Contract Drawings and Specifications Summary

This document consists of bid contract drawings and general construction specifications for the City of Philadelphia Water Department's Northeast Water Pollution Control Plant Polymer Feed System Rehabilitation project (Bid 2455). The project involves general construction work to rehabilitate the polymer feed system at the facility located in Philadelphia, Pennsylvania. The contract drawings include site location maps, civil details, piping plans and sections for both new and existing sedimentation basins, building foundations, plans and elevations, erosion and sediment control details, and dust control work practices. Multiple reference drawing sheets are indexed, including layout and specification notes prepared by Keystone Engineering Group. The drawings are marked "For Bids Only – Not for Construction" and are intended exclusively for bidding purposes prior to contract award. The estimated project value ranges from $4,000,000 to $5,000,000, and this solicitation is limited to pre-qualification; approved sellers will receive invitation to a closed bid solicitation.

The contractor is responsible for comprehensive project management obligations including obtaining all necessary construction permits, coordinating with utility providers (Philadelphia Water Department, PECO Energy, Philadelphia Gas Works, Comcast, Verizon, SEPTA, and AT&T), and conducting utility locating services through Pennsylvania One Call System at least three working days prior to excavation. Key requirements include compliance with Pennsylvania Act 287, OSHA excavation standards, dust control measures, erosion and sediment control practices, tree and landscape preservation, and maintenance of existing utilities during construction. The contractor must provide shoring and sheeting as needed, maintain vehicle access for chemical deliveries, and restore all disturbed areas to original condition at no additional cost to the owner. All demolition debris must be properly disposed of and recycled in accordance with applicable regulations, with the contractor bearing all associated costs and liability for damages to underground facilities during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL CONSTRUCTION

WORK No. 71124

CITY OF PHILADELPHIA

WATER DEPARTMENT

NORTHEAST WATER POLLUTION

POLYMER FEED SYSTEM REHABILITATION

CONTROL PLANT

FOR BIDS ONLY - NOT FOR CONSTRUCTION

MICHAEL R. FILMYER, P.E.

PE 037925E

DEPUTY COMMISSIONER, ENGINEERING

Micah.Fish-Gertz Textbox

LEGEND

CITY OF PHILADELPHIA

WATER DEPARTMENT

INDEX

SITE LOCATION

NORTHEAST WATER POLLUTION

POLYMER FEED SYSTEM REHABILITATION

CONTROL PLANT

X 17+28.47 Y 21+15.48

X 13+56.75 Y 21+15.48

FOR BIDS ONLY - NOT FOR CONSTRUCTION

S

S S

E

SS

EE

E

E

W

W W

E

S S

E

SS

EE

E

E

W

W W

E

TP

1. PRIOR TO EXCAVATION CALL PENNSYLVANIA 811 BY DIALING 811 WITHIN PA OR CALLING 800-242-1776 ANYWHERE WITHIN THE US.

2. KEEP ALL EXISTING UTILITIES IN OPERATION DURING CONSTRUCTION TO THE MAXIMUM EXTENT POSSIBLE.

3. LOCATION, SIZE, AND ELEVATION OF EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL INSPECT THE SITE THOROUGHLY AND FIELD VERIFY THE LOCATION, SIZE, MATERIAL, AND ELEVATION OF ALL UTILITIES. CONTRACTOR SHALL SCAN THE AREA PRIOR TO THE COMMENCING OF ANY EXCAVATION WORK. SEE SPECIFICATIONS FOR DETAILS ON SCANNING OPERATIONS.

4. RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO ORIGINAL STATE, UNLESS OTHERWISE NOTED. THESE ITEMS SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER AND MAY INCLUDE, BUT ARE NOT LIMITED TO, FENCES, IRRIGATIONS SYSTEMS, SHRUBS, SMALL TREES, LANDSCAPE MATERIALS, CONCRETE CURBING, ASPHALT AND SIDEWALKS.

5. PRESERVE AND PROTECT FROM INJURY ALL TREES NOT REQUIRED TO BE REMOVED. PROVIDE BARRICADES OR OTHER TYPES OF PROTECTION NECESSARY TO PREVENT UNNECESSARY DAMAGE.

6. ALL TREES, SHRUBBERY, SPOILS, ROCK, ETC THAT IS REMOVED/EXCAVATED FOR CONSTRUCTION OF THE PROPOSED FACILITIES, AND NOT INCORPORATED INTO THE WORK (IE BACKFILL) SHALL BE

HAULED OFF SITE AND DISPOSED OF BY THE CONTRACTOR.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY CONSTRUCTION PERMITS.

8. THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM DEMOLITION AND SHALL SAFELY AND LEGALLY DISPOSE OF ALL THESE ITEMS IN ACCORDANCE WITH APPLICABLE LOCAL, FEDERAL, STATE AND REGULATORY AUTHORITY HAVING JURISDICTION. RECYCLING MUST BE DONE IN ACCORDANCE WITH APPLICABLE REGULATIONS. BURNING OF ANY DEMOLISHED MATERIALS ON-SITE SHALL NOT BE PERMITTED. RECYCLING OF DEMOLITION DEBRIS SHALL BE APPROVED BY THE OWNER.

9. THE CONTRACTOR IS RESPONSIBLE FOR THE COSTS AND INSTALLATION OF DEMOLITION/CONSTRUCTION FENCE IF NECESSARY. THE CONTRACTOR IS RESPONSIBLE FOR ACTUAL LIMITS AND AMOUNT OF

FENCE REQUIRED IN ADDITION TO THE SECURITY OF THE WORK AREA.

10. PROVIDE SHORING, SHEETING AND BRACING, AS NEEDED, IN CONFORMANCE WITH THE APPLICABLE RULES AND REGULATIONS PROMULGATED BY THE DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), INCLUDING OSHA MANUAL 2226, "EXCAVATIONS". WHEN REQUIRED BY RULES AND REGULATIONS, THE CONTRACTOR SHALL PROVIDE DESIGNED SHORING SYSTEMS CERTIFICATIONS APPROVED BY A PROFESSIONAL ENGINEER TO THE OWNER AND ENGINEER FOR REFERENCE ONLY.

11. WHERE EXISTING UTILITY SERVICES (WATER, SEWER, TELEPHONE, ETC.) ARE CROSSED AND NEED TO BE TEMPORARILY INTERRUPTED, THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND UTILITY PROVIDER TO PROVIDE SUFFICIENT NOTICE TO THE CUSTOMER OF AN INTERRUPTION IN SERVICE. SERVICE SHALL BE RESTORED AS QUICKLY AS PRACTICAL. SERVICE INTERRUPTIONS DURING NORMAL BUSINESS HOURS WILL ONLY BE ALLOWED IF THE OCCUPANT CAN ACCOMMODATE WITH OUT AN ADVERSE IMPACT TO THEIR BUSINESS.

12. ALIGNMENTS OF ELECTRICAL CONDUIT SHOWN ON THE DRAWINGS ARE APPROXIMATE. CHANGES TO THE HORIZONTAL AND VERTICAL ALIGNMENT OF NEW ELECTRICAL CONDUIT MAY BE REQUIRED TO ACCOMMODATE THE ACTUAL LOCATION OF EXISTING UTILITIES, STRUCTURES, AND OBJECTS DETERMINED BY THE CONTRACTOR IN THE FIELD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING CHANGES TO ALIGNMENT WITH THE OWNER AND ENGINEER.

13. DURING INSTALLATION OF YARD PIPING, THE CONTRACTOR SHALL INSTALL TEMPORARY STEEL PLATES AS NECESSARY TO MAINTAIN VEHICLE ACCESS FOR CHEMICAL DELIVERIES ON A DAILY BASIS.

14. SEE SPECIFICATION SECTION 00850 FOR A LIST OF REFERENCE DRAWINGS THAT WILL BE MADE AVAILABLE TO THE SUCCESSFUL BIDDER AFTER AWARD OF CONTRACT. THE CONTRACTOR SHALL BE

LIABLE FOR ANY DAMAGES TO UNDERGROUND FACILITIES DURING CONSTRUCTION.

GENERAL NOTES

COMCAST CABLE

4400 WAYNE AVENUE

PHILADELPHIA, PA 19140

ATTN: PAT LAVIN

PAT_LAVIN@CABLE.COMCAST.COM

COMCAST CABLEVISION OF PHILADELPHIA

AREA 1 INC.

1351 S. DELAWARE AVE.

PHILADELPHIA, PA 19148

ATTN: JACK CLAYTON

JACK_CLAYTON@CABLE.COMCAST.COM

PECO ENERGY

830 S. SCHUYLKILL AVENUE

PHILADELPHIA, PA 19146

ATTN: LOUIS ROBINSON

215-292-1401

PHILADELPHIA WATER DEPARTMENT

1101 MARKET STREET, 5TH FLOOR

PHILADELPHIA, PA 19107

ATTN: MICHAEL QUINN

215-685-6309

IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH PENNSYLVANIA ACT

287, AS AMENDED, AND TO CONTACT THE "PENNSYLVANIA ONE CALL SYSTEM"

THREE (3) WORKING DAYS PRIOR TO THE START OF ANY EXCAVATION WORK.

PA ACT 287, AS AMENDED BY PA ACT 50 OF 2017

PENNSYLVANIA ONE CALL SYSTEM, INC.: 1-800-242-1776

FINAL DESIGN SERIAL NO. ______________

UTILITIES CONTACT LIST

PHILADELPHIA GAS WORKS

800 W. MONTGOMERY AVENUE

PHILADELPHIA, PA 19122

ATTN: THOMAS PENDERGAST

215-684-6344

TELEPORT COMMUNICATIONS AMERICA, LLC (AT&T)

175 WEST MAIN ST

FREEHOLD, NJ 07728

ATTN: CARLO VERDI III

732-577-8062 / 732-610-9568

VERIZON PENNSYLVANIA, INC.

900 RACE STREET, 6TH FLOOR

PHILADELPHIA, PA 19107

ATTN: B. KEEK

215-351-8947

SEPTA

1234 MARKET STREET, 12TH FLOOR

PHILADELPHIA, PA 1107

(215) 580-7800

CIVIL DETAILS

O.

D

X X X X XXXXX X X X X X X X X X X X X XX X X

VI. DUST CONTROL WORK PRACTICES

A. GENERAL

1. FUGITIVE DUST FROM CONSTRUCTION, DEMOLITION, AND EARTHWORK ACTIVITIES MAY

NOT BE VISIBLE AT THE POINT IT PASSES THE WORKSITE PROPERTY LINE.

2. THE CONTRACTOR SHALL NOT ENGAGE IN ANY CUTTING, SAWING, GRINDING, WRECKING,

SMASHING, OR MECHANICAL BREAKING OF CONSTRUCTION MATERIALS ON A WORKSITE

OPEN TO THE OUTDOOR AIR, ABSENT USE OF ONE OR MORE OF THE FOLLOWING

DUST CONTROL METHODS: (A) USE OF GRINDERS, SAWS, OR OTHER POWER TOOLS

EQUIPPED WITH DUST COLLECTION / EXTRACTION SYSTEMS. ALL SUCH TOOLS AND

DUST COLLECTION / EXTRACTION SYSTEMS MUST BE USED IN ACCORDANCE WITH

MANUFACTURER RECOMMENDATIONS. (B) ENSURING THAT CONSTRUCTION MATERIALS

OR STRUCTURE SURFACES ARE ADEQUATELY WETTED, WEATHER PERMITTING (E.G. >

THIRTY TWO (32) DEGREES FAHRENHEIT AT SOURCE OF DUST EMISSION).

3. DRY ABRASIVE BLASTING OF EXTERIOR SURFACES, BUILDING FACADES, AND OTHER

SURFACES OPEN TO THE OUTDOOR AIR IS PROHIBITED WHEN THE TEMPERATURE AT

POINT OF ABRASIVE BLASTING IS BELOW THIRTY TWO (32) DEGREES FAHRENHEIT.

4. NO CONSTRUCTION MATERIAL OR DEBRIS SHALL BE DROPPED MORE THAN TWENTY

(20) FEET TO ANY POINT LYING OUTSIDE OF THE EXTERIOR WALLS OF A BUILDING OR

OUTSIDE OF A STRUCTURE, EXCEPT THROUGH THE USE OF A MATERIALS CHUTE. ALL

MATERIALS CHUTES, OR SECTIONS THEREOF, SHALL BE ENTIRELY ENCLOSED, EXCEPT

FOR OPENINGS EQUIPPED WITH CLOSURES AT OR ABOUT FLOOR LEVEL FOR THE

INSERTION OF MATERIALS. AT ALL STORIES BELOW THE TOP FLOOR, SUCH OPENINGS

SHALL BE KEPT CLOSED WHEN NOT IN USE. CHUTES SHALL BE DESIGNED AND

CONSTRUCTED OF SUCH STRENGTH AS TO ELIMINATE FAILURE DUE TO IMPACT OF

MATERIALS OR DEBRIS LOADED THEREIN. TO PREVENT DUST EMISSIONS AT THE EXIT

OF THE MATERIALS CHUTE, ALL CONSTRUCTION MATERIAL OR DEBRIS DROPPED

THROUGH A MATERIALS CHUTE MUST BE ADEQUATELY WETTED TO PREVENT

DUST EMISSIONS. ALTERNATIVELY, THE MATERIAL CHUTE EXIT MUST BE SEALED

AGAINST THE TOP OF AN APPROPRIATE CONTAINER TO PREVENT DUST EMISSIONS.

5. WATER, OR OTHER DUST SUPPRESSANTS, MUST BE APPLIED TO ALL WORK AREAS

WITH ONGOING FILLING, GRADING, EXCAVATION, LAND CLEARING, GRUBBING, OR

EARTHWORK ACTIVITIES OPEN TO THE OUTDOOR AIR TO PREVENT DUST EMISSIONS.

APPLICATION OF WATER AS THE SOLE DUST SUPPRESSION AGENT IS PROHIBITED

WHEN THE TEMPERATURE IS BELOW THIRTY TWO (32) DEGREES FAHRENHEIT AT

SOURCE OF DUST EMISSION. MULCHING SHALL BE APPLIED FOR DUST CONTROL WHEN

THE TEMPERATURE IS BELOW THIRTY TWO (32) DEGREES FAHRENHEIT.

6. DUST CONTROL FABRIC MUST BE SECURELY ATTACHED TO ANY TEMPORARY WORKSITE

PERIMETER FENCING. THE DUST CONTROL FABRIC MATERIAL SHALL BE A MINIMUM OF

FIVE FEET IN HEIGHT AS MEASURED FROM THE BOTTOM OF THE PERIMETER FENCE

AND SHALL HAVE A MINIMUM BLOCKAGE OF 50%.

7. DEBRIS GENERATED FROM EARTHWORKS, CONSTRUCTION, AND DEMOLITION ACTIVITIES

MUST BE ADEQUATELY WETTED AND COVERED BEFORE BEING TRANSPORTED FROM

THE WORKSITE.

8. ANY SOIL, SAND, AGGREGATE, OR OTHER SIMILAR CONSTRUCTION MATERIALS THAT

ARE STORED ON A WORKSITE OPEN TO THE OUTDOOR AIR MUST BE ADEQUATELY

WETTED AND COVERED WHEN POSSIBLE TO PREVENT DUST EMISSIONS.

9. SUFFICIENT DRAINAGE MUST BE PROVIDED TO PREVENT THE UNCONTROLLED

DISCHARGE OF WATER OR OTHER LIQUID APPLIED TO THE SITE FOR DUST CONTROL.

10. A 10-MPH SPEED LIMIT SHALL BE OBSERVED BY ALL EQUIPMENT AND TRUCKS

TRAVELING WITHIN THE WORKSITE.

11. ALL ROADWAYS ON THE WORKSITE, AND ALL VEHICLE ACCESS POINTS TO THE SITE,

MUST BE ADEQUATELY WETTED AND SWEPT OF MATERIALS THAT WILL GIVE RISE TO

DUST EMISSIONS.

12. VEHICLE ACCESS POINTS MUST BE EQUIPPED WITH DUST TRACK OUT PREVENTION

MEASURES (E.G. WHEEL WASH SYSTEMS, RUMBLE GRATES, AND / OR GRAVEL PADS).

EROSION AND SEDIMENT CONTROL DETAILS

Properties

UV Resistance

Grab Tensile

Permitivity Flow Rate Puncture

Weight ASTM D-3776

ASTM D-4355

ASTM D-4991

ASTM D-4491

ASTM D-4833

ASTM D-4632

Test Method

0.55 oz./yd.

sec.-1 lbs.

lbs.

gal/min/ft

Woven Units

W

S

E

SS

E

SS

SS

S

EE

E

E

WILKINSXL

71124

WILKINSXL

71124

Frazer, Pennsylvania

(610) 407-4100 kegi.net

Keystone E N G I N E E R I N G G R O U P

21 34

S S

E

SS

EE

E

E

W

W W

E

Frazer, Pennsylvania

(610) 407-4100 kegi.net

Keystone E N G I N E E R I N G G R O U P

N

22 34 kegi.net

Keystone

23 34 kegi.net

Keystone E N G I N E E R I N G G R O U P

24 34 kegi.net

Keystone E N G I N E E R I N G G R O U P

25 34 kegi.net

Keystone E N G I N E E R I N G G R O U P

26 34 kegi.net

Keystone

27 34 kegi.net

Keystone

28 34 kegi.net

Keystone

29 34 kegi.net

Keystone

30 34 kegi.net

Keystone

31 34 kegi.net

Keystone

32 34 kegi.net

Keystone

33 34 kegi.net

Keystone

34 34

101
Sheets and Views
101
102
Sheets and Views
102 SITE DEMO PLAN OVERALL
103
104
Sheets and Views
104
105
Sheets and Views
105
106
Sheets and Views
106
107
Sheets and Views
107
201
Sheets and Views
201 PFS PIPING NEW SED BASIN PLAN
202
Sheets and Views
202 PFS PIPING NEW SED BASIN SECTIONS
203
Sheets and Views
203 PFS PIPING OLD SED BASIN EAST PLAN
204
Sheets and Views
204 PFS PIPING OLD SED BASIN EAST SECTIONS
205
Sheets and Views
205 PFS PIPING OLD SED BASIN WEST PLAN
206
Sheets and Views
206 PFS PIPING OLD SED BASIN WEST SECTIONS
207
Sheets and Views
207 PFS BLDG FND
208
Sheets and Views
208 PFS BLDG PLANS & ELEVS 01-13-25
209
Sheets and Views
209 PFS BLDG SECTIONS 01-13-25
210
Sheets and Views
210
211
Sheets and Views
211 SPEC NOTES AND DESIGN CRITERIA
Combined Bid Set.pdf
500
Layout
501
Layout
502
Layout
504
Layout
511
Layout
512
Layout
513
Layout
521
Layout
522
Layout
523
Layout
550
Layout
551
Layout
601
601
602
602
603
603
KEGI Drawings Issued for Bid.pdf
500
Layout
501
Layout
502
Layout
511
Layout
512
Layout
513
Layout
521
Layout
522
Layout
523
Layout
550
Layout
551
Layout
601
601
602
602
603
603
104.pdf
Sheets and Views
104

File details come from the government source that posted it. Updated .