BHB PRS.pdf

PDF 134 KB Posted

Attached to
Popular Music Production Federal contract opportunity
Solicitation number
W911SD-21-R-0107
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

View the file

Other files for this federal contract opportunity

Other files attached to Popular Music Production, newest first.
File Type Posted
BHB PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Requirements Summary (PRS)

Performance Objective (from PWS Section 5)

Performance Standard

Acceptable Quality Level

Method of Surveillance

Incentive / Disincentive

The vendor shall develop the overall concept and original melody, lyrics, style, and texture for four music tracks of three to four minutes in length each.

Contractor will make consistent progress towards the completion date

100% Compliance

- 100% Inspection

The vendor shall provide Musical Instrument Digital Interface (MIDI) mockup demos of each original song and lyrics, at the outset of the recording process, that are acceptable to the USMA Band and meet the intent of the recording project.

Contractor will make consistent progress

The vendor shall provide adequate studio time at a major New York City area recording studio. The studio must offer a large format recording console, large tracking room with grand piano, multiple isolation rooms, an array of top line instruments, current and vintage microphone options, and a selection of analog and digital signal processing, and have a reputable client list of recognizable artists.

Contractor will make consistent progress

The vendor shall provide to the USMA Band a rough engineered multi-track recording of each of the four songs at the conclusion of scheduled studio time.

The vendor shall provide post-production mix and mastering services, including modern processing, effects, digital instruments, and layering techniques to create a high-quality final master recording of each of the four original songs delivered to the USMA Band.

Contractor will make consistent progress

Contractor shall deliver the fully completed work by 15 SEP 2021.

Contractor will execute on time

File details come from the government source that posted it. Updated .