Bid 26-0140-5 Oglethorpe Library Replacement Construction.pdf

PDF 596 KB Posted

Attached to
Construction of the Oglethorpe Mall Replacement Library
Solicitation number
26-0140-5
Issued by
Chatham County, Georgia

About this file

This is an Invitation to Bid issued by the Chatham County Purchasing & Contracting Department in Savannah, Georgia for the construction of a new Oglethorpe Mall Replacement Library. The project requires bidders to furnish all materials, labor, and equipment necessary for the library construction. A non-mandatory pre-bid conference will be held on November 24, 2026 at 10:00 A.M. at the Library of Public Information located at 2002 Bull Street, Savannah, Georgia. Sealed bids must be submitted online through the Chatham County Purchasing Portal at https://chathamcountyga.bonfirehub.com/portal by 2:00 P.M. on December 15, 2026, at which time they will be opened and publicly read. The contract is awarded to the lowest responsive, responsible bidder based on the base bid amount only, though bidders must be responsive and responsible to all alternates and unit prices. This is a one-time contract with no renewal options specified.

Bidders must submit a bid bond, certified check, or money order equal to 5% of the bid price and, if awarded, must provide payment and performance bonds each equal to 100% of the contract value. The contract includes a one-year warranty for all materials and workmanship, with additional warranties as specified in the project manual. Chatham County has established a 30% combined Minority/Woman Business Enterprise (MBE/WBE) participation goal for this project, and bidders are required to demonstrate good faith efforts to meet this goal and submit a list of all MWBE subcontractors with their bid. Contractors must comply with Georgia's E-Verify employment verification requirements and the Systematic Alien Verification for Entitlements (SAVE) program. Comprehensive insurance requirements include commercial general liability with minimum limits of $3,000,000 general aggregate, workers' compensation, commercial automobile liability of $1,000,000, a $25,000,000 commercial umbrella policy, and builder's risk coverage equal to 100% of contract value. Bidders with bids of $500,000 or more must provide information on their five most recent projects with similar scope; all bidders must provide references from at least three previous projects. The bid price must include all applicable taxes, labor, materials, equipment, overhead, profit, insurance, and bonds.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chatham County

Purchasing &

Contracting Department 1117 Eisenhower Drive, Suite C, Savannah, Georgia 31406

(912) 790-1618

I N V I T A T I O N T O B I D

BID NO. 26-0140-5

CONSTRUCTION OF THE OGLETHORPE MALL

REPLACEMENT LIBRARY

PRE-BID CONFERENCE: 10:00A.M., NOVEMBER 24,

BID OPENING: 2:00P.M., DECEMBER 15, 2026

CHATHAM COUNTY GEORGIA

Purchasing & Contracting Division 1117 Eisenhower Drive, Suite C Savannah, GA 31406 Phone (912) 790-1619, Fax: (912) 790-1627

Bid No. 26-0140-5

CONSTRUCTION OF THE OGLETHORPE MALL REPLACEMENT LIBRARY

GENERAL INFORMATION FOR INVITATION TO BID

This is an invitation to submit a bid to supply Chatham County (Owner) with construction, equipment, supplies and/or services as indicated herein. Sealed bids or proposals will be received online as instructed on the Chatham County Purchasing Portal at https://chathamcountyga.bonfirehub.com/portal up to 2:00PM, December 15, 2026, at which time they will be opened and publicly read. Please notify the Procurement contact if you are unable to submit your bid on-line. The County reserves the right to reject all bids that are non-responsive or not responsible.

Instructions for preparation and submission of a bid or proposal are contained in this Invitation To Bid/Proposal package. Please note that specific forms for submission of a bid/proposal are required.

The following dates will be followed for the bid process: separate

1. Non-Mandatory Pre-Bid Conference: Non-Mandatory for single primes, open to all subcontractors. November 24, 2026 at 1 0 : 00 A . M . at L O P L l o c a t e d a t 2 0 0 2 B u l l S t , S a v a n n a h , G A 3 1 4 0 1 . The conference is not mandatory but encouraged.

2. Last day for written questions from Bidders: Listed on the Bonfire Portal.

3. Bids Due: December 15, 2026 at 2:00pm.

The Bidding Documents/Bid Documents consist of the General Information for Invitation to Bid, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Form, Bid Attachments required to be submitted with the bid, Plans, Specifications/Project Manual, all Addenda, General Conditions, Special Conditions, and other information issued by the Owner to the Bidders prior to the execution of the Contract that describe the proposed work and contract terms.

Bidders shall use complete sets of Bidding Documents in preparing Bids. The County does not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

https://chathamcountyga.bonfirehub.com/portal

Any changes to the Bidding Documents must be in the form of a written addendum to be valid/ therefore, the Purchasing Director will issue a written addendum to document each approved change.

Chatham County has an equal opportunity purchasing policy. Chatham County seeks to ensure that all segments of the business community have access to supplying the goods and services needed by County programs. The County affirmatively works to encourage utilization of disadvantaged and minority business enterprises in our procurement activities. The County provides equal opportunity for all businesses and does not discriminate against any persons or businesses regardless of race, color, religion, age, sex, national origin or handicap. The terms "disadvantaged business," "minority business enterprise," and "minority person" are more specifically defined and explained in the Chatham County Purchasing Ordinance.

The Chatham County Board of Commissioners reserves the right to reject any and all bids, waive technicalities and make the award in the best interest of the County.

SECTION I

INSTRUCTIONS TO BIDDERS

1.01 Purpose: The purpose of this document is to provide general and specific information for use in submitting a bid to supply Chatham County with equipment, supplies, and/or services as described herein. All bids are governed by the Code of Chatham County, Chapter 4, Article IV, and the laws of the State of Georgia.

The term “bidder” shall encompass the person, business, contractor, supplier, vendor or other party submitting a bid to Chatham County in such capacity before a contract has been entered into between such party and the County. The term “Contractor” refers to any person or business having a contract with Chatham County. The term “Owner” refers to Chatham County.

1.02 How to Prepare Bid Proposals: All bids shall be

a. Prepared on the forms enclosed herewith, unless otherwise prescribed, and all documents must be submitted.

b. Signed in each signature space provided.

Bidders are encouraged to carefully review all provisions and attachments of this document prior to submission. Each bid constitutes an offer and may not be withdrawn except as provided herein.

1.03 How to Submit Bid Proposals: All bids shall be:

a. Submitted on-line on the Chatham County Purchasing Portal at:

b. If a bidder is unable to submit their bid on-line, they should notify the procurement contact for the solicitation at least one (1) week prior to the closing date of the bid solicitations to receive instructions. The County is seeking to conduct all of our bids on-line. The phone number for Purchasing and Contracting is 912-790-1618.

BIDS NOT RECEIVED BY THE TIME AND DATE SPECIFIED WILL NOT BE OPENED

OR CONSIDERED.

1.04 How to Submit an Objection: Objections from bidders to the Bidding Documents should be brought to the attention of the County Purchasing Director in the following manner:

a. Bidder shall submit their written objections to the Purchasing Director, not less than seven (7) days prior to the bid opening.

b. The objections contemplated may pertain to form and/or substance of the Bid

Documents. Failure to object in accordance with the above procedure will constitute a waiver on the part of the business to protest this invitation to bid.

c. For questions related to the plans, cite name and number of the plan sheet and detail;

for questions related to the specifications, cite specification section, specification name, page number, article number, article name, paragraph number in all communications, and forward to Chatham County Purchasing Director. Answers to questions submitted that substantially change the conditions and specifications of this solicitation will be published as an addendum. Any discussions or documents will be considered non-binding unless incorporated and published in an addendum.

1.05 Errors in Bids: Bidders or their authorized representatives are expected to fully inform themselves as to the conditions, requirements, and specifications before submitting bids.

Failure to do so will be at the bidder's own risk. Error(s) in the bid will be evaluated in accordance with the Chatham County Procurement Ordinance Part 3.

a. Multiple Bids: No vendor will be allowed to submit more than one bid. Ay alternate proposals must be brought to the Purchasing Director’s attention during the Pre-bid Conference or submitted in writing a least seven (7) days preceding the bid opening date.

b. Completeness: All information required by the Invitation to Bid/Proposals must be completed and submitted to constitute a proper bid or proposal.

1.06 Site Examination: The Bidder is advised to examine the location of the work and to inform himself fully as to the conditions; the conformation of the ground; the character, quality and quantity of the products needed preliminary to and during the execution of the work;

the general and local conditions and all other matters which can in any way affect the work to be done under the contract. Failure to examine the site will not relieve the successful Bidder of the obligation to furnish all products and labor necessary to carry out the provisions of the contract. The Bidder/General Contractor/Sub Contractor shall confine their examination to the specific areas designated for the proposed project. The Bidder/General Contractor/Sub Contractor is solely responsible for any damages caused by their examination of the site.

1.07 Examination of Plans and Specifications: The Bidder is to fully inform themselves as to the conditions, requirements, Plans, Specifications/Project Manual and Addenda before submitting bids. Failure to do so will be at the Bidder’s own risk. Any obvious error or omission in the plans or specifications shall not inure to the benefit of the Bidder but shall put the Bidder on notice to inquire of or identify the same from the County.

1.08 Addenda: All addenda issued prior to the bid date adjusts, modifies, or changes the

Plans/drawings and Specifications/Project Manual(s). All such Addenda are part of the Bidding Documents.

1.09 Bid Alternates and Unit Prices: Bidders are required to submit a bid for each Alternate and Unit Price outlined in the Bid Form. Prices for the Alternates and Unit Prices shall be complete and shall include but not be limited to all labor, material, equipment, taxes, overhead and profit, insurance, and bonds. The County shall have the right to accept Alternates in any order or combination. Alternates may be selected based on cost and/or negotiated cost. The County shall have the right to incorporate Unit Prices when deemed necessary. The County reserves the right to negotiate the cost of the Alternates and Unit

Prices. For an Alternate priced at zero dollars, the County shall choose between the Base Bid and Alternate options.

1.10 State Licensing Board for General Contractors: Pursuant to Georgia law, the following types of contractors must obtain a license from the State Licensing Board of Residential and General Contractors:

a. Residential - Basic Contractor (Contractor work relative to detached one-family and two-family residences and one-family townhouses not over three stories in height).

b. Residential - Light Commercial Contractor (Contractor work or activity related to multifamily and multiuse light commercial buildings and structures).

c. General Contractor (Contractor work or activity that is unlimited in scope regarding any residential or commercial projects).

The Request Information section of the online solicitation will list any licenses required for the project.

A copy of the Contractor’s license shall be provided at contract execution.

1.11 Chatham County Tax Certificate Requirement: A current Chatham County Tax

Certificate (Business License) is required at contract execution. Please contact the Building Safety and Regulatory Services (912) 201-4300 for additional information.

Registration with the Georgia Secretary of State does not substitute for this requirement.

1.12 Surety Requirements and Bonds:

a. Bidder shall post a Bid Bond, certified check or money order made payable to the Chatham County Finance Department in the amount of 5% of the bid price.

b. Contractor shall post a Payment and Performance bond, as a certified check or money order made payable to the Chatham County Finance Department each in the amount of 100% of the bid price if awarded the contract. Such bond(s) are due prior to contract execution as a guarantee that goods meet specifications and will be delivered per contract. Such bonds will also guarantee quality performance of services and timely payment of invoices to any subcontractors.

c. Whenever a bond is provided, it shall be executed by a surety authorized to do business in the State of Georgia and approved by Chatham County.

d. Bidder acknowledges Chatham County’s right to require a Performance and Payment Bond of a specific kind and origin. “Performance Bond” means a bond with good and sufficient surety or sureties for the faithful performance of the contract and to indemnify the governmental entity for any damages occasioned by a failure to perform the same within the prescribed time. Such bond shall be payable to, in favor of, and for the protection of the governmental entity for which the work is to be done. “Payment Bond” means a bond with good and sufficient surety or sureties payable to the governmental entity for which the work is to be done and intended for the use and protection of all subcontractors and all persons supplying labor, materials, machinery, and equipment in the prosecution of the work provided for in the public works construction contract.

e. The Bidder shall forfeit the amount of the Bid Bond if he/she fails to enter into a contract with Chatham County.

1.13 References:

On July 25, 2003 the Board of Commissioners directed that for bidders to be responsive, on all construction projects with a bid of:

a. $500,000 or more: Each Bidder must provide information on the most recent five (5) projects with similar scope of work to determine experience and qualifications.

b. $499,000 and less: Provide references from owners of at least three (3) projects of various sizes for which contractor was the prime contractor. Include government owners. If the contractor has performed any work for the Chatham County Board of Commissioners within the last five (5) years, at least one (1) of the three (3) owner references must be from the appropriate party within the Chatham County Government.

Bidders are to use the attached forms. Failure to provide the above information may result in your firm’s bid being rejected and ruled as non-responsive.

1.14 Communications during bidding period: To ensure the integrity of the competitive bid process, inquiries, and other communications regarding the bid solicitation, must be directed, in writing, only to the Office of the Purchasing Director identified in the bid solicitation. Failure to comply can result in the disqualification of the bid. This is to insure everyone is provided the same information.

To ensure consistency and quality of information provided to bidders, replies to inquiries received will be provided simultaneously to bidders to which the bid solicitation has been sent, without revealing the sources of the inquiries.

Conversations or correspondence regarding this solicitation or report between prospective offerors and persons outside the Chatham County Purchasing Office will not be considered official or binding.

1.15 Terms and Conditions: The Invitation to Bid, Legal Advertisement, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Form, attachments to the Bid Form, General Conditions, Special Conditions, Plans, Specifications, Contractor/Vendor's Bid, Addendum, and/or any other pertinent documents form a part of the bidder’s proposal or bid and by reference are made a part hereof.

1.16 Withdrawal of Bids: Bids may be withdrawn by bidders prior to the time set for official opening. After time has been called, no bid may be withdrawn for a period of sixty days after the time and date of opening. Negligence or error on the part of any bidder in preparing the bid confers no right of withdrawal or modification of the bid after time has been called except as provided by Georgia law.

1.17 Standards for Acceptance of Bid for Contract Award: The County reserves the right to reject any or all bids and to waive any irregularities or technicalities in bids received whenever such rejection or waiver is in the best interest of the County. The County reserves the right to reject the bid of a bidder who has previously failed to perform properly or complete on time contracts of a similar nature, or a bid from a bidder whom investigation shows is not in a position to perform the contract.

1.18 Determination of Successful Bidder: Responsible Bidder means a person or entity that has the capability in all respects to perform fully and reliably the contract requirements.

Responsive Bidder means a person or entity that has submitted a bid or proposal that conforms in all material respects to the requirements set forth in the Invitation to Bid or Request for Proposal.

The contract, if awarded, shall be to the lowest responsive, responsible Bidder (considering only the base bid). Though award will be to the lowest responsive, responsible Bidder (considering only the base bid), Bidder shall be required to be responsive and responsible to all Alternates and Unit Prices.

a. Responsibility: The determination of the Bidder's responsibility will be made by the

County based on whether the Bidder:

1. maintains a permanent place of business,

2. has the appropriate technical experience,

3. has adequate capacity and equipment to do the work properly and expeditiously,

4. has suitable financial means to meet obligations incidental to this work,

5. has excellent safety record and published safety plan,

6. has updated Georgia General Contractor’s License,

7. can meet insurance and bonding requirements,

8. evidences a Good Faith Effort to meet the County M/WBE goals.

The above criteria shall apply to the complete work described in the bid, including the Base bid, Alternates and Unit prices. The Bidder shall furnish, to the County, all such information and data for this purpose as the County may request. The County reserves the right to reject any bid if the evidence submitted by, or investigation of, the Bidder fails to satisfy the County that he is properly qualified to carry out the obligations of the Contract.

b. Responsiveness: The determination of responsiveness will be made by the County based on a consideration of whether the Bidder has submitted a complete Bid Form (including all Alternates and Unit Prices) without irregularities, exceptions, special conditions, or alternative bids for any item unless specifically requested in the Bid Form.

1.20 Basis of Contract Award: Award shall be made to the lowest responsible, responsive, total lump sum fixed price base bid.

1.21 Prices to be Firm: Bidder warrants that bid prices, terms and conditions quoted in his bid will be firm for acceptance for a period of sixty (60) days from bid opening date, unless otherwise stated in the bid.

END OF INSTRUCTIONS TO BIDDERS

SECTION II

SUPPLEMENTAL INSTRUCTIONS TO BIDDERS

2.1 Quality: All materials, or supplies used for the construction necessary to comply with this proposal shall be of the best quality, and of the highest standard of workmanship.

Workmanship employed in any construction, repair, or installation required by this proposal shall be of the highest quality and meet recognized standards within the respective trades, crafts and of the skills employed.

2.2 Interpretations: No oral interpretation will be made to bidders as to the meaning of the drawings and specifications. Requests for interpretation of drawings and specifications must be made in writing to the Office of the Purchasing Director, Chatham County, prior to the date stated in this Invitation. Failure on the part of the successful bidder to request clarification shall not relieve him as Contractor of the obligation to execute such work in accordance with a later interpretation by the Architect/Engineer at no additional cost to the County. All interpretations made to bidder’s queries will be issued in the form of Addenda.

Acknowledgement of receipt of such Addenda shall be listed in the Bid Form by the Bidder.

2.3 Compliance with Laws: The bidder and/or contractor shall obtain and maintain all licenses, permits, liability insurance, workman's compensation insurance and comply with any and all other standards or regulations required by federal, state or County stature, ordinances, and rules during the performance of any contract between the contractor and the County. Any such requirement specifically set forth in any contract document between the contractor and the County shall be supplementary to this section and not in substitution thereof.

2.4 Guarantee: Unless otherwise specified by the County, the bidder shall unconditionally guarantee the material and workmanship on all material and/or services. If, within the guarantee period any defects occur which are due to faulty material and/or services, the contractor at his expense, shall repair or adjust the condition, or replace the material and /or services to the complete satisfaction of the County. These repairs, replacements or adjustments shall be made only at such time as will be designated by the County as being least detrimental to the operation of County business.

The successful Bidder/Contractor shall provide the County a one-year warranty for all materials and workmanship. The successful Bidder/Contractor shall provide the County additional warranties in accordance with the Plans and Specifications /Project Manual(s).

2.5 Trade Names in Plans and Specifications

Where reference is made in the plans and specifications to particular manufacturers and model numbers for various products, such reference is made to establish function and quality of such products and is not intended to restrict competitive bidding. If the Bidder desires to use materials/equipment of trade/manufacturer names or model numbers which are different from those mentioned in the Contract Documents where the specifications allow “or equal” products to be used, the Bidder may incorporate the cost of such products in the Bid price. The responsibility of determining equivalency however, rests with the Bidder. This provision does not prevent the Owner from initiating the addition of trade names, brand names, or names of manufacturers by addendum prior to bid opening.

After bid opening, the successful Bidder shall within seven (7) calendar days submit to the Owner for approval of the use of all the materials or specific items manufactured by firms other than those named in the Contract Documents. This shall apply to both substitutions and “or equal” products. The burden of proving equivalency of a proposed substitute/or equal to an item designated by trade name or by manufacturer's name or model number in the Contract Documents rests on the Bidder submitting the request for approval. Refer General Conditions Section Request for Substitution.

Should the Architect/Engineer not approve the Bidder’s request for Substitution due to non-equivalency or non-compliance with the Contract Documents, the Bidder shall provide the product of the manufacturer stated in the specifications at no change in Bid price.

2.6 Not Used.

2.7 Payment of Taxes: No contract shall be awarded unless all real and personal property taxes have been paid by the successful contractor and/or subcontractors as adopted by the Board of commissioners on April 8, 1994.

2.8 Gratuities: By submitting a bid, the Bidder certifies that the provisions of the Chatham County Purchasing Ordinance which prohibit officials and employees of the County from engaging in certain transactions with the County and County agencies, have not and will not be violated in any regard to this contract and further certifies that registration and all disclosures required thereby have been complied with.

2.9 Sales Tax: Every contractor, vendor, business, or person under contract with Chatham County is required by Georgia law to pay State sales or use taxes for products purchased in Georgia or transported into Georgia and sold to Chatham County by contract. Consult the State of Georgia, Department of Revenue, Sales and Use Tax Unit in Atlanta (404) 656-4065 for additional information. The Bidder shall include in bid, all sales taxes, consumer taxes, use taxes, and all other applicable taxes that are legally in effect at the time bids are received.

2.10 Terms of Contract: This contract shall be a one-time contract.

2.11 Bid Submission Considered Offer: Bids submitted on-line shall be considered an offer on the part of the bidder, which offer shall be deemed accepted upon approval by the Chatham County Board of Commissioners, Purchasing Director, or his designee. In case of a default on the part of the bidder after such acceptance, Chatham County may take such action as it deems appropriate, including legal action for damages or lack of required performance.

2.12 Owner’s Right to Negotiate with the Lowest Bidder: In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to the rights set forth above, reserves the right either to (i) supplement the budget with additional funds to permit award to the lowest responsive and responsible bid, or (ii) to negotiate with the lowest responsive and responsible bidder (after taking all deductive alternates) only for the purpose of making changes to the Project that will result in a cost to the Owner that is within the budget, as it may be amended.

2.13 MBE/WBE Participation: The Chatham County Board of Commissioners has adopted an aggressive program that establishes goals for minority/woman owned, small and disadvantaged business participation in construction, professional services, and general procurement.

a. The Chatham County Board of Commissioners under Georgia law may reject any bid as non-responsive if they feel a bidder did not exercise “Good Faith Effort” in obtaining the goal established for M/WBE participation.

b. The Chatham County Board of Commissioners adopted a policy establishing goals oriented to increase participation of minority and female owned businesses, through MBE/WBE certification and development. In order to accurately document participation, businesses submitting bids, quotes or proposals are encouraged to report ownership status. A bidder or vendor that is certified by any agency of the Federal Government or State of Georgia may submit a copy of their certification with their bid as proof of qualifications. Bidders that intend to engage in joint ventures or utilize subcontractors must submit to the County’s MWBE Coordinator, a report on Minority/Woman Business Enterprise participation.

Goals established for this project is 30% MBE/ WBE combined.

c. A Minority/Woman Business Enterprise (M/WBE) is a business concern that is at least 51% owned by one or more minority/woman individuals and whose daily business operations are managed and directed by one or more of the minority/female owners.

d. Bidders are required to submit a list of all MWBE subcontractors with their bid. Any change or substitution of an MWBE subcontractor can be made only after written approval by the County’s MWBE Coordinator.

2.14 Good Faith Effort: Bidders or proposers are required to make a Good Faith Effort, where subcontracting is to be utilized in performing the contract, to subcontract with or purchase supplies from qualified M/WBEs. Bidders or proposers are required to state if they intend to subcontract any part of the work. Forms for this purpose are included as attachments in the required documents section which must be completed and submitted online with your bid response. If forms are not completed and submitted, the bid may be considered nonresponsive.

Each bidder or proposer is required to maintain records of such efforts in detail adequate to permit a determination of compliance with these requirements. All contracts will reflect Good Faith Efforts and reporting requirements for the term of the contract.

For all information and any questions regarding MBE/WBE participation and Good Faith Effort contact Chatham County’s office of the MBE/WBE Program at (912) 652-7860.

2.15 Debarred Firms and Pending Litigation: Any potential proposer/firm listed on the

Federal or State of Georgia Excluded Parties Listing (Barred from doing business) will not be considered for contract award. Proposers shall disclose any record of pending criminal violations (Indictment) and/or convictions, pending lawsuits, etc., and any actions that may be a conflict of interest occurring within the past five (5) years. Any proposer/firm previously defaulting or terminating a contract with the County will not be considered. Also any contractor or subcontractor that has pending litigation with the County will not be considered for contract award.

All bidders or proposers are to read and complete attachments A through I which are posted online in the required documents field. Failure to do so may result in your solicitation response being rejected as non-responsive.

All bidders or proposers are to read and complete the Disclosure of Responsibility Statement enclosed as an Attachment to be returned with response. Failure to do so may result in your solicitation response being rejected as non-responsive.

Bidder acknowledges that in performing contract work for the Chatham County, bidder shall not utilize any firms that have been a party to any of the above actions. If bidder has engaged any firm to work on this contract or project that is later debarred, Bidder shall sever its relationship with that firm with respect to Board contract.

2.16 Liability Provisions: Where bidders are required to enter or go onto Chatham County property to take measurements or gather other information in order to prepare the bid or proposal as requested by the County, the bidder shall be liable for any injury, damage or loss occasioned by negligence of the bidder, his agent, or any person the bidder has designated to prepare the bid and shall indemnify and hold harmless Chatham County from any liability arising therefrom. The contract document specifies the liability provisions required of the successful bidder in order to be awarded a contract with Chatham County.

2.17 Award of Contract: The contract, if awarded, will be awarded to that responsible bidder whose bid/proposal will be most advantageous to Chatham County, price and other factors considered. The Board of Commissioners will make the determination as to which bid or proposal that serves as the best value to Chatham County.

2.18 Procurement Protests: Objections and protests to any portion of the procurement process or actions of the County staff may be filed with the Purchasing Director for review and resolution. The Chatham County Purchasing Ordinance – Part IX shall govern the review and resolution of all protests.

2.19 Insurance Provisions, General: The selected Contractor shall be required to procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors. The cost of such insurance shall be included in the Bid.

It is every contractor’s responsibility to provide the County Purchasing and Contracting Department current and up-to-date Certificates of Insurance and Declaration Sheets for multiple year contracts before the end of each term. Failure to do so may be cause for termination of contract.

a. General Information that shall appear on a Certificate of Insurance:

1. Name of the Producer (Contractor’s insurance Broker/Agent).

2. Company(s) affording coverage.

3. Name and Address of the Insured (Company or Parent of the firm Chatham

County is contracting with).

4. A Summary of all current insurance for the insured (includes effective dates of coverage).

5. A brief description of the operations to be performed, the specific job to be performed, or contract number.

6. Certificate Holder (This is to always include Chatham County).

Chatham County as an “Additional Insured”: Chatham County invokes the defense of “sovereign immunity”. In order not to jeopardize the use of this defense, the County is not to be included as an “Additional Insured” on insurance contracts.

b. Minimum Limits of Insurance to be maintained for the duration of the contract:

1. Commercial General Liability: Provides protection against bodily injury and property damage claims arising from operations of a Contractor or Tenant. This policy coverage includes: premises and operations, use of independent contractors, products/completed operations, personal injury, contractual broad form property damage, and underground, explosion and collapse hazards.

Minimum limits:

General Aggregate: $3,000,000 Products Completed Operations Aggregate: $3,000,000 Each Occurrence Limit: $1,000,000 Personal Injury Limit: $1,000,000 Damage To Premises Rented To You $1,000,000 Any Occurrence Medical Expenses $ 10,000 Any One Person

Required Endorsements and Certificate of Insurance:

i. Policy shall provide a Waiver of Subrogation endorsement in favor of Chatham

County Board of Commissioners and its agents and /or employees and must be attached to the Certificate of Insurance.

ii. No exclusions for subcontractors

iii. Shall include current operations, ongoing operations and completed operations (no exclusions of these)

2. Worker's Compensation and Employer’s Liability: Provides statutory protection against bodily injury, sickness or disease sustained by employees of the Contractor while performing within the scope of their duties. Employer’s Liability coverage is usually included in Worker’s Compensation policies, and insures common law claims of injured employees made in lieu of or in addition to a Worker’s Compensation claim.

Minimum limits:

Part A: Workers Compensation: Statutory (include State of Georgia) Part B: Bodily Injury By Accident: $500,000 Each Accident

Bodily Injury By Disease: $500,000 Policy Limit Bodily Injury By Disease: $500,000 Each Employee

Required Endorsements and Certificate of Insurance:

i. Policy shall provide a Waiver of Subrogation endorsement in favor of Chatham

County Board of Commissioners and its agents and /or employees and must be attached to the Certificate of Insurance.

3. Business Automobile Liability: Coverage insures against liability claims arising out of the Contractor’s use of automobiles. Minimum limit: $1,000,000 combined single limit per accident for bodily injury and property damage. Coverage should be written on an “Any Auto” basis.

Required Endorsements and Certificate of Insurance:

i. Policy shall provide a Waiver of Subrogation endorsement in favor of Chatham County Board of Commissioners and its agents and /or employees and must be attached to the Certificate of Insurance.

4. Commercial Umbrella:

Limits: $25,000,000 per Occurrence.

Required Endorsements and Certificate of Insurance:

i. Policy shall provide a Waiver of Subrogation endorsement in favor of Chatham

County Board of Commissioners and its agents and /or employees and must be attached to the Certificate of Insurance.

ii. This umbrella shall cover over Commercial General Liability (including Product and Completed Operations, and Personal and Advertising Injury), Commercial Auto and Employers Liability (Part B of Workers Compensation) and will be a follow form policy.

5. Builder’s Risk: (For Construction or Installation Contracts)

Covers against insured perils while in the course of construction.

Minimum Limits: All-Risk coverage equal 100% of contract value Coverage Requirements: Coverage shall remain in force until final acceptance of the project is granted by the Chatham County Board of Commissioners. Also, the policy shall grant permission to occupy prior to acceptance.

Policy Form: Special form including wind, flood and earthquake.

Sub limits (Minimum) Property In Transit: $1,000,000 Property At Temporary Location: $1,000,000 Ordinance and Law: $1,000,000 Demolition: $1,000,000 Debris Removal: $1,000,000 Expediting Expenses: $1,000,000 Extra Expense: $1,000,000 Soft Cost / Delay in Construction or Completion: $1,000,000 Mechanical Breakdown: $1,000,000 Mold / Fungus / Other Pathogens: $ 250,000 Hot & Cold Testing: $1,000,000

Additional coverage in addition to contract value:

Increased Cost Of Construction: $1,000,000 Soft Cost / Delay in Construction or Completion: $1,000,000

Deductibles: (Any deductibles are responsibility of the contractor)

All Perils Including Wind: $50,000 or Less Flood: $50,000 or Less Earthquake: $50,000 or Less

Required Endorsements and Evidence of Property:

i. Policy shall provide a Waiver of Subrogation endorsement in favor of Chatham County Board of Commissioners and its agents and / or employees and must be attached to the Certificate of Insurance along with the Declarations Pages and Endorsements.

ii. Loss Payee Clause in favor of Chatham County Board of Commissioners and its agents and / or employees

iii. No coinsurance provision

iv. No collapse exclusion

v. No water Damage exclusion / limitation

vi. No warranties suspending coverage

6. Payment and Performance Bond: The Payment and Performance Bond shall each be for 100% of the contract value.

Required Endorsements and Certificate of Insurance:

i. Policy shall provide a Waiver of Subrogation endorsement in favor of Chatham

County Board of Commissioners and its agents and /or employees and must be attached to the Certificate of Insurance.

ii. Bond shall extend for entire period of the project/final acceptance by Chatham County Board of Commissioners and its agents and /or employees

c. Special Requirements:

1. Claims-Made Coverage: The limits of liability shall remain the same as the occurrence basis, however, the Retroactive date shall be prior to the coincident with the date of any contract, and the Certificate of Insurance shall state the coverage is claims-made. The Retroactive date shall also be specifically stated on the Certificate of Insurance.

2. Extended Reporting Periods: The Contractor shall provide the County with a notice of the election to initiate any Supplemental Extended Reporting Period and the reason(s) for invoking this option.

3. Reporting Provisions: Any failure to comply with reporting provisions of the policies shall not affect coverage provided in relation to this request.

4. Cancellation: Each insurance policy that applies to this request shall be endorsed to state that it shall not be suspended, voided, or canceled, except after thirty (30) days prior to written notice by certified mail, return receipt requested, has been given to the County.

5. Proof of Insurance: Chatham County shall be furnished with certificates of insurance and with original endorsements affecting coverage required by this request. The certificates and endorsements are to be signed by a person authorized by the insurer to bind coverage on its behalf. All certificates of insurance are to be submitted prior to, and approved by, the County before services are rendered. The Contractor must ensure Certificate of Insurance are updated for the entire term of the Contract.

6. Insurer Acceptability: Insurance is to be placed with an insurer having an A.M.

Best’s rating of A and a five (5) year average financial rating of not less than V. If an insurer does not qualify for averaging on a five year basis, the current total Best’s rating will be used to evaluate insurer acceptability.

7. Lapse in Coverage: A lapse in coverage shall constitute grounds for contract termination by the Chatham County Board of Commissioners.

8. Deductibles and Self-Insured Retention: Any deductibles or self-insured retention must be declared to, and approved by, the County. At the option of the County, either: the insurer shall reduce or eliminate such deductibles or self-insured retention as related to the County, its officials, officers, employees, and volunteers; or the Contractor shall procure a bond guaranteeing payment of related suits, losses, claims, and related investigation, claim administration and defense expenses.

9. No exclusions for subcontractors.

10. Chatham County Board of Commissioners is not responsible for any of the property used in or owned by contractor.

11. All deductibles in the coverage are the responsibility of Named Insured (contractor) on policy

2.20 County’s Rights Concerning Award: The County reserves the right, and sole and complete discretion to waive technicalities and informalities. The County further reserves the right, and sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget, as amended. In judging whether the bidder is responsible, the County will consider, but is not limited to consideration of, the following:

a. Whether the bidder or principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;

b. Whether the bidder or principals have been terminated for cause or are currently in default on a public works contract.

c. Whether the bidder’s past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder’s contract obligations.

d. Whether the bidder has made a Good Faith Effort to meet the M/WBE goals set forth.

e. Whether the bidder can provide the required References outlined in the Instruction to Bidders, section 1.13.

2.21 Notice to Proceed: The successful bidder or proposer shall not commence work under this Invitation to Bid until a written contract is awarded and a Notice to Proceed is issued by the Purchasing Director or his designee. If the successful bidder does commence any work or deliver items prior to receiving official notification, he does so at his own risk.

2.22 Debarred or Suspended Contractors: Contractor shall not subcontract, and shall ensure that no subcontracts are awarded at any tier, to any individual, firm, partnership, joint venture, or any other entity regardless of the form of business organization, that is on the Federal Excluded Parties List System (EPLS) at https://www.epls.gov or the State of Georgia, DOAS, State Purchasing Exclusion listing. Contractor shall immediately notify County in the event any subcontractor is added to either Federal or State listing after award of the subcontract.

2.23 Payment to Contractors: Instructions for invoicing the County for services and products delivered to the County are specified in the General Conditions.

a. Questions regarding payment shall be directed to the County's Project Manager.

b. Contractors will be paid the agreed upon compensation upon satisfactory performance of the work in accordance with the Schedule of Values approved by the County’s Project Manager.

c. With each monthly Pay Application, the Contractor will provide the County with an affidavit certifying all subcontractors, suppliers, persons, or businesses employed by the Contractor for the work performed for the County have been paid in full.

d. With each Pay Application, the Contractor shall submit a monthly M/WBE Participation Report and compare it with the established project goal.

e. Every contractor, vendor, business, or person under contract with Chatham County is required by Georgia law to pay State sales or use taxes for products purchased in Georgia or transported into Georgia and sold to Chatham County by contract.

2.24 Cone of Silence: Lobbying of Procurement Evaluation Committee members, County

Government employees, and elected officials regarding this product / service solicitation / Invitation to Bid (ITB) / Request for Proposal (RFP) / contract by any member of a proposer’s staff, or those people employed by any legal entity affiliated with an organization that is responding to the solicitation is strictly prohibited. Negative campaigning through the mass media about the current service delivery is strictly prohibited. Such actions may cause your proposal to be rejected.

2.25 Security and Immigration Compliance Act and Systematic Alien Verification for Entitlements (SAVE): On July 1, 2008, the Georgia Security and Immigration Compliance Act (SB 529, Section 2) became effective. All contractors and subcontractors entering into a contract or performing work must sign an affidavit that he/she has used the E-Verify System. E- Verify is a no-cost federal employment verification system to insure employment eligibility. Affidavits are enclosed in this solicitation. Download M-274 Handbook for Employers at http://www.dol.state.ga.us/spotlight/employment/rules. You may go to http://www.uscis.gov., to find the E-Verify information.

O.C.G.A. § 50-36-1, requires Georgia’s counties to comply with the federal Systematic Alien Verification for Entitlements (SAVE) Program. SAVE is a federal program used to verify that applicants for certain “public benefits” are legally present in the United States.

Contracts with the County are considered “public benefits.” Therefore, the successful bidder will be required to provide the Affidavit Verifying Status for Chatham County Benefit Application prior to receiving any County contract. The affidavit is included as part of the bid package but is only required of the successful bidder.

https://www.epls.gov/ http://www.dol.state.ga.us/ http://www.uscis.gov./

Protection of Resident Workers: Chatham County Board of Commissioners actively supports the Immigration and Nationality Act (INA) which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Under the INA, employers may hire only persons who may legally work in the United States (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired, which includes completing the Employment Eligibility Verification Form (I-9). The Contractor shall establish appropriate procedures and controls so no services or products under the Contract Documents will be performed or manufactured by any worker who is not legally eligible to perform such services or employment.

2.26 Trading with the County Employees Purchasing Ordinance: By submitting a bid, the bidder certifies that the provisions of County Purchasing Ordinance, which prohibit officials and employees of the county from engaging in certain transactions with the county and county agencies, have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with.

2.27 Georgia Open Records Act: The responses will become part of the County’s official files without any obligation on the County’s part. Ownership of all data, materials and documentation prepared for and submitted to Chatham County in response to a solicitation, regardless of type, shall belong exclusively to Chatham County and will be considered a record prepared and maintained or received in the course of operations of a public office or agency and subject to public inspection in accordance with the Georgia Open Records Act, Official Code of Georgia Annotated, Section 50-18-70, et. Seq., unless otherwise provided by law.

The Bidder and their bid price in response to the ITB will be read aloud at public bid openings. The bid tabulation will be posted with the solicitation within 48 hours. Chatham County shall not be held accountable if material from responses is obtained without the written consent of the vendor by parties other than the County, at any time during the solicitation evaluation process.

2.28 Contractor Records: The Georgia Open Records Act is applicable to the records of all contractors and subcontractors under contract with the County. This applies to those specific contracts currently in effect and those which have been completed or closed for up to three (3) years following completion. This is contract specific to the County contracts only.

2.29 Exceptions: All proceedings, records, contracts, and other public records relating to procurement transactions shall be open to the inspection of any citizen, or any interested person, firm or corporation, in accordance with the Georgia Open Records Act except as provided below:

a. Cost estimates relating to a proposed procurement transaction prepared by or for a public body shall not be open to public inspection.

b. Any competitive sealed bidding bidder, upon request, shall be afforded the opportunity to inspect bid records within a reasonable time after the opening of all bids but prior to award, except in the event that the County decides not to accept any of the bids and to rebid the contract. Otherwise, bid records shall be open to public inspection only after award of the contract. Any competitive negotiation offeror, upon request, shall be afforded the opportunity to inspect proposal records within a reasonable time after the evaluation and negotiations of proposals are completed but prior to award except in the event that the County decides not to accept any of the proposals and to reopen the contract. Otherwise, proposal records shall be open to the public inspection only after award of the contract except as provided in paragraph "c" below. Any inspection of procurement transaction records under this section shall be subject to reasonable restrictions to ensure the security and integrity of the records.

c. Trade secrets or proprietary information submitted by a bidder, offeror or contractor in connection with a procurement transaction shall not be subject to public disclosure under the Georgia Open Records Act; however, the bidder, offeror or contractor must invoke the protections of this section prior to or upon submission of the data or other materials and must identify the data or other materials to be protected and state the reasons why protection is necessary.

d. Nothing contained in this section shall be construed to require the County, when procuring by "competitive negotiation" (Request for Proposal), to furnish a statement of the reasons why a particular proposal was not deemed to be the most advantageous to the County.

2.30 Georgia Trade Secret Act of 1990: In the event a Bidder/Proposer submits trade secret information to the County, the information must be clearly labeled as a Trade Secret. The County will maintain the confidentiality of such trade secrets to the extent provided by law.

2.31 Certification of Independent Price Determination: By submission of this bid, the bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, that in connection with this procurement:

a. The prices in this bid have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other bidder or with any competitor;

b. Unless otherwise required by law, the prices which have been quoted in this bid have not been knowingly disclosed by the bidder and will not knowingly be disclosed by the bidder prior to opening, directly or indirectly to any other bidder or to any competitor; and

c. No attempt has been made or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .