Bid_2614._Addenda_1.pdf
PDF 132 KB Posted
- Attached to
- Bardin Community Center with Restrooms Project
- Solicitation number
- Bid 26-14
- Issued by
- Polk County, Florida
About this file
Summary: Putnam County Addendum #1 to Bid 26-14
This is an addendum document issued by the Putnam County Procurement Department in Palatka, Florida, modifying the contract requirements for the Bardin Community Center with Restroom Project. Addendum #1, dated September 23, 2026, establishes contractor responsibilities and technical specifications for new construction of a 1,194 square foot community center with restrooms and covered porch at Etoniah Park. Key modifications include: the contractor shall install electrical components, all exterior doors (3' x 7' hollow metal), and door hardware; the county will pull and pay for permits; the building length has been adjusted to 59 feet 4 inches with an expansion joint required in the block wall; the front porch has been modified to 8 feet by 5 feet 8 inches with specific 16" x 16" column details; bathroom ventilation and bird screening shall use aluminum expanded metal; gutters and downspouts must be installed; and ceiling insulation shall be blown-in with a minimum R30 rating in conditioned spaces. The original bid due date remains October 14, 2026, at 2:00 p.m. EST, with project completion scheduled by July 12, 2027.
The addendum specifies additional technical and financial terms binding all bidders submitting responses. Electrical specifications include provision of a 200-amp Siemens meter main combo with two 1-inch chase conduits under concrete slab sidewalk, specific wiring gauges (3/0 THHN copper and #4 THHN copper for 120/240-volt single phase), and a separate meter main for disconnect. Kitchen countertops and cabinets shall be solid surface material rather than stainless steel; bathroom lights shall operate with motion sensors; and floors shall have concrete smooth finish. Liquidated damages are set at $800 per day for schedule non-compliance. Financial security requirements include a bid bond at five percent of total bid amount and payment and performance bonds at 100 percent of total bid if the contract value is $200,000 or greater. These addendum modifications become fully binding contract documents and supersede any conflicting provisions in the original bid package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID_2614._Intent_to_Award.pdf | ||
| Bid_2614._Revised_Bid_Tally.pdf | ||
| Bid_2614._Bid_Tally.pdf | ||
| Bid_2614._Addenda_3.pdf | ||
| Bid_2614._Addenda_2.pdf | ||
| Bid_2614._PreBid_Sign_In_Sheet.pdf | ||
| FOUNDATIONDETAILS.pdf | ||
| PLUMBING.pdf | ||
| ADA_COMP.pdf | ||
| Bid_2614._Bardin_Community_Center_with_RR.pdf | ||
| ELECTRICAL.pdf | ||
| PG_1_ELEVATIONSLIFE_SAFETY_FLOOR.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUTNAM COUNTY
PROCUREMENT DEPARTMENT
2509 CRILL AVE, STE 200
PALATKA, FL 32177
Bid 26-14 Bardin Community Center with Restroom Project
Addenda # 1 September 23, 2026
TO ALL BIDDERS SUBMITTING A RESPONSE ON THIS PROJECT
The changes, additions, substitutions, and/or deletions contained in Addenda #1 are hereby made part of the Contract Documents fully and completely for this Bid.
1. County will pull and pay for permits.
2. The electrical will be supplied by the Contractor.
3. Doors will be installed by Contractor.
4. Electrical 200A Siemans Meter main combo for the outside of building- provide (2) minimum 1” chase conduits with pull wire under the concrete slab sidewalk for future use
• Wiring for Panel A – (3) 3/0 THHN Cu and (1) #4 THHN Cu- 120/240 V single phase
5. Liquidated Damages will be $800 / day.
6. An expansion joint should be added to the 59’ wall. Building length has been adjusted to 59’4” painted exposed block finish with expansion joint required in block wall along this length
7. The front porch column detail should be 16” x 16” with 8 x 16 precast lintel above. Porch columns to be
16” x 16” x 9’4” brg height with 4#5 rebar in filled cell with 8x16” bond beam above and 24” x 24” x 12” footer w/2#5 each way -porch increased to 8’ x 5’
8. The bathroom ventilation screening should be aluminum expanded metal.
9. In the bathrooms, one turned block over the sink in both handicapped bathrooms will be removed. Bird screening to be aluminum with total of 5 turned block in each of the (2) handicapped bathrooms
10. This building will include gutters and downspouts.
11. For the electrical, provide a meter main for the disconnect.
12. Kitchen counter tops and cabinets should be solid surface, not stainless.
13. In bathroom, use sensors for the lights.
14. All exterior doors 3’x7’ hollow metal
15. Internet access will be handled by others.
16. Payment and Performance bonds – 100% of total bid if $200,000 or greater
17. Bid bond – always required and is 5% of total bid
18. Ceiling insulation should be blown in insulation.
19. Conditioned space to be insulated min R30 ceiling
20. Floors to be concrete smooth finish