BID 2024-31 Clarifying Questions 3.pdf

PDF 130 KB Posted

Attached to
BID# 2024-31 Metal Framing, Insulation, and Drywall For Lake Road Health Center
Solicitation number
S-C01010-00010180
Issued by
Clackamas County, Mission CDP, Oregon

About this file

This document is a clarification response for Invitation to Bid #2024-31 for metal framing, insulation, and drywall for the Lake Road Health Center project in Clackamas County, Oregon. The bid solicits qualified contractors to provide labor, materials, transportation, equipment, and services for this portion of the construction project. Bids are due by May 23, 2024 at 2:00 PM Pacific Time, with a non-mandatory pre-bid conference scheduled for May 1, 2024. The contract will be awarded to the lowest responsive and responsible bidder. The successful contractor must comply with prevailing wage rate requirements and provide performance and payment bonds.

The bid price should include all base bid items as well as any additive or deductive alternates. Clackamas County encourages participation by Minority, Women, and Emerging Small Businesses, and bidders must perform good faith outreach efforts to solicit quotes from such firms. There is no listed incumbent vendor or budget range provided, but the county is seeking to award this contract to the lowest responsive and responsible bidder that complies with the requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2024-31

Metal Framing, Insulation and Drywall for Lake Road Health Center (“BID”)

RESPONSE TO CLARIFYING QUESTIONS #3

May 15, 2024

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. The blueprints (clarifying questions S1.10, note #2, 550S137-43) shows that the walls underneath the platform will use metal studs 5 ½”in , is it possible to use the 6”in metal studs instead?

***UPDATED****Answer: We need to retract the answer of Yes, 6” metal studs are acceptable, to: No, it is necessary to use the 5 ½” metal stud dimension to maximize the size of the rooms. Ultimately, 2” of interior lineal wall footage will be lost if 6” metal studs are used. In addition to the maximization of interior square footage, the increase of wall thickness will result in the increased thickness of the door jams.

End of Clarifying Questions #3