WC-1 Well Pump RFP Summary

This is a Request for Proposal (RFP) issued by the Gulf County Board of County Commissioners for the purchase and installation of a submersible vertical turbine well pump for the WC-1 potable water well located near Old Millville Road in Gulf County, Florida (Bid No. 2526-32). The project requires furnishing all labor, materials, equipment, and incidentals necessary to install, test, and place into operation a complete stainless steel submersible well pump system with direct-coupled submersible motor driver, discharge column pipe, in-line check valve, surface plate, and accessories. One pump unit is required, designed for 200 gallons per minute at 155 feet of total dynamic head with a maximum shutoff head of 325 feet. The pump must be driven by a 230-volt, single-phase, 60 Hz submersible motor at 3,500 RPM with a maximum 15 horsepower and be variable frequency drive compatible. The proposal submission deadline is September 15, 2026, at 4:00 PM Eastern, with sealed proposals to be opened on September 16, 2026, at 10:00 AM Eastern at a public meeting in Port St. Joe, Florida. Bidders must submit one original and two copies of proposals either physically to the Gulf County Clerk of Court or electronically through the County's online bidding platform. Proposals must include an estimated delivery date, and qualified bidders must include complete shop drawings, performance curves, equipment specifications, spare parts lists, and factory test results. The contract will be awarded to the lowest responsive proposer, and the manufacturer must provide field installation support, instruction of County personnel, and a complete operations and maintenance manual.

The RFP specifies that the pump must be manufactured by Goulds, Flowserve, or Simflo and comply with AWWA E101 standards and Hydraulic Institute specifications. All materials in contact with raw water must be 316 stainless steel, with specific construction requirements for the motor cooling jacket, shaft seal, thrust bearing, and power cable. The project is funded in whole or in part through a grant agreement with the Florida Department of Environmental Protection's Office, requiring compliance with all applicable state and federal regulations, including provisions regarding public entity crimes, drug-free workplace certification, anti-human trafficking affidavits, and U.S.-produced iron and steel requirements. Contractors must maintain insurance as specified in the grant agreement, comply with nondiscrimination and civil rights laws, and provide documentation of compliance. The County is tax-exempt from federal excise and state sales taxes. Upon award, the contractor is responsible for well development, disinfection, and bacteriological clearance in accordance with AWWA standards, with all costs for remedial work if the well fails initial bacteriological testing at the contractor's expense. The contract term extends for two years following acceptance, during which the manufacturer's warranty applies concurrently with the contractor's correction period.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GULF COUNTY BOARD OF COUNTY COMMISSIONERS

REQUEST FOR PROPOSAL (RFP)

FOR THE WC-1 WELL PUMP

BID NO. 2526-32

The Gulf County Board of County Commissioners, Gulf County, Florida (the “BOCC” and/or “County”) is seeking solicitations from any qualified person, company or corporation interested in providing a submersible vertical turbine well pump for a potable well in Gulf County, FL.

RFP DEADLINE: Submitted on or before September 15, 2026 no later than 4:00 PM (Eastern) and will be opened thereafter on Wednesday, September 16, 2026 at a public meeting held in the Donald H. Butler Commission Chamber in the Robert M. Moore Administration Building.

LATE PROPOSALS RECEIVED AFTER THE AFOREMENTIONED DEADLINE DATE,

EITHER BY MAIL OR OTHERWISE, WILL NOT BE CONSIDERED AND RETURNED

UNOPENED. THE TIME OF RECEIPT WILL BE DETERMINED BY THE TIME RECEIVED IN

THE CLERK’S OFFICE. PROPOSALS OFFERED ARE THE SOLE RESPONSIBILITY OF THE

BIDDER FOR ASSURING THAT PROPOSALS ARE RECEIVED IN THE CLERK’S OFFICE BY

THE DESIGNATED DATE AND TIME. NO FAXED, ELECTRONIC, OR ORAL PROPOSALS

WILL BE ACCEPTED.

Proposals must be submitted in a sealed envelope or package, clearly marked with YOUR COMPANY NAME, SEALED BID, and the BID NUMBER and title “WC-1 WELL PUMP” so as to identify the enclosed proposal. Each submittal shall include one (1) original and two (2) copies of the proposal.

Proposal must be delivered to the Gulf County Clerk of Court, 1000 Cecil G. Costin Sr. Blvd, Room 149, Port St. Joe, Florida 32456. Proposals received later than the date and time as specified will be rejected.

Bids may be submitted electronically through the County’s online bidding platform at https://www.centralauctionhouse.com/SignIn?redirect=/Category/10885/GulfCounty. Electronic bids must be received by the system prior to the bid deadline. The time recorded by the system shall be the official time of receipt. Late submissions will not be accepted. Paper sealed bids may also be submitted to the Clerk’s Office as described above.

The Gulf County Board of County Commissioners is an Equal Opportunity Employer.

SECTION 1 – SCOPE OF WORK

1.1 SCOPE OF WORK:

The selected firm will be given written notification of being selected by the County. The County will negotiate and execute a contract with the selected firm prior to the beginning of the actual services.

1. This bid includes the purchase and installation of a submersible vertical turbine well pump as described further in the Technical Specifications.

2. Bidders shall include an estimated delivery date in the bid response.

The County along with an evaluation team of County staff employees shall evaluate all responsive proposals. The County reserves the right to determine whether a proposal is responsive and to waive any technicalities or requirements contained therein.

The County reserves the right to negotiate a contract in which, the judgment of the County, would best serve the interest of Gulf County, including the right to withdraw from negotiations, the right to limit negotiations to a single proposer or to otherwise modify the scope of services or terms hereof without further notice.

Ultimately, the County shall reserve the exclusive option and right to award a contract which will result in the lowest or best cost (or greatest benefit) to and provide the best and most comprehensive services to and be in the best interest of Gulf County and meeting those needs and requirements presented by the Gulf County staff in the RFP.

SECTION 2 – PROCUREMENT RULES AND INFORMATION

2.1 Contact Person:

All questions regarding this Request should be directed in writing; preferably by email to Clay Kennedy at ckennedy@gulfcounty-fl.gov. Questions shall be submitted no later than 12:00 PM (Eastern) on September 7, 2026. Failure to submit requests in writing by the specified time shall not be grounds for a protest. Written requirements in the Request or its amendments are binding, but any oral communications between the bidder and the County are not.

2.2 CALENDAR EVENTS:

DATE/TIME ACTION

Sept 15, 2026 no later than 4:00 PM (Eastern) Proposal Submission Deadline Sept 16, 2026 at 10:00 AM (Eastern) Sealed proposals opened by County in Public Meeting

2.3 SUBMISSION OF PROPOSAL:

Each proposal shall be prepared simply and economically, providing a straightforward, concise delineation of the bidder’s capabilities to satisfy the requirements of this Request for Proposal. Fancy bindings, colored displays and promotional material are not desired.

Emphasis in each proposal must be on completeness and clarity of content. In order to expedite the evaluation of proposals, it is essential that proposers follow the format and instructions herein. The Contractor shall submit one (1) original and two (2) copies as stated above.

2.4 PROPOSAL OPENING:

Proposals are due at the time and date specified. Proposals received late will not be considered and will be marked as LATE.

Any person with a qualified disability requiring special accommodations at the proposal opening should contact Silvia Williams, Deputy County Administrator at (850) 229-6106 and or at swilliams@gulfcounty-fl.gov and a copy of your correspondence to info@gulfclerk.com at least five (5) working days prior to the event.

2.5 COST OF PREPARING PROPOSALS:

The County is not liable for any costs incurred by the proposer in responding to this RFP, including those for oral presentations.

2.6 DISPOSAL OF PROPOSAL:

All proposals become the property of the County and will be a matter of record. The County shall have the right to use all ideas, or adaptations of those ideas, contained in any proposal received in response to this RFP. Selection or rejection of this proposal will not affect this right. Any submitted proposal shall remain a valid proposal for sixty (60) calendar days after the submission date.

2.7 PROPOSAL RULES FOR WITHDRAWAL:

A proposal may not be withdrawn for a period of sixty (60) calendar days after the date of the RFP opening. Proposals may be modified or withdrawn by an appropriate document duly executed (in the manner that a Proposal must be executed) and delivered to the place where Proposals are to be submitted at any time prior to the opening of the Proposals.

2.8 REJECTION OF PROPOSAL:

The County reserves the right to accept or reject any and all proposals as may be deemed necessary by the County to be in its best interest. The County further reserves the right to waive any and all informalities, and reserves the right to reject all nonconforming, unresponsive, unbalanced or conditional Proposals. The County reserves the right to reject the Proposal of any Proposer if the County believes that it would not be in the best interest of the Project to make an award to that Proposer, because the Proposal is not responsive or responsible, or the Proposer is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the County. The County also reserves the right to enter into contract negotiations with a qualified, responsible, and responsive Proposer who submits the best ranked proposal. If the County and the best Proposer cannot negotiate a successful contract the County may terminate such negotiations and begin negotiations with the qualified, responsible, and responsive Proposer who submits the next best ranked proposal. No Proposer shall have any rights against the County arising from such negotiations. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

Where numeric data is given both in Arabic numerals and in written language, and where there exists a discrepancy between an Arabic numeral and written language, the written language shall be presumed to be correct and the Arabic numeral presumed incorrect.

The County reserves the right to delete any Proposal items and the total Proposal shall be determined as the sum of the Proposal items awarded. In evaluating Proposals, the County will consider the qualifications of the proposers, whether or not the Proposals comply with the prescribed requirements, time of completion and other data, as may be requested in the Proposal form or prior to the Notice of Award.

2.9 VERBAL INSTRUCTIONS:

No negotiations, decisions, or actions shall be initiated or executed by the proposal as a result of any discussion with any county employee. Only those communications from proposers, which are signed and in writing will be recognized by the County, as duly authorized expressions on behalf of the Proposer. Oral and other interpretations or clarifications will be without legal effect.

2.10 SALES AND USE TAX:

The County is tax exempt from federal excise and state sales tax.

2.11 PUBLIC ENTITY CRIMES:

The Proposer must sign and complete a Public Entity Crime Sworn Statement as defined under Section 287.133(a), F.S. A person or affiliate who has been placed on the convicted vendor list following a conviction of a public entity crime may not submit a proposal on a contract to provide any goods or services to a public entity, may not submit a proposal on a contract with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a consultant, supplier, or subcontractor, under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for Category Two for a period of 36 months from the date of being place on the convicted vendor list.

2.12 DRUG FREE WORKPLACE:

The Proposer must complete the County’s Drug Free Workplace Certification form, attached and made a part of the proposal. According to Gulf County policy, preference shall be given to businesses with drug-free work place programs. Whenever two or more proposals, which are equal with respect price, quality, and service, are received by the state or by any political subdivision for the procurement of commodities or contractual services, a proposal received from a business that certified that it has implemented a drug-free work place program shall be given preference in the award process. Established procedures for processing tie proposals will be followed if none of the tied vendors have a drug-free work place program.

2.13 ADDENDUMS:

The County may issue Addendums to modify the proposal as deemed appropriate.

Addendums and clarification to this RFP along with an Addendum Acknowledgement Form will be posted to the County’s website at www.gulfcounty-fl.gov. The Addendum Acknowledgement Form shall be signed by an authorized company representative, dated, and returned with proposal.

2.14 NOTICES:

Any notices to be given under this RFP shall be given by United States Mail, addressed to Proposer at its address stated herein, and to the County at its address stated herein.

Additional notice may also be given by facsimile in which case it shall be deemed that notice was provided on the date said facsimile was received. The party providing notice by facsimile shall confirm that the facsimile was received by the other party.

2.15 PROTEST:

Any person or entity whose proposal is rejected, in whole or in part, or who submits a proposal but is not awarded the contract, may protest such decision. Written notice of intent to file a protest must be submitted with Clerk’s office or Deputy County Administrator, Kari Summers within twenty-four (24) hours after the Board’s declaration of its intention with regard to an award. Written protest must be submitted to the Clerk’s office or Deputy County Administrator, Kari Summers within ten (10) calendar days after filing written notice of intent.

SECTION 3 – AWARD OF PROPOSAL

The Board will award this RFP to the lowest, responsive proposer. In the event the best proposer is found to be non-responsive, the County may proceed to the next best responsive proposer and continue the award process.

SECTION 4 – TERMS AND CONDITIONS:

4.1 TERMINATION OF CONTRACT:

The County may terminate this Agreement at any time with or without cause, or with or without prior notice when it is in the best interest of the County.

APPENDIX A – WELL SITE LOCATION MAP

Gulf County Well Sites

0 2,0001,000 Feet

T07S R10W Sec003

T06S R10W Sec036

T07S R09W Sec006

T06S R10W Sec027

T06S R10W Sec034

T06S R10W Sec025

T06S R09W Sec031

T06S R10W Sec026

T07S R10W Sec001

T06S R09W Sec030

T07S R10W Sec002

T06S R10W Sec035

WC-1

WC-3

WC-4

WC-2

Fire Break 50

Fire Break 58

Fire Break 50

Po ss um B ra nc h Rd

Fire Break 50

Fire Break 56

Howard Creek Road

SR

Roads 1 Acre Well Site csmallwood Callout Well Location:

N29o 56' 04.2" W85o 11' 29.2"

APPENDIX B – TECHNICAL SPECIFICATIONS

11209-1 122313

SECTION 11209

SUBMERSIBLE WELL PUMPS

PART 1 - GENERAL

1.01 DESCRIPTION

A. Scope of Work

1. Furnish all labor, materials, equipment and incidentals required and install, place in operation, and field test stainless steel submersible well pumps, and motors for Gulf County Well WC-1 near Old Millville Road as hereinafter specified, and/or as shown on the Drawings.

2. These Specifications are intended to give a general description of what is required, but do not cover all details which will vary in accordance with the requirements of the equipment application. It is, however, intended to cover the furnishing, the shop testing the delivery and complete installation and field testing, of all materials, equipment and appurtenances for the complete pumping units as herein specified, whether specifically mentioned in these Specifications or not.

3. For all units there shall be furnished and installed all necessary and desirable accessory equipment and auxiliaries whether specifically mentioned in these Specifications or not, as required for an installation incorporating the highest standards for this type of service.

B. Related Work Described Elsewhere

1. Concrete work is included in Division 3.

2. Painting, except as specified herein, is included in Division 9.

3. Mechanical piping, valves, pipe hangers and supports are included in their respective Sections of Division 15.

4. Electrical work, except as hereinafter specified, is included in Division 16.

5. Concrete bases for pumps and pump motors and installation of anchor bolts is included in Division 3, but anchor bolts shall be furnished under this Section by the Contractor of the size and type recommended by the pump manufacturer.

11209-2 122313

C. General Design

1. One (1) raw water submersible well pumps shall be installed as shown on the

Drawings. The pumps shall start and stop based upon local and remote operator selected control strategies.

2. All working parts of identical pumps and motors, such as bearings, wearing rings, shafts, sleeves, motors, etc., shall be of standard dimension built to limit gauges or formed to templates such that parts will be interchangeable between like units and such that the Owner may at any time in the future obtain replacement and repair parts for those furnished in the original machines. All parts shall be properly stamped for identification and location in the machines as shown on the Operation and Maintenance Manuals furnished.

1.02 QUALITY ASSURANCE

A. Qualifications

1. To assure unity of responsibility, the cable and surface motor plates shall be furnished and coordinated by the pump manufacturer. The Contractor shall assume full responsibility for the satisfactory installation and operation of the entire pumping system including pumps and motors.

2. The pumps covered by these Specifications are intended to be standard pumping equipment of proven ability as manufactured by a reputable manufacturer having a minimum 10-years experience in the production of such pumps. The pumps furnished shall be designed, constructed and installed in accordance with the best practice and methods, and shall operate satisfactorily when installed. Pumps shall be manufactured in accordance with the Hydraulic Institute Standards.

3. All equipment furnished under this Specification shall be new and unused and shall be the standard product of manufacturers having a successful record of manufacturing and servicing the equipment and systems specified herein.

4. All submersible well pumps and motors shall be supplied by a single manufacturer to ensure uniformity, and unit responsibility.

B. Manufacturers

1. The naming or reference to a specific manufacturer does not indicate that the manufacturer’s standard equipment is acceptable in lieu of the specified component features. This reference is only an indication that the named manufacturers may have the capability of supplying the equipment as specified.

11209-3 122313

2. The pumps shall be manufactured by:

a. Goulds

b. Flowserve

c. Simflo

1.03 SUBMITTALS

A. Materials and Shop Drawings

Copies of all materials required to establish compliance with the specifications shall be submitted in accordance with the provisions of Section 01340: Shop Drawings, Working Drawings and Samples of these Specifications. Submittals shall include at least the following:

1. Certified shop and erection drawings showing all important details of construction, dimensions and anchor bolt locations. Long term storage requirements.

2. Descriptive literature, bulletins, and/or catalogs of the equipment.

3. Data on the characteristics and performance of each pump. Data shall include guaranteed performance curves, based on actual shop tests of the actual units, which show that they meet the specified requirements for head, capacity, efficiency, NPSHR, and horsepower. Curves shall be submitted on 8-1/2-inch by 11-inch sheets, at as large a scale as is practical. Curves shall be plotted from no flow at shut off head to pump capacity at minimum specified total head.

4. Data including principle dimensions, materials of construction, space required, clearances, piping and electrical connections and requirements, controls, type of finish, installation instructions and other pertinent information.

5. A complete total bill of materials of all equipment including the weights of equipment furnished.

6. A list of the manufacturer's recommended spare parts in addition to those specified in Paragraph 1.05, with the manufacturer's current price for each item.

Include gaskets, packing, etc., on the list. List bearings by the bearing manufacturer's numbers only.

7. Complete motor data. Long term storage requirements for the motor.

8. Copies of all factory test results, as specified in PART 2 - PRODUCTS of this

Section of the Specifications.

B. Additional Information

11209-4 122313

1. In the event that it is impossible to conform with certain details of the specifications due to different manufacturing techniques, describe completely all nonconforming aspects.

2. Upon receipt and review of submitted material, provide the required number of certified prints and one reproducible tracing of all Drawings as specified in Section 01340: Shop Drawings, Working Drawings and Samples.

1.04 OPERATIONS AND MAINTENANCE DATA

A. Operating and Maintenance Instructions

1. Operating and Maintenance Manuals shall be furnished. The manuals shall be prepared specifically for this installation and shall include all required cuts, drawings, equipment lists, descriptions, etc., that are required to instruct operation and maintenance personnel unfamiliar with such equipment. The number and special requirements shall be as specified in Section 01730:

Operating and Maintenance Data.

2. A factory representative of all major component manufacturers, who has complete knowledge of proper operation and maintenance, shall be provided to instruct representatives of the Owner and the Engineer on proper operation and maintenance. With the Owner's permission, this work may be conducted in conjunction with the inspection of the installation and test run as provided under PART 3. If there are difficulties in operation of the equipment due to the manufacturer's design or fabrication, additional service shall be provided at no cost to the Owner.

1.05 TOOLS AND SPARE PARTS

A. Furnish to the Owner a list of all manufacturer recommended spare parts and special tools for normal operation, adjustment and maintenance of the equipment supplied.

1.06 PRODUCT DELIVERY, STORAGE AND HANDLING

A. All parts shall be properly protected so that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation.

B. All equipment and parts must be properly protected against any damage during a prolonged storage period at the site.

C. Factory assembled parts and components shall not be dismantled for shipment unless permission is received in writing from the Engineer.

D. Finished surfaces of all exposed pump openings shall be protected by wooden blanks, strongly built and securely bolted thereto.

11209-5 122313

E. Finished iron or steel surfaces not painted shall be properly protected to prevent rust and corrosion.

F. After hydrostatic or other tests, all entrapped water shall be drained prior to shipment, and proper care shall be taken to protect parts from the entrance of water during shipment, storage and handling.

G. Each box or package shall be properly marked to show its net weight in addition to its contents.

1.07 WARRANTY AND GUARANTEES

A. The manufacturer's written warranty shall be submitted for all major pieces of equipment, as specified in Section 01783: Warranties and Bonds. The manufacturer's warranty period shall be concurrent with the Contractor's correction period for 2 years after the time of completion and acceptance.

PART 2 - PRODUCTS

2.01 GENERAL

A. A special data plate shall be attached to the pump frame which shall contain identification of frame and bearing numbers, specifying number and manufacturer of installed lubricants and specification number and manufacturer of at least two compatible lubricants to those installed (if applicable).

B. Hardware: All machine bolts, nuts and cap screws shall be of the hex head or socket head type. Hardware requiring special tools or wrenches shall not be used. All hardware shall be 316 stainless steel.

C. Parts Numbering: Parts shall be completely identified with a numerical system to facilitate parts inventory control and stocking. Each part shall be properly identified by a separate number, and those parts which are identical for more than one size unit shall have the same number to effect minimum spare parts inventory.

D. All parts that come in contact with the raw water shall be 316 stainless steel.

E. The motor, pumps, column pipe, brackets, and all attached cables and devices shall be sized to fit into the existing 10 inch well casing.

F. Each submersible pumping unit shall be designed and constructed for 24 hours per day, 365 days per year, continuous service at any and all points within the range of operation without overheating or cavitating and without excessive vibration or strain.

G. All working parts of each submersible pumping unit shall be standard dimensions such that parts can be interchanged between like units.

11209-6 122313

2.02 SUBMERSIBLE VERTICAL TURBINE PUMPS

A. General: The pumps shall be of the submersible motor vertical turbine type complete with direct coupled submersible motor driver, discharge column pipe, in-line check valve, surface plate, and accessories. Final pump length shall be as shown on the Drawings. The entire pumping unit including the discharge head, column piping, bowl assembly and suction bell shall be pickled and passivated following fabrication.

B. Submersible Motors:

1. The motor shall be of the submersible vertical solid shaft squirrel cage induction type, capable of continuous operation at nameplate rating submerged under water at a maximum temperature of 30 degrees C ambient water temperature with a minimum of 1/2 foot per second cooling flow past the motor. The motor must be suitable for variable speed control utilizing a variable frequency drive. A special 316 stainless steel cooling jacket with directional water cooling vanes shall be provided if required by the manufacturer to prevent motor overheating.

2. The motor shall be rated at 230 volt, 1 phase, 60 Hz, 3500 RPM with a minimum

Service Factor of 1.15. Minimum efficiency at full load shall be 85% inclusive of fully loaded thrust bearing. Minimum Power Factor a full load shall be 78%. The maximum actual motor diameter shall not exceed 6” in diameter at the stator casing.

3. The motor shall be of the water filled “wet winding” type, suitable for rewinding.

Oil filled and encapsulated or “can” type motors shall not be acceptable. The motor shall be filled with a 65/35 to 50/50 solution of water and propylene-glycol.

The motor winding insulation shall consist of an epoxy enamel layer over the copper conductor, covered by a denatured polypropylene insulation layer and an external nylon or PVC cover.

4. Motor housing material shall be 316 stainless steel.

5. The motor is to be totally enclosed, utilizing an elastomer expansion diaphragm for the equalization of internal and external pressure.

6. The motor shall be equipped with a single mechanical shaft seal, to seal the motor at the point that the shaft extends through the casing.

7. Replaceable carbon composite sleeve type radial bearings shall be provided at each end of the rotor. A rotor balance ring shall be provided for dynamic balancing of the entire rotating assembly. Dynamic balancing shall not exceed 1.0 mils, peak to peak.

8. The motor shall be equipped with a Kingsbury type thrust bearing, with a carbon composite pad, capable of carrying the weight of all rotating elements plus the hydraulic thrust of the pump at shutoff head. Thurst bearing shall be water

11209-7 122313 lubricated, self-aligning, self-equalizing assembly capable of operation in either direction without damage.

9. The motor shall have a splined or keyed 316 stainless steel shaft for connection to the pump shaft.

10. The motor shall be designed to accept all thrust loads imposed by the pump during starting and running.

11. All wetted fasteners and washers, cable glands, and fill/vent valves shall be of 316 stainless steel.

12. The motor shall be equipped with one (1) set of three separate, continuous leads.

The leads are to be internally spliced directly to the stator winding. The motor leads shall have a minimum length of 15’. Each motor shall be supplied with a removable water-block lead or a compression type cable assembly to prevent ingress of water into the motor terminals.

13. Exposed fasteners, plugs, and shafting shall be 316 stainless steel.

14. Tests:

a. All motors shall be completely assembled at the factory and shall be given routine tests conducted in accordance with NEMA Standards, and/or within the intent of NEMA Standards which includes the following non-witness tests as follows:

1) Unvarnished stator electrical test.

2) Varnished stator electrical test.

3) Motor-washout test.

4) No-Load Current test.

5) Meggar Readings to Ground.

6) Phase to Phase Resistance.

7) Final assembly electrical test.

b. If the motor fails any of the tests as defined by NEMA Standards, it shall be rejected.

C. Power Cable

1. The downhole power cable shall be sized to conform to National Electrical Code for 125 percent of motor full load current at a conductor temperature rating of 75 degrees C submerged, and a voltage drop at the motor not to exceed 5%.

2. The cable shall have three continuous conductors rated for 600V operations.

The individual conductors shall be class “B” stranding or better, with a synthetic rubber or thermoplastic insulation. The three conductor cables shall be contained in a flat or round jacket composed of synthetic rubber or thermo plastic with non-hygroscopic fillers between the conductor cables. The cable

11209-8 122313 shall conform to U.L. standard 44 or 83 for submersible pump cable. A compression fitting shall be used for passing the cable into the motor.

3. The cable shall be of sufficient length to allow easy connection in terminal box at the well head.

4. The motor lead to power cable splice shall be a rubber tape type splice, suitable for continuous submerged operation.

5. The spliced connection between the motor leads and the power cable shall be

HI/POT tested while submerged at the factory prior to shipment.

6. The power cable shall be attached to the pump discharge pipe at maximum 10 foot intervals using 316 stainless steel banding straps. The power cable shall be attached at the pump inlet and at the pump to motor coupling using 316 stainless steel banding straps. A 1/4-inch thick neoprene pad shall be installed between the power cable and banding straps to prevent damage to the cable.

Cable shall have neoprene jackets and ethylene propylene rubber insulation.

D. Motor Adapter Bracket

1. Provide a 316 stainless steel bracket, specifically designed and fabricated for connecting the motor to the pump.

2. The bracket shall have a double set of bearings to maintain shaft alignment and to minimize deflection at the coupling. The coupling shall be fabricated of super duplex stainless steel and shall be held to the motor and pump shafts using hex-head or socket-head set-screws. Motor and pump shafts shall be splined or keyed.

3. Suction velocity shall not exceed 6 ft/sec between the motor and adapter bracket (exist casing I.D. 11.04”).

4. Each bowl assembly shall be designed to accommodate a working pressure not less than 150 percent of the shut off head.

E. Bowl Assembly

1. Each bowl assembly shall consist of the discharge bowl, impeller and impeller shafting and bearings. Bearings shall be located above and below the impeller.

Impellers shall be statically and dynamically balanced.

2. Pump bowls shall be of the material listed under Table 11209-A. Pump bowls shall be sufficiently rigid to prevent adverse changes in bearing alignment and to maintain the running clearance of seal rings. Pump bowls shall be provided with wear rings.

11209-9 122313

3. Bowls shall be flanged with male and female rabbet for joining to the suction bell and the discharge column. Bowl to bowl fits shall be male and female register fits. Waterways and the diffusion vanes shall be smooth and free from nodules, bumps and dips.

F. Impellers

1. Pump impellers shall be of the enclosed type constructed of the material listed in Table 11209-A, and shall be one piece. Machine to fit the contour of the bowl, hand file in the waterways, and equip with replaceable wearing rings.

Bowl wear rings shall be minimum 50 BHN higher than impeller wear rings.

2. Attach impellers to the shaft keys and split-ring or collets such that they cannot become loose under any operating condition or under reverse rotation.

G. Discharge Column and Surface Plate

1. The drop pipe shall be the diameter shall be per Table 11209-B with splined couplings at 20-foot intervals. The maximum coupling diameter shall be less than 7.84 inches. Column pipe shall be minimum Schedule 80 thickness.

2. The discharge drop pipe and base plate shall be fabricated of the materials listed in Table 11209-A.

3. Surface plate, drop pipe, and bowls shall be pressure tested to 150% of pump shut-off head.

4. The discharge shall be flanged. Class 125 or 150 flanges shall comply with

AWWA C207, Class D. Class 300 flanges 24 inches and smaller shall comply with ANSI B16.5, Class 300. Class 300 flanges larger than 24 inches shall comply with ANSI B16.1, Class 250. Flanges shall be flat face. The discharge elbow shall be the long-radius type, with lifting lugs sufficiently sized to support the weight of the pump, motor, column piping, cable, and water in the column.

5. The surface plate shall be fabricated of 316 stainless steel capable of supporting the pump, motor, drop pipe, and fluid not less than 1 3/4” thick. The plate shall be cut to the diameter of, and provided with, a bolt hole pattern of 125 lb. flat face flange. A mating flange and Neoprene gasket shall be provided for the top of the well casing. The nominal diameter of well casing is 12”. The discharge elbow shall have a minimum wall thickness of 3/8” and shall be fitted with a flange which has the same outside diameter, bolt circle diameter and number of bolts as ANSI B 16.5.

6. The surface plate shall be provided with two lifting eye bolts, 2-inch well vent hole (nipple with threaded plugged), a 2.5-inch instrumentation access water tight nipple with one quarter turn plug valve, and a power cable entry hole.

Cable gland shall be 316 stainless steel.

11209-10 122313

H. Balancing

1. All pump and motor units shall be statically and dynamically balanced.

2. Vibration allowance in the combined motor/pump units shall not exceed 1 mil peak to peak.

2.03 CONTROLS

A. General: A control panel shall be supplied for each submersible well pump station containing all the electrical and mechanical equipment necessary to provide for the operation of the well pump. The control system shall automatically start and stop the pump based upon remote control signals through the telemetry system. Controls may be provided by others than pump manufacturer.

B. Monitoring and Control:

1. The supplier of equipment under this section is responsible for coordinating with the I&C System Supplier to ensure that its equipment is compatible with and provides all necessary ancillary and accessory equipment to accept control signals provided by the SCADA system and provide monitoring and feedback signals to the SCADA system that are listed in Section 13410, Table 13410-1 for this equipment. This shall include all equipment control switches, flow detection switches, motor winding temperature switches and position switches that are mounted on or adjacent to the equipment for monitoring the performance of that piece of equipment. This shall also include all relays, transmitters, dry contacts and termination switches that are required on, adjacent to or in control panels supplied by the equipment vendor that are necessary to interface with the PLC/SCADA control system.

C. The control panels shall consist of a main circuit breaker, reduced voltage motor starter, control transformer, and all ancillary switches, contacts, and devices for pump operation, all in a common enclosure. Control switches shall provide means to operate each pump manually or automatically.

D. Construction and Materials: The control panel shall be free-standing (20 inches minimum depth) NEMA 4X of 316 stainless steel construction.

E. Panel Exterior:

1. All exterior mounted accessories shall be constructed of corrosion proof materials and rated for NEMA 4X.

F. Panel Door:

1. The control panel door shall be mounted on a continuous hinge. Mounted on the door will be pump run lights, hand-off-automatic switches, and lamp test switches.

11209-11 122313

2. A permanently affixed 11-inch by 17-inch (minimum), laminated panel wiring schematic and pump data sheet shall be installed on the interior of the enclosure door.

G. Panel Components: All control panel components shall comply with Division 16.

2.04 FACTORY TESTS

A. Performance Tests:

1. Each pumping unit, complete with the job motor driver or a factory calibrated motor, shall be subjected to a non-witnessed laboratory performance test.

Perform tests in conformance with the applicable provisions of AWWA E101 or the standards of the Hydraulic Institute. To successfully pass a laboratory performance test, a pumping unit shall meet all performance requirements specified.

2. Performance tests shall be “full-scale.”

3. Conduct tests preferably at the same minimum submergence that will be realized in the field. The pump performance shall be guaranteed for the actual field conditions.

4. The pressure tap for head measurement shall be located not less than 10 pipe diameters downstream from the discharge elbow of the test pump.

5. Tests shall consist of checking the unit at its rated speed, head, capacity, efficiency and brake horsepower, and at such other conditions of head and capacity to properly establish the performance curve. Certified copies of test reports shall be submitted. The Standards of the Hydraulic Institute shall govern the procedures and calculations for these tests. During these tests, the pumps with drive motors shall be checked for balance. The tested pumps shall meet Hydraulic Institute acceptance level 1U (0% negative deviation) to be approved for shipment.

6. No motor overload above nameplate horsepower shall be allowed.

7. Should results of the full-scale tests indicate, in the opinion of the Engineer, that the pumps shall fail to meet any of the specified requirements, the Engineer shall notify the Contractor of such failure. The manufacturer shall thereupon, at no expense to the Owner, make such modifications and perform additional tests as may be necessary to comply with these Specifications.

PART 3 – EXECUTION

3.01 INSTALLATION

11209-12 122313

A. Installation shall be in strict accordance with the Manufacturer’s instructions and recommendations in the locations shown on the Drawings. Installation shall include furnishing the required oil and grease for initial operation. The grades of oil and grease shall be in accordance with the Manufacturer’s recommendations. Anchor bolts shall be set in accordance with the Manufacturer’s recommendations.

B. The Contractor shall submit a certificate from the equipment manufacturer stating that the installation of the equipment is satisfactory, that the equipment is ready for operation, and that the operating personnel have been suitably instructed in the operation, lubrication, and care of each unit.

C. During installation of the pump, do not drop or submerge the cable ends. If the cable end is submerged after the service end seal is broken, the entire cable shall be replaced with new cable.

3.02 INSPECTION AND TESTING

A. General

1. The equipment manufacturer shall furnish the services of a competent and experienced representative who has complete knowledge of proper operation and maintenance of the equipment to inspect the installed equipment, supervise the initial test run, and to provide instructions to the plant personnel.

The first visit will be for checking and inspecting the equipment after it is installed. The second visit will be to operate and supervise the initial field test.

At least one (1) day shall be allocated solely to the instruction of plant personnel in operation and maintenance of the equipment. This instruction period shall be scheduled at least ten days in advance with the Owner and shall take place prior to plant start-up and acceptance by the Owner. The final copies of operation and maintenance manuals specified in Section 01730: Operation and Maintenance Data must have been delivered to the Engineer prior to scheduling the instruction period with the Owner.

2. Field tests shall not be conducted until such time that the entire installation is complete and ready for testing.

B. Pumps

1. After all pumps have been completely installed, and working under the direction of the Manufacturer, conduct in the presence of the Engineer, such tests as are necessary to indicate that the pumping system operates satisfactorily and meets the conditions of service specified. The factory tests are the basis of equipment efficiency demonstration, the field test shall demonstrate correct mechanical operation after pump start-up. Field tests shall include all pumps included under this section. The Contractor shall supply all labor, equipment and incidentals required to complete the field tests.

11209-13 122313

2. The Demonstration Test shall demonstrate that all items of these Specifications have been met by the equipment as installed and shall include, but not be limited to, the following tests:

a. That all units have been property installed and are in correct alignment and rotation.

b. That the units operate without overheating or overloading any parts and without exceeding specified limits for objectionable noise and vibration.

c. That there are no mechanical defects in any of the parts.

d. That the pumps can deliver the specified pressure and quantity (±5% certified curves).

e. That the pumps shall be capable of pumping the specified service liquid.

f. That the pump sensors and controls perform satisfactorily and proper alarm functions.

3. If the pump performance does not meet the Specifications, corrective measures shall be taken or pumps shall be removed and replaced with pumps which satisfy the conditions specified. A 7-day operating period of the pumps will be required before acceptance.

4. Stainless steel pumping units shall show no signs of corrosion upon final acceptance by the Owner.

C. Motors

1. The Contractor shall megger each motor winding before energizing the motor, and, if insulation resistance is found to be low, shall notify the Engineer and shall not energize the motor.

2. The Contractor shall check all motors for correct clearances and alignment and for correct lubrication in accordance with Manufacturer's instructions. The Contractor shall check direction of rotation of all motors and reverse connections if necessary.

3.03 WELL DEVELOPMENT, DISINFECTION, AND CLEARANCE

A. The Contractor shall be responsible for supplying, installing, removal, and restoration of temporary discharge piping required in order to dispose of raw Floridan water during pump installation, testing, development, and disinfection. Temporary piping shall be supplied to convey the water from the end of the raw water main to the concentrate transmission main.

B. After the permanent well pump has been installed, the well shall be developed with the well pump at a flow rate of no less than the design pumping rate for a period of up to 20 hours. The turbidity of the raw water shall be monitored by the Contractor during development. Development shall be considered complete when the turbidities are less than 0.5 NTU for at least an hour based upon measurements taken every ten minutes

11209-14 122313 and the turbidities are not decreasing more than twenty percent from the beginning to end of the hour.

C. After the well has been successfully redeveloped, the Contractor shall disinfect the well, well pump installation, and raw water main. The Contractor shall introduce sufficient chlorine solution into the well, well piping, and raw water main to produce a chlorine residual of 50 mg/L in accordance with AWWA C651 and C654. The Contractor shall submit his procedures for disinfection to the Engineer for review and comment prior to proceeding with disinfection. The chlorine residual shall be measured until it drops to zero, at which time the well shall be pumped to waste for a minimum of 15 minutes and turbidities checked to be less than those specified in 3.03B, the well shall be ready for bacteriological evaluation.

D. The Contractor shall furnish the necessary labor and equipment to assist the City in obtaining daily bacteriological sample for 20 consecutive days. The samples shall be obtained using the permanent pump and taken after 20 to 30 minutes of pumping. If all 20 samples show the absence of coliform bacteria, the Engineer shall submit the results to FDEP and request clearance of the well for service. After receipt of clearance from the FDEP, the Contractor shall connect the well discharge piping to the raw water mains and proceed with final testing of the well installation.

E. If the wells fail the initial bacteriological evaluation, the Contractor shall redisinfect the well in accordance with 3.03C and assist the Owner in obtaining additional bacteriological samples as described in 3.03D, all at no additional cost to the Owner. If the second effort to clear the well fails, the Contractor may request a change order for the additional work required to obtain clearance of the well for service.

3.04 START-UP AND INSTRUCTION

A. Manufacturer's Representative: Present at site or classroom designated by Owner, for minimum person-days listed below, travel time excluded:

1. One (1) person-day for installation assistance and inspection.

2. One (1) person-day for functional and performance testing and completion of Manufacturer's Certificate or Proper Installation and prestartup classroom or site training.

B. See Section 01650 – Start-Up.

C. Disinfection: Following completion of installation and prior to placing each potable water supply well and discharge piping into operation, the Contractor shall disinfect each well in accordance with the latest revision of AWWA A-100, C-654, and C-651 and as set forth in Chapter 62-555.315 of the Florida Administrative Code (FAC). Each well and discharge piping shall then be bacteriologically tested in accordance with state and local requirements (i.e., 62-555.315 FAC). A representative of the Owner must be present during taking of all water samples.

11209-15 122313

3.05 TRANSPORTATION AND OFFLOADING

A. The Supplier shall coordinate with the Contractor to arrange transportation and delivery of the equipment.

B. The Contractor shall be responsible for offloading and inspecting all equipment against the approved Shop Drawings at time of delivery and before installation.

C. The equipment received by the Contractor are under the care and responsibility of the

Contractor. The Contractor is obligated to place the equipment into storage and shall be handled in accordance with the Manufacturer’s operation and maintenance manual.

11209-16 122313

TABLE 11209-A

MATERIALS OF CONSTRUCTION

Component

Material

Pump shafts and couplings

Nitronics 50

Bearing retainers (fabricated integral)

316 Stainless Steel

Impellers

Pump bowls and suction intake

Bowl bearings

Nitronics 50

Bowl and Impeller Wear Rings

Nitronics

All parts made of fabricated steel

Surface plate

Drop pipe

ASTM D1785 Polyvinyl Chloride Schedule 80

Flanges

Bolts and nuts for discharge head and column pipe flanges

Bolts: 316 Stainless Steel

Nuts: 316 Stainless Steel

Notes:

1. Materials of construction for components not listed shall conform to AWWA E101, Part A, Table 1, except that the materials shall be considered required, not typical.

11209-17 122313

TABLE 11209-B

WELL PUMP SCHEDULE

1. Type of Pump Submersible Vertical Turbine

2. Number Required (each) 1

3. Pump Speed (rpm) 3,500, maximum

4. Existing Casing Diameter (inches) 16

5. Column Pipe Diameter (inches) 4

6. Column Length (ft) See Drawings

7. Primary Design Point 200 gpm at 155 ft TDH

8. Shut-off Head (ft) 325, maximum

9. Type of Motor Submersible

10. Maximum Motor Size (HP) 15

11. VFD Driven Yes

END OF SECTION

APPENDIX C – GRANT CONTRACT TERMS

v.03.23.2026

Required Contract Terms and Conditions State of Florida Department of Environmental Protection

Standard Grant Agreement

1. General: This Contract is funded in whole or in part through a grant agreement between the Florida Department of Environmental Protection’s Office and the Gulf County Board of County Commissioners (“Owner”). As a condition of payment under this Contract, the Contractor and all subcontractors shall comply with the applicable requirements of the Standard Grant Agreement for this Project, as amended or otherwise modified from time to time (the “Grant Agreement”), including all applicable terms, conditions, certifications, assurances, and other obligations imposed thereunder, together with all applicable federal, state, and local laws, rules, and regulations, as may be amended from time to time. Any additional requirement of the Grant Agreement or applicable law that Owner determines must be passed through to the Contractor or any subcontractor in order to maintain compliance shall be deemed incorporated herein and binding to the extent applicable to the work, provided that no such requirement shall materially alter the Contractor’s scope of work, contract time, or compensation except by written amendment or change order.

Upon request, Contractor shall execute any additional certifications, acknowledgments, or written amendments reasonably required by Owner to evidence such flow-down compliance.

Upon request, a copy of the then-current Grant Agreement will be provided to the Contractor.

Florida DEP personnel shall be given access to and may observe and inspect any/all work being performed under this contract, with reasonable notice and during normal business hours, including access to work locations or storing or staging equipment, materials or documents. Further, the Owner shall allow and facilitate sampling and monitoring of any substances, soils, materials, or parameters at any work location.

2. State Funds Documentation: Pursuant to section 216.1366, F.S., if Contractor meets the definition of a non-profit organization under Section 215.97(2)(m), F.S., Contractor must provide documentation to the Owner and DEP that indicates the amount of state funds:

a. Allocated to be used during the full term of the contract or agreement for remuneration to any member of the board of directors or an officer of the Contractor.

b. Allocated under each payment by the public agency to be used for remuneration of any member of the board of directors or an officer of the Contractor.

3. Annual Appropriation Contingency: This project is funded in whole or in part by funding through the Department of Environmental Protection. The Owner’s performance and obligation to pay under this Agreement is contingent upon an annual appropriate by the Legislature. If funding should be rescinded by the Legislature for this award, the Owner reserves the right to immediately stop work and be released from future obligations for incomplete work.

4. Invoicing:

a. Contractual Costs: As applicable, invoices must include backup documentation identical to that which the Owner is required to provide to Florida DEP. Contracts which involve payments for direct salaries shall clearly identify the personnel involved, salary rate per hour, and hours spent on the Project. All eligible multipliers used (i.e., fringe benefits, overhead, indirect, and/or general and administrative rates) shall be supported by audit.

If Florida DEP determines that multipliers charged by any contractor or subcontractor exceeded the rates supported by audit, the contractor…