BHB PRS.pdf
PDF 134 KB Posted
- Attached to
- Popular Music Production Federal contract opportunity
- Solicitation number
- W911SD-21-R-0107
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BHB PWS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary (PRS)
Performance Objective (from PWS Section 5)
Performance Standard
Acceptable Quality Level
Method of Surveillance
Incentive / Disincentive
The vendor shall develop the overall concept and original melody, lyrics, style, and texture for four music tracks of three to four minutes in length each.
Contractor will make consistent progress towards the completion date
100% Compliance
- 100% Inspection
The vendor shall provide Musical Instrument Digital Interface (MIDI) mockup demos of each original song and lyrics, at the outset of the recording process, that are acceptable to the USMA Band and meet the intent of the recording project.
Contractor will make consistent progress
The vendor shall provide adequate studio time at a major New York City area recording studio. The studio must offer a large format recording console, large tracking room with grand piano, multiple isolation rooms, an array of top line instruments, current and vintage microphone options, and a selection of analog and digital signal processing, and have a reputable client list of recognizable artists.
Contractor will make consistent progress
The vendor shall provide to the USMA Band a rough engineered multi-track recording of each of the four songs at the conclusion of scheduled studio time.
The vendor shall provide post-production mix and mastering services, including modern processing, effects, digital instruments, and layering techniques to create a high-quality final master recording of each of the four original songs delivered to the USMA Band.
Contractor will make consistent progress
Contractor shall deliver the fully completed work by 15 SEP 2021.
Contractor will execute on time
File details come from the government source that posted it. Updated .