BID 27017 JG BeachamMiscCoatings DRAWINGS_FIN.pdf

PDF 9 MB Posted

Attached to
BID #27017 JG Beacham Water Treatment Plant Miscellaneous Coatings
Solicitation number
PE-62960-NONST-2027-000000134
Issued by
Clayton County, Georgia

About this file

Summary

This is a technical drawings and specifications document for BID 27017, a miscellaneous coatings project at what appears to be a water treatment facility. The project encompasses coating work across 15 buildings and structures, including the High Service Delivery Building, Main Electrical Building, North Oconee Electrical Building, Sedimentation Building, South Sedimentation Basins, Silos, Tank 1, Tank 2, UV Building, Vault, North Oconee Pump Stations 1 and 2, Operations Building, Pre-chemical Building, and Post-chemical Building. The scope involves preparing and coating various surfaces including exposed steel, transformers, electrical boxes, concrete, masonry, drywall, piping, railings, doors, vents, pumps, and structural components. Multiple coating systems are specified for different applications, such as exposed steel non-immersion systems, transformer and electrical box systems, immersion systems for accessories, exterior placed concrete systems, interior wall systems, and specialized coatings for generator equipment and sludge collectors. Lead abatement is required for specific interior wall and railing work at North Oconee Pump Stations 1 and 2.

The document provides detailed drawings and attachment references for each building section, with comprehensive figures showing the exact locations and types of surfaces requiring coating. The project specifies distinct coating systems based on surface type and environmental exposure, including systems for structural components, exterior accessories, basin stand pipes, NOPS railings, and post-chemical building structural elements. No pricing information, bidding deadlines, award dates, contract term, site visit details, or bidders' conference information is included in this technical specifications document.

View the file

Other files

File Type Posted
BID 27017 JG Beacham Misc Coatings_FINAL_ET.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Figure 1: Plant Layout tulene Sticky Note

Table of Contents

1. High Service Delivery Building

2. Main Electrical Building

3. North Oconee Electrical Building

4. Sedimentation Building

5. South Sedimentation Basin

6. Silos

7. Tank 1

8. Tank 2

9. UV Building

10. Vault

11. North Oconee Pump Station 1

12. North Oconee Pump Station 2

13. Operations Building

14. Pre-chemical Building

15. Post-chemical Building

Drawing Attachments

Figures & Coatings Systems

1. High Service Delivery Building

Figure 1.01: Roof Figure 1.02: Double Doors

Figure 1.03: Door Figure 1.04: Roof Hatches

Look at Drawing Attachment 1

High Service Delivery Building

Figure 1.05: Transformers

Look at Drawing Attachment 2

2. Main Electrical Building

Figure 2.01: Door Figure 2.02: Vent

Figure 2.03: Transformer Figure 2.04: Generator 1 Exhaust Muffler and Supporting Roof

Look at Drawing Attachment 3a

Look at Drawing Attachment 3a

Look at Drawing Attachment 3b

Look at Drawing Attachment 3c

Main Electrical Building

Figure 2.05: Generator 1 Building Figure 2.06: Generator 2 Exhaust Muffler and Supporting Roof

Figure 2.07: Generator 2 Building

3. North Oconee Electrical Building

Figure 3.01: Double Doors Figure 3.02: Door

Figure 3.03: Vent Figure 3.04a: Transformers

Look at Drawing Attachment 4a

Look at Drawing Attachment 4b

North Oconee Electrical Building

Figure 3.04b: Transformers

Look at Drawing Attachment 4b

4. Sedimentation Building

Figure 4.01a: Sludge Collectors Piping Valves

Figure 4.01b: Sludge Collectors Piping Valves

Figure 4.02a: Electrical Box and Conduit

Figure 4.02b: Electrical Box and Conduit

Look at Drawing Attachment 5

Look at Drawing Attachment 7

Look at Drawing Attachment 7

Sedimentation Building

Figure 4.03: Overflow Drain Figure 4.04: Drains

Figure 4.05: Basin 1 Wall

There is an overflow drain in all basins

There are 4 drains total in basins 1 and 2

5. South Sedimentation Basin

There are 4 South Sedimentation Basins that are grouped into two pairs. These equipment (other than the electrical box on figure 5.02) exist on each pair. The equipment need to be painted on both pairs.

Figure 5.01a: Electrical Conduit Figure 5.01b: Electrical Conduit

Figure 5.02: Electrical Box and Conduit Figure 5.03a: Piping

Look at Drawing Attachment 8 and 9

Look at Drawing Attachment 8

South Sedimentation Basin

Figure 5.03b: Piping Figure 5.04a: Piping

Figure 5.04b: Piping Figure 5.04C: Stand pipe water supply

South Sedimentation Basin

Figure 5.05: Sludge collector walkway Figure 5.06: Sludge Collector

There are 8 sludge collectors

6. Silos

There are two silos. The railings on both need to be painted.

Figure 6.01a: Railings Figure 6.01b: Railings

Figure 6.01c: Railings

Look at Drawing Attachment 10

Look at Drawing Attachment 10

Look at Drawing Attachment 10

7. Tank 1

Figure 7.01a: Piping Figure 7.01b: Piping

FIgure 7.02: Tank 1

Look at Drawing Attachment 11

Look at Drawing Attachment 11

8. Tank 2

Figure 8.01a: Piping Figure 8.01b: Piping

Figure 8.02: Tank Drain Station Piping Figure 8.03: Railing

Look at Drawing Attachment 2

Look at Drawing Attachment 2

Tank 2

Figure 8.04: Sanitary Sewer Lift Station Figure 8.05: Tank 2

9. UV Building

Figure 9.01: Door Figure 9.02: Door

Figure 9.03: Door Figure 9.04a: Door

Look at Drawing Attachment 11

Look at Drawing Attachment 12

Look at Drawing Attachment 12

UV Building

Figure 9.04b: Door Figure 9.05a: Piping

Figure 9.05b: Piping

Look at Drawing Attachment 2 and 11

Look at Drawing Attachment 11 and 12

10. Vault

Figure 10.01: Vent 1 Figure 10.02: Vent 2

Look at Drawing Attachment 13 Look at Drawing Attachment 13

11. North Oconee Pump Station 1

Figure 11.01: Door Figure 11.02a: Interior Walls

Figure 11.02b: Interior Walls Figure 11.02c: Interior Walls

Look at Drawing Attachment 14

Look at Drawing Attachment 14 Look at Drawing Attachment 14

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel Text Box Lead Abatement Required

North Oconee Pump Station 1

Figure 11.02d: Lower Floor Interior Walls Figure 11.03: Railings

Figure 11.04: Lower Floor Pump and Support

Figure 11.05: Window Screen - side of the building

Look at Drawing Attachment 14

Look at Drawing Attachment 14

Look at Drawing Attachment 14

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel

North Oconee Pump Station 1

Figure 11.06: Window Screen - side of the building

12. North Oconee Pump Station 2

Figure 12.01: Inside railings - side of the building

Figure 12.02a: Support Steel - side of the building

Figure 12.02b: Support Steel - side of the building

Figure 12.02c: Support Steel - side

North Oconee Pump Station 2

Figure 12.02d: Support Steel - side

Figure 12.03: Outside Railings - side of the building

Figure 12.04: Support Steel Figure 12.05: Window Screen

Look at Drawing Attachment 15 Look at Drawing Attachment 15

Figure 12.06a: Support Steel - back

Figure 12.06b: Support Steel - back of the building

Figure 12.06c: Support Steel - back of the building

Figure 12.07: Railing - back of the building

Figure 12.08: Exterior Light Pole Figure 12.09: Exterior Light Pole

Figure 12.10: Door Figure 12.11a: Interior Walls

Look at Drawing Attachment 15

Mamo, Bethel

Figure 12.11b: Interior Walls Figure 12.11c: Interior Walls

Figure 12.11d: Interior Walls Figure 12.12: Railings

Look at Drawing Attachment 15

Look at Drawing Attachment 15 Look at Drawing Attachment 15

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel Text Box Lead Abatement Required

Mamo, Bethel

Figure 12.13a: Pump Spray Base Figure 12.13b: Pump Spray Base

Figure 12.14a: Top part of travelling water screen

Figure 12.14b: Top part of travelling water screen.

Look at Drawing Attachment 15

Look at Drawing Attachment 15

Look at Drawing Attachment 15

Figure 12.14c: Top part of travelling water screen Figure 12.15: Exterior Piping

Figure 12.16a: Railings Figure 12.16b: Railings

Figure 12.17: Outside railings - side of the building

Figure 12.18: Outside Door - side of the building

13. Operations Building

Figure 13.01a: Control Room Walls Figure 13.01b: Control Room Walls

Figure 13.01c: Control Room Walls Figure 13.02a: Room 213 Lab Walls

Look at Drawing Attachment 16

Look at Drawing Attachment 16

Look at Drawing Attachment 16 Look at Drawing Attachment 16

Operations Building

Figure 13.02b: Room 213 Lab Walls Figure 13.03: Wall Above Stairway

Figure 13.04: Wall Next to Stairway Figure 13.05: Wall Behind Drinking Fountains

Look at Drawing Attachment 16 Look at Drawing Attachment 16

Figure 13.06: Walls Near Elevator – By Lobby

Figure 13.07a: Room 211 Training Room Walls

Figure 13.07b: Room 211 Training Room Walls

Figure 13.07c: Room 211 Training Room Walls

Figure 13.08a: Visitor Area Walls Figure 13.08b: Visitor Area Walls

Figure 13.08c: Visitor Area Walls Figure 13.09: Hallway Walls

Look at Drawing Attachment 16 Look at Drawing Attachment 16

Figure 13.10a: Filter pipe gallery Walls

Figure 13.10b: Filter pipe gallery Walls

Figure 13.10c: Filter pipe gallery Walls

Figure 13.10d: Filter pipe gallery Walls

Figure 13.10e: Filter pipe gallery

Figure 13.10f: Filter pipe gallery

14. Pre-chemical Building

Figure 14.01a: Roof Vent Boxes and Roof

Figure 14.01b: Roof Vent Boxes and Roof

Figure 14.02a: Bollards Figure 14.02b: Bollards

Look at Drawing Attachment 17a Look at Drawing Attachment 17a

Look at Drawing Attachment 17a Look at Drawing Attachment 17a

Pre-chemical Building

Figure 14.03a: Transformers Figure 14.03b: Transformers

Figure 14.03c: Transformers Figure 14.03d: Transformers

Look at Drawing Attachment 17b Look at Drawing Attachment 17b

Look at Drawing Attachment 17b Look at Drawing Attachment 17b

Figure 14.04: Double check backflow preventer

Figure 14.05: Reduced Pressure Zone and Flow Meter

Look at Drawing Attachment 6

Look at Drawing Attachment 6 and 17b

15. Post-chemical Building

Figure 15.01: Rust on Metal Trusses Figure 15.02: Possible Lead Paint on Walls

Figure 15.03: Possible Lead Paint on Beams Figure 15.04: Supports

Look at Drawing Attachment 18 Look at Drawing Attachment 18

Look at Drawing Attachment 18 Look at Drawing Attachment 18

Drawing Attachments

Drawing Attachment 1: High Service Building

Figure 1.01: Roof

Figures 1.02 & 1.03:

Doors

Figure 1.04: Roof Hatches

Drawing Attachment 2: Tank 1, Tank 2, High Service Building, UV Building

Figure 1.05: HSB Transformers

Figure 8.04: Tank 2 Sanitary Sewer Lift Station

Figure 9.05b:

Piping

Figure 8.01: Tank 2 Piping

Figure 8.02: Tank 2 Drain Station Piping

Figure 8.03: Tank 2 Railing

Tank 2

Tank 1

Post Chemical Building

Figure 8.05: Tank 2

Drawing Attachment 3a: Main Electrical Building – Plans/Elevations & Finish Schedule

Figure 2.01: Door

Figure 2.02: Vent

Drawing Attachment 3b: Main Electrical Building - Plan

Figure 2.03: Transformer

Drawing Attachment 3c: Main Electrical Building – Generator Plan and Wiring Diagram

Figure 2.04: Generator 1 Exhaust Muffler

Figure 2.06: Generator 2 Exhaust Muffler

Figure 2.07: Generator 2 Building

Figure 2.05: Generator 1 Building

Drawing Attachment 4a: North Oconee RWPS Electrical Building – Plans, Elevations, Sections, & Finish Schedule

Figures 3.01 & 3.02 : Doors

Figures 3.03: Vent

Drawing Attachment 4b: North Oconee RWPS Electrical Building - Plan

Figure 3.04: Transformers

Drawing Attachment 5: Sedimentation Basins

Figure 4.01: Sludge Collector’s Piping

Sedimentation Basins

Main Electrical Building

Figure 4.05: Basin 1 Wall

Drawing Attachment 6: Sedimentation Basins and Pre-Chemical Building

Figure 14.05: Double check backflow preventer

Figure 14.06: Reduced Pressure Zone and Flow Meter

Sedimentation Basins

Drawing Attachment 7: Sedimentation Basins – No.3 and No.4

Figure 4.02: Electrical Box and Conduit

In reality, it is closer to Floc/Sed Basin NO. 2

Drawing Attachment 8: South Sedimentation Basins – No.5 and No. 6

Figure 5.01: Electrical Box and Conduit

Figure 5.02: Electrical Box and Conduit

Figure 5.03: Piping

Figure 5.04: Piping Figure 5.05: Sludge Collector Walkway

There are multiple of the pipes shown in Figure 5.03. All should be painted.

Drawing Attachment 9: South Sedimentation Basins No. 7 and No. 8

Figure 5.01: Electrical Box and Conduit

Figure 5.03: Piping

Figure 5.04: Piping Figure 5.05: Sludge Collector Walkway

There are multiple of the pipes shown in Figure 5.03. All should be painted.

Drawing Attachment 10: Silos

Figure 6.01: Silos Railings

Drawing Attachment 11: Tank 1, Tank 2, UV Building

Figure 7.01: Tank 1 Piping

Figure 9.01:

Door

Figure 9.05b:

Piping

Figure 9.05a:

Piping

Figure 7.02: Tank 1

Drawing Attachment 12: UV Building

Figure 9.05a: Piping Figure 9.04: Door

Figure 9.03: Door

Figure 9.02: Door

Drawing Attachment 13: Vault

Figure 10.01: Vent

Figure 10.02: Vent

Drawing Attachment 14: North Oconee Raw Water Pump Station No. 1

Figure 11.02: Walls

Figure 11.04: Lower Floor Pump and Support

Figure 11.03: Railings

Drawing Attachment 15: North Oconee Raw Water Pump Station No. 2

Figure 12.05: Window Screen

Figure 12.13: Pump Spray Base

Figure 12.04: Support Steel

Figure 12.11: Interior Walls Screen

Figure 12.14:

Travelling Water Screen

Drawing Attachment 16: Operations Building

Figure 13.07: Room 211 Training Room Walls

Figure 13.09: Hallway Walls

Figure 13.01: Control Room Walls

Figure 13.02: Room 13 Lab Walls

Figures 13.03-13.04: Walls above and next to Stairway

Figure 13.05: Wall Behind Drinking Fountains Figures 13.06: Walls Near

Elevator

Figure 13.10: Filter Pipe Gallery Walls

Figure 13.08: Visitor Area

Drawing Attachment 17a: Pre-Chemical Building - Elevations

Figure 14.01: Roof Vent Boxes and Roof Fountains

Figure 14.01: Roof Vent Boxes and Roof Fountains

Figure 14.02: Bollards

Drawing Attachment 17b: Pre-Chemical Building

Figures 14.03:

Transformers

Figure 14.06: Reduced Pressure Zone and Flow Meter

Drawing Attachment 18: Post-Chemical Building

Figures 15.01- 15.04: Wall, Trusses, and Supports

Figures & Coating Systems

Building # Building Figure Number Type Coatings System

1.01 Roof Exposed Steel - Non Immersion

1.02 Doors Exposed Steel - Non Immersion

1.03 Doors Exposed Steel - Non Immersion

1.04 Roof Hatch Exposed Steel - Non Immersion

1.05 Transformers Transformers and Electrical Boxes

2.01 Doors Exposed Steel - Non Immersion

2.02 Vent Exposed Steel - Non Immersion

2.03 Transformers Transformers and Electrical Boxes

2.04 Generator 1 - Exhaust Muffler and Supporting Roof

Generator Exhaust Muffler and Supporting Roof

2.05 Generator 1 Building Exterior Accessories

2.06 Generator 2 - Exhaust Muffler and Supporting Roof

Generator Exhaust Muffler and Supporting Roof

2.07 Generator 2 Building Exterior Accessories

3.01 Doors Exposed Steel - Non Immersion

3.02 Doors Exposed Steel - Non Immersion

3.03 Vent Exposed Steel - Non Immersion

3.04 Transformers Transformers and Electrical Boxes

4.01 Valve Exterior Accessories

4.02 Electrical Box Transformers and Electrical Boxes

4.03 Overflow Drain Accessories - Immersion

4.04 Drains Accessories - Immersion

4.05 Basin 1 Wall Exterior Placed Concrete

5.01 Electrical Box Transformers and Electrical Boxes

5.02 Electrical Box Transformers and Electrical Boxes

5.03 Piping Exterior Accessories

5.04 Piping Basin Stand Pipe - Immersion

5.05 Walkway Exterior Accessories

5.06 Sludge Collector Sludge Collector

6 Silos 6.01 Railings Exterior Accessories

7.01 Piping Exterior Accessories

7.02 Tank Exterior Placed Concrete

8.01 Piping Exterior Accessories

8.02 Piping Exterior Accessories

8.03 Railings Exterior Accessories

8.04 Piping Exterior Accessories

8.05 Tank Exterior Placed Concrete

9.01 Doors Exposed Steel - Non Immersion

9.02 Doors Exposed Steel - Non Immersion

9.03 Doors Exposed Steel - Non Immersion

Tank 1

High Service Delivery Building

Main Electrical Building

North Oconee Electrical Building

Sedimentation Basin

South Sedimentation Basin

Tank 2

9.04 Doors Exposed Steel - Non Immersion

9.05 Piping Exterior Accessories

10.01 Vent Exposed Steel - Non Immersion

10.02 Vent Exposed Steel - Non Immersion

11.01 Doors

Exposed Steel - Non Immersion: lead-abatement

11.02 Walls Interior Walls - Masonry: lead-abatement

11.03 Railings NOPS Railings: lead-abatement

11.04 Pump and Support Accessories - Immersion

11.05 Window Screen Exterior Accessories

11.06 Window Screen Exterior Accessories

12.01 Railings Accessories - Immersion

12.02 Support Steel and Valve Accessories - Immersion

12.03 Railings NOPS Railings

12.04 Support Steel Exterior Accessories

12.05 Window Screen Exterior Accessories

12.06 Support Steel Exterior Accessories

12.07 Railings Exterior Accessories

12.08 Light Pole Exterior Accessories

12.09 Light Pole Exterior Accessories

12.10 Doors Exposed Steel - Non Immersion

12.11 Walls Interior Walls - Masonry: lead-abatement

12.12 Railings NOPS Railings: lead-abatement

12.13 Pump Spray Base Accessories - Immersion

12.14 Travelling Water Screen Accessories - Immersion

12.15 Exterior Piping NOPS 2 Exterior Piping

12.16 Railings Exterior Accessories

12.17 Railings Exterior Accessories

12.18 Doors Exterior Accessories

13.01 Walls Interior Walls - Dry Wall

13.02 Walls Interior Walls - Dry Wall

13.03 Walls Interior Walls - Dry Wall

13.04 Walls Interior Walls - Dry Wall

13.05 Walls Interior Walls - Dry Wall

13.06 Walls Interior Walls - Dry Wall

13.07 Walls Interior Walls - Dry Wall

13.08 Walls Interior Walls - Dry Wall

13.09 Walls Interior Walls - Dry Wall

13.10 Walls Interior Walls - Masonry

Operations Building13

Vault

North Oconee Pump Station 1

North Oconee Pump Station 2

14.01 Roof Vent Boxes and Roof Exposed Steel - Non Immersion

14.02 Bollards Interior Walls - Masonry

14.03 Transformers Transformers and Electrical Boxes

14.04 Valve Exterior Accessories

14.05 Valve Exterior Accessories

15.01 Trusses

Post-Chemical Building Structural Component

15.02 Walls Interior Walls - Masonry

15.03 Beam

Post-Chemical Building Structural Component

15.04 Supports

Post-Chemical Building Structural Component

Pre-chemical Building

Post-chemical Building

1. High Service Delivery Building
2. Main Electrical Building
3. North Oconee Electrical Building
4. Sedimentation Building
5. South Sedimentation Basin
6. Silos
7. Tank 1
8. Tank 2
9. UV Building
10. Vault
11. North Oconee Pump Station 1
12. North Oconee Pump Station 2
13. Operations Building
14. Pre-chemical Building
15. Post-chemical Building
Drawing Attachments
Figures & Coating Systems

File details come from the government source that posted it. Updated .