ITB 250597 RE-BID Remove and Replace Munitions Impacted Soils on the India Range Berm
Solicitation number
BD-27-1069-MILDV-30000-135116
Issued by
Massachusetts

About this file

This file is a technical cross-section diagram for the India Range Berm project in Massachusetts, detailing soil remediation and restoration specifications. The document provides engineering schematics for the removal and replacement of munitions-impacted soils on the berm, illustrating the layered construction sequence including removal of existing vegetation and top 40 inches of soil, installation of select sand fill material (maximum 1/8" gradation), erosion control matting (Tensar SC-150 BN or approved equal), and final topsoil placement. The diagram specifies typical sections with dimensions including an 82-foot berm width, 4-inch topsoil depth, 6.56-foot select sand fill height, and variable core fill dimensions, along with notes regarding soil screening requirements, material specifications, and erosion control installation protocols on slopes exceeding 2:1 grade.

All work must be completed by December 30, 2026, with the project scope encompassing removal and disposal of impacted soils, restoration of the inner liner mat with fabric replacement, installation of new 1/4" minus soils across the entire berm surface, jute matting application, and hydroseeding. The cross-section diagram serves as the technical specification guide for contractors bidding on ITB 250597, ensuring uniform implementation of the soil remediation and berm restoration requirements across the project area.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

EXISTING BERM

C

B

A

5'

TOPSOIL &

EROSION

CONTROL

FABRIC

VARIES 8'

(1YP.)

6.56

20.4'

TOP SOIL

SELECT SAND FILL

BACKSTOP CORE FILL�

4' lYPICAL SECTION

@ �MN.T.;:- ZERO RANGE

TOPSOIL

SC-150 BN

EROSION CONTROL MATTING

ON STEEPER THAN 2:1 SLOPES

FINISHED GRADE

SELECT SAND FILL

@ rYf J_f.5

AL SELECT SAND FILL SECTION

18' w :::;; _J lD 1 N w :z: t:;:;

0 a::

4' 1 Q'

82' (25M) w :z:

_J a::

LI..

VARIES

EXISTING GROUND 10: 1

NOTES:

1. REMOVE THE TOP 40 INCHES OF EXISTING VEGETATION AND SOILS

BEFORE INSTALLING THE SELECT MATERIAL.

2. THE SOISL SHALL BE SCREENED TO A MAXIMUM PARTICLE SIZE OF

½" AND ON TOP OF THECORE FILL..

3. THE TOPSOIL SHALL HAVE ALL DEBRIS AND ROCK REMOVED AND

SHALL BE SCREENED TO A MAXIMUM PARTICLE SIZE OF ½"

BEFORE BEING PLACED ON THE SELECT SAND FILL.

4. THE MAXIMUM SIZE GRADATION FOR SELECT SAND FILL MATERIAL

SHALL BE 1 /8"

5. INSTALL EROSION CONTROL MATTING ON ALL SLOPES OVER THE

CORE LAYER AND ON TOP OF THE SELECT FILL LAYER BELOW

THE TOPSOIL. EROSION CONTROL MATTING SHALL BE

TENSAR-SC-150 BN OR AN APPROVED EQUAL.

6. PLACE 4" OF TOPSOIL ON ALL DISTURBED AREAS BEFORE

SEEDING.

7.

X l �

I � I

0 ;§

.0 I')

0 oo ;; I "' •o "ll (.) m 00 I

�N V ;; IX � E 0 X e N e 0

IX) � I .2" Ll') ·;; e 15X m Ii) e • � ex i'l "' c:, il: N

� � U X ii-j!l m �e "E'.2" X e X -� � m X " X -" � /'l X , c:, X °' X V)

I ;

;1;§:li9 1;j i:! c!i;:

0::: i� JI[" <( 8 "" G� -' w

!::!1 z ::::> oI -U l;;;i: <( z�

0:::

a::

::::> �O:z: rnw . ::::;;;(/) wO> a:: 0 < a:: ;;::a..

o:::;;

w-a.. w < :z:

(/) <W-c., 0 z:z:

:z:

�J

WJ

Ill ei] a, V

CJ)

z

I-u w

CJ)

Sheet reference number:

iii .E '-' m <i Cl) .E

C-301

File details come from the government source that posted it. Updated .