Bid 6574 Specifications and Instructions.pdf

PDF 5 MB Posted

Attached to
Whitney Avenue - Phase II Sidewalk/Trail Connection Improvements
Solicitation number
Bid-RFP # 6574
Issued by
Fairfield County, Waterbury City, Connecticut

About this file

Summary of Bid 6574: Whitney Avenue - Phase II Sidewalk/Trail Connection Improvements

This Request for Proposal document is issued by the Town of Trumbull, Connecticut Department of Engineering for sealed proposals to perform sidewalk and trail connection improvements on Whitney Avenue in Phase II. The project scope includes earth excavation (700 CY), clearing and grubbing, bituminous concrete pavement cutting (800 LF), structure excavation—rock (125 CY), subbase installation (50 CY), processed aggregate subbase (30 CY), sedimentation control systems, catch basin resets and tops, retaining walls at two sites, underdrain installation (250 LF), concrete curbing (750 LF), stone wall relocation (25 LF), ornamental fencing (125 LF), concrete sidewalk (4,300 SF), sidewalk ramps (260 SF), detectable warning strips (3 EA), bituminous driveway (115 SY), topsoil and turf establishment (350 SY each), traffic control, pavement markings (750 LF and 375 SF), and construction signage (200 SF). Sealed proposals are due by June 30, 2026 at 2:00 PM at the Town Hall Purchasing Department office. The Town anticipates work to commence on or about July 27, 2026 and be completed by November 20, 2026, with completion required within 100 consecutive calendar days excluding winter shutdown from the Notice to Proceed. Bidders must submit one original, two exact copies, and one electronic copy on a memory stick. Technical inquiries must be submitted by June 18, 2026 to the Town Engineer William Maurer or the consulting engineer Stantec Consulting Services, Inc. The Town reserves the right to reject any or all proposals and to waive informalities in the bidding process.

Contractors shall submit unit prices for all line items, with the total bid price calculated by multiplying estimated quantities by the respective unit prices. A Bid Bond equal to 10 percent of the total proposal amount must accompany each proposal. The successful contractor must provide Performance and Payment Bonds, each in the amount of 100 percent of the contract price. This project is subject to Connecticut's state set-aside requirement that a minimum of 25 percent of the state-funded contract value be awarded to subcontractors holding current certification from the Connecticut Department of Administrative Services, with specific allocations for minority, women, and disabled-owned businesses. Contractors must demonstrate good faith efforts to meet these set-aside goals and file nondiscrimination certifications with the Commission on Human Rights and Opportunities. Prevailing wage rates apply to all workers on this project. Liquidated damages of $850 per consecutive calendar day are assessed for work not completed within the contract time. The project is federally and/or state-funded through LOTCIP, and the prime contractor must perform at least 50 percent of the total contract value. Additional insurance requirements include Workers' Compensation, Commercial General Liability, Automobile Liability, and Owner's and Contractor's Protective Liability, with minimum coverage amounts specified. A maintenance bond equal to 5 percent of the base bid for contracts exceeding $50,000 is required and shall be guaranteed for two years from the date of Town acceptance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF TRUMBULL, CONNECTICUT

REQUEST FOR PROPOSAL, CONDITIONS, SPECIFICATIONS,

AND DRAWINGS

BID-RFP #6574

WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL

CONNECTION IMPROVEMENTS PROPOSAL

SUBMITTAL DUE: June 30, 2026 @ 2 pm

Stantec Consulting Services, Inc.

55 Church Street

Suite 601 New Haven, CT 06510

203.495.1645 www.stantec.com

Town of Trumbull – General Instructions BID 6574– Whitney Avenue – Phase II Sidewalk/Trail

Connection Improvements

TABLE OF CONTENTS

Note: This Table of Contents has been prepared for the convenience of those using this contract with the sole express purpose of locating quickly the information contained herein; and no claims shall arise due to omis-sions, additions, deletions, etc., as this Table of Contents shall not be considered part of the contract.

Notice to Proposers Section 1 – General Requirements for Bidding and Instructions to Proposers Section 2 – Proposal Section 3 – Contract and Bonds Section 4 – State Required Contract Provisions Section 5 – Town of Trumbull General Specifications Section 6 – Technical Specifications

Notice to Proposers

TOWN OF TRUMBULL

TOWN ENGINEERING

REQUEST FOR PROPOSALS

WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS

BID-RFP # 6574 DUE: June 30, 2026 at 2:00PM

Sealed proposals for the WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS will be received at the office of the Purchasing Agent, 5866 Main Street, Trumbull, Connecticut, on or before the date indicated above, at which time all proposals received will be opened and read aloud.

Proposal, instructions, requirements and Specifications are available from the Town Of Trumbull Website (www.trumbull-ct.gov ) In the Purchasing Department Section Link To “Bid Opportunities & also on the State Contracting Portal http://das.ct.gov/portal

The consulting engineer for this project is: Stantec, 55 Church Street, New Haven, CT 203.495.1645.

Proposers shall comply with State mandated Guidelines if and shall comply with Equal Opportunity Employment Practices, and Safety and Health Regulations.

This contract is subject to state set-aside (CHRO) and contract compliance requirements The Town of Trumbull reserves the right to waive and/or reject any and all proposals or any part thereof, waive the information in the proposal process, and reject any unqualified proposals, or ac-cept any proposal or part thereof, deemed to be in the best interest of the Town of Trumbull.

Richard Kotchko Interim Purchasing

Agent

SECTION 1

GENERAL REQUIREMENTS FOR BIDDING AND INSTRUCTIONS TO PROPOSERS

REQUEST FOR PROPOSALS

WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS

BID-RFP # 6574 DUE: June 30, 2026 at 2:00PM

GENERAL INSTRUCTIONS

The Town of Trumbull, (hereinafter referred to as Town or Owner), through the office of the Purchasing Agent, will accept sealed proposals for the WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS in the Town of Trumbull in accordance with the specifications and requirements detailed in this request. All qualified and interested parties (hereinafter referred to as proposer, bidder, contractor or supplier) are invited to submit proposals under the terms and conditions set forth as follows:

This RFP is not a contract offer, and no contract exists until a written contract is signed by the Town and the successful proposer. It’s the sole responsibility of the contractor/ vendor to check the Towns website for any addendum.

1. PREPARATION FOR PROPOSALS

Bids shall be submitted by using the enclosed BID PROPOSAL FORM that accompanies this re-quest. Submit one (1) ORIGINAL and Two (2) EXACT COPY and One (1) e-copy on Memory stick.

Bidders should submit bids in a clear, concise and legible manner to permit proper evaluation of responsive bids.

An original and Two (2) exact copies and one e-copy of each Proposal shall be submitted in a sealed envelope, and addressed to:

Purchasing Agent, Town of Trumbull, in a sealed envelope and plainly marked on the outside as “WHITNEY AVENUE – PHASE II

SIDEWALK/TRAIL CONNECTION IMPROVEMENTS” The envelope shall bear on the outside the name of the proposer and address.

No oral, telephone or tele- graphic responses will be considered. Proposals received after the advertised time and date due shall not be opened or considered. The Town reserves the right to communicate with any or all of the proposers to clarify the provisions of Proposals. The Town further reserves the right to request additional information from any proposer at any time after proposals are opened

2. PROPOSAL SUBMISSION

a) Proposals are to be completed (unless directed otherwise in the specifications), printed, signed by an authorized agent, and sealed in an envelope (including all official literature, brochures, etc., which support this request) and addressed as follows:

BID 6574 WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS

Trumbull Town Hall – Attn: Richard Kotchko Interim Purchasing Agent 5866 Main Street, Trumbull CT

06611 DUE: June 30, 2026 at 2 pm sharp

b) All Proposals must be made on the enclosed Proposal form. All blank spaces for Proposal prices must be filled in, in ink or typewritten, and the proposal form must be fully completed and executed when submitted. Please be advised that the person signing the formal proposal must be authorized by your organization to contractually bind your firm with regard to prices and related contractual obligations for the subject project

c) The party signing the formal proposal must be authorized by your organization to contractually bind your firm with regard to prices and related contractual obligations for the contractual period requested.

d) The Town reserves the right to correct, after proposer verification, any mistake in a proposal that is a clerical error, such as a price extension or decimal point error. No oral, email, telephonic, or faxed proposals will be considered

3. PROPOSAL RESPONSE TIME

Responses to this request shall be received at the office of the Purchasing Agent, Town Hall prior to the advertised hour (noted above) of opening, at which time all proposals (total proposal amount only) shall be publicly opened and read aloud. A proposer may withdraw a proposal at any time prior to the above scheduled date and time. Any proposal received after the above scheduled date and time shall not be considered or opened. No proposer may withdraw a proposal within ninety (90) days after the actual Bid opening.

4. TOWN OPTIONS – Omitted

5. TAX EXEMPT

The Town of Trumbull is exempt from the payment of taxes imposed by the Federal Government and/or State of Connecticut. Such taxes must not be included in the proposal price. The Town of Trumbull Tax Exempt number is 05-010 31-000.

6. SPECIFICATIONS

a) If quoted materials and/or equipment do not meet or better the attached specifications on ALL points, the pro-poser must note ALL exceptions as separate attachments to their formal response; otherwise, it will be pre-sumed that the proposal is in accordance with all specifications requested herein. Each Bidder will be held responsible to have studied the Specifications, visit the site (if necessary), regarding the proposed work, satis-fied itself regarding all existing conditions and measurements, and to have included in the proposal an amount sufficient to cover all work.

b) Should any Bidder find discrepancies in the Specifications, or be in doubt as to the exact meaning, notify the Town at once. The Town may then at their option, issue Addenda clarifying same. The Town shall not be re-sponsible for oral instructions or misinterpretations of Specifications.

c) The Town reserves the right to issue Addenda at any time prior to the Bid Opening. All such Addenda be- come, upon issuance part of the Specification. Each Bidder shall cover such Addenda in the proposal and shall acknowledge receipt of same on the blank provided therefore. It is the bidders’ responsibility to access the Town’s website or contact the Town for any addenda that may be issued in conjunction with this bid.

d) The Town reserves the right to require any or all Bidders to submit statements as to previous experience in perform-ing comparable work; and as to financial and technical organizations and resources available for this work. The mere opening and reading aloud of a bid shall not constitute or imply the Town’s acceptance of the suitability of a Bidder or the bid, nor shall possession of Drawings or Specifications constitute an invitation to bid. The competency and re-sponsibility of Bidders as well as the number of working days required for completion will be considered in making an award.

7. INQUIRIES & ADDENDUMS

a) All technical inquiries regarding this request shall be answered up to the close of business on June 18, 2026, after which time no additional questions will be accepted to William Maurer– Trumbull Town Engineer (203-452-5056) wmaurer@trumbull-ct.gov and a copy to Kent Gannon at Stantec, Inc., kent.gannon@stantec.com.

All other questions may be directed to Richard Kotchko Interim Purchasing Agent (203.452.5042) rkotchko@trumbull-ct.gov.

Answers to questions the Town deems to be in the interest of all proposers will be made available in writing, email or by Fax as ap-propriate to all proposers or posted as an addendum on the Town web site.

b) To communicate with any or all the proposers to clarify the provisions of this request; the Town further reserves the right to re-quest additional information from any proposer at any time after proposals are opened.

c) It is the sole responsibility of a proposer to verify any addendums that may have been issued relating to this request prior to submission of a proposal. Any notice of addendum shall be published on the Town website (www.trumbull-ct.gov ) in the Purchasing Department Section (Bid Notices). Failure to submit a response that does not address any changes or addendums may result in a disqualification of a proposal submission.

8. ASSIGNMENT OF RIGHTS, TITLES, AND INTERESTS

Any assignment or subcontracting by a proposer, bidder, supplier, or contractor for work to be performed, or goods and/or services to be provided, in whole or in part, and any other interest in conjunction with a Town procurement shall not be permitted without the express written consent of the Town of Trumbull.

9. HOLD HARMLESS CLAUSE

The Contractor agrees to indemnify, hold harmless and defend the Town from and against any and all liability for loss, damage or expense which the Town may suffer or for which the Town may be held liable by reason of injury, including death, to any person or damage to any property arising out of or in any manner connected with the operations to be performed under this request, whether or not due in whole or in part of any act, omission or negligence of the Owner or any of his representatives or employees.

10. WORK REGULATIONS, STANDARDS AND FEDERAL AND STATE PREVAILING WAGE

a) All work activities performed in association with this request must be performed and completed for the Town in accordance with current Federal State and Local regulations. All services performed shall also conform to the latest OSHA standards and/or regulations.

b) Applicable laws and regulations relating to State of Connecticut Prevailing Wages, this a prevailing wage job all laws to prevailing wage must be met for employment practices, nondiscrimination, safety and health regulations shall be adhered to by the contractor. The contractor shall be responsible for “Certified Statements of Compliance” regarding Prevailing Wages.

Contractor shall also collect and submit four (4) Certified “Statements of Compliance” from any sub-contractors. Prevailing Wage rates are either included in the initial bid documents or will be issued.

11. INSURANCE

The successful proposer shall provide the Town Purchasing Agent with a Certificate of Insurance before work commences. The Town and the State of Connecticut shall be named as an additional insured with an Insurance Company licensed to write such insurance in Connecticut, against the following risks and in not less than those listed in the table below:

1. Workers’ Compensation Insurance: With respect to all operations the Contractor performs and all those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Workers’ Compensation insurance as required by the laws of the State of Connecticut. Employer’s Liability insurance shall be provided in amounts not less than $100,000 per accident for 1.03 bodily injury by accident; $500,000 policy limit by disease and $100,000 per employee for bodily injury by disease. Each Workers’ Compensation policy shall contain the U.S. Longshoreman’s and Harbor Workers’ Act endorsement when work is to be performed over or adjacent to navigable water. 2. Commercial General Liability Insurance: With respect to the operations the Contractor performs and also those performed for it by subcontractors, the Contractor shall carry, and require each subcontractor to carry, Commercial General Liability insurance, including Contractual Liability, Products and Completed Operations, Broad Form Property Damage and Independent Contractors. Products and completed operations insurance for ongoing and completed operations shall be maintained for a period of two (2) years after the acceptance of the Project by the Department in accordance with 1.08.14 in Form 819.

See chart below for applicable minimum coverage amounts.

.Automobile Liability Insurance: The Contractor shall obtain automobile liability insurance covering the operation of all motor vehicles, including those hired or borrowed, that are used in connection with the Project for all damages arising out of: (1) bodily injury to or death of all persons and/or (2) injury to or destruction of property; in any one accident or occurrence. This policy shal l not be subject to an annual aggregate limitation. See chart above for applicable minimum coverage amounts. 4. Owner’s and Contractor’s Protective Liability Insurance for and in the Name of the State: With respect to the Contractor’s Project operations and also those of its subcontractors, the Contractor shall carry, for and on behalf of the State for each accident or occurrence resulting in damages from (1) bodily injury to or death of persons and/or (2) injury to or destruction of property.

See chart below for applicable minimum coverage amounts.

The insurance policy must contain the additional provision wherein the company agrees that Thirty (30) days prior to termination, expiration, cancellation or reduction of the insurance afforded by this policy with respect to the contract involved, written notice will be served by registered mail to the Purchasing Agent, Town of Trumbull.

Additionally, the successful proposer (Contractor) shall provide adequate statutory Workmen’s Compensation Insurance for all labor employed on this project, and comprehensive General Public Liability Insurance (Coverage “B”) The successful proposer (Contractor) and each Subcontractor agree that their insurance carriers waive subrogation against the Town, its agents or employees with respect to any loss covered by the Contractor’s and each Subcontractor’s insurance.

12. CONFLICT OF INTEREST

Public officials shall be prohibited from receiving any town work procured through a public Bid or bid waived process so as to avoid any appearance of impropriety or conflict of interest;

And; Public officials cannot circumvent the intent of this ordinance by receiving town work Through a bid waiver, as proscribed by the Trumbull Town Charter.

13. PROPOSAL, PERFORMANCE AND PAYMENT BONDS

a) A Bid Bond payable to the Owner must accompany each Proposal for ten (10%) percent of the total amount of the Proposal. As soon as the Proposal prices have been compared, the Owner will return the bonds of all except the three lowest responsible Proposals. When the Agreement is executed, the bonds of the two remaining unsuccessful Proposers will be returned. The

Proposal Bond of the successful Proposer will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Proposal (Bid) Bond.

b) A Performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the Contract Price, with a corporate surety approved by the Owner, will be required for the faithful performance of the contract. Attorneys-in-fact who sign the Bid Bonds or Payment Bonds and Performance Bonds must file with each bond, a certified and effective dated copy of their power of attorney.

c) The party to whom the contract is awarded will be required to execute the Agreement and obtain the Performance Bond and Payment Bond within ten (10) calendar days from the date when Notice of Award is delivered to the Proposer. The Notice of Award shall be accompanied by the necessary Agreement and Bond forms. In case of failure of the Proposer to execute the Agreement, the Owner may, at his option, consider the Proposer in default, in which case the Bid Bond accompanying the pro-posal shall become the property of the Owner.

d) The Owner, upon receipt of acceptable Performance Bond, Payment Bond and Agreement signed by the Contractor, shall sign the Agreement and return to the Contractor an executed duplicate of the Agreement within a reasonable period of time. The re-turned executed Agreement by the Owner to the Contractor shall be accompanied with a Notice to Proceed.

e) The Contractor shall secure a maintenance bond with a company which shall have been approved by the Attorney of the Town of Trumbull, guaranteeing his work in all phases of construction for a period of two (2) years from the date of acceptance by the Town which shall also cover all damages due to trench settlement.

f) The face value of the maintenance bond shall be as follows: 5% of the base bid of contracts over $50,000.

14. WORK SCHEDULE

The Town anticipates Work shall begin on or about July 27, 2026 and be completed by November 20,2026.

15. LOWEST RESPONSIBLE PROPOSAL

a) The Town shall determine the “lowest responsible qualified proposer” on the basis of the Proposer submitting the lowest “Total

Proposal”, responsiveness of his Technical Proposal; and demonstrating a history of the ability and integrity necessary to per-form the required work; and certifying that it shall perform the work in accordance with the specifications.

b) Proposals will be compared on the basis of the “Total Proposal” of the items listed in the Proposal and on basis of the Propos-er’s experience and competence.

c) If the Lowest Total Proposal exceeds the amount of funds available for the project, the Town reserves the right to increase or decrease any class, item or part of the work. After determining the “lowest responsible qualified proposer”, the Town will issue a Notice of Award to the successful Proposer.

d) The Proposer designated by the Town as the “lowest responsible qualified proposer” to whom the contract is awarded shall execute the Contact and submit the following documents:

i. Performance Bond

ii. Labor, Payment and Materials Bond

iii. Copy of valid license issued by the State of Connecticut, Department of Consumer Protection.

e) In the event that the lowest responsible qualified proposer fails to execute the Contact and/or fails to provide the required doc-uments within the time period prescribed, the Town, at its option, may consider the lowest responsible qualified proposer to be in default, in which case the Bid Guarantee shall become the property of the Town.

16. LIQUIDATED DAMAGES

Each work assignment must be completed within 100 consecutive calendar days, excluding winter shutdown, after town issuing Letter to proceed. Contractor further agrees to pay as liquidated damages, the sum of ($850) eight hundred and fifty dollars for each consecutive calendar day thereafter from letter to Proceed

17. DELIVERY TIME IS OF THE ESSENCE - Omitted

18. STATEMENT OF QUALIFICATIONS AND REFERENCES

Bidders shall complete and submit the “Statement of Qualifications” section of this request along with the References form. The Town and Engineering Department may make such investigations as necessary, and it deems appropriate to determine the qualification-tions of the proposer to perform the work required. If the Town is not satisfied that the proposer is properly qualified, the Town along with Engineering Department reserves the right to reject the proposal of said proposer.

19. MISCELLANEOUS

a) All Contractors must develop a complete and thorough schedule which demonstrates that the Contractor will be able to com-plete the project in a timely fashion. Such schedule shall be provided prior to Award of Contract.

b) Selected proposer agrees to warranty all work completed for this requirement.

c) The Town may make such investigations as necessary, and it deems appropriate to determine the qualifications of the proposer to perform the work required. Each proposer shall submit a Statement of Bidder Qualifications. If the Town is not satisfied that the proposer is properly qualified, the Town reserves the right to reject the proposal of said proposer.

d) All material testing and material certification shall be in accordance with State requirements.

e) All closeout documents must be in accordance with State requirements.

20. UNIT PRICE

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corre-sponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Pric-es”; such total will be used by Owner for Bid comparison purposes. The estimated quantities of items are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Payments to the Contractor will be based on actual quantities.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices.

Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in fa-vor of the correct sum.

D. Unit prices for identical item numbers that are in more than one bid schedule shall be equal. Discrepancies will be resolved in favor of the lowest unit price.

21. COMMISSION ON HUMAN RIGHTS & OPPORTUNITIES REQUIREMENTS- STATE SET-ASIDE

The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60a, 4a-60g, and 46a-68b through 46a-68f, inclusive, as amended by June 2015 Special Session Public Act 15-5.

State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontrac-tors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

For municipal public works contracts and quasi-public agency projects, the contractor must file a written or electronic non-discrimination certification with the Commission on Human Rights and Opportunities. Forms can be found at:

https://portal.ct.gov/chro

Forms and Reports For Construction Contractors

• Checklist for Contractors on Municipal Public Works Contracts

• Affirmative Action Plan Format

• Set Aside Plan Format

• Sample AA/EOE Policy Statement

• Instructions for Filing Forms

• Minority Workforce Utilization Report (CHRO CC257 AND CC 257a)

• Cumulative Minority Workforce Utilization Report (CHRO CC257b)

• Small Contractor and MBE Status Report (CC258a)

• Monthly Materials Consumption Report (CHRO CC259)

• Map of CT Metropolitan Statistical Areas

• Links to maps for download in various formats

You should submit (or already have) a An Affirmative Action Plan to CHRO to be awarded and be on their CHRO contractor affidavit list

22. AWARD AND AUTHORITY

The Purchasing agent from Town Hall on will issue notification of award in writing along with Standard contract and a Pur-chase order. THE TOWN RESERVES THE RIGHT TO ELIMINATE ANY OR ALL ALTERNATE ITEMS. LOW BIDDER WILL

THEN BE BASED ON THE PROPOSAL OF REMAINING BASE BID AND / OR EITHER ALTERNATE.

ALL Original Invoices, submittals waiver of liens and certified payroll TO BE SENT TO:

ENGINEERING DEPARTMENT

ATT: William Maurer–

5866 MAIN STREET

TRUMBULL CT 06611

REQUEST FOR PROPOSALS

WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS

BID-RFP # 6574 DUE: June 30, 2026 at 2:00PM

STATEMENT OF QUALIFICATIONS (To be submitted with proposal)

Submitted by:

Name of Organization

Name of Individual

Title

Address

Telephone

Submitted to:

Name

Telephone

Project Name and Description (if applicable)

Contractor's General Business Information

Check If:

Corporation Partnership Joint Venture Sole Proprietorship

If Corporation:

a. Date and State of Incorporation

b. List of Executive Officers

Name Title

If Partnership:

a. Date and State of Organization

b. Names of Current General Partners

c. Type of Partnership

General Publicly Traded

Limited Other (describe):

If Joint Venture:

b. Name, Address and Form of Organization of Joint Venture Partners: (Indicate managing partner by an asterisk*)

If Sole Proprietorship:

b. Name and Address of Owner or Owners

1. On Schedule A, attached, list major engineered similar construction projects completed by this organization in the past five (5) years. (If a joint venture list each participant's projects separately).

2. On Schedule B, attached, list current projects similar under construction by this organization. (If joint venture, list each participant's projects separately).

3. Name of surety company and name, address, and phone number of agent.

4. Is your organization a member of a controlled group of corporations as defined in I.R.C. Sec. 1563?

Yes No

If yes, show names and addresses of affiliated companies.

5. Furnish on Schedule C, attached, details of the construction experience of the principal individuals of your organization directly involved in construction operations.

6. Has your organization ever failed to complete any construction contract awarded to it?

If yes, describe circumstances on attachment.

7. Has any Corporate officer, partner, joint venture participant or proprietor ever failed to complete a construction contract awarded to him or her in their own name or when acting as a principal of another organization?

8. In the last five years, has your organization ever failed to substantially complete a project in a timely manner?

I hereby certify that the information submitted herewith, including any attachment is true to the best of my knowledge and belief.

Name of Organization:

By:

Title:

Dated:

REQUEST FOR PROPOSALS

WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS

BID-RFP # 6574 DUE: Jun 30, 2026 at 2:00PM

Schedule A: Prior Experience (Copy Additional Pages as Needed)

Project

Owner Design

Professional

Contract Price

Amount Completed

Date of Scheduled Completion

Schedule B: Current Experience (Copy Additional Pages as Needed)

Project

Owner

Design

Professional

Contract Price

Amount Completed

Date of Scheduled Completion

Schedule C: Personnel (Copy Additional Pages as Needed)

Name Position Date of Hire Date Started in Construction

Prior Positions & Construction Experience

REQUEST FOR PROPOSALS

REFERENCES

(To be submitted with proposal – attach additional pages as necessary)

List references for similar services provided for at least Four (4) clients in the past five (5) years (attach any other client references if desired). PLEASE NOTE IT IS THE TOWN’S INTENT TO COMMUNICATE WITH THE

REFERENCES LISTED HEREIN.

CLIENT 1:

Organization Name:

Contact Name: Phone:

Service Dates:

Project(s):

CLIENT 2:

Contact Name: Phone:

CLIENT 3:

Contact Name: Phone:

CLIENT 4:

Contact Name: Phone:

REQUEST FOR PROPOSALS

PROPOSED SUBCONTRACTORS

If none, write "None" .

*Description of Work Proposed Subcontractor Name

*Insert description of work and subcontractors' names as may be required.

This is to certify that the names of the above-mentioned subcontractors are submitted with full knowledge and consent of the respective par-ties.

The Proposer warrants that none of the proposed subcontractors have any conflict of interest as respects this contract.

Proposer

(Fill in Name)

By

(Signature and Title)

SECTION 2

PROPOSAL

REQUEST FOR PROPOSALS

PROPOSAL

Proposal of (hereinafter called "Proposer, Bidder"), organized and existing under the laws of the State of Connecticut, doing business as to the Engineering Department, Town of Trumbull, Connecticut (hereinafter called the “Owner").

In compliance with your Advertisement for Proposals, Proposer hereby proposes for the “WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS” project in the Town of Trumbull, Connecticut together with all related incidental and appurtenant work as described in the specifications or outlined and/or shown on the exhibits. The work is to be done in strict accordance with the Specifications, Drawings and all Contract Documents, within the time set forth therein, and at the prices stated on the Proposal Schedule.

By submission of this Proposal, each Proposer certifies, that this Proposal has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this Proposal with any other Proposer or with any competitor.

Proposer hereby agrees to commence work under this contract on or before a date to be specified in the “Notice to Proceed”, and to fully complete the Project within one hundred (100) consecutive calendar days, excluding winter shutdown, thereafter.

Proposer further agrees to pay as liquidated damages, the sum of ($850.00) eight hundred and fifty for each consecutive calendar day thereafter till completion of the full contract as provided in the General Conditions. Proposer further agrees that he will provide and sustain the required Bonds and Insurance Policies as required.

Proposer understands that under a LOTCIP funded project, the prime contractor is required to perform at least 50% of the total contract value.

Proposer understands that the Owner reserves the right to reject any or all proposals and to waive any informality in the bidding.

Proposer agrees that this proposal shall be good and may not be withdrawn for a period of one hundred (100) calendar days after the scheduled closing time for receiving proposals.

Upon receipt of written notice of the acceptance of this proposal, proposer shall execute the formal contract attached within five (5) days and deliver a Surety Bond or Bonds as required in the General Conditions. The Bid Security attached in the sum of

Dollars ($ ) is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

Company Name By (Signature)

Address - City-Town-Zip Print Name

Email Title

Date Telephone/Fax

PROPOSAL – WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS (continued)

The undersigned hereby declares that in regard to all conditions affecting the work to be done and the labor and materials required, this proposal is based on his investigations and findings, and the Town of Trumbull and the Engineers and their officers, agents and employees shall not in any manner be held responsible for the accuracy of, or be bound by any estimates, borings, water or underground conditions relative to the proposed work, indicated in this or in the other contract documents; that no warranty or representation has been made by the Town of Trumbull or the Engineers or their officers, agents and employees as to subsurface soil or rock conditions, ground water, or other underground and similar conditions; nor has any representation or warranty been so made that the estimated quantities to be used for comparison of proposals will even approximate the actual quantities or materials and work which the Contractor may be required to furnish or perform.

BID FORM - Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

Acknowledgement of Addenda

Proposer hereby acknowledges receipt of all Addenda through and including:

Addendum No. , dated

Company

Authorized Signature

Print Name

WHITNEY AVENUE – PHASE II SIDEWALK/TRAIL CONNECTION IMPROVEMENTS – Base Bid Pay Items

Item

Number

Item Name and Unit Bid Prices Written in Figures

Units Estimated Quantity

Total Amount of Item

(in figures)

0202000 Earth Excavation, per CY, the price of:

CY

0201001A Clearing and Grubbing, per LS, the price of:

LS

0201501 Reset Mailbox, per EA, the price of:

EA

0202529 Cut Bituminous Concrete Pavement per LF, the price of:

LF

0203100 Structure Excavation - Rock, per CY, the price of:

0212000 Subbase, per CY, the price of:

0212300 Processed Aggregate Subbase, per

CY, the

0219001 Sedimentation Control System, per

LF, the

0219011 Sedimentation Control System at Catch Basin, per EA, the price of:

0406171 HMA S0.5, per TON, the price of:

Ton

0406172 HMA S0.375, per TON, the price of:

Ton

0586601 Reset Type ‘C’ Catch Basin, per EA, the price of:

0586620 Reset Type ‘C-L’ Catch Basin, per EA, the price

0586750 Type ‘C’ Catch Basin Top, per EA, the price of:

0586760 Type ‘C-L’ Catch Basin Top, per EA, the price

0601651A Retaining Wall (Site No. 1), per LS, the price

0601652 Retaining Wall (Site No. 2), per LS, the price

0751710 6” Underdrain, per LF, the price of:

0811001 Concrete Curbing, per LF, the price of:

0905008 Relocate Stone Wall, per LF, the price

0914013 Ornamental Fence, per LF, the price

0921001 Concrete Sidewalk, per SF, the price

SF

092100 Sidewalk Ramp, per SF, the price of:

0921039 Detectable Warning Strip, per EA, the

0922501 Bituminous Concrete Driveway, per SY, the price of:

SY

0944000 Furnishing and Placing Topsoil, per SY, the price of:

0949003A Furnishing, Planting and Mulching Trees, Shrubs, Vines and Ground Cover, per LS, the price of:

0950019A Turf Establishment - Lawn, per SY, the price of:

0970006 Trafficperson (Municipal Police Officer), per EST, the price of:

($Ninety six thousand dollars and zero cents

EST

$ 96,000

0970007 Trafficperson (Uniformed Flagger), per HR, the price of:

HR

0971001A Maintenance and Protection of Traffic, per LS, the price of:

0975004 Mobilization and Project Closeout, per LS, the price of:

0980001 Construction Staking, per LS, the price

1206023 Removal and Relocation of Existing Signs, per LS, the price of:

1210101 4” White Epoxy Resin Pavement Markings, per LF, the price of:

1210105 Epoxy Resin Pavement Markings, Symbols and Legends, per SF, the price of:

1220027 Construction Signs, per SF, the price

TOTAL AMOUNT OF BASE BID – (A)

(In figures)

THE QUANTITIES IN THIS BID FORM ARE FOR PURPOSES OF ILLUSTRATION ONLY. THE FINAL

QUANITIES WILL BE DETERMINED BY THE ACTUAL WORK COMPLETED.

PROPOSAL (continued)

Respectfully submitted, Company Name By (Signature)

Address Print Name

City –Town -Zip Title

EMAIL

(SEAL-if proposal is by a corporation)

Note: Insert Proposer's name. If a corporation, give the State of Incorporation using the phrase, "A corporation organized under the laws of

, composed of officers as follows:

President Secretary

Vice President Treasurer

If a partnership, give names of partners, using also the phrase, "co-partners trading and doing business under the firm name and style of , composed of partners as follows:

EMAIL

END OF GENERAL BID

SECTION 3

CONTRACT AND BONDS

BID BOND to be submitted with RFP proposal

Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name, and Address of Principal Place of Business):

OWNER (Name and Address):

BID

Bid Due Date:

Description (Project Name— Include Location):

BOND

Bond Number:

Date:

Penal sum $

(Words) (Figures)

Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal)

Bidder’s Name and Corporate Seal

Surety’s Name and Corporate Seal

Signature Signature (Attach Power of Attorney)

Print Name Print Name

Attest:

Signature Signature

Title Title

Note: Addresses are to be used for giving any required notice.

Provide execution by any additional parties, such as joint venturers, if necessary.

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.

Prepared by the Engineers Joint Contract Documents Committee.

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Docu-ments (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding

Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Docu-ments and any performance and payment bonds required by the Bidding Documents, or

3.2 All Bids are rejected by Owner, or

3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by

Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including ex-tensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default re- quired in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

PENAL SUM FORM

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States

Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective up-on receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such

Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any ap-plicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length.

If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.

Prepared by the Engineers Joint Contract Documents Committee.

CONTRACTOR (name and address): SURETY (name and address of principal place of business):

OWNER (name and address):

CONSTRUCTION CONTRACT

Effective Date of the Agreement: Amount:

Description (name and location):

Date (not earlier than the Effective Date of the Agreement of the Construction Contract):

Amount:

Modifications to this Bond Form: None See Paragraph 16

Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Performance Bond to be duly executed by an authorized officer, agent, or representative.

CONTRACTOR AS PRINCIPAL SURETY

Contractor’s Name and Corporate Seal

(seal) (seal)

Surety’s Name and Corporate Seal

Signature Signature (attach power of attorney)

Print Name Print Name

Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to

Contractor, Surety, Owner, or other party shall be considered plural where applicable.

PERFORMANCE BOND Sample if awarded

EJCDC® C-610, Performance Bond

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Compa-nies, and American Society of Civil Engineers. All rights reserved. 1 of 2

1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference.

2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, ex-cept when applicable to participate in a conference as provided in

Paragraph 3.

3. If there is no Owner Default under the Construction Contract, the

Surety’s obligation under this Bond shall arise after:

3.1 The Owner first provides notice to the Contractor and the

Surety that the Owner is considering declaring a Contractor De-fault. Such notice shall indicate whether the Owner is requesting a conference among the Owner, Contractor, and Surety to dis-cuss the Contractor’s performance. If the Owner does not re-quest a conference, the Surety may, within five (5) business days after receipt of the Owner’s notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend.

Unless the Owner agrees otherwise, any conference requested under this Paragraph 3.1 shall be held within ten (10) business days of the Surety’s receipt of the Owner’s notice. If the Owner, the Contractor, and the Surety agree, the Contractor shall be al-lowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner’s right, if any, subsequently to declare a Contractor Default;

3.2 The Owner declares a Contractor Default, terminates the

Construction Contract and notifies the Surety; and

3.3 The Owner has agreed to pay the Balance of the Contract

Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Con-struction Contract.

4. Failure on the part of the Owner to comply with the notice re-quirement in Paragraph 3.1 shall not constitute a failure to com-ply with a condition precedent to the Surety’s obligations, or release the Surety from its obligations, except to the extent the

Surety demonstrates actual prejudice.

5. When the Owner has satisfied the conditions of Paragraph 3, the

Surety shall promptly and at the Surety’s expense take one of the following actions:

5.1 Arrange for the Contractor, with the consent of the Own-

er, to perform and complete the Construction Contract;

5.2 Undertake to perform and complete the Construction

Contract itself, through its agents or independent contractors;

5.3 Obtain bids or negotiated proposals from qualified con-

tractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a con-tract to be prepared for execution by the Owner and a contrac-tor selected with the Owners concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Para-graph 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or

5.4 Waive its right to perform and complete, arrange for

completion, or obtain a new contractor, and with reasonable promptness under the circumstances:

5.4.1 After investigation, determine the amount for which it

may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or

5.4.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial.

6. If the Surety does not proceed as provided in Paragraph 5 with reasonable promptness, the Surety shall be deemed to be in de-fault on this Bond seven days after receipt of an additional writ-ten notice from the Owner to the Surety demanding that the

Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Paragraph 5.4, and the Owner refuses the payment or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner.

7. If the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, then the responsibilities of the Surety to the Owner shall not be great- er than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Con- tract.

Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication for:

7.1 the responsibilities of the Contractor for correction of de-fective work and completion of the Construction Contract;

7.2 additional legal, design professional, and delay costs re-sulting from the Contractor’s Default, and resulting from the ac-tions or failure to act of the Surety under Paragraph 5; and

7.3 liquidated damages, or if no liquidated damages are speci-fied in the Construction Contract, actual damages caused by de-layed performance or non-performance of the Contractor.

8. If the Surety elects to act under Paragraph 5.1, 5.3, or 5.4, the

Surety’s liability is limited to the amount of this Bond.

9. The Surety shall not be liable to the Owner or others for obliga-tions of the Contractor that are unrelated to the Construction

Contract, and the Balance of the Contract Price shall not be re-duced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors, and assigns.

14. Definitions

14.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made including allow-ance for the Contractor for any amounts received or to be re-ceived by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contrac-tor under the Construction Contract.

10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.

11. Any proceeding, legal or equitable, under this Bond may be insti-tuted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be insti-tuted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obliga-tions under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum peri-ods of limitations available to sureties as a defense in the juris-diction of the suit shall be applicable.

12. Notice to the Surety, the Owner, or the Contractor shall be mailed or delivered to the address shown on the page on which their signature appears.

13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.

14.2 Construction Contract: The agreement between the Own-

er and Contractor identified on the cover page, including all Con-tract Documents and changes made to the agreement and the

Contract Documents.

14.3 Contractor Default: Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to com- ply with a material term of the Construction Contract.

14.4 Owner Default: Failure of the Owner, which has not been

remedied or waived, to pay the Contractor as required under the

Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract.

14.5 Contract Documents: All the documents that comprise the

agreement between the Owner and Contractor.

15. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall…

This is the start of the file's text. The full file is on GovTribe.