individual’s name and official address.
14.07 A Bid by a JOINT VENTURE shall be executed by each joint venturer. The official address of the joint venture shall be shown.
14.08 All names shall be typed or printed in ink below the signatures.
14.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. Any bids not showing all Addenda may be rejected.
14.10 Postal and email addresses and telephone number for communications regarding the Bid shall be shown.
14.11 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state Contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 15 – BASIS OF BID
15.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid Form.
41006-22 00200 - 7
B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with Article 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
15.02 The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Article 13.02 of the General Conditions.
15.03 The Bid Form may include Supplemental Items that may be required to complete the Work. If minimum unit prices have been established for Supplemental Items shown on the Bid Form, the bidder may not bid a unit price less than the minimum; however, he may increase the unit price.
If maximum unit prices have been established for Supplemental Items shown on the Bid Form, the bidder may not bid a unit price more than the maximum; however, he may decrease the unit price. When Work covered by Supplemental Items is requested by the Owner or Contractor and approved by the Engineer, payment will be based on the quantity actually constructed and the unit prices in the Bid Form. Award of the Contract will be based on the total amount bid, which may include selected Supplemental and Alternate Bid Items (See Article 22.02 below).
ARTICLE 16 – SUBMITTAL OF BID
16.01 Bids shall be submitted via Civcast.com
ARTICLE 17 – MODIFICATION AND WITHDRAWAL OF BID
17.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
17.02 If within 24 hours after Bids are received, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned.
ARTICLE 18 – OPENING OF BIDS - “ INTENTIONALLY DELETED”
ARTICLE 19 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
19.01 All Bids will remain subject to acceptance for the period stated in Section 00410 Bid Form, but
Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
41006-22 00200 - 8
ARTICLE 20 – AWARD OF CONTRACT
20.01 Owner reserves the right to reject any or all Bids, including without limitation, non-conforming, non-responsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible.
Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
20.02 The Owner reserves the right to award the project based on any combination of items in the Bid
20.03 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
20.04 In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
20.05 In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
20.06 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
20.07 If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
ARTICLE 21 – CONTRACT SECURITY AND INSURANCE
21.01 Article 6 of the General Conditions, and as modified by Section 00750 Supplementary Conditions
- Insurance, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds and a Certificate of Insurance.
ARTICLE 22 – SIGNING OF AGREEMENT
22.01 When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 10 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached
41006-22 00200 - 9 documents to Owner. Within 10 days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Construction Plans.
ARTICLE 23 – SALES AND USE TAXES
23.01 Provisions concerning state sales and use taxes are set forth in the Supplementary Conditions.
ARTICLE 24 – RETAINAGE
24.01 Provisions concerning retainage are set forth in the Agreement.
ARTICLE 25 – WORKERS’ COMPENSATION INSURANCE COVERAGE
25.01 Provisions concerning workers’ compensation insurance coverage are set forth in Section 00750
Supplementary Conditions - Insurance.
- END OF SECTION –
Magnolia Woods Sec 2A WSD , ALT PAV
FOR:
DATE:
SUBMITTED BY:
Bidding Firm's Full Name
Address
City, State Zip
Phone Number
Addendum No. ______ Dated _____________ Addendum No. ______ Dated _____________
Addendum No. ______ Dated _____________ Addendum No. ______ Dated _____________
Addendum No. ______ Dated _____________ Addendum No. ______ Dated _____________
Addendum No. ______ Dated _____________ Addendum No. ______ Dated _____________
SECTION 00 4100
BID FORM
LGI Homes - Texas, LLC c/o Pape-Dawson Consulting Engineers, LLC
ATTN: Jacob Miller, P.E.
2107 CityWest Blvd, 3rd Flr
Houston, Texas 77042
Magnolia Woods Sec 2A WSD & PAV, Montgomery County, Texas
Having received and carefully examined the Bidding Documents, the other related data identified in the Bidding
Documents, the Project Site, and the Addenda listed in the following table, I, the Undersigned submits this Bid
41006-21 00 4100 - 1
(1)
(2)
(3)
(4)
(5)
(6)
I acknowledge that:
(1)
(2)
(3)
(4)
(5)
(6)
(1)
(2)
(3)
(4)
(5) the amounts given in this Bid have been carefully checked and are submitted as correct and final; and this Bid is made without collusion involving any other person, group, partnership, or corporation;
no other individuals or entities have been solicited or induced to refrain from bidding or to submit a false
Bid;
to the Contract Times as specified in the Agreement.
to accomplish the Work in accordance with the Contract Documents by furnishing all materials, equipment, and labor for proper construction and completion of the Work; and to enter into and execute the Agreement within 9 calendar days of receipt of Notice of Award or acceptance of this Bid and to furnish the required bonds and a certificate of insurance within 5 calendar days of receipt of Notice of Award or acceptance of this Bid;
that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted;
the total Contract Price may be increased or decreased or the total Contract Time reduced or extended to compensate for changes in the Work as ordered by the Owner; and the Owner reserves the right to reject any or all proposals and to waive irregularities in the bidding. In case of ambiguity or lack of clearness in stating the prices in the proposal, the Owner reserves the right to consider the most adavantageous construction thereof or to reject the proposal;
the Owner reserves the right to reject any and all Bids;
that the Owner reserves the right to award any combination of the items in the Bid Form;
the estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price bid items will be based on actual quantities, determined as provided in the
Contract Documents;
the Contractor's Statement of Qualifications has been completed true and accurate and is included with this Bid.
this Bid is genuine, and the only person or parties associated with or having an interest in this Bid as principals are those named herein;
Furthermore, I certify that:
the Undersigned hereby declares that he has visited the site and carefully examined the Site Conditions, Drawings, Specifications, Contract Documents, and Bidding Documents related to the work covered by his
Bid.
that this Bid will be open to acceptance and is irrevocable for 60 calendar days from the Bid closing date.
to accept all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security;
For the performance of the Work, the enclosed amounts are bid. The unit prices and extended totals on the following pages are written in figures with the unit prices prevailing in the event of any discrepancies. In submitting this Bid Form, I agree:
41006-21 00 4100 - 2
Witness:
Address:
Phone:
E-Mail:
Performance, Payment and Maintenance Bonds
Bonds on Behalf of Corporate Surety:
will be issued by (Name of Corporate Surety):
Name and Address of Local Agency for Corporate Surety:
Phone Number:
Name of Person(s) Executing
E-Mail:
Name of Insurance Agency:
Phone Number:
Bidder:
By:
Title:
[Corporate Seal]
41006-21 00 4100 - 3
BASE BID ITEMS:
Water Line Items Subtotal -$
Sanitary Sewer Items Subtotal -$
Drainage Items Subtotal -$
Storm Water Pollution Prevention Plan Items Subtotal -$
Miscellaneous Items Subtotal -$
CONTRACT TIME:
We will complete the Alternate Paving Items in _______ calendar days (60 days maximum) from the Notice to
Proceed.
If this Bid is accepted, we will complete the Stage I Items in _______ calendar days (52 days maximum) from the
Stage I Notice to Proceed. We will complete the Stage II Items in _______ calendar days (15 days maximum) from the Stage II Notice to Proceed.
WSD Completion time includes ________ calendar days (12 days minimum) for adverse weather conditions, and we acknowledge that time is of the essence to Owner and additional adverse weather days will not be granted.
CONSTRUCTION OF WATER, SANITARY SEWER, DRAINAGE, AND PAVING FACILITIES FOR MAGNOLIA WOODS
SEC 2A
PAV Alternate Items
Storm Water Pollution Prevention Plan Alternate Items
Miscellaneous Alternate Items Total
Construction Of Water, Sanitary Sewer, Drainage, And Paving
Facilities For Magnolia Woods Sec 2A Including Alternates WSD A1
& PAV A2 Grand Total
PD PROJECT NO.41006-21
BID SUMMARY
Construction Of Water, Sanitary Sewer, Drainage, And
_____ Paving Facilities For Magnolia Woods Sec 2A Grand Total
WSD Alternate Items Total
Alt PAV Completion time includes ________ calendar days (14 days minimum) for adverse weather conditions, and we acknowledge that time is of the essence to Owner and additional adverse weather days will not be granted.
41006-21 00 4100 - 4
Cost
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
11300 1 4-Inch Water Line, All Depths, Complete in
Place
Linear
Foot
11300 2 6-Inch Water Line, All Depths, Complete in
Place
Linear
Foot
11300 3 8-Inch Water Line, All Depths, Complete in
Place
Linear
Foot
11300 4
8-Inch Class 235, C900 Polyvinyl Chloride
(PVC) Water Line, With Restraint Devices for Pipe Joints and Fittings, All Depths, Complete in Place
Linear
Foot
11300 5 12-Inch Water Line, All Depths, Complete in Place
Linear
Foot
11300 6
12-Inch Class 235, C900 Polyvinyl Chloride
(PVC) Water Line, With Restraint Devices for Pipe Joints and Fittings, All Depths, Complete in Place
Linear
Foot
11300 7 4-Inch AWWA Gate Valve and Box, Complete in Place Each 11
11300 8 6-Inch AWWA Gate Valve and Box, Complete in Place Each 11
11300 9 8-Inch AWWA Gate Valve and Box, Complete in Place Each 22
11300 10 12-Inch AWWA Gate Valve and Box, Complete in Place Each 1
11300 11 2-Inch Blow-Off Valve & Box (Permanent), Complete in Place Each 11
11300 12 2-Inch Blow-Off Valve & Box (Temporary), Complete in Place Each 2
11300 13
12-Inch Wet Connection, Including
Removal and Disposal Offsite of Existing 2-
Inch Blow-Off Valve & Box and 12-Inch Plug and Clamp, All Depths, Complete in Place
Each 1
11300 14
12-Inch by 6-Inch AWWA Tapping Sleeve &
Valve with Box, All Depths, Complete in
Place
Each 2
11300 15
12-Inch by 8-Inch AWWA Tapping Sleeve &
Valve with Box, All Depths, Complete in
Place
Each 1
11300 16 Flushing Valve, All Depths, Complete in
Place Each 10
11300 17 Trench Safety System Greater Than 5-Feet, Complete in Place
Linear
Foot
11300 18 Design of Trench Excavation and Shoring
Safety Plan, Complete
Lump
Sum
11700 19
6-Inch Sanitary Sewer Pipe for Service
Laterals, All Depths, Including All Wyes, Tees, Bends, and Marker Pipe, Complete in
Place
Linear
Foot
Water Line Items
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
Water Line Items Subtotal
Sanitary Sewer Items
41006-21 00 4100 - 5
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
11700 20
8-Inch Sanitary Sewer Pipe for Service
Laterals, All Depths, Including All Wyes, Tees, Bends, and Marker Pipe, Complete in
Place
Linear
Foot
11700 21
8-Inch Sanitary Sewer Pipe, Depth of 0 Feet to 8 Feet from Proposed Top of Curb, Complete in Place
Linear
Foot
11700 22
8-Inch Sanitary Sewer Pipe, Depth of 8 Feet to 16 Feet from Proposed Top of Curb, Complete in Place
Linear
Foot
11700 23
18-Inch Sanitary Sewer Pipe, Depth of 8
Feet to 16 Feet from Proposed Top of Curb, Complete in Place
Linear
Foot
11700 24
18-Inch Sanitary Sewer Pipe, Depth of 16
Feet and Greater from Proposed Top of
Curb, Complete in Place
Linear
Foot
11700 25 8-Inch Sanitary Sewer Cleanout, All Depths, Complete in Place Each 9
11700 26
City of Houston Sanitary Sewer Precast
Concrete Manhole (4-Foot Diameter), With
Inflow Preventor, Depth of 0 Feet to 8 Feet, Complete in Place
Each 17
11700 27
City of Houston Sanitary Sewer Precast
Concrete Manhole (4-Foot Diameter), With
Inflow Preventor, Depth of 8 Feet to 16
Feet, Complete in Place
Each 11
11700 28
City of Houston Sanitary Sewer Precast
Concrete Manhole (4-Foot Diameter), With
Inflow Preventor, Depth of 16 Feet and
Greater, Complete in Place
Each 2
11700 29 8-Inch Standard Sanitary Sewer Drop
Connection, All Depths, Complete in Place Each 8
11700 30 6-Inch Standard Sanitary Sewer Stack, All
Depths, Complete in Place Each 18
11700 31
Adjust Existing Sanitary Sewer Precast
Concrete Manhole Top to Proposed Grade, Complete in Place
Each 5
11700 32
Connection to Existing Sanitary Sewer
Manhole with 8-Inch Sanitary Sewer Line, Including Coring and Rubber Boot at
Connection into Manhole, Complete in
Place
Each 1
11700 33
Connection to Existing Sanitary Sewer
Manhole with 18-Inch Sanitary Sewer Line, Including Coring and Rubber Boot at
Connection into Manhole, Complete in
Place
Each 2
11700 34
Bypass Pumping as Necessary to Provide
Adequate Time for Removal and
Installation of Proposed Sanitary Sewer
Line to Manhole, Complete
Lump
Sum
41006-21 00 4100 - 6
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
11700 35 Trench Safety System Greater Than 5-Feet, Complete in Place
Linear
Foot
11700 36 Design of Trench Excavation and Shoring
Safety Plan, Complete
Lump
Sum
12300 37
24-Inch Polypropylene Pipe (PP), ASTM
F2881, With Watertight Joints, All Depths, Including Post-Installation Mandrel Testing, Per Harris County Specification Item 400 &
482, with 2 Stack per Ton Cement
Stabalized Sand for Backfill, Complete in
Place
Linear
Foot
12300 38
24-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, Complete in Place
Linear
Foot
12300 39
30-Inch Polypropylene Pipe (PP), ASTM
F2881, With Watertight Joints, All Depths, Including Post-Installation Mandrel Testing, Per Harris County Specification Item 400 &
482, with 2 Stack per Ton Cement
Stabalized Sand for Backfill, Complete in
Place
Linear
Foot
12300 40
30-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, Complete in Place
Linear
Foot
12300 41
36-Inch Polypropylene Pipe (PP), ASTM
F2881, With Watertight Joints, All Depths, Including Post-Installation Mandrel Testing, Per Harris County Specification Item 400 &
482, with 2 Stack per Ton Cement
Stabalized Sand for Backfill, Complete in
Place
Linear
Foot
12300 42
42-Inch Polypropylene Pipe (PP), ASTM
F2881, With Watertight Joints, All Depths, Including Post-Installation Mandrel Testing, Per Harris County Specification Item 400 &
482, with 2 Stack per Ton Cement
Stabalized Sand for Backfill, Complete in
Place
Linear
Foot
12300 43
42-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, Complete in Place
Linear
Foot
12300 44
48-Inch Polypropylene Pipe (PP), ASTM
F2881, With Watertight Joints, All Depths, Including Post-Installation Mandrel Testing, Per Harris County Specification Item 400 &
482, with 2 Stack per Ton Cement
Stabalized Sand for Backfill, Complete in
Place
Linear
Foot
Drainage Items
Sanitary Sewer Items Subtotal
41006-21 00 4100 - 7
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
12300 45
48-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, Complete in Place
Linear
Foot
12300 46
60-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, Complete in Place
Linear
Foot
12300 47 Type "B-B" Inlet, Stage I Construction, All
Depths, Complete in Place Each 4
12300 48
Type "B-B" Inlet, Stage II Construction, When Authorized by Owner, Complete in
Place
Each 4
12300 49 Type "C-1" Inlet, Stage I Construction, All
Depths, Complete in Place Each 8
12300 50
Type "C-1" Inlet, Stage II Construction, When Authorized by Owner, Complete in
Place
Each 8
12300 51 Type "C-2" Inlet, Stage I Construction, All
Depths, Complete in Place Each 12
12300 52
Type "C-2" Inlet, Stage II Construction, When Authorized by Owner, Complete in
Place
Each 12
12300 53 Type "E" Inlet, All Depths, Complete in
Place Each 2
12300 54 Type "C" Manhole for 42-Inch and Smaller
Pipe, All Depths, Complete in Place Each 25
12300 55 Type "C" Manhole for 48-Inch to 72-Inch
Pipe, All Depths, Complete in Place Each 6
12300 56
Connect Proposed 30-Inch Polypropylene
Pipe (PP) to Existing Type "C" Manhole, Complete in Place
Each 1
12300 57 Type "C" Manhole for with "E" Inlet Top, All Depths, Complete in Place Each 2
12300 58 Removal and Disposal Offsite of Existing 30-
Inch Reinforced Concrete Pipe (RCP) Linear
Foot
12300 59 Removal and Disposal Offsite of 24-Inch
Corrugated Galvanized Metal Pipe (CGMP) Linear
Foot
12300 60 Removal and Disposal Offsite of Existing
Type "E" Inlet Each 1
12300 61 Removal and Disposal Offsite of Existing
Interceptor Structure Each 2
12300 62
5-Inch Thick Reinforced Concrete Slope
Paving With 36-Inch Deep Concrete
Toewall, All Sides, Complete in Place
Square
Yards
12300 63
18-Inch Thick Broken Concrete Riprap With
"Mirafi-600", or Approved Equal, Woven
Filter Fabric, Complete in Place
Square
Yards
12300 64 Trench Safety System Greater than 5-Feet, Complete in Place
Linear
Foot
41006-21 00 4100 - 8
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
12300 65 Design of Trench Excavation and Shoring
Safety Plan, Complete
Lump
Sum
10900 66
Compliance with the Texas Commission on
Environmental Quality’s (TCEQ) Texas
Pollutant Discharge Elimination System
(TPDES) Regulations Under the State of
Texas General Permit No. TXR150000, Including Storm Water Pollution
Prevention Plan (SWPPP) Preparation, Filing, Installation, Maintenance, Inspections, Reporting, etc. as Required by
Said Permit.
Lump
Sum
10900 67
Stabilized Construction Road and Exit, When Authorized by Owner, Complete in
Place
Each 1
10900 68 Stage I Inlet Protection Trap, When
Authorized by Owner, Complete in Place Each 28
10900 69
Stage II Standard Inlet Protection Device By
Texas Erosion Control or Approved Equal, As Shown in Construction Plans, Including
Two Burlap Bags Per Inlet, When
Authorized by Owner, Complete in Place
Each 28
10900 70
Reinforced Filter Fabric Fence, to be
Installed as Shown on the Construction
Plans, When Authorized by Owner, Complete in Place
Linear
Foot 12859
10900 71
Removal of Reinforced Filter Fabric Fence
Following Completion of Construction, to be Properly Disposed of Offsite, When
Authorized by Owner, Complete in Place
Linear
Foot 12859
10900 72 Rock Filter Dam, Type II, When Authorized by Owner, Complete in Place Each 4
10900 73
Removal of Rock Filter Dam, Type II, Following Completion of Construction, to be Properly Disposed of Offsite, When
Authorized by Owner, Complete in Place
Each 4
10300 74 Move-in and Start-up as Required to Begin
Construction
Lump
Sum
10300 75 Performance and Payment Bonds for 100
Percent (100%) of the Contract Amount
Lump
Sum 1
Drainage Items Subtotal $ -
Storm Water Pollution Prevention Plan Items
Storm Water Pollution Prevention Plan Items Subtotal
Miscellaneous Items
41006-21 00 4100 - 9
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
13100 76
Control and Construction Staking for
Construction and/or Installation of Water
Line, Sanitary Sewer, Storm Sewer Items and Required Appurtenances, Including, but not Limited to Pipes, Valves, Manholes, and Inlets; Staking for Construction to be
Provided by the Engineer; Complete in
Place
Lump
Sum
$ 35,000.00 $ 35,000.00
13100 77
General Control and Construction Staking for Construction when Required and
Approved by Owner or Engineer; To be
Provided by the Engineer
Lump
Sum
$ 4,500.00 $ 4,500.00
13100 78
As-Built No Boundary Survey of WSD
Facilities to be Conducted Upon
Completion of the Project; to be Provided by the Engineer, Complete in Place
Lump
Sum
$ 22,000.00 $ 22,000.00
13100 79
Dewatering System for Installation of
Utiliites, When Authorized by Owner, Complete in Place (Minimum Unit Price of
$25.00 per Linear Foot)
Linear
Foot
13100 80
Extra Cement-Stabilized Sand, When
Authorized by Owner, Complete in Place
(Minimum Unit Price of $20.00 per Cubic
Yard)
Cubic
Yard
13100 81
Bedding for Construction of Sanitary Sewer or Storm Sewer in Unsatisfactory Soil
Conditions, in Lieu of Specified Bedding of
Sanitary Sewer or Storm Sewer, When
Authorized by Owner, Complete in Place
(Minimum Unit Price of $20.00 per Linear
Foot)
Linear
Foot
Item
No.
Item Description Unit Quantity Unit Price Total Amount
12300 A1-1
24-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, in Lieu of Item No. 37 Complete in Place
Each 1094
12300 A1-2
30-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, in Lieu of Item No. 39 Complete in Place
Each 1206
12300 A1-3
36-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, in Lieu of Item No. 41 Complete in Place
Each 407
Construction Of Water, Sanitary Sewer, Drainage, And Paving Facilities For
Magnolia Woods Sec 2A Grand Total
WSD Alternate Items
Miscellaneous Items Subtotal $ -
41006-21 00 4100 - 10
Code
Item
No.
Item Description Unit
Approx.
Quantity Unit Price Total Amount
CONSTRUCTION OF WATER, SANITARY SEWER, AND DRAINAGE FACILITIES FOR MAGNOLIA WOODS SEC 2A :
12300 A1-4
42-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, in Lieu of Item No. 43 Complete in Place
Each 611
12300 A1-5
48-Inch Reinforced Concrete Pipe (RCP), C76, Class III, With Rubber Gasket Joints, All Depths, in Lieu of Item No. 45 Complete in Place
Each 357
Item
No.
Item Description Unit Quantity Unit Price Total Amount
12500 A2-1 Roadway & Lot Excavation, Complete Cubic
Yard
12500 A2-2
Spread and Compact Excavation Spoils
Onsite as Shown in the Construction Plans;
Includes Proof Rolling, Interim Drainage
(Includes Cutting Swales to Provide Positive
Drainage); Onsite Hauling, and Uniformly
Spreading, Shaping, Grading, and
Compacting Spoil Material, As Directed by
Engineer, Complete in Place
Cubic
Yard
12500 A2-3
Spread and Compact Utility Spoils Onsite as
Shown in the Construction Plans; Includes
Proof Rolling, Interim Drainage (Includes
Cutting Swales to Provide Positive
Drainage); Onsite Hauling, and Uniformly
Spreading, Shaping, Grading, and
Compacting Spoil Material, As Directed by
Engineer, Complete in Place
Cubic
Yard 11640
12500 A2-4
Sprea…
This is the start of the file's text. The full file is on GovTribe.