BIA-TTGP-2024-OIED NOFO.pdf
PDF 339 KB Posted
- Attached to
- Tribal Tourism Grant Program (TTGP)
- Opportunity number
- BIA-TTGP-2024-OIED
About this file
This document is a Notice of Funding Opportunity (NOFO) for the Tribal Tourism Grant Program (TTGP), a competitive discretionary grant program authorized under the NATIVE Act and the Consolidated Appropriations Act, 2024.
The NOFO solicits proposals from eligible Indian Tribes and Tribal Organizations for Tribal tourism implementation projects that have an economic development focus to achieve substantial community benefits. The OIED anticipates awarding 10-15 grants ranging from $75,000 to $150,000 with a 24-month period of performance. Applications are due by October 25, 2024, and awards are anticipated to be made on January 2, 2025. The grants will be funded under the Indian Economic Development program (CFDA 15.032) administered by the Department of the Interior Bureau of Indian Affairs.
BIA-TTGP-2024-OIED NOFO.pdf
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4337-15
DEPARTMENT OF THE INTERIOR
Bureau of Indian Affairs
[245A2100DD/AAKC001030/A0A501010.999900]
Tribal Tourism Grant Program (TTGP); Solicitation of Proposals
AGENCY: Bureau of Indian Affairs (BIA), Interior.
ACTION: Notice.
Due Date for Applications: 10/25/2024
Table of Contents A. Program Description
A1. Authority A2. Background, Purpose and Program Requirements
B. Federal Award Information B1. Total Funding B2. Expected Award Amount B3. Anticipated Award Funding and Dates B4. Number of Awards B5. Type of Award
C. Eligibility Information C1. Eligible Applicants C2. Cost Sharing or Matching C3. Other
D. Application and Submission Information D1. Address to Request Application Package D2. Content and Form of Application Submission D3. Unique Entity Identifier and System for Award Management (SAM) D4. Submission Dates and Times D5. Intergovernmental Review D6. Funding Restrictions D7. Other Submission Requirements
E. Application Review Information E1. Criteria E2. Review and Selection Process E3. CFR – Regulatory Information E4. Anticipated Announcement and Federal Award Dates
F. Federal Award Administration Information F1. Federal Award Notices F2. Administrative and National Policy Requirements F3. Reporting
G. Federal Awarding Agency Contact(s) G1. Program Technical Contact G2. Program Administration Contact G3. Application System Technical Support
H. Other Information
A. Program Description
A1. Authority This Notice of Funding Opportunity (NOFO) is designed to provide financial assistance to Tribal communities to create, rebuild or strengthen their tourism industry. This competitive discretionary grant program is authorized under the NATIVE Act (25 U.S.C. 4354(b)) and the Consolidated Appropriations Act, 2024 (PL 118-42). The NATIVE Act authorizes the head of an agency with assets or resources relating to travel, recreation, tourism promotion or branding enhancement for which Indian Tribes, Tribal organizations, or Native Hawaiian organizations may be used: (1) to support the efforts of Indian Tribes, Tribal organizations, and Native Hawaiian organizations to tell the story of Native Americans as the First Peoples of the United States; (2) to use the arts and humanities to help revitalize Native communities, promote economic development, increase livability and present the uniqueness of the United States to visitors in a way that celebrates the diversity of the United States; and to carry out 25 U.S.C.
4354. This NOFO does not include eligibility for Native Hawaiian Organizations (see Section C.
Eligibility Information).
A2. Background, Purpose and Program Requirements It is very important to thoroughly review this Full Announcement to fully understand how to apply for a TTGP grant.
Background The U.S. Department of Interior (DOI), Office of the Assistant Secretary—Indian Affairs, through the Office of Indian Economic Development (OIED), solicits proposals from eligible entities for TTGP grants. Eligible entities are referred to using the term “Tribe” throughout this notice, see Section C. Eligibility Information. The OIED supports a Tribe’s capacity to plan, develop and manage tourism and related infrastructure in support of economic development and the NATIVE Act (Pub. L. 114-221). The TTGP grant funding strives to achieve substantial community benefits by supporting infrastructure development and increased tourism capacity to elevate the living standards of the community.
The two previous TTGP grants focused on supporting Tribal tourism by providing Tribes funds to obtain technical assistance to perform feasibility studies or develop Tribal tourism business plans. The feasibility studies or business plans empowered Tribes to make informed decisions on potential tourism project(s), Tribal tourism businesses, or Tribal tourism businesses recovering from the economic impacts of the COVID-19 pandemic.
Purpose Summary The TTGP FY 2024 will take the next step in program development by funding a pilot group of competitively selected Tribal tourism implementation projects. This small cohort will allow the OIED to focus and develop those Tribes to be successful with their Tribal tourism implementation projects. Each application must provide supporting documentation that the project proposal is in the implementation phase of its life cycle by submitting completed planning documents (i.e. Feasibility Study, Business Plan). The implementation of the tourism project will address a tourism challenge(s) that is guided by the economic development needs of the community.
Application Proposal Parameters The following sections on project proposal structure and parameters are suggested to be used as a guide toward supporting a tourism implementation project that can be competitively ranked.
Whereas each proposal will tackle their community’s own distinctive needs and have the freedom to provide for that flexibility, the methods outlined in the proposal should demonstrate the same level of Tribal community cohesion, commitment and depth. The application should show quality and descriptiveness in the details to be very clear in describing the program design.
The following sections will outline the structure by which the TTGP will solicit applications from Tribes interested in tourism implementation project funds and the criteria by which the applications will be competitively reviewed (see Section E. Application Review Information):
1. Community Driven Need
2. Planning Documentation and Project Direction
3. Cultural Significance
4. Economic Development Focus with Capacity Building for Local Entrepreneurs
5. Project Deliverables and Measurable Increase to Tourism Visitor & Resident
Experience
6. Cost Appropriateness of Project
1. Community Driven Need
An application submitted for consideration for TTGP funding must provide a project proposal that is centered around an economically derived community need. Apart from systematic needs of the Tribe, the TTGP funding strives to award proposals demonstrating a deep understanding of the economic community necessities central to the project. The proposal may be a component of a larger project; however, it must have a clear delineation of funding and project deliverables (see Section 5. Project Deliverables and Measurable Increase to Tourism Visitor & Resident Experience). This community driven focus will help support the efforts of the Tribe’s tourism goals and to tell their story of Native Americans as the First Peoples of the United States.
2. Planning Documentation and Project Direction Each application must contain a completed planning document supporting the implementation phase of its life cycle. The planning documents may include, but are not limited to: a completed Feasibility Study; a Business Plan; etc. The planning document may include community surveys, preliminary statistics, long-term planning parameters, etc., to demonstrate the project meets a high probability of success.
While the planning document identified the tourism project direction and overall feasibility, this project implementation proposal will provide the directional agenda and tasks to tackle the tourism challenge. The application must demonstrate why the Tribe chose this particular implementation project, how it plans to accomplish the necessary portions, how it will budget for those particular needs, and how it has the capacity to complete a project of this scope. If this project involves complimentary tourism plans, those funding sources and deliverables must be identified and separated from those contained in this proposal for TTGP funding.
3. Cultural Significance The TTGP funding helps to empower Indian Tribes and Tribal organizations to showcase the heritage, foods, traditions, history, and continuing vitality of Native American communities. The proposal should thread authentic local community Tribal culture throughout the implementation project and showcase those unique traits to increase the visitor and resident experience. The project plans should include ways to identify, enhance, or maintain traditions and cultural features, that are important to sustain the distinctiveness of the local Native American community. Tourists to the area will be exposed to these efforts to promote understanding and respect for diverse cultures and subcultures in the United States and the relevance of those cultures to the national brand of the United States.
4. Economic Development Focus with Capacity Building for Local Entrepreneurs The implementation project must be centered around an economically derived community tourism need. While the project will be rooted in furthering the economic development of a community at large, the proposal should provide some measure of local entrepreneurial involvement. Innovative projects that show a deep understanding of the community will incorporate the local businesses, artists, and entrepreneurs who help further revitalize Native communities, promote economic development, increase livability, and present the uniqueness of the United States to visitors in a way that celebrates the diversity of the United States. The project should strive to improve the economic development of the community by driving tourism to the area to experience the distinct qualities of the community culture and its local entrepreneurs.
5. Project Deliverables and Measurable Increase to Tourism Visitor & Resident Experience
The Tribal tourism implementation project must contain tracking mechanisms to accurately measure goals to gauge the success of the project. The project will identify goals that have appropriate timelines, increase national or global recognition, have positive impacts to the local community, and correlate to the overall parameters as outlined in this section.
Depending on if the project is standalone or part of a consolidated effort, the deliverables must speak to measuring increased tourism traffic, visitor and resident experience, and the completion of portions of an overall project. Any consolidated project must have the capacity and well-defined financial systems to separate the various goals and financial expenditures. A project that is a component of a much larger project will demonstrate those milestones and deliverables contained in this grant award. These deliverables must be submitted at the end of the period of performance, as well as monitored and reported during the interim reporting periods (see Section F3. Reporting).
6. Cost Appropriateness of Project The project expenditures must be allowable costs per 2 CFR 200 and the TTGP grant program (see Section D6. Funding Restrictions). The overall project costs, as well as the individual cost categories, must be pragmatically commensurate to the desired outcomes. The proposal should act cautiously to outline a budget and timelines that are appropriate for the project term and cost structure. While only eligible Tribes may apply for TTGP grants, grantees may select or retain for-profit or non-profit Tribal Organizations to perform a grant’s scope of work for grant funding to support Tribal programs. Every effort should be made to link funding costs to the overall goal of capturing tourism traffic, visitors and ultimately to increase Tribal income.
Applicant Procurement Procedures The applicant is subject to the procurement standards under 2 CFR 200.318 through 200.326. In accordance with 2 CFR 200.318, an applicant must use its own documented procurement procedures which reflect Tribal laws and regulations, provided that the procurements conform to applicable Federal law and standards identified in Part 2 of the Code of Federal Regulations. All Tribes are subject to audit reviews once selected.
B. Federal Award Information
B1. Total Funding Estimated Total Funding $1,400,000
B2. Expected Award Amount Maximum Award $150,000, one-time funding Minimum Award $75,000, one-time funding Term 24-month term
The OIED anticipates awarding approximately 10-15 grants under this announcement ranging in value from approximately $75,000 to $150,000 in one-time funding. The TTGP awards will remain active for a 24-month period of performance. The OIED will use a competitive evaluation process for awarding based on criteria described in Section E. Application Review Information of this notice. Only one application will be accepted from an eligible Tribe. The TTGP funding is intended for Tribal tourism implementation projects that have an economic development focus to achieve substantial community benefits. No project shall be funded that has comparable activities previously carried out under other federal assistance.
B3. Anticipated Award Funding and Dates Anticipated Award Date January 2, 2025
B4. Number of Awards Expected Number of Awards
B5. Type of Award Funding Instrument Type G - Grant
C. Eligibility Information
C1. Eligible Applicants Eligible Applicants 11 – Native American tribal organizations (other than Federally recognized tribal governments) 07 – Native American tribal governments (Federally recognized)
Eligibility for Funding The Office of the Assistant Secretary – Indian Affairs, through OIED, is soliciting proposals from eligible applicants. Eligible applicants are Indian Tribes and Tribal Organizations, as defined in Section 4 of the Indian Self-Determination and Education Assistance Act (ISDEAA) (25 U.S.C. 5304), including Tribal Consortia. Eligible applicants may select or retain for-profit or non-profit Tribal Organizations to perform a grant’s scope of work for grant funding to support the Tribal tourism implementation project.
https://uscode.house.gov/view.xhtml?req=(title:25%20section:5304%20edition:prelim)
Note: The U.S. Department of the Interior Office of Native Hawaiian Relations is managing NATIVE Act tourism grants to Native Hawaiian Organizations. For additional information on grants for Native Hawaiian Organizations, please visit their webpage at https://www.doi.gov/hawaiian/grants, or contact directly at hawaiian@ios.doi.gov.
C2. Cost Sharing or Matching Cost Sharing / Matching Requirement No
C3. Other Excluded Parties: BIA conducts a review of the SAM.gov Exclusions database for all applicant entities and their key project personnel prior to award. BIA cannot award funds to entities or their key project personnel identified in the SAM.gov Exclusions database as ineligible, prohibited/restricted or otherwise excluded from receiving Federal contracts, certain subcontracts, and certain Federal assistance and benefits, as their ineligibility condition applies to this Federal program.
D. Application and Submission Information
D1. Address to Request Application Package The required method of submitting proposals is through Grants.gov. For information on how to apply for grants in Grants.gov, see the instructions available at https://www.grants.gov/help/html/help/Applicants/HowToApplyForGrants.htm. Proposals must be submitted to Grants.gov by the deadline established, no later than 5 p.m. EST, as indicated in Sections B3. Anticipated Award Funding and Dates and E4. Anticipated Announcement and Federal Award Dates.
D2. Content and Form of Application Submission The mandatory components, and forms identified below, must be included in the proposal package. Links to the mandatory forms can be found under the “package” tab on the TTGP FY 2024 grant opportunity page at Grants.gov. Any information in the possession of the BIA or submitted to the BIA throughout the process, including final work product, constitutes government records and may be subject to disclosure to third parties under the Freedom of Information Act (FOIA), 5 U.S.C. 552, and the Department of the Interior’s FOIA regulations at 43 CFR part 2, unless a FOIA exemption or exception applies, or other provisions of law protect the information.
https://www.doi.gov/hawaiian/grants http://www.grants.gov/ https://www.grants.gov/help/html/help/Applicants/HowToApplyForGrants.htm http://www.grants.gov/
The Applicant is responsible to confirm that all mandatory documents have been properly uploaded and submitted within the Grants.gov system before the deadline. Please reference the Mandatory Component Checklist (see Section D7. Other Submission Requirements) for a summary checklist. Following are the names of the required forms:
1. Cover Page
2. Cover Letter
3. Application for Federal Assistance (SF-424) [V4.0]
4. Budget Information for Non-Construction Programs (SF-424A) [V1.0]
5. Project Abstract Summary [V2.0]
a. Project Narrative Attachment Form [V1.2]
b. Planning Document
6. Budget Narrative
a. Line-Item Budget
7. Attachments [V1.2]
8. Key Contacts [V2.0]
1. Cover Page A Cover Page must be included in the application and contain the following:
• Category of Funding for the TTGP application (15.032)
• Proposal Title
• Total Amount of funding requested from the Program
• Full and Proper Name of the applicant organization
• For federally recognized Tribes, please utilize the name as listed in the Federal Register Notice 89 FR 944 (1/8/2024) for Indian Entities Recognized by and Eligible To Receive Services From the United States Bureau of Indian Affairs.
• Statement confirming the proposed work will have the potential to reach the intended goals and objectives.
• Confirm active registration in SAM, attaching print-out from SAM.gov to the cover page.
See instructions in Section D7. Other Submission Requirements.
• Provide confirmation of an active enrollment in the Automated Standard Application for Payment (ASAP) and your Recipient ID with the BIA. Allow 3-4 weeks to complete all steps of enrollment prior to submission deadline. The organization must be enrolled in ASAP with BIA, current enrollment with other federal agencies is not sufficient. See instructions in Section D7. Other Submission Requirements.
• Confirmation of other completed Mandatory Components identified in this section (SF- 424, Project Abstract Summary, Planning Document, etc.).
• Identification of Point of Contact personnel that will provide project oversight and management (see below 8. Key Contacts [V2.0]).
• Identification of notable partnerships such as Tribes, other Tribal Organizations or Entities.
chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/www.govinfo.gov/content/pkg/FR-2024-01-08/pdf/2024-00109.pdf
2. Cover Letter A cover letter is not to exceed one (1) page that summarizes the interest and intent, complete with authorized signature(s) of organization leadership.
3. SF-424, Application for Federal Assistance [V4.0] Applicants must submit the appropriate Standard Form (SF)-424, Application for Federal Assistance. Individuals applying as a private citizen (i.e., unrelated to any business or nonprofit organization you may own or operate in your name), must complete the SF-424, Application for Federal Assistance-Individual form. All other applicants must complete the standard SF-424, Application for Federal Assistance. The required application forms are available with this announcement on Grants.gov. Please indicate the Legal Name of the organization that will be consistent in other federal programs on for all correspondences. For federally recognized Tribes, please utilize the name as listed in the Federal Register Notice 89 FR 944 (1/8/2024) for Indian Entities Recognized by and Eligible To Receive Services From the United States Bureau of Indian Affairs.
The programmatic point of contact should be provided as the individual to contact pertaining to all matters of the application. The Unique Entity Identifier (UEI) number indicated must match what is registered as a vendor in SAMs/FBMS and must be current. Identify the County and the Congressional Districts in the fields provided. The Authorized Representative should be the Tribal Leader or their official designee. The SF-424, Application for Federal Assistance must be complete, signed, and dated. Do not include any proprietary or personally identifiable information. Please note: Enter only the amount requested from this Federal program in the “Federal” funding box on the SF-424 Application form. Include any other Federal sources of funding in the “Other” box and provide details on those Federal source(s) and funding amount(s) in the required Budget Narrative (see SF-424A, Budget Information for Non-Construction Programs section below).
Please use a descriptive file name that includes tribal name and project description. For example: TTGPSF424.Tribalname.Project. The SF-424 [V4.0] form requires the County as well as the Congressional District number of the applicant, which can be found at https://www.house.gov/representatives/find-your-representative.
4. SF-424A, Budget Information for Non-Construction Programs Reference Section 3. SF-424, Application for Federal Assistance [V4.0] and Section 6. Budget Narrative and Line-Item Budget, to correlate the Object Class Categories and Totals that will be expanded and justified in this section. Applicants must submit the appropriate SF-424 Budget Information form and Budget Narrative. For non-construction programs or projects, applicants must complete and submit the SF-424A, “Budget Information for Non-Construction Programs” form. All required application forms are available with this announcement on Grants.gov.
Federal award recipients and subrecipients are subject to Federal award cost principles in 2 CFR 200.
chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/www.govinfo.gov/content/pkg/FR-2024-01-08/pdf/2024-00109.pdf http://www.house.gov/representatives/find-http://www.house.gov/representatives/find-
The budget must identify the amount of grant funding requested and a comprehensive and itemized breakdown of all projected and anticipated expenditures, including contracted personnel fees, consulting fees (hourly or fixed), travel costs, data collection and analysis costs, computer rentals, report generation, drafting, advertising costs for a proposed project and other relevant project expenses, and their subcomponents.
• Travel costs should be itemized by airfare, vehicle rental, lodging, and per diem, etc., based on the current Federal government per diem schedule. See below Required Grantee Travel and Attendance at an Annual Grantee Meeting.
• Data collection and analysis costs should be itemized in sufficient detail for the OIED review committee to evaluate the charges.
• Personnel may be charged directly or covered indirectly. Do not include the personnel costs or travel of consultants or contractors under this category. For any position, provide: the name of the individual (if known), their title; time commitment to the project in months; time commitment to the project as a percentage or FTE equivalent; annual salary; grant salary; wage rates; etc. Identify the project director or principal investigator, if known at the time of application. Costs of employee fringe benefits are the allowances and services provided by employers to their employees in addition to regular salaries and wages. Typically, fringe benefit amounts are determined by applying a calculated rate for a particular class of employee (full-time or part-time) to the salary and wages requested. Fringe benefits, like salary, will also be as direct cost (Health insurance, Federal Insurance Contributions Act (FICA) taxes, retirement, taxes, etc.)
• Other expenses may include computer rental, report generation, drafting, and advertising costs for a proposed project.
Applicants are required to utilize the SF-424A for the budget submission. Please use a descriptive file name that includes tribal name and project description. For example:
TTGPSF424A.Tribalname.Project.
5. Project Abstract Summary, Project Narrative Attachment Form and Planning
Document The Project Abstract Summary must be submitted utilizing the appropriate form that is available with this announcement on Grants.gov. All fields must be filled with the information requested.
Please provide an abstract that is a concise summary to be further applied as an accurate definition of the Tribal tourism implementation project.
Project Narratives are not judged based on their length. Please do not submit any unnecessary attachments or documents beyond what is listed above, e.g., Tribal history, unrelated photos and maps. All information below will follow those structures in Section A2. Background, Purpose and Program Requirements.
The first paragraph of the project narrative must include the title and basic summary description of the proposed tourism implementation project. The Project Narrative must not exceed 50 pages. Supplemental information such as letters of support, graphs, charts, maps, photographs and other graphic and/or other relevant information may be included as an Attachments and not counted against the 50-page Project Narrative Limit. At a minimum, it should include:
• A detailed technical description of the tourism implementation project as structured in Section A2. Background, Purpose and Program Requirements.
• The project narrative and supporting data should demonstrate the implementation project is centered around an economically derived community need.
• The alignment of the project narrative, deliverables and planning document should show a consistent direction the Tribe is taking their tourism goals.
• Tribal cultural aspects, economic development and capacity building for local entrepreneurs should be major components of the implementation project.
• A description of the project goals, milestones, and deliverables that will correlate to the technical description and timeline of the tourism implementation project.
• Identification of measurable tourism goals that coincide with the project to ideally be produced according to the associated timeline status of interim reporting.
• Final project deliverables should be clear and reasonable to the project scope.
The project must include a completed planning document that supports the direction of the implementation project, for example a completed Feasibility Study or a Business Plan. No application will be considered complete without a submission of a planning document. The planning document will not count toward the 50 page limit for the project narrative.
It must be indicated if this proposal is a portion or component of a much larger tourism project.
Care should be taken to demonstrate the Tribe has the capacity and financial systems to carry out the project, and to properly delineate the purpose, costs and deliverables of this TTGP funded portion.
Please use a descriptive file name that includes Tribal name and project description. For example: TTGPProjectNarrative.Tribalname.Project
6. Budget Narrative and Line-Item Budget Reference Section 3. SF-424, Application for Federal Assistance [V4.0] and Section 4. SF- 424A, Budget Information for Non-Construction Programs, to correlate Object Class Categories and Totals that will be expanded and justified in this section. The project budget shall include detailed information on all cost categories and must clearly identify all estimated project costs.
Unit costs shall be provided for all budget items including the cost of work to be provided by contractors or sub-recipients. Applicants shall include a narrative description of the items included in the project budget. When applicable, the value of in-kind contributions of goods and services will be provided to complete the project when cost share is identified to be included (reference Section C. Eligibility Information). Cost categories can include, but are not limited to, those costs items included on the SF424A.
The Budget Narrative will include additional spreadsheets and narrative formats to help itemize and fully break-down the individual budget items. Do not provide any blanket budget estimates that are not supported with documentation, itemized breakdown, and narrative justification.
Rounding can be done to the nearest $100s. Please use a descriptive file name that includes tribal name and project description. For example: TTGPBudgetNarrative.Tribalname.Project.
Appropriate summations of various budget sections should be correctly tabulated within each Object Class Category of the SF-424A. The budget should include the mandatory Grantee Meeting attendance budget that is fully itemized to Washington DC per the current GSA standards (See Required Grantee Travel and Attendance at an Annual Grantee Meeting below).
Do provide unsupported travel costs for the Grantee Meeting. Travel by consultants, contractors, etc., should be justified and included in the Travel category if it is paid by the Grantee directly, or added into the Contractor category if they will be reimbursed.
7. Attachments [V1.2] See D7. Other Submission Requirements for more information. Utilize the “attachments form” to include the Tribal Resolution or Authorization Letter issued in the fiscal year of the grant application, authorizing the submission of the TTGP grant application. It must be signed by authorized Tribal representative(s). The Tribal Resolution or Authorization Letter must also include a description of the language immersion program to be developed. An application submitted without a Tribal Resolution or Tribal Authorization will be considered incomplete.
The attachments form can also be used to include any other attachments related to the proposal.
8. Key Contacts [V2.0] Applicants must include the Key Contacts information page(s) that includes the individuals who will be responsible for the programmatic, financial, leadership and associated communication roles:
• Please use a descriptive file name that includes Tribal name and identifies it in the critical information page (CIP). For example: TTGPCIP.Tribalname.Project.
• Please identify the main Project Point of Contact information including address, email, desk, and cell phone number.
• Please identify the main Fiscal Point of Contact information including address, email, desk, and cell phone number.
• Please identify the Tribal Leader information including address, email, desk, and cell phone number.
• Please identify individuals for the following roles in the GrantSolutions system that will manage the grant, communicate with the OIED staff, as well as be responsible for reporting:
• Grantee Administrative Official / Grantee Authorized Representative
• Grantee Principal Investigator / Program Director
Required Grantee Travel and Attendance at an Annual Grantee Meeting Grantees will be required to have two Tribal individuals who work directly on the project attend an in-person annual DOI/OIED grantee meeting to convene during the Reservation Economic Summit (RES) in Las Vegas, Nevada, during the term of the grant award. Applicants must include an itemized budget for these travel costs, per GSA guidelines, in the budget to cover this requirement. Travel costs must not exceed $6,000 for those two individuals. Applicants should follow their own travel policies to budget for this meeting, plus travel days, with a complete itemized breakdown of those anticipated costs. Additional funds for these expenses will not be available once grant is awarded. In the event the meeting is converted to a virtual meeting due to timing or COVID related issues, or the location changes to a cheaper venue, any additional unused funds may be repurposed into the grant.
Special Notes Please make sure that the SAM number used to apply is active, not expired, with a current UEI number on the SF-424. Please make sure an active ASAP number is provided. Applicants must have a current ASAP number and be enrolled with the BIA to be eligible. Please list counties where the project is located and congressional district number where the project will be located.
Conflict of Interest Disclosure Per the Financial Assistance Interior Regulation (FAIR), 2 CFR §1402.112, applicants must state in their application if any actual or potential conflict of interest exists at the time of submission.
(a) Applicability.
(1) This section intends to ensure that non-Federal entities and their employees take appropriate steps to avoid conflicts of interest in their responsibilities under or with respect to Federal financial assistance agreements.
https://www.ecfr.gov/cgi-bin/text-idx?SID=1bfd0da1190f850482e94794cca23a5d&mc=true&node=20190830y1.1
(2) In the procurement of supplies, equipment, construction, and services by recipients and by subrecipients, the conflict of interest provisions in 2 CFR 200.318 apply.
(b) Notification.
(1) Non-Federal entities, including applicants for financial assistance awards, must disclose in writing any conflict of interest to the DOI awarding agency or pass-through entity in accordance with 2 CFR 200.112.
(2) Recipients must establish internal controls that include, at a minimum, procedures to identify, disclose, and mitigate or eliminate identified conflicts of interest. The recipient is responsible for notifying the Financial Assistance Officer in writing of any conflicts of interest that may arise during the life of the award, including those that have been reported by subrecipients.
(c) Restrictions on lobbying. Non-Federal entities are strictly prohibited from using funds under a grant or cooperative agreement for lobbying activities and must provide the required certifications and disclosures pursuant to 43 CFR part 18 and 31 U.S.C. 1352.
(d) Review procedures. The Financial Assistance Officer will examine each conflict of interest disclosure on the basis of its particular facts and the nature of the proposed grant or cooperative agreement, and will determine whether a significant potential conflict exists and, if it does, develop an appropriate means for resolving it.
(e) Enforcement. Failure to resolve conflicts of interest in a manner that satisfies the government may be cause for termination of the award. Failure to make required disclosures may result in any of the remedies described in 2 CFR 200.338, Remedies for noncompliance, including suspension or debarment (see also 2 CFR part 180).
Single Audit Reporting Statement All U.S. states, local governments, federally recognized Indian tribal governments, and non-profit organizations expending $750,000 USD or more in Federal award funds in the applicant’s fiscal year must submit a Single Audit report for that year through the Federal Audit Clearinghouse’s Internet Data Entry System. U.S. state, local government, federally recognized Indian tribal government, and non-profit applicants must state if your organization was or was not required to submit a Single Audit report for the most recently closed fiscal year. If your organization was required to submit a Single Audit report for the most recently closed fiscal year, provide the EIN associated with that report and state if it is available through the Federal Audit Clearinghouse website.
Certification Regarding Lobbying Applicants requesting more than $100,000 in Federal funding must certify to the statements in 43 CFR Part 18, Appendix A-Certification Regarding Lobbying. If this application requests more than $100,000 in Federal funds, the Authorized Official’s signature on the appropriate SF-424, Application for Federal Assistance form also represents the entity’s certification of the statements in 43 CFR Part 18, Appendix A.
https://harvester.census.gov/facides/Account/Login.aspx https://harvester.census.gov/facides/Account/Login.aspx https://harvester.census.gov/facdissem/Main.aspx https://harvester.census.gov/facdissem/Main.aspx http://www.ecfr.gov/cgi-bin/text-idx?SID=683823273fc0da6a1060883eda593fb8&mc=true&node=pt43.1.18&rgn=div5 http://www.ecfr.gov/cgi-bin/text-idx?SID=683823273fc0da6a1060883eda593fb8&mc=true&node=pt43.1.18&rgn=div5
Disclosure of Lobbying Activities Applicants and recipients must not use any federally appropriated funds (annually appropriated or continuing appropriations) or matching funds under a Federal award to pay any person for lobbying in connection with the award. Lobbying is influencing or attempting to influence an officer or employee of any U.S. agency, a Member of the U.S. Congress, an officer or employee of the U.S. Congress, or an employee of a Member of the U.S. Congress connection with the award. Applicants and recipients must complete and submit the SF-LLL, “Disclosure of Lobbying Activities” form if the Federal share of the proposal or award is more than $100,000 and the applicant or recipient has made or has agreed to make any payment using non-appropriated funds for lobbying in connection with the application or award. The SF-LLL form is available with this Funding Opportunity on Grants.gov. See 43 CFR, Subpart 18.100 and 31 USC 1352 for more information on when additional submission of this form is required.
Overlap or Duplication of Effort Statement Applicants must provide a statement indicating if there is any overlap between this Federal application and any other Federal application, or funded project, in regards to activities, costs, or time commitment of key personnel. If no such overlap or duplication exists, state, “There are no overlaps or duplication between this application and any of our other Federal applications or funded projects, including in regards to activities, costs, or time commitment of key personnel”.
If any such overlap exists, provide a complete description of overlaps or duplications between this proposal and any other federally funded project or application in regards to activities, costs, and time commitment of key personnel, as applicable. Provide a copy of any overlapping or duplicative proposal submitted to any other potential funding entity and identify when that proposal was submitted, to whom (entity name and program), and when you anticipate being notified of their funding decision. The statement and the description of overlap or duplication, when applicable, may be provided within the proposal or as a separate attachment to the application. If at any time a proposal is awarded funds that would be overlapping or duplicative of the funding requested from BIA, the applicant must immediately notify the BIA point of contact. Any overlap or duplication of funding between the proposed project and other active or anticipated projects may impact selection and/or funding amount.
https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html
D3. Unique Entity Identifier and System for Award Management (SAM) Identifier and SAM (SAM.gov) Registration This requirement does not apply to individuals applying for funds as an individual (i.e., unrelated to any business or nonprofit organization you may own, operate, or work within), or any entity with an exception to bypass SAM.gov registration with prior approval from the funding bureau or office in accordance with bureau or office policy. All other applicants are required to register in SAM.gov prior to submitting a Federal award application and obtain a Unique Entity Identifier (UEI) which replaces the Data Universal Numbering System (DUNS) number from Dun & Bradstreet in April 2022. A Federal award may not be made to an applicant that has not completed the SAM.gov registration. If an applicant selected for funding has not completed their SAM.gov registration by the time the program is ready to make an award, the program may determine the applicant is not qualified to receive an award. Federal award recipients must also continue to maintain an active SAM.gov registration with current information through the life of their Federal award(s).
Register with SAM Applicants can register on the SAM.gov website. The “Help” tab on the website contains User Guides and other information to assist you with registration. The Grants.gov “Register with SAM” page also provides detailed instructions. Applicants can contact the supporting Federal Service Desk for help registering in SAM. Once registered in SAM, entities will be assigned a UEI. Entities must renew and revalidate their SAM registration at least once every 12 months from the date previously registered. Entities are strongly encouraged to revalidate their registration as often as needed to ensure their information is up to date and reflects changes that may have been made to the entity’s IRS information. There is no cost to register with SAM.gov.
There are third-party vendors who will charge a fee in exchange for registering entities with SAM.gov; please be aware you can register and request help for free. If applicable, foreign entities who want to receive payment directly to a U.S. bank account must enter and maintain valid, current banking information in SAM.
D4. Submission Dates and Times Due Date for Applications 10/25/2024
Application Due Date Explanation Electronically submitted applications must be submitted no later than 5:00 p.m., ET, on the listed application due date.
Addresses All Applications must be electronically submitted in grants.gov, no physical or electronic submissions will be accepted. All correspondence will be via email or phone at the contacts below.
https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update http://www.sam.gov/ https://www.grants.gov/help/html/help/Register/RegisterWithSAM.htm https://www.grants.gov/help/html/help/Register/RegisterWithSAM.htm
For Further Information Contact Mr. Dennis Wilson, Grant Management Specialist, Office of Indian Economic Development, telephone: (505) 917-3235; email: dennis.wilson@bia.gov and DEDGrants@bia.gov If you have questions regarding the application process, please contact Ms. Jo Ann Metcalfe, Grant Officer, telephone (410) 703-3390; email jo.metcalfe@bia.gov Individuals in the United States who are deaf, deafblind, hard of hearing, or have a speech disability may dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay services.
Additional Program information can be found at: https://www.bia.gov/service/grants/ttgp
D5. Intergovernmental Review Prior to application submission, U.S. state and local government applicants should visit the OMB Office of Federal Financial Management website and view the “State Point of Contact (SPOC) List” to determine whether their application is subject to the state intergovernmental review process under Executive Order (E.O.) 12372 “Intergovernmental Review of Federal Programs.”
States not on the list do not participate in the intergovernmental review process, and therefore do not have a SPOC. If you are located within a State that does not have a SPOC, you may send application materials directly to a Federal awarding agency. If your state is on the list, contact the designated entity for more information on the state’s prior review requirements for Federal assistance applications.
D6. Funding Restrictions Limitations TTGP funding is for Tribal tourism implementation projects that have not been previously funded under other federal assistance. The OIED will verify that all sources of federal funding have not overlapped in any way to be considered “double-dipping” (Subpart E of 2 CFR 200.400, and 2 CFR 200.403). All program goals and targets must adhere to the submitted budget and no portion may be utilized for anything outside of TTGP grant objectives.
TTGP grant funding must be expended in accordance with applicable federal statutory and regulatory requirements, including 2 CFR part 200. As part of the grant application review process, OIED may conduct a review of an applicant's prior OIED grant(s). Applicants currently under BIA sanction Level 2 or higher resulting from noncompliance with the Single Audit Act are ineligible for a TTGP grants. Applicants at Sanction Level 1 will be considered for funding.
Under no circumstances can OIED fund construction or construction related activities.
mailto:dennis.wilson@bia.gov mailto:jo.metcalfe@bia.gov https://www.bia.gov/service/grants/ttgp https://www.whitehouse.gov/omb/management/office-federal-financial-management/ https://www.whitehouse.gov/omb/management/office-federal-financial-management/
Grants awarded with OIED discretionary grant funds must stay in alignment with the approved Statement Of Work (SOW). This solicitation and the facilitation of OIED discretionary grant programs prohibit any changes to the SOW once selected for funding. This is due to the systematic process from which proposals are selected through the evaluation and ranking procedures. This maintains consistency and integrity in the grant program(s), as well as fairness to those entities who were eligible and submitted complete applications but were not selected for funding.
Only one application will be accepted from an eligible Tribe or Tribal Organization.
Applications should address one cohesive project and any submissions that contain multiple project proposals will not be considered. OIED will apply the same objective ranking criteria to each proposal. The purpose of TTGP grants is to fund tourism implementation projects only.
TTGP awards may not be used for:
• Sub-awarding to another federal agency;
• Establishing or operating a Tribal office or department, nor to openly staff an office;
• Supplementing employment or income for current positions not significantly and directly involved in the proposed project (e.g., positions like Executive Directors with little to no described involvement in the proposed work);
• Projects with core administration functions that essentially support only the applicant's ongoing administrative functions and are not related to the proposed project;
• International travel;
• Travel by staff, contractors, consultants, etc., that is not reasonable or necessary for the tourism implementation project. Additional scrutiny will be places on repeated travel, blanket travel rounded and not itemized, travel in excess of common GSA rates, and travel that is considered unnecessary to the project.
• Legal fees;
• Application fees associated with permitting;
• Contract negotiation fees;
• Implementation projects of energy, mineral, energy legal infrastructure, broadband related projects, businesses, or technologies that are addressed by OIED’s Energy and Mineral Development Program (EMDP), Tribal Energy Development Capacity (TEDC);
• Projects that require funding for feasibility studies, business plans, marketing plans, or written materials such as manuals that are not an essential part of the applicant's long-range tourism implementation plan;
• Projects that support ongoing social service delivery programs or the expansion, or continuation, of existing social service delivery programs;
• And any other activities not authorized by the grant Notice of Award letter.
TTGP funding is for Tribal tourism implementation projects only. All costs should be necessary and reasonable as they relate to the overall project. Allowable costs may include, but are not limited to:
• Leasing and renting of any necessary equipment for the duration of the 24-month Period of Performance is the preferred option over purchasing, unless the Useful Life is less than two-years;
• Equipment and technology supplies as related to the project (i.e. software), allowable up to $5,000;
• Upgrades, retrofits to existing travel, tourism and outdoor recreation infrastructure, to increase travel or tourism;
• Support for travel, tourism and outdoor recreation sectors consistent with guidelines for safe travel;
• Costs of communication pertaining to specific activities or accomplishments which result from performance of the federal award. These costs are considered necessary as part of the outreach effort for the federal award, allowable up to $5,000;
o Interpretation costs;
o Brochures, digital enhancements,, signage;
o Web announcements;
o Arts and Culture events to support cultural expression such as festivals, museums, historical sites, art shows or concerts to promote tourism
• And workforce training that supports travel, tourism and outdoor recreation to improve job opportunities and work skills when implementing the tourism project;
Required Indirect Cost Statement to be submitted with Application The Applicant utilizing IDC must submit a current copy of their signed Indirect Cost Agreement, with all mandatory documents (Budget Narrative, SF-424, SF-424A, etc.) supporting the appropriate application of those negotiated rates. All organizations must include the applicable statement from the following list in their application, and attach to their application any documentation identified in the applicable statement:
We are:
• A U.S. state or local government entity receiving more than $35 million in direct Federal funding each year with an indirect cost rate of [insert rate]. We submit our indirect cost rate proposals to our cognizant agency. Attached is a copy of our most recently approved rate agreement/certification.
• A U.S. state or local government entity receiving less than $35 million in direct Federal funding with an indirect cost rate of [insert rate]. We have prepared and will retain for audit an indirect cost rate proposal and related documentation.
• A [insert your organization type; U.S. states and local governments, do not use this statement] that has previously negotiated or currently has an approved indirect cost rate with our cognizant agency. Our indirect cost rate is [insert rate]. [Insert either:
“Attached is a copy of our most recently approved but expired rate agreement. In the event an award is made, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award is made.” or “Attached is a copy of our current negotiated indirect cost rate agreement.”]
• A [insert your organization type] that has never submitted an indirect cost rate proposal to our cognizant agency. Our indirect cost rate is [insert rate].
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .