This Request for Proposals document is issued by the Town of Trumbull, Connecticut, for the Unity Park Field Renovation project (State Project #2024-144-094-10001). The town seeks competitive proposals from qualified general contracting firms to renovate an existing athletic field, including removal of existing infrastructure and installation of synthetic turf systems with associated drainage, perimeter improvements, and ancillary structures. The scope encompasses 21 line items including removal of fencing, infield clay, and turf; installation of synthetic turf system covering 40,000 square feet; placement of infill materials (500 cubic yards), coarse aggregate base layers (1,000 cubic yards), underdrain systems (315 linear feet), and composite flat drains (1,250 linear feet); installation of concrete perimeter curbing (800 linear feet), chain link fencing (750 linear feet), backstop structures, electrical components, and project signage. Sealed proposals are due December 4, 2026, at 2:00 PM ET at the Town Hall office. The town anticipates work commencement in December 2026 with a completion requirement of 100 consecutive calendar days from the Notice to Proceed. Contractor qualifications, references for similar projects within the past five years, and statement of qualifications must accompany proposals.

Bidders must submit one original, two exact copies, and one electronic copy along with bid bonds equal to 10 percent of the base proposal amount, performance and payment bonds in the full contract amount, proof of Connecticut contractor license, and evidence of insurance with minimum limits of $2,000,000 per occurrence and $5,000,000 aggregate for general liability coverage. The town names the Town of Trumbull and State of Connecticut as additional insureds. Prevailing wage requirements apply if the awarded contract exceeds $100,000. Contractors must comply with Connecticut General Statutes sections 4a-60, 4a-60a, and 4a-60g, demonstrating good faith effort to award 25 percent of the state-funded work to DAS-certified small and minority-owned businesses and 25 percent to DAS-certified minority, women, and/or disabled-owned businesses. Liquidated damages are assessed at $1,100 per calendar day for failure to achieve substantial completion within the 100-day period and $250 per day thereafter for final completion delays. Progress payments are made monthly with a 5 percent retainage, released upon substantial completion. The contract is funded through state allocation, and award consideration may favor bidders capable of expedited completion. The town reserves the right to reject any or all bids, waive formalities, cancel the bid if funding is not approved, and award to the lowest responsible qualified bidder based on total proposal price, technical responsiveness, and demonstrated ability and integrity to perform the work.

View the file

Other files

File Type Posted
6580_Nov_16_26_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF TRUMBULL, CONNECTICUT

REQUEST FOR PROPOSALS

UNITY PARK FIELD RENOVATION

BID# 6580 DUE: DECEMBER 4, 2026, at 2:00 PM ET

PREPARED BY TRUMBULL PURCHASING DEPARTMENT

Bid 6580 – Unity Park Field Renovation State Project #2024-144-094-10001

TABLE OF CONTENTS

Note: This Table of Contents has been prepared for the convenience of those using this contract with the sole express purpose of locating quickly the information contained herein; and no claims shall arise due to omissions, additions, deletions, etc., as this Table of Contents shall not be considered part of the contract.

I. Notice to Proposers

II. Section 1 – General Requirements for Bidding & Instructions to Proposers

a. General Instructions

b. Statement of Qualifications

c. Experience

d. References

e. Subcontractors

III. Section 2 – Proposal

a. Proposal & Bid Form

b. Non-Collusion Affidavit of Prime Bidder

c. Certificate of Compliance with CGS Section 31-57b

IV. Section 3 – Contract & Bonds

a. Bid Bond

b. Performance Bond

c. Payment Bond

d. Independent Contractor Contract (Sample)

V. Section 4 – Opinion of Probable Cost

VI. Section 5 – Project Sign Specifications

VII. Section 6 – Town of Trumbull General Specifications

VIII. Section 7 – Technical Specifications

a. Title Sheet

b. Site Plan – Existing Conditions

c. Site Plan – Removals

d. Site Development Plan

e. Site Details – 1

f. Site Details – 2

g. Site Details – 3

IX. Prevailing Wage Schedule

TOWN OF TRUMBULL

REQUEST FOR PROPOSALS

Unity Park Field Renovation

RFP # 6580 DUE: DECEMBER 4, 2026, at 2:00 PM ET

Notice to Proposers

Sealed proposals for the Unity Park Field Renovation project will be received at the office of the Purchasing Agent, 5866 Main Street, Trumbull, Connecticut, on or before the date indicated above, at which time all proposals received will be opened and read aloud.

Proposal documents are available from the Purchasing Department website https://www.trumbull-ct.gov/Bids.aspx and also on the CT Source Bid Board https://portal.ct.gov/das/ctsource/bidboard.

The engineer for this project is: William Maurer, P.E., L.S., Town Engineer, 366 Church Hill Road, Trumbull, CT 06611.

Proposers shall comply with State mandated Prevailing Wage Guidelines, Equal Opportunity Employment Practices, and Safety and Health Regulations.

Bid Security is required in the amount of ten percent (10%) of the base proposal and shall be in the form of a Certified Check or Bid Bond. A Performance and Payment Bond in the full amount (100%) of the contract is required and shall be included in the Base Proposal. No oral, telephone or telegraphic responses shall be considered. A proposer may not withdraw a proposal within ninety (90) days of the proposal opening.

The Town of Trumbull reserves the right to waive and/or reject any and all proposals or any part thereof, waive the information in the proposal process, and reject any unqualified proposals, or accept any proposal or part thereof, deemed to be in the best interest of the Town of Trumbull.

An Affirmative Action/Equal Opportunity Employer. Minority/Women's Business Enterprises are encouraged to apply. This contract is subject to state spending allocation goals and contract compliance requirements.

Stephen Day

Purchasing Agent Town of Trumbull

SECTION 1

GENERAL REQUIREMENTS FOR BIDDING AND INSTRUCTIONS TO PROPOSERS

REQUEST FOR PROPOSAL

RFP #6580 DUE: DECEMBER 4, 2026, at 2:00 PM ET

General Instructions

The Town of Trumbull, (hereinafter referred to as Town or Owner), through the office of the Purchasing Agent, will accept sealed proposals for the Unity Park Field Renovation project in the Town of Trumbull in accordance with the specifications and requirements detailed in this request. The Town of Trumbull is seeking competitive proposals from qualified firms to provide General Contracting (GC) services for the project. All qualified and interested parties (hereinafter referred to as proposer, bidder, contractor or supplier) are invited to submit proposals under the terms and conditions set forth as follows.

This RFP is not a contract offer, and no contract exists until a written contract is signed by the Town and the successful proposer.

It’s the sole responsibility of the contractor/ vendor to check the Towns website for any addendum.

1. PREPARATION FOR PROPOSALS

a. Bids shall be submitted using the enclosed Proposal Form and Bid Form that accompanies this request. Submit one (1) original, two (2) exact copies, and one (1) exact electronic copy on a thumb drive or CD in a sealed envelope addressed to the Purchasing Agent, Town of Trumbull, and plainly marked on the outside as “#6580 – Unity Park Field Renovation”.

The outside of the envelope shall include the name and address of the Proposer. Bidders should submit bids in a clear, concise, and legible manner to permit proper evaluation of responsive bids.

b. Bidders shall submit, with their proposal, all documents necessary to meet the requirements and deliverables of this re-quest, such as the Bid Bond, qualifications, references, subcontractor information, if applicable, and the non-collusion form.

c. No oral, emailed, telephonic, or faxed proposals will be considered. No corrections, deletions, or additions submitted by email or telephone will be accepted. The Town reserves the right to reject any or all bids and to waive any or all formalities in connection therewith.

2. PROPOSAL SUBMISSION

a. Proposals are to be completed (unless directed otherwise in the specifications), printed, signed by an authorized agent, and sealed in an envelope (including all official literature, brochures, etc., which support this request) and addressed as follows:

BID #6580

Unity Park Field Renovations, State Project #2024-144-094-10001 DUE: DECEMBER 4, 2026, at 2:00 PM ET Trumbull Town Hall – Stephen Day, Purchasing Agent 5866 Main Street, Trumbull CT 06611

b. All Proposals must be made on the enclosed Proposal form. All blank spaces for Proposal prices must be filled in, in ink or typewritten, and the proposal form must be fully completed and executed when submitted.

c. The party signing the formal proposal must be authorized by your organization to contractually bind your firm regarding prices and related contractual obligations for the contractual period requested.

d. The Town reserves the right to correct, after proposer verification, any clerical error in the proposal, such as a price extension or decimal point error.

3. PROPOSAL RESPONSE TIME

Responses to this request shall be received at the office of the Purchasing Agent, Town Hall prior to the advertised hour (noted above) of opening, at which time all proposals (total proposal amount only) shall be publicly opened and read aloud.

A proposer may withdraw a proposal at any time prior to the above scheduled date and time. Any proposal received after the above scheduled date and time shall not be considered or opened. No proposer may withdraw a proposal within ninety (90) days after the actual proposal opening.

4. TOWN OPTIONS

a. The Town reserves the right to reject any and all bids and does not bind itself to accept the lowest bid or any proposal for this work or any part thereof, shall have the right to ask for new bids for the whole or parts, should it desire to do so.

b. If your proposal does not meet or better the required specifications on all points that must be outlined in a letter otherwise it will be presumed that a proposal is in accordance with the required specifications. The Town of Trumbull reserves the exclusive right to determine whether or not a proposal meets or exceeds the stated specifications. The Town reserves the right to cancel the Bid or not award if funding is not approved.

Contractor must submit a schedule at bid submission to ensure work will be completed by the required date.

Consideration for award can be given to the next lowest bidder if work schedule can be completed earlier.

5. TAX EXEMPT

The Town of Trumbull is exempt from the payment of taxes imposed by the Federal Government and/or State of Connecticut.

Such taxes must not be included in the proposal price. The Town of Trumbull Tax Exempt number is 05-010 31-000.

6. SPECIFICATIONS

a. If quoted materials and/or equipment do not meet or better the attached specifications on ALL points, the proposer must note ALL exceptions as separate attachments to their formal response; otherwise, it will be presumed that the proposal is in accordance with all specifications requested herein. Each Bidder will be held responsible to have studied the Spec-ifications, visit the site (if necessary), regarding the proposed work, satisfied itself regarding all existing conditions and measurements, and to have included in the proposal an amount sufficient to cover all work.

b. Should any Bidder find discrepancies in the Specifications, or be in doubt as to the exact meaning, notify the Town at once. The Town may then at their option, issue Addenda clarifying same. The Town shall not be responsible for oral instructions or misinterpretations of Specifications.

c. The Town reserves the right to issue Addenda at any time prior to the Bid Opening. All such Addenda become, upon issuance part of the Specification. Each Bidder shall cover such Addenda in the proposal and shall acknowledge receipt of same on the blank provided therefore. It is the bidders’ responsibility to access the Town’s website or contact the Town for any addenda that may be issued in conjunction with this bid.

d. The Town reserves the right to require any or all Bidders to submit statements as to previous experience in performing comparable work; and as to financial and technical organizations and resources available for this work. The mere open-ing and reading aloud of a bid shall not constitute or imply the Town’s acceptance of the suitability of a Bidder or the bid, nor shall possession of Drawings or Specifications constitute an invitation to bid. The competency and responsibility of Bidders as well as the number of working days required for completion will be considered in making an award.

7. INQUIRIES & ADDENDUMS

a. All technical inquiries regarding this request shall be answered up to 5:00 PM ET on November 20, 2026, after which time no additional questions will be accepted to: William Maurer – Trumbull Town Engineer (203-452-5050) wmaurer@trumbull-ct.gov. All other questions may be directed to the Purchasing Agent (203-452-5042) sday@trumbull-ct.gov.

b. Answers to questions the Town deems to be in the interest of all proposers will be made available in writing, email or by Fax as appropriate to all proposers.

c. The Town reserves the right to communicate with any or all of the proposers to clarify the provisions of this request; the

Town further reserves the right to request additional information from any proposer at any time after proposals are opened.

d. It is the sole responsibility of a proposer to verify any addendums that may have been issued relating to this request prior to submission of a proposal. Any notice of addendum shall be published on the Town website (www.trumbull-ct.gov ) in the Purchasing Department Section (Bid Notices). Failure to submit a response that does not address any changes or addendums may result in a disqualification of a proposal submission.

8. ASSIGNMENT OF RIGHTS, TITLES, AND INTERESTS

Any assignment or subcontracting by a proposer, bidder, supplier, or contractor for work to be performed, or goods and/or services to be provided, in whole or in part, and any other interest in conjunction with a Town procurement shall not be permitted without the express written consent of the Town of Trumbull.

9. HOLD HARMLESS CLAUSE

The Contractor agrees to indemnify, hold harmless and defend the Town and the State of Connecticut from and against any and all liability for loss, damage or expense which the Town and the State of Connecticut may suffer or for which the Town and the State of Connecticut may be held liable by reason of injury, including death, to any person or damage to any property arising out of or in any manner connected with the operations to be performed under this request, whether or not due in whole or in part of any act, omission or negligence of the Owner or any of their representatives or employees.

10. WORK REGULATIONS, STANDARDS AND FEDERAL AND STATE PREVAILING WAGE

a. All work activities performed in association with this request must be performed and completed for the Town in accord-ance with current Federal State and Local regulations. All services performed shall also conform to the latest OSHA standards and/or regulations.

b. Applicable laws and regulations relating to employment practices, nondiscrimination, safety and health regulations shall be adhered to by the contractor. The contractor shall be responsible for “Certified Statements of Compliance” regarding Prevailing Wages. Contractor shall also collect and submit four (4) Certified “Statements of Compliance” from any sub-contractors. If the low qualified low bidder is chosen and is not over 100,000.00 then prevailing wages will NOT apply.

c. The wages paid on an hourly basis to any person performing the work of any mechanic, laborer or worker on the work herein contracted to be done and the amount of payment or contribution paid or payable on behalf of each such person to any employee welfare fund, as defined in subsection (i) of section 31-53, shall be at a rate equal to the rate customary or prevailing for the same work in the same trade or occupation in the town in which such construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair project is being undertaken. Any contractor who is not obligated by agreement to make payment or contribution on behalf of such persons to any such employee welfare fund shall pay to each mechanic, laborer or worker as part of such person's wages the amount of payment or contribution for such person's classification on each pay day.

11. INSURANCE

The successful proposer shall provide the Town Purchasing Agent with a Certificate of Insurance before work commences.

The Town of Trumbull and State of Connecticut shall be named as an additional insured with an Insurance Company licensed to write such insurance in Connecticut, against the following risks and in not less than the following amounts:

Worker’s Compensation Contractor’s Public Liability and Property Damage Automobile Insurance

Commercial General Liability Each Occurrence Aggregate Bodily Injury Liability $2,000,000 $5,000,000 Property Damage Liability $2,000,000 $5,000,000

Personal Injury Liability $2,000,000 $5,000,000

Comprehensive Auto Liability Each Occurrence Aggregate

Including coverage of owned, non-owned & rented vehicles $2,000,000 $5,000,000

The insurance policy must contain the additional provision wherein the company agrees that Thirty (30) days prior to termination, expiration, cancelation or reduction of the insurance afforded by this policy with respect to the contract involved, written notice will be served by registered mail to the Purchasing Agent, Town of Trumbull.

Additionally, the successful proposer (Contractor) shall provide adequate statutory Workmen’s Compensation Insurance for all labor employed on this project, and comprehensive General Public Liability Insurance (Coverage “B”).

The successful proposer (Contractor) and each Subcontractor agree that their insurance carriers waive subrogation against the Town, its agents or employees with respect to any loss covered by the Contractor’s and each Subcontractor’s insurance.

12. CONFLICT OF INTEREST

Public officials shall be prohibited from receiving any town work procured through a public Bid or bid waived process so as to avoid any appearance of impropriety or conflict of interest; and; Public officials cannot circumvent the intent of this ordinance by receiving town work through a bid waiver, as proscribed by the Trumbull Town Charter.

13. PROPOSAL, PERFORMANCE AND PAYMENT BONDS

a. A Bond payable to the Owner must accompany each Proposal for ten (10%) percent of the total amount of the Proposal.

As soon as the Proposal prices have been compared, the Owner will return the bonds of all except the three lowest responsible Proposals. When the Agreement is executed, the bonds of the two remaining unsuccessful Proposers will be returned. The Proposal Bond of the successful Proposer will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Proposal (Bid) Bond.

b. A Performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the Contract Price, with a corporate surety approved by the Owner, will be required for the faithful performance of the contract. Attorneys-in-fact who sign the Bid Bonds or Payment Bonds and Performance Bonds must file with each bond, a certified and effective dated copy of their power of attorney.

c. The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond and Payment Bond within five (5) calendar days from the date when Notice of Award is delivered to the Proposer. The Notice of Award shall be accompanied by the necessary Agreement and Bond forms. In case of failure of the Proposer to execute the Agreement, the Owner may, at his option, consider the Proposer in default, in which case the Bid Bond accompanying the proposal shall become the property of the Owner.

d. The Owner, upon receipt of acceptable Performance Bond, Payment Bond and Agreement signed by the Contractor, shall sign the Agreement and return to the Contractor an executed duplicate of the Agreement within a reasonable period of time. The returned executed Agreement by the Owner to the Contractor shall be accompanied with a Notice to Pro-ceed.

e. The Contractor shall secure a maintenance bond with a company which shall have been approved by the Attorney of the

Town of Trumbull, guaranteeing his work in all phases of construction for a period of two (2) years from the date of acceptance by the Town which shall also cover all damages due to trench settlement.

f. The face value of the maintenance bond shall be as follows: 5% of the base bid of contracts over $50,000.

g. Bid Security is required in the amount of ten percent (10%) of the base proposal and shall be in the form of a Certified

Check or Bid Bond.

14. WORK SCHEDULE

The Town anticipates Work shall begin on or about December 2026 and is to be completed according to the contract time.

15. LOWEST RESPONSIBLE PROPOSAL

a. Lowest Responsible and Qualified Bidder: As used in this section, “lowest responsible and qualified bidder” means the bidder whose bid is the lowest of those bidders possessing the skill, ability and integrity necessary to faithfully perform the work based on objective criteria considering past performance and information.

b. The Town shall determine the “lowest responsible qualified bidder” on the basis of the Proposer submitting the lowest “Total Proposal”, responsiveness of his Technical Proposal; and demonstrating a history of the ability and integrity nec-essary to perform the required work; and certifying that it shall perform the work in accordance with the specifications.

c. Proposals will be compared on the basis of the “Total Proposal” of the items listed in the Proposal and on basis of the

Proposer’s experience and competence.

d. If the Lowest Total Proposal exceeds the amount of funds available for the project, the Town reserves the right to increase or decrease any class, item or part of the work. After determining the “lowest responsible qualified bidder”, the Town will issue a Notice of Award to the successful Proposer.

e. The Proposer designated by the Town as the “lowest responsible qualified bidder” to whom the contract is awarded shall execute the Contact and submit the following documents:

i. Performance Bond

ii. Labor, Payment and Materials Bond

iii. Copy of valid license issued by the State of Connecticut, Department of Consumer Protection.

f. Should the lowest responsible qualified bidder fails to execute the Contact and/or fails to provide the required documents within the time period prescribed, the Town, at its option, may consider the lowest responsible qualified proposer to be in default, in which case the Bid Guarantee shall become the property of the Town.

16. LIQUIDATED DAMAGES

The work assignment must be completed within 100 calendar days after town issuing Letter to Proceed. Contractor further agrees to pay as liquidated damages, the sum of ($1,100) one thousand one hundred dollars for each consecutive calendar day beyond the required completion date, as adjusted by approved extensions.

17. DELIVERY TIME IS OF THE ESSENCE

Special consideration may be given to bidders that provide an expediated delivery. Bidders that can complete the work sooner than the work schedule shown above in Article 14 shall state expected time to complete in calendar days.

18. STATEMENT OF QUALIFICATIONS AND REFERENCES

Bidders shall complete and submit the “Statement of Qualifications” section of this request along with the References form.

The Town and Engineering Department may make such investigations as necessary and it deems appropriate to determine the qualifications of the proposer to perform the work required. If the Town is not satisfied that the proposer is properly qualified, the Town along with Engineering Department reserves the right to reject the proposal of said proposer.

19. COMMISSION ON HUMAN RIGHTS & OPPORTUNITIES REQUIREMENTS – STATE SET-ASIDE

The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5.

State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

For municipal public works contracts and quasi-public agency projects, the contractor must file a written or electronic non-discrimination certification with the Commission on Human Rights and Opportunities. Forms can be found at:

https://portal.ct.gov/chro

The Contractor shall comply with the applicable non-discrimination and affirmative action provisions contained in Appendix F – CHRO Non-Discrimination Contract Language, attached hereto and incorporated by reference into these Contract Documents. Such provisions shall form part of the resulting Contract and shall be binding upon the Contractor.

20. MISCELLANEOUS

a. All Contractors must develop a complete and thorough schedule which demonstrates that the Contractor will be able to complete the project in a timely fashion.

b. Selected proposer agrees to warranty all work completed for this requirement.

c. The Town may make such investigations as necessary, and it deems appropriate to determine the qualifications of the proposer to perform the work required. Each proposer shall submit a Statement of Bidder Qualifications. If the Town is not satisfied that the proposer is properly qualified, the Town reserves the right to reject the proposal of said proposer.

d. Progress payments to the selected Contractor will be subject to a retainage of five percent (5%) withheld from each approved Application for Payment. The accumulated retainage will be released to the Contractor as part of the Final Payment following Substantial Completion of the Work and fulfillment of all closeout requirements.

21. AWARD AND AUTHORITY

The Purchasing agent from Town Hall will issue notification of award in writing along with Standard contract and a Purchase order.

All original invoices, submittals waiver of liens and certified payroll are to be sent to:

ENGINEERING DEPARTMENT

ATT: WILLIAM MAURER

366 CHURCH HILL ROAD

PUBLIC WORKS ADMIN BUILDING

TRUMBULL, CT 06611

Statement of Qualifications

(To be submitted with Proposal – Attach additional pages as necessary)

Submitted By:

Name of Organization:

Name of Individual:

Title:

Address:

Telephone/Fax/Cell:

Submitted To:

Name of Organization:

Name of Individual:

Title:

Address:

Telephone/Fax/Cell:

Project Name and Description (if applicable)

Contractor’s General Business Information (Check if: Corporation, Partnership, Joint Venture, or Sole Proprietorship)

If Corporation:

a. Date and State of Incorporation:

b. List of Executive Officers:

Name Title

If Partnership:

a. Date and State of Organization:

b. Names of Current General Partners:

c. Type of Partnership:

(General, Publicly Traded, Limited, Other (Describe))

If Joint Venture:

a. Date and State of Organization:

b. Name, Address, and Form of Organization of Joint Venture Partners (Indicate managing partner by an asterisk (*)):

If Sole Proprietorship:

a. Date and State of Organization:

b. Name and Address of Owner(s)

1.

On Schedule A, attached, list major engineered construction projects completed by this organization in the past five

(5) years (If a joint venture list each participant’s project separately).

2.

On Schedule B, attached, list current projects under construction by this organization (If joint venture, list each participant's project separately).

3. Name of surety company and name, address, and phone number of agent:

4.

Is your organization a member of a controlled group of corporations as defined in I.R.C. Sec. 1563 (If yes, show the names and addresses of affiliated compa-nies.)

Yes No

Affiliated Company Name Affiliated Company Address

5.

Furnish on Schedule C, attached, details of the construction experience of the principal individuals of your organiza-tion directly involved in construction operations.

6.

Has your organization ever failed to complete any construction contract awarded to it (If yes, describe circumstances on attachment)?

Yes No

7.

Has any Corporate officer, partner, joint venture par-ticipant or proprietor ever failed to complete a con-struction contract awarded to him or her in their own name or when acting as a principal of another organi-zation (If yes, describe circumstances on attach-ment.)?

Yes No

8.

In the last five years, has your organization ever failed to substantially complete a project in a timely manner (If yes, describe circumstances on attach-ment)?

Yes No

I hereby certify that the information submitted herewith, including any attachment is true to the best of my knowledge and belief.

Name of Organization:

By:

Title:

Dated:

Experience

(To be submitted with Proposal – Attach additional pages as necessary)

Schedule A: Prior Experience

Project Owner Design

Professional Contract Price

Amount Completed

Date of Scheduled Completion

Schedule B: Current Experience

Design

Professional Contract Price

Amount Completed

Date of

Schedule C: Personnel

Design

Professional Contract Price

Amount Completed

Date of

References

(To be submitted with Proposal)

List references for similar services provided for at least four (4) clients in the past five (5) years (attach any other client references if desired). Please note it is the Town’s intent to communicate with the References listed herein.

CLIENT 1:

Organization Name:

Contact Name:

Phone:

Service Dates:

Project(s)

CLIENT 2:

Organization Name:

Contact Name:

Phone:

Service Dates:

Project(s)

CLIENT 3:

Organization Name:

Contact Name:

Phone:

Service Dates:

Project(s)

CLIENT 4:

Organization Name:

Contact Name:

Phone:

Service Dates:

Project(s)

Proposed Subcontractors

If none, write “None”:

*Description of Work:

Proposed Subcontractor Name:

Address:

*Insert description of work and subcontractors' names as may be required.

This is to certify that the names of the above-mentioned subcontractors are submitted with full knowledge and consent of the respective parties.

The Proposer warrants that none of the proposed subcontractors have any conflict of interest as respects this contract.

Proposer:

(Name and Title)

By:

(Signature)

Acknowledgement of Addenda

Proposer hereby acknowledges receipt of all Addenda through and including:

Addendum No. ______________________, dated _________________

Addendum No. ______________________, dated _________________

Addendum No. ______________________, dated _________________

Company:

Print Name and Title:

Authorized Signature:

SECTION 2

PROPOSAL

Proposal Form

Proposal of ______________________________________________________________ (hereinafter called the “Proposer”), or-ganized and existing under the laws of the State of Connecticut, and doing business as ______________________________________________________________, submitted to the Engineering Department, Town of Trumbull, Connecticut (hereinafter called the “Owner”).

In compliance with the Advertisement for Proposals, the Proposer hereby submits its proposal for the Unity Park Field Renovation project in the Town of Trumbull, Connecticut, together with all related incidental and appurtenant work as described in the Specifi-cations or outlined and/or shown on the exhibits. The Work shall be performed in strict accordance with the Specifications, Draw-ings, and all Contract Documents, within the time set forth therein, and at the prices stated on the Proposal Schedule.

By submission of this Proposal, the Proposer certifies that this Proposal has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this Proposal with any other Proposer or competitor.

The Proposer hereby agrees to commence Work under this Contract on or before the date specified in the Notice to Proceed and to fully complete the Project within one hundred (100) consecutive calendar days thereafter, unless otherwise extended in accord-ance with the Contract Documents.

The Proposer further agrees to pay, as liquidated damages, the sum of one thousand one hundred dollars ($1,100.00) for each consecutive calendar day beyond the required completion date, as adjusted by any approved extensions, until completion of the full Contract, as provided in the General Conditions. The Proposer further agrees to provide and maintain all Bonds and Insurance Policies required by the Contract Documents.

The Proposer understands that the Owner reserves the right to reject any or all Proposals and to waive any informalities in the bidding process.

The Proposer agrees that this Proposal shall remain valid and may not be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receiving Proposals.

Upon receipt of written notice of acceptance of this Proposal, the successful Proposer shall execute the formal Contract within five

(5) days and deliver the Surety Bond or Bonds required by the General Conditions.

Company Name By (Signature)

Address Print Name

City, State, Zip Title

Date Telephone / Email Address

Bid Form

The undersigned hereby declares that in regard to all conditions affecting the work to be done and the labor and materials required, this proposal is based on their investigations and findings, and the Town of Trumbull and the Engineers and their officers, agents and employees shall not in any manner be held responsible for the accuracy of, or be bound by any estimates, borings, water or underground conditions relative to the proposed work, indicated in this or in the other contract documents; that no warranty or representation has been made by the Town of Trumbull or the Engineers or their officers, agents and employees as to subsurface soil or rock conditions, ground water, or other underground and similar conditions; nor has any representation or warranty been so made that the estimated quantities to be used for comparison of proposals will even approximate the actual quantities or materials and work which the Contractor may be required to furnish or perform.

Project: UNITY PARK FIELD RENOVATION, STATE PROJECT #2024-144-094-10001

TRUMBULL, CONNECTICUT

RFP #6580

Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

Item Item Name and Unit Bid Prices Written in Words and Figures

Units Estimated Quantity

Total Amount

Removal of existing fence/gates/backstop

LS 1

Removal of existing clay infield

SF 15000

Removal of existing turf/topsoil to a depth of 12”

SY 24000

Removal and capping of existing irrigation system

LS 1

Synthetic turf system

SF

40000

Infill materials

CY 500

Coarse aggregate base layer

CY 750

Perimeter underdrain/collector pipe with fabric

LF 315

Composite flat drains

LF 1,250

Dynamic stone base - bottom layer

CY 500

Dynamic stone base - top layer

CY 250

Concrete perimeter curbing

LF 800

¾” Stone

CY 50

8” HDPE Storm Pipe

LF 25

ADS manhole

EA 1

Chain link fence, post and gates

LF 750

Backstop

Foul poles as per spec

EA 2

Electrical & Conduits

EA 2

Project Sign

Mobilization and closeout

TOTAL AMOUNT OF BASE BID

Dollars (words)

($ ) (figures)

The quantity shown for Processed Aggregate Base is an estimate provided for bidding purposes only. The actual quantity required, if any, will depend on field conditions.

THE QUANTITIES SHOWN IN THIS BID FORM ARE ESTIMATES PROVIDED FOR BIDDING AND BID EVALUATION PURPOSES ONLY. THE TOTAL BID SHALL BE CALCULATED BY MULTIPLYING THE ESTIMATED QUANTITY OF EACH BID ITEM BY ITS PROPOSED UNIT PRICE AND ADDING THE RESULTING EXTENDED AMOUNTS. THE LOW PROPOSER WILL BE DETERMINED BASED ON THIS TOTAL. FINAL PAYMENT FOR UNIT-PRICE ITEMS SHALL BE BASED ON ACTUAL QUANTITIES OF WORK COMPLETED AND ACCEPTED, AT THE APPLICABLE CONTRACT UNIT PRICES.

Respectfully submitted, Company Name By (Signature)

Address Print Name

City, State, Zip Title

(SEAL-if proposal is by a corporation)

Note: Insert Proposer's name. If a corporation, give the State of Incorporation using the phrase, A corporation organized under the laws of

____________________________, composed of officers as follows:

President Secretary

Vice President Treasurer

If a partnership, give names of partners, using also the phrase, "co-partners trading and doing business under the firm name and style of______________________________, composed of partners as follows:

Non-Collusion Affidavit of Prime Proposer

This affidavit shall be completed, signed by an authorized representative of the Proposer, notarized, and submitted with the Proposal.

State of ___________________________________________)

)SS:

County of _________________________________________)

___________________________________________________ , being first duly sworn,

1. He is ___________________________________________of the bidder that has submitted the attached bid.

2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respect-ing such bid.

3. Such price is genuine and is not a collusive or sham bid.

4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firms or person to submit a collusive or sham Bid in connection with the Contract for which the Contract, or has in any man-ner, directly or indirectly, sought by agreement or collusion or communications or conference with any other Bidder, firm or person to fix the proceeds or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any bidder, or to secure through any collusion, conspiracy, connivance or unlawful agree-ment any advantage, against the Town of Trumbull, (Owner) or any person interested in the proposed Contract; and

5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, conniv-ance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest including this affiant.

Signed: _______________________________________________________

Title: __________________________________________________________

Subscribed and sworn to before me this ________ day of____________, 20__

Title: _________________________________________________________

My Commission Expires: ______________________________________

-End of General Bid-

SECTION 3

CONTRACT AND BONDS

BID BOND to be submitted with RFP proposal

Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name, and Address of Principal Place of Business):

OWNER (Name and Address):

BID

Bid Due Date:

Description (Project Name— Include Location):

BOND

Bond Number:

Date:

Penal sum $

(Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal)

Bidder’s Name and Corporate Seal

By:

Surety’s Name and Corporate Seal

By:

Signature Signature (Attach Power of Attorney)

Print Name Print Name

Title

Attest:

Title

Attest:

Signature Signature

Title Title

Note: Addresses are to be used for giving any required notice.

Provide execution by any additional parties, such as joint venturers, if necessary.

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013. Pre-pared by the Engineers Joint Contract Documents Committee.

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and as-signs to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Docu-ments (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Docu-ments and any performance and payment bonds required by the Bidding Documents, or

3.2 All Bids are rejected by Owner, or

3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable prompt-ness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including ex-tensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default re- quired in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

PENAL SUM FORM

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Reg-istered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective up- on receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length.

If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013. Pre-pared by the Engineers Joint Contract Documents Committee.

CONTRACTOR (name and address): SURETY (name and address of principal place of business):

OWNER (name and address):

CONSTRUCTION CONTRACT

Effective Date of the Agreement: Amount:

Description (name and location):

Date (not earlier than the Effective Date of the Agreement of the Construction Contract):

Amount:

Modifications to this Bond Form: None See Paragraph 16

Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Performance Bond to be duly executed by an authorized officer, agent, or representative.

CONTRACTOR AS PRINCIPAL SURETY

Contractor’s Name and Corporate Seal (seal) (seal)

Surety’s Name and Corporate Seal

By: By:

Signature Signature (attach power of attorney)

Print Name Print Name

Title Title

Attest: Attest:

Title Title

Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party shall be considered plural where applicable.

PERFORMANCE BOND Sample if awarded

EJCDC® C-610, Performance Bond Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Compa-nies, and American Society of Civil Engineers. All rights reserved. 1 of 2

1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference.

2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, ex-cept when applicable to participate in a conference as provided in Paragraph 3.

3. If there is no Owner Default under the Construction Contract, the

Surety’s obligation under this Bond shall arise after:

3.1 The Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor De-fault. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor, and Surety to dis-cuss the Contractor’s performance. If the Owner does not re-quest a conference, the Surety may, within five (5) business days after receipt of the Owner’s notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend.

Unless the Owner agrees otherwise, any conference requested under this Paragraph 3.1 shall be held within ten (10) business days of the Surety’s receipt of the Owner’s notice. If the Owner, the Contractor, and the Surety agree, the Contractor shall be al-lowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner’s right, if any, subsequently to declare a Contractor Default;

3.2 The Owner declares a Contractor Default, terminates the

Construction Contract and notifies the Surety; and

3.3 The Owner has agreed to pay the Balance of the Contract

Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Con- struc-tion Contract.

4. Failure on the part of the Owner to comply with the notice re-quirement in Paragraph 3.1 shall not constitute a failure to com-ply with a condition precedent to the Surety’s obligations, or re-lease the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice.

5. When the Owner has satisfied the conditions of Paragraph 3, the

Surety shall promptly and at the Surety’s expense take one of the following actions:

5.1 Arrange for the Contractor, with the consent of the Own-

er, to perform and complete the Construction Contract;

5.2 Undertake to perform and complete the Construction Con-

tract itself, through its agents or independent contractors;

5.3 Obtain bids or negotiated proposals from qualified con-

tractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a con-tract to be prepared for execution by the Owner and a contrac-tor selected with the Owners concurrence, to be secured with per-formance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Para-graph 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or

5.4 Waive its right to perform and complete, arrange for com-pletion, or obtain a new contractor, and with reasonable prompt-ness under the circumstances:

5.4.1 After investigation, determine the amount for which it

may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or

5.4.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial.

6. If the Surety does not proceed as provided in Paragraph 5 with reasonable promptness, the Surety shall be deemed to be in de- fault on this Bond seven days after receipt of an additional writ- ten notice from the Owner to the Surety de-manding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Paragraph 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without fur-ther notice the Owner shall be entitled to enforce any rem-edy available to the Owner.

7. If the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, then the responsibilities of the Surety to the Owner shall not be great- er than those of the Contractor under the Construc-tion Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Con- tract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication for:

7.1 the responsibilities of the Contractor for correction of de-fective work and completion of the Construction Contract;

7.2 additional legal, design professional, and delay costs re-sulting from the Contractor’s Default, and resulting from the ac-tions or failure to act of the Surety under Paragraph 5; and

7.3 liquidated damages, or if no liquidated damages are speci-fied in the Construction Contract, actual damages caused by de-layed performance or non-performance of the Contractor.

8. If the Surety elects to act under Paragraph 5.1, 5.3, or 5.4, the Surety’s liability is limited to the amount of this Bond.

9. The Surety shall not be liable to the Owner or others for obliga-tions of the Contractor that are unrelated to the Construction Con-tract, and the Balance of the Contract Price shall not be re- duced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, succes-sors, and assigns.

14. Definitions

14.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract af-ter all proper adjustments have been made including allow- ance for the Contractor for any amounts received or to be re- ceived by the Owner in settlement of insurance or other claims for dam-ages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contrac- tor under the Construction Contract.

10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.

11. Any proceeding, legal or equitable, under this Bond may be insti-tuted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be insti-tuted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obliga-tions under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum peri-ods of limitations available to sureties as a defense in the juris-diction of the suit shall be applicable.

12. Notice to the Surety, the Owner, or the Contractor shall be mailed or delivered to the address shown on the page on which their sig-nature appears.

13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here-from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so fur-nished, the intent is that this Bond shall be construed as a statu-tory bond and not as a common law bond.

14.2 Construction Contract: The agreement between the Own-

er and Contractor identified on the cover page, including all Con-tract Documents and changes made to the agreement and the Contract Documents.

14.3 Contractor Default:…