BID 27017 JG BeachamMiscCoatings DRAWINGS_FIN.pdf
PDF 9 MB Posted
- Solicitation number
- PE-62960-NONST-2027-000000134
- Issued by
- Clayton County, Georgia
About this file
Summary
This is a technical drawings and specifications document for BID 27017, a miscellaneous coatings project at what appears to be a water treatment facility. The project encompasses coating work across 15 buildings and structures, including the High Service Delivery Building, Main Electrical Building, North Oconee Electrical Building, Sedimentation Building, South Sedimentation Basins, Silos, Tank 1, Tank 2, UV Building, Vault, North Oconee Pump Stations 1 and 2, Operations Building, Pre-chemical Building, and Post-chemical Building. The scope involves preparing and coating various surfaces including exposed steel, transformers, electrical boxes, concrete, masonry, drywall, piping, railings, doors, vents, pumps, and structural components. Multiple coating systems are specified for different applications, such as exposed steel non-immersion systems, transformer and electrical box systems, immersion systems for accessories, exterior placed concrete systems, interior wall systems, and specialized coatings for generator equipment and sludge collectors. Lead abatement is required for specific interior wall and railing work at North Oconee Pump Stations 1 and 2.
The document provides detailed drawings and attachment references for each building section, with comprehensive figures showing the exact locations and types of surfaces requiring coating. The project specifies distinct coating systems based on surface type and environmental exposure, including systems for structural components, exterior accessories, basin stand pipes, NOPS railings, and post-chemical building structural elements. No pricing information, bidding deadlines, award dates, contract term, site visit details, or bidders' conference information is included in this technical specifications document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID 27017 JG Beacham Misc Coatings_FINAL_ET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 1: Plant Layout tulene Sticky Note
Table of Contents
1. High Service Delivery Building
2. Main Electrical Building
3. North Oconee Electrical Building
4. Sedimentation Building
5. South Sedimentation Basin
6. Silos
7. Tank 1
8. Tank 2
9. UV Building
10. Vault
11. North Oconee Pump Station 1
12. North Oconee Pump Station 2
13. Operations Building
14. Pre-chemical Building
15. Post-chemical Building
Drawing Attachments
Figures & Coatings Systems
1. High Service Delivery Building
Figure 1.01: Roof Figure 1.02: Double Doors
Figure 1.03: Door Figure 1.04: Roof Hatches
Look at Drawing Attachment 1
High Service Delivery Building
Figure 1.05: Transformers
Look at Drawing Attachment 2
2. Main Electrical Building
Figure 2.01: Door Figure 2.02: Vent
Figure 2.03: Transformer Figure 2.04: Generator 1 Exhaust Muffler and Supporting Roof
Look at Drawing Attachment 3a
Look at Drawing Attachment 3a
Look at Drawing Attachment 3b
Look at Drawing Attachment 3c
Main Electrical Building
Figure 2.05: Generator 1 Building Figure 2.06: Generator 2 Exhaust Muffler and Supporting Roof
Figure 2.07: Generator 2 Building
3. North Oconee Electrical Building
Figure 3.01: Double Doors Figure 3.02: Door
Figure 3.03: Vent Figure 3.04a: Transformers
Look at Drawing Attachment 4a
Look at Drawing Attachment 4b
North Oconee Electrical Building
Figure 3.04b: Transformers
Look at Drawing Attachment 4b
4. Sedimentation Building
Figure 4.01a: Sludge Collectors Piping Valves
Figure 4.01b: Sludge Collectors Piping Valves
Figure 4.02a: Electrical Box and Conduit
Figure 4.02b: Electrical Box and Conduit
Look at Drawing Attachment 5
Look at Drawing Attachment 7
Look at Drawing Attachment 7
Sedimentation Building
Figure 4.03: Overflow Drain Figure 4.04: Drains
Figure 4.05: Basin 1 Wall
There is an overflow drain in all basins
There are 4 drains total in basins 1 and 2
5. South Sedimentation Basin
There are 4 South Sedimentation Basins that are grouped into two pairs. These equipment (other than the electrical box on figure 5.02) exist on each pair. The equipment need to be painted on both pairs.
Figure 5.01a: Electrical Conduit Figure 5.01b: Electrical Conduit
Figure 5.02: Electrical Box and Conduit Figure 5.03a: Piping
Look at Drawing Attachment 8 and 9
Look at Drawing Attachment 8
South Sedimentation Basin
Figure 5.03b: Piping Figure 5.04a: Piping
Figure 5.04b: Piping Figure 5.04C: Stand pipe water supply
South Sedimentation Basin
Figure 5.05: Sludge collector walkway Figure 5.06: Sludge Collector
There are 8 sludge collectors
6. Silos
There are two silos. The railings on both need to be painted.
Figure 6.01a: Railings Figure 6.01b: Railings
Figure 6.01c: Railings
Look at Drawing Attachment 10
Look at Drawing Attachment 10
Look at Drawing Attachment 10
7. Tank 1
Figure 7.01a: Piping Figure 7.01b: Piping
FIgure 7.02: Tank 1
Look at Drawing Attachment 11
Look at Drawing Attachment 11
8. Tank 2
Figure 8.01a: Piping Figure 8.01b: Piping
Figure 8.02: Tank Drain Station Piping Figure 8.03: Railing
Look at Drawing Attachment 2
Look at Drawing Attachment 2
Tank 2
Figure 8.04: Sanitary Sewer Lift Station Figure 8.05: Tank 2
9. UV Building
Figure 9.01: Door Figure 9.02: Door
Figure 9.03: Door Figure 9.04a: Door
Look at Drawing Attachment 11
Look at Drawing Attachment 12
Look at Drawing Attachment 12
UV Building
Figure 9.04b: Door Figure 9.05a: Piping
Figure 9.05b: Piping
Look at Drawing Attachment 2 and 11
Look at Drawing Attachment 11 and 12
10. Vault
Figure 10.01: Vent 1 Figure 10.02: Vent 2
Look at Drawing Attachment 13 Look at Drawing Attachment 13
11. North Oconee Pump Station 1
Figure 11.01: Door Figure 11.02a: Interior Walls
Figure 11.02b: Interior Walls Figure 11.02c: Interior Walls
Look at Drawing Attachment 14
Look at Drawing Attachment 14 Look at Drawing Attachment 14
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel Text Box Lead Abatement Required
North Oconee Pump Station 1
Figure 11.02d: Lower Floor Interior Walls Figure 11.03: Railings
Figure 11.04: Lower Floor Pump and Support
Figure 11.05: Window Screen - side of the building
Look at Drawing Attachment 14
Look at Drawing Attachment 14
Look at Drawing Attachment 14
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel
North Oconee Pump Station 1
Figure 11.06: Window Screen - side of the building
12. North Oconee Pump Station 2
Figure 12.01: Inside railings - side of the building
Figure 12.02a: Support Steel - side of the building
Figure 12.02b: Support Steel - side of the building
Figure 12.02c: Support Steel - side
North Oconee Pump Station 2
Figure 12.02d: Support Steel - side
Figure 12.03: Outside Railings - side of the building
Figure 12.04: Support Steel Figure 12.05: Window Screen
Look at Drawing Attachment 15 Look at Drawing Attachment 15
Figure 12.06a: Support Steel - back
Figure 12.06b: Support Steel - back of the building
Figure 12.06c: Support Steel - back of the building
Figure 12.07: Railing - back of the building
Figure 12.08: Exterior Light Pole Figure 12.09: Exterior Light Pole
Figure 12.10: Door Figure 12.11a: Interior Walls
Look at Drawing Attachment 15
Mamo, Bethel
Figure 12.11b: Interior Walls Figure 12.11c: Interior Walls
Figure 12.11d: Interior Walls Figure 12.12: Railings
Look at Drawing Attachment 15
Look at Drawing Attachment 15 Look at Drawing Attachment 15
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel Text Box Lead Abatement Required
Mamo, Bethel
Figure 12.13a: Pump Spray Base Figure 12.13b: Pump Spray Base
Figure 12.14a: Top part of travelling water screen
Figure 12.14b: Top part of travelling water screen.
Look at Drawing Attachment 15
Look at Drawing Attachment 15
Look at Drawing Attachment 15
Figure 12.14c: Top part of travelling water screen Figure 12.15: Exterior Piping
Figure 12.16a: Railings Figure 12.16b: Railings
Figure 12.17: Outside railings - side of the building
Figure 12.18: Outside Door - side of the building
13. Operations Building
Figure 13.01a: Control Room Walls Figure 13.01b: Control Room Walls
Figure 13.01c: Control Room Walls Figure 13.02a: Room 213 Lab Walls
Look at Drawing Attachment 16
Look at Drawing Attachment 16
Look at Drawing Attachment 16 Look at Drawing Attachment 16
Operations Building
Figure 13.02b: Room 213 Lab Walls Figure 13.03: Wall Above Stairway
Figure 13.04: Wall Next to Stairway Figure 13.05: Wall Behind Drinking Fountains
Look at Drawing Attachment 16 Look at Drawing Attachment 16
Figure 13.06: Walls Near Elevator – By Lobby
Figure 13.07a: Room 211 Training Room Walls
Figure 13.07b: Room 211 Training Room Walls
Figure 13.07c: Room 211 Training Room Walls
Figure 13.08a: Visitor Area Walls Figure 13.08b: Visitor Area Walls
Figure 13.08c: Visitor Area Walls Figure 13.09: Hallway Walls
Look at Drawing Attachment 16 Look at Drawing Attachment 16
Figure 13.10a: Filter pipe gallery Walls
Figure 13.10b: Filter pipe gallery Walls
Figure 13.10c: Filter pipe gallery Walls
Figure 13.10d: Filter pipe gallery Walls
Figure 13.10e: Filter pipe gallery
Figure 13.10f: Filter pipe gallery
14. Pre-chemical Building
Figure 14.01a: Roof Vent Boxes and Roof
Figure 14.01b: Roof Vent Boxes and Roof
Figure 14.02a: Bollards Figure 14.02b: Bollards
Look at Drawing Attachment 17a Look at Drawing Attachment 17a
Look at Drawing Attachment 17a Look at Drawing Attachment 17a
Pre-chemical Building
Figure 14.03a: Transformers Figure 14.03b: Transformers
Figure 14.03c: Transformers Figure 14.03d: Transformers
Look at Drawing Attachment 17b Look at Drawing Attachment 17b
Look at Drawing Attachment 17b Look at Drawing Attachment 17b
Figure 14.04: Double check backflow preventer
Figure 14.05: Reduced Pressure Zone and Flow Meter
Look at Drawing Attachment 6
Look at Drawing Attachment 6 and 17b
15. Post-chemical Building
Figure 15.01: Rust on Metal Trusses Figure 15.02: Possible Lead Paint on Walls
Figure 15.03: Possible Lead Paint on Beams Figure 15.04: Supports
Look at Drawing Attachment 18 Look at Drawing Attachment 18
Look at Drawing Attachment 18 Look at Drawing Attachment 18
Drawing Attachments
Drawing Attachment 1: High Service Building
Figure 1.01: Roof
Figures 1.02 & 1.03:
Doors
Figure 1.04: Roof Hatches
Drawing Attachment 2: Tank 1, Tank 2, High Service Building, UV Building
Figure 1.05: HSB Transformers
Figure 8.04: Tank 2 Sanitary Sewer Lift Station
Figure 9.05b:
Piping
Figure 8.01: Tank 2 Piping
Figure 8.02: Tank 2 Drain Station Piping
Figure 8.03: Tank 2 Railing
Tank 2
Tank 1
Post Chemical Building
Figure 8.05: Tank 2
Drawing Attachment 3a: Main Electrical Building – Plans/Elevations & Finish Schedule
Figure 2.01: Door
Figure 2.02: Vent
Drawing Attachment 3b: Main Electrical Building - Plan
Figure 2.03: Transformer
Drawing Attachment 3c: Main Electrical Building – Generator Plan and Wiring Diagram
Figure 2.04: Generator 1 Exhaust Muffler
Figure 2.06: Generator 2 Exhaust Muffler
Figure 2.07: Generator 2 Building
Figure 2.05: Generator 1 Building
Drawing Attachment 4a: North Oconee RWPS Electrical Building – Plans, Elevations, Sections, & Finish Schedule
Figures 3.01 & 3.02 : Doors
Figures 3.03: Vent
Drawing Attachment 4b: North Oconee RWPS Electrical Building - Plan
Figure 3.04: Transformers
Drawing Attachment 5: Sedimentation Basins
Figure 4.01: Sludge Collector’s Piping
Sedimentation Basins
Main Electrical Building
Figure 4.05: Basin 1 Wall
Drawing Attachment 6: Sedimentation Basins and Pre-Chemical Building
Figure 14.05: Double check backflow preventer
Figure 14.06: Reduced Pressure Zone and Flow Meter
Sedimentation Basins
Drawing Attachment 7: Sedimentation Basins – No.3 and No.4
Figure 4.02: Electrical Box and Conduit
In reality, it is closer to Floc/Sed Basin NO. 2
Drawing Attachment 8: South Sedimentation Basins – No.5 and No. 6
Figure 5.01: Electrical Box and Conduit
Figure 5.02: Electrical Box and Conduit
Figure 5.03: Piping
Figure 5.04: Piping Figure 5.05: Sludge Collector Walkway
There are multiple of the pipes shown in Figure 5.03. All should be painted.
Drawing Attachment 9: South Sedimentation Basins No. 7 and No. 8
Figure 5.01: Electrical Box and Conduit
Figure 5.03: Piping
Figure 5.04: Piping Figure 5.05: Sludge Collector Walkway
There are multiple of the pipes shown in Figure 5.03. All should be painted.
Drawing Attachment 10: Silos
Figure 6.01: Silos Railings
Drawing Attachment 11: Tank 1, Tank 2, UV Building
Figure 7.01: Tank 1 Piping
Figure 9.01:
Door
Figure 9.05b:
Piping
Figure 9.05a:
Piping
Figure 7.02: Tank 1
Drawing Attachment 12: UV Building
Figure 9.05a: Piping Figure 9.04: Door
Figure 9.03: Door
Figure 9.02: Door
Drawing Attachment 13: Vault
Figure 10.01: Vent
Figure 10.02: Vent
Drawing Attachment 14: North Oconee Raw Water Pump Station No. 1
Figure 11.02: Walls
Figure 11.04: Lower Floor Pump and Support
Figure 11.03: Railings
Drawing Attachment 15: North Oconee Raw Water Pump Station No. 2
Figure 12.05: Window Screen
Figure 12.13: Pump Spray Base
Figure 12.04: Support Steel
Figure 12.11: Interior Walls Screen
Figure 12.14:
Travelling Water Screen
Drawing Attachment 16: Operations Building
Figure 13.07: Room 211 Training Room Walls
Figure 13.09: Hallway Walls
Figure 13.01: Control Room Walls
Figure 13.02: Room 13 Lab Walls
Figures 13.03-13.04: Walls above and next to Stairway
Figure 13.05: Wall Behind Drinking Fountains Figures 13.06: Walls Near
Elevator
Figure 13.10: Filter Pipe Gallery Walls
Figure 13.08: Visitor Area
Drawing Attachment 17a: Pre-Chemical Building - Elevations
Figure 14.01: Roof Vent Boxes and Roof Fountains
Figure 14.01: Roof Vent Boxes and Roof Fountains
Figure 14.02: Bollards
Drawing Attachment 17b: Pre-Chemical Building
Figures 14.03:
Transformers
Figure 14.06: Reduced Pressure Zone and Flow Meter
Drawing Attachment 18: Post-Chemical Building
Figures 15.01- 15.04: Wall, Trusses, and Supports
Figures & Coating Systems
Building # Building Figure Number Type Coatings System
1.01 Roof Exposed Steel - Non Immersion
1.02 Doors Exposed Steel - Non Immersion
1.03 Doors Exposed Steel - Non Immersion
1.04 Roof Hatch Exposed Steel - Non Immersion
1.05 Transformers Transformers and Electrical Boxes
2.01 Doors Exposed Steel - Non Immersion
2.02 Vent Exposed Steel - Non Immersion
2.03 Transformers Transformers and Electrical Boxes
2.04 Generator 1 - Exhaust Muffler and Supporting Roof
Generator Exhaust Muffler and Supporting Roof
2.05 Generator 1 Building Exterior Accessories
2.06 Generator 2 - Exhaust Muffler and Supporting Roof
Generator Exhaust Muffler and Supporting Roof
2.07 Generator 2 Building Exterior Accessories
3.01 Doors Exposed Steel - Non Immersion
3.02 Doors Exposed Steel - Non Immersion
3.03 Vent Exposed Steel - Non Immersion
3.04 Transformers Transformers and Electrical Boxes
4.01 Valve Exterior Accessories
4.02 Electrical Box Transformers and Electrical Boxes
4.03 Overflow Drain Accessories - Immersion
4.04 Drains Accessories - Immersion
4.05 Basin 1 Wall Exterior Placed Concrete
5.01 Electrical Box Transformers and Electrical Boxes
5.02 Electrical Box Transformers and Electrical Boxes
5.03 Piping Exterior Accessories
5.04 Piping Basin Stand Pipe - Immersion
5.05 Walkway Exterior Accessories
5.06 Sludge Collector Sludge Collector
6 Silos 6.01 Railings Exterior Accessories
7.01 Piping Exterior Accessories
7.02 Tank Exterior Placed Concrete
8.01 Piping Exterior Accessories
8.02 Piping Exterior Accessories
8.03 Railings Exterior Accessories
8.04 Piping Exterior Accessories
8.05 Tank Exterior Placed Concrete
9.01 Doors Exposed Steel - Non Immersion
9.02 Doors Exposed Steel - Non Immersion
9.03 Doors Exposed Steel - Non Immersion
Tank 1
High Service Delivery Building
Main Electrical Building
North Oconee Electrical Building
Sedimentation Basin
South Sedimentation Basin
Tank 2
9.04 Doors Exposed Steel - Non Immersion
9.05 Piping Exterior Accessories
10.01 Vent Exposed Steel - Non Immersion
10.02 Vent Exposed Steel - Non Immersion
11.01 Doors
Exposed Steel - Non Immersion: lead-abatement
11.02 Walls Interior Walls - Masonry: lead-abatement
11.03 Railings NOPS Railings: lead-abatement
11.04 Pump and Support Accessories - Immersion
11.05 Window Screen Exterior Accessories
11.06 Window Screen Exterior Accessories
12.01 Railings Accessories - Immersion
12.02 Support Steel and Valve Accessories - Immersion
12.03 Railings NOPS Railings
12.04 Support Steel Exterior Accessories
12.05 Window Screen Exterior Accessories
12.06 Support Steel Exterior Accessories
12.07 Railings Exterior Accessories
12.08 Light Pole Exterior Accessories
12.09 Light Pole Exterior Accessories
12.10 Doors Exposed Steel - Non Immersion
12.11 Walls Interior Walls - Masonry: lead-abatement
12.12 Railings NOPS Railings: lead-abatement
12.13 Pump Spray Base Accessories - Immersion
12.14 Travelling Water Screen Accessories - Immersion
12.15 Exterior Piping NOPS 2 Exterior Piping
12.16 Railings Exterior Accessories
12.17 Railings Exterior Accessories
12.18 Doors Exterior Accessories
13.01 Walls Interior Walls - Dry Wall
13.02 Walls Interior Walls - Dry Wall
13.03 Walls Interior Walls - Dry Wall
13.04 Walls Interior Walls - Dry Wall
13.05 Walls Interior Walls - Dry Wall
13.06 Walls Interior Walls - Dry Wall
13.07 Walls Interior Walls - Dry Wall
13.08 Walls Interior Walls - Dry Wall
13.09 Walls Interior Walls - Dry Wall
13.10 Walls Interior Walls - Masonry
Operations Building13
Vault
North Oconee Pump Station 1
North Oconee Pump Station 2
14.01 Roof Vent Boxes and Roof Exposed Steel - Non Immersion
14.02 Bollards Interior Walls - Masonry
14.03 Transformers Transformers and Electrical Boxes
14.04 Valve Exterior Accessories
14.05 Valve Exterior Accessories
15.01 Trusses
Post-Chemical Building Structural Component
15.02 Walls Interior Walls - Masonry
15.03 Beam
Post-Chemical Building Structural Component
15.04 Supports
Post-Chemical Building Structural Component
Pre-chemical Building
Post-chemical Building
| 1. High Service Delivery Building |
| 2. Main Electrical Building |
| 3. North Oconee Electrical Building |
| 4. Sedimentation Building |
| 5. South Sedimentation Basin |
| 6. Silos |
| 7. Tank 1 |
| 8. Tank 2 |
| 9. UV Building |
| 10. Vault |
| 11. North Oconee Pump Station 1 |
| 12. North Oconee Pump Station 2 |
| 13. Operations Building |
| 14. Pre-chemical Building |
| 15. Post-chemical Building |
| Drawing Attachments |
| Figures & Coating Systems |
File details come from the government source that posted it. Updated .