Bid Breakdown Table.pdf
PDF 98 KB Posted
- Solicitation number
- 36C24621B0017
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24621B0017 0002.pdf | ||
| List of Fixture Rooms 8-24-2021.pdf | ||
| S05 RFI Questions 8-20-2021.pdf | ||
| S04 Site Visit 08-10-2021.pdf | ||
| 36C24621B0017 0001.pdf | ||
| 36C24621B0017_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Materials
Feature of Work Time (MH/Unit)
Unit Cost
($/MH)
Quantity (Unit)
Total ($) Quantity Unit
Unit Cost ($/Unit) Total
Water Closet
Demolition Install Repair of walls and floor
Sink Demolition Installation Repair of walls
Water Fountain
Demolition Install Repair of walls
Drain Line Demolition Installation Repair of walls
Labor Total w/ Markup = 0 Materials Total w/o Markup
= 0