Bid 19-14 ROHS Vertical Lift Modernization Quotation Form Section 00310 (1).docx
DOCX document 53 KB Posted
- Attached to
- ROHS VERTICAL LIFT MODERNIZATION
- Solicitation number
- RFP-ROY-190000002511-1
- Issued by
- Michigan
About this file
This document is a Quotation Form (Section 00310) for the Royal Oak School District in Royal Oak, Michigan, specifically for a Vertical Platform Lift (VPL) Modernization project at Royal Oak High School. The project involves removing existing vertical platform lifts and installing new ones in two locations: the Main Gym and Auxiliary Gym, with a required completion date of August 26, 2019. The contractor is expected to provide comprehensive engineering, labor, materials, transportation, services, and equipment for the project, which includes an 18-month warranty and preventive maintenance.
The base quotation for the project is $18,000 for the removal and installation of new vertical platform lifts, with the warranty maintenance cost included in the base price. The document includes provisions for two alternates: a deductive alternate to retain existing landing entrances and an option to provide a battery lowering system. The quotation form allows for potential pricing adjustments and requires the contractor to submit detailed information about proposed modernization components, technology, and subcontractors. The Royal Oak School District reserves the right to reject any or all quotations and is not obligated to enter into a contract based on this submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00310
tABLE OF CONTENTS
| Part 1 - GENERAL | 2 | |
| 1.1 | CONTRACTOR’S BASE QUOTATION | 2 |
| 1.2 | ADDENDA | 2 |
| 1.3 | Contractor’S OTHER SUPPORTING ENCLOSURES | 2 |
| 1.4 | proposed modernization installation schedule | 2 |
| 1.5 | CONTRACTOR PROPOSED MODERNIZATION COMPONENTS AND TECHNOLOGY | 3 |
| 1.6 | Contractor’S LIST OF SUBContractorS | 3 |
| 1.7 | SUBMISSION AND ACCEPTANCE OF QUOTATIONS | 3 |
| 1.8 | Contractor SIGNATURE | 4 |
LERCH, BATES
| LERCH BATES INC. | VPL |
| Elevator Consulting Group | QUOTATION FORM |
| C:\Users\michaelh\OneDrive - Lerch Bates Inc\00 Projects\Royal Oak Schools\CD\VPL\Specs\RFP\Quotation Form Section 00310.docx |
| 46 |
SECTION 00310
QUOTATION FORM
| DATE: |
| PROJECT: |
| ROYAL OAK HIGH SCHOOL |
VERTICAL PLATFORM LIFTS
| SUBMITTED BY: |
Name of CONTRACTOR
| CONTRACTOR’S Representative |
| Telephone Number |
Street Address
| City |
| State |
| Zip Code |
| TO Company |
| Royal Oak School District |
| Address |
| 800 Devillen Avenue |
| City, State Zip |
| Royal Oak, MI 48073 |
| Attn: |
| Kathy Abela |
GENERAL
CONTRACTOR’S BASE QUOTATION
Having examined documents prepared by Lerch Bates Inc. dated June 10, 2019, and having reviewed site conditions, applicable codes and all conditions affecting and governing the work, the Undersigned Contractor hereby offers to provide all engineering, labor, materials, transportation, services and equipment necessary and incidental to properly execute required work of the Contract Documents for the sum of:
| Item: |
| 1 |
| Removal of Existing and Installation of New Vertical Platform Lifts: |
| Section: |
| 144216 |
| Dollars $ |
18-Month Warranty Preventive Maintenance: Amount included in base quotation Item A., 1 above.
Total Included in Item A.
NOTE: Purchaser reserves the right to pay warranty maintenance cost in a lump sum or on a monthly basis during period maintenance is actually performed.
Enter a cost figure for all pricing requested. Failure to comply, subjects quotation to disqualification.
Undersigned affirms that quotations provided represent entire cost including site conditions, code requirements, drawings, specifications, addenda, and any other Contract Documents, and no claim will be made due to any increase in wage scales, material prices, taxes, insurance, cost indexes or any other factors affecting the construction industry or this project except as expressly allowed in Owner’s maintenance contract.
ADDENDA
| Undersigned acknowledges receipt of Addendum No. |
| through |
Contractor’S OTHER SUPPORTING ENCLOSURES Undersigned has enclosed the following (Check YES or NO):
Separate letter containing any “Qualification” related to its Quotation. |_| YES |_| NO proposed modernization installation schedule Undersigned contractor submits the following completion schedule for project. Bidders are instructed to add additional rows to the following schedule grid to accommodate job specific phasing. Work to be completed no later than August 26, 2019.
PHASE #
PHASE
DURATION (WEEKS)
Engineering Surveys
Submittal Preparation
Client Approval Period
Engineering, Procurement and Fabrication
Installation, VPL #1, Main Gym
Installation, VPL #2, Auxiliary Gym
Total Project Duration
CONTRACTOR PROPOSED MODERNIZATION COMPONENTS AND TECHNOLOGY
Undersigned Contractor will utilize the following modernization technology for the projects and submits these systems for approval. Upon acceptance of these systems by Purchaser/Consultant, no substitutions shall be made without written approval of Consultant.
Systems and Components Proposed Model Description/Vendor
| Vertical Platform Lifts |
Contractor’S LIST OF SUBContractorS The undersigned Contractor will utilize the following subcontractors for major components of work and submits these firms for approval. Upon acceptance of these Sub-Contractors by Purchaser/Consultant, no substitutions shall be made without written approval of Consultant.
| Subcontractor Name |
| Type of Work |
SUBMISSION AND ACCEPTANCE OF QUOTATIONS
Undersigned Contractor agrees to Purchaser’s right to reject any and all quotations without explanation.
Undersigned Contractor declares that preparation and submission of quotations herein contained do not obligate Purchaser or Consultant in any way.
Undersigned Contractor agrees and understands that Purchaser assumes no obligation to enter into a Contract.
Alternates A. State net sum to be added to or deducted from Stipulated Sum (Base Quotation) in event any Alternate Quotation is accepted.
B. Submit Alternate Quotations by filling in blank spaces provided herein.
C. Purchaser reserves right to accept or reject any or all Alternates.
D. Provide lump sum price for all alternates as described below and in Section 01030, Alternates.
| ALTERNATE 1: |
| Deductive alternate to retain the existing lower and upper landing entrances. |
| DOLLARS $ |
| ALTERNATE 2: |
| Provide battery lowering system. |
| DOLLARS $ |
Contractor SIGNATURE
| DATE: |
SIGNED:
| PRINT NAME: |
| TITLE: |
| NAME OF FIRM: |
| STATE LICENSE NO.: |
LEGAL ADDRESS:
ORGANIZED AS A (MARK ONE):
|_| INDIVIDUAL
|_| PARTNERSHIP
|_| CORPORATION
| UNDER STATE LAW OF |
| TELEPHONE: |
(SEAL)
END OF SECTION
Royal Oak High School, Royal Oak, MI LB Project No.0100021807 ©2019 Lerch Bates Inc.
June 10, 2019 00310 - 1